Building project collaborative design method and system based on data simulation

Through the collaborative design method of building projects based on data simulation, the problem of low efficiency in project allocation, data processing and conflict identification in traditional design methods is solved, scientific allocation and efficient processing are realized, design quality and coordination efficiency are improved, and design conflicts are reduced. and construction risks.

CN118967013AActive Publication Date: 2024-11-15CONSTR PLANNING DESIGN INST ZHEJIANG UNIV OF TECH

Patent Information

Application Number
CN202410952914.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-15
Estimated Expiration
2044-07-16

AI Technical Summary

Technical Problem

Traditional architectural design methods have problems such as inefficiency, waste of resources and incomplete conflict identification in project allocation, design drawing data processing and design conflict identification, especially in large and complex projects, which are difficult to ensure accuracy and timeliness.

Method used

Using a collaborative design method for building projects based on data simulation, the design project priorities are determined by obtaining basic information of buildings and personnel, scientifically allocating and efficient processing are carried out, and the simulation construction and conflict identification are carried out using BIM technology and convolutional neural networks, and finally Collaborative correction of design drawings.

Benefits of technology

It improves design efficiency and quality, realizes the optimal allocation of design resources, timely identify and corrects design conflicts, reduces the number of rework and modifications, and reduces the risks and costs in the actual construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118967013A_ABST
    Figure CN118967013A_ABST
Patent Text Reader

Abstract

The invention discloses a building project collaborative design method and system based on data simulation. Firstly, basic building information of a target building project and basic personnel information of a design team are obtained, the priority of the design project is determined, and a priority ranking list is generated; and then, according to the sorting list and the personnel basic information, carrying out design project allocation to form a design project allocation scheme. Thirdly, project design is carried out according to the distribution scheme, design drawing data are obtained, and building component recognition is carried out on the drawing data; and constructing a simulation construction system by using the BIM technology and the recognition result, and performing simulation construction based on the system to obtain a simulation construction result. And finally, carrying out design conflict identification according to a simulation construction result, and carrying out collaborative correction on design drawing data. According to the method, data simulation is carried out through the BIM technology, and the design cooperation efficiency and the design quality are effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of architectural design, and in particular to a collaborative design method and system for architectural projects based on data simulation. Background Art

[0002] In the design process of modern construction projects, with the continuous increase in the scale and complexity of buildings, traditional design methods face many challenges. These challenges are mainly reflected in the allocation of design projects, data processing of design drawings, and coordination and conflict identification between different design projects. In order to solve these problems and improve design efficiency and quality, Building Information Modeling (BIM) technology has gradually been applied to the design and management of construction projects.

[0003] BIM technology is a building information management method based on three-dimensional digital models. It can integrate various data of construction projects and provide comprehensive information support for the design, construction and operation stages. Through BIM technology, the visualization, simulation and optimization of construction projects can be achieved, which greatly improves the efficiency of design and construction. However, the existing BIM technology still has some shortcomings in the application process, which are mainly manifested in the following aspects: First, in the allocation of design projects, traditional methods often rely on experience and manual allocation, lacking systematicity and scientificity. Irrational allocation of design projects can easily lead to waste of design resources and extended design cycles. Secondly, in the data processing of design drawings, traditional methods rely on manual identification and processing, which is inefficient and prone to errors. Especially in large and complex construction projects, the amount of data in design drawings is huge, and manual processing is difficult to ensure accuracy and timeliness. Thirdly, in the identification of design conflicts between design projects, traditional methods mainly rely on the experience and communication of designers, and there are problems such as low efficiency and incomplete conflict identification. Due to the interrelationship of various design projects, the timely discovery and handling of design conflicts is crucial to the smooth progress of the entire project.

[0004] Based on the above background, a collaborative design method system for building projects based on data simulation is proposed. Through this method, the efficiency and quality of building project design can be improved, and the scientific allocation of design projects, efficient processing of design drawing data, and timely identification and collaborative correction of design conflicts can be achieved. Summary of the invention

[0005] In order to solve at least one of the above technical problems, the present invention proposes a collaborative design method and system for a construction project based on data simulation.

[0006] A first aspect of the present invention provides a collaborative design method for a construction project based on data simulation, comprising: Obtaining basic architectural information of the target architectural project and basic personnel information of the design team, determining the priority of each design project in the target architectural project according to the basic architectural information, and obtaining a priority ranking list of the design projects; Allocate design projects according to the design project priority list and basic personnel information to obtain a design project allocation plan for the target building project; Performing architectural project design on the target architectural project according to the design project priority ranking list and the design project allocation plan, obtaining design drawing data of each design project, and performing architectural component recognition on the design drawing data to obtain architectural component recognition results; Building a simulated construction system for the target building project based on BIM technology and the building component recognition results, and performing simulated construction on the target building project according to the simulated construction system and the design drawing data of each design project to obtain a simulated construction result; Performing design conflict identification according to the simulation construction result to obtain a design conflict identification result; The design drawing data of each design project is collaboratively revised according to the design conflict identification result.

