Engine complete machine salt spray corrosion resistance test equipment based on suspension type test bed

By using flexible circulation ducts and circulating fans in the engine salt spray test equipment to form a breeze circulation and using circulating gas for humidification and heating, the problem of high energy consumption of existing equipment under high temperature and high humidity conditions is solved, and the test equipment is realized energy efficiency improvement.

CN118961218APending Publication Date: 2024-11-15AVIC GUIYANG ENGINE DESIGN & RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411235135.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing engine salt spray test equipment needs to be reconfigured during the high-temperature and high-humidity in the standstill stage of the engine not operating, resulting in an increase in energy consumption.

Method used

A salt spray corrosion resistance test equipment for the whole engine based on a suspended test bench was designed. The breeze air circulation is formed through flexible circulation ducts and circulation fans, and the humidity and temperature of the circulation gas are used for humidification and heating, reducing energy. Consumption.

Benefits of technology

It effectively reduces the energy consumption of the test equipment under high temperature and high humidity conditions, avoids the need to reconfigure the gas humidity and temperature, and ensures that the temperature and humidity around the engine meet the test specified values.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118961218A_ABST
    Figure CN118961218A_ABST
Patent Text Reader

Abstract

The invention discloses complete engine salt spray corrosion resistance test equipment based on a suspension type test bed. The complete engine salt spray corrosion resistance test equipment comprises test equipment for circularly humidifying and heating gas with certain humidity and temperature in the test equipment and conveying the gas to the periphery of an engine in a salt spray test cabin. The circulating fan is started to operate at low power, air at an outlet of the salt spray test chamber forms breeze air circulation through the flexible circulating air pipe, the breeze air circulation circulates to the mixer through the flexible circulating air pipe B and then is conveyed to an inlet of the main air pipe, and the circulating air has certain humidity and temperature. The energy consumption is low when the air heater is started to heat circulating air and the circulating air pipe steam humidifying section is opened to humidify the circulating air in a low-energy mode, the situation that a large amount of energy needs to be supplied to the humidity and the temperature of gas again for reconfiguration is avoided, and the energy consumption of the test is reduced. The problem that the energy consumption of the test is increased due to the fact that the gas needs to be humidified and heated again to supply a large amount of energy when the gas is directly exhausted is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a whole engine salt spray corrosion resistance test device based on a suspended test bench, belonging to the technical field of aviation engines. Background Art

[0002] Aviation turbojet and turbofan engines have a wide range of uses and have a large number of actual use requirements in marine and shipboard environments. Engines that have been in service for a long time in marine and shipboard environments are susceptible to corrosion in the marine salt spray air environment, resulting in damage and performance degradation. Therefore, during the development of aviation engines, corrosion resistance tests are required to simulate the specified marine salt spray air environment, carry out engine corrosion resistance tests, verify the engine's corrosion resistance, and obtain performance changes. The test is divided into four stages. The first stage is the engine running test under the specified salt spray air concentration, temperature and humidity conditions; the second stage is to let the engine stand still in the atmosphere; the third stage is to let the engine stand still under the specified salt spray air concentration, temperature and humidity conditions, and the engine does not run; the fourth stage is to let the engine stand still under high temperature and high humidity conditions without salt spray, and the engine does not run.

[0003] The existing salt spray test equipment for engines is shown in Chinese patent publication number CN110057593B. The gas supplied by the air supply unit is directly discharged after the salt spray mixing and regulating unit carries the salt spray to the engine. Although it can meet the first stage test during the engine operation test, when the engine is not running and the fourth stage is immersed and static, directly discharging the gas requires a large amount of energy to be re-configured for the humidity and temperature of the gas, which increases the energy consumption of the test. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides an engine whole machine salt spray corrosion resistance test equipment based on a suspended test bench.

[0005] The present invention is achieved through the following technical solutions.

[0006] The invention provides a whole engine salt spray corrosion resistance test equipment based on a suspended test bench, comprising: a test equipment for realizing circulating humidification and heating of gas with a certain humidity and temperature in the test equipment and transporting it to the surrounding of the engine in a salt spray test chamber.

