Pile foundation guide pipe
By designing a detachable and connected pile-based conduit, concrete pouring is achieved using a funnel-shaped feed hopper and plug-in rope, the problems of low construction efficiency and high cost in the prior art are solved, and construction efficiency is improved and costs are reduced.
Patent Information
- Application Number
- CN202420448743.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-07
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-07
AI Technical Summary
The construction process of existing pile foundation conduits is complicated, resulting in low construction efficiency and high cost.
A pile foundation conduit including a loading pipe and a plug-in pipe is designed. Concrete filling is realized through a funnel-shaped feed hopper and a removable connecting member, avoiding the process of lifting an auxiliary hopper by cranes. The plug-in rope and sealing ring are used to ensure the stability of the connection. and sealing.
It improves the construction efficiency of concrete filling, reduces construction costs, and simplifies the disassembly and assembly process of conduits, reducing the risk of parts loss and bumping.
Smart Images

Figure CN222100866U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of bridge pile foundation construction, and in particular relates to a pile foundation conduit. Background Art
[0002] The pile foundation conduit is an important equipment used in the construction of bridge pile foundations, mainly used for pouring concrete. The common types of joints for pile foundation conduits in the concrete pouring construction of foundation engineering are mainly flange bolt type and threaded connection type. The disadvantage of flange bolt type joints is that the workload of disassembly and assembly is large, there are many parts such as bolts and nuts used for connection, which are easy to be contaminated and lost, and the outer diameter of the flange used for installing bolts is large, which is easy to hit other objects during the process of lifting and lowering the conduit. The disadvantage of threaded connection type joints is that the conduit needs to be twisted several times when connecting. If the diameter of the conduit is large, it is not easy to operate when twisting, and the construction efficiency is low.
[0003] To this end, the patent with publication number CN217899119U discloses a concrete conduit connection assembly, which includes a plug-in tube, a receiving tube and a wire rope. The assembly has few parts and is not easy to lose. The assembly and disassembly only requires pulling out or inserting the wire rope, without twisting the conduit. The assembly and disassembly are convenient, the workload is small, and compared with the flange-type connector, there is no flange with a larger outer diameter, and it is not easy to hit or hang other objects during the process of lifting the conduit. The patent effectively solves the above problems. However, in actual application, it is found that before inserting the conduit into the pile hole and pouring concrete into the conduit, it is necessary to use a crane to insert the auxiliary hopper into the upper end of the receiving tube before concrete pouring can be carried out. Because there are many pile holes on the construction site, it is necessary to frequently use a crane to lift the funnel-shaped feed hopper. The construction process is complicated, resulting in relatively low construction efficiency and high construction costs. Utility Model Content
[0004] In view of the problems existing in the prior art, the utility model provides a pile foundation conduit, which aims to solve the problems of relatively low construction efficiency and high construction cost caused by construction procedures.
[0005] In order to solve the above technical problems, the utility model is implemented through the following technical solutions:
[0006] A pile foundation conduit, comprising:
[0007] A receiving pipe, comprising a first pipe section, a funnel-shaped feed hopper connected to the upper end of the first pipe section, and a first connecting pipe connected to the lower end of the first pipe section, wherein the inner diameter of the first connecting pipe is greater than the inner diameter of the first pipe section;
[0008] The plug-in tube includes a second connecting tube and a second tube section connected to the lower end of the second connecting tube. The length of the second connecting tube is the same as that of the first connecting tube. The second connecting tube can be matched and plugged into the first connecting tube and can be detachably connected through a connecting component.
[0009] Furthermore, the funnel-shaped feed hopper includes a gradually expanding tube portion and a constant diameter tube portion, the lower end of the gradually expanding tube portion is fixedly connected to the upper end of the first tube section, and the upper end of the gradually expanding tube portion is fixedly connected to the lower end of the constant diameter tube portion.
