Saline-alkali soil remediation composition and preparation method thereof
By using improved mixtures in porous carriers in saline-alkali soil, the problems of poor breathability and poor drainage in saline-alkali soil are solved, and the soil structure and drainage performance are significantly improved, achieving effective restoration of saline-alkali soil.
Patent Information
- Application Number
- CN202411155473.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-11-15
AI Technical Summary
Saline-alkali soil causes deterioration in the living environment of soil microorganisms, poor breathability, and poor drainage, which seriously affects vegetation growth and ecological environment and threatens food security.
A salt-alkali soil repair composition is adopted, including a porous carrier and an improved mixture. The improved mixture is composed of microbial bacteria agents, organic materials, chemical improvers, plant extracts and binders. By filling the pore cavity of the porous carrier, Improve the soil's breathability and hydrophobic drainage performance.
Significantly improves the permeability and hydrophobic drainage performance of the soil, reduces the probability of soil water accumulation, improves the soil structure, and improves the soil restoration effect. It is suitable for the treatment and repair of saline-alkali soil soil.
Smart Images

Figure CN118956412A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of soil remediation, and in particular to a saline-alkali soil remediation composition and a preparation method thereof. Background Art
[0002] Soil salinization has the following reasons. On the one hand, it is the result of the change of the suitable environment for microorganisms to survive due to salinity. The soil microorganisms, carbon, nitrogen, and basic respiration in saline-alkali land are significantly lower than those in ordinary agricultural soils. The reduction of soil salinity will increase the decomposition of organic matter by microorganisms. On the other hand, due to poor drainage, the water rich in salt and alkali cannot be discharged in time, resulting in the retention of salt and alkali in the soil, thus causing soil salinization.
[0003] Soil salinization can cause soil compaction, low porosity, poor soil toughness, poor air permeability and other problems. It can also directly cause toxic effects on many plants. Soil compaction and poor air permeability can cause vegetation root rot, which can seriously affect vegetation growth. Farmland salinization is not suitable for crop cultivation and seriously threatens the ecological environment and food security. Therefore, the control and prevention of land salinization is of great significance. Summary of the invention
[0004] The purpose of the present invention is to solve the above problems and provide a saline-alkali soil remediation composition and a preparation method thereof, so as to solve the technical problems existing in the prior art.
[0005] To achieve the above-mentioned purpose, the technical scheme of the present invention is: a saline-alkali soil remediation composition, comprising: an improved mixture and a porous carrier, wherein the porous carrier is formed with interconnected cavities, at least one end of the cavities is connected to the outside, and the improved mixture is at least filled in the cavities; the improved mixture comprises: microbial agents, organic materials, chemical modifiers, plant extracts and adhesives, wherein the mass ratio of the porous carrier, microbial agents, organic materials, chemical modifiers, plant extracts and adhesives is (100-200): 1: 20: 10: 5: 8. Furthermore, the microbial agents include arbuscular mycorrhizal fungi and Bacillus.
[0006] Furthermore, the organic materials include humic acid, straw and manure.
[0007] Furthermore, the chemical modifier includes gypsum, sulfur and calcium chloride.
[0008] Furthermore, the plant extract includes seaweed extract and amino acids, and the mass ratio of the seaweed extract to the amino acids is (3-4):2.
[0009] Furthermore, the present application also provides a method for preparing a saline-alkali soil remediation composition, comprising the following steps: Step 1: preparing a porous carrier; Step 2, preparing the improved mixture according to the weight ratio; Step three: mix the porous carrier prepared in step one and the improved mixture prepared in step two according to a weight ratio, so that the improved mixture fills the pores of the porous carrier.
[0010] Furthermore, in step 1, preparing the porous carrier includes: S10, mixing the fly ash, soil and coal gangue to prepare a slurry with a water content of 20%-30%; S11, adding paraffin particles into the slurry, the volume ratio of the paraffin particles to the slurry is 3: (5-8), and the paraffin particles and the slurry are mixed and stirred evenly; S12, dehydrating the mixture obtained in step S11, granulating it, and then drying it, and the dried paraffin particles melt and flow out, thereby obtaining a porous carrier with interconnected cavities inside.
[0011] Furthermore, the porous carrier prepared in step one is cooled, and when the temperature of the porous carrier is cooled to 50 degrees Celsius-60 degrees Celsius, it is mixed with the improved mixture prepared in step two, and then placed in a negative pressure chamber for cooling so that the improved mixture is filled in the porous carrier.
[0012] Further, when the improved mixture and the porous carrier are mixed, the temperature difference between the temperature of the mixed improved mixture and the temperature of the porous carrier does not exceed 10 degrees Celsius.
[0013] Furthermore, the radius of the paraffin particles is 0.5 mm-1.5 mm.
[0014] The invention discloses a saline-alkali soil remediation composition and a preparation method thereof. The saline-alkali soil remediation composition can be prepared by the preparation method. Compared with the prior art, the saline-alkali soil remediation composition has the following beneficial effects: the soil can be improved by a porous carrier-improved mixture in a porous carrier, and after the composition is decomposed and absorbed, the pores in the porous carrier can improve the air permeability and hydrophobic drainage performance of the soil, thereby improving the soil and improving the soil hydrophobic drainage performance, and reducing the probability of soil waterlogging, thereby improving the soil and improving the soil drainage, and achieving a better soil remediation effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 The process of preparing a saline-alkali soil remediation composition of the present invention is as follows Figure 1 .