[0007] Includes: Salt spray test chamber;

[0008] Suspension test bench pre-assembly frame used for suspending and installing the engine into the salt spray test chamber;

[0009] The front section of the salt spray test chamber is connected with a main air duct; the outlet of the salt spray test chamber is connected to the inlet of the main air duct through the flexible circulating air duct A, the circulating fan and the flexible circulating air duct B.

[0010] The rear end of the salt spray test chamber is provided with a covered salt spray test chamber rear baffle, and a test chamber environmental parameter measurement section is installed in the salt spray test chamber.

[0011] The main air duct is equipped with a main air duct damper, a mixer, a rectifier, a steam humidification section, a main air duct spray humidification section, an air parameter measurement section, a protective net, a salt spray injection ring, and a salt spray sampling section in sequence on the basis of gradually approaching the salt spray test chamber.

[0012] The front side opening of the main air duct is spaced apart with an external pressure spray humidification section; the outlet of the salt spray test chamber is spaced apart with an exhaust ejector tube.

[0013] The end of the salt spray test chamber close to the ejector tube is connected with a flexible circulating air duct A, and a circulating air duct damper is installed on the flexible circulating air duct A.

[0014] The flexible circulating air duct A is connected to the circulating fan inlet, the circulating fan inlet is provided with a fan air intake damper, and the inlet end of the circulating fan inlet is provided with a dustproof mesh cover.

[0015] The outlet of the circulating fan is sequentially equipped with an air heater, a circulating air duct steam humidification section, and a circulating air duct spray humidification section. The circulating air duct spray humidification section is connected to the mixer of the main air duct through a flexible circulating air duct B.

[0016] The beneficial effects of the present invention are as follows: the circulating fan is started and operated at low power, and the gas at the outlet of the salt spray test chamber forms a breeze air circulation through the flexible circulating air duct, circulates to the blender through the flexible circulating air duct B, and is then transported to the main air duct inlet. Since the circulating gas itself contains a certain humidity and temperature, the energy consumption when the air heater is started to heat the circulating air and the steam humidification section of the circulating air duct is opened to humidify the circulating air at a low energy is low, which avoids the need to re-configure the humidity and temperature of the gas with a large amount of energy, reduces the energy consumption of the test, and solves the problem of increasing the energy consumption of the test by re-humidifying and heating the gas when the gas is directly discharged. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a distribution schematic diagram of the present invention;

[0018] In the figure: 1-external pressure spray humidification section; 2-main air duct; 3-main air duct damper; 4-mixer; 5-rectifier; 6-steam humidification section; 7-main air duct spray humidification section; 8-air parameter measurement section; 9-protection net; 10-salt spray injection ring; 11-salt spray sampling section; 12-suspended test bench pre-assembly rack; 13-salt spray test chamber; 14-salt spray test chamber rear baffle; 15-injection tube; 16-flexible circulation air duct A; 17-dustproof mesh cover; 18-fan air inlet damper; 19-circulation air duct damper; 20-circulation fan; 21-air heater; 22-circulation air duct steam humidification section; 23-circulation air duct spray humidification section; 24-flexible circulation air duct B; 25-test chamber environmental parameter measurement section. DETAILED DESCRIPTION

[0019] The technical solution of the present invention is further described below, but the scope of protection claimed is not limited to the description.

[0020] like Figure 1 shown.

[0021] The present application discloses an engine whole machine salt spray corrosion resistance test equipment based on a suspended test bench, comprising:

[0022] A salt spray test chamber 13 is installed on a suspended test bench pre-installation frame 12, and an engine to be tested can be installed inside the salt spray test chamber 13; a salt spray test chamber rear baffle 14 is covered at the rear end of the salt spray test chamber 13, and a salt spray sampling ring is installed in the salt spray test chamber 13 to form a test chamber environmental parameter measurement section 25.

[0023] The front section of the salt spray test chamber 13 is non-contactly connected with a main air duct 2, and the main air duct damper 3, the mixer 4, the rectifier 5, the steam humidification section 6, the main air duct spray humidification section 7, the air parameter measurement section 8, the protective net 9, the salt spray injection ring 10, and the salt spray sampling section 11 are installed in the main air duct 2 in sequence on the basis of gradually approaching the salt spray test chamber 13. The air parameter measurement section 8 is composed of a temperature and humidity sensor, and the salt spray sampling section 11 is composed of a salt spray sampling probe.