[0007] In this solution, the basic information of the building of the target building project and the basic information of the personnel of the design team are obtained, and the priority of each design project in the target building project is determined according to the basic information of the building, and a priority ranking list of the design projects is obtained, which is specifically: Obtaining basic building information of the target building project, wherein the basic building information includes building type, building function requirements, building site geographical environment, and building scale; Collecting basic personnel information of the target building project design team, including professional skills, work experience, current workload, available time, historical project evaluation, and work efficiency of the design team members; Determine the design projects of the design team according to the basic architectural information of the target building project, obtain the construction sequence information of each design project, and determine the design urgency of each design project and the dependency relationship between each design project according to the construction sequence information; Initialize a design project set T according to the design project, and sort the design project set T from high to low urgency according to the design urgency of each design project to obtain an initial sorting list; According to the dependency relationship between each design project, the initial sorting list is re-sorted according to the dependency relationship, all the design projects in the initial sorting list are marked as unvisited, the design projects in the initial sorting list are visited in turn, and the design projects that are visited are marked as visited design projects; For design projects entering the access state, design projects that have dependencies with the design projects in the access state are identified based on the dependency relationship between each design project, and the design projects with dependencies are inserted after the design projects in the access state. If multiple design projects have dependencies with the design projects in the access state, the design projects with dependencies are sorted according to their urgency and inserted after the design projects in the access state. The initial sorting list is updated, and the design projects that have not been visited in the updated initial sorting list are visited in turn until all design projects are visited, thereby obtaining a design project priority sorting list T_sort.

[0008] In this solution, the design project allocation is performed according to the design project priority list and the basic information of the personnel to obtain a design project allocation scheme for the target building project, specifically: Constructing a design project allocation model for a target building project, importing the basic building information and basic personnel information into the design project allocation model, the design project allocation model initializing a set of designers P according to the basic personnel information, initializing an allocation result set R as an empty set, and initializing a workload W_p of each designer to 0; Sequentially take out the design project t with the highest priority from T_sort, traverse the designer set P, search for designers who match the professional of the design project t from the designer set P, and determine the professional matching degree of the professionally matched designers to obtain a professionally matched personnel list; Determine the number of designers X required for design project t according to the construction scale of the target construction project, and calculate the time required for designing project t; Obtaining the influence weight of the professional matching degree and workload of the designer on the completion quality of the design project, and scoring the designers in the professional matching personnel list according to the influence weight to obtain the scoring result of each designer in the professional matching personnel list; Select the top X designers from the professional matching personnel list as the design team for design project t, update the allocation result set R according to the design project t and the corresponding design team personnel, and update the workload W_p of the designers according to the design time required for design project t; The design projects to which designers are not assigned in T_sort are assigned personnel in a loop until all the design projects in T_sort are assigned, and an assignment result set R of complete task assignment is obtained, and the assignment result set R of complete task assignment is used as the design project assignment scheme for the target building project.

[0009] In this solution, the target building project is designed according to the design project priority ranking list and the design project allocation plan, the design drawing data of each design project is obtained, and the building component recognition is performed on the design drawing data to obtain the building component recognition result, which is specifically: The design team of each design project in the design project allocation plan constructs a design plan for each design project of the target building project according to the design project priority ranking list, draws design drawings according to the design plan, and obtains design drawing data for each design project; Acquire historical building project data of the same type as the target building project according to the basic building information of the target building project, and acquire building components included in the historical building project according to the historical building project data; Obtaining a representation graphic of the building component in the design drawing from the Internet, and labeling the representation graphic with the name of the building component to obtain a building component representation graphic data set; A building component recognition model is established based on a convolutional neural network, the building component representation graphic data set is imported into the building component recognition model for training, the design drawing data of each design project is imported into the trained building component recognition model, the building components of each design project are recognized, and the building component recognition results of each design project are obtained.

[0010] In this solution, the simulation construction system of the target building project is constructed based on the BIM technology and the building component recognition results, and the target building project is simulated and constructed according to the simulation construction system and the design drawing data of each design project to obtain the simulation construction results, which are specifically: Based on the laser scanning technology, a modeling operation is performed on the building components of the target building project in the building construction recognition result to obtain a three-dimensional model of the building components; Building a simulation construction system for a target building project based on BIM technology, importing the three-dimensional model of the building into the simulation construction system, and restricting the connection mode of the three-dimensional model of the building components to obtain BIM model components of the target building project; A simulated geographical environment for building site selection is established in the simulated construction system based on the basic building information, and simulated construction is performed in the simulated construction system based on the design drawing data of each design project, the construction sequence information of each design project, and the dependency relationship between each design project to obtain a simulated construction result.

[0011] In this solution, the design conflict identification is performed according to the simulation construction result to obtain the design conflict identification result, which is specifically: According to the simulation result, a building virtual model of the target building project after the simulated construction of the target building project is obtained, and a building component spatial overlap analysis is performed on the building virtual model based on the spatial analysis function of the BIM technology, and building component pairs with spatial overlap in the building virtual model are marked to obtain a data set of spatially overlapping building component pairs; Acquire spatial overlap rationality data of each building component pair in the spatial overlap building component pair data set, extract building component pairs with unreasonable spatial overlap, determine position information of the building component pairs with unreasonable spatial overlap, and obtain a building component position conflict identification result of a target building project; Determine the theoretical construction path of the target building project according to the construction sequence information of each design project and the dependency relationship between each design project, and obtain the simulated construction path of the target building project in the simulated construction process according to the simulated design result; The simulated construction path is compared with the theoretical construction path, and the construction steps that deviate from the theoretical construction path are marked to obtain a construction sequence conflict identification result of the target building project; The building component position conflict identification result and the construction sequence conflict identification result are integrated to obtain the design conflict identification result of the target building project.

[0012] In this solution, the collaborative correction of the design drawing data of each design project according to the design conflict identification result is specifically as follows: Determine the conflict type, conflict item, and conflict location of the conflict item according to the design conflict result, and determine the design drawing data and design team corresponding to each conflict item; Determine the conflict position of the design drawing according to the conflict position of the conflicting project, and send conflict warning information including the conflict type, conflicting project, conflict position of the conflicting project, and conflict position of the design drawing to the corresponding design team; Collaboratively correct the design drawing data with design conflicts according to the conflict warning information to obtain corrected design drawing data of the target building project; The revised design drawing data is imported into the simulated construction system for secondary simulated construction to determine whether there is a design conflict. If there is still a design conflict, the design drawing data is revised for a second time until there is no design conflict in the design drawing data, thereby obtaining the actual construction design drawing data of the target building project.

