Through the work decomposition structure template, the problem that the project leader cannot grasp the work progress in real time is solved, and the efficiency and standardization of project data processing is improved.
Patent Information
- Application Number
- CN202411166932.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-11-15
AI Technical Summary
The project leader cannot grasp the work progress of each position in real time, resulting in low efficiency and poor standardization of project data processing.
Ensure project process normative and progress tracking by obtaining and using work breakdown structure templates, obtaining target positions and assigning participants, performing operations based on activity workflows and editing output documents.
It improves the efficiency and standardization of project data processing, ensures that the processing progress of project activities can be traced, and reduces offline inquiries and document consistency issues.
Smart Images

Figure CN118967054A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of data processing technology, and in particular to a project data processing method, device, system and medium. Background Art
[0002] The server hardware R&D process has the characteristics of a long time span, many positions involved, wide overlap of positions, and many delivery documents. The relevant project data processing process is that after the project leader receives the project, he will follow the full name of the Integrated Product Development (IPD) technical review process, analyze the positions to be involved in each stage, and the project leader will ask each position leader, who will recommend the right person for the position and pull the people into a group, and then discuss the goals to be completed in this stage through online video and finally form a unified document. The project leader will publish the sorted document to the group for relevant personnel to download. When the project moves to the next stage, continue to select the right person in charge and repeat the above work.
[0003] In the data processing method of this project, the project leader cannot grasp the work progress of each position in real time, and the efficiency of project processing is low because of the need to ask the position leader offline to assign specific personnel. The classification of the IPD technical review process is controlled by the project leader, and the standardization of the project process cannot be guaranteed.
[0004] It can be seen from this that how to ensure that the project leader has real-time knowledge of the work progress of personnel in each position and improve the efficiency and standardization of project data processing is a technical problem that people in this field urgently need to solve. Summary of the invention
[0005] The purpose of the present invention is to provide a project data processing method, device, system and medium to solve the technical problems that the project leader cannot grasp the work progress of each position personnel in real time, the efficiency of project data processing is low and the standardization is poor.
[0006] In order to solve the above technical problems, the present invention provides a project data processing method, comprising:
[0007] Acquire a target work breakdown structure template selected by the first user according to the current project; wherein the work breakdown structure template at least includes activities related to processing the project instance, workflows corresponding to the activities, input documents, output documents and positions;
[0008] Upon receiving an instruction sent by the first user for indicating confirmation of the current project, obtaining all positions from the target work breakdown structure template, and sending information indicating allocation of a third user to participate in the current project to second users associated with each of the positions;
[0009] upon receiving information sent by the second user indicating that the assignment of the third user is completed, selecting a target user from the third users;
[0010] In the case where it is detected that the target user issues an instruction to start the activity, sending information representing participation in the activity of the current project to the third user;
[0011] Prompting the third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity;
[0012] Output the actual file corresponding to the output document.
[0013] On the one hand, establishing a work breakdown structure template includes:
[0014] Obtaining a preset scenario; wherein the preset scenario at least includes a system engineering design scenario, a board design scenario, or a firmware development scenario;
[0015] Creating corresponding work breakdown structure templates for the preset scenarios according to each stage in integrated product development;
[0016] The obtaining of the target work breakdown structure template selected by the first user according to the current project includes:
[0017] The target work breakdown structure template selected by the first user from all work breakdown structure templates according to the attribute of the current project is obtained.
[0018] On the other hand, after obtaining the target work breakdown structure template selected by the first user according to the current project and before receiving the instruction sent by the first user for characterizing and confirming the current project, the method further includes:
[0019] Acquire activities in the current project and activities in the target work breakdown structure template;
[0020] When it is detected that the target activity belongs to an activity in the target work breakdown structure template and does not belong to an activity in the current project, all activities related to the target activity and the tree relationship formed by all activities are obtained;
[0021] Determine whether the target activity is the only leaf activity in the tree relationship;
[0022] If not, deleting the target activity from the target work breakdown structure template;
[0023] If so, keep the target work breakdown structure template unchanged.
[0024] On the other hand, after receiving the instruction sent by the first user for characterizing and confirming the current project, before acquiring all positions from the target work breakdown structure template, the method further includes:
[0025] Obtaining activity attributes of each activity in the current project; wherein the activity attributes at least include the activity start time, end time and activity completion status;
[0026] The prompting the third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity includes:
[0027] Prompting the third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity at the time of the activity start;
[0028] After prompting the third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity and before outputting the actual file corresponding to the output document, the method further includes:
[0029] Get the completion status of the activity at the end time;
[0030] When it is detected that the activity completion state is the completion state, entering the step of outputting the actual file corresponding to the output document;
[0031] When it is detected that the activity completion state is an incomplete state, a prompt message indicating that the activity is incomplete is sent to the user, and the step of outputting the actual file corresponding to the output document is entered; the users include at least the first user, the second user and the third user.