[0016] Figure 2 The process of preparing a saline-alkali soil remediation composition of the present invention is as follows Figure 2 .
[0017] Figure 3 The schematic diagram of the structure of the preparation system used in the preparation method of the present invention.
[0018] Figure 4 It is a schematic diagram of the structure of the conveying device in the preparation system of the present invention.
[0019] Figure 5 for Figure 3 A side structural schematic diagram of the conveying device of the present invention.
[0020] Figure 6 This is a schematic diagram of the structure of the collection bin in the preparation system used in the present invention.
[0021] Figure 7 It is a partial enlarged structural schematic diagram of the air intake assembly in the present invention.
[0022] Figure 8 It is a structural schematic diagram of the valve stem and valve plate in the present invention.
[0023] Fig. 9 It is a partial enlarged structural schematic diagram of the movable sleeve in the present invention.
[0024] Fig.10 It is a schematic diagram of the structure of the heat locking member in the present invention.
[0025] Fig.11 It is a partial enlarged structural schematic diagram of the hot extrusion component and the air pressure buffer component in the present invention.
[0026] Fig.12 For the present invention Figure 4 Schematic diagram of the local enlarged structure at point A in the middle.
[0027] Fig.13 It is a schematic diagram of the partially enlarged structure of the driving member in the present invention.
[0028] In the figure: 1. first silo; 10. mixing silo; 11. auger conveying mechanism; 12. pump body; 13. feed pipe; 14. first sub-silo; 141. power telescopic rod; 15. second sub-silo; 151. discharge port; 152. second shaft; 153. valve plate; 16. detection plate; 17. rotating shaft; 18. angle sensor; 2. conveyor belt; 22. baffle; 23. support frame; 24. first drive motor; 3. collection silo; 31. negative pressure silo; 310. shielding plate; 311. discharge port; 32. collection funnel; 3 21. first electric control valve; 33. air pump; 331. air outlet; 34. air inlet pipe; 35. hot extrusion assembly; 350. first extrusion chamber; 351. heat-conducting cylinder; 352. second piston; 353. thermal expansion flow medium; 354. second compression spring; 355. air communication pipe; 36. air inlet assembly; 361. first filter chamber; 3610. first flow channel; 3611. position limiting step; 3612. second vent; 3613. first vent; 3614. first communication pipe; 362. second filter chamber; 36 20, second flow channel; 3621, second connecting pipe; 3622, third vent; 3623, fourth vent; 363, air inlet; 3630, first air outlet; 3631, pressure valve; 3632, air permeable plate; 365, valve stem; 366, temperature sensor; 3651, first valve plate; 3652, tension spring; 3653, second valve plate; 3654, connecting plate; 3655, movable sleeve; 36551, threaded hole; 3656, hanging column; 367, driving member; 3671, piston cylinder; 367 2. First piston; 3673. First piston rod; 3674. Support plate; 3675. First compression spring; 3676. Second connecting air channel; 3677. Connecting air channel; 368. Thermal locking member; 3681. Support ring body; 3682. Thermal expansion bellows; 3683. Locking friction block; 37. Air pressure buffer assembly; 370. Connecting space; 371. Second extrusion chamber; 372. Buffer chamber; 373. Third compression spring; 375. Fourth piston; 376. Third piston; 377. Air vent; 38. Electric control valve. DETAILED DESCRIPTION
[0029] The present invention will now be described in further detail with reference to the accompanying drawings. The accompanying drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and thus only show the components related to the present invention.
[0030] Embodiment 1 The technical scheme of the present invention is: a saline-alkali soil repair composition, comprising: an improved mixture and a porous carrier, wherein the porous carrier is formed with interconnected cavities, at least one end of the cavities is connected to the outside, and the improved mixture is at least filled in the cavities; the improved mixture comprises: microbial agents, organic materials, chemical improvers, plant extracts and adhesives, wherein the mass ratio of the porous carrier, the microbial agents, the organic materials, the chemical improvers, the plant extracts and the adhesives is 100:1:20:10:5:8; an alkaline sample plot is selected, the composition is mixed in the sample soil, the soil is applied to a depth of 20cm-25cm, and the weight of the composition applied per square meter is 0.03kg / m 2 , vegetation was planted on the sample soil and grown for two months. After two months, the soil pH value and permeability were tested.
[0031] Embodiment 2 Select an alkaline sample plot, mix the composition in the sample soil, the mass ratio of the porous carrier, microbial agent, organic material, chemical modifier, plant extract and adhesive in the composition is 150:1:20:10:5:8; apply to the soil depth of 20cm-25cm, and the weight of the composition applied per square meter is 0.03kg / m 2 , vegetation was planted on the sample soil and grown for two months. After two months, the pH value and water permeability were tested.