[0010] Further, the connecting member includes a plug rope, a first semicircular groove spirally opened on the inner wall of the first connecting tube, a second semicircular groove spirally opened on the outer wall of the second connecting tube, and a through hole opened on the first connecting tube and connected to the lower end of the first semicircular groove;
[0011] When the second connecting tube is matched and inserted into the first connecting tube, the first semicircular groove and the second semicircular groove face each other to form a circular guide groove. After the plug rope passes through the through hole, it can be inserted along the circular guide groove to achieve a detachable connection between the second connecting tube and the first connecting tube.
[0012] Furthermore, a first sealing ring installation groove is provided on the outer wall of the second connecting pipe at a position above the uppermost second semicircular groove, and a first sealing ring is installed in the first sealing ring installation groove.
[0013] Furthermore, a second sealing ring installation groove is provided on the outer wall of the second connecting pipe below the second semicircular groove of the lowest layer, and a second sealing ring is installed in the second sealing ring installation groove.
[0014] Furthermore, horizontal support rods are evenly distributed on the outer wall of the second pipe section along the circumferential direction, and the length of the horizontal support rods is not greater than the distance between the outer wall of the second pipe section and the inner wall of the pile hole.
[0015] Furthermore, a ball bearing is installed at one end of the horizontal support rod away from the outer wall of the second pipe section.
[0016] Furthermore, the second connecting pipe, the second pipe section and the first pipe section have the same inner diameter.
[0017] Furthermore, the outer diameter of the second connecting pipe is smaller than the outer diameter of the second pipe section, and a limiting step is formed at the connection between the second connecting pipe and the second pipe section.
[0018] Compared with the prior art, the utility model has at least the following beneficial effects:
[0019] The utility model provides a pile foundation conduit, in which the second connecting pipe is matched and plugged into the first connecting pipe, and the connecting member is detachably connected to realize the assembly connection of the receiving pipe and the plugging pipe to form the pile foundation conduit; after the second pipe section is lowered into the pile hole, concrete can be directly poured into the funnel-shaped feed hopper, and the concrete is poured through the first pipe section, the second connecting pipe and the second pipe section in sequence. It can be seen that the pile foundation conduit of the utility model, because the funnel-shaped feed hopper is connected to the upper end of the first pipe section, when pouring concrete, the concrete can be directly added to the funnel-shaped feed hopper for rapid pouring, without the need to use a crane to lift the auxiliary hopper, avoiding the process of inserting the auxiliary hopper into the receiving pipe, thereby effectively improving the efficiency of concrete pouring construction and reducing construction costs.
[0020] Furthermore, when the second connecting tube is matched and plugged into the first connecting tube, the first semicircular groove and the second semicircular groove are opposite to form a circular guide groove, and the splicing rope is inserted along the spiral circular guide groove to achieve a detachable connection between the second connecting tube and the first connecting tube, and fixation is achieved to form a pile foundation conduit; when disassembly is required, it is only necessary to pull the splicing rope out of the through hole. It can be seen that the pile foundation conduit can be disassembled and assembled by only pulling out or inserting the splicing rope, which has a small workload and is convenient for disassembly and assembly.
[0021] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions in the specific implementation modes of the present invention, the drawings required for use in the description of the specific implementation modes will be briefly introduced below. Obviously, the drawings described below are some implementation modes of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0023] Figure 1 It is a schematic diagram of a pile foundation conduit according to an embodiment of the utility model.
[0024] In the figure: 1-receiving pipe; 100-first pipe section; 101-funnel-shaped feed hopper; 101a-gradually expanding pipe portion; 101b; equal-diameter pipe portion; 102-first connecting pipe; 2-plug-in pipe; 200-second connecting pipe; 201-second pipe section; 300-plug-in rope; 301-first semicircular groove; 302-second semicircular groove; 303-through hole; 4-first sealing ring; 5-second sealing ring; 6-horizontal support rod; 7-ball. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical solution and advantages of the embodiments of the utility model clearer, the technical solution of the utility model will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0026] like Figure 1 As shown, the embodiment of the utility model provides a pile foundation conduit, including a receiving pipe 1 and a plug pipe 2, the receiving pipe 1 includes a first pipe section 100, a funnel-shaped feed hopper 101 and a first connecting pipe 102, the upper end of the first pipe section 100 is connected with the funnel-shaped feed hopper 101, the lower end of the first pipe section 100 is connected with the first connecting pipe 102, and the inner diameter of the first connecting pipe 102 is greater than the inner diameter of the first pipe section 100. Exemplarily, the first pipe section 100 is fixedly connected to the funnel-shaped feed hopper 101 by welding, and the first pipe section 100 is fixedly connected to the first connecting pipe 102 by welding.
