Substation operation auxiliary decision-making method, system and equipment

By collecting multi-source information and performing logical analysis, we automatically judge the substation environment and equipment status, and optimizing personnel and equipment configuration, we solve the burden and safety hazards of manual verification by substation operation and maintenance personnel, and realize the lean management and safe and stable operation of the substation .

CN118967090APending Publication Date: 2024-11-15JINAN LICHENG POWER SUPPLY CO OF STATE GRID SHANDONG ELECTRIC POWER CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410959573.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

Substation operation and maintenance personnel need to manually check the equipment status and environment when performing operations, resulting in an increase in operating burden. The existing monitoring system can only issue alarms and cannot make automatic decisions, which poses safety hazards.

Method used

A substation operation assisted decision-making method is adopted to determine whether the environment and equipment meet operating conditions by receiving tasks and collecting environmental information, electrical equipment status, safety tool information, personnel information and geographical location information, and to determine whether the environment and equipment meet operating conditions, optimize the selection of personnel and driving paths to ensure that Perform an operation when the condition is met.

Benefits of technology

It improves the status perception capability of substation equipment, realizes automatic decision-making and lean management, reduces the need for manual verification, and ensures the safe and stable operation of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118967090A_ABST
    Figure CN118967090A_ABST
Patent Text Reader

Abstract

The invention provides an auxiliary decision-making method, system and equipment for substation operation. The method comprises the following steps: receiving a substation operation task; acquiring substation environment information, electrical equipment state information, safety tool information, personnel information and geographical location information according to the received substation operation task; judging whether the substation environment is normal according to the substation environment information; judging whether the position of the electrical equipment accords with five-prevention logic or not and meets operation conditions or not according to the state information of the electrical equipment; the types and the number of needed tools are judged according to the safety tool information; and according to the personnel information and the geographical location information, optimizing the selected personnel and a driving path. And when the substation environment is normal, the electrical equipment state is normal, and the tools and the personnel meet the preset requirements, executing substation operation. Based on the method, the invention also provides a substation operation auxiliary decision-making system and equipment. Lean management of the substation equipment is realized, and safe and stable operation of the equipment is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of substation operation, and in particular relates to a substation operation auxiliary decision-making method, system and equipment. Background Art

[0002] With the rapid development of power grids, the operation and maintenance tasks of the power industry are becoming more and more serious, and the workload and difficulty of substation operation and maintenance personnel have increased significantly. In order to reduce the workload of personnel and improve the safe and stable operation of substation equipment, it is urgent to design a substation operation auxiliary decision-making method that can improve the state perception ability of substation equipment and realize the lean management of substation equipment.

[0003] In the daily operation of the substation, it is mainly up to the substation operation and maintenance personnel to determine whether the environment is abnormal, decide the number and type of safety tools required, and perform operations according to the operating steps. There is only an online monitoring function for the status of electrical equipment and the corresponding locking logic. In the "Remote Intelligent Online Temperature Measurement System for Power Equipment Based on Ubiquitous Power Internet of Things" disclosed in Chinese Patent 202210370244.3, it includes an online temperature measurement perception layer, a network transmission layer, and an application intelligent decision-making center layer to achieve wired and wireless two-phase connection. The temperature detected by the power equipment is compared and identified twice to achieve the purpose of completely avoiding false alarms. However, when the substation currently performs relevant switching operations, it is necessary to manually check the equipment status and the environment in advance, and the operator decides on the required safety tools and inspects the safety tools. The existing monitoring system can only issue alarms for monitoring the environment and equipment. Summary of the invention

[0004] In order to solve the above technical problems, the present invention proposes a substation operation decision-making assistance method, system and device to improve the state perception capability of substation equipment, realize lean management of substation equipment, assist operation and maintenance personnel in decision-making and operation, and eliminate safety hazards.

