Urban underground pipe gallery monitoring system and monitoring method thereof

By adopting a monitoring system combining primary and secondary node sensors in urban underground pipelines, LoRa wireless ad hoc network and historical data analysis, the problem of high misjudgment rate in the existing technology is solved, and higher monitoring accuracy is achieved and longer system life.

CN118960827APending Publication Date: 2024-11-15JILIN JIANZHU UNIVERSITY

Patent Information

Application Number
CN202410965852.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The prior art has a high misjudgment rate in urban underground pipeline monitoring and lacks scope effectiveness, making it difficult to effectively monitor pipeline deformation and damage through the detection results of individual fixed-point sensors.

Method used

采用主节点和副节点传感器结合的监测系统,通过LoRa无线自组网络进行分区域组网,结合历史数据进行权重耦合分析,并在预警模块中对监测数据进行比对,降低误判率。

Benefits of technology

Through the coordinated work of the primary and secondary node sensors, the alarm error rate is reduced, the monitoring accuracy is improved, the system service life is extended, and the monitoring effect is significantly improved through range detection and historical data comparison.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118960827A_ABST
    Figure CN118960827A_ABST
Patent Text Reader

Abstract

The invention discloses an urban underground pipe gallery monitoring system and a monitoring method thereof, and relates to the technical field of underground pipe gallery monitoring, and the method comprises the steps: collecting monitoring data collected by main node sensors, starting auxiliary node sensors when the induction data collected by the main node sensors exceeds a preset threshold value, carrying out the regional networking of the plurality of main node sensors, and carrying out the regional networking of the plurality of auxiliary node sensors; when the auxiliary node sensor is started, the auxiliary node sensor inherits the networking position of the main node sensor; performing weight coupling on the monitoring data according to the node relationship in the region; the weight coupling data is compared with the historical monitoring standard data, when the preset threshold value is exceeded, an alarm is given, the monitoring misjudgment rate in the underground pipe gallery is reduced, and the urban underground pipe gallery monitoring effect is improved through range detection and historical data comparison.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of underground pipe gallery monitoring, and more particularly to an urban underground pipe gallery monitoring system and a monitoring method thereof. Background Art

[0002] The city's underground integrated pipe corridor integrates various projects such as electricity, communications, gas, heating, water supply and drainage, and has the characteristics of high long-term benefits, long service life, and wide coverage. Since the integrated pipe corridor is long, buried underground, and easily affected by multiple factors such as surrounding address conditions, the pipes in the corridor are prone to deformation, which may lead to pipeline damage in severe cases. Therefore, monitoring the pipe corridor is an essential task.

[0003] However, most of the related technologies deploy sensors in the pipeline corridor to realize the monitoring of the integrated pipeline corridor. Since the integrated pipeline corridor environment has high humidity, high dust, low temperature, high vibration and electromagnetic interference, the detection accuracy of the sensor is greatly affected. At the same time, judging by the detection results of a single fixed sensor will lead to a lack of range effectiveness of the monitoring results, and the misjudgment rate of the monitoring alarm is high.

[0004] Therefore, how to propose an urban underground pipeline corridor monitoring system and a monitoring method thereof, reduce the monitoring misjudgment rate in the underground pipeline corridor, and improve the monitoring effect of the urban underground pipeline corridor through range detection and historical data comparison is an urgent problem that technical personnel in this field need to solve. Summary of the invention

[0005] In view of this, the present invention provides an urban underground pipe gallery monitoring system and a monitoring method thereof, which reduce the monitoring misjudgment rate in the underground pipe gallery and improve the monitoring effect of the urban underground pipe gallery through range detection and historical data comparison. In order to achieve the above purpose, the present invention adopts the following technical solutions:

[0006] An urban underground pipe gallery monitoring system, comprising: a main node monitoring data acquisition module, a secondary node monitoring data acquisition module, a LoRa wireless ad hoc network module, a monitoring data analysis module and an early warning module;

[0007] The master node monitoring data collection module is used to collect the master node monitoring data collected by the master node sensor;

[0008] The secondary node monitoring data collection module is used to enable the secondary node sensor under the primary node when the primary node monitoring data exceeds the primary node preset threshold, and summarize the secondary node monitoring data collected by the secondary node sensor;

[0009] The wireless self-organizing network module is used to network multiple main node sensors in different areas, and when the secondary node sensors are enabled, the secondary node sensors inherit the networking position of the main node sensors;

[0010] The monitoring data analysis module is used to weight the monitoring data of the main node and the monitoring data of the secondary node in the region according to the node relationship in the region;

[0011] The early warning module is used to compare the weighted coupling data with the historical monitoring standard data, and issue an alarm when a preset threshold is exceeded.