[0032] Embodiment 3 Select an alkaline sample plot, mix the composition in the sample soil, the mass ratio of the porous carrier, microbial agent, organic material, chemical modifier, plant extract and adhesive in the composition is 200:1:20:10:5:8; apply the soil to a depth of 20cm-25cm, and the weight of the composition applied per square meter is 0.03kg / m 2 , vegetation was planted on the sample soil and grown for two months. After two months, the pH value and water permeability of the soil were tested.
[0033] As can be seen from the above table, the composition provided by the present application is applied to alkaline soil through the porous support-improved mixture in the porous support body when in use. The improved mixture can improve the soil. After the composition is decomposed and absorbed, the pores in the porous support body can improve the air permeability and hydrophobic drainage performance of the soil, thereby improving the soil and improving the hydrophobic drainage performance of the soil, and reducing the probability of water accumulation in the soil, thereby achieving better soil remediation effects, and can reduce the pH value of the soil to about 7, and the water permeability coefficient is 0.28 meters per day, significantly improving the pH value and water permeability coefficient of alkaline soil.
[0034] Further, as a specific implementation, the microbial agent includes at least one of arbuscular mycorrhizal fungi and bacillus. Specifically, arbuscular mycorrhizal fungi can form a symbiotic relationship with plant roots, help plants absorb nutrients, and improve plant stress resistance; bacillus can decompose organic matter, produce organic acids, reduce soil pH, and alleviate salinity hazards. In actual implementations, the ratio of arbuscular mycorrhizal fungi and bacillus can be adjusted according to soil properties, specifically: according to the mass ratio, the ratio of arbuscular mycorrhizal fungi and bacillus in the biological agent is (0.5-2):1.
[0035] Furthermore, as a specific implementation method, the organic material includes humic acid, straw, and manure. Specifically, the organic material can improve the soil structure, increase the soil porosity and water retention, and improve the soil aeration. At the same time, the organic material can also provide nutrients for microorganisms, promote the growth and metabolism of microorganisms, and further improve the soil environment. In the actual implementation process, the humic acid, straw, and manure in the organic material are prepared according to a weight ratio of 1:1.5:1. In the actual process, the organic material is ground after drying and crushed into a particle size of 800 mesh to 1000 mesh.
[0036] Furthermore, the chemical improver includes gypsum, sulfur, and calcium chloride. Specifically, the chemical improver can neutralize soil alkalinity, reduce soil salt content, and improve soil texture. The chemical improver is composed of gypsum, sulfur, and calcium chloride. These improvers can react with alkaline substances in the soil to generate stable compounds, thereby reducing soil alkalinity. The gypsum, sulfur, and calcium chloride in the chemical improver are configured according to a weight ratio of 1:0.5:1.5. In the actual process, the chemical improver is crushed into a particle size of 500 to 800 meshes by a crushing device.
[0037] Furthermore, as a specific embodiment, the plant extract includes seaweed extract and amino acid, and the mass ratio of seaweed extract to amino acid is (3-4): 2. They can promote plant growth, improve plant stress resistance, improve soil environment and porous carriers, and the combination of these components can be adjusted according to the specific conditions of saline-alkali land to achieve the best restoration effect.
[0038] Embodiment 4 The present application also provides a method for preparing a saline-alkali soil remediation composition, which is used to prepare a saline-alkali soil remediation composition provided in the present application, referring to Figure 1 , Figure 2 , specifically including the following steps: Step 1: Prepare a porous carrier; wherein the porous carrier is prepared by sintering, and the specific preparation method is referred to below.
[0039] Step 2: Prepare the improved mixture according to the weight ratio; specifically, when preparing the improved mixture, put each component into a stirring mixing chamber, then add clean water, and then mix and stir to prepare a mixture with a water content of 25%-35%.
[0040] Step three: Mix the porous carrier prepared in step one and the improved mixture prepared in step two according to a weight ratio, so that the improved mixture fills the pores of the porous carrier.
[0041] Specifically, after the improved mixture is filled in the porous carrier, the porous carrier is dried to obtain a saline-alkali soil remediation composition. It should be noted that an adhesive is added to the improved mixture, wherein the adhesive is plant starch, so that the improved mixture prepared in step 2 has viscosity, so that after most of the improved mixture is filled in the porous carrier, the excess part can still adhere to the surface of the porous carrier. Through the above method, the improved mixture is filled in the porous carrier, so that when applied to the land, the improved mixture can prevent soil from entering the porous carrier. After being applied to the land, the substances in the improved mixture can be decomposed by microorganisms and absorbed by plants, and the soil is improved. The holes inside the porous carrier can be hydrophobic and permeable, thereby improving the water permeability of the soil.
[0042] Further, as a specific implementation method, refer to Figure 2 In step 1, preparing a porous carrier comprises: S10, mixing the fly ash, soil and coal gangue to prepare a slurry with a water content of 20%-30%; S11, adding paraffin particles into the slurry, the volume ratio of the paraffin particles to the slurry is 3: (5-8), and the paraffin particles and the slurry are mixed and stirred evenly; S12, dehydrating the mixture obtained in step S11, granulating it, and then drying it, and the dried paraffin particles melt and flow out, thereby obtaining a porous carrier with interconnected cavities inside.
