An assembled low-energy green building construction structure

By designing a prefabricated low-energy green building construction structure that utilizes wind energy and water pressure, the problems of high dust concentration and insufficient fence fixation in construction sites are solved, and the effects of green dust reduction and automatic tightening are achieved, which improves the working environment and safety of the construction site.

CN118958725BActive Publication Date: 2025-04-18SHANDONG CHENGXIN ENG CONSTR SUPERVISION CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411174615.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2025-04-18
Estimated Expiration
2044-08-26

AI Technical Summary

Technical Problem

The existing prefabricated low-energy green building construction structure cannot effectively reduce the dust concentration during construction site construction, and the fence is insufficient, which poses safety hazards.

Method used

A prefabricated low-energy green building construction structure is designed, and the transmission rack is driven to push the balanced roof plate upwards to achieve automatic tightening of the top of the balcony; at the same time, through the air pressure changes in the water tank, high-pressure water pipes and atomized nozzles are used to achieve dust reduction effect on dust in the air.

Benefits of technology

It achieves green dust reduction through wind energy and water pressure in construction sites, improves the cleanliness of the working environment, and enhances the stability of the fence through the automatic tightening function, and ensures the safety of workers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958725B_ABST
    Figure CN118958725B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of building construction technology, specifically, an assembled low-energy green building construction structure, including a support frame, a guide hole is opened in the middle of the support frame, a support assembly is slidably arranged in the middle of the guide hole; a driving assembly is arranged on one side of the support frame; a stabilizing assembly is arranged at the bottom of the support frame; the stabilizing assembly includes a water tank for increasing the stability of the support frame, the water tank is fixedly connected to both sides of the bottom of the support frame, the driving assembly includes a driving shaft, the driving shaft rotates and penetrates the middle of the support frame, and an outer toothed ring is fixedly arranged on the outer wall of one side of the driving shaft. The balancing top plate is pushed upward by a transmission rack, so that the pressing plate and the balcony top are pressed together, which saves the manual pressing process and is convenient and fast. When the pressing plate and the balcony top are pressed together, the driving shaft continues to rotate and rotates relative to the outer toothed ring. As long as the driving shaft rotates, the balancing top plate and the balcony top can be kept in a continuous pressing state, thereby ensuring the stability of the support frame.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, in particular to an assembled low-energy consumption green building construction structure. Background Art

[0002] Construction refers to the production activities in the implementation stage of engineering construction. It is the construction process of various buildings. It can also be said to be the process of turning various lines on the design drawings into physical objects at designated locations. It includes foundation engineering construction, main structure construction, roof engineering construction, decoration engineering construction, etc. The place where the construction work is done is called "construction site" or "construction site", also called construction site.

[0003] The patent with authorization announcement number CN210316648U discloses an assembled low-energy green building construction structure. After the use of the utility model, the card block and the card slot are connected to fold the two protective plates together for easy recycling. The whole structure is simple to set up, low-energy and green and environmentally friendly. The top plate and the bottom plate are equipped with a telescopic mechanism to realize the adjustment function to adapt to floors of different specifications.

[0004] The patent with authorization announcement number CN220539400U discloses an assembled low-energy green building construction structure. By setting up support components and enclosure components, the construction process can be fenced and protected to improve stability.

[0005] The above two patents can both realize enclosure protection during the construction process. During construction at a construction site, there is often a lot of dust. The above patents can only achieve a protective effect with a relatively single function. When the wind blows at the construction site, a lot of dust will be blown up. The workers work in a dusty environment for a long time, which is not good for their health; the patent with the authorized patent number CN210316648U can also be folded for easy subsequent recycling. During the construction of multi-story buildings, there will be balconies without railings between the multiple floors. When the workers are working here, although the above patents can play a blocking role, there is no fixed position between the balconies between the two floors, resulting in unstable fixation. When the workers accidentally hit the enclosure, the enclosure may move. When the impact is too strong, the enclosure may be knocked off the balcony, which is not conducive to the safe work of the workers. Summary of the invention

[0006] In view of the problems in the prior art, the present invention provides an assembled low-energy green building construction structure, which can utilize wind energy and green energy to reduce dust in the surrounding area, and can also utilize wind to fix the structure, which is convenient and quick.