[0032] On the other hand, the work breakdown structure template also includes the reusability of predecessor activities and activities;
[0033] The methods for starting the current pending activity include:
[0034] Determining whether the current activity to be started has a predecessor activity according to the target work breakdown structure template;
[0035] If it is determined that the current activity to be started has a predecessor activity, then upon detecting that the predecessor activity of the current activity to be started is completed and the final output is confirmed, determining whether the current activity to be started is a leaf activity according to the tree relationship;
[0036] If it is determined that the current activity to be started does not have a preceding activity, then entering the step of determining whether the current activity to be started is a leaf activity according to the tree relationship;
[0037] If it is determined that the current activity to be started is a leaf activity, and in the case that the current activity to be started is determined to be a descendant activity of a reusable activity according to the target work breakdown structure template, after copying the reusable activity, a command for indicating manual start of the current activity to be started is sent to the target user; if it is determined that the current activity to be started is not a descendant activity of a reusable activity according to the target work breakdown structure template, the step of sending a command for indicating manual start of the current activity to be started to the target user is performed;
[0038] If it is determined that the current activity to be started is not a leaf activity, the current activity to be started is automatically started after it is detected that a leaf activity of the current activity to be started is started.
[0039] On the other hand, the prompting the third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity includes:
[0040] Get the sequence relationship between all activities in the current project;
[0041] Determine whether there is an activity before the current activity according to the sequence relationship;
[0042] If yes, obtaining the output document of the activity before the current activity, using the output document of the activity before the current activity as the input document of the current activity, prompting the third user to perform corresponding operations according to the workflow corresponding to the activity and to edit the content of the output document with reference to the input document;
[0043] If not, a preset document is designated as the input document of the current activity, and the step of prompting the third user to perform corresponding operations according to the workflow corresponding to the activity and to edit the content of the output document with reference to the input document is entered.
[0044] On the other hand, after outputting the actual file corresponding to the output document, the method further includes:
[0045] Prompt the target user to update the operation authority of the output document from read-write mode to read-only mode;
[0046] Submitting the actual document to a fourth user so that the fourth user can review the actual document;
[0047] When the prompt information indicating that the review is completed is received from the fourth user, the activity status is modified to a completed status.
[0048] In order to solve the above technical problems, the present invention further provides a project data processing device, comprising:
[0049] An acquisition module, used to acquire a target work breakdown structure template selected by the first user according to the current project; wherein the work breakdown structure template at least includes activities related to processing project instances, workflows corresponding to the activities, input documents, output documents and positions;
[0050] an acquisition and sending module, configured to acquire all positions from the target work breakdown structure template upon receiving an instruction sent by the first user for indicating confirmation of the current project, and to send information indicating allocation of a third user to participate in the current project to second users associated with each of the positions;
[0051] a receiving and selecting module, configured to select a target user from the third users upon receiving information sent by the second user indicating that the third user has been assigned;
[0052] A detection and sending module, configured to send information representing participation in the activity of the current project to the third user when detecting that the target user issues an instruction to start the activity;
[0053] A prompting module, used for prompting the third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity;
[0054] The output module is used to output the actual file corresponding to the output document.
[0055] In order to solve the above technical problems, the present invention further provides a project data processing system, comprising:
[0056] Memory for storing computer programs;
[0057] A processor is used to implement the steps of the above-mentioned project data processing method when executing the computer program.
[0058] In order to solve the above technical problem, the present invention also provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the above project data processing method are implemented.
[0059] The project data processing method provided by the present invention comprises: obtaining a target work breakdown structure template selected by a first user according to a current project, obtaining all positions from the target work breakdown structure template when receiving an instruction sent by the first user for indicating confirmation of the current project, and sending information indicating that a third user is assigned to participate in the current project to a second user related to each position, selecting a target user from the third user when receiving information sent by the second user for indicating completion of the assignment of the third user; sending information indicating the activity of participating in the current project to the third user when detecting that the target user issues an instruction to start the activity; prompting the third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity; and outputting the actual file corresponding to the document.
[0060] The beneficial effects of the present invention are that, in the process of processing project data, by setting a work breakdown structure template, selecting a target work breakdown structure template corresponding to the current project, notifying users related to each position with reference to the position in the target work breakdown structure template to allocate users to participate in the project, and the users performing corresponding operations and editing documents with reference to the workflow corresponding to the activity set in the target work breakdown structure template, the standardization of project process processing is ensured, and the output document edited by the user is output, so that the processing progress of the project activity can be understood through the output document; and, in the method, by sending information representing the allocation of a third user to participate in the current project to a second user related to each position, and when detecting that the target user issues an instruction to start the activity, sending information representing the activity of participating in the current project to the third user, there is no need to ask the position leader offline to allocate specific personnel and to participate in the activity through the personnel, thereby improving the efficiency of project data processing.
[0061] In addition, by creating corresponding work breakdown structure templates for preset scenarios according to each stage of integrated product development, it is ensured as much as possible that each project instance can find the corresponding work breakdown structure template as a reference template in the project data processing process, thereby improving the standardization of project data processing; and the technical review process for integrated product development is divided in detail, thereby improving the quality of project processing.
[0062] By deleting (i.e. trimming) activities in the work breakdown structure template, the template used can be more in line with the actual situation of the project instance, achieving flexible use of the template; and in the process of deleting activities, the target activity is deleted only when it is not the only leaf activity in the tree relationship, so that the activities can be effectively processed.
[0063] By setting the start and end time of the activity, the unified handling of the activities is improved, and the standardization of the activity handling is improved.
