Method for expanding small-diameter high-depth cutting raise through one-time blasting

By using the method of blasting and expanding the small diameter and high depth cutting patio in the construction of the cutting groove patio, the problem of blasting failure at a height of 15m to 30m is solved, which improves the blasting success rate and production efficiency, ensuring that Effective recycling of ore resources.

CN118960494APending Publication Date: 2024-11-15YUXI DAHONGSHAN MINING
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411043171.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In the construction of cutting groove patio, Φ670mm small diameter high-deep cutting patio is prone to bursting and jamming after being at a height of 15m to 30m, which cannot form a free surface, resulting in failure of the expansion and affecting ore resource recovery and production efficiency.

Method used

The method of blasting and expanding the patio with a small diameter and high depth is adopted. By arranging two Φ670mm cutting patios in parallel in the middle of the width direction of the cutting tunnel, and setting slot holes and auxiliary holes are set up between them. Digital electronic detonators and detonators are used to jointly detonate. Detonation is postponed to blast one by one to ensure that the rock mass is fully loose.

Benefits of technology

The success rate of one-time blasting and expansion of small diameter high-deep cutting patio is improved, ensuring normal blasting of the subsequent ranking of the cutting groove and the continuous efficiency of production organization, increasing the blasting compensation space, and ensuring the effective recovery of ore resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118960494A_ABST
    Figure CN118960494A_ABST
Patent Text Reader

Abstract

The invention discloses a method for expanding a small-diameter high-depth cutting raise through one-time blasting. According to the blast hole arrangement structure of the method, the arrangement structure comprises two cutting courtyards 1 which are arranged in parallel and have the diameter phi of 670 mm; the three slotting holes 2 are positioned between the two cutting raises 1; and the nine auxiliary holes 3 are positioned at the peripheries of the two cutting courtyards 1. According to the one-time blasting well expanding method for the small-diameter high-depth cutting raise, the small-diameter high-depth cutting raise with the height being 15-30 m and the diameter being 670 mm is constructed on the basis of cutting groove raise boring machine advanced equipment which is newly researched and developed in recent years in China, and well shaft arrangement and well expanding blast hole parameters and processes are innovated; the one-time blasting well expanding success rate of the small-diameter high-depth cutting raise with the height of 15-30 m and the diameter of phi 670 mm is greatly increased, and normal blasting groove broaching of follow-up arrangement of the cutting groove and continuous and efficient production organization are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of mine shaft and tunnel engineering blasting, and in particular relates to a method for expanding a small-diameter high-depth cutting shaft by one-time blasting. Background Art

[0002] The function of cutting shaft is to create free surface and provide free space for large-scale mining. The excavation and blasting of cutting shaft directly affect the continuous balanced production of underground mines and the efficient recovery of ore resources. At present, most cutting shafts in underground mines in my country are still constructed by manual excavation, mostly with a rectangular section of about 2m×2m. The height of the cutting shaft is basically below 20m. The height of a few cutting shafts may reach 30m due to the influence of the ore body occurrence and mining methods. With the continuous advancement of the technological level of my country's equipment research and development manufacturing industry, domestic enterprises have developed professional cutting slot shaft drilling rigs, which can achieve an upward cutting shaft section of Φ670mm and a maximum shaft depth of 60m. In recent years, it has been used in many large underground mining enterprises in China, and this advanced equipment has a trend of being widely used in underground mines across the industry, and is specially used for various types of upward cutting shaft excavation construction.

[0003] The positive row slot blasting of the cutting slot must take the space formed by the cutting riser expansion blasting as the free surface, and the space size should be about 3m×2m, which is ideal. However, the section of the cutting riser constructed by the cutting slot riser drilling rig is only Φ670mm, which is much smaller than the rectangular section of about 2m×2m in traditional manual construction. When starting to grooving, the Φ670mm cutting riser expansion blasting must be carried out first to form a small slot space close to 3m×2m. Due to the significant reduction of the free surface of the Φ670mm cutting riser, the closer the wellbore is to the upper part, the greater the clamping effect of the surrounding rock entity on the blasted loose rock mass, and it is very easy to fail in well expansion. Through the on-site blasting and well expansion test of the Φ670mm cutting shaft, it was found that when the shaft depth is 15m to 30m, the upper foundation of the shaft is serious, and it is very easy to be squeezed and stuck after blasting, and the rock mass cannot be pushed away to form a free surface. The effective well expansion height is basically below 18m, which ultimately leads to the groove height failing to meet the design requirements, ore resource loss, and even a great impact on continuous production.