[0012] Optionally, the monitoring data includes vibration information, strain information, temperature and humidity information, gas information, joint crack information and displacement information.

[0013] Optionally, the monitoring data analysis module includes: a first underground pipeline gallery monitoring data analysis module and a second underground pipeline gallery monitoring data analysis module, the first underground pipeline gallery monitoring data analysis module is used to obtain first monitoring data weight information, and the second underground pipeline gallery monitoring data analysis module is used to obtain second monitoring data weight information.

[0014] Optionally, the first underground pipe gallery monitoring data analysis module is used to determine the first underground pipe gallery monitoring standard data according to the first monitoring data weight information and the monitoring data of multiple master nodes in the area;

[0015] The second underground utility corridor monitoring data analysis module is used to determine the second underground utility corridor monitoring standard data based on the second monitoring data weight information and when the main node monitoring data exceeds the main node preset threshold in the same area, the remaining main node monitoring data in the area where the main node monitoring data does not exceed the main node preset threshold and the collected secondary node monitoring data after a preset time.

[0016] Optionally, a third underground pipeline gallery monitoring data analysis module is also included, and the third underground pipeline gallery monitoring data analysis module is used to determine the third underground pipeline gallery monitoring standard data based on the first underground pipeline gallery monitoring standard data and the second underground pipeline gallery monitoring standard data.

[0017] Optionally, it also includes: a fourth underground pipeline gallery monitoring data analysis module, and the fourth underground pipeline gallery monitoring data analysis module is used to issue an alarm when the third underground pipeline gallery monitoring standard data exceeds a preset threshold value of the historical underground pipeline gallery monitoring standard data.

[0018] Optionally, it also includes: a timed wake-up module, which is used to regularly wake up the secondary node sensor and summarize the secondary node monitoring data collected by the secondary node sensor.

[0019] Optionally, it also includes an abnormal value judgment module and a main node sensor replacement module, wherein the abnormal value judgment module is used to summarize the abnormal values ​​of the main node sensor and the secondary node sensors; the main node sensor replacement module is used to determine the secondary node sensor with the lowest abnormal value as the new main node sensor.

[0020] Optionally, the abnormal value judgment module includes: a monitoring reference data acquisition unit and an abnormal value judgment unit, wherein the monitoring reference data acquisition unit is used to wake up the reference sensor and summarize the monitoring reference data collected by the reference sensor; the abnormal value judgment unit is used to judge the abnormal values ​​of the main node sensor and the secondary node sensor based on the main node monitoring data, the secondary node monitoring data and the monitoring reference data.

[0021] Optionally, a method for monitoring an urban underground pipe gallery includes:

[0022] Summarize the master node monitoring data collected by the master node sensors;

[0023] When the monitoring data of the master node exceeds the preset threshold of the master node, the secondary node sensor under the master node is enabled, and the monitoring data of the secondary nodes collected by the secondary node sensor is summarized;

[0024] Multiple master node sensors are networked in different areas. When slave node sensors are enabled, the slave node sensors inherit the networking position of the master node sensors.

[0025] The monitoring data of the main node and the monitoring data of the secondary node in the region are weighted coupled according to the node relationship in the region;

[0026] The weighted coupling data is compared with the historical monitoring standard data, and an alarm is issued when the preset threshold is exceeded.

[0027] It can be seen from the above technical solutions that, compared with the prior art, the present invention discloses a city underground pipe gallery monitoring system and a monitoring method thereof, which have the following beneficial effects:

[0028] The present invention enables the secondary node sensor under the main node when the sensing data collected by the main node sensor exceeds the preset threshold of the main node, and then jointly determines whether an alarm is needed through the sensing data collected by the main node sensor and the sensing data collected by the secondary node sensor, which greatly reduces the alarm misjudgment rate and improves the monitoring accuracy of the above-mentioned urban underground comprehensive pipe gallery online monitoring method; the main node sensor is operated in real time, and the secondary node sensor is enabled after the data collected by the main node sensor exceeds the threshold, thereby extending the service life of the monitoring system;