[0013] The second aspect of the present invention further provides a construction project collaborative design system based on data simulation, the system comprising: a memory, a processor, the memory comprising a construction project collaborative design method program based on data simulation, and when the construction project collaborative design method program based on data simulation is executed by the processor, the following steps are implemented: Obtaining basic architectural information of the target architectural project and basic personnel information of the design team, determining the priority of each design project in the target architectural project according to the basic architectural information, and obtaining a priority ranking list of the design projects; Allocate design projects according to the design project priority list and basic personnel information to obtain a design project allocation plan for the target building project; Performing architectural project design on the target architectural project according to the design project priority ranking list and the design project allocation plan, obtaining design drawing data of each design project, and performing architectural component recognition on the design drawing data to obtain architectural component recognition results; Building a simulated construction system for the target building project based on BIM technology and the building component recognition results, and performing simulated construction on the target building project according to the simulated construction system and the design drawing data of each design project to obtain a simulated construction result; Performing design conflict identification according to the simulation construction result to obtain a design conflict identification result; The design drawing data of each design project is collaboratively revised according to the design conflict identification result.

[0014] The present invention discloses a collaborative design method and system for a building project based on data simulation. First, the basic building information of the target building project and the basic personnel information of the design team are obtained, the priority of the design project is determined and a priority ranking list is generated. Then, the design project is allocated according to the ranking list and the basic personnel information to form a design project allocation plan. Next, the project is designed according to the allocation plan, the design drawing data is obtained, and the building components are identified for the drawing data. Using BIM technology and the identification results, a simulation construction system is constructed, and simulation construction is performed based on the system to obtain a simulation construction result. Finally, design conflict identification is performed according to the simulation construction result, and the design drawing data is collaboratively corrected. The present invention performs data simulation through BIM technology, which effectively improves the design collaboration efficiency and design quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 A flow chart of a construction project collaborative design method based on data simulation according to the present invention is shown; Figure 2 A flow chart showing the simulation construction result obtained by the present invention is shown; Figure 3A flow chart showing collaborative correction of design drawing data according to the present invention is shown; Figure 4 A block diagram of a construction project collaborative design system based on data simulation according to the present invention is shown. DETAILED DESCRIPTION

[0016] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0017] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.

[0018] Figure 1 A flow chart of a construction project collaborative design method based on data simulation according to the present invention is shown.

[0019] like Figure 1 As shown, the first aspect of the present invention provides a collaborative design method for a construction project based on data simulation, comprising: S102, obtaining basic building information of the target building project and basic personnel information of the design team, determining the priority of each design project in the target building project according to the basic building information, and obtaining a priority ranking list of the design projects; S104, allocating design projects according to the design project priority list and basic personnel information to obtain a design project allocation plan for the target building project; S106, performing building project design on the target building project according to the design project priority ranking list and the design project allocation plan, obtaining design drawing data of each design project, and performing building component recognition on the design drawing data to obtain a building component recognition result; S108, constructing a simulated construction system for the target building project based on the BIM technology and the building component recognition result, and performing simulated construction on the target building project according to the simulated construction system and the design drawing data of each design project to obtain a simulated construction result; S110, performing design conflict identification according to the simulation construction result to obtain a design conflict identification result; S112: collaboratively correcting the design drawing data of each design project according to the design conflict identification result.

[0020] It should be noted that the design priority of each design project in the target building project is determined through the basic information of the building, and the design project is allocated to the target building project according to the design project priority list and the basic information of the personnel to obtain a design project allocation plan. The design project allocation plan can be reasonably allocated according to the personal professional expertise and experience through the personnel information of the design team to ensure that each design project can get the most appropriate resource support, thereby improving the design efficiency and quality, and can effectively reduce the work pressure of the design team, and improve the coordination and work efficiency of the design process; design projects are allocated according to the priority list and personnel information to ensure that important and urgent design tasks are completed first, optimize the utilization of design resources, and reduce bottlenecks within the project cycle; by identifying the building components in the design drawings and modeling operations, and building a simulation construction system for the target building project based on BIM technology, three-dimensional visualization and dynamic simulation of the entire building project can be achieved. The simulation construction system can detect potential problems and conflicts in the design plan in advance, and can promptly discover and locate conflicts and unreasonable aspects in the design, reduce the number of rework and modifications in the design stage, and improve the feasibility and optimization of the design plan, thereby reducing the risks and costs in the actual construction process; collaborative corrections are made based on the design conflict identification results to ensure that the final drawing data of each design project is optimized and verified.

[0021] According to an embodiment of the present invention, the basic information of the building of the target building project and the basic information of the personnel of the design team are obtained, and the priority of each design project in the target building project is determined according to the basic information of the building to obtain a priority ranking list of the design projects, specifically: Obtaining basic building information of the target building project, wherein the basic building information includes building type, building function requirements, building site geographical environment, and building scale; Collecting basic personnel information of the target building project design team, including professional skills, work experience, current workload, available time, historical project evaluation, and work efficiency of the design team members; Determine the design projects of the design team according to the basic architectural information of the target building project, obtain the construction sequence information of each design project, and determine the design urgency of each design project and the dependency relationship between each design project according to the construction sequence information; Initialize a design project set T according to the design project, and sort the design project set T from high to low urgency according to the design urgency of each design project to obtain an initial sorting list; According to the dependency relationship between each design project, the initial sorting list is re-sorted according to the dependency relationship, all the design projects in the initial sorting list are marked as unvisited, the design projects in the initial sorting list are visited in turn, and the design projects that are visited are marked as visited design projects; For design projects entering the access state, design projects that have dependencies with the design projects in the access state are identified based on the dependency relationship between each design project, and the design projects with dependencies are inserted after the design projects in the access state. If multiple design projects have dependencies with the design projects in the access state, the design projects with dependencies are sorted according to their urgency and inserted after the design projects in the access state. The initial sorting list is updated, and the design projects that have not been visited in the updated initial sorting list are visited in turn until all design projects are visited, thereby obtaining a design project priority sorting list T_sort.