[0064] When starting the current activity to be started, if there is a predecessor activity for the current activity to be started, then after the predecessor activity is completed and the final output is confirmed, if it is determined that the current activity to be started is a leaf activity and is a descendant activity of a reusable activity, after copying the reusable activity, manually start the leaf activity; if it is determined that the current activity to be started is a leaf activity and is not a descendant activity of a reusable activity, directly start the leaf activity manually; if it is determined that the current activity to be started is not a leaf activity, the current activity to be started is automatically started after detecting that the leaf activity of the current activity to be started is started. In this method, the activity is judged and started in a corresponding manner, which ensures the standardization of the activity start and ensures that the activity can be started normally.
[0065] By obtaining the sequence relationship between all activities in the current project, the output document of the previous activity is used as the input document of the current activity as a reference for the current activity. After the actual file corresponding to the output document, the operation permission of the output document is updated from read-write mode to read-only mode, that is, only the document is locked to ensure the consistency of the activity output results.
[0066] In addition, the present invention also provides a project data processing device, a project data processing system and a computer-readable storage medium, which have the same or corresponding technical features as the above-mentioned project data processing method and have the same effects as above. BRIEF DESCRIPTION OF THE DRAWINGS
[0067] In order to more clearly illustrate the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0068] Figure 1 A flowchart of a project data processing method provided by an embodiment of the present invention;
[0069] Figure 2 A schematic diagram of a general milestone baseline review process provided by an embodiment of the present invention;
[0070] Figure 3 A schematic diagram of a general collaboration process provided by an embodiment of the present invention;
[0071] Figure 4 A flowchart of a hardware development processing method based on WBS provided in an embodiment of the present invention;
[0072] Figure 5 A schematic diagram of basic attributes of an active template provided by an embodiment of the present invention;
[0073] Figure 6 A structural diagram of a project data processing system provided for another embodiment of the present invention. DETAILED DESCRIPTION
[0074] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0075] The core of the present invention is to provide a project data processing method, device, system and medium to solve the technical problems that the project leader cannot grasp the work progress of each position personnel in real time, the efficiency of project data processing is low and the standardization is poor.
[0076] The server hardware R&D process has the characteristics of a long span of time, involving many positions, a wide range of overlapping positions, and a large number of delivery documents. The specific manifestations are as follows:
[0077] 1. In order to ensure high performance and reliability during the server development process, it is usually necessary to go through the Engineering Verification Test (EVT) stage, the Design Verification Test (DVT) stage, the Production Verification Test (PVT) stage and the Mass Production (MP) stage. It may take a long time from product demand review to final delivery to users.
[0078] 2. The server hardware structure is complex and requires cooperation between personnel in multiple positions to complete it. The positions involved include hardware, testing, heat dissipation, cables, etc.
[0079] 3. To ensure the quality and efficiency of the product development process, the entire IPD technical review process is required. Each review stage involves collaboration and communication between multiple positions, and there is frequent overlap in positions.
[0080] 4. After consensus is reached among personnel in various positions at each stage of the IPD technical review process, a unified and standardized deliverable document is usually formed to provide a reference for the start of the next stage and problem tracing.
[0081] In a product development process that spans a long period and involves many positions, the more detailed the division of R&D tasks and the more complete the documentation, the more reliable the product quality can be guaranteed, and the problems can be discovered as soon as they occur, providing reference for the development of other products in the later stage.
[0082] After receiving the project, the project leader will follow the full IPD technical review process, analyze the positions to be involved in each stage, and ask each position leader to recommend the right person for the position, and pull the people into a group. Then, they will discuss the goals to be completed in this stage through online video and finally form a unified document. The project leader will post the organized document to the group for relevant personnel to download. When the project moves to the next stage, continue to select the right person in charge and repeat the above work.
[0083] Considering the complexity of the server hardware development process, the current technical solution has the following shortcomings:
[0084] 1. The project leader cannot grasp the work progress of each position in real time. Especially when one person is responsible for multiple projects, he needs to pay attention to the progress of each project at all times. The inability to see the progress of the project may cause delays in project tasks.
[0085] 2. The efficiency of offline asking job leaders to assign specific personnel is low. The personnel need to be fed back to the project leader first, and then the project leader will create a related group, which leads to the creation of too many groups and easy confusion.
[0086] 3. The classification of IPD technical review process is controlled by the project leader, which cannot guarantee the standardization of the project process. Moreover, the processes of different projects may be different, and unified management cannot be formed.
[0087] 4. Documents shared in the group cannot guarantee final consistency. Any person in the group can modify the document, and there is no guarantee that the document is the result of the final discussion. Moreover, once the number of documents increases, it will lead to cumbersome searches and errors.
[0088] 5. The lack of detailed IPD process classification leads to reduced efficiency. During the meeting discussion, discussion content that is not related to oneself also needs to be kept online, which reduces the efficiency of developers.
[0089] Therefore, the present invention provides a project data processing method to realize the processing of project data.
