Coal mine underground air and water pipeline online monitoring system

By installing an online monitoring system underground in coal mines and using flow sensors, pressure sensors and remote control systems, the problems of untimely monitoring and remote control in the management of feng shui pipelines in traditional coal mines are solved, and high-precision, real-time monitoring and automation are achieved Adjustment has improved the level of safety production and reduced labor costs.

CN118959077APending Publication Date: 2024-11-15安徽恒源煤电股份有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411071373.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The management of underground feng shui pipelines in traditional coal mines relies on manual inspection, and there are problems such as untimely monitoring, inaccurate data, and difficult to remotely control, which seriously restricts the improvement of coal mines' safety production and automation level.

Method used

A coal mine underground feng shui pipeline online monitoring system is designed, including an underground monitoring terminal, a data transmission network and a ground monitoring center. It uses flow sensors, pressure sensors and electric gate valves to achieve high-speed and stable data transmission through Ethernet technology and on the ground. The monitoring center conducts real-time data analysis and remote control, supports remote switching control of downhole electric gate valves, trigger alarm mechanism and partition management.

Benefits of technology

It improves monitoring accuracy and real-time performance, enhances remote control capabilities, improves the level of safety production, reduces labor costs, and can close the pipeline in a timely manner to prevent safety accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118959077A_ABST
    Figure CN118959077A_ABST
Patent Text Reader

Abstract

The invention discloses a coal mine underground air and water pipeline on-line monitoring system which comprises a system framework, and the system framework comprises an underground monitoring terminal, a data transmission network, a ground monitoring center and a remote control system. The underground monitoring terminal comprises a flow sensor, a pressure sensor and an electric gate valve; the ground monitoring center comprises a data analysis module and a data display module; compared with the prior art, the system has the advantages that through the high-precision sensor and the real-time data transmission technology, accurate and real-time monitoring of underground air and water pipelines is achieved; the system supports remote opening and closing control of an underground electric gate valve, and the automatic adjusting capacity of a water supply and air supply system is improved; a pipeline can be closed in time under the abnormal condition, and safety accidents caused by water flow turbulence and water pressure fluctuation are effectively prevented; the manual inspection frequency is reduced, the labor cost is reduced, and the working efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal mine safety monitoring, and in particular to an online monitoring system for underground wind and water pipelines in a coal mine. Background Art

[0002] Traditional coal mine underground Fengshui pipeline management mostly relies on manual inspections, which has problems such as untimely monitoring, inaccurate data, and difficulty in remote control, which seriously restricts the safe production and automation level of coal mines. Therefore, it is particularly important to develop a system that can monitor and remotely control underground Fengshui pipelines in real time and accurately. Summary of the invention

[0003] The purpose of the present invention is to provide an online monitoring system for underground wind and water pipelines in a coal mine to solve the problems raised in the above-mentioned background technology.

[0004] In order to solve the above technical problems, the technical solution provided by the present invention is: an online monitoring system for underground Fengshui pipelines in coal mines, comprising a system framework, wherein the system framework comprises an underground monitoring terminal, a data transmission network, a ground monitoring center, and a remote control system;

[0005] The downhole monitoring terminal includes a flow sensor, a pressure sensor, and an electric gate valve;

[0006] The ground monitoring center includes a data analysis module and a data display module;

[0007] The system framework is connected with the downhole monitoring terminal, the data transmission network, the ground monitoring center, and the remote control system;

[0008] The downhole monitoring terminal is connected to a flow sensor, a pressure sensor, and an electric gate valve;

[0009] The ground monitoring center is connected to the data analysis module and the data display module;

[0010] The remote control system is connected to the electric gate valve.

[0011] As a preferred solution, the flow sensor is responsible for collecting the flow parameters of the Feng Shui pipeline in real time, and the pressure sensor is responsible for collecting the pressure parameters of the Feng Shui pipeline in real time, and uploading the data to the ground monitoring center in real time.

[0012] As a preferred solution, the data transmission network adopts Ethernet technology to ensure high-speed and stable data transmission.

[0013] As a preferred solution, the data analysis module and data display module are used for real-time monitoring and data analysis, can display the real-time data of each mining area and each pipeline, and generate historical data reports to provide a basis for management decisions.