[0029] Furthermore, the present invention obtains first monitoring data weight information through a first underground pipeline gallery monitoring data analysis module, and obtains second monitoring data weight information through a second underground pipeline gallery monitoring data analysis module; determines the first underground pipeline gallery monitoring standard data according to the first monitoring data weight information and the monitoring data of multiple master nodes in the area; determines the second underground pipeline gallery monitoring standard data according to the second monitoring data weight information and when the monitoring data of the master node exceeds the preset threshold of the master node in the same area, the remaining master node monitoring data in the area where the monitoring data of the master node does not exceed the preset threshold of the master node and the collected secondary node monitoring data after a preset time; determines the second underground pipeline gallery monitoring standard data according to the first underground pipeline gallery monitoring standard data The third underground pipeline corridor monitoring standard data is determined based on the data and the second underground pipeline corridor monitoring standard data, and is input into the recurrent neural network model for risk identification; the identified risk status is associated with the corresponding regional serial number, and the prediction model is used to predict the risk level and type of each region in the future, and a preset threshold of historical underground pipeline corridor monitoring standard data is set for each region; the third underground pipeline corridor monitoring standard data is obtained in real time and compared with the preset threshold of historical underground pipeline corridor monitoring standard data. When the preset threshold of historical underground pipeline corridor monitoring standard data is exceeded, an alarm is issued, thereby reducing the monitoring misjudgment rate in the underground pipeline corridor, and improving the monitoring effect of urban underground pipeline corridors through range detection and historical data comparison. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0031] Figure 1 A structural framework diagram of an urban underground pipe gallery monitoring system provided by the present invention.

[0032] Figure 2 A schematic flow chart of a method for monitoring an urban underground pipe gallery provided by the present invention. DETAILED DESCRIPTION

[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0034] The embodiment of the present invention discloses a city underground pipe gallery monitoring system. Figure 1As shown, it includes: a main node monitoring data acquisition module, a secondary node monitoring data acquisition module, a LoRa wireless self-organizing network module, a monitoring data analysis module and an early warning module;

[0035] The master node monitoring data collection module is used to collect the master node monitoring data collected by the master node sensor;

[0036] The secondary node monitoring data collection module is used to enable the secondary node sensor under the primary node when the primary node monitoring data exceeds the primary node preset threshold, and summarize the secondary node monitoring data collected by the secondary node sensor;

[0037] The wireless self-organizing network module is used to network multiple main node sensors in different areas, and when the secondary node sensors are enabled, the secondary node sensors inherit the networking position of the main node sensors;

[0038] The monitoring data analysis module is used to weight the monitoring data of the main node and the monitoring data of the secondary node in the region according to the node relationship in the region;

[0039] The early warning module is used to compare the weighted coupling data with the historical monitoring standard data, and issue an alarm when a preset threshold is exceeded.

[0040] Furthermore, the monitoring data includes vibration information, strain information, temperature and humidity information, gas information, joint crack information and displacement information. Various sensors are deployed inside and around the underground pipe gallery system, including but not limited to vibration sensors, strain sensors, temperature and humidity sensors, gas detection sensors, FBG strain sensors, static level sensors, etc., for real-time monitoring of the status of the pipe gallery structure and the surrounding environment.

[0041] Furthermore, the monitoring data analysis module includes: a first underground pipe gallery monitoring data analysis module and a second underground pipe gallery monitoring data analysis module, wherein the first underground pipe gallery monitoring data analysis module is used to obtain first monitoring data weight information, and the second underground pipe gallery monitoring data analysis module is used to obtain second monitoring data weight information. The first monitoring data weight information is the ratio of the number of master node sensors exceeding the threshold to the total number of master node sensors, and the second monitoring data weight information is the ratio of the number of master node sensors that do not exceed the threshold to the total number of master node sensors.

[0042] Furthermore, the first underground pipe gallery monitoring data analysis module is used to determine the first underground pipe gallery monitoring standard data according to the first monitoring data weight information and the monitoring data of multiple master nodes in the area;

[0043] The second underground utility gallery monitoring data analysis module is used to determine the second underground utility gallery monitoring standard data according to the second monitoring data weight information and when the main node monitoring data in the same area exceeds the main node preset threshold, the remaining main node monitoring data in the area where the main node monitoring data does not exceed the main node preset threshold and the collected secondary node monitoring data after a preset time, and the preset time is determined according to the sensor parameters. The first underground utility gallery monitoring standard data and the second underground utility gallery monitoring standard data are weighted according to the first monitoring data weight information, the second monitoring data weight information and the real-time sensor monitoring data, respectively.