[0024] The front side of the main air duct 2 is installed with an external pressure spray humidification section 1; the outlet of the salt spray test chamber 13 is installed with an exhaust ejector 15. The end of the salt spray test chamber 13 close to the ejector 15 is connected to a flexible circulating air duct A16, and a circulating air duct damper 19 is installed on the flexible circulating air duct A16.

[0025] It also includes a circulating fan 20, the flexible circulating air duct A16 is connected to the inlet of the circulating fan 20, the inlet of the circulating fan 20 is provided with a fan air intake damper 18, and the inlet end of the circulating fan 20 is provided with a dustproof mesh cover 17; the outlet of the circulating fan 20 is sequentially installed with an air heater 21, a circulating air duct steam humidification section 22, and a circulating air duct spray humidification section 23, and the circulating air duct spray humidification section 23 is connected to the mixer 4 of the main air duct 2 through the flexible circulating air duct B24.

[0026] The main air duct 2 is connected to the salt spray test chamber 13, and the outlet of the salt spray test chamber 13 is connected to the inlet of the main air duct 2 through a wind circulation loop composed of a flexible circulating air duct A16, a circulating fan 20 and a flexible circulating air duct B24. In the fourth stage of infiltration and static when the engine is not running, the salt spray injection ring 10 and the air heater 21 are closed to adjust the temperature, and the circulating air duct steam humidification section 22 and the circulating air duct spray humidification section 23 are used, and the circulating fan 20 is used to blow away the remaining salt spray air in the flow channel. Close the fan air intake damper 18, the rear cover plate 14 of the salt spray test chamber, and the main air duct damper 3, and open the circulating air duct damper 19; start the circulating fan 20 and operate at low power, the outlet gas of the salt spray test chamber 13 forms a breeze air circulation through the flexible circulating air duct 16, circulates to the blender 4 through the flexible circulating air duct B24, and then is transported to the inlet of the main air duct 2. Since the circulating gas itself contains a certain humidity and temperature, the energy consumption when starting the air heater 21 to heat the circulating air and opening the steam humidification section 22 of the circulating air duct to humidify the circulating air at low energy is low, avoiding the need to re-configure the humidity and temperature of the gas with a large amount of energy, reducing the energy consumption of the test, and solving the problem of increasing the energy consumption of the test by directly discharging the gas and re-humidifying and heating the gas with a large amount of energy; make the temperature and humidity around the engine in the salt spray test chamber 13 reach the specified values ​​of the test. Use the temperature and humidity measurement points of the test chamber environmental parameter measurement section 25 to measure the heating and humidification of the control equipment, and keep the temperature and humidity constant after reaching the required temperature and humidity.

[0027] The present invention utilizes the main air duct 2, the salt spray test chamber 13, and the ejector tube 15 to form a test flow channel of the first stage. During the first stage test, the main air duct damper 3 and the salt spray test chamber rear baffle 14 are opened, the circulating air duct damper 19 is closed, the engine is started, and the suction capacity of the engine when working is utilized to inhale air from the inlet of the main air duct 2, forming an air flow direction that flows from the main air duct to the salt spray test chamber, the engine, and finally is discharged from the ejector tube. The airflow in the main air duct 2 is rectified and smoothed by the rectifier 5; the air is supplied to the downstream after the temperature and humidity are adjusted to meet the requirements by the external pressure spray humidification section 1, the steam humidification section 6 and the main air duct spray humidification section 7; the FOD protection net 9 prevents foreign matter from entering the downstream; a salt spray injection ring 10 is used to spray a certain mass flow of atomized salt water to the air after temperature and humidity adjustment to generate salt spray air that meets the requirements, which is blown into the salt spray test chamber 13 mounted with the engine; a part of the salt spray air is sucked in by the engine and discharged from the tail nozzle, and the remaining salt spray air is blown over the engine surface and discharged from the exhaust holes on the rear wall of the salt spray test chamber with the engine jet injection effect, and discharged into the atmosphere through the exhaust ejector tube 15.

