Offshore wind turbine tower connection structure, wind turbine generator set and construction method

By connecting the concrete tower and the pipe pile structure through a combination of connecting mechanisms, prestressed cables and anchor bolts, the problem of tower height requirements under complex wind conditions at sea is solved, and the stability and safety of concrete tower construction at sea are improved.

CN118959233BActive Publication Date: 2026-11-17ZHEJIANG HUADONG XINNENG TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411050685.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2026-11-17
Estimated Expiration
2044-08-01

AI Technical Summary

Technical Problem

The existing connection methods of concrete towers and pipe pile structures are difficult to meet the requirements for higher tower heights under complex wind conditions at sea, which limits the application of prestressed concrete towers at sea.

Method used

The concrete tower and the pipe pile structure are connected by a combination of connecting mechanisms, prestressed cables and anchor bolts. The concrete tower is initially fixed by anchor bolts, and the stress state of the tower is changed after the prestressed cables are tensioned, thereby enhancing the structural strength and connection strength.

Benefits of technology

It improves the structural and connection strength of the concrete tower, reduces construction difficulty, ensures that it can meet the requirements for higher tower height under complex wind conditions at sea, and improves construction safety and economy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118959233B_ABST
    Figure CN118959233B_ABST
Patent Text Reader

Abstract

This invention relates to the field of wind power generation technology, and discloses an offshore wind turbine tower connection structure, a wind turbine generator set, and a construction method. The offshore wind turbine tower connection structure, used to connect a concrete tower and a pipe pile structure, includes a connection mechanism, several prestressed cables, and several anchor bolts. The connection mechanism connects the concrete tower and the pipe pile structure, with one end connected to the concrete tower and the other end connected to the pipe pile structure. One end of each prestressed cable is connected to the top of the concrete tower, and the other end is anchored to the connection mechanism. Several prestressed cables are spaced apart circumferentially along the concrete tower. One end of each anchor bolt is embedded in the concrete tower, and the other end is anchored to the connection mechanism. Several anchor bolts are installed between adjacent prestressed cables. The prestressed cables can improve the structural strength of the concrete tower and the connection strength with the connection mechanism, and the anchor bolts can also improve the connection strength of the concrete tower during the construction of the prestressed cables, reducing construction difficulty.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of wind power generation technology, specifically to an offshore wind turbine tower connection structure, a wind turbine generator set, and a construction method. Background Technology

[0002] With the support of relevant policies, offshore wind power projects are developing rapidly towards larger scale and deeper waters. At the same time, with the leapfrog increase in single-unit capacity and rotor diameter, the height of wind turbine towers is also constantly being refreshed. More complex offshore operating conditions are placing higher demands on the safety of the towers; however, as the tower height continues to increase, the safety and economic issues of traditional steel towers are becoming increasingly prominent.

[0003] Prestressed concrete towers, as a solution for ultra-high towers in recent years, have been tested in numerous onshore wind power projects and have broad application prospects at sea. However, the existing connection methods between concrete towers and pipe pile structures are still difficult to cope with the complex wind conditions at sea and meet the requirements for higher tower heights, making it difficult to apply prestressed concrete towers in offshore wind power. Summary of the Invention

[0004] In view of this, the present invention provides an offshore wind turbine tower connection structure, a wind turbine generator set, and a construction method to solve the problem that the existing connection methods of concrete towers and pipe pile structures are still difficult to cope with complex wind conditions at sea and meet the requirements for higher tower heights.

[0005] In a first aspect, the present invention provides an offshore wind turbine tower connection structure for connecting a concrete tower and a pipe pile structure, comprising: A connecting mechanism is used to connect the concrete tower and the pipe pile structure. One end of the connecting mechanism is connected to the concrete tower, and the other end is connected to the pipe pile structure. Several prestressed cables are provided, with one end connected to the top of the concrete tower and the other end anchored to the connecting mechanism. The several prestressed cables are arranged at intervals along the circumference of the concrete tower. Several anchor bolts are provided, with one end pre-embedded in the concrete tower and the other end anchored to the connecting mechanism. Several anchor bolts are provided between adjacent prestressed cables.

[0006] Beneficial Effects: The offshore wind turbine tower connection structure utilizes a connecting mechanism, prestressed cables, and anchor bolts to connect the concrete tower and the pipe pile structure. Anchor bolts provide initial fixation to the concrete tower during hoisting onto the connecting mechanism, ensuring a stable connection even in harsh offshore environments. This allows for smooth and safe prestressed cable tensioning. By connecting one end of the prestressed cable to the top of the concrete tower and anchoring the other end to the connecting mechanism, the tensioned prestressed cable alters the stress state of the concrete tower, improving its structural strength and connection strength with the connecting mechanism. Connecting the concrete tower and pipe pile structure using this method not only enhances the structural strength and connection strength through the prestressed cables but also strengthens the connection during prestressed cable installation through the anchor bolts. This reduces construction difficulty and is sufficient to meet the requirements for higher tower heights under complex offshore wind conditions, ensuring the safe construction and operation of concrete towers at sea.

