Construction method for hard rock pipe jacking to penetrate through water-rich fault fracture zone

By using observation holes and high viscosity mud sealing technology in hard rock top pipe construction, the construction problem of crossing the water-rich fault breaking zone is solved, the construction safety and speed are improved, and the construction risk is reduced.

CN118959033APending Publication Date: 2024-11-15SINOHYDRO BUREAU 14 CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411333285.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-24
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

During the construction of hard rock top pipes, when passing through the water-rich fault breaking zone, the rock mass is poor intact and abundant in water, resulting in formation collapse and thixotropic mud loss, increasing the lead-in resistance, and the reinforcement effect cannot be detected in advance, which poses construction risk.

Method used

By presetting observation holes within the fault range, high-viscosity thixotropic mud and flow-shaped thick mud are injected, the water seepage in the fracture zone is blocked, the pipeline friction resistance is reduced, and the gap between the pipe section and surrounding rock is filled after passing through to isolate the groundwater, ensuring that Slurry stability.

Benefits of technology

It effectively reduces the construction risk of hard rock top pipe passing through the water-rich fault crushing zone, ensures construction safety and speed, improves the overall stability of the crushing zone, and avoids the phenomenon of pipe jamming.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118959033A_ABST
    Figure CN118959033A_ABST
Patent Text Reader

Abstract

The invention relates to a construction method for hard rock pipe jacking to pass through a water-rich fault fracture zone, which comprises the following steps of: presetting an observation hole and a grouting hole at the bottom of a steel pipe joint, analyzing the surrounding rock condition by combining jacking thrust with the observation hole, and determining a specific section of the fault fracture zone; after the pipe jacking machine passes through the fault fracture zone, plastic flow thick mud is injected into 6-7 sections of pipes in the front section and the rear section of the fault fracture zone from preset grouting holes of the pipe sections to fill gaps between the pipe sections and surrounding rocks, so that underground water is blocked, the underground water does not flow to the front portion and the rear portion of the fracture zone, and it is ensured that thixotropic mud outside the fracture zone is not diluted or lost; high-concentration thixotropic slurry is continuously injected from a reserved grouting hole of a pipe joint in a fracture zone section at high pressure, so that surrounding rock fractures of a fault fracture zone are filled with the slurry, slurry pressure and external water pressure balance is formed, and a stratum does not collapse; thixotropic slurry is continuously injected in the whole jacking process to achieve resistance reduction. Water plugging is carried out before and after the hard rock jacking pipe penetrates through the fault fracture zone, the stratum loss of the fault fracture zone is supplemented, the stratum is stabilized, pipe clamping in the jacking process is prevented, and smooth jacking of the long-distance hard rock jacking pipe is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of pipe jacking construction of water conservancy projects, and in particular relates to a construction method for a hard rock pipe jacking to pass through a water-rich fault fracture zone. Background Art

[0002] With the acceleration of national infrastructure construction, more and more underground tunnels are constructed by pipe jacking. Pipe jacking has the advantages of high safety and fast construction speed. In hard rock formations, pipe jacking construction is also increasingly used. One of the major construction difficulties of long-distance hard rock pipe jacking is crossing the water-rich fault fracture zone. The rock mass in the fault fracture zone has poor integrity. Affected by the fault, the rock mass is broken, the self-stabilization ability is poor, and the water volume is abundant. During the pipe jacking crossing process, it is often easy to collapse the formation and the loss of thixotropic mud causes the jacking resistance to increase, which is very likely to cause the pipe to get stuck. The pipe generally passes through the mountain, is buried deep, has limited terrain and geomorphic conditions, and is not suitable for exploration. The fault fracture zone has uncertainty in length and position, and the internal space of the pipe is limited. There is no condition for pre-reinforcement of the fault fracture zone from the ground or in the cave, and the reinforcement effect cannot be detected before crossing. How to isolate, seal and stabilize the fault fracture zone after the long-distance hard rock pipe jacking passes through the fault zone to prevent the pipe from getting stuck during the jacking process and reduce the construction risk of long-distance hard rock pipe jacking passing through the water-rich fault fracture zone is a construction technical problem that needs to be solved urgently in this field. Summary of the invention

[0003] The purpose of the present invention is to provide a construction method for a hard rock pipe jacking to cross a water-rich fault fracture zone, which can seal the water seepage in the fault zone and reduce the friction of the pipeline by injecting thick mud in the fault zone, increasing the concentration of thixotropic mud, flushing slag from the observation hole, etc., to ensure that the long-distance hard rock mud water balance pipe jacking can smoothly cross the water-rich fault fracture zone.

