Metro station side wall construction formwork unit and system and side wall construction method
By using the formwork units of hydraulic cylinder drive parts and adjustment components in the side wall construction of subway stations, high-strength active support and accurate vertical adjustment are achieved, solving the problems of low efficiency and poor quality of concrete pouring in traditional construction. Improve construction efficiency and forming quality.
Patent Information
- Application Number
- CN202411352680.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-26
- Publication Date
- 2024-11-15
AI Technical Summary
During the construction of side walls of traditional subway stations, due to the large steel formwork height and insufficient support strength, the concrete pouring efficiency is low, and the construction personnel are inconvenient to operate, which affects the quality of the project.
A subway station side wall construction formwork unit is designed, using upper and lower brackets, hydraulic cylinder drive parts and adjustment components to realize active support force adjustment and accurate verticality adjustment, and a walking platform is set on the formwork for vibration.
High-strength active support is achieved, the one-time pouring area of concrete is improved, the construction efficiency and forming quality are improved, and the natural texture and aesthetics of the concrete surface are improved.
Smart Images

Figure CN118958372A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of subway station construction, and in particular to a subway station side wall construction template unit, a system and a side wall construction method. Background Art
[0002] The statements herein merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] During the construction of the main structure of the subway station, due to the huge size of the main structure, a large amount of concrete pouring is required. Traditional concrete pouring formwork is mostly a simple splicing of large steel formworks. The large steel formworks have high support strength requirements, but wooden supports, steel supports, etc. are mostly used for passive support on site. The support strength is limited, resulting in a limited amount of concrete poured at one time. In addition, due to the large height of the large steel formwork, which is usually 2 times or more of the height of a person, it is inconvenient for construction workers to manually vibrate during the concrete pouring process, affecting the quality of the main structure project. Summary of the invention
[0004] In view of the deficiencies in the prior art, the object of the present invention is to provide a subway station side wall construction template unit, system and side wall construction method, thereby improving the construction efficiency of the subway station side wall.
[0005] In order to achieve the above object, the present invention is implemented through the following technical solutions:
[0006] In the first aspect, an embodiment of the present invention provides a subway station side wall construction formwork unit, including an upper bracket and a lower bracket, wherein one side of the upper bracket is connected to an upper vertical back rib, which is connected to an upper formwork, and one side of the lower bracket is connected to a lower vertical back rib, which is connected to a lower formwork. A connecting frame is rotatably connected to the top of the lower vertical back rib, which is connected to the other side of the upper bracket, the lower bracket is hinged to one end of a first telescopic drive member, and the other end of the first telescopic drive member is hinged to the connecting frame, and the other side of the lower bracket is also connected to one end of a horizontally arranged second telescopic drive member through an adjustment component, and the other end of the second telescopic drive member is used to abut against the surface of a fixed object on a ground foundation, and pressure detection elements are provided on the inner sides of the upper formwork and the lower formwork.
[0007] Optionally, the upper bracket and the connecting frame are detachably fixedly connected.
[0008] Optionally, the connecting frame is a triangular frame, one end of which is rotatably connected to the lower vertical back rib, the other end is connected to the upper bracket, and the third end is hinged to the end of the first telescopic driving member.
[0009] Optionally, the first telescopic driving member adopts a first hydraulic cylinder, the cylinder body of the first hydraulic cylinder is hinged to the lower bracket, and the piston rod thereof is hinged to the connecting frame.
[0010] Optionally, the second telescopic driving member adopts a second hydraulic cylinder, the cylinder body of the second hydraulic cylinder is provided with a pad for abutting against the surface of a fixed object on the ground foundation, and the piston rod of the second hydraulic cylinder is connected to the adjustment assembly.
[0011] Optionally, the adjustment assembly includes an adjustment seat, which is fixedly connected to the bottom end of the adjustment screw, and an adjustment nut is threadedly connected to the adjustment screw. The adjustment screw passes through a lower bracket, and the lower bracket contacts the adjustment nut to be supported by the adjustment nut.
