Metering box monitoring method and device and metering box

By acquiring historical environmental data and using the LMS adaptive filtering method to predict the current state of the metering box, the measurement switch is controlled to disconnect the internal circuit, thus solving the safety threat caused by data interference to the low-voltage metering box and realizing timely fault elimination and equipment protection.

CN118964880AActive Publication Date: 2024-11-15STATE GRID HEBEI ELECTRIC POWER CO LTD +1

Patent Information

Application Number
CN202410930086.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-11-15
Estimated Expiration
2044-07-11

AI Technical Summary

Technical Problem

In existing technologies, low-pressure metering boxes contain a lot of interfering data, making it difficult to quickly confirm whether environmental data threatens the safety of the metering box. This results in the inability to troubleshoot in a timely manner, which in turn causes damage to the metering box.

Method used

By acquiring historical environmental data, the optimal tap weights are determined using the LMS adaptive filtering method, the predicted environmental data for the current moment is predicted, and fault judgment conditions are set. If these conditions are met, the measurement switch is controlled to open and disconnect the internal circuit of the metering box.

Benefits of technology

It enables timely protection of the internal circuitry of the metering box, prevents malfunctions, reduces the risk of damage to the metering box, and improves the efficiency of troubleshooting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118964880A_ABST
    Figure CN118964880A_ABST
Patent Text Reader

Abstract

The invention provides a metering box monitoring method and device and a metering box, and the method comprises the steps: obtaining historical environment data, determining an optimal tap weight according to the historical environment data and an expected response, predicting the predicted environment data at the current moment according to the optimal tap weight and the historical environment data, and if the predicted environment data meets a fault judgment condition, determining a fault judgment result. And if yes, the measuring switch is controlled to be turned on so as to disconnect the internal circuit of the metering box. The optimal tap weight is determined through the historical environment data and the expected response, and the predicted environment data at the current moment is predicted by taking the optimal tap weight as the basic data, so that pure predicted environment data can be accurately obtained; whether an internal circuit of the metering box breaks down or not is determined by predicting environment data and fault judgment conditions, and if the internal circuit breaks down, a measuring switch needs to be turned on, so that the metering box is protected, and the fault is eliminated in time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of meter box monitoring, and in particular to a meter box monitoring method, device and meter box. Background Art

[0002] As the end of the power grid, the low-voltage meter box is the focus of the construction of the power Internet of Things and the main source of terminal data perception. The meter box physically manages assets such as energy meters and collectors, but in fact it fails to monitor the assets in real time and holographically, and cannot report various fault parameters to the main station in time to generate early warnings.

[0003] The traditional low-voltage meter box inlet and outlet switches are only equipped with overload and short-circuit protection. However, in some short-circuit fault scenarios, the inlet and outlet switches cannot cooperate effectively. When obtaining the environmental data of the meter box, due to the presence of a large amount of interference data in the data, it is impossible to quickly confirm whether there will be safety problems inside the meter box, and thus the fault cannot be eliminated in time, causing damage to the meter box. Summary of the invention

[0004] In order to solve the above technical problems, this application is proposed. The embodiments of this application provide a monitoring method, device and meter box for a meter box, which solves the problem in the prior art that due to the presence of a lot of interference data in the data, it is impossible to quickly confirm whether the environmental data threatens the safety of the meter box, and thus it is impossible to eliminate the fault in time, resulting in damage to the meter box.

[0005] According to one aspect of the present application, a method for monitoring a meter box is provided, comprising:

[0006] Access historical environmental data;

[0007] Determining optimal tap weights based on the historical environmental data and the expected response;

[0008] Predicting the predicted environmental data at the current moment according to the optimal tap weight and the historical environmental data;

[0009] If the predicted environmental data meets the fault judgment condition, the measurement switch is controlled to be turned on to disconnect the internal circuit of the meter box.

[0010] In one embodiment, if the predicted environmental data meets the fault judgment condition, controlling the measurement switch to turn on includes:

[0011] Obtaining the three-phase incoming line current of the meter box at the current moment;

[0012] Obtaining the three-phase outgoing current of the meter box at the current moment;

[0013] Calculating the differential current of each phase according to the three-phase incoming line current and the three-phase outgoing line current;

[0014] If the values ​​corresponding to the predicted environmental data are all greater than the preset environmental thresholds and the differential current of each phase is all less than the preset differential current threshold, the measurement switch is controlled to be turned on.

[0015] In one embodiment, obtaining the three-phase outgoing current of the meter box at the current moment includes:

[0016] Obtaining the three-phase incoming line current of the meter box at the first historical moment;

[0017] Obtaining the three-phase incoming line current of the meter box at a second historical moment; wherein the second historical moment is later than the first historical moment;

[0018] Determine whether to start a fault judgment operation according to the three-phase incoming line current of the meter box at the current moment, the three-phase incoming line current of the meter box at the first historical moment, and the three-phase incoming line current of the meter box at the second historical moment;

[0019] If it is determined to start the fault judgment operation, the three-phase outgoing line current of the meter box at the current moment is obtained.