[0007] The technical solution adopted by the present invention to solve the technical problem is: an assembled low-energy green building construction structure, comprising a support frame, a guide hole is opened in the middle of the support frame, and a support component is slidably arranged in the middle of the guide hole;

[0008] A driving assembly is provided on one side of the support frame; a stabilizing assembly is provided at the bottom of the support frame;

[0009] The stabilizing assembly includes a water tank for increasing the stability of the support frame, the water tank is fixedly connected to both sides of the bottom of the support frame, the driving assembly includes a driving shaft, the driving shaft rotates and penetrates the middle of the support frame, an outer wall fixed sleeve on one side of the driving shaft is provided with an outer gear ring, and a sliding sleeve on one side of the support frame is provided with a transmission rack, and the transmission rack is meshed with the outer gear ring;

[0010] The transmission rack is fixedly connected to a balancing top plate on one side close to the top of the support frame, a supporting shaft is fixedly connected to the middle part of the balancing top plate on one side close to the top of the support frame, and a clamping plate is fixedly connected to one end of the supporting shaft away from the balancing top plate.

[0011] Specifically, a guardrail is arranged between the two groups of support frames, a hollow tube is fixedly connected to the top of the guardrail, and an atomizing nozzle is arranged through the top of the hollow tube.

[0012] Specifically, a transfer water bag is fixedly connected to the top of the support frame, and the transfer water bag is connected to the water tank through a high-pressure water pipe. The end of the high-pressure water pipe close to the water tank extends to the bottom of the water tank. A connecting water pipe is connected to one side of the transfer water bag, and the connecting water pipe is arranged through the hollow tube.

[0013] Specifically, a reducer is connected to one end of the driving shaft away from the transmission rack, and the reducer is fixedly connected to the side wall of the support frame through a support member. A fan blade is arranged at one end of the reducer away from the driving shaft.

[0014] Specifically, support bosses are fixedly connected on both sides of the support frame, an air pressure cylinder is fixedly connected to the middle of the support boss, a reciprocating pressure plate is fixedly connected to the top of the air pressure cylinder, a cylinder is arranged between the reciprocating pressure plate and the support boss, an air pipe is arranged at the bottom of the air pressure cylinder, and the lower end of the air pipe extends into the water tank.

[0015] Specifically, a cam is fixedly connected to the outer wall of the driving shaft, and the protruding end of the cam can contact the outer wall of the reciprocating pressure plate.

[0016] Specifically, the support assembly includes a U-shaped support plate, the U-shaped support plate slides through the guide hole, and the two ends of the guardrail are placed in the U-shaped support plate.

[0017] Specifically, an adjusting threaded rod is rotatably provided in the middle of the guide hole, the U-shaped support plate is sleeved on the outer wall of the adjusting threaded rod, and the U-shaped support plate is threadedly connected to the adjusting threaded rod, and a rotating disk is fixedly connected to the top of the adjusting threaded rod.

[0018] Specifically, both ends of the U-shaped support plate are fixedly connected with side limit frames, a clamping block is slidably penetrated through the middle of the side limit frame, a chamfer is provided on the side of the clamping block close to the middle of the U-shaped support plate, a rotating screw is threadedly penetrated through the end of the side limit frame away from the U-shaped support plate, a clamping spring is fixedly connected to the side of the clamping block close to the side limit frame, and the end of the clamping spring away from the clamping block is fixedly connected to the inner wall of the side limit frame.

[0019] Specifically, the outer gear ring is rotatably sleeved on the outer wall of the driving shaft, and the contact surfaces of the outer gear ring and the driving shaft are roughened, and the friction force between the outer gear ring and the driving shaft is greater than the sum of the gravity of the clamping plate, the support shaft and the balancing top plate, and the clamping plate, the support shaft and the balancing top plate are all made of lightweight materials.

[0020] Beneficial effects of the present invention:

[0021] (1) The present invention discloses an assembled low-energy green building construction structure, which pushes the balancing top plate upward through a transmission rack, thereby achieving the goal of tightening the clamping plate against the balcony top, saving the manual tightening process and being convenient and quick. After the clamping plate and the balcony top are tightened, the driving shaft continues to rotate and rotates relative to the outer gear ring. As long as the driving shaft rotates, the balancing top plate and the balcony top can be kept in a continuous tightening state, thereby ensuring the stability of the support frame.