[0012] Optionally, the upper vertical back rib is fixedly connected to the upper horizontal back rib set on the back of the upper template to fix the upper vertical back rib to the upper template, and the lower vertical back rib is fixedly connected to the lower horizontal back rib set on the back of the lower template to fix the lower vertical back rib to the lower template.
[0013] Optionally, a support frame is provided at the top of the upper vertical back rib, and a walking platform is provided on the support frame.
[0014] In a second aspect, an embodiment of the present invention provides a subway station side wall construction formwork system, which is composed of a plurality of subway station side wall construction formwork units as described in the first aspect arranged and combined.
[0015] In a third aspect, an embodiment of the present invention provides a side wall construction method using the subway station side wall construction template system according to the second aspect, comprising the following steps:
[0016] Tie the steel bars of the side walls;
[0017] Assembling the subway station side wall construction formwork system on both sides of the side wall reinforcement structure;
[0018] During the pouring of concrete, the pressure detected by the pressure detection elements on the inner sides of the upper and lower templates is obtained in real time. Then, the first telescopic drive member and the second telescopic drive member are controlled to operate according to the detected pressure to provide active support force for the upper and lower templates.
[0019] After the pouring is completed, the first telescopic driving member and the second telescopic driving member are depressurized, and then the subway station side wall construction template system on both sides of the poured side wall is dismantled.
[0020] The beneficial effects of the present invention are as follows:
[0021] 1. The construction formwork unit and system of the side wall of a subway station of the present invention are provided with a first telescopic driving member and a second telescopic driving member. The first telescopic driving member can apply an active supporting force to the upper formwork through a connecting frame and an upper bracket, and the second telescopic driving member can apply an active supporting force to the lower formwork through an adjusting component and a lower bracket, so that the supporting force can be adjusted according to the pressure of concrete exerted on the upper formwork and the lower formwork, thereby realizing active support, and the supporting strength is high, and a large area of concrete can be poured at one time, which greatly improves the efficiency of concrete pouring construction of the main side wall of the subway station.
[0022] 2. The construction formwork unit and system of the subway station side wall of the present invention are provided with an adjusting screw and an adjusting nut. The adjusting screw passes through the lower bracket, and the end of the lower bracket is supported by the adjusting nut. By rotating the adjusting nut, the adjusting nut can drive one side end of the lower bracket to move up and down, thereby realizing precise adjustment of the verticality of the entire formwork unit. After pouring concrete, the forming quality and aesthetics of the concrete side wall structure can be significantly improved.
[0023] 3. The construction formwork unit and system of the subway station side wall of the present invention is provided with a walking platform at the top of the upper vertical back rib, which can provide a vibration platform for the staff, and can realize multi-point and multi-surface dense vibration of large-area concrete pouring of the side wall, greatly improving the natural texture and defects of the overall pouring surface of the large-area concrete, and improving the aesthetics of the concrete side wall. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0025] Figure 1 It is a schematic diagram of the overall structure of Embodiment 1 of the present invention;
[0026] Figure 2 The template structure of Example 1 of the present invention is shown in FIG. Figure 1 ;
[0027] Figure 3 The template structure of Example 1 of the present invention is shown in FIG. Figure 2 ;
[0028] Figure 4 It is a schematic diagram of the assembly between the upper bracket, the first hydraulic cylinder, the lower bracket and the connecting frame in Example 1 of the present invention;
[0029] Figure 5 is a schematic diagram of the structure of the regulating component in Example 1 of the present invention;
[0030] Figure 6 This is a schematic diagram of the assembly of the walking platform and the support frame of Embodiment 1 of the present invention;
[0031] Among them, 1. upper template, 2. lower template, 3. upper bracket, 4. lower bracket, 5. connecting frame, 6. adjustment component, 7. upper horizontal back rib, 8. upper vertical back rib, 9. lower horizontal back rib, 10. lower vertical back rib, 11. L-shaped bolt, 12. L-shaped bolt, 13. hinge shaft, 14. fixing bolt, 15. first hydraulic cylinder, 16. second hydraulic cylinder, 17. bolt, 18. support frame, 19. walking platform, 20. pressure sensor;
[0032] 3-1. The first square beam, 3-2. The second square beam;
[0033] 4-1. Upper horizontal square beam, 4-2. Lower horizontal square beam, 4-3. Diagonal bracing square beam;
[0034] 6-1. Adjusting seat, 6-2. Adjusting screw, 6-3. Adjusting nut. DETAILED DESCRIPTION
[0035] For the convenience of description, if the words "upper" and "lower" appear in the present invention, they only indicate that they are consistent with the upper and lower directions of the drawings themselves, and do not limit the structure. They are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.