[0090] In order to enable those skilled in the art to better understand the solution of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. Figure 1 A flowchart of a project data processing method provided by an embodiment of the present invention is as follows Figure 1 As shown, the method includes:
[0091] S10: Obtaining a target work breakdown structure template selected by the first user according to the current project; wherein the work breakdown structure template at least includes activities related to processing the project instance, workflows corresponding to the activities, input documents, output documents, and positions;
[0092] S11: upon receiving an instruction sent by the first user for indicating confirmation of the current project, obtaining all positions from the target work breakdown structure template, and sending information indicating allocation of a third user to participate in the current project to second users related to each position;
[0093] S12: upon receiving information sent by the second user indicating that the allocation to the third user is completed, selecting a target user from the third users;
[0094] S13: When it is detected that the target user issues an instruction to start the activity, information representing participation in the activity of the current project is sent to the third user;
[0095] S14: prompting the third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity;
[0096] S15: Output the actual file corresponding to the document.
[0097] First, the various users in this method are described. In the process of project processing, the first user refers to the project leader, the second user refers to the position leader, the third user refers to the specific person, and the target user refers to the activity leader.
[0098] There is no limitation on the Work Breakdown Structure (WBS) template to be established. In order to achieve a detailed division of the IPD technical review process and to ensure that each project instance can find the corresponding work breakdown structure template as much as possible. In implementation, the establishment of the work breakdown structure template includes:
[0099] Obtaining a preset scenario; wherein the preset scenario at least includes a system engineering design scenario, a board design scenario, or a firmware development scenario;
[0100] Create corresponding work breakdown structure templates for preset scenarios according to each stage of integrated product development;
[0101] Acquiring a target work breakdown structure template selected by the first user according to the current project includes:
[0102] A target work breakdown structure template selected by a first user from all work breakdown structure templates according to attributes of a current project is obtained.
[0103] Specifically, different workflow templates are set according to the actual operational details of the activity, such as general collaboration process, review conclusion archiving process, general milestone baseline review process, etc. Each template contains different process nodes.
[0104] Figure 2 A schematic diagram of a general milestone baseline review process provided by an embodiment of the present invention is shown as follows: Figure 2 As shown, the process includes initiation, submission, field confirmation, and approval. It ends when the approval is passed. When the approval is rejected, it continues to return to the field confirmation step.
[0105] Figure 3 A schematic diagram of a general collaboration process provided by an embodiment of the present invention, such as Figure 3 As shown, the process includes: starting, review after submission, approval, if the approval is passed, then end, if the approval is rejected, then return to the submission step; after review, if the approval is skipped, then end; after submission, if the review is skipped, then enter the approval, if the approval is passed, then end, if the approval is rejected, then return to the submission step; after submission, if the review and approval are skipped, then end.
[0106] pass Figure 2 The common milestone baseline review process provided realizes the standardization of the common milestone baseline review process and Figure 3 The universal collaboration process provided realizes the standardization of the universal collaboration process; and different workflow templates are set. Due to the different characteristics of different workflows, the process of processing each workflow is more reasonable.
[0107] Due to the complexity of the scenario, a certain stage or an activity in a stage may not be needed in some projects. Therefore, in implementation, after obtaining the target work breakdown structure template selected by the first user according to the current project and before receiving the instruction sent by the first user for characterizing and confirming the current project, the method further includes:
[0108] Get the activities in the current project and the activities in the target work breakdown structure template;
[0109] When it is detected that the target activity belongs to an activity in the target work breakdown structure template and does not belong to an activity in the current project, all activities related to the target activity and the tree relationship formed by all the activities are obtained;
[0110] Determine whether the target activity is the only leaf activity in the tree relationship;
[0111] If not, delete the target activity from the target work breakdown structure template;
[0112] If yes, keep the target work breakdown structure template unchanged.
[0113] In the method provided by the embodiment of the present invention, by deleting (i.e., trimming) the activities in the work breakdown structure template, the used template is made more suitable for the actual situation of the project instance, thereby achieving flexible use of the template; and in the process of deleting activities, the target activity is deleted only when it is not the only leaf activity in the tree relationship, so that the activities can be effectively processed.
[0114] In order to uniformly process the activities, after receiving the instruction sent by the first user for characterizing and confirming the current project and before obtaining all positions from the target work breakdown structure template, the process further includes:
[0115] Get the activity attributes of each activity in the current project; the activity attributes at least include the activity start time, end time and activity completion status;
[0116] Prompting the third user to perform corresponding operations and edit the output document according to the workflow corresponding to the activity includes:
[0117] Prompting the third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity at the activity start time;
[0118] After prompting the third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity, and before outputting the actual file corresponding to the document, the method further includes:
[0119] Get the activity completion status at the end time;
[0120] When it is detected that the activity completion state is the completion state, entering the step of outputting the actual file corresponding to the document;
[0121] When it is detected that the activity completion state is an incomplete state, a prompt message indicating that the activity is incomplete is sent to the user, and the step of outputting an actual file corresponding to the document is entered; the users include at least a first user, a second user and a third user.
[0122] There is no limitation on the prompting method, such as sending an email. In the method provided in this embodiment, by setting the activity start time and end time, the unified processing of activities and the standardization of activity processing are improved.