[0004] Therefore, in order to ensure the success rate of blasting for Φ670mm cutting shaft expansion and ensure the normal blasting and grooving of subsequent cutting grooves, it is urgently necessary to design and develop a blasthole arrangement structure and method for one-time blasting expansion of small-diameter and high-depth cutting shaft based on Φ670mm cutting shaft with a height of 15m to 30m in view of the above-mentioned technical problems and defects.

[0005] The present invention aims to provide a blasthole arrangement structure and method for one-time blasting and well expansion of a small-diameter high-depth cutting raise. Summary of the invention

[0006] The purpose of the present invention is to provide a method for expanding a small-diameter high-depth cutting shaft by one-time blasting.

[0007] The object of the present invention is achieved by a method for expanding a small-diameter high-depth cutting shaft by one-shot blasting, which is achieved by the following steps: A. Cutting height arrangement process: Use a cutting groove height drilling machine to construct two Φ670mm cutting heights in parallel in the middle of the cutting lane width direction. The center line of the two cutting heights is perpendicular to the direction of the cutting lane, and the distance between the center points of the two cutting heights is 1270mm-1470mm; B. Blast hole arrangement technology: Use medium-deep hole drilling trolley to construct slot holes and auxiliary holes; Evenly arranged on the perpendicular median of the center line of the two cutting heights and not exceeding the tangent of the two cutting heights; the horizontal distance between the center point of the cut hole and the center point of the adjacent cutting height is 635-735mm, and the distance between the center points of adjacent cut holes is 300-400mm; The auxiliary holes are arranged in a rectangular shape evenly on the edges and vertices of the rectangular areas around the two cutting patios with the first cutout hole as the base point; the area of ​​the rectangular area is not less than 2500mm×1200mm; The auxiliary holes include first-order auxiliary holes, second-order auxiliary holes and third-order auxiliary holes; The horizontal distance between the short side of the rectangular area and the perpendicular bisector of the line connecting the centers of the two cutting skylights is 985-1185mm; wherein, the first-order auxiliary holes No. 1 and No. 3 are arranged at the vertices of the rectangular area close to the first groove hole, the first-order auxiliary holes No. 2 and No. 4 are arranged at the midpoints of the two short sides of the rectangular area, the third-order auxiliary holes No. 1 and No. 3 are arranged at the other two vertices of the rectangular area, the third-order auxiliary holes No. 2 are arranged at the midpoint of the long side of the rectangular area away from the first groove hole, and the second-order auxiliary holes No. 1 and No. 2 are arranged on the long side of the rectangular area away from the first groove hole opposite to the center points of the two Φ670mm cutting skylights; the distance between the center points of each adjacent auxiliary hole is 550mm-700mm; C. Layout of detonation network: Continuously coupled loading of granular viscous ammonium oil explosives in the hole, using digital electronic detonators and detonating cords for combined detonation, inserting digital electronic detonators into 3 rolls of detonators as detonating charges and placing them at the bottom of the blasthole as detonating charges, leading the detonator leg wires out of the hole to connect to the blasting busbar, and laying a detonating cord for detonation transmission within the entire length of the charge; D. Blast hole filling process: The length of the blast hole filled with blast mud is 500mm, and the length of the auxiliary hole filled with blast mud is 800mm; E. Delay time control process: There is no delayed detonation for the slot holes, the first-order auxiliary holes No. 1 and No. 2 are detonated with a delay of 1 second, the first-order auxiliary holes No. 3 and No. 4 are detonated with a delay of 2 seconds, the second-order auxiliary holes No. 1 and No. 2 are detonated with a delay of 3 seconds, and the third-order auxiliary holes No. 1, No. 2 and No. 3 are detonated with a delay of 4 seconds.

[0008] The one-time blasting well expansion method for small-diameter high-depth cutting shafts provided by the present invention is based on the latest domestically developed cutting slot shaft drilling rig advanced equipment for constructing 15m-30m high Φ670mm small-diameter deep cutting shafts, innovates shaft arrangement and well expansion blasthole parameters and processes, greatly improves the one-time blasting well expansion success rate for 15m-30m high Φ670mm small-diameter high-depth cutting shafts, and ensures the normal blasting and grooving of subsequent cutting slots and continuous and efficient production organization.