[0004] In order to achieve the above-mentioned purpose, the construction method of the hard rock jacking pipe passing through the water-rich fault fracture zone of the present invention is as follows: 1) Preset observation holes at the bottom of the 15-20 steel pipe sections behind the hard rock pipe jacking machine. Analyze the surrounding rock conditions through the jacking thrust combined with the observation holes to determine the specific section of the fault fracture zone. When the pipe is jacked, the steel cover of the observation hole is closed to prevent groundwater and mud outside the pipe wall from flowing into the pipe. When it is necessary to check the surrounding rock conditions of the pipe wall, open the steel cover to carry out the surrounding rock inspection. 2) Four grouting holes are set every 3m in the pipe section, and the four grouting holes are arranged at 90 degrees. Eight grouting holes are set in each section of steel pipe; during the jacking process, thixotropic mud is injected into the gap between the outer wall of the pipe and the excavation surface through the grouting holes. The Martens viscosity of the drag-reducing mud is greater than 120s. It is replenished and injected every 3~6m of jacking. The injection volume each time is 1.5~2.0 times the theoretical gap between the pipe wall and the surrounding rock to reduce the friction resistance of the pipeline; plastic thick mud is injected before and after the fault zone. The plastic thick mud is injected from the end away from the fault zone to the end close to the fault zone. The thick mud is injected from low to high at each grouting section; 3) After the pipe jacking machine passes through the fault fracture zone, 6 to 7 pipe sections in the front and rear sections of the fault fracture zone are injected from the preset grouting holes of the pipe sections to fill the gap between the pipe sections and the surrounding rock, thereby isolating and blocking the groundwater in the fracture zone, so that the groundwater does not flow to the front and rear of the fracture zone, ensuring that the thixotropic mud outside the fracture zone is not diluted or lost, and the formation does not collapse; 4) Use high-pressure water to repeatedly flush the observation hole at the bottom of the pipe joint, and remove the accumulated slag between the bottom of the pipe and the surrounding rock through the observation hole to reduce frictional resistance.

[0005] Furthermore, the observation hole has an inner diameter of 150 mm and is composed of a steel casing, a flange, a steel cover plate, connecting bolts, and a sealing rubber pad.

[0006] Furthermore, the thixotropic mud injected into the fault fracture zone has a Martens viscosity greater than 120s and is formed by mixing bentonite, CMC and water (ratio 1:0.012). The grouting volume is mainly controlled, and the grouting volume is controlled to 1.5-2.0 times the theoretical gap between the pipe wall and the surrounding rock to ensure that the thixotropic mud fills the gap between the pipe wall and the surrounding rock and penetrates into the rock cracks in the fault fracture zone.

[0007] Furthermore, the fluidized thick mud is prepared by mixing mud powder and bentonite in a ratio of 2:1, and the moisture content is controlled at 400%-500%. The mud powder has high viscosity and can block water. The bentonite has good thixotropy and can enhance the fluidity of the thick mud, making it easier to inject.

[0008] Furthermore, the injection pressure of the fluidized thick mud is 0-5MPa, and the grouting pressure is terminated at 5MPa, or until the thick mud flows out from the grouting hole.

[0009] Beneficial effects of the present invention: For long-distance hard rock slurry-balanced jacking pipes passing through water-rich fractured zones, observation holes are opened and jacking force analysis is performed to determine the surrounding rock conditions. Thick mud is injected, and the viscosity of thixotropic mud is increased to effectively block the fissure water and improve the overall stability of the fractured zone. This allows long-distance hard rock jacking pipes to pass through the fractured zone smoothly, ensuring construction safety and speed, and has good economic applicability. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] In order to more clearly illustrate the specific implementation of the present invention, the following will briefly introduce the drawings required for use in the specific implementation. In all the drawings, each element or part is not necessarily drawn according to the actual scale.

[0011] Figure 1 It is a longitudinal section schematic diagram of the construction method of the hard rock jacking pipe passing through the water-rich fault fracture zone of the present invention; Figure 2 It is a cross-sectional schematic diagram of the hard rock top pipe of the present invention.

[0012] Figure 3 It is a schematic diagram of the steel pipe (with observation hole) of the present invention; Figure 4 It is a schematic diagram of the observation hole of the present invention.