[0036] Example 1
[0037] This embodiment provides a subway station side wall construction template unit, such as Figure 1 As shown, it includes an upper template 1, a lower template 2, an upper bracket 3, a lower bracket 4, a connecting frame 5, an adjustment component 6, a first telescopic driving member and a second telescopic driving member.
[0038] like Figure 2-Figure 3 As shown, the back of the upper template 1 is provided with a plurality of upper transverse back ribs 7 arranged in the horizontal direction. In this embodiment, the upper transverse back ribs 7 are made of I-beams, and the upper transverse back ribs 7 are welded and fixed to the back of the upper template 1. One side of the plurality of upper transverse back ribs 7 is fixed to the upper template 1, and the other side is welded and fixed with a plurality of upper vertical back ribs 8, and the upper vertical back ribs 8 are vertically arranged with the upper transverse back ribs 7.
[0039] Preferably, two upper vertical back ribs 8 are provided.
[0040] The back of the lower template 2 is provided with a plurality of lower transverse back ribs 9 arranged in the horizontal direction. In this embodiment, the lower transverse back ribs 9 are made of I-beams, and the lower transverse back ribs 9 are welded and fixed to the back of the lower template 2. One side of the plurality of lower transverse back ribs 9 is fixed to the lower template 2, and the other side is welded and fixed with a plurality of lower vertical back ribs 10, and the lower vertical back ribs 10 are vertically arranged with the lower transverse back ribs 9.
[0041] Preferably, two lower vertical back ribs 10 are provided.
[0042] like Figure 4 As shown, two upper vertical back ribs are detachably connected to an upper bracket 3. In this embodiment, the upper bracket 3 is composed of a first square beam 3-1 and a second square beam 3-2. One end of the first square beam 3-1 and the second square beam 3-2 are cross-welded and fixed, and the other end of the first square beam 3-1 is detachably connected to the upper vertical back rib 8 by an L-shaped bolt 11, and the other end of the second square beam 3-2 is detachably connected to the upper vertical back rib 8 by an L-shaped bolt 11.
[0043] The two lower vertical back ribs 10 are detachably connected to a lower bracket 4. In the present embodiment, the lower bracket 4 adopts a frame structure formed by welding a plurality of square beams, including an upper horizontal square beam 4-1, a lower horizontal square beam 4-2, and a plurality of diagonal bracing square beams 4-3 arranged between the upper horizontal square beam 4-1 and the lower horizontal square beam 4-2. One side end portions of the upper horizontal square beam 4-1, the lower horizontal square beam 4-2, and the set diagonal bracing square beam 4-3 are detachably fixed to the lower vertical back ribs 10 by L-shaped bolts 12.
[0044] The top end of the lower vertical back rib 10 is rotatably connected to a connecting frame 5, and the connecting frame 5 adopts a triangular structure formed by welding three square beams.