[0027] The plug-in pipe 2 includes a second connecting pipe 200 and a second pipe section 201. The length of the second connecting pipe 200 is the same as that of the first connecting pipe 102. The second connecting pipe 200 can be matched and plugged into the first connecting pipe 102 and can be detachably connected through a connecting member. The lower end of the second connecting pipe 200 is connected to the second pipe section 201. Exemplarily, the second connecting pipe 200 and the second pipe section 201 are fixedly connected by welding.
[0028] Specifically, in the actual implementation process of the pile hole concrete pouring, the second connecting pipe 200 is first matched and plugged into the first connecting pipe 102, and the connecting member is detachably connected to realize the assembly connection of the receiving pipe 1 and the plug-in pipe 2 to form a pile foundation conduit; then, after the second pipe section 201 is lowered into the pile hole, concrete is poured into the funnel-shaped feed hopper 101, and the concrete is poured in sequence through the first pipe section 100, the second connecting pipe 200 and the second pipe section 201. The pile foundation conduit of the utility model, because the funnel-shaped feed hopper 101 is connected to the upper end of the first pipe section 100, can be poured quickly by directly adding concrete to the funnel-shaped feed hopper 101 during concrete pouring, without the need to use a crane to lift the auxiliary hopper, avoiding the process of inserting the auxiliary hopper into the receiving pipe, thereby effectively improving the efficiency of concrete pouring construction.
[0029] Preferably, the inner diameters of the second connecting pipe 200, the second pipe section 201 and the first pipe section 100 are the same, and the concrete is poured evenly.
[0030] On the basis of the above embodiments, as a more preferred embodiment, Figure 1As shown, the funnel-shaped feed hopper 101 includes a gradually expanding pipe part 101a and a constant diameter pipe part 101b. It should be understood that the gradually expanding pipe part 101a is a pipe fitting with a small diameter at the lower end and a large diameter at the upper end, and the constant diameter pipe part 101b is a pipe fitting with the same diameters at the upper and lower ends. The diameter of the lower end of the gradually expanding pipe part 101a is the same as the diameter of the upper end of the first pipe section 100, and the diameter of the constant diameter pipe part 101b is the same as the diameter of the upper end of the gradually expanding pipe part 101a. The lower end of the gradually expanding pipe part 101a is fixedly connected to the upper end of the first pipe section 100, and the upper end of the gradually expanding pipe part 101a is fixedly connected to the lower end of the constant diameter pipe part 101b. Exemplarily, the lower end of the gradually expanding pipe part 101a is fixedly connected to the upper end of the first pipe section 100 by welding, and the upper end of the gradually expanding pipe part 101a is fixedly connected to the lower end of the constant diameter pipe part 101b by welding.
[0031] In this embodiment, the funnel-shaped feed hopper 101 composed of the gradually expanding pipe portion 101a and the equal-diameter pipe portion 101b can better accommodate concrete, which is conducive to better improving the pouring efficiency.
[0032] In one embodiment, if Figure 1 As shown, the connecting member includes a splicing rope 300, a first semicircular groove 301 spirally opened on the inner wall of the first connecting tube 102, a second semicircular groove 302 spirally opened on the outer wall of the second connecting tube 200, and a through hole 303 opened on the first connecting tube 102 and connected to the lower end of the first semicircular groove 301. In other words, the first semicircular groove 301 is spirally opened on the inner wall of the first connecting tube 102, and the second semicircular groove 302 is spirally opened on the outer wall of the second connecting tube 200. Exemplarily, the splicing rope 300 is a steel wire rope.