[0005] To achieve the above object, the present invention adopts the following technical solutions:

[0006] A substation operation auxiliary decision method comprises the following steps:

[0007] A substation operation auxiliary decision method, characterized in that it comprises the following steps:

[0008] Receiving a substation operation task; collecting substation environment information, electrical equipment status information, safety tool information, personnel information and geographic location information according to the received substation operation task;

[0009] Determine whether the substation environment is normal based on the substation environment information; determine whether the location of the electrical equipment complies with the five-defense logic and whether it meets the operating conditions based on the electrical equipment status information; determine the type and quantity of tools required based on the safety tool information; and optimize the selection of personnel and driving routes based on personnel information and geographic location information;

[0010] When the substation environment is normal, the electrical equipment is in normal condition, and the tools and personnel meet the preset requirements, perform substation operations.

[0011] Furthermore, the substation environmental information includes ambient temperature, ambient humidity, infrared and GIS gas chamber SF6 gas density.

[0012] Furthermore, the electrical equipment status information includes the circuit breaker opening and closing positions, the disconnector opening and closing positions and the earthing switch opening and closing positions of different electrical equipment.

[0013] Furthermore, the safety tools include a safety helmet, insulating gloves, an operating rod, a grounding gun and a tester;

[0014] The personnel information includes personnel skill level and familiarity with different substations;

[0015] The geographic location information includes the warehouse where the safety tools are located and the real-time location information of the personnel.

[0016] Further, judging whether the substation environment is normal according to the substation environment information specifically includes:

[0017] If it is judged that the ambient temperature and humidity of the substation are normal, and there is no infrared discharge and SF6 gas leakage, then the substation environment is normal and substation operations can be performed;

[0018] If it is judged that the ambient temperature or humidity of the substation is abnormal, but no infrared discharge or SF6 gas leakage occurs, ventilation or dehumidification work can still be performed, and the substation operation can still be performed;

[0019] If it is determined that infrared discharge or SF6 gas leakage has occurred, the operating equipment will be locked and an alarm will be sounded, and no operation will be allowed.

[0020] Furthermore, judging whether the position of the electrical equipment complies with the five-protection logic and whether the operation conditions are met based on the electrical equipment status information specifically includes: using electrical equipment sensors to respectively obtain the circuit breaker opening and closing positions, disconnector opening and closing positions and earthing switch positions of the operated equipment and related equipment, and respectively judging whether the circuit breaker opening and closing positions, disconnector opening and closing positions and earthing switch opening and closing positions are located at corresponding positions; if they are all located at corresponding positions and meet the five-protection logic, substation operation can be performed; otherwise, the operating equipment is locked and an alarm is issued, and no operation is allowed.

[0021] Furthermore, determining the required tool type and quantity based on the safety tool information; and optimizing the selection of personnel and driving routes based on personnel information and geographic location information include: determining the required tool type and quantity through operators, and obtaining safety tool information in different warehouses through safety tool sensors; if the tools in the warehouse meet the required tool type and quantity, substation operation can be performed; if not, the substation operation task is updated.

[0022] Furthermore, the process of optimizing the selection of personnel includes: grading the operation tasks according to the difficulty of the operation tasks, and allocating the operation workers according to the grades of the operation tasks on the basis of satisfying the operation requirements;

[0023] The process of optimizing the driving route includes: optimizing the shortest path from the operation and maintenance center to the warehouse and then to the substation, and from the substation back to the warehouse and then back to the operation and maintenance center.

[0024] The present invention also proposes a substation operation auxiliary decision system, comprising: an acquisition module, a judgment module and a decision module;

[0025] The acquisition module is used to receive the substation operation task; according to the received substation operation task, collect substation environment information, electrical equipment status information, safety tool information, personnel information and geographical location information;

[0026] The judgment module is used to judge whether the substation environment is normal according to the substation environment information; judge whether the location of the electrical equipment complies with the five-defense logic and whether it meets the operating conditions according to the electrical equipment status information; judge the type and quantity of the required tools according to the safety tool information; and optimize the selection of personnel and driving routes according to the personnel information and geographic location information;

[0027] The decision module is used to execute substation operations when the substation environment is normal, the electrical equipment is in normal status, and the tools and personnel meet the preset requirements.

[0028] The present invention also proposes a substation operation decision-making auxiliary device, comprising:

[0029] Memory for storing computer programs;

[0030] A processor is used to implement the method steps described when executing the computer program.