[0022] (2) In the assembled low-energy green building construction structure described in the present invention, the speed at which the air pressure in the water tank increases will also change with the change of wind speed. The greater the wind speed, the greater the increase in the air pressure in the water tank. The water in the water tank will be pressed into the high-pressure water pipe, and then enter the transfer water bag through the high-pressure water pipe. A part of the water will enter the hollow tube through the connecting water pipe and be sprayed out through the atomizing nozzle. The sprayed water can reduce the dust content in the air within a certain range, thereby ensuring a better working environment for the staff, and realizing green dust reduction through wind power, which is more in line with environmental protection requirements.

[0023] (3) The assembled low-energy green building construction structure described in the present invention has fan blades that rotate under the action of wind. During the rotation, the fan blades can transmit power to the reducer, and the reducer drives the driving shaft to rotate at a uniform speed. The purpose of green dust reduction is achieved by utilizing wind power. At the same time, the wind power can also be used to balance the top plate and the top of the balcony in a continuous tight state, which is convenient and quick. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0025] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0026] Figure 2 It is a schematic diagram of the three-dimensional structure of the stabilizing assembly of the present invention;

[0027] Figure 3 The present invention is attached Figure 2 Schematic diagram of the structure at A in the middle;

[0028] Figure 4 It is a schematic diagram of the three-dimensional structure of the rotating disk and the adjusting threaded rod of the present invention;

[0029] Figure 5 This is a schematic diagram of the three-dimensional structure of the U-shaped support plate of the present invention;

[0030] Figure 6 For the present invention Figure 2 Axis view of

[0031] Figure 7 This is a position diagram of the cam and reciprocating pressure plate of the present invention.

[0032] In the figure: 1. support frame; 11. guide hole; 12. connecting water pipe; 13. transfer water bag; 14. rotating disk; 15. adjusting threaded rod; 16. supporting boss; 2. supporting assembly; 21. U-shaped supporting plate; 22. side limit frame; 23. tightening block; 24. rotating screw; 25. tightening spring; 3. driving assembly; 31. fan blade; 32. reducer; 33. driving shaft; 34. cam; 35. outer gear ring; 4. stabilizing assembly; 41. water tank; 42. high-pressure water pipe; 43. reciprocating pressure plate; 44. air pressure cylinder; 441. air pipe; 442. cylinder; 45. transmission rack; 46. balancing top plate; 47. supporting shaft; 48. tightening plate; 5. guardrail; 51. hollow tube; 6. atomizing nozzle. DETAILED DESCRIPTION

[0033] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0034] like Figure 1-Figure 7 As shown, an assembled low-energy green building construction structure of the present invention comprises a support frame 1, a guide hole 11 is opened in the middle of the support frame 1, and a support assembly 2 is slidably arranged in the middle of the guide hole 11;

[0035] A driving component 3 is provided on one side of the support frame 1; a stabilizing component 4 is provided at the bottom of the support frame 1;

[0036] The stabilizing assembly 4 includes a water tank 41 for increasing the stability of the support frame 1, and the water tank 41 is fixedly connected to both sides of the bottom of the support frame 1. The driving assembly 3 includes a driving shaft 33, and the driving shaft 33 rotates through the middle of the support frame 1. An outer wall of one side of the driving shaft 33 is fixedly sleeved with an outer gear ring 35, and a sliding sleeve on one side of the support frame 1 is provided with a transmission rack 45, and the transmission rack 45 is meshed with the outer gear ring 35.

[0037] The transmission rack 45 is fixedly connected to a balancing top plate 46 on one side close to the top of the support frame 1 , a support shaft 47 is fixedly connected to the middle part of the balancing top plate 46 close to the top of the support frame 1 , and a clamping plate 48 is fixedly connected to one end of the support shaft 47 away from the balancing top plate 46 .

[0038] By setting the driving component 3, natural wind force can be used to make the balancing top plate 46 move upward and press against the balcony, thereby increasing the stability of the supporting frame 1. The water tank 41 can act as a counterweight. At the same time, the water in the water tank 41 can also be sprayed out through the driving component 3 and the stabilizing component 4 to reduce the dust content in the surrounding air, thereby achieving the purpose of purifying the working environment of the staff.