[0007] In one optional embodiment, the connecting mechanism includes a connecting flange and a support assembly. One end of the support assembly is sleeved around the periphery of the connecting flange, and the other end is supported on the pipe pile structure. One end of the connecting flange is connected to the concrete tower. The end of the prestressed cable near the connecting mechanism is connected to the end of the connecting flange away from the concrete tower. The end of the anchor bolt away from the concrete tower is connected to the connecting flange.

[0008] Beneficial effects: By connecting one end of the support component to the connecting flange and the other end to the pipe pile structure, the connecting flange can remain stable and effectively transmit force to the pipe pile structure. The connecting flange provides anchoring ends for the anchor bolts and prestressed cables, making the anchoring of the anchor bolts and prestressed cables more secure and thus enhancing their contribution to the structural strength of the concrete tower.

[0009] In one optional embodiment, the connecting flange includes a top flange, an anchoring flange, ribs, and an anchoring plate. One end of the top flange is connected to the concrete tower, and the periphery of the top flange is connected to the support assembly. The top flange and the anchoring flange are coaxially arranged. The ribs are spaced apart around the axis of the top flange. The anchoring plate is disposed between the top flange and the anchoring flange. The connecting flange has a first channel and a second channel. The connecting flange also has a first through hole and a second through hole. The first through hole communicates with the first channel, and the second through hole communicates with the second channel. One end of the prestressed cable is connected to the anchoring flange through the first through hole, and one end of the anchor bolt is connected to the anchoring plate through the second through hole.

[0010] Beneficial effects: Anchor flanges are used for anchoring prestressed cables, while anchor plates are used for anchoring anchor bolts. The use of anchor plates reduces the amount of work involved in anchoring anchor bolts. Ribs between the top flange and anchor flange provide connection and support, significantly enhancing the structural strength of the connecting flange. The presence of first and second channels on the connecting flange prevents interference between the prestressed cables and anchor bolts, reduces the amount of positioning work for the prestressed cables and anchor bolts, and strengthens the connection strength between the prestressed cables and anchor bolts to the concrete tower.

[0011] In one optional embodiment, the sidewall of the concrete tower is provided with a channel, the prestressed cable passes through the channel, and a first channel or a second channel is formed between adjacent ribs. The first channel and the second channel are staggered. The top flange and the anchoring flange are both provided with the first through hole. The second through hole is provided in the top flange and the anchoring plate. The anchoring plate is provided in the second channel. One end of the prestressed cable is anchored to the anchoring flange through the first through hole, and one end of the anchor bolt is anchored to the anchoring plate through the second through hole.

[0012] Beneficial effects: By setting ducts inside the concrete tower, prestressed cables can be inserted into the ducts, placing the prestressed cables within the sidewalls of the concrete tower. A first or second channel is formed between the ribs, allowing the prestressed cables within the sidewalls to pass through the first channel and connect to the anchoring flange. Anchor bolts pass through the second channel and are anchored to the anchoring plate. This method of setting prestressed cables integrates the prestressed cables with the concrete tower structure, reducing the design difficulty of the construction scheme and also reducing the construction difficulty.

[0013] In one optional embodiment, the connecting mechanism further includes a cylinder and a base plate. One end of the cylinder is disposed between the connecting flange and one end of the support assembly. The other end of the cylinder and the other end of the support assembly are both connected to one side of the base plate, and the other side of the base plate is connected to the pipe pile structure.

[0014] Beneficial effects: The base plate can strengthen the connection strength and stability between the support components, connecting flanges and pipe pile structure, and the cylinder can further provide support for the connecting flanges.

[0015] In one optional embodiment, the prestressed cable passes through the inner side of the concrete tower, forming a first channel between adjacent ribs, and a second channel is formed between the outer wall of the cylinder and the inner side of the support assembly. The top flange and the anchoring flange are both provided with the first through hole, the second through hole is provided in the top flange and the anchoring plate, the anchoring plate is provided in the second channel, one end of the prestressed cable is anchored to the anchoring flange through the first through hole, and one end of the anchor bolt is anchored to the anchoring plate through the second through hole.

[0016] Beneficial effects: Since the prestressed cables are installed inside the concrete tower, the anchor bolts are located further away from the tower's axis than the prestressed cables. Therefore, the first channel for the prestressed cables is formed between the ribs, while the second channel for the anchor bolts is formed inside the cylinder and support components. This second channel is further away from the tower's axis than the first channel, thus corresponding to the anchor bolt positions. This prestressed cable installation method facilitates inspection, allows for regular monitoring of stress changes, effectively extends the lifespan of the concrete tower, and ensures stable and safe connections.