[0043] Specifically, paraffin wax and slurry are mixed in the above manner, and then dehydrated and granulated. The obtained granules will be evenly filled with paraffin wax particles. Since paraffin wax has a low melting point, it can melt when heated, thereby preparing a porous carrier. In step S12, when drying the granules, first maintain the drying temperature at 40-50 degrees Celsius for 30 minutes to 1 hour. This process can fully soften the paraffin wax particles and fully heat the granules to preliminarily dry the moisture inside the granules, thereby ensuring that the porous carrier can maintain its original state after the paraffin melts. Then the temperature is raised to 80-90 degrees Celsius and maintained for 30 minutes. This process can melt the paraffin and flow out, and dry the moisture in the porous carrier. Then the temperature is continued to be raised to 800-1000 degrees Celsius for sintering, thereby obtaining a porous carrier. The porous carrier prepared in this way not only has a hydrophobic effect in the internal pores, but also has a pore wall with a pore size and good water permeability.
[0044] Furthermore, as a specific implementation method, the porous carrier prepared in step one is cooled, and when the temperature of the porous carrier is cooled to 50 degrees Celsius-60 degrees Celsius, it is mixed with the improved mixture prepared in step two, and then placed in a negative pressure chamber for cooling so that the improved mixture is filled in the porous carrier.
[0045] Specifically, through the above-mentioned setting method, the porous carrier is mixed with the improved mixture when the residual temperature is 50-60 degrees Celsius. During mixing, the improved mixture wraps the porous carrier. On the one hand, the water in the improved mixture can be evaporated under the residual temperature of the porous carrier. On the other hand, in the cooling stage after the two are mixed, the temperature of the pores inside the porous carrier is reduced, and the internal air pressure is reduced, so that the improved mixture can be adsorbed and flowed into the pores inside the porous carrier under the action of negative pressure, so that the improved mixture can be more easily filled in the porous carrier. The porous carrier itself is water-absorbent and can absorb the water inside the improved mixture, so that the improved mixture can be dehydrated faster and attached to the porous carrier, thereby improving the efficiency of preparing saline-alkali soil remediation composition.
[0046] Further, when the improved mixture and the porous carrier are mixed, the temperature difference between the temperature of the mixed improved mixture and the temperature of the porous carrier does not exceed 10 degrees Celsius.
[0047] Specifically, by controlling the temperature of the improved mixture so that the temperature difference between the two does not exceed 10 degrees Celsius, a large amount of water vapor will not be generated instantaneously when the two are mixed, thus avoiding the problem of high-pressure water vapor being retained inside the porous carrier due to the instantaneous generation of a large amount of steam. This is more conducive to the improved mixture flowing into the porous carrier under the action of negative pressure during the cooling stage.
[0048] It should be noted that in the actual preparation process, part of the modified mixture that has not entered the porous carrier will adhere to the surface of the porous carrier, and then be processed by a rolling granulator after cooling, so that the modified mixture is evenly adhered to the surface of the porous carrier, making the porous carrier into columnar or spherical particles.
[0049] Furthermore, as a specific implementation, the radius of the paraffin particles is 0.3 mm-0.6 mm.
[0050] Specifically, the porous carrier prepared in the present application is generally spherical or cylindrical, with a radius of 3-5 mm. By controlling the radius of the paraffin particles to 0.3 mm-0.6 mm, it can adapt to the size of the expanded carrier to ensure that suitable holes can be formed inside.
[0051] Embodiment 5 Furthermore, the present application also provides a preparation system for preparing a saline-alkali soil remediation composition, and the composition is prepared by using the system according to the method described in Example 4, referring to Figure 3-Figure 13 The system includes a first silo 1 for placing a porous carrier and a stirring silo 10 for preparing and holding an improved mixture, and the side walls of the first silo 1 and the stirring silo 10 are thermally connected. After the porous carrier is fired, it is cooled to a temperature of 80-90 degrees Celsius and collected inside the first silo 1. At this time, the improved mixture is prepared by the stirring silo 10. During the stirring preparation process, the residual temperature inside the first silo 1 can be used to heat the improved mixture. The stirring silo 10 is also equipped with a heating component to heat the material in the stirring silo, and can be heated to a predetermined temperature during the stirring process when working.
[0052] Furthermore, the system also includes a mixing unit, wherein the mixing unit includes a conveyor belt 2, a first sub-bin 14 and a second sub-bin 15 which are arranged above the conveyor belt at intervals along the conveying direction, the first sub-bin 14 is connected to the first bin 1 through an auger conveying mechanism 11, and the second sub-bin 15 is connected to the feed pipe 13 through a pump body 12, and a collecting bin 3 is arranged at the rear end of the conveyor belt. When the temperature of the material inside the first bin 1 is cooled to 50 degrees Celsius-60 degrees Celsius, and the temperature difference between the material temperature in the mixing bin 10 and the material in the first bin is within 10 degrees Celsius, the mixing bin 10 stops stirring, and the auger conveying mechanism 11 and the pump body 12 are controlled to work and convey the material according to the weight ratio of the material. The porous carrier is spread on the conveyor belt 2 by the first sub-bin 14, and the conveyor belt drives the material to be conveyed to the bottom of the second sub-bin 15. The second sub-bin spreads the slurry-like improved mixture on the surface of the porous carrier, and the improved mixture adheres to the surface of the porous carrier, and then is conveyed to the top of the collecting bin 3 and the dropped material is collected by the collecting bin 3.