[0123] In practice, the work breakdown structure template also includes the reusability of predecessor activities and activities. In order to start the current pending activity, you can use the following methods to start it:
[0124] Determine whether there are any predecessor activities for the current activity to be started according to the target work breakdown structure template;
[0125] If it is determined that the current activity to be started has a predecessor activity, then when it is detected that the predecessor activity of the current activity to be started is completed and the final output is confirmed, it is determined whether the current activity to be started is a leaf activity according to the tree relationship;
[0126] If it is determined that the current activity to be started does not have a preceding activity, then proceed to the step of determining whether the current activity to be started is a leaf activity based on the tree relationship;
[0127] If it is determined that the current activity to be started is a leaf activity, and if it is determined according to the target work breakdown structure template that the current activity to be started is a descendant activity of a reusable activity, after copying the reusable activity, a command for indicating manual start of the current activity to be started is sent to the target user; if it is determined according to the target work breakdown structure template that the current activity to be started is not a descendant activity of the reusable activity, the step of sending a command for indicating manual start of the current activity to be started to the target user is entered;
[0128] If it is determined that the current activity to be started is not a leaf activity, the current activity to be started is automatically started after it is detected that the leaf activity of the current activity to be started is started.
[0129] In the method provided in this embodiment, by judging the activity and starting the activity in a corresponding manner, the standardization of the activity start-up is ensured and the activity can be started normally.
[0130] In addition, prompting the third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity includes:
[0131] Get the sequence relationship between all activities in the current project;
[0132] Determine whether there is an activity before the current activity based on the sequence relationship;
[0133] If so, obtaining the output document of the activity before the current activity, using the output document of the activity before the current activity as the input document of the current activity, prompting the third user to perform corresponding operations according to the workflow corresponding to the activity and to edit the content of the output document with reference to the input document;
[0134] If not, then specify the preset document as the input document of the current activity, and proceed to the step of prompting the third user to perform corresponding operations according to the workflow corresponding to the activity and edit the content of the output document with reference to the input document.
[0135] After the actual files corresponding to the output documents, it also includes:
[0136] Prompt the target user to update the operation permission of the output document from read-write mode to read-only mode;
[0137] submitting the actual document to the fourth user so that the fourth user can review the actual document;
[0138] When the prompt information indicating that the review is completed is received from the fourth user, the activity status is modified to a completed status.
[0139] The fourth user refers to the reviewer. In the method provided in this embodiment, by obtaining the sequence relationship between all activities in the current project, the output document of the previous activity is used as the input document of the current activity as a reference for the current activity, and after the actual file corresponding to the output document, the operation permission of the output document is updated from the read-write mode to the read-only mode, that is, only the document is locked to ensure the consistency of the output results of the activity.
[0140] In order to enable those skilled in the art to better understand the solution of the present invention, the overall technical solution of the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0141] Figure 4 A flowchart of a hardware development processing method based on WBS provided by an embodiment of the present invention is shown in FIG. Figure 4 As shown, the method includes:
[0142] S16: Define various workflow templates that are suitable for the server hardware R&D field;
[0143] S17: Define different work breakdown structure templates for various hardware R&D areas;
[0144] S18: Create a project instance and select a work breakdown structure template corresponding to the project instance;
[0145] S19: Project confirmation, forming the personnel required for the project according to the job information;
[0146] S20: The project leader designates specific persons in charge of the activity and selects participants;
[0147] S21: The activity leader starts the activity;
[0148] S22: Output document association actual file;
[0149] S23: The output document is locked and reviewed and confirmed.
[0150] For step S16, different workflow templates are set according to the actual operational details of the activity, such as general collaboration process, review conclusion archiving process, general milestone baseline review process, etc. Each template contains different process nodes, as mentioned above. Figure 2 The generic milestone baseline review process shown and Figure 3 The general collaboration process shown.
[0151] For step S17: create different WBS templates according to different scenarios such as system engineering design, board design, firmware development, etc. For template activities: specify the responsible person position, participating positions, related specific workflows, workflow approval personnel positions, workflow review personnel positions, pre-activity, input document type, output document type, whether it can be reused, and other attributes. Figure 5 A schematic diagram of basic attributes of an active template provided by an embodiment of the present invention. Figure 5 As shown, only one basic attribute, Technical Review (TR), is listed, and “-” means none. In practice, corresponding basic attributes can be set for each stage (TR1 to TR6) of the IPD technology. It should be noted in step S17 that:
[0152] [1] When the template is defined, the activity is not bound to a specific person. The positions involved in the activity are used as the connection. When the project activity is started, the positions are then associated with specific people.
[0153] [2] When the template is defined, it is already known what type of document a certain activity needs as a reference, or what type of document is needed as an output. Therefore, the document of this type is associated in the activity, but the specific content of the document does not exist at this time. It is only associated with a specific file according to the document type when the project activity is started.
[0154] [3] There is a parent-child relationship among multi-level activities, and only the leaf activities at the bottom level are associated with specific workflows.
[0155] 【4】Ensure the uniqueness of the output document in the activity, that is, the output document of one activity cannot be used as the output document of another activity.
[0156] In step S18, the project leader creates a project instance, specifies project-related attributes, and selects an existing WBS template. The activities in the existing template can be tailored according to the situation, and the project is confirmed after confirming that there are no problems. It should be noted in step S18 that:
[0157] [1] After the project is confirmed, additional necessary attributes will be added to the activity, such as the start time, expected end time, activity workflow execution node, activity completion status, specific person in charge and specific participants of the activity, etc.
[0158] [2] During the activity pruning process, it must be ensured that there is at least one leaf activity under the sub-activity of the activity. Not all leaf activities can be deleted.