[0028] The present invention uses the air flow measurement points of the air parameter measurement section 8 on the main air duct to measure the air mass flow, controls the atomized salt water injection flow of the salt spray injection ring 10 to control the salt spray air concentration, and realizes that when the working state of the engine changes, the salt spray concentration changes accordingly; uses the temperature and humidity measurement points of the air parameter measurement section 8 on the main air duct and the test cabin environmental parameter measurement section 25 to measure the temperature and humidity of the air in real time, and controls the air humidification and heating amounts of the equipment in real time according to the measured parameters, so as to realize stable control of the test parameters.

[0029] The present invention extracts and collects salt fog air through a salt fog sampling probe at a salt fog sampling section 11 and a salt fog sampling ring at a test chamber environmental parameter measuring section 25, and obtains the salt fog air concentration after detection.

[0030] The present invention uses the external pressure spray humidification section 1, the steam humidification section 6 and the main air duct spray humidification section 7 as the main humidity adjustment means in the first stage. When the capacity is insufficient, the circulating fan 20, the circulating air duct steam humidification section 22 and the circulating air duct spray humidification section 23 are used to further increase the humidification amount. The humidification capacity of the present invention has a wide range, and can be humidified in stages and in different working conditions, and can adapt to large, medium and small wide humidity changes and air flow changes.

[0031] In the second stage of the present invention, the relevant humidification equipment and the salt spray injection ring 10 are turned off, the fan air inlet damper 18 is opened, the main air duct damper 3 is closed, the circulating fan 20 is started, air is supplied to the salt spray test chamber, the environment in the chamber is blown to atmospheric conditions, and an atmospheric static test is carried out.

[0032] The third stage of the present invention utilizes a fan to supply air at a constant flow to form a positive air flow from the air duct, the salt spray test chamber to the exhaust ejector tube. The air output by the fan is temperature-controlled, humidity-controlled, and sprayed with atomized salt water to form salt spray air, which is then blown into the salt spray test chamber, blown over the inner and outer surfaces of the engine, and then carried out by wind force and discharged from the test chamber through the ejector tube.

[0033] In the third stage, the fan air intake damper 18 is opened, the rear cover plate 14 of the salt spray test chamber is opened, and the main air duct damper 3 and the circulating air duct damper 19 are closed; the circulating fan 20 is started, and the air is sucked from the atmosphere into the air duct after being filtered by the dustproof net cover 17 to form a constant flow of air supply, and the air is supplied to the main air duct 2 through the blender 4, and then the main air duct 2 supplies air to the salt spray test chamber 13 and the circulating fan 20, and the air volume is adjusted so that the flow rate around the engine reaches the requirement and remains constant; the temperature is adjusted by the air heater 21, and the steam humidification section 22 of the circulating air duct and the spray humidification section 23 of the circulating air duct adjust the humidity to supply to the downstream; the salt spray injection ring 10 is used to spray a certain mass flow of atomized salt water to the air after temperature and humidity adjustment, so as to generate salt spray air that meets the requirements, and blow it into the salt spray test chamber 13 mounted with the engine, and the salt spray air blows over the inner and outer surfaces of the engine and is discharged from the exhaust hole on the rear wall of the salt spray test chamber by the air supply pressure, and is discharged to the atmosphere through the exhaust ejector 15. In the third stage, the engine is not running, and the fan is used to supply air at a constant flow. After stabilization, the atomized salt water injection flow rate of the salt spray injection ring 10 remains constant and does not need to be adjusted. The air mass flow rate can be measured and monitored through the air flow measurement point of the air parameter measurement section 8 on the main air duct 2; the temperature and humidity measurement points of the air parameter measurement section 8 and the test chamber environmental parameter measurement section 25 on the main air duct are used to measure the temperature and humidity of the air in real time, and the equipment is controlled in real time to control the air humidification and heating amount according to the measured parameters to achieve stable control of the test parameters. When adjusting the wind speed around the engine, the wind speed measurement point of the test chamber environmental parameter measurement section 25 is used to measure the wind speed and adjust the fan flow. The functions of the rectifier 5 and the FOD protection net 9 in this stage are the same as those in the first stage. The salt spray air is extracted and collected through the salt spray sampling probe of the salt spray sampling section 11 and the salt spray sampling ring of the test chamber environmental parameter measurement section 25, and the salt spray air concentration is obtained after detection.