[0022] It should be noted that the design projects include architectural design, structural design, water supply and drainage design, HVAC design, electrical design, interior design, landscape design, fire protection design, etc.; the dependencies between each design project include construction sequence dependencies: some design projects must be started after other design projects are completed, or some design projects require other design projects to be synchronized when the construction reaches a certain progress. For example, architectural design must be completed before electrical design, physical location dependencies: some design projects need to be coordinated due to overlapping or adjacent spatial locations. For example, wall design and door and window design need to be carried out simultaneously to ensure the correctness of the opening position. The design project priority sorting list T_sort is first determined by the urgency and sorted according to the construction sequence. The higher the urgency of the construction sequence, the higher the ranking of the design project. Assuming that the design projects in the initial sorting list sorted by urgency are ranked 123456, the secondary sorting is to first find out the design projects that have a dependency relationship with design project 1, and mark 1 as visited. Assuming that the dependent design projects are 4 and 6, 4 and 6 are sorted according to the urgency and inserted after design project 1. The updated initial sorting list is 146235. The design projects that have not been visited in the updated initial sorting list are visited in sequence. 1 has been visited, that is, 4 has been visited. The design projects that have a dependency relationship with 4 are sorted according to the urgency and inserted after design project 4. And so on, finally the design project priority sorting list T_sort is obtained.

[0023] According to an embodiment of the present invention, the design project allocation is performed according to the design project priority list and the basic information of the personnel to obtain a design project allocation scheme for the target building project, specifically: Constructing a design project allocation model for a target building project, importing the basic building information and basic personnel information into the design project allocation model, the design project allocation model initializing a set of designers P according to the basic personnel information, initializing an allocation result set R as an empty set, and initializing a workload W_p of each designer to 0; Sequentially take out the design project t with the highest priority from T_sort, traverse the designer set P, search for designers who match the professional of the design project t from the designer set P, and determine the professional matching degree of the professionally matched designers to obtain a professionally matched personnel list; Determine the number of designers X required for design project t according to the construction scale of the target construction project, and calculate the time required for designing project t; Obtaining the influence weight of the professional matching degree and workload of the designer on the completion quality of the design project, and scoring the designers in the professional matching personnel list according to the influence weight to obtain the scoring result of each designer in the professional matching personnel list; Select the top X designers from the professional matching personnel list as the design team for design project t, update the allocation result set R according to the design project t and the corresponding design team personnel, and update the workload W_p of the designers according to the design time required for design project t; The design projects to which designers are not assigned in T_sort are assigned personnel in a loop until all the design projects in T_sort are assigned, and an assignment result set R of complete task assignment is obtained, and the assignment result set R of complete task assignment is used as the design project assignment scheme for the target building project.

[0024] It should be noted that the initialization of the designer set P is to save the basic information of each designer into the set P, and the empty set R is used to finally save the designer allocation results of each design project; the search for designers who match the professional of the design project t from the designer set P is to check whether the professional skills of the designer p match according to the professional requirements of the design project t. For example, if the design project t requires a structural engineer, check whether the designer p has the professional skills of structural engineering; the determination of the professional matching degree of the professional matching designer is to calculate the professional skills matching degree. The professional skills matching degree is scored according to the relevance of the professional skills, for example, a complete match is scored as 1 point, a partial match is scored as 0.5 points, and a mismatch is scored as 0 points; the work experience matching degree is calculated. The work experience matching degree is scored according to the years of work and relevant project experience. For example, the longer the years of work and the richer the relevant project experience, the higher the score; the historical project evaluation matching degree is calculated. The historical project evaluation matching degree is scored according to the completion quality and customer evaluation of past projects; the workload matching degree is calculated. The lower the workload, the higher the matching degree. The higher the final calculated matching total score, the higher the matching degree.

[0025] According to an embodiment of the present invention, the target building project is designed according to the design project priority ranking list and the design project allocation scheme, the design drawing data of each design project is obtained, and the building component recognition is performed on the design drawing data to obtain the building component recognition result, specifically: The design team of each design project in the design project allocation plan constructs a design plan for each design project of the target building project according to the design project priority ranking list, draws design drawings according to the design plan, and obtains design drawing data for each design project; Acquire historical building project data of the same type as the target building project according to the basic building information of the target building project, and acquire building components included in the historical building project according to the historical building project data; Obtaining a representation graphic of the building component in the design drawing from the Internet, and labeling the representation graphic with the name of the building component to obtain a building component representation graphic data set; A building component recognition model is established based on a convolutional neural network, the building component representation graphic data set is imported into the building component recognition model for training, the design drawing data of each design project is imported into the trained building component recognition model, the building components of each design project are recognized, and the building component recognition results of each design project are obtained.