[0159] For step S19, after the project is confirmed, the team is formed. The background automatically obtains all positions and sends email notifications to the leaders of these positions. The leaders of each position assign specific personnel to participate in the project. It is important to note in step S19 that:
[0160] 【1】The personnel of each position can be changed later;
[0161] [2] Multiple specific people can be assigned to a certain position to cope with the situation where the same position plays different roles in multiple activities.
[0162] In step S20, the project leader assigns the activity to a specific person in charge. The project leader selects a person from the assigned personnel under the activity leader position as the actual person in charge of the activity. Later, the person in charge will have multiple execution permissions for the activity, such as starting the activity, downward execution of workflow nodes, document confirmation and locking, and screening of position personnel.
[0163] In step S21, the activity leader starts the activity. After the activity starts, all relevant personnel are notified by email to participate. It should be noted in step S21 that:
[0164] [1] Before launching an activity, the person in charge needs to select suitable personnel from multiple positions to participate in the activity.
[0165] [2] Before starting an activity, you must specify an estimated end time to ensure that if the activity is not completed by the end time, relevant personnel can be informed in a timely manner.
[0166] [3] Only leaf activities can be started manually. Non-leaf activities will be started automatically after their descendant leaf activities are started.
[0167] [4] If a leaf activity is a descendant activity of a reusable activity, the activity must be copied before it can be started normally.
[0168] [5] If an activity has a predecessor activity, the activity must wait until all its predecessor activities are completed before it can start normally.
[0169] For step S22 and step S23, after the activity is launched, all relevant personnel participate and reach a final consensus document through discussion. The activity leader checks the document and locks it, and the document becomes read-only later. After locking, it is submitted for review and approval. After the review is completed, the activity is automatically changed to the completed status. It is worth noting that:
[0170] 【1】If the document does not meet the review requirements and is rejected, the document will be modified back to read-write mode.
[0171] 【2】Each document type corresponds to an actual file, and the files can be modified and viewed online.
[0172] [3] Auditors must carefully check the documents to avoid problems caused by errors in the documents themselves after the project goes into production.
[0173] It can be seen that the WBS concept is introduced in the embodiment of the present invention to divide the IPD process in the server hardware R&D field in more detail. This method can achieve:
[0174] 1. Analyze the company's actual scenarios and decompose them into multiple usage scenarios, define the process of each scenario in detail, form a standardized process plan for each scenario, and define it as a WBS template. In the later project definition, the fixed template is referenced to force the project development process to follow fixed standards, which is convenient for later management, error checking and process standardization approval.
[0175] 2. Each IPD process is divided into multiple multi-level activities. Each activity (including the project itself) is assigned a person in charge (1) and participants (multiple). Participants do not need to care about activities that are not related to them at the same stage. The person in charge is responsible for the final deliverables and process flow of this activity. Participants edit and negotiate the deliverable documents related to this activity.
[0176] 3. The activity specifies the start time. Setting the start time is used to remind the participants of the activity to participate in the activity in time. Setting the end time is used to remind all personnel to complete their work as soon as possible before the end of the activity. If the activity cannot be completed on time due to actual conditions, it can provide a reference for the next time setting.
[0177] 4. Each leaf activity specifies the input and output documents of the current activity. The input document is generated by the output documents of other activities and is used as a reference for the current activity. The output document is the final output of the current activity and is checked by the activity leader. Once the activity is completed, it is locked and cannot be modified to ensure the consistency of the activity output results.
[0178] 5. You can mark the relationship between an activity and other activities to indicate whether multiple activities have a sequential relationship. If a specified activity is a predecessor activity of one or more other activities, you must ensure that the activity has been completed and the final output has been confirmed before you can start other related activities.
[0179] 6. Due to the complexity of the scenario, a certain stage or an activity in a stage may not be needed in some projects. This patent allows the project leader to tailor the existing activities in the template when the project is created to achieve flexible use of the template.
[0180] 7. In the actual development process, it may be necessary to repeat the activities and their sub-activities in the project for many times. This patent also allows the activity reusability attribute to be specified for a certain activity. During the actual operation, the person in charge of the activity specifies whether to copy it. Each copy requires the management and output of the copied subsequent sub-activities. By ensuring that the output results of each activity process are reviewed and approved, the errors in the development process are reduced. Early detection of errors ensures the quality of research and development and can effectively reduce research and development costs.
[0181] In the above embodiments, the project data processing method is described in detail, and the present invention also provides corresponding embodiments of the project data processing device and the project data processing system. It should be noted that the present invention describes the embodiments of the device part from two perspectives, one is based on the functional module perspective, and the other is based on the hardware perspective.
[0182] An embodiment of the present invention provides a project data processing device, based on the perspective of functional modules, including:
[0183] An acquisition module, used to acquire a target work breakdown structure template selected by the first user according to the current project; wherein the work breakdown structure template at least includes activities related to processing project instances, workflows corresponding to the activities, input documents, output documents and positions;
[0184] an acquisition and sending module, configured to acquire all positions from the target work breakdown structure template upon receiving an instruction sent by the first user for indicating confirmation of the current project, and to send information indicating allocation of a third user to participate in the current project to the second user associated with each position;
[0185] A receiving and selecting module, configured to select a target user from the third users upon receiving information sent by the second user indicating that the allocation to the third user is completed;
[0186] A detection and sending module, configured to send information representing participation in the activity of the current project to a third user when detecting that the target user has issued an instruction to start the activity;
[0187] A prompting module, used to prompt a third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity;
[0188] The output module is used to output the actual files corresponding to the document.