[0020] In one embodiment, determining whether to start the fault judgment operation according to the three-phase incoming line current of the meter box at the current moment, the three-phase incoming line current of the meter box at the first historical moment, and the three-phase incoming line current of the meter box at the second historical moment includes:

[0021] Calculating a first difference between the incoming line current of each phase of the meter box at the current moment and the corresponding incoming line current at the first historical moment;

[0022] Calculating a second difference between the incoming line current of each phase of the meter box at a first historical moment and the corresponding incoming line current at a second historical moment;

[0023] calculating a third difference between the first difference and the second difference;

[0024] If the third difference satisfies the difference judgment condition, it is determined to start the fault judgment operation.

[0025] In one embodiment, if the third difference satisfies the difference judgment condition, determining to start the fault judgment operation includes:

[0026] Obtaining the maximum current value of the electric energy meter of the meter box;

[0027] If the third difference is greater than the maximum current value, it is determined that a fault judgment operation is started.

[0028] In one embodiment, determining the optimal tap weight according to the historical environmental data and the expected response includes:

[0029] Determine the filter order and step size;

[0030] Initialize the tap weights of the filter order to 0 and construct a weight vector;

[0031] constructing the historical environmental data as an input vector;

[0032] Arrange the expected responses into a column vector in time order to obtain an expected response vector;

[0033] Calculating an actual output vector according to the weight vector and the input vector;

[0034] Calculating a deviation vector according to the actual output vector and the expected response vector;

[0035] Estimate a tap weight vector of the weight vector at a next moment according to the weight vector, the bias vector, the step size, and the input vector;

[0036] Get the offset parameters;

[0037] If the offset parameter is less than a preset offset threshold, a tap weight vector of the weight vector at the next moment is determined as the optimal tap weight.

[0038] In one embodiment, obtaining the imbalance parameter includes:

[0039] Obtaining the maximum eigenvalue of the autocorrelation matrix of the input vector;

[0040] The offset parameter is calculated according to the step size, the filter order and the maximum eigenvalue.

[0041] In one embodiment, calculating the actual output vector according to the weight vector and the input vector comprises:

[0042] Transposing the weight vector to obtain a transposed vector;

[0043] The product between the transposed vector and the input vector is calculated as the actual output vector.

[0044] According to another aspect of the present application, a monitoring device for a meter box is provided, comprising:

[0045] Acquisition module, used to obtain historical environmental data;

[0046] A calculation module, used for determining an optimal tap weight according to the historical environmental data and the expected response;

[0047] A determination module, used to predict the predicted environmental data at the current moment according to the optimal tap weight and the historical environmental data;

[0048] The control module is used to control the measurement switch to turn on if the predicted environmental data meets the fault judgment condition, so as to disconnect the internal circuit of the meter box.

[0049] According to another aspect of the present application, a metering box is provided, comprising:

[0050] A meter box body, wherein a smoke sensor, a temperature and humidity sensor, a controller, a measuring switch, an electric energy meter and a current transformer are arranged inside the meter box body; the smoke sensor, the temperature and humidity sensor, the electric energy meter, the measuring switch, the electric energy meter and the current transformer are electrically connected to the controller respectively; the output end of the current transformer is electrically connected to the measuring switch; the smoke sensor is used to detect smoke in the meter box body; the temperature and humidity sensor is used to detect the temperature and humidity in the meter box body; the electric energy meter detects the current value transmitted by the transformer; the controller is used to execute any of the above-mentioned monitoring methods for the meter box; the current transformer is used to detect the three-phase outgoing current value of the electric energy meter; and the controller controls the opening or closing of the measuring switch.

[0051] The monitoring method, device and meter box of the meter box provided in the present application include: obtaining historical environmental data, determining the best tap weight according to the historical environmental data and the expected response, predicting the predicted environmental data at the current moment according to the best tap weight and the historical environmental data, and if the predicted environmental data meets the fault judgment condition, controlling the measurement switch to open to disconnect the internal circuit of the meter box. The best tap weight is determined by the historical environmental data and the expected response, and the predicted environmental data at the current moment is predicted based on the best tap weight, so that the pure predicted environmental data can be accurately obtained, and whether the internal circuit of the meter box is faulty is determined by the predicted environmental data and the fault judgment condition. If a fault occurs, the measurement switch needs to be turned on to protect the meter box and eliminate the fault in time. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] By describing the embodiments of the present application in more detail in conjunction with the accompanying drawings, the above and other purposes, features and advantages of the present application will become more apparent. The accompanying drawings are used to provide a further understanding of the embodiments of the present application and constitute a part of the specification. Together with the embodiments of the present application, they are used to explain the present application and do not constitute a limitation of the present application. In the accompanying drawings, the same reference numerals generally represent the same components or steps.

[0053] Figure 1It is a flow chart of a method for monitoring a metering box provided by an exemplary embodiment of the present application.

[0054] Figure 2 It is a flowchart of a measurement switch control method provided by an exemplary embodiment of the present application.

[0055] Figure 3 It is a curve diagram of differential protection during proportional braking provided by an exemplary embodiment of the present application.

[0056] Figure 4 It is a structural schematic diagram of a monitoring device for a metering box provided by an exemplary embodiment of the present application.

[0057] Figure 5 It is a structural schematic diagram of a monitoring device for a metering box provided by another exemplary embodiment of the present application.