[0045] One end of the connecting frame passes through a hinge shaft 13, the connecting frame 5 is rotatably connected to the hinge shaft 13, the hinge shaft 13 is fixed to the top of the lower vertical back rib 10, and the other end of the connecting frame 5 is detachably connected to the upper bracket 3 connected to the upper vertical back rib 8 directly above the lower vertical back rib 10.
[0046] Specifically, a fixing bolt 14 passes through the intersection of the end of the connecting frame 5 and the first square beam 3 - 1 and the second square beam 3 - 2 of the upper bracket 3 and the fixing nut is tightened, thereby realizing the detachable fixation of the connecting frame and the upper bracket 3.
[0047] This arrangement makes it easy to separate the connecting frame 5 from the upper bracket 3, thereby making it easy to disassemble the entire template unit for transportation.
[0048] A first telescopic driving member is provided between the third end of the connecting frame 5 and the lower bracket. The telescopic movement of the first telescopic driving member can drive the connecting frame to rotate, thereby driving the upper template to rotate through the upper bracket.
[0049] Furthermore, the first telescopic driving member adopts a first hydraulic cylinder 15 , a cylinder body of the first hydraulic cylinder 15 is hinged to the lower bracket 4 , and a piston rod thereof is hinged to the third end of the connecting frame 5 .
[0050] The first telescopic driving member adopts a first hydraulic cylinder 15, which can provide a larger supporting force.
[0051] Specifically, the cylinder body of the first hydraulic cylinder 15 extends into the square beam of the lower support and is hinged to the hinge shaft in the square beam, and its piston rod extends into the square beam of the connecting frame 5 and is hinged to the hinge shaft in the square beam. The cross-sectional dimensions of the internal space of the square beam are larger than the cross-sectional dimensions of the cylinder body and piston rod of the first hydraulic cylinder 15 to leave space for the first hydraulic cylinder 15 to move.
[0052] One end of the lower horizontal square beam 4-2 of the lower bracket 4 is detachably fixedly connected to the lower vertical back rib 10, and the other end is connected to an adjustment component 6, which is used to adjust the verticality of the upper template 1 and the lower template 2. The adjustment component 6 is connected to a horizontally arranged second telescopic drive member.
[0053] In this embodiment, the second telescopic driving member adopts a second hydraulic cylinder 16, the piston rod of the second hydraulic cylinder 16 is hinged to the adjustment assembly, and a pad is provided at the end of the cylinder body thereof, and the pad is used to abut against the surface of a fixed object on the ground foundation.
[0054] Through the second hydraulic cylinder 16, an active supporting force can be applied to the lower template, and a larger active supporting force can be applied.
[0055] like Figure 5 As shown, the adjustment assembly 6 includes an adjustment seat 6-1, which adopts an L-shaped structure, including a horizontal plate and a vertical plate fixed to one end of the horizontal plate by bolts 17. The outer side surface of the vertical plate is provided with a hinged ear plate and is hinged to the piston rod of the second hydraulic cylinder 16 through the hinged ear plate.
[0056] The horizontal plate is fixedly connected to the bottom end of the adjusting screw 6-2, and the adjusting screw 6-2 passes through the lower horizontal square beam 4-2 through a through hole provided in the lower horizontal square beam 4-2, and the diameter of the through hole is larger than the diameter of the adjusting screw 6-2.
[0057] An adjusting nut 6-3 is threadedly connected to the adjusting screw 6-2 below the lower horizontal square beam 4-2, and the adjusting nut 6-3 contacts the bottom surface of the lower horizontal square beam 4-2 to support the lower horizontal square beam 4-2.
[0058] In this embodiment, the bottom of the lower formwork 2 is supported by a support, and the adjusting nut 6-3 is rotated so that the adjusting nut 6-3 can be raised and lowered, thereby driving the end of the lower horizontal square beam 4-2 to rise and fall, thereby achieving precise adjustment of the verticality of the lower formwork 2 and the upper formwork 1. After pouring concrete, the forming quality and aesthetics of the concrete side wall structure can be significantly improved.