[0044] Furthermore, a third underground pipeline gallery monitoring data analysis module is included, and the third underground pipeline gallery monitoring data analysis module is used to determine the third underground pipeline gallery monitoring standard data according to the first underground pipeline gallery monitoring standard data and the second underground pipeline gallery monitoring standard data. The third underground pipeline gallery monitoring standard data is obtained by weighting the first underground pipeline gallery monitoring standard data and the second underground pipeline gallery monitoring standard data.

[0045] Specifically, it also includes: third monitoring data weight information and fourth monitoring data weight information. The third monitoring data weight information and the fourth monitoring data weight information are determined according to preset thresholds of historical underground pipeline corridor monitoring standard data. The sum of all sensor monitoring data in the area under the first underground pipeline corridor monitoring data analysis module is A; the sum of all sensor monitoring data in the area under the second underground pipeline corridor monitoring data analysis module is B, and the preset threshold of historical underground pipeline corridor monitoring standard data is C. The third monitoring data weight information is BC / C, and the fourth monitoring data weight information is AC / C. The third monitoring data weight information and the fourth monitoring data weight information are used to perform weighted averaging on the first pipeline corridor sensing data and the second pipeline corridor sensing data to obtain the third underground pipeline corridor monitoring standard data.

[0046] Furthermore, it also includes: a fourth underground pipeline gallery monitoring data analysis module, and the fourth underground pipeline gallery monitoring data analysis module is used to issue an alarm when the third underground pipeline gallery monitoring standard data exceeds a preset threshold value of the historical underground pipeline gallery monitoring standard data.

[0047] In a specific implementation manner, the preset thresholds of the historical underground pipe gallery monitoring standard data include preset thresholds of various historical underground pipe gallery monitoring standard data, specifically including:

[0048] S1: Obtain the location information of each area of ​​the underground pipe gallery and assign a regional serial number to each area through the wireless ad hoc network module;

[0049] S2: Arrange sensors according to the master node in each area and assign master node numbers to the sensors;

[0050] S3: Obtain the geographical location information of the underground pipeline corridor monitoring area, build a historical statistical model, and use historical data and statistical analysis methods to analyze the risk types of each area in the historical statistical model;

[0051] S4: Acquire historical environmental monitoring data monitored by the sensor according to the master node serial number, wherein the historical environmental monitoring data includes:

[0052] The first monitoring data weight information is obtained through the first underground pipe gallery monitoring data analysis module, and the second monitoring data weight information is obtained through the second underground pipe gallery monitoring data analysis module;

[0053] A first underground pipe gallery monitoring data analysis module, which determines the first underground pipe gallery monitoring standard data according to the first monitoring data weight information and the monitoring data of multiple master nodes in the area;

[0054] The second underground utility corridor monitoring data analysis module determines the second underground utility corridor monitoring standard data according to the second monitoring data weight information and when the main node monitoring data in the same area exceeds the main node preset threshold, the remaining main node monitoring data in the area where the main node monitoring data does not exceed the main node preset threshold and the collected secondary node monitoring data after a preset time;

[0055] The third underground pipeline gallery monitoring data analysis module determines the third underground pipeline gallery monitoring standard data based on the first underground pipeline gallery monitoring standard data and the second underground pipeline gallery monitoring standard data, and inputs the data into the recurrent neural network model for risk identification;

[0056] S5: Associate the identified risk status with the corresponding area serial number, and use the prediction model to predict the risk level and type of each area in the future, and set a preset threshold for the historical underground pipeline corridor monitoring standard data for each area;

[0057] S6: Obtain the third underground pipeline corridor monitoring standard data in real time and compare it with the preset threshold of the historical underground pipeline corridor monitoring standard data. When the preset threshold of the historical underground pipeline corridor monitoring standard data is exceeded, an alarm is issued.