[0189] In some embodiments, the project data processing device further comprises:
[0190] A first acquisition module is used to acquire activities in the current project and activities in the target work breakdown structure template;
[0191] A second acquisition module is used to acquire all activities related to the target activity and the tree relationship formed by all activities when it is detected that the target activity belongs to the activity in the target work breakdown structure template and does not belong to the activity in the current project;
[0192] The judgment module is used to judge whether the target activity is the only leaf activity in the tree relationship; if not, the deletion module is triggered; if so, the retention module is triggered;
[0193] Delete module, used to delete target activities from the target work breakdown structure template;
[0194] Maintain module, used to keep the target work breakdown structure template unchanged.
[0195] In some embodiments, the project data processing device further comprises:
[0196] The third acquisition module is used to acquire the activity attributes of each activity in the current project; wherein the activity attributes at least include the activity start time, end time and activity completion status.
[0197] Since the embodiments of the apparatus part correspond to the embodiments of the method part, please refer to the description of the embodiments of the method part for the embodiments of the apparatus part, which will not be repeated here.
[0198] Figure 6 This is a structural diagram of a project data processing system provided by another embodiment of the present invention. This embodiment is based on the hardware perspective, such as Figure 6 As shown, the project data processing system includes:
[0199] A memory 20, used for storing computer programs;
[0200] The processor 21 is used to implement the steps of the project data processing method mentioned in the above embodiment when executing the computer program.
[0201] Among them, the processor 21 may include one or more processing cores, such as a 4-core processor, an 8-core processor, etc. The processor 21 can be implemented in at least one hardware form of a digital signal processor (DSP), a field-programmable gate array (FPGA), and a programmable logic array (PLA). The processor 21 may also include a main processor and a coprocessor. The main processor is a processor for processing data in the awake state, also known as a central processing unit (CPU); the coprocessor is a low-power processor for processing data in the standby state. In some embodiments, the processor 21 may be integrated with a graphics processing unit (GPU), which is responsible for rendering and drawing the content to be displayed on the display screen. In some embodiments, the processor 21 may also include an artificial intelligence (AI) processor, which is used to process computing operations related to machine learning.
[0202] The memory 20 may include one or more computer-readable storage media, which may be non-transitory. The memory 20 may also include a high-speed random access memory, and a non-volatile memory, such as one or more disk storage devices, flash memory storage devices. In this embodiment, the memory 20 is at least used to store the following computer program 201, wherein, after the computer program is loaded and executed by the processor 21, it can implement the relevant steps of the project data processing method disclosed in any of the aforementioned embodiments. In addition, the resources stored in the memory 20 may also include an operating system 202 and data 203, etc., and the storage method may be temporary storage or permanent storage. Among them, the operating system 202 may include Windows, Unix, Linux, etc. The data 203 may include, but is not limited to, the data involved in the project data processing method mentioned above, etc.
[0203] In some embodiments, the project data processing system may further include a display screen 22 , an input / output interface 23 , a communication interface 24 , a power supply 25 , and a communication bus 26 .
[0204] Those skilled in the art will understand that Figure 6 The structure shown in the figure does not constitute a limitation of the project data processing system, and may include more or fewer components than shown in the figure.
[0205] The project data processing system provided by the embodiment of the present invention includes a memory and a processor. When the processor executes the program stored in the memory, it can implement the following method: the project data processing method, the effect is the same as above.
[0206] An embodiment of the present invention further provides a computer program product, including a computer program / instruction, which implements the steps of the above-mentioned project data processing method when executed by a processor.
[0207] Finally, the present invention also provides an embodiment corresponding to a computer-readable storage medium. The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps recorded in the above method embodiment are implemented.
[0208] It is understandable that if the method in the above embodiment is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium to execute all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk, etc. Various media that can store program codes.
[0209] The computer-readable storage medium provided by the present invention includes the above-mentioned project data processing method, and the effect is the same as above.
[0210] The above is a detailed introduction to a project data processing method, device, system and medium provided by the present invention. The various embodiments in the specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same and similar parts between the embodiments can be referenced to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description. It should be pointed out that for ordinary technicians in this technical field, without departing from the principle of the present invention, the present invention can also be improved and modified in a number of ways, and these improvements and modifications also fall within the scope of protection of the present invention.
[0211] It should also be noted that, in this specification, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "comprise", "include" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the statement "comprises a ..." does not exclude the presence of other identical elements in the process, method, article or device including the element.
Claims
1. A project data processing method, It is characterized in that include: Acquire a target work breakdown structure template selected by the first user according to the current project; wherein the work breakdown structure template at least includes activities related to processing the project instance, workflows corresponding to the activities, input documents, output documents and positions; Upon receiving an instruction sent by the first user for indicating confirmation of the current project, obtaining all positions from the target work breakdown structure template, and sending information indicating allocation of a third user to participate in the current project to second users associated with each of the positions; upon receiving information sent by the second user indicating that the assignment of the third user is completed, selecting a target user from the third users; In the case where it is detected that the target user issues an instruction to start the activity, sending information representing participation in the activity of the current project to the third user; Prompting the third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity; Output the actual file corresponding to the output document.