[0059] Further, such as Figure 6As shown, support frames 18 are fixed to the tops of the two upper vertical back ribs 8, and a walking platform 19 is provided between the two support frames 18. The walking platform 19 can provide a vibration platform for the workers, and can achieve multi-point and multi-faceted close vibration of large-area concrete pouring of the side wall, greatly improving the natural texture and defects of the overall pouring surface of the large-area concrete, and improving the aesthetics of the concrete side wall.
[0060] During use, construction workers can enter the walking platform 19 by setting up a ladder.
[0061] Furthermore, a plurality of pressure detection elements are arranged on the inner side surfaces of the upper formwork 1 and the lower formwork 2 . In this embodiment, the pressure detection element is a pressure sensor 20 for detecting the pressure of the poured concrete on the upper formwork 1 and the lower formwork 2 .
[0062] Example 2
[0063] This embodiment provides a subway station side wall construction formwork system, including multiple subway station side wall construction formwork units described in Embodiment 1, and multiple subway station side wall construction formwork units are arranged and combined in sequence to form the entire formwork system.
[0064] Example 3
[0065] This embodiment provides a side wall construction method using the subway station side wall construction template system described in Embodiment 2, comprising the following steps:
[0066] Step 1: Tie the side wall reinforcement according to the design documents and technical instructions, and after acceptance, the construction of the side wall reinforcement structure is completed.
[0067] Step 2: Measurement and positioning. By measuring and setting out, locate the exact location of the template system installation and make markings. This step can be done using existing technology and will not be described in detail here.
[0068] Step 3: Hoisting and assembly of the subway station side wall construction formwork system. After assembling the lower bracket 4 and the lower vertical back rib 10, use the hoisting equipment to hoist the lower bracket to the set position on the side of the side wall reinforcement mechanism, so that the lower horizontal square beam 4-2 passes through the adjusting screw 6-2 and is supported on the adjusting nut 6-3. The bottom end of the lower formwork 2 is supported by pre-placed supports, and then the upper bracket 3 and the upper formwork 1 are installed and assembled on the connecting frame 5, thereby completing the assembly of the entire formwork unit. Multiple formwork units are assembled in the horizontal direction until the entire formwork system is assembled.
[0069] Step 4: Turn the adjusting nut 6-3 to adjust the verticality of the upper template 1 and the lower template 2, and use a total station or a construction laser level to monitor the verticality of the upper template 1 and the lower template 2 to meet the construction requirements.
[0070] Step 5: Use wooden formwork to seal the side ends of the concrete pouring space formed between the multiple systems.
[0071] Step 6: Start pouring concrete for the side wall of the subway station. During the pouring process, use the pressure sensor 20 to monitor the pressure on the upper formwork 1 and the lower formwork 2 in real time. According to the obtained pressure value, control the operation of the first hydraulic cylinder 15 and the second hydraulic cylinder 16 to adjust the active support force of the upper formwork 1 and the lower formwork 2 to ensure the working stability of the upper formwork 1 and the lower formwork 2. During the pouring process, in accordance with the technical briefing requirements, the construction workers stand on the walking platform 19 and use vibrating rods to vibrate the concrete at multiple points and surfaces to ensure the density of the concrete pouring.
[0072] Step 7: After pouring is completed, when the concrete strength of the side wall and the curing time with formwork meet the construction requirements, the first hydraulic cylinder 15 and the second hydraulic cylinder 16 are depressurized and the mold system is removed.
[0073] Repeat steps 1 to 7 to cast and construct the next section of the side wall until the casting and construction of all the side walls are completed.
[0074] The formwork system and side wall construction method of this embodiment are easy to assemble. Since the first hydraulic cylinder 15 and the second hydraulic cylinder 16 can provide active supporting force, a large area of concrete can be poured at one time, which greatly improves the construction efficiency of the side wall concrete pouring of the station body.