[0017] In one alternative embodiment, the rib further includes an extension that extends toward the pile structure and connects to the inner wall of the cylinder.

[0018] Beneficial effects: The extension section can further strengthen the connection between the cylinder and the connecting flange, and also strengthen the structural strength of the cylinder, preventing the cylinder from deforming and thus reducing the support force on the connecting flange, ensuring the stability of the connecting flange installation.

[0019] In one optional embodiment, the support assembly includes an annular box girder and a supporting box girder, the annular box girder being arranged around the periphery of the connecting flange, one end of the supporting box girder being connected to the annular box girder, and the other end of the supporting box girder being connected to the base plate.

[0020] Beneficial effects: The ring box girder can apply support force to the periphery of the top flange and anchor flange, strengthen the support strength of the top flange and anchor flange, avoid deformation of the top flange and anchor flange, and the supporting box girder can support the ring box girder, ensuring the stability of the ring box girder and connecting flanges.

[0021] Secondly, the present invention also provides a wind turbine generator set, including the concrete tower, the pipe pile structure, and the aforementioned offshore wind turbine tower connection structure, wherein the concrete tower and the pipe pile structure are connected through the offshore wind turbine tower connection structure.

[0022] Beneficial effects: The offshore wind turbine generator set connects the concrete tower and the pipe pile structure through the offshore wind turbine tower connection structure, which can strengthen the connection between the concrete tower and the pipe pile structure, enabling the wind turbine generator set to adapt to complex offshore wind conditions and higher tower height requirements, and can reduce the construction difficulty during the construction of the wind turbine generator set.

[0023] Thirdly, the present invention also provides a construction method for a wind turbine generator set, used to construct the aforementioned wind turbine generator set, comprising: Installation of pipe pile structure and connection mechanism; The first section of the concrete tower is hoisted and connected to the connecting mechanism. Anchor the anchor bolts to the connection mechanism, tighten the anchor bolts, and perform pre-tensioning. Hoist the remaining sections of the concrete tower until the hoisting is complete; One end of the prestressed cable is lifted to the top of the concrete tower and connected, while the other end of the prestressed cable is anchored to the connecting mechanism to tension the prestressed cable.

[0024] Beneficial effects: During the hoisting of the first section of the concrete tower, the construction method of this wind turbine generator set uses anchor bolts to secure it to the connecting mechanism, ensuring that the first section of the concrete tower can be stably set on the connecting mechanism. This ensures the stability of the first section of the concrete tower during the hoisting of other sections, ensuring construction safety and reducing construction difficulty. After all the concrete tower sections are hoisted, prestress is applied to the concrete tower by tensioning prestressed cables, which effectively improves the structural strength of the concrete tower and the connection strength between the concrete tower and the connecting mechanism. Attached Figure Description

[0025] To more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.

[0026] Figure 1 This is a schematic diagram of the structure of a wind turbine generator set according to an embodiment of the present invention; Figure 2 This is a schematic diagram of the connection between a pipe pile structure and an offshore wind turbine tower according to an embodiment of the present invention; Figure 3 This is a schematic diagram of a connection structure for an offshore wind turbine tower according to an embodiment of the present invention; Figure 4 This is a partial structural schematic diagram of a concrete tower according to an embodiment of the present invention; Figure 5This is a schematic diagram of a connection structure between a concrete tower and an offshore wind turbine tower according to an embodiment of the present invention; Figure 6 This is a schematic diagram of another connection structure between a concrete tower and an offshore wind turbine tower according to an embodiment of the present invention.

[0027] Explanation of reference numerals in the attached figures: 100. Concrete tower; 101. Duct; 200. Pipe pile structure; 300. Wind turbine main unit; 400. Steel tower; 1. Connecting mechanism; 11. Connecting flange; 111. Top flange; 112. Anchoring flange; 113. Rib plate; 1131. Extension section; 114. Anchoring plate; 115. First channel; 116. Second channel; 117. First through hole; 118. Second through hole; 12. Support assembly; 121. Circular box girder; 122. Support box girder; 13. Cylinder; 131. Doorway; 14. Base plate; 2. Prestressed cables; 3. Anchor bolts. Detailed Implementation

[0028] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0029] The following is combined with Figures 1 to 6 The following describes embodiments of the present invention.