[0058] Figure 6 It is a schematic diagram of the structure of a metering box provided by an exemplary embodiment of the present application.

[0059] Figure 7 It is a structural diagram of an electronic device provided by an exemplary embodiment of the present application. DETAILED DESCRIPTION

[0060] Below, the exemplary embodiments according to the present application will be described in detail with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments of the present application, and it should be understood that the present application is not limited to the exemplary embodiments described here.

[0061] Figure 1 FIG. 1 is a flow chart of a method for monitoring a meter box provided by an exemplary embodiment of the present application. Figure 1 As shown, the monitoring method of the meter box includes:

[0062] Step 110: Obtain historical environmental data.

[0063] In the embodiment of the present application, environmental data at every moment can be collected by sensors arranged inside the meter box. The historical environmental data includes data such as temperature and humidity. The environmental changes inside the meter box in the historical time period can be known in advance through the historical environmental data, and the predicted environmental data at the current moment can be predicted based on the historical environmental data, so that corresponding measures can be taken in time to avoid damage to the meter box.

[0064] Step 120: Determine the optimal tap weights based on historical environmental data and expected responses.

[0065] In an embodiment of the present application, the present application adopts an LMS adaptive filtering method to predict the predicted environmental data at the current moment. The LMS (least mean square) adaptive filtering method is a commonly used adaptive filtering algorithm for adjusting the weight of the filter so that its output signal is as close to the expected signal as possible. The present application needs to determine the expected response in advance and determine the optimal tap weights by the expected response and historical environmental data, and then predict the predicted environmental data at the current moment by the tap weights and historical environmental data. Among them, the expected response refers to the output response that the system expects to obtain under a given input. In the context of an adaptive filter, the expected response represents the target value that we hope the signal output by the filter should reach. In an adaptive filter, according to the difference between the expected response and the actual output of the filter, the weight parameters of the filter can be adjusted so that the actual output gradually approaches the expected output.

[0066] Step 130: predict the predicted environmental data at the current moment according to the optimal tap weight and the historical environmental data.

[0067] In an embodiment of the present application, the predicted environmental data at the current moment is the product of the optimal tap weight and the historical environmental data.

[0068] Step 140: If the predicted environmental data meets the fault judgment condition, the measurement switch is controlled to be turned on to disconnect the internal circuit of the meter box.

[0069] In the embodiment of the present application, in order to determine whether the predicted environmental data is abnormal, it is necessary to set a fault judgment condition, and determine the abnormality of the predicted environmental data through the fault judgment condition. If the predicted environmental data is abnormal, the measurement switch is controlled to open in time to disconnect the internal circuit of the meter box.

[0070] The meter box includes a measuring switch, an electric energy meter, a circuit breaker, and a current transformer which are electrically connected in sequence, and the output end of the current transformer is electrically connected to the measuring switch. An abnormality in the internal circuit of the meter box indicates an abnormality in the circuit between the electric energy meter and the circuit breaker. If the predicted environmental data is abnormal, it means that an abnormality has occurred in the meter box. It may be because the internal circuit is short-circuited, causing the current to increase and cause a fire. Therefore, the predicted environmental data at the current moment is predicted in time before the internal circuit is short-circuited, so as to quickly determine whether there is an abnormality in the meter box. If an abnormality occurs, the measuring switch is controlled in time to short-circuit the internal circuit to ensure the safety of the meter box.

[0071] The monitoring method of the meter box provided in the present application includes: obtaining historical environmental data, determining the best tap weight according to the historical environmental data and the expected response, predicting the predicted environmental data at the current moment according to the best tap weight and the historical environmental data, and if the predicted environmental data meets the fault judgment condition, controlling the measurement switch to open to disconnect the internal circuit of the meter box. The best tap weight is determined by the historical environmental data and the expected response, and the predicted environmental data at the current moment is predicted based on the best tap weight, so that the pure predicted environmental data can be accurately obtained, and whether the internal circuit of the meter box is faulty is determined by the predicted environmental data and the fault judgment condition. If a fault occurs, the measurement switch needs to be turned on to protect the meter box and eliminate the fault in time.

[0072] Figure 2 FIG. 1 is a flow chart of a measurement switch control method provided by an exemplary embodiment of the present application. Figure 2 As shown, step 140 may include:

[0073] Step 141: Obtain the three-phase incoming line current of the meter box at the current moment.

[0074] In an embodiment of the present application, the transformer is electrically connected to the measuring switch, and the current transmitted by the transformer to the measuring switch is a three-phase incoming line current, wherein the measuring switch is provided with a transformer sampling interface to collect the three-phase incoming line current. The current detected by the current transformer is a three-phase outgoing line current. When there is a short circuit fault inside the meter box or there are conditions such as aging, leakage, and electricity theft, there will be a significant difference in the incoming and outgoing line currents. The action area of ​​the differential protection is inside the meter box, and the fault can be removed without delay. The differential protection detects whether there are any phase-to-phase short circuits or ground faults in the meter box. The differential protection is based on comparing the currents flowing in and out of the device, that is, the currents flowing into and out of the device should be balanced. If the incoming and outgoing currents are unbalanced, this indicates that a fault may have occurred inside the device, and the differential protection will operate to isolate the fault.