[0026] It should be noted that by using a convolutional neural network (CNN) to establish a building component recognition model, the advantages of deep learning technology can be used to achieve efficient and accurate image recognition. Importing the building component representation graphic dataset into the model for training can enable the model to learn the characteristics of various building components and enhance the generalization ability of the model. By importing the design drawing data into the trained model for recognition, the building components in the design drawings can be automatically identified and annotated, improving the automation level and work efficiency of the building design process and reducing human errors; the design drawing data of each design project may contain multiple identical building components, and only the names of the identified building components are output here. Each building component represents the building materials needed in the construction process of the target building project, such as concrete and bricks in the building structure design, pipes in the water supply and drainage design, wires and sockets in the electrical design, etc. The purpose is to identify what building materials are needed for the target building project. Connection materials are not included. For example, the mortar between bricks and the interface between pipes do not need to be represented in the design drawings.

[0027] Figure 2 A flow chart of the present invention for obtaining simulation construction results is shown.

[0028] According to an embodiment of the present invention, the simulated construction system of the target building project is constructed based on the BIM technology and the building component recognition result, and the target building project is simulated constructed according to the simulated construction system and the design drawing data of each design project to obtain the simulated construction result, which is specifically: S202, performing a modeling operation on the building components of the target building project in the building construction recognition result based on laser scanning technology to obtain a three-dimensional model of the building components; S204, constructing a simulation construction system of the target building project based on BIM technology, importing the building construction three-dimensional model into the simulation construction system, and restricting the connection mode of the building component three-dimensional model to obtain BIM model components of the target building project; S206, establishing a simulated geographical environment for building site selection in the simulated construction system according to the basic building information, performing simulated construction in the simulated construction system according to the design drawing data of each design project, the construction sequence information of each design project, and the dependency relationship between each design project to obtain a simulated construction result.

[0029] It should be noted that the use of BIM technology to build a simulation construction system can seamlessly integrate the three-dimensional model of building components into the system. By limiting the connection method, the correct assembly and connection method of building components in the simulation construction process can be ensured; the simulated geographical environment of the building site selection is established in the simulation construction system, which can simulate the impact of real geographical conditions on the construction project. Combined with the design drawing data, construction sequence information and dependencies of each design project, the simulation construction can predict and optimize the construction process and efficiency of the construction project. The simulation construction results can provide visual and operational verification of each stage of the construction project, which helps to discover and solve potential design and construction problems and improve the overall quality and efficiency of the project; the simulation construction results are obtained by simulating the construction according to the design drawings of each design project and the construction sequence of each design project to obtain the building virtual model of the target building project, and the simulation construction results also include the semi-finished virtual models corresponding to the different construction progresses of each design project in the simulation construction process according to the construction sequence; the modeling operation of the building components is the process of laser scanning and modeling the physical objects of the building components.

[0030] According to an embodiment of the present invention, the design conflict identification is performed according to the simulation construction result to obtain the design conflict identification result, which is specifically: According to the simulation result, a building virtual model of the target building project after the simulated construction of the target building project is obtained, and a building component spatial overlap analysis is performed on the building virtual model based on the spatial analysis function of the BIM technology, and building component pairs with spatial overlap in the building virtual model are marked to obtain a data set of spatially overlapping building component pairs; Acquire spatial overlap rationality data of each building component pair in the spatial overlap building component pair data set, extract building component pairs with unreasonable spatial overlap, determine position information of the building component pairs with unreasonable spatial overlap, and obtain a building component position conflict identification result of a target building project; Determine the theoretical construction path of the target building project according to the construction sequence information of each design project and the dependency relationship between each design project, and obtain the simulated construction path of the target building project in the simulated construction process according to the simulated design result; The simulated construction path is compared with the theoretical construction path, and the construction steps that deviate from the theoretical construction path are marked to obtain a construction sequence conflict identification result of the target building project; The building component position conflict identification result and the construction sequence conflict identification result are integrated to obtain the design conflict identification result of the target building project.

[0031] It should be noted that the spatial analysis function of BIM technology is used to detect the spatial overlap between building components, which helps identify potential design conflicts. By analyzing the spatial overlap rationality data, it is possible to effectively distinguish which spatial overlaps are acceptable and necessary, and which are unreasonable and need to be resolved; the determination of the theoretical construction path and the comparison of the simulated construction path can help identify the construction sequence conflicts in the design. By comparing the actual simulated construction path with the theoretically set construction path, deviations and inconsistencies can be found and marked; the pair of building components with spatial overlap is two building components with spatial overlap; the spatial overlap rationality data is standard data on whether the spatial overlap between building components is reasonable, for example, wires and water pipes can be buried in the ground or in the wall, so the overlap between the wire or water pipe components and the building frame structure is reasonable, and for example, doors and windows are independent components, and the spatial overlap between doors and windows is unreasonable; the overlap here refers to the two building components occupying the same spatial position.

[0032] Figure 3 A flow chart of the collaborative correction of design drawing data according to the present invention is shown.

[0033] According to an embodiment of the present invention, the collaborative correction of the design drawing data of each design project according to the design conflict identification result is specifically: S302, determining the conflict type, conflict item, and conflict position of the conflict item according to the design conflict result, and determining the design drawing data and design team corresponding to each conflict item; S304, determining the conflict position of the design drawing according to the conflict position of the conflicting project, and sending conflict warning information including the conflict type, conflicting project, conflict position of the conflicting project, and conflict position of the design drawing to the corresponding design team; S306, collaboratively correcting the design drawing data with design conflicts according to the conflict warning information to obtain corrected design drawing data of the target building project; S308, importing the revised design drawing data into the simulated construction system for secondary simulated construction to determine whether there is a design conflict. If there is still a design conflict, the design drawing data is revised for a second time until there is no design conflict in the design drawing data, thereby obtaining the actual construction design drawing data of the target building project.