[0053] Further, refer to Figure 4 , Figure 5 , Fig.12 The conveyor belt 2 is arranged on a support frame 23 and is driven by a first driving motor 24. Two baffles 22 are arranged on the upper surface of the conveyor belt. The first sub-bin 14 and the second sub-bin are arranged between the two baffles 22 along the width direction of the conveyor belt 2. Power telescopic rods 141 are arranged on both sides of the first sub-bin 14. The two power telescopic rods are arranged synchronously. The extension and shortening of the power telescopic rod 141 can adjust the distance between the discharge port of the first sub-bin 14 and the upper surface of the conveyor belt. When the distance between the discharge port of the first sub-bin 14 and the upper surface of the conveyor belt is large, the thickness of the porous carrier spread on the surface of the conveyor belt is large, otherwise the thickness is thin, so that the paving thickness of the porous carrier can be adjusted by the power telescopic rod 141, wherein the power telescopic rod is an electric telescopic rod.
[0054] Furthermore, between the first material distribution bin and the second material distribution bin, a rotating shaft 17 is rotatably provided on two baffles 22 along the width direction of the conveyor belt, a detection plate 16 is provided on the rotating shaft 17, the rotating shaft 17 and the detection plate 16 are non-rotatably matched, the rotating shaft 17 is also provided with an angle sensor 18, and a torsion spring (not shown in the figure) is provided between the rotating shaft 17 and at least one baffle 22, refer to Figure 4 , under the elastic force of the torsion spring (not shown in the figure), the lower end of the detection plate 16 can be pressed against the upper surface of the conveyor belt 2; Fig.12 The second sub-bin is provided with a discharge port 151, and a second shaft 152 is provided in the discharge port along the width direction of the conveyor belt, and a valve plate 153 is provided on the second shaft. The second shaft is connected to a second driving motor (not shown in the figure). The deflection angle of the second shaft 152 can be adjusted by the driving motor, thereby adjusting the position of the valve plate 153 to adjust the size of the opening of the discharge port 151. The power telescopic rod 141 and the second driving motor (not shown in the figure) are connected to the angle sensor 18. When the conveyor belt 2 is transported, when the porous carrier spread on the conveyor belt passes through the detection plate 16, it can push the detection plate 16 to drive the rotating shaft 17 to deflect. The angle sensor 18 obtains the paving thickness of the porous carrier by obtaining the deflection angle of the rotating shaft 17, thereby controlling the second driving motor (not shown in the figure) to deflect at a suitable angle, and adjusting the opening of the discharge port 151 to make the amount of the porous carrier match the amount of the improved mixture.
[0055] Further, refer to Figure 6The collecting bin 3 includes a negative pressure bin 31, a collecting funnel 32 arranged on the top of the negative pressure bin, and a first electrically controlled valve 321 arranged between the collecting funnel and the negative pressure bin 31. An air outlet 331 and an air inlet pipe 34 are arranged on the side wall of the negative pressure bin 31. The air outlet 331 is connected to an air pump 33. One end of the air inlet pipe is connected to the inside of the negative pressure bin 31, and the other end is connected to an air inlet assembly 36. A discharge port 311 is also arranged at the bottom of the negative pressure bin, and a baffle plate 310 is arranged on the side wall of the negative pressure bin above the air outlet end of the air inlet pipe 34.
[0056] Specifically, during operation, the discharge port 311 is closed, and the air pump 33 works to discharge the gas inside the negative pressure chamber so as to form a certain negative pressure inside the negative pressure chamber. After the material on the conveyor belt is conveyed to the very end, it falls into the collecting funnel 32 under the action of gravity. By setting a position sensor (not shown in the figure) in the collecting funnel 32, when a certain amount of material is collected in the collecting funnel 32, the first electrically-controlled valve 321 is controlled to open, and the material inside the collecting funnel enters the negative pressure bin 31 and is collected. The negative pressure bin can discharge the steam generated by the material in time, and can reduce the concentration of the mixed gas in the material in a negative pressure environment until the material mixing is completed. The material is collected at the bottom of the negative pressure chamber 31, and then the first electrically-controlled valve 321 is closed, and the air pump works for a predetermined time at intervals to maintain a certain negative pressure inside the negative pressure chamber and discharge the water vapor above the negative pressure chamber in time.
[0057] Further, refer to Figure 6 The air inlet pipe 34 adopts a metal heat-conducting pipe and is provided with a bending section at the bottom of the negative pressure chamber. The air inlet component 36 is connected to the high-pressure gas source. When the air pump is working, when the negative pressure value inside the negative pressure chamber reaches a predetermined value, the air inlet component 36 can be opened to inhale the external high-temperature gas. When the high-temperature gas passes through the air inlet pipe 34, it can heat the surrounding materials and increase the dissipation rate of the moisture inside the materials. Since the negative pressure chamber has a negative pressure, it can speed up the steam overflow speed and reduce the length of time that the steam stays in the material. When steam is generated, the steam can be discharged by the air pump 33 in time with the air flow, which also helps to discharge the gas retained in the porous carrier, thereby facilitating the filling of the slurry-like improved mixture into the porous carrier.