[0033] Specifically, when the second connecting tube 200 is matched and plugged into the first connecting tube 102, the first semicircular groove 301 and the second semicircular groove 302 are opposite to form a circular guide groove, and after the plug rope 300 passes through the through hole 303, the plug rope 300 is inserted along the circular guide groove to achieve a detachable connection between the second connecting tube 200 and the first connecting tube 102, that is, the assembly of the receiving tube 1 and the plug pipe 2 is completed. When disassembly is required, it is only necessary to pull the plug rope 300 out of the through hole.
[0034] Preferably, the outer diameter of the second connecting pipe 200 is smaller than the outer diameter of the second pipe section 201, and a limiting step is formed at the connection between the second connecting pipe 200 and the second pipe section 201. The limiting step can ensure that the first semicircular groove 301 and the second semicircular groove 302 are quickly aligned to form a circular guide groove.
[0035] As a more preferred embodiment, Figure 1As shown, a first sealing ring installation groove is provided on the outer wall of the second connecting pipe 200, and the first sealing ring installation groove is located above the uppermost second semicircular groove 302, and a first sealing ring 4 is installed in the first sealing ring installation groove. When the second connecting pipe 200 is matched and plugged into the first connecting pipe 102, the first sealing ring 4 is squeezed to achieve sealing contact between the two, thereby preventing concrete leakage.
[0036] Better, such as Figure 1 As shown, a second sealing ring installation groove is provided on the outer wall of the second connecting pipe 200, and the second sealing ring installation groove is located below the second semicircular groove 302 of the lowest layer, and a second sealing ring 5 is installed in the second sealing ring installation groove to cooperate with the first sealing ring to better achieve sealing and prevent leakage.
[0037] On the basis of the above embodiments, as a more preferred embodiment, Figure 1 As shown, horizontal support rods 6 are evenly arranged along the circumferential direction on the outer wall of the second pipe section 201, and the length of the horizontal support rods 6 is not greater than the distance between the outer wall of the second pipe section 201 and the inner wall of the pile hole. Specifically, during the process of the pile foundation conduit descending in the pile hole, the circumferentially arranged horizontal support rods 6 are used for positioning to ensure that the pile foundation conduit descends vertically along the pile hole without tilting.
[0038] Better, such as Figure 1 As shown, a ball 7 is installed at one end of the horizontal support rod 6 away from the outer wall of the second pipe section 201. By providing the ball 7, while playing a positioning role, it can also reduce the friction between the second pipe section 201 and the pile hole wall, thereby facilitating the lifting and lowering of the pile foundation guide tube.
[0039] In actual implementation, the pile hole pouring construction is combined with the use of the pile foundation conduit of this embodiment, as follows:
[0040] 1) Surveying and staking out: Establish a surveying control network on site, and then survey and lay out the positions of each pile based on the control network.
[0041] 2) Casing installation: The casing should be installed before the drilling rig is put into place. The bottom and the outer sides of the casing should be backfilled with clay soil and compacted layer by layer.
[0042] 3) Drilling: dig a mud pool, prepare mud, put the drill rig in place to drill holes, and circulate the mud to remove slag.
[0043] 4) Hole inspection: hole diameter, hole shape, hole depth and hole bottom sediment detection.
[0044] 5) First hole cleaning: Use an air compressor and hole cleaning pipe to clean the hole so that the thickness of the sediment at the bottom of the hole and the amount of drilling debris in the mud meet the quality requirements and design requirements.
[0045] 6) Installation of steel cage and acoustic detection tube: Use a crane to install the steel cage and acoustic detection tube according to the design documents.
[0046] 7) Installation of pile foundation conduit: Combine the plug-in pipe and the receiving pipe to form a conduit, and use a truck crane to adjust it into the hole.
[0047] 8) Second hole cleaning: After the steel cage and concrete conduit are installed, the second hole cleaning is carried out.
[0048] 9) Pouring concrete: Pour concrete into the funnel-shaped feed hopper according to the designed mix ratio.
[0049] 10) Pile foundation testing: After the piles are constructed, the quality of the pile foundation shall be tested and evaluated according to the design requirements.