[0075] During the concrete pouring process, the pressure inside the steel formwork can be obtained in real time based on the pressure sensor 20, and the active support force can be dynamically fine-tuned. It has the functions of actively monitoring the pressure inside the formwork and intelligently adjusting the active support force, which significantly improves the intelligence and stability of the entire formwork system, thereby improving the safety of side wall concrete pouring.
[0076] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A subway station side wall construction template unit, It is characterized in that It includes an upper bracket and a lower bracket, one side of the upper bracket is connected to the upper vertical back rib, the upper vertical back rib is connected to the upper template, one side of the lower bracket is connected to the lower vertical back rib, the lower vertical back rib is connected to the lower template, the top of the lower vertical back rib is rotatably connected to a connecting frame, the connecting frame is connected to the other side of the upper bracket, the lower bracket is hinged to one end of the first telescopic driving member, the other end of the first telescopic driving member is hinged to the connecting frame, the other side of the lower bracket is also connected to one end of the horizontally arranged second telescopic driving member through an adjusting component, the other end of the second telescopic driving member is used to abut against the surface of a fixed object on the ground foundation, and the inner sides of the upper template and the lower template are provided with pressure detection elements.
2. A subway station side wall construction template unit as claimed in claim 1, It is characterized in that The upper bracket and the connecting frame are detachably fixedly connected.
3. A subway station side wall construction template unit as claimed in claim 1, It is characterized in that The connecting frame adopts a triangular frame, one end of which is rotatably connected to the lower vertical back rib, the other end is connected to the upper bracket, and the third end is hinged to the end of the first telescopic driving member.
4. A subway station side wall construction template unit as claimed in claim 1, It is characterized in that The first telescopic driving member adopts a first hydraulic cylinder, the cylinder body of the first hydraulic cylinder is hinged to the lower bracket, and the piston rod of the first hydraulic cylinder is hinged to the connecting frame.
5. A subway station side wall construction template unit as claimed in claim 1, It is characterized in that The second telescopic driving member adopts a second hydraulic cylinder, the cylinder body of the second hydraulic cylinder is provided with a pad for abutting against the surface of a fixed object on the ground foundation, and the piston rod of the second hydraulic cylinder is connected to the adjustment assembly.
6. A subway station side wall construction template unit as claimed in claim 1, It is characterized in that The adjustment assembly includes an adjustment seat, which is fixedly connected to the bottom end of the adjustment screw. The adjustment screw is threadedly connected with an adjustment nut. The adjustment screw passes through a lower bracket, and the lower bracket contacts the adjustment nut to be supported by the adjustment nut.
7. A subway station side wall construction template unit as claimed in claim 1, It is characterized in that The upper vertical back rib is fixedly connected to the upper horizontal back rib set on the back of the upper template to fix the upper vertical back rib to the upper template, and the lower vertical back rib is fixedly connected to the lower horizontal back rib set on the back of the lower template to fix the lower vertical back rib to the lower template.
8. A subway station side wall construction template unit as claimed in claim 1, It is characterized in that A support frame is arranged at the top of the upper vertical back rib, and a walking platform is arranged on the support frame.
9. A subway station side wall construction formwork system, It is characterized in that It is composed of a plurality of subway station side wall construction template units as described in any one of claims 1 to 8.
10. A side wall construction method using the subway station side wall construction template system according to claim 9, It is characterized in that The following steps are involved: Tie the steel bars of the side walls; Assembling the subway station side wall construction formwork system on both sides of the side wall reinforcement structure; The concrete is poured. During the pouring process, the pressure detected by the pressure detection element on the inner side of the upper formwork and the lower formwork is obtained in real time, and then the first telescopic driving member and the second telescopic driving member are controlled to work according to the detected pressure to provide active support force for the upper formwork and the lower formwork; After the pouring is completed, the first telescopic driving member and the second telescopic driving member are depressurized, and then the subway station side wall construction template system on both sides of the poured side wall is dismantled.