[0031] The effects provided in the content of the invention are only the effects of the embodiments, not all the effects of the invention. One of the above technical solutions has the following advantages or beneficial effects:

[0032] The present invention proposes a substation operation auxiliary decision method, system and equipment, which includes the following steps: receiving a substation operation task; collecting substation environment information, electrical equipment status information, safety tool information, personnel information and geographic location information according to the received substation operation task; judging whether the substation environment is normal according to the substation environment information; judging whether the electrical equipment location conforms to the five-defense logic and whether it meets the operation conditions according to the electrical equipment status information; judging the required tool type and quantity according to the safety tool information; and optimizing the selection of personnel and driving path according to the personnel information and geographic location information; when the substation environment is normal, the electrical equipment status is normal, and the tools and personnel meet the preset requirements, the substation operation is performed. Based on a substation operation auxiliary decision method, a substation operation auxiliary decision system and equipment are also proposed. The present invention integrates multi-source information, improves the state perception ability of substation equipment, realizes online monitoring of substations, assists operation and maintenance personnel in operation judgment through logical analysis, ensures that the environment, tools and equipment status meet the operation requirements, and the operation steps are correct, so as to realize the lean management of substation equipment and ensure the safe and stable operation of equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 A flow chart of a substation operation auxiliary decision-making method proposed in Embodiment 1 of the present invention;

[0034] Figure 2 This is a diagram of an implementation architecture of a substation operation auxiliary decision-making method proposed in Embodiment 1 of the present invention;

[0035] Figure 3 A schematic diagram of a substation operation auxiliary decision system proposed in Embodiment 2 of the present invention;

[0036] Figure 4 This is a schematic diagram of a substation operation decision support device proposed in Example 3 of the present invention. DETAILED DESCRIPTION

[0037] In order to clearly illustrate the technical features of the present solution, the present invention is described in detail below through specific implementation methods and in conjunction with the accompanying drawings. The disclosure below provides many different embodiments or examples for realizing different structures of the present invention. In order to simplify the disclosure of the present invention, the components and settings of specific examples are described below. In addition, the present invention may repeat reference numbers and / or letters in different examples. This repetition is for the purpose of simplification and clarity, and does not itself indicate the relationship between the various embodiments and / or settings discussed. It should be noted that the components illustrated in the accompanying drawings are not necessarily drawn to scale. The present invention omits the description of known components and processing techniques and processes to avoid unnecessary limitations on the present invention.

[0038] Example 1

[0039] Embodiment 1 of the present invention proposes a substation operation auxiliary decision method for solving the technical problems existing in the substation operation in the prior art. Figure 1 This is a flow chart of a substation operation auxiliary decision-making method proposed in Example 1 of the present invention.

[0040] In step S100, the process starts.

[0041] In step S101 , a substation operation task is received.

[0042] In step S102, after receiving the substation operation task, the operation process is optimized.

[0043] In step S103, the substation environmental information is collected. In the present application, the environmental factor sensing array can obtain information such as ambient temperature, ambient humidity, infrared and SF6 gas density of the GIS gas chamber.

[0044] In step S104, after the substation environment information is collected, it is transmitted to the decision-making unit through the network.

[0045] In step S105, the decision unit makes a level judgment based on the transmitted substation environmental information. In this application, if it is judged that the temperature and humidity of the substation are normal, and no infrared discharge and SF6 gas leakage occur, the substation environment is judged to be normal, and substation operations can be performed; if it is judged that the temperature or humidity of the substation is abnormal, but no infrared discharge and SF6 gas leakage occur, ventilation or dehumidification work is performed, and substation operations can still be performed; if it is judged that infrared discharge or SF6 gas leakage occurs, the operating equipment is locked and an alarm is issued, and no operation is allowed. Environmental factors are judged into three levels: normal, general and dangerous.

[0046] In step S106, if the environmental factor is judged to be dangerous, that is, SF6 gas leakage occurs, infrared discharge is detected.

[0047] In step S107, the operating device is locked and an alarm is sounded, and no operation is allowed.