[0034] It should be noted that by clarifying the specific types, projects and locations of design conflicts, the design content that needs to be corrected can be accurately identified; conflict warning information can be sent to the relevant design team to promptly notify and alert designers of existing problems and specific locations that need to be corrected. The warning mechanism can quickly respond and adjust the design plan to avoid delays and additional costs caused by conflicts in the actual construction process; based on the conflict warning information, the design team can work together to make timely corrections to the conflicting design drawing data; through collaborative corrections, the coordination and consistency between various design projects can be ensured, the design plan can be optimized, and the smoothness and efficiency of construction can be improved; the corrected design drawing data can be re-imported into the simulation construction system for secondary simulation construction, which can comprehensively test whether the correction is effective and whether there are new design conflicts; through the iterative correction process, it is ensured that the design drawing data eventually reaches a conflict-free state, which improves the smooth progress of the construction process and the assurance of project quality.

[0035] According to an embodiment of the present invention, it also includes: Import the actual construction design drawing data into the simulation construction system for simulation construction, record the construction steps in the simulation construction process in real time, and determine the construction progress after each construction step is completed; The construction steps are sorted and integrated according to the time series to obtain theoretical construction step data of the target building project, and a one-to-one mapping relationship is formed between the construction steps and the construction progress to obtain a construction step-progress mapping table after each construction step is completed; Carry out the actual construction of the target building project according to the actual construction design drawing data, and record the actual construction process data and actual construction progress during the construction process in real time; Matching and analyzing the actual construction process data and the actual construction progress with the construction step-progress mapping table, determining the impact of construction according to the actual construction process data on the construction progress, and obtaining construction progress impact data; The construction efficiency of the actual construction process is evaluated according to the construction progress impact data. When the construction efficiency is lower than a preset value, the subsequent construction process is adjusted according to the theoretical construction step data.

[0036] It should be noted that during the actual construction of the target building project, the actual construction process may deviate from the theoretical construction steps, resulting in a delay in the construction progress. By constructing a construction step-progress mapping table after the completion of each construction step as the progress standard data for the actual construction of the target building project, the impact of construction according to the actual construction process data on the construction progress is judged, and the construction efficiency is evaluated based on the construction progress impact data. When the construction efficiency is lower than the preset value, it is considered that construction according to the actual construction process data will cause a lag in the construction progress and fail to meet the construction progress requirements of the target building project. Therefore, the subsequent construction process is adjusted through the theoretical construction step data, the actual construction plan is timely optimized, the construction efficiency is improved, and the project is completed on time.

[0037] According to an embodiment of the present invention, it also includes: Obtain a preset number of conflict warning information, and record the conflict types, conflict locations, and conflict occurrence order of each conflict type of the design conflicts in the target building project during the simulated construction process according to the conflict warning information to obtain a historical conflict record information data set; Arrange the conflict types of each piece of historical conflict record information according to the conflict occurrence sequence according to the historical conflict record information data set, and determine the conflict position change relationship data of the conflict types of each piece of historical conflict record information; Perform similarity analysis on conflict location change data of the same conflict type in each piece of historical conflict record information, determine the change relationship of the conflict location in the target building project, and obtain conflict location change relationship data; Real-time recording of real-time construction conflict information of the target building project during the actual construction process, wherein the construction conflict information includes the conflict type and the location where the conflict occurs; Analyze the real-time construction conflict information based on the conflict location change relationship data, predict the location where the conflict type will occur next, and obtain the predicted location information of the conflict type; The corresponding design position in the design drawing is determined according to the predicted occurrence position information, and the corresponding design position is collaboratively corrected.

[0038] It should be noted that by analyzing the historical conflict record information data set, it is determined whether a design conflict of a certain type will cause the same type of design conflict to occur at another location when a design conflict occurs at a certain location of the target building project. This phenomenon is called a chain effect. Therefore, by analyzing a large amount of conflict warning information, it is determined that the occurrence of a design conflict of a certain type of conflict will cause the location of the second occurrence of this type of design conflict, and the conflict location change relationship data is obtained. For the construction conflict that occurs in the actual construction process of the target building project, the conflict location of the next construction conflict of this type is predicted based on the conflict location change relationship data, and the location of the conflict location in the design drawing is determined, and then the location of the conflict location in the design drawing is analyzed, and then coordinated corrections are made. By analyzing the construction conflicts in the actual construction process, the location of the next construction conflict is predicted in advance for correction, so as to avoid construction errors, thereby affecting the construction progress, construction quality, and building safety.

[0039] Figure 4 A block diagram of a construction project collaborative design system based on data simulation according to the present invention is shown.

[0040] The second aspect of the present invention further provides a construction project collaborative design system 4 based on data simulation, the system comprising: a memory 41, a processor 42, the memory comprising a construction project collaborative design method program based on data simulation, and when the construction project collaborative design method program based on data simulation is executed by the processor, the following steps are implemented: Obtaining basic architectural information of the target architectural project and basic personnel information of the design team, determining the priority of each design project in the target architectural project according to the basic architectural information, and obtaining a priority ranking list of the design projects; Allocate design projects according to the design project priority list and basic personnel information to obtain a design project allocation plan for the target building project; Performing architectural project design on the target architectural project according to the design project priority ranking list and the design project allocation plan, obtaining design drawing data of each design project, and performing architectural component recognition on the design drawing data to obtain architectural component recognition results; Building a simulated construction system for the target building project based on BIM technology and the building component recognition results, and performing simulated construction on the target building project according to the simulated construction system and the design drawing data of each design project to obtain a simulated construction result; Performing design conflict identification according to the simulation construction result to obtain a design conflict identification result; The design drawing data of each design project is collaboratively revised according to the design conflict identification result.