[0014] As a preferred solution, the remote control system realizes the function of remotely controlling the electric gate valve.

[0015] As a preferred solution, the ground monitoring center uses a remote control system to remotely control the opening and closing of underground electric gate valves, thereby realizing automatic adjustment of the water supply and air supply systems. Under abnormal circumstances, the system can automatically or manually close related pipelines to ensure water supply safety.

[0016] As a preferred solution, when the system detects that the flow and pressure parameters of the Feng Shui pipeline are beyond the set range, it will automatically trigger the alarm mechanism and notify relevant personnel through sound, light signals and text messages for timely processing.

[0017] As a preferred solution, in response to the water supply pressure requirements of different mining areas and levels in coal mines, the system adopts a zoning management method and realizes independent water supply control in different mining areas and levels through remote control of electric gate valves.

[0018] The advantages of the present invention compared with the prior art are:

[0019] 1. Improve monitoring accuracy and real-time performance: Through high-precision sensors and real-time data transmission technology, accurate and real-time monitoring of underground Fengshui pipelines is achieved;

[0020] 2. Enhanced remote control capability: The system supports remote switch control of underground electric gate valves, improving the automatic adjustment capability of water supply and air supply systems;

[0021] 3. Improve production safety: In abnormal situations, the pipeline can be closed in time to effectively prevent safety accidents caused by water flow disturbance and water pressure fluctuation;

[0022] 4. Reduce labor costs: Reduce the frequency of manual inspections, reduce labor costs, and improve work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a block diagram of the present invention.

[0024] Figure 2 It is a schematic diagram of underground water supply in the West Three Mining Area of ​​the present invention.

[0025] Figure 3 This is a schematic diagram of underground water supply in the East 1 mining area of ​​the present invention.

[0026] Figure 4 It is a schematic diagram of underground air supply of the present invention. DETAILED DESCRIPTION

[0027] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0028] In the description of the embodiments of the present invention, it should be noted that if the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, or the orientation or position relationship in which the invented product is usually placed when used. It is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0029] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components must be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0030] In the description of the embodiments of the present invention, "plurality" means at least 2.

[0031] In the description of the embodiments of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0032] Combined with Figure 1 , an online monitoring system for underground Fengshui pipelines in a coal mine, comprising a system framework, wherein the system framework comprises an underground monitoring terminal, a data transmission network, a ground monitoring center, and a remote control system;

[0033] The downhole monitoring terminal includes a flow sensor, a pressure sensor, and an electric gate valve;

[0034] The ground monitoring center includes a data analysis module and a data display module;

[0035] The system framework is connected with the downhole monitoring terminal, the data transmission network, the ground monitoring center, and the remote control system;

[0036] The downhole monitoring terminal is connected to a flow sensor, a pressure sensor, and an electric gate valve;

[0037] The ground monitoring center is connected to the data analysis module and the data display module;

[0038] The remote control system is connected to the electric gate valve.

[0039] The flow sensor is responsible for collecting the flow parameters of the Feng Shui pipeline in real time, and the pressure sensor is responsible for collecting the pressure parameters of the Feng Shui pipeline in real time, and uploading the data to the ground monitoring center in real time.

[0040] The data transmission network adopts Ethernet technology to ensure high-speed and stable data transmission.

[0041] The data analysis module and data display module are used for real-time monitoring and data analysis, and can display the real-time data of each mining area and each pipeline, and generate historical data reports to provide a basis for management decisions.

[0042] The remote control system realizes the function of remotely controlling the electric gate valve.

[0043] Real-time monitoring: The system monitors the flow rate, pressure and other parameters of the underground Fengshui pipeline in real time through flow sensors and pressure sensors, and uploads the data to the ground monitoring center in real time. The monitoring center can display the real-time data of each mining area and each pipeline, and generate historical data reports to provide a basis for management decisions.

[0044] Remote control: The ground monitoring center can remotely control the opening and closing of underground electric gate valves through the remote control system, and realize the automatic adjustment of water supply and air supply systems. In abnormal situations, the system can automatically or manually close the relevant pipelines to ensure water supply safety.

[0045] Abnormal alarm: When the system detects that the flow rate, pressure and other parameters of the Feng Shui pipeline are beyond the set range, it will automatically trigger the alarm mechanism and notify relevant personnel through sound, light signals and text messages for timely processing.