[0039] During the rotation, the driving shaft 33 can drive the outer gear ring 35 to rotate. During the rotation, the outer gear ring 35 can drive the transmission rack 45 to move upward along the side wall of the support frame 1, and the balancing top plate 46 is pushed upward by the transmission rack 45, so that the clamping plate 48 is clamped against the balcony top, saving the manual clamping process, which is convenient and fast. After the clamping plate 48 is clamped against the balcony top, the driving shaft 33 continues to rotate and rotates relative to the outer gear ring 35. As long as the driving shaft 33 rotates, the balancing top plate 46 and the balcony top can be kept in a continuous clamping state, thereby ensuring the stability of the support frame 1.

[0040] Specifically, a guardrail 5 is provided between the two groups of support frames 1 , a hollow tube 51 is fixedly connected to the top of the guardrail 5 , and an atomizing nozzle 6 is provided through the top of the hollow tube 51 .

[0041] The water in the water tank 41 can enter the hollow tube 51 through the power provided by the driving assembly 3, and be sprayed out through the atomizing nozzle 6. The atomizing nozzle 6 can spray the water more dispersedly so that the water can contact the dust in the air, thereby achieving the purpose of dust removal. The guardrail 5 can play a blocking role and remind the staff in time.

[0042] Specifically, a transfer water bag 13 is fixedly connected to the top of the support frame 1, and the transfer water bag 13 is connected to the water tank 41 through a high-pressure water pipe 42. The end of the high-pressure water pipe 42 close to the water tank 41 extends to the bottom of the water tank 41. A connecting water pipe 12 is connected to one side of the transfer water bag 13, and the connecting water pipe 12 is connected to the hollow tube 51.

[0043] At this time, the speed at which the air pressure in the water tank 41 increases will also change with the change of wind speed. The greater the wind speed, the greater the increase in the air pressure in the water tank 41. The water in the water tank 41 will be pressed into the high-pressure water pipe 42, and then enter the transfer water bag 13 through the high-pressure water pipe 42. Part of the water will enter the hollow tube 51 through the connecting water pipe 12 and be sprayed out through the atomizing nozzle 6. The sprayed water can reduce the dust content in the air within a certain range, thereby ensuring a better working environment for the staff, and achieving green dust reduction through wind power, which is more in line with environmental protection requirements.

[0044] Specifically, the end of the driving shaft 33 away from the transmission rack 45 is connected to the reducer 32 , and the reducer 32 is fixedly connected to the side wall of the support frame 1 through a support member. The end of the reducer 32 away from the driving shaft 33 is provided with a fan blade 31 .

[0045] Under the action of wind, the fan blades 31 will rotate. During the rotation, the fan blades 31 can transmit power to the reducer 32. The reducer 32 drives the driving shaft 33 to rotate at a uniform speed. The purpose of green dust reduction is achieved by utilizing wind power. At the same time, the wind power can also be used to balance the top plate 46 and the top of the balcony in a continuous tight state, which is convenient and quick.

[0046] Specifically, support bosses 16 are fixedly connected on both sides of the support frame 1, a pneumatic cylinder 44 is fixedly connected to the middle of the support boss 16, a reciprocating pressure plate 43 is fixedly connected to the top of the pneumatic cylinder 44, a cylinder 442 is arranged between the reciprocating pressure plate 43 and the support boss 16, an air pipe 441 is arranged at the bottom of the pneumatic cylinder 44, and the lower end of the air pipe 441 extends into the water tank 41.

[0047] The reciprocating pressure plate 43 can press the gas out through the air cylinder 44 during the downward movement, and the gas enters the water tank 41 through the air pipe 441. The air pressure in the water tank 41 will gradually increase, and when the wind speed is higher, the dust prevention amount of the construction site may increase. At this time, the speed of increasing the air pressure in the water tank 41 will also change with the change of wind speed. The higher the wind speed, the greater the increase in the air pressure in the water tank 41 will also increase accordingly. The water in the water tank 41 will be pressed into the high-pressure water pipe 42, and then enter the transfer water bag 13 through the high-pressure water pipe 42. Part of the water will enter the hollow tube 51 through the connecting water pipe 12 and be sprayed out through the atomizing nozzle 6. The sprayed water can reduce the dust content in the air within a certain range in the air, thereby ensuring a better working environment for the staff.