[0030] According to an embodiment of the present invention, in one aspect, an offshore wind turbine tower connection structure is provided for connecting a concrete tower 100 and a pipe pile structure 200, including a connection mechanism 1, a plurality of prestressed cables 2, and a plurality of anchor bolts 3. The connection mechanism 1 is used to connect the concrete tower 100 and the pipe pile structure 200, with one end connected to the concrete tower 100 and the other end connected to the pipe pile structure 200; one end of the prestressed cable 2 is connected to the top of the concrete tower 100, and the other end is anchored to the connection mechanism 1, with a plurality of prestressed cables 2 spaced apart circumferentially along the concrete tower 100; one end of the anchor bolt 3 is pre-embedded in the concrete tower 100, and the other end is anchored to the connection mechanism 1, with a plurality of anchor bolts 3 provided between adjacent prestressed cables 2.

[0031] The offshore wind turbine tower connection structure provided in this embodiment utilizes a connection mechanism 1, prestressed cables 2, and anchor bolts 3 to connect the concrete tower 100 and the pipe pile structure 200. The anchor bolts 3 can initially fix the concrete tower 100 when it is hoisted onto the connection mechanism 1, so that the concrete tower 100 can maintain a stable connection with the connection mechanism 1 in the harsh marine environment. This allows for the smooth and safe tensioning of the prestressed cables 2. By connecting one end of the prestressed cable 2 to the top of the concrete tower 100 and anchoring the other end to the connection mechanism 1, the tensioned prestressed cable 2 can change the stress state of the concrete tower 100, thereby improving the structural strength of the concrete tower 100 and the connection strength with the connection mechanism 1. The concrete tower 100 and the pipe pile structure 200 are connected by the connecting mechanism 1, the prestressed cable 2, and the anchor bolt 3. This not only improves the structural strength of the concrete tower 100 and the connection strength with the connecting mechanism 1 through the prestressed cable 2, but also improves the connection strength of the concrete tower 100 when constructing the prestressed cable 2 through the anchor bolt 3. This reduces the difficulty of construction and is sufficient to meet the requirements of higher tower heights under complex wind conditions at sea, thus ensuring the construction and use of the concrete tower 100 at sea.

[0032] Specifically, the concrete tower 100 is made of concrete, and prestress can be applied to it to increase the structural strength of the concrete tower 100, thereby improving the safety of the concrete tower 100 in offshore applications. It can also reduce the manufacturing cost of wind turbine generators and improve economic efficiency. Since the pipe pile structure 200 does not have enough space for tensioning the prestressed cable 2, the concrete tower 100 and the pipe pile structure 200 are connected by the connecting mechanism 1, which provides a platform for the construction of the prestressed cable 2 and improves the connection strength between the concrete tower 100 and the pipe pile structure 200.

[0033] Specifically, the connecting mechanism 1 includes a connecting flange 11 and a support assembly 12. One end of the support assembly 12 is fitted around the periphery of the connecting flange 11, and the other end is supported on the pipe pile structure 200. One end of the connecting flange 11 is connected to the concrete tower 100. The end of the prestressed cable 2 near the connecting mechanism 1 is connected to the end of the connecting flange 11 away from the concrete tower 100. The end of the anchor bolt 3 away from the concrete tower 100 is connected to the connecting flange 11. By connecting one end of the support assembly 12 to the connecting flange 11 and supporting the pipe pile structure 200 at the other end, the connecting mechanism 1 ensures that the connecting flange 11 remains stable and effectively transmits force to the pipe pile structure 200. The connecting flange 11 provides anchoring ends for the anchor bolt 3 and the prestressed cable 2, making the anchoring of the anchor bolt 3 and the prestressed cable 2 more secure and enhancing their contribution to the structural strength of the concrete tower 100.

[0034] Specifically, the connecting flange 11 includes a top flange 111, an anchoring flange 112, a rib plate 113, and an anchoring plate 114. One end of the top flange 111 is connected to the concrete tower 100, and the periphery of the top flange 111 is connected to the support assembly 12. The top flange 111 and the anchoring flange 112 are coaxially arranged. The rib plate 113 is spaced around the axis of the top flange 111. The anchoring plate 114 is arranged between the top flange 111 and the anchoring flange 112. The connecting flange 11 is provided with a first channel 115 and a second channel 116. The connecting flange 11 is also provided with a first through hole 117 and a second through hole 118. The first through hole 117 communicates with the first channel 115, and the second through hole 118 communicates with the second channel 116. One end of the prestressed cable 2 is connected to the anchoring flange 112 through the first through hole 117, and one end of the anchor bolt 3 is connected to the anchoring plate 114 through the second through hole 118. Anchor flange 112 is used for anchoring prestressed cable 2, and anchor plate 114 is used for anchoring anchor bolt 3. By setting anchor plate 114, the amount of work required for anchoring anchor bolt 3 can be reduced. By setting rib plate 113 between top flange 111 and anchor flange 112, top flange 111 and anchor flange 112 can be connected and supported, thereby greatly enhancing the structural strength of connecting flange 11. By setting first channel 115 and second channel 116 on connecting flange 11, prestressed cable 2 and anchor bolt 3 do not interfere with each other, and the positioning work of prestressed cable 2 and anchor bolt 3 is reduced, thereby enhancing the connection strength of prestressed cable 2 and anchor bolt 3 to concrete tower 100.