[0075] Step 142: Obtain the three-phase outgoing current of the meter box at the current moment.

[0076] In the embodiment of the present application, the three-phase outgoing current of the meter box at the current moment can be detected by a current transformer connected to the circuit breaker.

[0077] Step 143: Calculate the differential current of each phase according to the three-phase incoming line current and the three-phase outgoing line current.

[0078] In this application, two methods are implemented. Fourier filtering is performed on the incoming and outgoing currents of each phase to obtain the outgoing current vector of each phase and the incoming current vector of each phase. Then, the differential current calculation is performed on the current vector of each phase. The differential current calculation formula of the incoming and outgoing line currents of the differential protection can be expressed as: in, is the differential current, is the A or B or C phase incoming line current vector flowing into the measuring switch, It is the outgoing current vector of phase A, B or C after the meter box flows out of the meter, which can be collected by the current transformer. According to the above calculation formula, the differential current of each phase can be calculated. That is, the difference between the incoming current of phase A and the outgoing current of phase A, the difference between the incoming current of phase B and the outgoing current of phase B, and the incoming current of phase C and the outgoing current of phase C are calculated.

[0079] Step 144: Determine whether the differential current of each phase is less than a preset differential current threshold.

[0080] In an embodiment of the present application, if the judgment result of step 144 is yes, that is, the differential current of each phase is less than the preset differential current threshold, step 145 is executed; if the judgment result of step 144 is no, that is, the differential current of each phase is greater than or equal to the preset differential current threshold, step 146 is executed.

[0081] Step 145: Determine whether the values ​​corresponding to the predicted environmental data are all greater than the preset environmental thresholds.

[0082] In the embodiment of the present application, if the judgment result of step 145 is yes, that is, the values ​​corresponding to the predicted environmental data are all greater than the preset environmental threshold, then step 146 is executed. If the judgment result of step 145 is no, that is, the values ​​corresponding to the predicted environmental data are all less than the preset environmental threshold, then step 110 is executed.

[0083] Step 146: Control the measuring switch to turn on.

[0084] In addition, if the value corresponding to the predicted environmental data is less than the preset environmental threshold, an alarm signal is generated to prompt the operation and maintenance personnel to repair the meter box.

[0085] In one embodiment, step 141 can be specifically implemented as follows: obtaining the three-phase incoming line current of the meter box at a first historical moment; obtaining the three-phase incoming line current of the meter box at a second historical moment; wherein the second historical moment is later than the first historical moment; determining whether to start a fault judgment operation based on the three-phase incoming line current of the meter box at the current moment, the three-phase incoming line current of the meter box at the first historical moment, and the three-phase incoming line current of the meter box at the second historical moment; if it is determined to start the fault judgment operation, obtaining the three-phase outgoing line current of the meter box at the current moment.

[0086] In the embodiment of the present application, the system can be easier to maintain and manage by setting the fault start function. When the system fails, the cause of the failure can be quickly identified and repaired or switched to a backup system, reducing maintenance time and cost.

[0087] Specifically, the three-phase incoming line current of the meter box at the current moment is obtained, the three-phase incoming line current of the meter box at the first historical moment is obtained, and the three-phase incoming line current of the meter box at the second historical moment is obtained. Then, the first difference between the incoming line current of each phase at the current moment and the incoming line current of its corresponding phase at the first historical moment is calculated, and the second difference between the incoming line current of each phase at the first historical moment and the incoming line current of its corresponding phase at the second historical moment is calculated. The difference between the first difference and the second difference is calculated, and it is determined whether to start the fault judgment operation through the difference. If it is determined to start the fault judgment operation, the three-phase outgoing line current of the meter box at the current moment is obtained.

[0088] In one embodiment, step 141 can be specifically implemented as follows: calculating a first difference between the incoming current of each phase of the meter box at the current moment and its corresponding incoming current at the first historical moment; calculating a second difference between the incoming current of each phase of the meter box at the first historical moment and its corresponding incoming current at the second historical moment; calculating a third difference between the first difference and the second difference; if the third difference meets the difference judgment condition, determining to start the fault judgment operation.

[0089] In the embodiment of the present application, the calculation formula of the third difference is:

[0090] ||I k -I k-N |-|I k-N -I k-2N ||, where N represents the number of sampling points per cycle, I k Indicates the current value of the three-phase incoming line current at the current moment, I k-N Indicates the three-phase incoming line current value at the second historical moment (which can be the current value one week ago), I k-2N Indicates the three-phase incoming line current value at the second historical moment (which can be the current value two weeks ago).

[0091] A difference judgment condition is set, and whether a fault judgment operation needs to be initiated is determined according to the difference judgment condition and the third difference. If the third difference satisfies the difference judgment condition, it is determined to initiate the fault judgment operation.

[0092] In one embodiment, step 141 may be specifically implemented as follows: obtaining the maximum current value of the electric energy meter of the meter box; if the third difference is greater than the maximum current value, determining to start the fault judgment operation.

[0093] In the embodiment of the present application, the maximum current value of the electric energy meter of the meter box is set to I qd If the third difference is greater than the maximum current value, the fault judgment operation is started. That is, the difference judgment condition ||I k -I k-N |-|I k-N -I k-2N||>I qd , thereby determining that a fault diagnosis operation needs to be initiated.