[0048] When the cam 34 rotates to a state of being separated from the reciprocating pressure plate 43, the cylinder 442 pushes the reciprocating pressure plate 43 to move to an initial state.

[0049] Specifically, a cam 34 is fixedly connected to the outer wall of the driving shaft 33 , and a protruding end of the cam 34 can contact the outer wall of the reciprocating pressure plate 43 .

[0050] When the cam 34 rotates, the protruding end of the cam 34 can contact the upper surface of the reciprocating pressure plate 43 and press the reciprocating pressure plate 43 downward. During this process, the cylinder 442 is also compressed. When the cam 34 rotates to a state separated from the reciprocating pressure plate 43, the reciprocating pressure plate 43 will move upward to the initial position under the push of the cylinder 442.

[0051] Specifically, the support assembly 2 includes a U-shaped support plate 21 , the U-shaped support plate 21 slides through the guide hole 11 , and both ends of the guardrail 5 are placed in the U-shaped support plate 21 .

[0052] The U-shaped support plate 21 supports and limits the guardrail 5, and the installation is convenient and quick. The guardrail 5 can be installed on both sides of the support frame 1. By setting multiple groups of support frames 1, multiple guardrails 5 can be installed according to actual needs.

[0053] Specifically, an adjusting threaded rod 15 is rotatably provided in the middle of the guide hole 11 , the U-shaped support plate 21 is sleeved on the outer wall of the adjusting threaded rod 15 , and the U-shaped support plate 21 is threadedly connected to the adjusting threaded rod 15 , and a rotating disk 14 is fixedly connected to the top of the adjusting threaded rod 15 .

[0054] The adjusting threaded rod 15 can be driven to rotate by rotating the rotating disk 14 , and the adjusting threaded rod 15 can drive the U-shaped support plate 21 to move up and down along the guide hole 11 during the rotation process, so as to adjust the height of the U-shaped support plate 21 conveniently and quickly.

[0055] Specifically, both ends of the U-shaped support plate 21 are fixedly connected with side limit frames 22, a clamping block 23 is slidably penetrated in the middle of the side limit frame 22, and a chamfer is provided on the side of the clamping block 23 close to the middle of the U-shaped support plate 21, and a rotating screw 24 is threadedly penetrated in the end of the side limit frame 22 away from the U-shaped support plate 21, and a clamping spring 25 is fixedly connected to the side of the clamping block 23 close to the side limit frame 22, and the end of the clamping spring 25 away from the clamping block 23 is fixedly connected to the inner wall of the side limit frame 22.

[0056] When installing the guardrail 5, it is only necessary to place the two ends of the guardrail 5 above the corresponding U-shaped support plate 21. Under the squeezing of the end of the guardrail 5, the clamping block 23 will move to the side away from the support frame 1 until the end of the guardrail 5 contacts the inner wall of the U-shaped support plate 21. At this time, the clamping block 23 and the end of the guardrail 5 are pressed together under the push of the clamping spring 25, and the end of the guardrail 5 can be fixed by rotating the rotating screw 24.

[0057] Specifically, the outer gear ring 35 is rotatably sleeved on the outer wall of the driving shaft 33, and the contact surfaces between the outer gear ring 35 and the driving shaft 33 are roughened, and the friction force between the outer gear ring 35 and the driving shaft 33 is greater than the sum of the gravity of the clamping plate 48, the support shaft 47 and the balancing top plate 46, and the clamping plate 48, the support shaft 47 and the balancing top plate 46 are all made of lightweight materials.

[0058] The driving shaft 33 can drive the outer gear ring 35 to rotate during the rotation process, and the outer gear ring 35 can drive the transmission rack 45 to move upward along the side wall of the support frame 1 during the rotation process, and the balance top plate 46 is pushed upward by the transmission rack 45, so that the abutting plate 48 is abutted against the top of the balcony, which saves the manual abutting process and is convenient and fast. When the abutting plate 48 is abutted against the top of the balcony, the driving shaft 33 continues to rotate and rotates relative to the outer gear ring 35. As long as the driving shaft 33 rotates, the balance top plate 46 can be kept in a continuous abutting state with the top of the balcony, ensuring the stability of the support frame 1. The friction force between the outer gear ring 35 and the driving shaft 33 during the rotation process is much greater than the sum of the gravity of the abutting plate 48, the support shaft 47 and the balance top plate 46, so that during use, when the outer gear ring 35 and the driving shaft 33 rotate relative to each other, the balance top plate 46 can continue to be in a tight state with the top of the balcony. When the outer gear ring 35 and the driving shaft 33 do not rotate, the balance top plate 46 can still be in a tight state.