[0035] Specifically, the axis of the first through hole 117 is parallel to the extension direction of the first channel 115, and the axis of the second through hole 118 is parallel to the extension direction of the second channel 116, so as to avoid friction or interference between the prestressed cable 2 and / or anchor bolt 3 and the connecting flange 11, and extend the service life of the prestressed cable 2 and anchor bolt 3.

[0036] There is no limit to the number of prestressed cables 2, anchor bolts 3 and ribs 113. The number of prestressed cables 2, anchor bolts 3 and ribs 113 should be set according to the design requirements of the concrete tower 100, and the structural strength of the concrete tower 100 should be ensured to meet the design requirements.

[0037] In this embodiment, every two anchor bolts 3 form an anchor bolt group 3. When viewed along the circumference of the concrete tower 100, the prestressed cable 2 and the anchor bolt group 3 are staggered, so that the anchor bolt 3 does not affect the setting of the prestressed cable 2 after it is anchored.

[0038] In one embodiment, such as Figure 5As shown, the side wall of the concrete tower 100 is provided with a channel 101, and the prestressed cable 2 passes through the channel 101. A first channel 115 or a second channel 116 is formed between adjacent ribs 113. The first channel 115 and the second channel 116 are arranged alternately. The top flange 111 and the anchor flange 112 are both provided with a first through hole 117. A second through hole 118 is provided in the top flange 111 and the anchor plate 114. The anchor plate 114 is provided in the second channel 116. One end of the prestressed cable 2 is anchored to the anchor flange 112 through the first through hole 117, and one end of the anchor bolt 3 is anchored to the anchor plate 114 through the second through hole 118. By setting a channel 101 in the concrete tower 100, the prestressed cable 2 can be inserted into the channel 101, so that the prestressed cable 2 is located in the side wall of the concrete tower 100. A first channel 115 or a second channel 116 is formed between the ribs 113, so that the prestressed cable 2 in the side wall can be inserted into the first channel 115 and connected to the anchor flange 112. The anchor bolt 3 passes through the second channel 116 and is anchored to the anchor plate 114. This setting method of the prestressed cable 2 makes the prestressed cable 2 and the concrete tower 100 structurally integrated, which reduces the design difficulty of the construction scheme and also reduces the construction difficulty.

[0039] Specifically, the connecting mechanism 1 also includes a cylinder 13 and a base plate 14. One end of the cylinder 13 is disposed between the connecting flange 11 and one end of the support assembly 12. The other end of the cylinder 13 and the other end of the support assembly 12 are both connected to one side of the base plate 14, and the other side of the base plate 14 is connected to the pipe pile structure 200. The base plate 14 can enhance the connection strength and stability between the support assembly 12, the connecting flange 11, and the pipe pile structure 200, and the cylinder 13 can further provide support for the connecting flange 11.

[0040] Furthermore, the cylinder 13 has a doorway 131, and a climbing device is installed inside the cylinder 13. The doorway 131 allows construction personnel to enter and exit the cylinder 13 to carry out construction or maintenance on the connecting mechanism 1. The climbing device facilitates the inspection and maintenance of the anchoring points of the prestressed cable 2 and the anchoring flange 112, as well as the anchoring points of the anchor bolt 3 and the anchoring plate 114, thus facilitating future maintenance. The connecting mechanism 1, through the above-mentioned design, forms a hollow structure, further facilitating the operation of personnel and tools during prestressed construction and effectively reducing the difficulty of prestressed construction.

[0041] In another embodiment, such as Figure 6As shown, the prestressed cable 2 passes through the inner side of the concrete tower 100, and a first channel 115 is formed between adjacent ribs 113. A second channel 116 is formed between the outer wall of the cylinder 13 and the inner side of the support assembly 12. The top flange 111 and the anchoring flange 112 are both provided with a first through hole 117. A second through hole 118 is provided in the top flange 111 and the anchoring plate 114. The anchoring plate 114 is provided in the second channel 116. One end of the prestressed cable 2 is anchored to the anchoring flange 112 through the first through hole 117, and one end of the anchor bolt 3 is anchored to the anchoring plate 114 through the second through hole 118. Since the prestressed cable 2 is inserted inside the concrete tower 100, the anchor bolt 3 is positioned further away from the axis of the concrete tower 100 than the prestressed cable 2. Therefore, the first channel 115 for inserting the prestressed cable 2 is formed between the ribs 113, while the second channel 116 for inserting the anchor bolt 3 is formed inside the cylinder 13 and the support assembly 12. This makes the second channel 116 further away from the axis of the concrete tower 100 than the first channel 115, thus corresponding to the position of the anchor bolt 3. The above-mentioned arrangement of the prestressed cable 2 facilitates inspection, allows for regular monitoring of stress changes, effectively extends the service life of the concrete tower 100, and ensures the stable and safe connection of the concrete tower 100.