[0058] Furthermore, a detection sensor (not shown in the figure) for detecting the humidity of the material is provided on the side wall of the negative pressure chamber. When the humidity of the material drops to 15%-20%, the improved mixture basically does not flow and can be fully combined with the porous carrier; at this time, the air inlet component 36 stops connecting to the normal temperature gas, cools the material, and maintains the negative pressure inside the negative pressure chamber until the temperature drops to room temperature (25-30 degrees Celsius). During this process, the temperature drops, and the pressure of the small amount of air retained in the pores inside the porous carrier decreases, thereby further improving the bonding strength between the material and the porous carrier, making it difficult for the material to separate from the porous carrier, and then controlling the air pump 33 to stop working, so that the negative pressure chamber returns to atmospheric pressure, and then opening the discharge port 311 to guide the material out of the negative pressure chamber. After being guided out, the porous carrier is processed by a rolling granulator, so that the improved mixture is fully wrapped and combined with the porous carrier, and then dried.
[0059] Further, for a full explanation, refer to Figure 7-Figure 11 , Fig.13 As a specific implementation, the specific structure of the air intake assembly 36 is as follows: it includes a rigid outer shell arranged on the outer side wall of the negative pressure chamber 31, a first air outlet 3630 communicating with the air intake pipe 34 is arranged in the rigid outer shell, an air intake duct 363 communicating with the first air outlet, an air permeable plate 3632 arranged at the port of the first air outlet 3630, and a pressure valve 3631 arranged between the air intake duct 363 and the air permeable plate 3632, the pressure valve opens when the air pressure difference on both sides reaches a predetermined value; it also includes a first filter chamber 361 and a second filter chamber 362 arranged on both sides of the air intake duct 363, a first flow channel 3610 and a second flow channel 3620, gas filters are arranged in the first filter chamber and the second filter chamber, the first filter chamber is provided with a first vent 3613 communicating with the air intake duct 363 and a pressure valve 3631 connected to the air intake duct 363. A second vent 3612 is connected to the first flow channel 3610, the second filter chamber is provided with a third vent 3622 connected to the air inlet channel 363 and a fourth vent 3623 connected to the second flow channel 3620, the first flow channel 3610 is provided with a first connecting pipe 3614 for connecting to the porous carrier drying device, the second flow channel 3620 is provided with a second connecting pipe 3621, the second connecting pipe 3621 is used to connect to the air flow dryer, a valve stem 365 is provided on the guide of the rigid outer shell, a first valve plate 3651 and a second valve plate 3653 are provided at both ends of the valve stem 365, a tension spring 3652 is provided between the rigid shell and the valve stem, and a limiting step 3611 is also provided to limit the valve stem, and the valve stem can be abutted against the limiting step under the elastic force of the tension spring 3652, refer to Figure 7At this time, the first valve plate 3651 is located above the second air vent 3612, and the second valve plate 3653 blocks the fourth air vent 3623. At this time, when the air pump 33 works to make the air pressure inside the negative pressure chamber lower than the predetermined value, the pressure valve 3631 opens, thereby generating a negative pressure in the air inlet 363. Under the action of the negative pressure, the high-temperature airflow inside the porous carrier drying body can enter the first connecting pipe, enter the first flow channel 3610 through the first connecting pipe 3614, and then enter the first filter chamber 361 to be filtered, enter the air inlet 363, and then enter the air inlet pipe 34. The internal material is heat exchanged through the air inlet pipe, so that the preheating inside the drying chamber can be fully utilized to achieve the purpose of saving energy.
[0060] Further, refer to Figure 7 A mounting groove is provided around the valve stem 365 on the side wall of the first flow channel 3610, and a heat locking member 368 is provided in the mounting groove. The heat locking member 368 can lock the valve stem 365 when the temperature inside the first flow channel 3610 is above 40 degrees Celsius, and keep the first valve plate 3651 in a state of opening the second vent 3612. Fig.10 The structure of the thermal locking member 368 is as follows: it includes a support ring body 3681, a plurality of locking components arranged around the axis of the support ring body, the locking components include a locking friction block 3683 and a thermal expansion bellows 3682, wherein the thermal expansion bellows is made of plastic or metal material with good thermal conductivity, preferably copper, and is filled with a thermal expansion medium. When the temperature inside the first flow channel 3610 exceeds 40 degrees Celsius, the thermal expansion bellows 3682 can extend to make the locking friction block 3683 contact the valve stem, and lock the valve stem through friction. When the temperature inside the first flow channel 3610 is lower than 40 degrees Celsius, the thermal expansion bellows 3682 contracts to make the locking friction block 3683 contact the valve stem. The wiper block 3683 is separated from the valve stem and is in a released state. In this way, the valve stem can be locked when the drying chamber is fully preheated, and the preheating of the drying chamber can be continuously utilized. When the residual temperature in the drying chamber is low and the material cannot be fully heated, the valve stem is released, and it is convenient to drive the valve stem to move, so that the first valve plate 3651 blocks the second air vent 3612, and the second valve plate opens the fourth air vent 3623, so that the air pipe is connected to the second filter chamber 362. When air flows into the second connecting pipe 3621, the air flow dryer connected thereto is controlled to work at the same time, so that the high-temperature air flow generated by the air flow dryer can be utilized. As a specific implementation method, refer to Figure 7 , Figure 8 A support plate 3674 is provided in the second flow channel 3620, a connecting plate 3654 is provided on the second valve plate 3653, and a driving member 367 is provided between the connecting plate 3654 and the supporting plate. The driving member 367 can drive the valve stem 365 to move in the direction of the elastic force of the tension spring 3652 when the temperature flowing into the inlet channel 363 is lower than 40 degrees Celsius, thereby driving the first valve plate and the second valve plate to switch. Figure 7A temperature sensor 366 is provided in the air inlet duct 363. As a specific implementation, the driving member 367 can be an electric telescopic rod.