[0048] In step S108, if the environmental factor is judged to be normal, it is determined that the temperature or humidity of the substation is abnormal, but infrared discharge and SF6 gas leakage do not occur.

[0049] In step S109, the corresponding auxiliary facility contacts are opened to perform ventilation or dehumidification.

[0050] In step S110, if the environmental factors are judged to be normal, that is, the temperature and humidity of the substation are normal and no infrared discharge and SF6 gas leakage occur, the operation can be performed and step S114 is executed.

[0051] In step S111, electrical equipment status information is collected, and the electrical equipment status information includes the opening and closing positions of the circuit breaker, the opening and closing positions of the disconnector, and the opening and closing positions of the earthing switch.

[0052] In step S112, after the electrical equipment status information is collected, it is transmitted to the decision-making unit through the network.

[0053] In step S113, electrical equipment sensors are used to obtain the circuit breaker open / close position, the disconnector open / close position and the earthing switch position respectively, and it is determined whether the circuit breaker open / close position, the disconnector open / close position and the earthing switch open / close position are in corresponding positions respectively. If they are all in corresponding positions and meet the five-protection logic, step S114 is executed, otherwise step S120 is executed.

[0054] In step S114, substation operation is performed;

[0055] In step S115, safety tool information is collected. The safety tool sensor collects safety tool information from each safety tool library, as well as safety tool information, personnel information and geographic location information.

[0056] In step S116, after the safety tool information is collected, it is transmitted to the decision-making unit through the network.

[0057] In step S117, the safety tool information is obtained through the safety tool sensor, the type and quantity of the required tools are determined, and the driving route is optimized. The shortest path from the operation and maintenance center to the warehouse and then to the substation, and from the substation back to the warehouse and then back to the operation and maintenance center is optimized.

[0058] In this application, the operator determines the type and quantity of tools required, and obtains the information of safety tools in different warehouses through the safety tool sensor; if the tools in the warehouse meet the required tool type and quantity, the substation operation can be performed; if not, the substation operation task is updated.

[0059] According to the difficulty of the operation tasks, the operation tasks are graded and the operators are assigned according to the level of the operation tasks on the basis of meeting the operation requirements;

[0060] The process of optimizing the driving route includes: optimizing the shortest path from the operation and maintenance center to the warehouse and then to the substation, and from the substation back to the warehouse and then back to the operation and maintenance center.

[0061] In step S118, it is determined whether the tools in the warehouse meet the required tool types and quantities. If so, step S114 is executed, otherwise, it returns to step S102.

[0062] In step S119, it is determined whether the operation step is correct, if it is correct, step S120 is executed, otherwise, step S121 is executed.

[0063] In step S120, the operating device is locked and an alarm is sounded, and no operation is allowed.

[0064] In step S121, the process ends.

[0065] Figure 2 This is an architecture diagram for implementing a substation operation auxiliary decision-making method proposed in Example 1 of the present invention; the main architecture of the system in this application is divided into: perception layer, network layer, decision layer, and interaction layer.

[0066] In the perception layer, the environmental factor perception array can obtain information such as temperature, humidity, infrared, sound, and SF6 gas density in the GIS gas chamber. The electrical equipment sensors can obtain information such as the open and close positions of circuit breakers, isolating switches, and grounding switches, and the main transformer on-load tap changer joints. The safety tool sensors collect safety tool information from each safety tool library.

[0067] The substation environmental information includes ambient temperature, ambient humidity, infrared and GIS gas chamber SF6 gas density.

[0068] Safety tools include hard hats, insulating gloves, operating rods, grounding guns and testers;

[0069] Personnel information includes personnel skill levels and familiarity with different substations;

[0070] Geographic location information includes the warehouse where the safety tools are located and the real-time location information of the personnel

[0071] The network layer includes signal acquisition, conversion, transmission and uploading through protocols to meet the data transmission needs within the substation, ensuring confidentiality and timeliness.