[0041] The present invention discloses a collaborative design method and system for a building project based on data simulation. First, the basic building information of the target building project and the basic personnel information of the design team are obtained, the priority of the design project is determined and a priority ranking list is generated. Then, the design project is allocated according to the ranking list and the basic personnel information to form a design project allocation plan. Next, the project is designed according to the allocation plan, the design drawing data is obtained, and the building components are identified for the drawing data. Using BIM technology and the identification results, a simulation construction system is constructed, and simulation construction is performed based on the system to obtain a simulation construction result. Finally, design conflict identification is performed according to the simulation construction result, and the design drawing data is collaboratively corrected. The present invention performs data simulation through BIM technology, which effectively improves the design collaboration efficiency and design quality.

[0042] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. The device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as: multiple units or components can be combined, or can be integrated into another system, or some features can be ignored or not executed. In addition, the coupling, direct coupling, or communication connection between the components shown or discussed can be through some interfaces, and the indirect coupling or communication connection of the devices or units can be electrical, mechanical or other forms.

[0043] The units described above as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units; they may be located in one place or distributed on multiple network units; some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0044] In addition, all functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may be separately used as a unit, or two or more units may be integrated into one unit; the above-mentioned integrated units may be implemented in the form of hardware or in the form of hardware plus software functional units.

[0045] A person of ordinary skill in the art can understand that: all or part of the steps of implementing the above method embodiment can be completed by hardware related to program instructions, and the aforementioned program can be stored in a computer-readable storage medium. When the program is executed, it executes the steps of the above method embodiment; and the aforementioned storage medium includes: a mobile storage device, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.

[0046] Alternatively, if the above-mentioned integrated unit of the present invention is implemented in the form of a software function module and sold or used as an independent product, it can also be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the embodiment of the present invention can be essentially or partly reflected in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to execute all or part of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as mobile storage devices, ROM, RAM, magnetic disks or optical disks.

[0047] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A collaborative design method for a construction project based on data simulation, characterized in that: The following steps are involved: Obtaining basic architectural information of the target architectural project and basic personnel information of the design team, determining the priority of each design project in the target architectural project according to the basic architectural information, and obtaining a priority ranking list of the design projects; Allocate design projects according to the design project priority list and basic personnel information to obtain a design project allocation plan for the target building project; Performing architectural project design on the target architectural project according to the design project priority ranking list and the design project allocation plan, obtaining design drawing data of each design project, and performing architectural component recognition on the design drawing data to obtain architectural component recognition results; Building a simulated construction system for the target building project based on BIM technology and the building component recognition results, and performing simulated construction on the target building project according to the simulated construction system and the design drawing data of each design project to obtain a simulated construction result; Performing design conflict identification according to the simulation construction result to obtain a design conflict identification result; The design drawing data of each design project is collaboratively revised according to the design conflict identification result.

2. A collaborative design method for a construction project based on data simulation according to claim 1, characterized in that: The basic information of the building of the target building project and the basic information of the personnel of the design team are obtained, and the priority of each design project in the target building project is determined according to the basic information of the building to obtain a priority ranking list of the design projects, specifically: Obtaining basic building information of the target building project, wherein the basic building information includes building type, building function requirements, building site geographical environment, and building scale; Collecting basic personnel information of the target building project design team, including professional skills, work experience, current workload, available time, historical project evaluation, and work efficiency of the design team members; Determine the design projects of the design team according to the basic architectural information of the target building project, obtain the construction sequence information of each design project, and determine the design urgency of each design project and the dependency relationship between each design project according to the construction sequence information; Initialize a design project set T according to the design project, and sort the design project set T from high to low urgency according to the design urgency of each design project to obtain an initial sorting list; According to the dependency relationship between each design project, the initial sorting list is re-sorted according to the dependency relationship, all the design projects in the initial sorting list are marked as unvisited, the design projects in the initial sorting list are visited in turn, and the design projects that are visited are marked as visited design projects; For design projects entering the access state, design projects that have dependencies with the design projects in the access state are identified based on the dependency relationship between each design project, and the design projects with dependencies are inserted after the design projects in the access state. If multiple design projects have dependencies with the design projects in the access state, the design projects with dependencies are sorted according to their urgency and inserted after the design projects in the access state. The initial sorting list is updated, and the design projects that have not been visited in the updated initial sorting list are visited in turn until all design projects are visited, thereby obtaining a design project priority sorting list T_sort.

3. A collaborative design method for a construction project based on data simulation according to claim 2, characterized in that: The design project allocation is performed according to the design project priority list and the basic information of the personnel to obtain a design project allocation plan for the target building project, specifically: Constructing a design project allocation model for a target building project, importing the basic building information and basic personnel information into the design project allocation model, the design project allocation model initializing a set of designers P according to the basic personnel information, initializing an allocation result set R as an empty set, and initializing a workload W_p of each designer to 0; Sequentially take out the design project t with the highest priority from T_sort, traverse the designer set P, search for designers who match the professional of the design project t from the designer set P, and determine the professional matching degree of the professionally matched designers to obtain a professionally matched personnel list; Determine the number of designers X required for design project t according to the construction scale of the target construction project, and calculate the time required for designing project t; Obtaining the influence weight of the professional matching degree and workload of the designer on the completion quality of the design project, and scoring the designers in the professional matching personnel list according to the influence weight to obtain the scoring result of each designer in the professional matching personnel list; Select the top X designers from the professional matching personnel list as the design team for design project t, update the allocation result set R according to the design project t and the corresponding design team personnel, and update the workload W_p of the designers according to the design time required for design project t; The design projects to which designers are not assigned in T_sort are assigned personnel in a loop until all the design projects in T_sort are assigned, and an assignment result set R of complete task assignment is obtained, and the assignment result set R of complete task assignment is used as the design project assignment scheme for the target building project.