[0050] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0051] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present utility model, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0052] In the present invention, unless otherwise clearly defined and limited, the terms "connected", "connection" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0053] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0054] In the present utility model, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0055] Finally, it should be noted that the above-described embodiments are only specific implementation methods of the utility model, which are used to illustrate the technical solution of the utility model, rather than to limit it. The protection scope of the utility model is not limited thereto. Although the utility model is described in detail with reference to the above-mentioned embodiments, ordinary technicians in this field should understand that any technician familiar with the technical field can still modify the technical solution recorded in the above-mentioned embodiments within the technical scope disclosed by the utility model, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solution deviate from the spirit and scope of the technical solution of the embodiment of the utility model, and should be included in the protection scope of the utility model. Therefore, the protection scope of the utility model shall be based on the protection scope of the claims.
Claims
1. A pile foundation conduit, characterized in that: include: A receiving pipe (1), comprising a first pipe section (100), a funnel-shaped feed hopper (101) connected to the upper end of the first pipe section (100), and a first connecting pipe (102) connected to the lower end of the first pipe section (100), wherein the inner diameter of the first connecting pipe (102) is greater than the inner diameter of the first pipe section (100); A plug-in pipe (2) comprises a second connecting pipe (200) and a second pipe section (201) connected to the lower end of the second connecting pipe (200), the length of the second connecting pipe (200) being the same as that of the first connecting pipe (102), and the second connecting pipe (200) being able to be matched and plugged into the first connecting pipe (102) and detachably connected via a connecting member.
2. A pile foundation conduit according to claim 1, characterized in that: The funnel-shaped feed hopper (101) comprises a gradually expanding tube portion (101a) and a constant diameter tube portion (101b), wherein the lower end of the gradually expanding tube portion (101a) is fixedly connected to the upper end of the first tube section (100), and the upper end of the gradually expanding tube portion (101a) is fixedly connected to the lower end of the constant diameter tube portion (101b).
3. A pile foundation conduit according to claim 1, characterized in that: The connecting member comprises a plug rope (300), a first semicircular groove (301) spirally formed on the inner wall of the first connecting tube (102), a second semicircular groove (302) spirally formed on the outer wall of the second connecting tube (200), and a through hole (303) formed on the first connecting tube (102) and connected to the lower end of the first semicircular groove (301); When the second connecting tube (200) is matched and plugged into the first connecting tube (102), the first semicircular groove (301) and the second semicircular groove (302) are opposite to each other to form a circular guide groove, and the plug rope (300) can be inserted along the circular guide groove after passing through the through hole (303), thereby realizing a detachable connection between the second connecting tube (200) and the first connecting tube (102).
4. A pile foundation conduit according to claim 1, characterized in that: A first sealing ring installation groove is provided on the outer wall of the second connecting pipe (200) above the uppermost second semicircular groove (302), and a first sealing ring (4) is installed in the first sealing ring installation groove.
5. A pile foundation conduit according to claim 1, characterized in that: A second sealing ring installation groove is provided on the outer wall of the second connecting pipe (200) below the second semicircular groove (302) at the bottom layer, and a second sealing ring (5) is installed in the second sealing ring installation groove.
6. A pile foundation conduit according to claim 1, characterized in that: Horizontal support rods (6) are evenly distributed on the outer wall of the second pipe section (201) along the circumferential direction, and the length of the horizontal support rods (6) is not greater than the distance between the outer wall of the second pipe section (201) and the inner wall of the pile hole.
7. A pile foundation conduit according to claim 6, characterized in that: A ball bearing (7) is mounted on one end of the horizontal support rod (6) away from the outer wall of the second pipe section (201).
8. The pile foundation conduit according to claim 1, characterized in that: The second connecting pipe (200), the second pipe section (201) and the first pipe section (100) have the same inner diameter.
9. The pile foundation conduit according to claim 1, characterized in that: The outer diameter of the second connecting pipe (200) is smaller than the outer diameter of the second pipe section (201), and a limiting step is formed at the connection between the second connecting pipe (200) and the second pipe section (201).