[0072] In the decision-making layer, the substation environment information is used to determine whether the substation environment is normal; the electrical equipment status information is used to determine whether the electrical equipment is located at the corresponding position and whether the electrical equipment meets the five-defense logic; and the type and quantity of the required tools are determined based on the safety tool information, and the driving route is optimized;

[0073] The interactive layer can realize functions such as online monitoring of comprehensive information of substations, delegating operation tasks, viewing alarm information and simulation drills.

[0074] A substation operation decision-making assistance method proposed in Example 1 of the present invention integrates multi-source information, improves the ability to perceive the status of substation equipment, realizes online monitoring of the substation, and assists operation and maintenance personnel in making operational judgments through logical analysis, ensuring that the environment, tools and equipment status meet the operational requirements and that the operating steps are correct, thereby realizing lean management of substation equipment and ensuring safe and stable operation of the equipment.

[0075] Example 2

[0076] Based on the substation operation auxiliary decision method proposed in Embodiment 1 of the present invention, Embodiment 2 of the present invention further proposes a substation operation auxiliary decision system. Figure 3 A schematic diagram of a substation operation auxiliary decision system proposed in Embodiment 2 of the present invention; the system comprises: an acquisition module, a judgment module and a decision module;

[0077] The acquisition module is used to receive the substation operation task; according to the received substation operation task, collect the substation environment information, electrical equipment status information, safety tool information, personnel information and geographical location information;

[0078] The judgment module is used to judge whether the substation environment is normal according to the substation environment information; judge whether the location of the electrical equipment complies with the five-defense logic and whether it meets the operating conditions according to the electrical equipment status information; judge the type and quantity of the required tools according to the safety tool information; and optimize the selection of personnel and driving routes according to the personnel information and geographical location information;

[0079] The decision-making module is used to execute substation operations when the substation environment is normal, the electrical equipment is in normal condition, and the tools and personnel meet the preset requirements.

[0080] In the acquisition module, the substation environmental information includes ambient temperature, ambient humidity, infrared and SF6 gas density in the GIS gas chamber.

[0081] The electrical equipment status information includes the circuit breaker opening and closing positions, disconnector opening and closing positions and grounding switch opening and closing positions of different electrical equipment.

[0082] Safety tools include hard hats, insulating gloves, operating rods, grounding guns and testers;

[0083] Personnel information includes personnel skill levels and familiarity with different substations;

[0084] Geographic location information includes the warehouse where the safety tools are located and the real-time location information of the personnel.

[0085] In the judgment module, whether the position of the electrical equipment complies with the five-protection logic and whether the operation conditions are met is judged according to the electrical equipment status information, specifically including: using electrical equipment sensors to respectively obtain the circuit breaker opening and closing positions, disconnector opening and closing positions and earthing switch positions of the operated equipment and related equipment, and respectively judging whether the circuit breaker opening and closing positions, disconnector opening and closing positions and earthing switch opening and closing positions are located at corresponding positions; if they are all located at corresponding positions and meet the five-protection logic, substation operation can be performed; otherwise, the operating equipment is locked and an alarm is issued, and no operation is allowed.

[0086] Determine the required tool type and quantity based on the safety tool information; and optimize the selection of personnel and driving routes based on personnel information and geographic location information, including: determine the required tool type and quantity through operators, and obtain safety tool information in different warehouses through safety tool sensors; if the tools in the warehouse meet the required tool type and quantity, substation operation can be performed; if not, the substation operation task is updated.

[0087] The process of optimizing personnel selection includes: grading the operation tasks according to the difficulty of the operation tasks, and assigning operators according to the level of the operation tasks on the basis of meeting the operation requirements;

[0088] The process of optimizing the driving route includes: optimizing the shortest path from the operation and maintenance center to the warehouse and then to the substation, and from the substation back to the warehouse and then back to the operation and maintenance center.

[0089] In the decision-making module, if all three factors meet the operation conditions, the operation will be started and the operation process will be executed. If the operation is wrong during the process, it will be locked. If it is correct, it will be executed until the operation is completed.

[0090] A substation operation decision support system proposed in Example 2 of the present invention integrates multi-source information, improves the ability to perceive the status of substation equipment, realizes online monitoring of the substation, and assists operation and maintenance personnel in making operational judgments through logical analysis, ensuring that the environment, tools and equipment status meet the operational requirements and that the operating steps are correct, thereby realizing lean management of substation equipment and ensuring safe and stable operation of the equipment.