[0046] Zoning management: In view of the water supply pressure requirements of different mining areas and levels in coal mines, the system adopts zoning management and realizes independent water supply control of different mining areas and levels through remote control of electric gate valves.

[0047] When the present invention is implemented specifically, Qianyingzi Coal Mine is taken as an example.

[0048] 1. Application of Feng Shui Online Monitoring

[0049] 1. Application in water supply

[0050] Qianyingzi Coal Mine currently has West Three Mining Areas (elevation between -650m and 290m), West One Mining Area and East One Mining Area (-650m), and Two Horizontal Mining Areas (-650m—-970m, opening up tunnels). Each mining area is distributed on different contour lines and has different requirements for water supply pressure. In order to meet the water supply requirements, it is necessary to manage underground water use in different areas, and apply the Fengshui online monitoring system to achieve management effectiveness. At the same time, the underground water supply of Qianyingzi Coal Mine is divided into auxiliary shaft water supply and west wind shaft water supply, with the auxiliary shaft as the main water supply, and the west wind shaft only supplies water to the West Three Mining Areas. The auxiliary shaft water supply passes through the auxiliary shaft shaft to the auxiliary shaft lower mouth. After decompression in the auxiliary shaft decompression chamber, it meets the underground water supply demand and is divided into two east and west routes. The main water supply pipeline extends westward to the lower part of the West Three Mining Area and is separated from the water supply of the West Wind Well. It is responsible for the water supply of the West One Mining Area, the water supply during the development of the Second Level Mining Area, and the water supply of the lower part of the West Three Mining Area; it supplies water to the Second Level, and after the pressure is reduced again by a pressure reducing valve at the upper mouth of the Second Level, it supplies water to the Second Level during the development period; and it supplies water to the East One Mining Area to the east.

[0051] (1) Application in Xisan mining area

[0052] The water supply elevation of the West Wind Well used in the West Three Mining Area is high. It is connected to the water supply of the auxiliary well at the lower parking lot of the West Three Track. The electric gate valve at the connection is in a closed state to prevent the water supply of the West Wind Well from entering the auxiliary well water supply system, avoid water flow turbulence, and prevent water pressure fluctuations from causing pipe bursts in the auxiliary well water supply system. Online monitoring can be used to determine whether the water pressure is within the set range, and whether there is turbulence between the water supply of the West Wind Well and the auxiliary well, to prevent the high-level water supply of the West Wind Well from entering the auxiliary well water supply system. The elevation of the West Three Mining Area is between -650m and -290m. At -400m and above, the static pressure of the water supply can be directly used to meet production requirements; below -400m, a pressure reducing valve is used to reduce pressure and reduce the water supply pressure. The pressure sensor is used to monitor the water supply pressure of different elevations in the West Three Mining Area in real time to confirm that it meets the requirements for on-site use.

[0053] When there is a problem with the water supply of the west wind well or the water supply is insufficient, it is necessary to reduce the water supply to the West Three Mining District. By remotely controlling the lower electric gate valve and the two electric gate valves in the middle of the West Three Mining District, the water supply mode and water supply pressure of the West Three Mining District can be adjusted to meet the water supply safety of the West Three Mining District. Figure 2 shown.

[0054] (2) Application in West 1 Mining Area and 2 Horizontal Mining Area

[0055] The water supply of West 1 Mining Area and 2 Mining Area is supplied by the same main water supply pipeline, which is controlled by the western electric gate valve. The water supply of 2nd level can upload parameters through the pressure sensor and flow sensor on the upper part of 2nd level. By comparing the water supply parameters of other locations, it can be judged whether the water supply of 2nd level is normal, which improves the accuracy and timeliness of problem judgment. By remotely controlling the western electric gate valve, the water supply system can be automatically managed to avoid the expansion of problems or the occurrence of derivative disasters.

[0056] (3) Application in East 1 Mining Area

[0057] The East 1 mining area's mining working face is arranged at -650m and above, and has relatively high requirements for water pressure. When the underground water consumption is large, the system water supply pressure is low. The water consumption of other mining areas can be reduced by reducing the opening of the electric gate valve in other mining areas, and the water supply pressure of the system pipe network can be increased to meet the safety management of the water supply system in the East 1 mining area. Figure 3 shown.