[0009] The present invention provides a sufficient blasting compensation space foundation by arranging parallel double cutting shafts; the slot holes arranged between the two cutting shafts further ensure the effective blasting fracture of the rock mass between the two cutting shafts; the auxiliary holes are divided into three stages and the delay time is increased to blast in stages, so that the rock mass after the blasting of the previous stage can fully fall and loosen, creating a higher compensation space for the rock mass of the blasting of the next stage, and ensuring the success rate of blasting and well expansion; the construction of the cutting shafts and well expansion holes involved can be realized under the existing equipment and technical conditions in the industry, and the charging structure also adopts the operation form commonly used in the current underground mining industry, and the overall implementation is simple and efficient without difficulty improvement. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a schematic plan view of the blasthole arrangement structure of the present invention; Figure 2 This is a cross-sectional view of the blasthole arrangement structure of the present invention taken along the A axis, i.e., a schematic diagram of the blasthole charging structure; Figure 3 It is a schematic diagram of the blast hole detonation sequence in Example 1 of the blast hole arrangement structure of the present invention; Figure 4 It is a schematic diagram of the process flow of the one-time blasting well expansion method of a small-diameter high-depth cutting raise shaft of the present invention; In the figure, 1—Φ670mm cutting ceiling, 101—No. 1 Φ670mm cutting ceiling, 102—No. 2 Φ670mm cutting ceiling; 2—slot hole, 201—slot hole No. 1, 202—slot hole No. 2, 203—slot hole No. 3; 3—auxiliary hole, 31—first-order auxiliary hole, 3101—first-order auxiliary hole No. 1, 3102—first-order auxiliary hole No. 2, 3103—first-order auxiliary hole No. 3, 3104—first-order auxiliary hole No. 4, 32—second-order auxiliary hole; 3201—second-order auxiliary hole No. 1, 3202—second-order auxiliary hole No. 2, 33—third-order auxiliary hole, 3301—third-order auxiliary hole No. 1, 3302—third-order auxiliary hole No. 2, 3303—third-order auxiliary hole No. 3; 4—detonating charge; 5—detonating cord; 6—explosive; 7—blasting mud; 8—Digital electronic detonator pin line, 801—0 delay; 802—0 delay; 803—0 delay; 804—1s delay; 805—1s delay; 806—2s delay; 807—2s delay; 808—3s delay; 809—3s delay; 810—4s delay; 811—5s delay; 812—5s delay.

[0011] 9—blasting busbar; 10—initiator. DETAILED DESCRIPTION

[0012] The present invention is further described below in conjunction with the embodiments, but the present invention is not limited in any way. Any changes or substitutions made based on the teachings of the present invention belong to the protection scope of the present invention.

[0013] The present invention provides a method for expanding a small-diameter high-depth cutting rise by one-time blasting, such as a blasthole arrangement structure of the method, the arrangement structure comprises two Φ670mm cutting rises 1 arranged in parallel; and three slot holes 2 located between the two cutting rises 1; and nine auxiliary holes 3 located outside the two cutting rises 1, such as Figure 1-3 As shown; the method specifically comprises the following steps: S1. Cutting raise arrangement process: on the working surface to be blasted and expanded, pumice and uneven rocks are removed, and after the surveying technicians actually measure and mark the points with paint, two Φ670mm cutting raises 1 are constructed using a cutting groove raise drilling rig, namely cutting raise 101 and cutting raise 102. The two cutting raises 1 are arranged in parallel in the middle of the width direction of the cutting lane, and the center line of the two Φ670mm cutting raises 1 is perpendicular to the direction of the cutting lane; S2. Blast hole arrangement process: on the working surface to be blasted and expanded, pumice and uneven rocks are removed, and after the surveying technicians place points and paint and mark, the medium-deep hole drilling trolley is used to drill the slot holes 2 and auxiliary holes 3; the slot holes 2 are evenly arranged on the median perpendicular line of the center line of the two Φ670mm cutting heights 1 and do not exceed the tangent of the two cutting heights 1; the auxiliary holes 3 are evenly arranged in a rectangular shape on the edges and vertices of the rectangular area outside the two cutting heights 1 with the first slot hole 201 as the base point; the area of ​​the rectangular area is not less than 2500mm×1200mm; The number of the groove holes 2 is 3, namely groove hole 201, groove hole 202, and groove hole 203; the horizontal distance between the center point of the groove hole 2 and the center point of the adjacent Φ670mm cutting ceiling 1 is 635-735mm, and the distance between the center points of adjacent groove holes 2 is 300-400mm; The auxiliary holes 3 include first-order auxiliary holes 31, second-order auxiliary holes 31 and third-order auxiliary holes 31; the number of the first-order auxiliary holes 31 is 4, namely, first-order auxiliary hole 3101, first-order auxiliary hole 3102, first-order auxiliary hole 3103, and first-order auxiliary hole 3104; the number of the second-order auxiliary holes 32 is 2, namely, second-order auxiliary hole 3201 and second-order auxiliary hole 3202; the number of the third-order auxiliary holes 33 is 3, namely, third-order auxiliary hole 3301, third-order auxiliary hole 3302, and third-order auxiliary hole 3303.