[0013] The numbers in the figure are: 1-steel casing, 2-flange, 3-steel cover, 4-connecting bolts, 5-sealing rubber pad, 6-steel pipe, 7-grouting hole, 8-preparation of thick mud, 9-pipe jacking machine. DETAILED DESCRIPTION

[0014] The following embodiments of the technical solution of the present invention are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and are therefore only used as examples, and cannot be used to limit the protection scope of the present invention. Example

[0015] like Figure 1 As shown, a construction method for a hard rock pipe jacking to pass through a water-rich fault fracture zone. When the hard rock pipe jacking passes through the fracture zone fault, it will be affected by the seepage of water in the fracture zone and the broken rock blocks, which will reduce the mud water balance effect. At the same time, the slag will accumulate around the pipe, which will further increase the friction resistance, making the thixotropic mud lubrication ineffective and even causing the pipe to get stuck. In order to reduce the impact of the fault fracture zone on the hard rock pipe jacking, the stability of the surrounding rock of the fracture zone fault is ensured by grouting with thick mud and increasing the concentration of thixotropic mud, so as to avoid pipe and machine jams and ensure the mud water balance effect. Since the operating space inside the pipe jacking is small, it is impossible to directly perform geological reinforcement of the surrounding rock through the pipeline. Therefore, after the pipe jacking machine 9 passes through the fracture zone, the specific position of the fault fracture zone is judged by opening the observation hole to observe, flush out the slag and the change of the jacking force. The details are as follows: An observation hole is preset at the bottom of the 15-20 steel pipe sections behind the hard rock pipe jacking machine. The surrounding rock conditions are analyzed through the jacking thrust combined with the observation hole to determine the specific section of the fault fracture zone. When the pipe is jacked, the steel cover of the observation hole is closed to prevent groundwater and mud outside the pipe wall from flowing into the pipe. When it is necessary to check the surrounding rock conditions of the pipe wall, the steel cover can be opened to carry out the surrounding rock inspection. like Figure 3As shown, the hard rock jacking pipe adopts a steel pipe 6, with a single section length of 6m. Four grouting holes are set at every 3m interval. The four grouting holes are arranged at 90 degrees, and 8 grouting holes are opened in each section of the steel pipe. During the jacking process, thixotropic mud is injected into the gap between the outer wall of the pipe and the excavation surface through the grouting holes. The thixotropic mud is continuously injected to reduce the drag. The Martens viscosity of the drag-reducing mud is greater than 120s. It is replenished and injected once every 3-6m of jacking. The injection amount each time is 1.5-2.0 times the theoretical gap between the pipe wall and the surrounding rock, which reduces the friction resistance of the pipeline; the fluidized thick mud is injected from the end away from the fault zone to the end near the fault zone. The thick mud is injected from the low to the high at each grouting section. Four grouting holes 7 are set at every 3m interval on the pipe section, and the four grouting holes 7 are arranged at 90 degrees.

[0016] After the pipe jacking machine passes through the fault fracture zone, for each of the 6-7 pipe sections in the front and rear sections of the fault fracture zone, the reserved grouting holes 7 in the pipeline are connected to the grouting equipment to inject prepared thick mud 8 to fill the gap between the pipe section and the surrounding rock; fluidized thick mud is injected from the preset grouting holes in the pipe section to fill the gap between the pipe section and the surrounding rock, forming a balance between the mud pressure and the external water pressure, thereby isolating and blocking the groundwater in the fracture zone, so that the groundwater does not flow to the front and rear of the fracture zone, ensuring that the thixotropic mud outside the fracture zone is not diluted or lost, and the formation does not collapse.

[0017] Use high-pressure water to repeatedly flush the observation hole at the bottom of the pipe joint, and remove the accumulated slag between the bottom of the pipe and the surrounding rock through the observation hole to reduce frictional resistance.

[0018] The inner diameter of the observation hole is 150mm, and it is composed of a steel casing 1, a flange 2, a steel cover 3, connecting bolts 4, and a sealing rubber pad 5. The steel cover 3 is tightly connected and fixed to the steel casing 1 by the flange 2 and the connecting bolts 4. At the same time, a sealing rubber pad 5 is added between the steel cover 3 and the flange 2 to prevent water from seeping into the observation hole when it is closed. The steel components are made of the same high-strength steel as the pipeline. An observation hole is set for the 15-20 sections of steel pipe 6 behind the pipe jacking machine 9. The observation hole is located at the bottom position in the middle of each section of the pipeline. Figure 4 shown.