[0094] Figure 3 is a curve diagram of differential protection during proportional braking provided by an exemplary embodiment of the present application. Figure 3 As shown, during normal operation, the fault start judgment will not be activated. During this period, the differential current calculation is continuously performed. The differential current at this time is used as a floating threshold. After the fault start judgment is activated, it is determined whether the differential current is less than the preset differential current threshold. If the differential current is greater than or equal to the preset differential current threshold and the braking current is greater than or equal to the preset braking current threshold, the measurement switch is controlled to open to disconnect the internal circuit of the meter box. Among them, the braking current is the maximum value of the three-phase outgoing line current.

[0095] Specifically, Icdd represents the differential current, Izdd represents the braking current, Icd represents the preset differential current threshold, and Icd represents the preset braking current threshold. When the differential current is greater than or equal to the preset differential current threshold and the braking current is greater than or equal to the preset braking current threshold, it means that the relationship between the differential current and the braking current is within the zone, and the measurement switch needs to be controlled to be turned on. That is to say, when the ratio between the differential current and the braking current is within the zone, the internal circuit of the meter box fails. When it is outside the zone, it means that the external circuit of the meter box fails.

[0096] In one embodiment, step 120 can be specifically implemented as follows: determine the filter order and step size; initialize the filter order tap weights to 0 and construct a weight vector; construct historical environmental data as an input vector; arrange the expected responses into a column vector in chronological order to obtain an expected response vector; calculate the actual output vector based on the weight vector and the input vector; calculate the deviation vector based on the actual output vector and the expected response vector; estimate the tap weight vector of the weight vector at the next moment based on the weight vector, the deviation vector, the step size and the input vector; obtain the offset parameter; if the offset parameter is less than the preset offset threshold, determine the tap weight vector of the weight vector at the next moment as the optimal tap weight.

[0097] In the embodiment of the present application, in order to achieve comprehensive monitoring and accurate measurement of characteristic quantities in complex environments, a multi-characteristic quantity collection and data processing scheme for the meter box is used to monitor multiple state information of the electric energy meter box including temperature, humidity, vibration, etc., and the collected data is processed by LMS adaptive filtering to obtain high-reliability data, and the data is transmitted in real time through bus communication. For the processing of predicted environmental data, the LMS adaptive filtering method is adopted, which includes two parts: the filtering process and the adaptive process. The filtering process first calculates the response of the linear filter to the input signal, and then generates an estimated error by comparing the output result with the expected response. The adaptive process automatically adjusts the filter parameters according to the estimated error, and the adaptive control algorithm is used to find the appropriate transverse filter tap weights.

[0098] Specifically, the filter order M and step size μ are determined, and the tap weight is initialized to 0, that is, the M tap weights w are pre-set to 0 as the initial state of the tap weight to obtain a weight vector and record it as w(n). Then the data is updated. First, the historical environment data is constructed as an M×1 input vector, and the following is obtained:

[0099] u=[u(n), (n-1), ..., u(n-M+1)], the historical environment data at different times can be arranged in chronological order to obtain the u vector. The expected response is constructed into an expected response vector, that is, d(n), and the above n represents the time. Due to the change of time, it is necessary to update the historical environment data and the expected response, that is, to update the input vector and the expected response vector. Then, according to the weight vector and the input vector, the actual output vector is calculated. The specific calculation formula is: y(n)=w T (n)u, y(n) is the actual output vector. Then the deviation vector is calculated based on the actual output vector and the expected response vector. The specific calculation formula is: e(n) = d(n)-y(n), d(n) represents the expected response vector, y(n) is the actual output vector, and e(n) is the deviation vector. The weight vector is adaptively processed, that is, the tap weight vector of the weight vector at the next moment is estimated. The specific calculation formula is: w(n+1) = w(n) + 2μe(n)u(n)(n = 0, 1, 2, ...,). Then the offset parameter is obtained, and the offset parameter is used to determine whether the calculated tap weight vector at the next moment can be used as the optimal tap weight. Set the preset offset threshold to 10%. If the offset parameter is less than the preset offset threshold, that is, the offset parameter is less than 10%, the tap weight of the weight vector at the next moment is determined as the optimal tap weight. The offset parameter refers to the deviation between the actual output of the filter and the expected output.

[0100] In one embodiment, step 120 may be specifically implemented as follows: obtaining the maximum eigenvalue of the autocorrelation matrix of the input vector; and calculating the offset parameter according to the step size, the filter order and the maximum eigenvalue.

[0101] In the embodiment of the present application, the maximum eigenvalue of the autocorrelation matrix of the input vector is set to λ k , and then calculate the offset parameter according to the step size, filter order and maximum eigenvalue. The calculation formula is: J(∞) is the steady-state value of the additional mean square error, J min is the minimum mean square error, M is the filter order, μ is the step size, and λ is the k is the largest eigenvalue of the autocorrelation matrix of the input vector.

[0102] In one embodiment, step 120 may be specifically implemented as follows: transposing the weight vector to obtain a transposed vector; and calculating the product between the transposed vector and the input vector as the actual output vector.