4. A collaborative design method for a construction project based on data simulation according to claim 1, characterized in that: The target building project is designed according to the design project priority ranking list and the design project allocation plan, the design drawing data of each design project is obtained, and the building component recognition is performed on the design drawing data to obtain the building component recognition result, specifically: The design team of each design project in the design project allocation plan constructs a design plan for each design project of the target building project according to the design project priority ranking list, draws design drawings according to the design plan, and obtains design drawing data for each design project; Acquire historical building project data of the same type as the target building project according to the basic building information of the target building project, and acquire building components included in the historical building project according to the historical building project data; Obtaining a representation graphic of the building component in the design drawing from the Internet, and labeling the representation graphic with the name of the building component to obtain a building component representation graphic data set; A building component recognition model is established based on a convolutional neural network, the building component representation graphic data set is imported into the building component recognition model for training, the design drawing data of each design project is imported into the trained building component recognition model, the building components of each design project are recognized, and the building component recognition results of each design project are obtained.

5. The collaborative design method for a construction project based on data simulation according to claim 1 is characterized in that: The simulated construction system of the target building project is constructed based on the BIM technology and the building component recognition result, and the target building project is simulated constructed according to the simulated construction system and the design drawing data of each design project to obtain the simulated construction result, specifically: Based on the laser scanning technology, a modeling operation is performed on the building components of the target building project in the building construction recognition result to obtain a three-dimensional model of the building components; Building a simulation construction system for a target building project based on BIM technology, importing the three-dimensional model of the building into the simulation construction system, and restricting the connection mode of the three-dimensional model of the building components to obtain BIM model components of the target building project; A simulated geographical environment for building site selection is established in the simulated construction system based on the basic building information, and simulated construction is performed in the simulated construction system based on the design drawing data of each design project, the construction sequence information of each design project, and the dependency relationship between each design project to obtain a simulated construction result.

6. A collaborative design method for a construction project based on data simulation according to claim 1, characterized in that: The design conflict identification is performed according to the simulation construction result to obtain the design conflict identification result, which is specifically: According to the simulation result, a building virtual model of the target building project after the simulated construction of the target building project is obtained, and a building component spatial overlap analysis is performed on the building virtual model based on the spatial analysis function of the BIM technology, and building component pairs with spatial overlap in the building virtual model are marked to obtain a data set of spatially overlapping building component pairs; Acquire spatial overlap rationality data of each building component pair in the spatial overlap building component pair data set, extract building component pairs with unreasonable spatial overlap, determine position information of the building component pairs with unreasonable spatial overlap, and obtain a building component position conflict identification result of a target building project; Determine the theoretical construction path of the target building project according to the construction sequence information of each design project and the dependency relationship between each design project, and obtain the simulated construction path of the target building project in the simulated construction process according to the simulated design result; The simulated construction path is compared with the theoretical construction path, and the construction steps that deviate from the theoretical construction path are marked to obtain a construction sequence conflict identification result of the target building project; The building component position conflict identification result and the construction sequence conflict identification result are integrated to obtain the design conflict identification result of the target building project.

7. The collaborative design method for a construction project based on data simulation according to claim 1 is characterized in that: The collaboratively correcting the design drawing data of each design project according to the design conflict identification result is specifically: Determine the conflict type, conflict item, and conflict location of the conflict item according to the design conflict result, and determine the design drawing data and design team corresponding to each conflict item; Determine the conflict position of the design drawing according to the conflict position of the conflicting project, and send conflict warning information including the conflict type, conflicting project, conflict position of the conflicting project, and conflict position of the design drawing to the corresponding design team; Collaboratively correct the design drawing data with design conflicts according to the conflict warning information to obtain corrected design drawing data of the target building project; The revised design drawing data is imported into the simulated construction system for secondary simulated construction to determine whether there is a design conflict. If there is still a design conflict, the design drawing data is revised for a second time until there is no design conflict in the design drawing data, thereby obtaining the actual construction design drawing data of the target building project.

8. A collaborative design system for building projects based on data simulation, characterized in that: The construction project collaborative design system based on data simulation includes a storage and a processor, wherein the storage includes a construction project collaborative design method program based on data simulation, and when the construction project collaborative design method program based on data simulation is executed by the processor, the following steps are implemented: Obtaining basic architectural information of the target architectural project and basic personnel information of the design team, determining the priority of each design project in the target architectural project according to the basic architectural information, and obtaining a priority ranking list of the design projects; Allocate design projects according to the design project priority list and basic personnel information to obtain a design project allocation plan for the target building project; Performing architectural project design on the target architectural project according to the design project priority ranking list and the design project allocation plan, obtaining design drawing data of each design project, and performing architectural component recognition on the design drawing data to obtain architectural component recognition results; Building a simulated construction system for the target building project based on BIM technology and the building component recognition results, and performing simulated construction on the target building project according to the simulated construction system and the design drawing data of each design project to obtain a simulated construction result; Performing design conflict identification according to the simulation construction result to obtain a design conflict identification result; The design drawing data of each design project is collaboratively revised according to the design conflict identification result.

Citation Information

Patent Citations

  • Requirement priority ordering method and system based on dependence reduction

    CN101986267A

  • Building design method based on BIM (building information modeling)

    CN108537519A

  • Strategic project management method and computer readable media

    CN109544030A

  • A product design task processing method and electronic equipment

    CN109598411A

  • Employment recommendation matching method and system based on multi-factor evaluation

    CN112633641A

Cited By

  • Fabricated building collaborative design method and system based on BIM

    CN119579112A

  • A BIM-based collaborative design method and system for prefabricated buildings

    CN119579112B

  • Rapid function recommendation method, system and device for building industry

    CN119599346A

  • A method, system and device for rapid function recommendation for the construction industry

    CN119599346B