[0019] Before starting the jacking after the concentrated mud is injected, for the fault fracture zone section, the Martens viscosity of the injected thixotropic mud must be greater than 120s. Bentonite, CMC and water are mixed and molded (ratio 1:0.012), and the grouting volume is mainly controlled. The grouting volume is controlled to 1.5-2.0 times the theoretical gap between the pipe wall and the surrounding rock to ensure that the thixotropic mud fills the gap between the pipe wall and the surrounding rock and penetrates into the rock cracks in the fault fracture zone. Together with the concentrated mud, it plays a role in ensuring the stability of the broken surrounding rock and blocking the water seepage of the surrounding rock.

[0020] The fluidized thick mud is prepared by mixing mud powder + bentonite in a ratio of 2:1, and the water content is controlled at 400% to 500%. The thick mud can be prepared by using mixing equipment and combined with manual transportation. The mud powder has high viscosity and can block water. The bentonite has good thixotropy and can enhance the fluidity of the thick mud, making it easier to inject.

[0021] The order of thick mud injection follows the sequence of "end first, then middle, bottom first, then top", the injection pressure is 0-5MPa, the grouting pressure is terminated at 5MPa, or until thick mud flows out near grouting hole 7, the thick mud needs to be injected continuously and cannot be interrupted at will.

[0022] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A construction method for hard rock pipe jacking through a water-rich fault fracture zone, characterized in that: 1) Preset observation holes at the bottom of the 15-20 steel pipe sections behind the hard rock pipe jacking machine. Analyze the surrounding rock conditions through the jacking thrust combined with the observation holes to determine the specific section of the fault fracture zone. When the pipe is jacked, the steel cover of the observation hole is closed to prevent groundwater and mud outside the pipe wall from flowing into the pipe. When it is necessary to check the surrounding rock conditions of the pipe wall, open the steel cover to carry out the surrounding rock inspection. 2) Four grouting holes are set every 3m in the pipe section, and the four grouting holes are arranged at 90 degrees. Eight grouting holes are set in each section of steel pipe; during the jacking process, thixotropic mud is injected into the gap between the outer wall of the pipe and the excavation surface through the grouting holes. The Martens viscosity of the drag-reducing mud is greater than 120s. It is replenished and injected every 3~6m of jacking. The injection volume each time is 1.5~2.0 times the theoretical gap between the pipe wall and the surrounding rock to reduce the friction resistance of the pipeline; plastic thick mud is injected before and after the fault zone. The plastic thick mud is injected from the end away from the fault zone to the end close to the fault zone. The thick mud is injected from low to high at each grouting section; 3) After the pipe jacking machine passes through the fault fracture zone, 6 to 7 pipe sections in the front and rear sections of the fault fracture zone are injected from the preset grouting holes of the pipe sections to fill the gap between the pipe sections and the surrounding rock, thereby isolating and blocking the groundwater in the fracture zone, so that the groundwater does not flow to the front and rear of the fracture zone, ensuring that the thixotropic mud outside the fracture zone is not diluted or lost, and the formation does not collapse; 4) Use high-pressure water to repeatedly flush the observation hole at the bottom of the pipe joint, and remove the accumulated slag between the bottom of the pipe and the surrounding rock through the observation hole to reduce frictional resistance.

2. A construction method for hard rock pipe jacking through a water-rich fault zone according to claim 1, characterized in that: The inner diameter of the observation hole is 150mm, and it is composed of a steel casing, a flange, a steel cover, connecting bolts, and a sealing rubber pad. The steel cover is tightly connected and fixed to the steel casing by the flange and connecting bolts, and a sealing rubber pad is added between the steel cover and the flange.

3. The construction method of a hard rock pipe jacking through a water-rich fault fracture zone according to claim 1, characterized in that: The thixotropic mud injected into the fault fracture zone has a Martens viscosity greater than 120s and is formed by mixing bentonite, CMC and water (ratio 1:0.012). The grouting volume is mainly controlled, and the grouting volume is controlled to 1.5-2.0 times the theoretical gap between the pipe wall and the surrounding rock to ensure that the thixotropic mud fills the gap between the pipe wall and the surrounding rock and penetrates into the rock cracks in the fault fracture zone.

4. A construction method for hard rock pipe jacking through a water-rich fault zone according to claim 1, characterized in that: The fluidized thick mud is prepared by mixing mud powder and bentonite in a ratio of 2:1, and the water content is controlled at 400%-500%. The mud powder has high viscosity and can block water. The bentonite has good thixotropy and can enhance the fluidity of the thick mud, making it easy to inject into the construction.

5. The construction method of a hard rock pipe jacking through a water-rich fault fracture zone according to claim 1, characterized in that: The injection pressure of the fluidized thick mud is 0-5MPa, and the grouting pressure is terminated at 5MPa, or until the thick mud flows out from the grouting hole.