[0091] Example 3

[0092] The present invention also proposes a device, Figure 4 A schematic diagram of a substation operation decision support device proposed in Embodiment 3 of the present invention includes:

[0093] Memory for storing computer programs;

[0094] The processor is used to implement the following method steps when executing the computer program:

[0095] In step S100, the process starts.

[0096] In step S101 , a substation operation task is received.

[0097] In step S102, after receiving the substation operation task, the operation process is optimized.

[0098] In step S103, the substation environmental information is collected. In the present application, the environmental factor sensing array can obtain information such as ambient temperature, ambient humidity, infrared and SF6 gas density of the GIS gas chamber.

[0099] In step S104, after the substation environment information is collected, it is transmitted to the decision-making unit through the network.

[0100] In step S105, the decision unit makes a level judgment based on the transmitted substation environmental information. In this application, if it is judged that the temperature and humidity of the substation are normal, and no infrared discharge and SF6 gas leakage occur, the substation environment is judged to be normal, and substation operations can be performed; if it is judged that the temperature or humidity of the substation is abnormal, but no infrared discharge and SF6 gas leakage occur, ventilation or dehumidification work is performed, and substation operations can still be performed; if it is judged that infrared discharge or SF6 gas leakage occurs, the operating equipment is locked and an alarm is issued, and no operation is allowed. Environmental factors are judged into three levels: normal, general and dangerous.

[0101] In step S106, if the environmental factor is judged to be dangerous, that is, SF6 gas leakage occurs, infrared discharge is detected.

[0102] In step S107, the operating device is locked and an alarm is sounded, and no operation is allowed.

[0103] In step S108, if the environmental factor is judged to be normal, it is determined that the temperature or humidity of the substation is abnormal, but infrared discharge and SF6 gas leakage do not occur.

[0104] In step S109, the corresponding auxiliary facility contacts are opened to perform ventilation or dehumidification.

[0105] In step S110, if the environmental factors are judged to be normal, that is, the temperature and humidity of the substation are normal and no infrared discharge and SF6 gas leakage occur, the operation can be performed and step S113 is executed.

[0106] In step S111, electrical equipment status information is collected, and the electrical equipment status information includes the opening and closing positions of the circuit breaker, the opening and closing positions of the disconnector, and the opening and closing positions of the earthing switch.

[0107] In step S112, after the electrical equipment status information is collected, it is transmitted to the decision-making unit through the network.

[0108] In step S113, electrical equipment sensors are used to obtain the circuit breaker open / close position, the disconnector open / close position and the earthing switch position respectively, and it is determined whether the circuit breaker open / close position, the disconnector open / close position and the earthing switch open / close position are in corresponding positions respectively. If they are all in corresponding positions and meet the five-protection logic, step S114 is executed, otherwise step S120 is executed.

[0109] In step S114, substation operation is performed;

[0110] In step S115, safety tool information is collected. The safety tool sensor collects safety tool information from each safety tool library.

[0111] In step S116, after the safety tool information is collected, it is transmitted to the decision-making unit through the network.

[0112] In step S117, the safety tool information is obtained through the safety tool sensor, the type and quantity of the required tools are determined, and the driving route is optimized. The shortest path from the operation and maintenance center to the warehouse and then to the substation, and from the substation back to the warehouse and then back to the operation and maintenance center is optimized.

[0113] The operator determines the required tool type and quantity, and obtains the safety tool information of different warehouses through the safety tool sensor; if the tools in the warehouse meet the required tool type and quantity, the substation operation can be performed; if not, the substation operation task is updated.

[0114] According to the difficulty of the operation tasks, the operation tasks are graded and the operators are assigned according to the level of the operation tasks on the basis of meeting the operation requirements;

[0115] The process of optimizing the driving route includes: optimizing the shortest path from the operation and maintenance center to the warehouse and then to the substation, and from the substation back to the warehouse and then back to the operation and maintenance center.