[0103] In the embodiment of the present application, the weight vector w(n) is transposed to obtain a transposed vector, namely w T (n), and then calculate the product between the transposed vector and the input vector u as the actual output vector, which is calculated as y(n) = w T (n)u.

[0104] Figure 4 FIG. 1 is a schematic diagram of a monitoring device for a metering box provided by an exemplary embodiment of the present application. Figure 4 As shown, the monitoring device 20 of the meter box includes: an acquisition module 201, which is used to acquire historical environmental data; a calculation module 202, which is used to determine the optimal tap weight according to the historical environmental data and the expected response; a determination module 203, which is used to predict the predicted environmental data at the current moment according to the optimal tap weight and the historical environmental data; a control module 204, which is used to control the measurement switch to open if the predicted environmental data meets the fault judgment condition, so as to disconnect the internal circuit of the meter box.

[0105] Figure 5 FIG. 1 is a schematic diagram of a monitoring device for a metering box provided by another exemplary embodiment of the present application. Figure 5 As shown, the control module 204 may include: a first acquisition unit 2041, used to obtain the three-phase incoming current of the meter box at the current moment; a second acquisition unit 2042, used to obtain the three-phase outgoing current of the meter box at the current moment; a calculation unit 2043, used to calculate the differential current of each phase according to the three-phase incoming current and the three-phase outgoing current; a control subunit 2044, used to control the measurement switch to turn on if the values ​​corresponding to the predicted environmental data are all greater than the preset environmental threshold and the differential current of each phase is less than the preset differential current threshold.

[0106] In one embodiment, if Figure 5As shown, the first acquisition unit 2041 can be specifically configured as: obtaining the three-phase incoming line current of the meter box at the first historical moment; obtaining the three-phase incoming line current of the meter box at the second historical moment; wherein the second historical moment is later than the first historical moment; determining whether to start a fault judgment operation based on the three-phase incoming line current of the meter box at the current moment, the three-phase incoming line current of the meter box at the first historical moment, and the three-phase incoming line current of the meter box at the second historical moment; if it is determined to start the fault judgment operation, then obtaining the three-phase outgoing line current of the meter box at the current moment.

[0107] In one embodiment, if Figure 5 As shown, the first acquisition unit 2041 can be specifically configured as: calculating a first difference between the incoming current of each phase of the meter box at the current moment and its corresponding incoming current at the first historical moment; calculating a second difference between the incoming current of each phase of the meter box at the first historical moment and its corresponding incoming current at the second historical moment; calculating a third difference between the first difference and the second difference; if the third difference meets the difference judgment condition, determining to start the fault judgment operation.

[0108] In one embodiment, if Figure 5 As shown, the first acquisition unit 2041 can be specifically configured to: acquire the maximum current value of the electric energy meter of the meter box; if the third difference is greater than the maximum current value, determine to start the fault judgment operation.

[0109] In one embodiment, the calculation module 202 can be specifically configured as follows: determining the filter order and step size; initializing the filter order tap weights to 0 and constructing a weight vector; constructing historical environmental data as an input vector; arranging the expected responses into a column vector in chronological order to obtain an expected response vector; calculating the actual output vector based on the weight vector and the input vector; calculating the deviation vector based on the actual output vector and the expected response vector; estimating the tap weight vector of the weight vector at the next moment based on the weight vector, the deviation vector, the step size and the input vector; obtaining an offset parameter; if the offset parameter is less than a preset offset threshold, determining the tap weight vector of the weight vector at the next moment as the optimal tap weight.

[0110] In one embodiment, the calculation module 202 may be specifically configured to: obtain the maximum eigenvalue of the autocorrelation matrix of the input vector; and calculate the offset parameter according to the step size, the filter order, and the maximum eigenvalue.

[0111] In one embodiment, the calculation module 202 may be specifically configured to: transpose the weight vector to obtain a transposed vector; and calculate the product between the transposed vector and the input vector as the actual output vector.

[0112] Figure 6 Schematic diagram of the structure of a metering box provided by an exemplary embodiment of the present application. Figure 6 As shown, the meter box includes: a meter box body, a smoke sensor, a temperature and humidity sensor, a controller, a measuring switch, an electric energy meter and a current transformer are arranged inside the meter box body, the smoke sensor, the temperature and humidity sensor, the electric energy meter, the measuring switch, the electric energy meter and the current transformer are electrically connected to the controller respectively, the output end of the current transformer is electrically connected to the measuring switch, the smoke sensor is used to detect the smoke in the meter box body, the temperature and humidity sensor is used to detect the temperature and humidity in the meter box body, the electric energy meter detects the current value transmitted by the transformer, the controller is used to execute any one of the monitoring methods of the meter box, the current transformer is used to detect the three-phase outgoing current value of the electric energy meter, and the controller controls the opening or closing of the measuring switch.