[0042] Furthermore, in the embodiment where the prestressed cable 2 passes through the inner side of the concrete tower 100, the periphery of the top flange 111 extends to fully support the concrete tower 100, avoiding the bottom area of ​​the concrete tower 100 being larger than the area of ​​the top flange 111, thereby effectively supporting the concrete tower 100.

[0043] Specifically, the cylinder 13 is welded to the top flange 111, the anchoring flange 112, the rib plate 113, and the anchoring plate 114, and the connection is firm and stable, which enhances its structural strength in marine application scenarios.

[0044] Furthermore, the rib plate 113 also includes an extension section 1131, which extends toward the pipe pile structure 200 and connects to the inner wall of the cylinder 13. The extension section 1131 can further strengthen the connection strength between the cylinder 13 and the connecting flange 11, and can also strengthen the structural strength of the cylinder 13, preventing the cylinder 13 from deforming and thus reducing the supporting force on the connecting flange 11, ensuring the stable installation of the connecting flange 11.

[0045] Furthermore, the support assembly 12 includes an annular box girder 121 and a support box girder 122. The annular box girder 121 is arranged around the periphery of the connecting flange 11. One end of the support box girder 122 is connected to the annular box girder 121, and the other end of the support box girder 122 is connected to the base plate 14. The annular box girder 121 can apply a supporting force to the periphery of the top flange 111 and the anchor flange 112, strengthening the support strength of the top flange 111 and the anchor flange 112 and preventing deformation of the top flange 111 and the anchor flange 112. The support box girder 122 can support the annular box girder 121, ensuring the stability of the annular box girder 121 and the connecting flange 11.

[0046] In this embodiment, four supporting box girders 122 are provided, and four support points are formed at the top of the pipe pile structure 200. One end of the supporting box girders 122 is evenly spaced around the annular box girders 121, and the other end is respectively located at the position of the four support points projected onto the bottom plate 14, so that the weight of the concrete tower 100 can be directly transferred to the pipe pile structure 200 through the supporting box girders 122.

[0047] According to an embodiment of the present invention, another aspect provides a wind turbine generator set, including a concrete tower 100, a pipe pile structure 200, and the aforementioned offshore wind turbine tower connection structure, wherein the concrete tower 100 and the pipe pile structure 200 are connected by the offshore wind turbine tower connection structure.

[0048] The wind turbine generator provided in this embodiment connects the concrete tower 100 and the pipe pile structure 200 through the offshore wind turbine tower connection structure, which can strengthen the connection strength between the concrete tower 100 and the pipe pile structure 200, enabling the wind turbine generator to adapt to complex offshore wind conditions and higher tower height requirements, and reducing the construction difficulty during the construction of the wind turbine generator.

[0049] Furthermore, the wind turbine generator set also includes a wind turbine main unit 300 and a steel tower 400, with the wind turbine main unit 300 and the concrete tower 100 connected by the steel tower 400.

[0050] According to an embodiment of the present invention, in another aspect, a method for constructing a wind turbine generator set is also provided, for constructing the aforementioned wind turbine generator set, comprising: Install pipe pile structure 200 and connecting mechanism 1; The first section of the concrete tower 100 is hoisted and connected to the connecting mechanism 1. Anchor bolt 3 is anchored to connecting mechanism 1, and anchor bolt 3 is tightened and pre-tensioned; Hoist the remaining 100 sections of the concrete tower frame until the hoisting is complete; One end of the prestressed cable 2 is lifted to the top of the concrete tower 100 and connected, while the other end of the prestressed cable 2 is anchored to the connecting mechanism 1, and the prestressed cable 2 is tensioned.

[0051] The wind turbine generator construction method provided in this embodiment uses anchor bolts 3 to anchor the first section of the concrete tower 100 to the connecting mechanism 1 during hoisting. This ensures that the first section of the concrete tower 100 is stably set on the connecting mechanism 1 during hoisting of other sections of the concrete tower 100, thereby ensuring construction safety and reducing construction difficulty. After all the concrete tower 100 sections are hoisted, prestress is applied to the concrete tower 100 by tensioning the prestressed cables 2, which effectively improves the structural strength of the concrete tower 100 and the connection strength between the concrete tower 100 and the connecting mechanism 1.