[0014] The first-order auxiliary holes 3101-3104 are arranged on the outer sides of the cutting skylight 101 and the cutting skylight 102 along the width direction of the cutting lane, two on each side, and the connecting line of the two first-order auxiliary holes on each side is parallel to the direction of the cutting lane; The horizontal distance between the short side of the rectangular area and the perpendicular bisector of the center line connecting the two Φ670mm cutting ceilings 1 is 985-1185mm; wherein, the first-order auxiliary hole 3101 No. 1 and the first-order auxiliary hole 3103 No. 3 are arranged at the vertices of the rectangular area close to the first groove hole 201, the first-order auxiliary hole 3102 No. 2 and the first-order auxiliary hole 3104 No. 4 are arranged at the midpoints of the two short sides of the rectangular area, the third-order auxiliary hole 3301 No. 1 and the third-order auxiliary hole 3303 No. 3 are arranged at the other two vertices of the rectangular area, the third-order auxiliary hole 3303 No. 2 is arranged at the midpoint of the long side of the rectangular area away from the first groove hole 201, and the second-order auxiliary hole 3201 No. 1 and the second-order auxiliary hole 3202 No. 2 are arranged on the long side of the rectangular area opposite to the center points of the two Φ670mm cutting ceilings away from the first groove hole 201; the distance between the center points of each adjacent auxiliary hole 3 is 550mm-700mm; The diameters of the cutout holes 2 and the auxiliary holes 3 are Φ76mm to Φ90mm; The distance between two adjacent auxiliary holes 3 is 550 mm to 700 mm, and the connecting line of the auxiliary holes 3 forms a rectangle, and the rectangular area is not less than 2500 mm × 1200 mm; The peripheral of the rectangular area can be covered by engineering and technical personnel according to the requirements of well expansion and grooving, with auxiliary holes added at a hole spacing of 600mm-800mm and the detonation delay time extended at intervals of 1s.

[0015] S3. Delay time control process: there is no delay in detonation for the slot hole 2, the first-order auxiliary hole 3101 No. 1 and the first-order auxiliary hole 3102 No. 2 are detonated with a delay of 1 second, the first-order auxiliary hole 3103 No. 3 and the first-order auxiliary hole 3104 No. 4 are detonated with a delay of 2 seconds, the second-order auxiliary hole 3201 No. 1 and the second-order auxiliary hole 3202 No. 2 are detonated with a delay of 3 seconds, and the third-order auxiliary hole 3301 No. 1, the third-order auxiliary hole 3302 No. 2 and the third-order auxiliary hole 3303 No. 3 are detonated with a delay of 4 seconds.

[0016] S4. Layout of detonation network: digital electronic detonator and detonating cord combined detonation method is adopted. The digital electronic detonator is inserted into 3 rolls of detonating charge as the detonating charge package and placed at the bottom of the blasthole. The detonator leg wire is led out of the hole to connect to the blasting busbar. Granular viscous ammonium oil explosive is continuously coupled and loaded in the hole. A detonating cord is laid within the entire length of the charge to transmit the detonation. S5, blasthole filling process: the length of the blasthole filling mud is 500mm, and the length of the auxiliary hole filling mud is 800mm; S6. Detonation sequence: The slot holes are detonated first, followed by the first-order auxiliary holes, the second-order auxiliary holes, and the third-order auxiliary holes.