2. The project data processing method according to claim 1, It is characterized in that The work breakdown structure template includes: Obtaining a preset scenario; wherein the preset scenario at least includes a system engineering design scenario, a board design scenario, or a firmware development scenario; Creating corresponding work breakdown structure templates for the preset scenarios according to each stage in integrated product development; The obtaining of the target work breakdown structure template selected by the first user according to the current project includes: The target work breakdown structure template selected by the first user from all work breakdown structure templates according to the attribute of the current project is obtained.
3. The project data processing method according to claim 1, It is characterized in that After acquiring the target work breakdown structure template selected by the first user according to the current project and before receiving the instruction sent by the first user for characterizing and confirming the current project, the method further includes: Acquire activities in the current project and activities in the target work breakdown structure template; When it is detected that the target activity belongs to an activity in the target work breakdown structure template and does not belong to an activity in the current project, all activities related to the target activity and the tree relationship formed by all activities are obtained; Determine whether the target activity is the only leaf activity in the tree relationship; If not, deleting the target activity from the target work breakdown structure template; If so, keep the target work breakdown structure template unchanged.
4. The project data processing method according to claim 3, It is characterized in that After receiving the instruction sent by the first user for characterizing and confirming the current project, and before acquiring all positions from the target work breakdown structure template, the method further includes: Obtaining activity attributes of each activity in the current project; wherein the activity attributes at least include the activity start time, end time and activity completion status; The prompting the third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity includes: Prompting the third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity at the time of the activity start; After prompting the third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity and before outputting the actual file corresponding to the output document, the method further includes: Get the completion status of the activity at the end time; When it is detected that the activity completion state is the completion state, entering the step of outputting the actual file corresponding to the output document; When it is detected that the activity completion state is an incomplete state, a prompt message indicating that the activity is incomplete is sent to the user, and the step of outputting the actual file corresponding to the output document is entered; the users include at least the first user, the second user and the third user.
5. The project data processing method according to claim 4, It is characterized in that The work breakdown structure template also includes the reusability of predecessor activities and activities; The methods for starting the current pending activity include: Determining whether the current activity to be started has a predecessor activity according to the target work breakdown structure template; If it is determined that the current activity to be started has a predecessor activity, then upon detecting that the predecessor activity of the current activity to be started is completed and the final output is confirmed, determining whether the current activity to be started is a leaf activity according to the tree relationship; If it is determined that the current activity to be started does not have a preceding activity, then entering the step of determining whether the current activity to be started is a leaf activity according to the tree relationship; If it is determined that the current activity to be started is a leaf activity, and in the case that the current activity to be started is determined to be a descendant activity of a reusable activity according to the target work breakdown structure template, after copying the reusable activity, a command for indicating manual start of the current activity to be started is sent to the target user; if it is determined that the current activity to be started is not a descendant activity of a reusable activity according to the target work breakdown structure template, the step of sending a command for indicating manual start of the current activity to be started to the target user is performed; If it is determined that the current activity to be started is not a leaf activity, the current activity to be started is automatically started after it is detected that a leaf activity of the current activity to be started is started.
6. The project data processing method according to any one of claims 1 to 5, It is characterized in that The prompting the third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity includes: Get the sequence relationship between all activities in the current project; Determine whether there is an activity before the current activity according to the sequence relationship; If yes, obtaining the output document of the activity before the current activity, using the output document of the activity before the current activity as the input document of the current activity, prompting the third user to perform corresponding operations according to the workflow corresponding to the activity and to edit the content of the output document with reference to the input document; If not, a preset document is designated as the input document of the current activity, and the step of prompting the third user to perform corresponding operations according to the workflow corresponding to the activity and to edit the content of the output document with reference to the input document is entered.
7. The project data processing method according to claim 6, It is characterized in that After outputting the actual file corresponding to the output document, the method further includes: Prompt the target user to update the operation authority of the output document from read-write mode to read-only mode; Submitting the actual document to a fourth user so that the fourth user can review the actual document; When the prompt information indicating that the review is completed is received from the fourth user, the activity status is modified to a completed status.
8. A project data processing device, It is characterized in that include: An acquisition module, used to acquire a target work breakdown structure template selected by the first user according to the current project; wherein the work breakdown structure template at least includes activities related to processing project instances, workflows corresponding to the activities, input documents, output documents and positions; an acquisition and sending module, configured to, upon receiving an instruction sent by a first user to indicate confirmation of the current project, acquire all positions from the target work breakdown structure template, and send information indicating allocation of a third user to participate in the current project to second users associated with each of the positions; a receiving and selecting module, configured to select a target user from the third users upon receiving information sent by the second user indicating that the third user has been assigned; A detection and sending module, configured to send information representing participation in the activity of the current project to the third user when detecting that the target user issues an instruction to start the activity; A prompting module, used for prompting the third user to perform corresponding operations and edit the content of the output document according to the workflow corresponding to the activity; The output module is used to output the actual file corresponding to the output document.
9. A project data processing system, It is characterized in that include: Memory for storing computer programs; A processor, configured to implement the steps of the project data processing method as described in any one of claims 1 to 7 when executing the computer program.
10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the project data processing method according to any one of claims 1 to 7 are implemented.