[0059] Working principle: Place a set of support frames 1 on the balcony between two floors. The staff can push the balancing top plate 46 upward to drive the support shaft 47 set on the top to move upward. During the upward movement of the support shaft 47, the clamping plate 48 can be driven to clamp against the top of the balcony, thereby increasing the stability of the support frame 1.

[0060] When the staff accidentally hits the support frame 1, the support frame 1 will not shake, ensuring the construction safety of the staff. If the staff forgets to tighten the clamping plate 48 against the balcony top, the fan blade 31 will start to rotate under the action of wind, and the kinetic energy of the fan blade 31 will be transmitted to the driving shaft 33 through the reducer 32. The driving shaft 33 can drive the outer gear ring 35 to rotate during the rotation. The outer gear ring 35 can drive the transmission rack 45 to move upward along the side wall of the support frame 1 during the rotation, and the balancing top plate 46 is pushed upward by the transmission rack 45, so that the clamping plate 48 is tightened against the balcony top, saving the manual tightening process, which is convenient and fast. After the clamping plate 48 is tightened against the balcony top, the driving shaft 33 continues to rotate and rotates relative to the outer gear ring 35. As long as the driving shaft 33 rotates, the balancing top plate 46 and the balcony top can be kept in a continuous tightening state, thereby ensuring the stability of the support frame 1.

[0061] During the rotation of the driving shaft 33, the cam 34 fixedly installed on the outer wall can be driven to rotate synchronously. During the rotation, the cam 34 can reciprocally press the reciprocating pressure plate 43 set downward. During the downward movement of the reciprocating pressure plate 43, the gas can be pressed out through the air pressure cylinder 44, and the gas enters the water tank 41 through the air pipe 441. The air pressure in the water tank 41 will gradually increase, and when the wind speed is higher, the dust prevention amount of the construction site may increase. At this time, the speed of increasing air pressure in the water tank 41 will also change with the change of wind speed. The higher the wind speed, the greater the increase in air pressure in the water tank 41. The water in the water tank 41 will be pressed into the high-pressure water pipe 42, and then enter the transfer water bag 13 through the high-pressure water pipe 42. Part of the water will enter the hollow tube 51 through the connecting water pipe 12 and be sprayed out through the atomizing nozzle 6. The sprayed water can reduce the dust content in the air within a certain range in the air, thereby ensuring a better working environment for the staff, and achieving green dust reduction through wind power, which is more in line with environmental protection requirements.

[0062] When installing the guardrail 5, it is only necessary to place the two ends of the guardrail 5 above the corresponding U-shaped support plate 21. Under the squeezing of the end of the guardrail 5, the clamping block 23 will move to the side away from the support frame 1 until the end of the guardrail 5 contacts the inner wall of the U-shaped support plate 21. At this time, the clamping block 23 and the end of the guardrail 5 are pressed together under the push of the clamping spring 25, and the end of the guardrail 5 can be fixed by rotating the rotating screw 24.

[0063] The adjusting threaded rod 15 can be driven to rotate by rotating the rotating disk 14 , and the adjusting threaded rod 15 can drive the U-shaped support plate 21 to move up and down along the guide hole 11 during the rotation process, so as to adjust the height of the U-shaped support plate 21 conveniently and quickly.

[0064] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of the present invention is defined by the attached claims and their equivalents.