[0017] The cutting raise 1 is drilled vertically upward using a CY-R40C cutting slot raise drilling rig, and the drilling deviation rate is controlled within 0.5%; The slot hole 2 and the auxiliary hole 3 are drilled vertically and parallelly upward by a Simba H1354 drilling rig or a GZ-919 drilling rig, with a hole diameter of Φ76mm to Φ90mm, and a drilling deviation rate controlled within 1%; The explosives used in the cutout hole 2 and the auxiliary hole 3 are granular viscous ammonium oil explosives continuously coupled charges, and digital electronic detonators are used for detonation and detonating cords for detonation.

[0018] The specific embodiments of the present invention are as follows: Example 1 This embodiment is illustrated by taking the construction conditions of cutting a horizontal tunnel in an underground mine as an example. A small-diameter high-depth cutting rise with a cutting rise of Φ670 mm and a well depth of 15 to 30 m is designed to be expanded by blasting once. The cross-section of the cutting rise after blasting and expansion is rectangular.

[0019] Specific blasthole arrangement forms, such as Figure 1As shown, it includes two Φ670mm cutting skylights 1, which are arranged in parallel in the middle of the width direction of the cutting lane, and the center line of the two Φ670mm cutting skylights 1 is perpendicular to the grooving direction of the cutting lane; the groove holes 2 are evenly arranged on the median perpendicular line of the center line of the two Φ670mm cutting skylights and do not exceed the tangent of the two cutting skylights 1; the auxiliary holes 3 are evenly arranged on the edges and vertices of the rectangular area outside the two cutting skylights 1. Among them, the first-order auxiliary hole 3101 No. 1 and the first-order auxiliary hole 3103 No. 3 are arranged at the vertices of the rectangular area close to the first groove hole 201, the first-order auxiliary hole 3102 No. 2 and the first-order auxiliary hole 3104 No. 4 are arranged at the midpoints of the two short sides of the rectangular area, the third-order auxiliary hole 3301 No. 1 and the third-order auxiliary hole 3303 No. 3 are arranged at the other two vertices of the rectangular area, the third-order auxiliary hole 3303 No. 2 is arranged at the midpoint of the long side of the rectangular area away from the first groove hole 201, and the second-order auxiliary hole 3201 No. 1 and the second-order auxiliary hole 3202 No. 2 are arranged on the long side of the rectangular area opposite to the center points of the two Φ670mm cutting ceilings 1 away from the first groove hole 201; The one-time blasting and well expansion process for small-diameter high-depth cutting shaft is as follows: In accordance with the requirements for well expansion, on-site construction personnel used tools such as crowbars to remove the floating rocks in the area where the well was to be expanded by blasting. Figure 1 The hole arrangement structure completes the measurement and positioning of the well center and the blast hole at the working face, and paints and marks the well. The cutting groove well drilling rig is used to construct the cutting well according to the marked well center position, and the medium-deep hole drilling trolley is used to drill and expand the well hole according to the marked hole position. After the drilling is completed, the technicians will inspect and accept the blast hole porosity. The relevant equipment and well expansion blasting parameters are selected as follows: 1. Cutting roof equipment: Use CY-R40C cutting slot roof drilling rig for construction, and control the deflection rate within 0.5%; 2. Wellbore expansion equipment: Simba H1354 drilling rig is used for construction, and the deflection rate is controlled within 1%; 3. Aperture: cutting hole diameter Φ670mm, expansion hole diameter Φ76mm; 4. Hole depth: The depth of the slot hole 2 is 500-1000mm deeper than the depth of the cutting height 1, and the depth of the auxiliary hole 3 is the same as the depth of the Φ670mm cutting height 1. If the cutting height 1 is 25m deep, the depth of the slot hole 2 is 25.5m-26m, and the depth of the auxiliary hole 3 is 25m; the depth of the slot hole 2 is preferably 750mm deeper than the depth of the Φ670mm cutting height 1; 5. Hole spacing: The horizontal distance between the center points of two Φ670mm cutting ceilings 1 is 1270-1470mm, preferably 1370mm; the horizontal distance between the center point of the groove hole 2 and the center point of the adjacent Φ670mm cutting ceiling 1 is 635-735mm, preferably 685mm; the distance between the center points of adjacent groove holes 2 is 300-400mm, preferably 350mm; the horizontal distance between the short side of the rectangular area and the perpendicular bisector of the center line connecting the two Φ670mm cutting ceilings 1 is 985-1185mm, preferably 1085mm; the distance between the center points of each adjacent auxiliary hole 3 is 550mm-700mm, preferably 625mm; 6. Blast hole filling: All well expansion holes are filled with blast hole mud, of which the length of the blast hole filling blast hole mud is 500mm, and the length of the auxiliary hole filling blast hole mud is 800mm; 7. Blasting equipment: Granular viscous ammonium oil explosives are used as explosives, and BQF charge loader is used for continuous coupling charging. Digital electronic detonators are used for detonation and detonating cords are used for detonation. The digital electronic detonators are inserted into 3 rolls of detonators as detonating charges and placed at the bottom of the blasthole as detonating charges. The detonator leg wire is connected to the blasting busbar outside the hole, and a detonating cord is laid within the entire length of the charge for detonation. 8. Delay time: the slot holes are detonated first, followed by the first-order auxiliary holes, second-order auxiliary holes and third-order auxiliary holes, slot holes 201-203 No. 1-3 are detonated without delay, first-order auxiliary hole 3101 No. 1 and first-order auxiliary hole 3102 No. 2 are detonated with a delay of 1 second, first-order auxiliary hole 3103 No. 3 and first-order auxiliary hole 3104 No. 4 (3104) are detonated with a delay of 2 seconds, second-order auxiliary hole 3201 No. 1 and second-order auxiliary hole 3202 No. 2 are detonated with a delay of 3 seconds, third-order auxiliary hole 3301 No. 1, third-order auxiliary hole 3302 No. 2 and third-order auxiliary hole 3303 No. 3 are detonated with a delay of 4 seconds.