[0052] Specifically, after the pipe pile structure 200 and the connecting mechanism 1 are connected on land to form a whole, they are floated to the machine site at sea and then sunk and fixed. Connecting the pipe pile structure 200 and the connecting mechanism 1 on land is simpler and more convenient. Transporting the integrated pipe pile structure 200 and the connecting mechanism 1 by sea also reduces the difficulty of transportation.

[0053] The specific connection method between the pipe pile structure 200 and the connecting mechanism 1 is not limited here. In this embodiment, the pipe pile structure 200 and the connecting mechanism 1 are connected by welding, and the connection is firm and reliable.

[0054] Specifically, hoisting the first section of the concrete tower 100 and connecting the first section of the concrete tower 100 to the connecting mechanism 1 includes: after connecting the concrete tower cylinder to the top flange 111, applying a sealing structural adhesive to the splicing surface of the top flange 111 and the first section of the concrete tower 100, thereby filling the small gaps caused by the precision error of the mating surface and playing a sealing role.

[0055] In the embodiment where the prestressed cable 2 is installed on the inner side wall of the concrete tower 100, after the anchoring and anti-corrosion work of the anchor bolt 3 is completed, the annular box girder 121 needs to be sealed to prevent the anchor bolt 3 from being directly exposed to the marine environment, thereby extending the service life of the anchor bolt 3.

[0056] Specifically, anchoring the anchor bolt 3 to the connecting mechanism 1, tightening the anchor bolt 3, and performing pre-tensioning include: After installing anchor bolt 3 in the conventional manner, tightening and pre-tensioning are performed. A conspicuous anti-loosening mark line is marked on anchor bolt 3. After acceptance, dirt and debris on the bolt surface of anchor bolt 3 are removed. Then, wax film rust inhibitor is applied with a brush or other brushing tools to perform anti-corrosion treatment and extend service life.

[0057] Specifically, one end of the prestressed cable 2 is lifted to the top of the concrete tower 100 and connected, and the other end of the prestressed cable 2 is anchored to the connecting mechanism 1. Tensioning the prestressed cable 2 includes: after the entire section of the concrete tower 100 is hoisted, the prestressed cable 2 is lifted and tensioned.

[0058] Once the prestressed cable 2 is fabricated on land, the entire roll of prestressed cable 2 can be transported into the cylinder 13 for hoisting and tensioning. The prestressed cable 2 tooling is hoisted to the top of the concrete tower 100, and the prestressed cable 2 is lifted using the winch and ropes on the tooling.

[0059] After the lifting of the prestressed cable 2 is completed, the tensioning process of the prestressed cable 2 is carried out. The upper end of the prestressed cable 2 is anchored to the upper end of the concrete tower 100, and the lower end is anchored to the anchoring flange 112. The hydraulic tensioning and anti-corrosion operation of the prestressed cable 2 are completed inside the cylinder 13.

[0060] Furthermore, one end of the prestressed cable 2 is lifted to the top of the concrete tower 100 and connected, while the other end of the prestressed cable 2 is anchored to the connecting mechanism 1. After tensioning the prestressed cable 2, the process further includes: The steel tower 400 is hoisted onto the top of the concrete tower 100. After the steel tower 400 is fully hoisted, the wind turbine main unit 300 is hoisted, completing the entire construction of the wind turbine generator set.

[0061] Although embodiments of the invention have been described in conjunction with the accompanying drawings, those skilled in the art can make various modifications and variations without departing from the spirit and scope of the invention, and such modifications and variations all fall within the scope defined by the appended claims.