Claims

1. An assembled low-energy green building construction structure, comprising a support frame (1), characterized in that: A guide hole (11) is provided in the middle of the support frame (1), and a support assembly (2) is slidably arranged in the middle of the guide hole (11); A driving component (3) is disposed on one side of the support frame (1); a stabilizing component (4) is disposed at the bottom of the support frame (1); The stabilizing component (4) comprises a water tank (41) for increasing the stability of the support frame (1), the water tank (41) being fixedly connected to both sides of the bottom of the support frame (1), the driving component (3) comprising a driving shaft (33), the driving shaft (33) rotatably passing through the middle of the support frame (1), an outer toothed ring (35) being fixedly sleeved on one side of the outer wall of the driving shaft (33), a transmission rack (45) being slidingly sleeved on one side of the support frame (1), the transmission rack (45) being meshed with the outer toothed ring (35); A balancing top plate (46) is fixedly connected to one side of the transmission rack (45) close to the top of the support frame (1); a support shaft (47) is fixedly connected to the middle part of one side of the balancing top plate (46) close to the top of the support frame (1); and a clamping plate (48) is fixedly connected to one end of the support shaft (47) away from the balancing top plate (46); A guardrail (5) is provided between the two groups of support frames (1), a hollow tube (51) is fixedly connected to the top of the guardrail (5), and an atomizing nozzle (6) is provided through the top of the hollow tube (51); The end of the driving shaft (33) away from the transmission rack (45) is connected to a reducer (32), the reducer (32) is fixedly connected to the side wall of the support frame (1) via a support member, and the end of the reducer (32) away from the driving shaft (33) is provided with a fan blade (31); Both sides of the support frame (1) are fixedly connected to support bosses (16), the middle of the support bosses (16) is fixedly connected to an air cylinder (44), the top of the air cylinder (44) is fixedly connected to a reciprocating pressure plate (43), a cylinder (442) is provided between the reciprocating pressure plate (43) and the support bosses (16), an air pipe (441) is provided at the bottom of the air cylinder (44), and the lower end of the air pipe (441) extends into the water tank (41); A cam (34) is fixedly connected to the outer wall of the driving shaft (33), and a protruding end of the cam (34) can contact the outer wall of the reciprocating pressure plate (43).

2. The assembled low-energy green building construction structure according to claim 1 is characterized by: A transfer water bag (13) is fixedly connected to the top of the support frame (1), and the transfer water bag (13) is connected to the water tank (41) via a high-pressure water pipe (42). One end of the high-pressure water pipe (42) close to the water tank (41) extends to the bottom of the water tank (41). One side of the transfer water bag (13) is connected to a connecting water pipe (12), and the connecting water pipe (12) is arranged to penetrate the hollow pipe (51).

3. The assembled low-energy green building construction structure according to claim 1 is characterized by: The support assembly (2) comprises a U-shaped support plate (21), the U-shaped support plate (21) slidingly passes through the guide hole (11), and the two ends of the guardrail (5) are placed in the U-shaped support plate (21).

4. The assembled low-energy green building construction structure according to claim 3 is characterized by: An adjusting threaded rod (15) is rotatably provided in the middle of the guide hole (11), the U-shaped support plate (21) is sleeved on the outer wall of the adjusting threaded rod (15), and the U-shaped support plate (21) is threadably connected to the adjusting threaded rod (15), and a rotating disk (14) is fixedly connected to the top of the adjusting threaded rod (15).

5. The assembled low-energy green building construction structure according to claim 4 is characterized by: Both ends of the U-shaped support plate (21) are fixedly connected to a side limit frame (22); a clamping block (23) is slidably provided through the middle of the side limit frame (22); a chamfer is provided on the side of the clamping block (23) close to the middle of the U-shaped support plate (21); a rotating screw (24) is threadedly provided through the end of the side limit frame (22) away from the U-shaped support plate (21); a clamping spring (25) is fixedly connected to the side of the clamping block (23) close to the side limit frame (22); and an end of the clamping spring (25) away from the clamping block (23) is fixedly connected to the inner wall of the side limit frame (22).

6. The assembled low-energy green building construction structure according to claim 1 is characterized by: The outer gear ring (35) is rotatably sleeved on the outer wall of the driving shaft (33), and the contact surfaces of the outer gear ring (35) and the driving shaft (33) are both roughened, and the friction force between the outer gear ring (35) and the driving shaft (33) is greater than the sum of the weights of the abutting plate (48), the support shaft (47) and the balancing top plate (46), and the abutting plate (48), the support shaft (47) and the balancing top plate (46) are all made of lightweight materials.

Citation Information

Patent Citations

  • Assembly type low-energy-consumption green building construction structure

    CN210316648U

  • Fabricated low-energy-consumption green building construction structure

    CN220539400U

  • Building engineering construction fence

    CN116876913A

  • Protective fence for constructional engineering

    CN220167692U