[0058] In a specific implementation, the identified risk status is associated with the corresponding regional serial number, and the prediction model is used to predict the risk level and type of each region in the future, and the preset threshold of the historical underground pipe gallery monitoring standard data is set for each region, including the following steps:

[0059] Obtain the recognition result output by the recurrent neural network model and associate the recognized risk status with the master node serial number;

[0060] According to the correspondence between the master node number and the sensor location, the risk status is associated with the corresponding area number;

[0061] Using the prediction model, the third underground pipeline corridor monitoring standard data and risk status are input into the prediction model to predict the risk level and type of each area in the future;

[0062] Based on the location information of each area of ​​the underground pipeline corridor and the risk type of each area, preset thresholds for historical underground pipeline corridor monitoring standard data are set up for each area.

[0063] In a specific implementation, the use of a prediction model, inputting monitoring data and risk status into the prediction model, and predicting the risk level and type of each area in the future time includes the following steps:

[0064] Collect historical third underground pipeline gallery monitoring standard data and corresponding risk status;

[0065] Build a random forest model and set the parameters of the random forest model;

[0066] Use the training set data to build multiple decision trees and introduce random features when splitting nodes;

[0067] Each decision tree classifies the training set according to random features and obtains the classification results;

[0068] For the newly input third underground utility corridor monitoring standard data, prediction is performed on each decision tree to obtain the classification results of each decision tree;

[0069] Summarize the prediction results of each decision tree and obtain the final prediction result of the random forest through voting method;

[0070] Based on the final prediction results, determine the risk level and risk type of each area in the future, and output the risk prediction results.

[0071] Furthermore, it also includes: a timed wake-up module, which is used to regularly wake up the secondary node sensor and summarize the secondary node monitoring data collected by the secondary node sensor.

[0072] Furthermore, it also includes an abnormal value judgment module and a main node sensor replacement module. The abnormal value judgment module is used to summarize the abnormal values ​​of the main node sensor and the secondary node sensor; the main node sensor replacement module is used to determine the secondary node sensor with the lowest abnormal value as the new main node sensor.

[0073] Furthermore, the abnormal value judgment module includes: a monitoring reference data acquisition unit and an abnormal value judgment unit, wherein the monitoring reference data acquisition unit is used to wake up the reference sensor and summarize the monitoring reference data collected by the reference sensor; the abnormal value judgment unit is used to judge the abnormal values ​​of the main node sensor and the secondary node sensor based on the main node monitoring data, the secondary node monitoring data and the monitoring reference data.

[0074] In a specific implementation manner, judging the abnormal values ​​of the primary node sensor and the secondary node sensor according to the primary node monitoring data, the secondary node monitoring data and the monitoring reference data includes:

[0075] Wake up the reference sensor and summarize the monitoring reference data collected by the reference sensor; calculate the first deviation value and the second deviation value between the monitoring data of the main node and the monitoring reference data, and between the monitoring data of the secondary node and the monitoring reference data; calculate the proportional relationship between the first deviation value and the monitoring reference data, and between the second deviation value and the monitoring reference data, to obtain the first deviation ratio and the second deviation ratio; determine the abnormal values ​​of the main node sensor and the secondary node sensor according to the mapping relationship between the preset deviation ratio and the abnormal value.

[0076] In a specific implementation, a method for monitoring an urban underground pipe gallery is provided. Figure 2 As shown, including:

[0077] Summarize the master node monitoring data collected by the master node sensors;

[0078] When the monitoring data of the master node exceeds the preset threshold of the master node, the secondary node sensor under the master node is enabled, and the monitoring data of the secondary nodes collected by the secondary node sensor is summarized;

[0079] Multiple master node sensors are networked in different areas. When slave node sensors are enabled, the slave node sensors inherit the networking position of the master node sensors.

[0080] The monitoring data of the main node and the monitoring data of the secondary node in the region are weighted coupled according to the node relationship in the region;

[0081] The weighted coupling data is compared with the historical monitoring standard data, and an alarm is issued when the preset threshold is exceeded.

[0082] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0083] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. An urban underground pipe gallery monitoring system, characterized in that: include: Main node monitoring data collection module, secondary node monitoring data collection module, LoRa wireless ad hoc network module, monitoring data analysis module and early warning module; The master node monitoring data collection module is used to collect the master node monitoring data collected by the master node sensor; The secondary node monitoring data collection module is used to enable the secondary node sensor under the primary node when the primary node monitoring data exceeds the primary node preset threshold, and summarize the secondary node monitoring data collected by the secondary node sensor; The wireless self-organizing network module is used to network multiple main node sensors in different areas, and when the secondary node sensors are enabled, the secondary node sensors inherit the networking position of the main node sensors; The monitoring data analysis module is used to weight the monitoring data of the main node and the monitoring data of the secondary node in the region according to the node relationship in the region; The early warning module is used to compare the weighted coupling data with the historical monitoring standard data, and issue an alarm when a preset threshold is exceeded.