[0020] The one-time blasting well expansion method for small-diameter high-depth cutting shafts provided by the present invention applies the latest advanced equipment of cutting slot shaft drilling rigs developed in China in recent years, innovates the shaft layout and well expansion blasthole parameters and processes, greatly improves the one-time blasting well expansion success rate of small-diameter high-depth cutting shafts above 15m in height, effectively ensures the normal blasting and grooving of subsequent cutting slots, and is beneficial to ensuring the utilization rate of ore resources and the continuous and efficient production organization.

[0021] The present invention provides a sufficient blasting compensation space foundation by arranging parallel double cutting shafts; the slot holes arranged between the two cutting shafts further ensure the effective blasting fracture of the rock mass between the two cutting shafts; the auxiliary holes are divided into three stages, and the delay time is increased to blast in stages, so that the rock mass after the blasting of the previous stage can fully fall and loosen, creating a higher compensation space for the rock mass of the next stage blasting, and ensuring the success rate of blasting and well expansion; the construction of the cutting shaft and the well expansion hole is not difficult under the existing equipment conditions in the industry, and the charging structure also adopts the operation form commonly used in the current underground mining industry. The overall implementation is simple and convenient, without obvious increase in difficulty.

Claims

1. A method for expanding a small-diameter high-depth cutting shaft by one-shot blasting, characterized in that: To do this, follow these steps: A. Cutting riser arrangement process: Use a cutting groove riser drilling machine to construct two Φ670 mm cutting risers (1) in parallel in the middle of the cutting lane width direction. The center line of the two cutting risers (1) is perpendicular to the direction of the cutting lane. The distance between the center points of the two Φ670 mm cutting risers (1) is 1270 mm-1470 mm. B. Blast hole arrangement technology: Use a medium-long hole drilling rig to construct the slot hole (2) and auxiliary hole (3); slot hole (2) Evenly arranged on the perpendicular median line of the center line of the two cutting ceilings (1), and not exceeding the tangent line of the two cutting ceilings (1); the horizontal distance between the center point of the groove hole (2) and the center point of the adjacent cutting ceiling is 635-735 mm, and the distance between the center points of adjacent groove holes (2) is 300-400 mm; The auxiliary holes (3) are arranged in a rectangular shape evenly on the edges and vertices of a rectangular area outside the two cutting ceilings (1) with the first cutout hole (201) as a base point; the area of ​​the rectangular area is not less than 2500 mm×1200 mm; The auxiliary holes (3) include a first-order auxiliary hole (31), a second-order auxiliary hole (31) and a third-order auxiliary hole (31); The horizontal distance between the short side of the rectangular area and the perpendicular bisector of the line connecting the centers of the two cutting skylights (1) is 985-1185 mm; wherein the first-order auxiliary hole No. 1 (3101) and the first-order auxiliary hole No. 3 (3103) are arranged at the vertex of the rectangular area close to the first groove hole (201), the first-order auxiliary hole No. 2 (3102) and the first-order auxiliary hole No. 4 (3104) are arranged at the midpoints of the two short sides of the rectangular area, and the third-order auxiliary hole No. 1 (3301) and the third-order auxiliary hole No. 3 (3303) are arranged at the midpoints of the two short sides of the