[0058] 2. Application in air supply

[0059] The air supply of Qianyingzi Coal Mine is supplied from the air compressor room through the auxiliary shaft. The moisture in the air is filtered through the oil-water separator at the bottom of the auxiliary shaft, and then supplied to the West Mining Area 1, the Second Horizontal Mining Area (temporary development), and the West Mining Area 3 to the west, and to the East Mining Area 1 to the east. Pressure sensors and flow meters are installed on the western air supply pipeline, the eastern air supply pipeline, and the lower air supply pipeline of the West Mining Area 3 to monitor whether the underground air supply pressure and flow are normal, provide a basis for judgment on existing problems, reduce the difficulty of problems, improve the efficiency of solving them, and reduce the time to deal with problems. Figure 4 shown.

[0060] 2. Management of Feng Shui Online Monitoring

[0061] 1. When the underground or dispatching office reports problems with the air or water supply pressure, the duty personnel will go to the duty room in time to check the online monitoring of Feng Shui. Through the picture, they can find the problem in time, accurately determine the root cause of the problem, reduce the time of problem handling, and promote safe production.

[0062] 2. The on-duty personnel judge the operation status of the underground air and water supply system by checking the values ​​of the Feng Shui online monitoring center.

[0063] 3. Establish a management system that requires on-duty personnel to check the air and water pressure at the monitoring center every day and understand the pressure of the underground air and water supply system; if any problems are found, organize personnel to deal with them in a timely manner.

[0064] 4. When problems with system operation are discovered during daily management, we will actively seek solutions, revise the management system, and continuously improve it in line with on-site use requirements.

[0065] 5. There is a lack of professional personnel in system maintenance, and on-site training is conducted to improve employees’ processing capabilities and maintenance skills.

[0066] 6. Remote operation requirements

[0067] (1) Before remote start-up, the underground maintenance personnel shall conduct a comprehensive inspection and confirmation of the intelligent monitoring system of the compressed air and water supply pipelines. The inspection contents are as follows:

[0068] 1) Check whether the power switch is normal;

[0069] 2) Check whether the monitoring data displayed by each instrument is normal and accurate;

[0070] 3) Check whether the control switch of each device is switched to the "remote control" state.

[0071] (2) Before remote operation, the following work must be done:

[0072] 1) After entering the main interface, you can see the pressure, flow rate and status of gate valves in the Feng Shui pipelines at various locations underground.

[0073] 2) Carefully observe the computer system operation interface to check whether there are any signal interruption failures and alarm signals.

[0074] 3) Click the gate valve button and the gate valve button pops up.

[0075] 4) Click the three buttons of Gate Valve Open, Gate Valve Close and Gate Valve Stop to control the gate valve. When opening the gate valve, open it 25% first, and then fully open it after the water supply pressure returns to normal.

[0076] 7. Requirements during operation

[0077] (1) After the gate valve is opened or closed, the operator must concentrate and stick to his post. Observe the operation of various parameters through the industrial computer.

[0078] (2) Ask the on-site maintenance personnel whether the gate valve operating status and various parameters are consistent with the corresponding parameters of the ground industrial control computer. If any abnormality is found in the industrial control computer parameters, promptly notify the inspection personnel and on-duty personnel to handle it.

[0079] (3) Fill in various records in accordance with regulations.

[0080] 3. Problems encountered during system operation

[0081] 1. The pressure sensor at the bottom of the West 3rd track shows normal results. After the signal is fed back to the PLC control cabinet, it is fed back to the industrial computer and the value is small. By adjusting the background parameters, it shows normal results.

[0082] 2. The Feng Shui online monitoring system is distributed at many points underground, and the network signal is obtained nearby, resulting in unstable communication, which can only be eliminated after the mine network is upgraded.

[0083] 3. An electric gate valve is installed on the main water supply line, and only a pressure sensor and a flow meter are installed at the mining face. The user unit cannot remotely control the water supply pipeline at the mining face, and cannot achieve precise control, which needs to be added in the later extension project.