2. The urban underground pipe gallery monitoring system according to claim 1 is characterized in that: The monitoring data includes vibration information, strain information, temperature and humidity information, gas information, joint crack information and displacement information.

3. The urban underground pipe gallery monitoring system according to claim 1 is characterized in that: The monitoring data analysis module includes: a first underground pipeline gallery monitoring data analysis module and a second underground pipeline gallery monitoring data analysis module, the first underground pipeline gallery monitoring data analysis module is used to obtain first monitoring data weight information, and the second underground pipeline gallery monitoring data analysis module is used to obtain second monitoring data weight information.

4. The urban underground pipe gallery monitoring system according to claim 3 is characterized in that: The first underground pipe gallery monitoring data analysis module is used to determine the first underground pipe gallery monitoring standard data according to the first monitoring data weight information and the monitoring data of multiple master nodes in the area; The second underground utility corridor monitoring data analysis module is used to determine the second underground utility corridor monitoring standard data based on the second monitoring data weight information and when the main node monitoring data exceeds the main node preset threshold in the same area, the remaining main node monitoring data in the area where the main node monitoring data does not exceed the main node preset threshold and the collected secondary node monitoring data after a preset time.

5. The urban underground pipe gallery monitoring system according to claim 4 is characterized in that: It also includes a third underground pipeline gallery monitoring data analysis module, which is used to determine the third underground pipeline gallery monitoring standard data based on the first underground pipeline gallery monitoring standard data and the second underground pipeline gallery monitoring standard data.

6. The urban underground pipe gallery monitoring system according to claim 5, characterized in that: Also includes: The fourth underground pipeline gallery monitoring data analysis module is used to issue an alarm when the third underground pipeline gallery monitoring standard data exceeds a preset threshold value of the historical underground pipeline gallery monitoring standard data.

7. The urban underground pipe gallery monitoring system according to claim 1, characterized in that: Also includes: A timed wake-up module, wherein the timed wake-up module is used to regularly wake up the secondary node sensor and summarize the secondary node monitoring data collected by the secondary node sensor.

8. The urban underground pipe gallery monitoring system according to claim 1, characterized in that: It also includes an abnormal value judgment module and a main node sensor replacement module. The abnormal value judgment module is used to summarize the abnormal values ​​of the main node sensor and the secondary node sensor; the main node sensor replacement module is used to determine the secondary node sensor with the lowest abnormal value as the new main node sensor.

9. The urban underground pipe gallery monitoring system according to claim 8, characterized in that: The abnormal value judgment module includes: a monitoring reference data acquisition unit and an abnormal value judgment unit, wherein the monitoring reference data acquisition unit is used to wake up the reference sensor and summarize the monitoring reference data collected by the reference sensor; the abnormal value judgment unit is used to judge the abnormal values ​​of the main node sensor and the secondary node sensor according to the main node monitoring data, the secondary node monitoring data and the monitoring reference data.

10. A method for monitoring an urban underground pipe gallery, characterized in that: include: Summarize the master node monitoring data collected by the master node sensors; When the monitoring data of the master node exceeds the preset threshold of the master node, the secondary node sensor under the master node is enabled, and the monitoring data of the secondary nodes collected by the secondary node sensor is summarized; Multiple master node sensors are networked in different areas. When slave node sensors are enabled, the slave node sensors inherit the networking position of the master node sensors. The monitoring data of the main node and the monitoring data of the secondary node in the region are weighted coupled according to the node relationship in the region; The weighted coupling data is compared with the historical monitoring standard data, and an alarm is issued when the preset threshold is exceeded.

Citation Information

Patent Citations

  • Remote monitoring system for disaster of mountain massif coast

    CN101452629A

  • Bridge health monitoring method and system based on wireless sensor network

    CN114894411A

  • Data synchronization method and data synchronization device

    CN116991635A

  • Distributed hydropower station information data monitoring system

    CN117270437A

  • Industrial data management method and system based on cloud edge fusion

    CN117872989A

Cited By

  • Collaborative design optimization method for forward design of water supply and drainage BIM

    CN120850422A