[0061] Further, as a preferred embodiment, refer to Figure 6 , Fig.11 , Fig.13 The driving member 367 includes a piston cylinder 3671 arranged on the support plate, a first piston 3672 arranged in the piston cylinder, a first piston rod 3673 guided at the end of the piston cylinder, and a first compression spring arranged between the first piston and the support plate. The first piston rod is connected to the first piston, and the other end is connected to the connecting plate 3654. A connecting air channel 3677 connected to the atmosphere is provided at the bottom of the piston cylinder, and a second connecting air channel 3676 is provided at the other end; a hot extrusion component 35 is provided at the bottom of the negative pressure chamber 31, and a gas pressure buffer component 37 is provided on the outer wall of the negative pressure chamber. Fig.11 The hot extrusion assembly 35 includes a heat-conducting cylinder 351, a second piston 352 disposed in the heat-conducting cylinder, a heat-expanding fluid medium 353 filled above the second piston, a sealing end cover is disposed at the lower end of the heat-conducting cylinder, a second compression spring 354 is disposed between the sealing end cover and the second piston, and a first extrusion chamber 350 is formed between the second piston and the sealing end cover; the air pressure buffer assembly 37 includes a rigid cylinder, two annular plates are disposed at intervals in the middle area of the rigid cylinder, and a buffer chamber 372 and a second annular plate are formed on the side away from each other. The extrusion chamber 371 forms a connecting space 370 between the two annular plates, and the connecting space 370 is connected to the first extrusion chamber 350 through the connecting air pipe 355; a third piston 376 is arranged in the buffer chamber 372, and a venting port 377 is arranged at the bottom; a fourth piston 375 is arranged in the second extrusion chamber 371, and a second air pipe connected to the second connecting air channel 3676 is arranged at the upper end, and an electric control valve 38 is arranged on the second air pipe, and a third compression spring 373 is arranged between the bottom of the buffer chamber away from the annular plate and the third piston 376, refer to Figure 8 A movable sleeve 3655 is provided on the valve stem, a hanging column 3656 is provided on the movable sleeve, and a threaded hole 36551 is provided on the movable sleeve. The locking stud can be connected to the valve stem through a threaded connection, and the position of the movable sleeve can be adjusted conveniently. The hanging column 3656 is hung and matched with the tension spring 3652.
[0062] By the above arrangement, in the initial state where there is no material in the negative pressure chamber 31, the electric control valve 38 is in a closed state. At this time, the initial states of the hot extrusion component 35, the air pressure buffer component 37 and the driving member 367 are as follows: Fig.11 , Fig.13 As shown, the positions of the valve stem 365 and the two valve plates are as follows Figure 7As shown, the whole system starts to work, and the material enters the negative pressure chamber. The material has an initial temperature of about 50 degrees Celsius, so that the heat-conducting cylinder 351 can be heated to expand the heat-expanding flow medium 353 inside it, and the second piston 352 is pushed to move, thereby squeezing the gas inside the first extrusion chamber to flow to the connecting space 370. In the initial state, the electric control valve 38 is closed. Since the electric control valve is closed, the gas cannot flow out of the second extrusion chamber. Therefore, the movable distance of the fourth piston 375 is limited, and the third piston can be squeezed to resist the elastic movement of the third compression spring 373 to buffer the air pressure. At this time, the driving member 367 does not move; After negative pressure is generated in the negative pressure chamber to open the pressure valve 3631, the air flow in the drying chamber flows to the air inlet 363. If the temperature in the drying chamber is higher than 40 degrees Celsius, the heat locking member 368 can lock the valve stem. The temperature sensor 366 detects that the temperature exceeds 40 degrees Celsius and controls the electric control valve 38 to remain closed. When the temperature inside the drying chamber is lower than 40 degrees Celsius, the heat locking member 368 releases the valve stem. The temperature sensor 366 detects that the temperature is lower than 40 degrees Celsius and controls the electric control valve 38 to open. At this time, the thermal expansion flow medium in the heat-conducting cylinder remains in an expanded state. At this time, the third piston is pushed under the elastic force of the third compression spring 373. 376 moves, thereby pushing the fourth piston 375 to move, squeezing the gas in the second extrusion chamber to flow into the piston cylinder 3671, and pushing the first piston 3672 to resist the elastic force of the first compression spring 3675 under the action of air pressure, thereby pulling the valve stem 365 to move through the first piston rod 3673 until the movable sleeve 3655 abuts against the end of the first flow channel 3610. At this time, the first valve plate 3651 is in a state of covering the second vent 3612, and the second valve plate 3653 opens the fourth vent 3623, completing the switching. At this time, the air enters through the second connecting pipe 3621, and the air is heated by the air flow dryer Flow, keep the air flow temperature at 45-50 degrees Celsius, until the material humidity inside the negative pressure chamber drops to a predetermined value, and the air flow dryer stops working. At this time, the air flow entering is a normal temperature air flow, which can cool the material. During the cooling process of the material, the thermal expansion flow medium in the heat-conducting cylinder gradually shrinks and recovers to its initial state, then the second piston returns to its initial position, the driving member 367 also gradually returns to its initial position, and the valve stem also returns to its initial position under the pull of the tension spring 3652. During this process, the electric control valve remains in an open state. After the humidity of the material reaches a predetermined value and the air pump stops working, the electric control valve 38 also switches to a closed state.