[0113] In the embodiment of the present application, the measuring switch adds a transformer sampling interface to collect the three-phase incoming current, and a voltage transformer or a current transformer can be set inside the measuring switch to collect the three-phase incoming current. A smoke sensor, a temperature and humidity sensor, and a water immersion sensor are installed in the metering box. The measuring switch monitors the environmental status of the metering box in real time, automatically warns of environmental abnormalities, and actively pushes on-site operation and maintenance personnel to handle them in time. The smoke sensor is used to detect smoke in the metering box body, and the temperature and humidity sensor is used to detect the humidity and temperature in the metering box body. The water immersion sensor is used to detect the water level in the metering box body. The management unit is connected to the controller for communication, and the management unit has built-in pyroelectric infrared human body detection sensors, strong magnetic induction modules, evidence collection cameras, Beidou positioning modules, etc. The Beidou positioning module has the characteristics of high sensitivity, low power consumption, and miniaturization. Its extremely high tracking sensitivity greatly expands its coverage of positioning, meets the needs of high-precision and accurate positioning of the equipment, and automatically reports fault events in combination with the perception module to realize the optimal path and real-time map navigation formulated by the repair personnel. The pyroelectric infrared human body detection sensor can detect whether there is a person operating in front of the equipment. When there is illegal intrusion, the protection module triggers the evidence collection camera to take continuous photos, store them in the SD card, and upload them to the main station through the perception module to trigger an early warning. In actual operation, the strong magnetic induction module detects whether there is strong magnetic interference, and conducts real-time monitoring of abnormal behaviors such as illegal opening of boxes and stealing of electricity.

[0114] In addition, an acceleration sensor is installed in the meter box body, which has low power consumption, high impact resistance and programmable standby wake-up function, and can realize the functions of tilt detection, vibration detection, movement detection, etc. of the box body. A door lock control module is installed in the meter box body, which has the function of intelligent lock management and control, supports remote unlocking and local Bluetooth authentication unlocking, and real-time feedback of the door lock switch status. The management unit and the substation concentrator use broadband power line carrier (HPLC) for uplink communication transmission; the downlink communication RS-485 interface is used for intelligent meter reading, supporting DL / T645 and DL / T698.4 communication protocols; the near-end is equipped with a low-power Bluetooth module to support short-range wireless and local maintenance and upgrades.

[0115] Figure 7 A block diagram of an electronic device according to an embodiment of the present application is illustrated.

[0116] like Figure 7 As shown, the electronic device 10 includes one or more processors 11 and a memory 12 .

[0117] The processor 11 may be a central processing unit (CPU) or other forms of processing units having data processing capabilities and / or instruction execution capabilities, and may control other components in the electronic device 10 to perform desired functions.

[0118] The memory 12 may include one or more computer program products, and the computer program product may include various forms of computer-readable storage media, such as volatile memory and / or non-volatile memory. The volatile memory may include, for example, random access memory (RAM) and / or cache memory (cache), etc. The non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc. One or more computer program instructions may be stored on the computer-readable storage medium, and the processor 11 may run the program instructions to implement the monitoring method of the metering box of each embodiment of the present application described above and / or other desired functions. Various contents such as input signals, signal components, noise components, etc. may also be stored in the computer-readable storage medium.

[0119] In one example, the electronic device 10 may further include: an input device 13 and an output device 14, and these components are interconnected via a bus system and / or other forms of connection mechanisms (not shown).

[0120] When the electronic device is a stand-alone device, the input device 13 may be a communication network connector, which is used to receive the collected input signals from the first device and the second device.

[0121] In addition, the input device 13 may also include, for example, a keyboard, a mouse, and the like.

[0122] The output device 14 can output various information to the outside, including the determined distance information, direction information, etc. The output device 14 can include, for example, a display, a speaker, a printer, a communication network and a remote output device connected thereto, and the like.

[0123] Of course, to simplify, Figure 7 Only some of the components related to the present application in the electronic device 10 are shown, and components such as a bus, an input / output interface, etc. are omitted. In addition, according to specific application situations, the electronic device 10 may also include any other appropriate components.

[0124] The computer program product may be written in any combination of one or more programming languages ​​to write program codes for performing the operations of the embodiments of the present application, including object-oriented programming languages, such as Java, C++, etc., and conventional procedural programming languages, such as "C" language or similar programming languages. The program code may be executed entirely on the user computing device, partially on the user device, as an independent software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server.

[0125] The computer readable storage medium can adopt any combination of one or more readable media. The readable medium can be a readable signal medium or a readable storage medium. The readable storage medium can include, for example, but is not limited to, a system, device or device of electricity, magnetism, light, electromagnetic, infrared, or semiconductor, or any combination of the above. More specific examples (non-exhaustive list) of readable storage media include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.

[0126] The above description has been given for the purpose of illustration and description. In addition, this description is not intended to limit the embodiments of the present application to the forms disclosed herein. Although multiple example aspects and embodiments have been discussed above, those skilled in the art will recognize certain variations, modifications, changes, additions and sub-combinations thereof.

Claims

1. A method for monitoring a metering box, characterized in that: include: Obtain historical environmental data; Determining optimal tap weights based on the historical environmental data and the expected response; Predicting the predicted environmental data at the current moment according to the optimal tap weight and the historical environmental data; If the predicted environmental data meets the fault judgment condition, the measurement switch is controlled to be turned on to disconnect the internal circuit of the meter box.