rectangular area. The step auxiliary holes (3303) are arranged at the other two vertices of the rectangular area, the No. 2 third-order auxiliary hole (3303) is arranged at the midpoint of the long side of the rectangular area away from the first groove hole (201), and the No. 1 second-order auxiliary hole (3201) and the No. 2 second-order auxiliary hole (3202) are arranged on the long side of the rectangular area opposite to the center points of the two cutting skylights and away from the first groove hole (201); the distance between the center points of each adjacent auxiliary hole (3) is 550mm-700mm; C. Layout of detonation network: Continuously coupled loading of granular viscous ammonium oil explosives in the hole, using digital electronic detonators and detonating cords for combined detonation, inserting digital electronic detonators into 3 rolls of detonators as detonating charges and placing them at the bottom of the blasthole as detonating charges, leading the detonator leg wires out of the hole to connect to the blasting busbar, and laying a detonating cord for detonation transmission within the entire length of the charge; D. Blast hole filling process: The length of the blast hole filled with blast mud is 500mm, and the length of the auxiliary hole filled with blast mud is 800mm; E. Delay time control process: the slot hole (2) has no delay detonation, the first-order auxiliary hole No. 1 (3101) and the first-order auxiliary hole No. 2 (3102) have a delay of 1 second for detonation, the first-order auxiliary hole No. 3 (3103) and the first-order auxiliary hole No. 4 (3104) have a delay of 2 seconds for detonation, the second-order auxiliary hole No. 1 (3201) and the second-order auxiliary hole No. 2 (3202) have a delay of 3 seconds for detonation, and the third-order auxiliary hole No. 1 (3301), the third-order auxiliary hole No. 2 (3302) and the third-order auxiliary hole No. 3 (3303) have a delay of 4 seconds for detonation.

2. The method according to claim 1, characterized in that In step A, the two cutting shafts (1) are vertically drilled upward using a CY-R40C cutting groove shaft drilling rig, and the drilling deviation rate is controlled within 0.5%.

3. The method according to claim 1, characterized in that: In the step B, the slot holes (2) and the auxiliary holes (3) are drilled vertically and parallelly upward using a Simba H1354 drilling rig or a GZ-919 drilling rig, with a hole diameter of Φ76 mm to Φ90 mm, and a drilling deviation rate controlled within 1%.

4. The method according to claim 1, characterized in that: In step B, the diameters of the cutout holes (2) and the auxiliary holes (3) are both Φ76-90 mm, the depth of the cutout holes (2) is 500-1000 mm deeper than the cutting ceiling (1), and the depth of the auxiliary holes (3) is the same as the depth of the two cutting ceilings (1).

5. The method according to claim 1, characterized in that In the step B, the engineering and technical personnel can add auxiliary holes at a hole spacing of 600mm-800mm on the periphery of the rectangular area according to the requirements of well expansion and grooving, and extend the detonation delay time at intervals of 1s.

6. The method according to claim 1, characterized in that The depth of the cutting well (1) is 15 to 30 m.

Citation Information

Patent Citations

  • Cutting patio blasting construction method

    CN109539915A

  • Blasting shaft forming method for shallow vertical shaft

    CN110145981A

  • Blast hole arrangement structure and method for one-blasting shaft excavation of small-section upward blind raise

    CN113720226A

  • Method and device for quickly forming cutting raise through intelligent deep hole blasting

    CN113916074A

  • Well expanding and hole distributing method for circular shaft

    CN114001606A