[0063] It should be noted that the system further includes a control device, which is connected to the electric control valve 38, the temperature sensor 366, the air pump 33 and a detection sensor for detecting the humidity of the material in the negative pressure chamber 31. The air pump 33 is controlled to work intermittently by the control device. For example, the air pump is controlled to work once at an interval of 15 minutes. The air pump works for 3-5 minutes each time to ensure the negative pressure in the negative pressure chamber and to introduce external high-temperature gas to heat the internal material. In the initial state of the system, the electric control valve 38 is controlled to be closed. At this time, the air pump introduces the waste heat of the drying chamber through the first connecting pipe 3614 when working, and the temperature sensor 366 is controlled to work only after the air pump has worked for 1 minute to ensure that there is airflow passing through the air inlet duct 363, so as to detect the temperature of the airflow. When the airflow temperature drops to below 40°C, the electric control valve is controlled to open. After the electric control valve 38 is opened, The electric control valve is controlled to remain in an open state until the material humidity reaches a predetermined value and then the electric control valve 38 is controlled to close.
[0064] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. A saline-alkali soil remediation composition, characterized in that: include: An improved mixture and a porous carrier, wherein the porous carrier is formed with interconnected cavities, at least one end of the cavity is connected to the outside, and the improved mixture is at least filled in the cavity; the improved mixture includes: microbial agents, organic materials, chemical modifiers, plant extracts and adhesives, wherein the mass ratio of the porous carrier, microbial agents, organic materials, chemical modifiers, plant extracts and adhesives is (100-200):1:20:10:5:
8.
2. The saline-alkali soil remediation composition according to claim 1, characterized in that: The microbial agents include arbuscular mycorrhizal fungi and bacillus.
3. The saline-alkali soil remediation composition according to claim 1, characterized in that: The organic materials include humic acid, straw and manure.
4. The saline-alkali soil remediation composition according to claim 1, characterized in that: The chemical modifiers include gypsum, sulfur and calcium chloride.
5. The saline-alkali soil remediation composition according to claim 1, characterized in that: The plant extract comprises seaweed extract and amino acids, and the mass ratio of the seaweed extract to the amino acids is (3-4):
2.
6. A method for preparing the saline-alkali soil remediation composition according to any one of claims 1 to 5, characterized in that: The following steps are involved: Step 1: preparing a porous carrier; Step 2, preparing the improved mixture according to the weight ratio; Step three: Mix the porous carrier prepared in step one and the improved mixture prepared in step two according to a weight ratio, so that the improved mixture fills the pores of the porous carrier.
7. The method for preparing the saline-alkali soil remediation composition according to claim 6, characterized in that: In step 1, preparing a porous carrier includes: S10, mixing the fly ash, soil and coal gangue to prepare a slurry with a water content of 20%-30%; S11, adding paraffin particles into the slurry, the volume ratio of the paraffin particles to the slurry is 3: (5-8), and the paraffin particles and the slurry are mixed and stirred evenly; S12, dehydrating the mixture obtained in step S11, granulating it, and then drying it, and the dried paraffin particles melt and flow out, thereby obtaining a porous carrier with interconnected cavities inside.
8. The method for preparing the saline-alkali soil remediation composition according to claim 7, characterized in that: The porous carrier prepared in step one is cooled, and when the temperature of the porous carrier is cooled to 50 degrees Celsius-60 degrees Celsius, it is mixed with the improved mixture prepared in step two, and then placed in a negative pressure chamber for cooling so that the improved mixture is filled in the porous carrier.
9. The method for preparing the saline-alkali soil remediation composition according to claim 7, characterized in that: When the improved mixture and the porous carrier are mixed, the temperature difference between the temperature of the mixed improved mixture and the temperature of the porous carrier does not exceed 10 degrees Celsius.
10. The method for preparing the saline-alkali soil remediation composition according to claim 7, characterized in that: The radius of the paraffin particles is 0.5 mm to 1.5 mm.
Citation Information
Cited By
Filtering device for saline-alkali soil improvement
CN119586376A
Saline-alkali soil remediation composition and preparation method thereof
CN120158303A
Mixing device for repairing saline-alkali soil based on fly ash and repairing method thereof
CN120304077A