[0034] When the present invention is used in the fourth stage, the salt spray injection ring 10 and the air heater 21 are closed to adjust the temperature, the circulating air duct steam humidification section 22 and the circulating air duct spray humidification section 23 are closed, and the circulating fan 20 is used to blow away the remaining salt spray air in the flow channel. The fan air intake damper 18, the rear cover plate 14 of the salt spray test chamber, and the main air duct damper 3 are closed, and the circulating air duct damper 19 is opened; the circulating fan 20 is started to operate at low power; a breeze air circulation is formed through the flexible circulating air duct 16 installed in the salt spray test chamber 13; the air heater 21 is started to heat the circulating air, and the circulating air duct steam humidification section 22 is opened to humidify the circulating air, so that the temperature and humidity around the engine in the salt spray test chamber reach the test specified values. The temperature and humidity measuring points of the test chamber environmental parameter measurement section 25 are used to measure the heating and humidification amount of the control equipment, and the temperature and humidity are kept constant after reaching the required temperature and humidity.

Claims

1. An engine whole machine salt spray corrosion resistance test equipment based on a suspended test bench, characterized in that: include: The invention realizes the test equipment for circulating humidification and heating of gas with a certain humidity and temperature in the test equipment and transporting the gas to the surrounding of the engine in the salt spray test chamber (13).

2. The engine whole machine salt spray corrosion resistance test equipment based on the suspended test bench according to claim 1 is characterized in that: include: Salt spray test chamber (13); A suspended test bench pre-installation frame (12) for suspending and installing an engine in a salt spray test chamber (13); The front section of the salt spray test chamber (13) is connected to a main air duct (2); the outlet of the salt spray test chamber (13) is connected to the inlet of the main air duct (2) through a flexible circulating air duct A (16), a circulating fan (20) and a flexible circulating air duct B (24).

3. The engine whole machine salt spray corrosion resistance test equipment based on the suspended test bench as claimed in claim 2 is characterized by: The rear end of the salt spray test chamber (13) is provided with a covered salt spray test chamber rear baffle (14), and a test chamber environmental parameter measurement section (25) is installed in the salt spray test chamber (13).

4. The engine whole machine salt spray corrosion resistance test equipment based on the suspended test bench as claimed in claim 2 is characterized by: The main air duct (2) is provided with a main air duct damper (3), a mixer (4), a rectifier (5), a steam humidification section (6), a main air duct spray humidification section (7), an air parameter measurement section (8), a protective net (9), a salt spray injection ring (10), and a salt spray sampling section (11) in sequence on the basis of gradually approaching the salt spray test chamber (13).

5. The engine whole machine salt spray corrosion resistance test equipment based on the suspended test bench as claimed in claim 4 is characterized by: An external pressure spray humidification section (1) is installed at intervals at the front side opening of the main air duct (2); and an exhaust ejector tube (15) is installed at intervals at the outlet of the salt spray test chamber (13).

6. The engine whole machine salt spray corrosion resistance test equipment based on the suspended test bench as claimed in claim 2 is characterized by: The end of the salt spray test chamber (13) close to the ejector tube (15) is connected to a flexible circulating air duct A (16), and a circulating air duct damper (19) is installed on the flexible circulating air duct A (16).

7. The engine whole machine salt spray corrosion resistance test equipment based on the suspended test bench as claimed in claim 6 is characterized by: The flexible circulation air duct A (16) is connected to the inlet of the circulation fan (20), the inlet of the circulation fan (20) is provided with a fan air intake damper (18), and the inlet end of the circulation fan (20) is provided with a dustproof mesh cover (17).

8. The engine whole machine salt spray corrosion resistance test equipment based on the suspended test bench according to claim 6, characterized in that: The outlet of the circulating fan (20) is sequentially provided with an air heater (21), a circulating air duct steam humidification section (22), and a circulating air duct spray humidification section (23); the circulating air duct spray humidification section (23) is connected to the mixer (4) of the main air duct (2) through a flexible circulating air duct B (24).