Claims

1. A connection structure for an offshore wind turbine tower, used to connect a concrete tower (100) and a pipe pile structure (200), characterized in that, include: A connecting mechanism (1) is used to connect the concrete tower (100) and the pipe pile structure (200). One end of the connecting mechanism (1) is connected to the concrete tower (100), and the other end is connected to the pipe pile structure (200). Several prestressed cables (2) are connected at one end to the top of the concrete tower (100) and at the other end to the connecting mechanism (1). Several prestressed cables (2) are arranged at intervals along the circumference of the concrete tower (100). Several anchor bolts (3) are pre-embedded in the concrete tower (100) at one end and anchored to the connecting mechanism (1) at the other end. Several anchor bolts (3) are provided between adjacent prestressed cables (2). When the concrete tower (100) is hoisted onto the connecting mechanism (1), the anchor bolts (3) can be used to initially fix the concrete tower (100), so that the concrete tower (100) can maintain a stable connection with the connecting mechanism (1) in the harsh marine environment, thereby enabling the prestressed cable (2) to be tensioned smoothly and safely. The connecting mechanism (1) includes a connecting flange (11) and a support assembly (12). One end of the support assembly (12) is sleeved on the periphery of the connecting flange (11), and the other end is supported on the pipe pile structure (200). One end of the connecting flange (11) is connected to the concrete tower (100). The end of the prestressed cable (2) near the connecting mechanism (1) is connected to the end of the connecting flange (11) away from the concrete tower (100). The end of the anchor bolt (3) away from the concrete tower (100) is connected to the connecting flange (11). The connecting flange (11) includes a top flange (111), an anchoring flange (112), a rib plate (113), and an anchoring plate (114). One end of the top flange (111) is connected to the concrete tower (100), and the periphery of the top flange (111) is connected to the support assembly (12). The top flange (111) and the anchoring flange (112) are coaxially arranged. The rib plate (113) is spaced apart around the axis of the top flange (111). The anchoring plate (114) is disposed between the top flange (111) and the anchoring flange (112). The connecting flange (11) is provided with a first channel (115) and a second channel (116). The connecting flange (11) is also provided with a first through hole (117) and a second through hole (118). The first through hole (117) is connected to the first channel (115), and the second through hole (118) is connected to the second channel (116). One end of the prestressed cable (2) is connected to the anchoring flange (112) through the first through hole (117), and one end of the anchor bolt (3) is connected to the anchoring plate (114) through the second through hole (118). The connecting mechanism (1) further includes a cylinder (13) and a base plate (14). One end of the cylinder (13) is welded to the top flange (111), the anchor flange (112), the rib plate (113) and the anchor plate (114). The other end of the cylinder (13) and the other end of the support assembly (12) are both connected to one side of the base plate (14). The other side of the base plate (14) is connected to the pipe pile structure (200).

2. The offshore wind turbine tower connection structure according to claim 1, characterized in that, The side wall of the concrete tower (100) is provided with a channel (101), and the prestressed cable (2) passes through the channel (101). The first channel (115) or the second channel (116) is formed between adjacent ribs (113). The first channel (115) and the second channel (116) are staggered. The top flange (111) and the anchor flange (112) are both provided with the first through hole (117). The second through hole (118) is provided in the top flange (111) and the anchor plate (114). The anchor plate (114) is provided in the second channel (116). One end of the prestressed cable (2) is anchored to the anchor flange (112) through the first through hole (117). One end of the anchor bolt (3) is anchored to the anchor plate (114) through the second through hole (118).

3. The offshore wind turbine tower connection structure according to claim 1, characterized in that, One end of the cylinder (13) is located between the connecting flange (11) and one end of the support assembly (12).

4. The offshore wind turbine tower connection structure according to claim 1, characterized in that, The prestressed cable (2) passes through the inner side of the concrete tower (100), and the first channel (115) is formed between adjacent ribs (113). The second channel (116) is formed between the outer wall of the cylinder (13) and the inner side of the support assembly (12). The top flange (111) and the anchor flange (112) are both provided with the first through hole (117). The second through hole (118) is provided in the top flange (111) and the anchor plate (114). The anchor plate (114) is provided in the second channel (116). One end of the prestressed cable (2) is anchored to the anchor flange (112) through the first through hole (117). One end of the anchor bolt (3) is anchored to the anchor plate (114) through the second through hole (118).

5. The offshore wind turbine tower connection structure according to claim 1, characterized in that, The rib (113) also includes an extension (1131) that extends toward the pipe pile structure (200) and is connected to the inner wall of the cylinder (13).

6. The offshore wind turbine tower connection structure according to claim 1, characterized in that, The support assembly (12) includes an annular box girder (121) and a support box girder (122). The annular box girder (121) is arranged around the periphery of the connecting flange (11). One end of the support box girder (122) is connected to the annular box girder (121), and the other end of the support box girder (122) is connected to the base plate (14).

7. A wind turbine generator set, comprising: A concrete tower (100), a pipe pile structure (200), and an offshore wind turbine tower connection structure according to any one of claims 1-6, characterized in that the concrete tower (100) and the pipe pile structure (200) are connected by the offshore wind turbine tower connection structure.

8. A construction method for a wind turbine generator set, used to construct the wind turbine generator set as described in claim 7, characterized in that, include: Install pipe pile structure (200) and connection mechanism (1); The first section of the concrete tower (100) is hoisted and connected to the connecting mechanism (1). Anchor the anchor bolt (3) to the connecting mechanism (1), tighten the anchor bolt (3) and perform pre-tensioning; Hoist the remaining sections of the concrete tower (100) until the hoisting is complete; One end of the prestressed cable (2) is lifted to the top of the concrete tower (100) and connected, and the other end of the prestressed cable (2) is anchored to the connecting mechanism (1) to tension the prestressed cable (2).

Citation Information

Patent Citations

  • Fan base with pressure dispersed type arrangement high-strength pre-stressed anchor rods (cables)

    CN104110039A

  • Mixing tower drum connecting structure

    CN107859600A