[0084] With the continuous improvement of mine mechanization, automation, informationization and intelligence, the promotion and application of online monitoring systems, the continuous reduction of underground personnel, and the continuous improvement of coal mine safety production standardization. The application of online monitoring of Fengshui pipelines has become an inevitable trend, and it is also a major factor in improving the standardization of coal mine safety production, while promoting the intelligent development of mines.

[0085] In the application of the present invention in this embodiment, there are the following advantages:

[0086] 1. Remotely monitor the electric gate valves at the uphill and downhill entrances of the West Third Track to ensure that they are in a closed state to prevent the water supply from the west wind well from entering the auxiliary well water supply system, thereby avoiding water flow disturbances and water pressure fluctuations that may lead to pipe bursts in the auxiliary well water supply system.

[0087] 2. Online monitoring can be used to determine whether the water pressure is within the set range, and whether there is any disorder in the water supply of the westerly well and the auxiliary well, so as to prevent the high-level water supply from the westerly well from entering the auxiliary well water supply system.

[0088] 3. Use pressure sensors to monitor the water supply pressure at different elevations in the West Three Mining Area in real time to confirm that it meets the requirements for on-site use.

[0089] 4. When there is a problem with the water supply of the west wind well or the water supply is insufficient, it is necessary to reduce the water supply to the West Three Mining District. By remotely controlling the electric gate valves at the uphill and downhill entrances of the West Three track and the two electric gate valves in the middle, the water supply mode and water supply pressure of the West Three Mining District can be adjusted to meet the water supply safety of the West Three Mining District.

[0090] The present invention and its embodiments are described above, which is not restrictive. The drawings show only one embodiment of the present invention, and the actual structure is not limited thereto. In short, if ordinary technicians in the field are inspired by it and do not deviate from the purpose of the invention, they can creatively design a structure and embodiment similar to the technical solution, which should fall within the protection scope of the present invention.

Claims

1. An online monitoring system for underground wind and water pipelines in coal mines, characterized by: It includes a system framework, which includes an underground monitoring terminal, a data transmission network, a ground monitoring center, and a remote control system; The downhole monitoring terminal includes a flow sensor, a pressure sensor, and an electric gate valve; The ground monitoring center includes a data analysis module and a data display module; The system framework is connected with the downhole monitoring terminal, the data transmission network, the ground monitoring center, and the remote control system; The downhole monitoring terminal is connected to a flow sensor, a pressure sensor, and an electric gate valve; The ground monitoring center is connected to the data analysis module and the data display module; The remote control system is connected to the electric gate valve.

2. The online monitoring system for underground coal mine wind and water pipelines according to claim 1 is characterized by: The flow sensor is responsible for collecting the flow parameters of the Feng Shui pipeline in real time, and the pressure sensor is responsible for collecting the pressure parameters of the Feng Shui pipeline in real time, and uploading the data to the ground monitoring center in real time.

3. The online monitoring system for underground coal mine wind and water pipelines according to claim 1 is characterized by: The data transmission network adopts Ethernet technology to ensure high-speed and stable data transmission.

4. The online monitoring system for underground coal mine wind and water pipelines according to claim 1 is characterized by: The data analysis module and data display module are used for real-time monitoring and data analysis, and can display the real-time data of each mining area and each pipeline, and generate historical data reports to provide a basis for management decisions.

5. The online monitoring system for underground coal mine wind and water pipelines according to claim 1 is characterized by: The remote control system realizes the function of remotely controlling the electric gate valve.

6. The online monitoring system for underground coal mine wind and water pipelines according to claim 1 is characterized by: The ground monitoring center uses a remote control system to remotely control the opening and closing of underground electric gate valves, thereby achieving automated adjustment of the water supply and air supply systems. Under abnormal circumstances, the system can automatically or manually close related pipelines to ensure water supply safety.

7. The online monitoring system for underground coal mine wind and water pipelines according to claim 1 is characterized by: When the system detects that the flow and pressure parameters of the Feng Shui pipeline are beyond the set range, it will automatically trigger the alarm mechanism and notify relevant personnel through sound, light signals and text messages for timely processing.

8. The online monitoring system for underground coal mine wind and water pipelines according to claim 1 is characterized by: In response to the water supply pressure requirements of different mining areas and levels in coal mines, the system adopts a zoning management method and realizes independent water supply control in different mining areas and levels through remote control of electric gate valves.