2. The method for monitoring a metering box according to claim 1, characterized in that: If the predicted environmental data meets the fault judgment condition, controlling the measurement switch to turn on includes: Obtaining the three-phase incoming line current of the meter box at the current moment; Obtaining the three-phase outgoing current of the meter box at the current moment; Calculating the differential current of each phase according to the three-phase incoming line current and the three-phase outgoing line current; If the values ​​corresponding to the predicted environmental data are all greater than the preset environmental thresholds and the differential current of each phase is all less than the preset differential current threshold, the measurement switch is controlled to be turned on.

3. The monitoring method of the metering box according to claim 2, characterized in that: The obtaining of the three-phase outgoing current of the meter box at the current moment comprises: Obtaining the three-phase incoming line current of the meter box at the first historical moment; Obtaining the three-phase incoming line current of the meter box at a second historical moment; wherein the second historical moment is later than the first historical moment; Determine whether to start a fault judgment operation according to the three-phase incoming line current of the meter box at the current moment, the three-phase incoming line current of the meter box at the first historical moment, and the three-phase incoming line current of the meter box at the second historical moment; If it is determined to start the fault judgment operation, the three-phase outgoing line current of the meter box at the current moment is obtained.

4. The method for monitoring a metering box according to claim 3, characterized in that: The determining whether to start the fault judgment operation according to the three-phase incoming line current of the meter box at the current moment, the three-phase incoming line current of the meter box at the first historical moment, and the three-phase incoming line current of the meter box at the second historical moment includes: Calculating a first difference between the incoming line current of each phase of the meter box at the current moment and the corresponding incoming line current at the first historical moment; Calculating a second difference between the incoming line current of each phase of the meter box at a first historical moment and the corresponding incoming line current at a second historical moment; calculating a third difference between the first difference and the second difference; If the third difference satisfies the difference judgment condition, it is determined to start the fault judgment operation.

5. The method for monitoring a metering box according to claim 4, characterized in that: If the third difference satisfies the difference judgment condition, determining to start the fault judgment operation includes: Obtaining the maximum current value of the electric energy meter of the meter box; If the third difference is greater than the maximum current value, it is determined that a fault judgment operation is started.

6. The method for monitoring a metering box according to claim 1, characterized in that: Determining the optimal tap weight according to the historical environmental data and the expected response includes: Determine the filter order and step size; Initialize the tap weights of the filter order to 0 and construct a weight vector; constructing the historical environmental data as an input vector; Arrange the expected responses into a column vector in time order to obtain an expected response vector; Calculating an actual output vector according to the weight vector and the input vector; Calculating a deviation vector according to the actual output vector and the expected response vector; Estimate a tap weight vector of the weight vector at a next moment according to the weight vector, the bias vector, the step size, and the input vector; Get the offset parameters; If the offset parameter is less than a preset offset threshold, a tap weight vector of the weight vector at the next moment is determined as the optimal tap weight.

7. The method for monitoring a metering box according to claim 6, characterized in that: The obtaining of the imbalance parameter comprises: Obtaining the maximum eigenvalue of the autocorrelation matrix of the input vector; The offset parameter is calculated according to the step size, the filter order and the maximum eigenvalue.

8. The method for monitoring a metering box according to claim 6, characterized in that: The calculating the actual output vector according to the weight vector and the input vector comprises: Transposing the weight vector to obtain a transposed vector; The product between the transposed vector and the input vector is calculated as the actual output vector.

9. A monitoring device for a metering box, characterized in that: include: Acquisition module, used to obtain historical environmental data; A calculation module, used for determining an optimal tap weight according to the historical environmental data and the expected response; A determination module, used to predict the predicted environmental data at the current moment according to the optimal tap weight and the historical environmental data; The control module is used to control the measurement switch to turn on if the predicted environmental data meets the fault judgment condition, so as to disconnect the internal circuit of the meter box.

10. A metering box, characterized in that: include: A meter box body, wherein a smoke sensor, a temperature and humidity sensor, a controller, a measuring switch, an electric energy meter and a current transformer are arranged inside the meter box body; the smoke sensor, the temperature and humidity sensor, the electric energy meter, the measuring switch, the electric energy meter and the current transformer are electrically connected to the controller respectively; the output end of the current transformer is electrically connected to the measuring switch; the smoke sensor is used to detect smoke in the meter box body; the temperature and humidity sensor is used to detect the temperature and humidity in the meter box body; the electric energy meter detects the current value transmitted by the transformer; the controller is used to execute the monitoring method of the meter box according to any one of claims 1 to 8; the current transformer is used to detect the three-phase outgoing current value of the electric energy meter; and the controller controls the opening or closing of the measuring switch.

Citation Information

Patent Citations

  • Cable force monitoring method and system, terminal and storage medium

    CN117419843A

  • Noise reduction method and system for realizing non-line-of-sight link based on link discrimination

    CN117500097A

  • Method and system for detecting abnormal operation of intelligent metering box

    CN117554885A

  • Nuclear reactor primary loop sensor fault monitoring method, device, equipment and medium

    CN118129820A

  • Malfunction preventing device for grain batch weighing machine

    JP2001041807A

Cited By

  • Metering box remote control method, storage medium and metering box

    CN120067955A

  • Electric energy metering box abnormal box opening and metering abrupt change linkage identification method

    CN122487720A