[0116] In step S118, it is determined whether the tools in the warehouse meet the required tool types and quantities. If so, step S114 is executed, otherwise, it returns to step S102.

[0117] In step S119, it is determined whether the operation step is correct, if it is correct, step S120 is executed, otherwise, step S121 is executed.

[0118] In step S120, the operating device is locked and an alarm is sounded, and no operation is allowed.

[0119] In step S121, the process ends.

[0120] A substation operation decision-making assistance device proposed in Example 3 of the present invention integrates multi-source information, improves the ability to perceive the status of substation equipment, realizes online monitoring of the substation, and assists operation and maintenance personnel in making operational judgments through logical analysis, ensuring that the environment, tools and equipment status meet the operational requirements and that the operating steps are correct, thereby realizing lean management of substation equipment and ensuring safe and stable operation of the equipment.

[0121] It should be noted that the technical solution of the present invention also provides an electronic device, including: a communication interface, which can exchange information with other devices such as network devices; a processor, connected to the communication interface to realize information exchange with other devices, and used to execute a substation operation auxiliary decision-making method provided by one or more of the above technical solutions when running a computer program, and the computer program is stored in a memory. Of course, in actual application, the various components in the electronic device are coupled together through a bus system. It can be understood that the bus system is used to realize the connection and communication between these components. In addition to the data bus, the bus system also includes a power bus, a control bus and a status signal bus. The memory in the embodiment of the present application is used to store various types of data to support the operation of the electronic device. Examples of these data include: any computer program for operating on an electronic device. It can be understood that the memory can be a volatile memory or a non-volatile memory, and can also include both volatile and non-volatile memories. Among them, the non-volatile memory can be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), a magnetic random access memory (FRAM), a flash memory, a magnetic surface memory, an optical disc, or a compact disc read-only memory (CD-ROM); the magnetic surface memory can be a disk memory or a tape memory. The volatile memory can be a random access memory (RAM), which is used as an external cache.By way of exemplary but not limiting explanation, many forms of RAM are available, such as static random access memory (SRAM), synchronous static random access memory (SSRAM), dynamic random access memory (DRAM), synchronous dynamic random access memory (SDRAM), double data rate synchronous dynamic random access memory (DDRSDRAM), enhanced synchronous dynamic random access memory (ESDRAM), synchronous link dynamic random access memory (SLDRAM), direct memory bus random access memory (DRRAM). The memory described in the embodiment of the present application is intended to include but is not limited to these and any other suitable types of memory. The method disclosed in the above embodiment of the present application can be applied to a processor or implemented by a processor. The processor may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by an integrated logic circuit of hardware in a processor or an instruction in the form of software. The above processor can be a general-purpose processor, a DSP (Digital Signal Processing, which refers to a chip that can implement digital signal processing technology), or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. The processor can implement or execute the methods, steps and logic block diagrams disclosed in the embodiments of the present application. The general-purpose processor can be a microprocessor or any conventional processor, etc. In conjunction with the steps of the method disclosed in the embodiments of the present application, it can be directly embodied as a hardware decoding processor to perform, or it can be performed by a combination of hardware and software modules in a decoding processor. The software module can be located in a storage medium, which is located in a memory, and the processor reads the program in the memory and completes the steps of the above method in combination with its hardware. When the processor executes the program, the corresponding process in each method of the embodiment of the present application is implemented, and for the sake of brevity, it is not repeated here.

[0122] The description of the relevant parts of a substation operation decision-making assistance device provided in Example 3 of the present application can be found in the detailed description of the corresponding parts of a substation operation decision-making assistance method provided in Example 1 of the present application, and will not be repeated here.

[0123] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is any such actual relationship or order between these entities or operations. Moreover, the term "include", "comprise" or any other variant thereof is intended to cover non-exclusive inclusion, so that the process, method, article or equipment that includes a series of elements are inherent to the elements. In the absence of more restrictions, the elements limited by the sentence "comprise one..." do not exclude the presence of other identical elements in the process, method, article or equipment that includes the elements. In addition, the above-mentioned technical solution provided in the embodiment of the present application is consistent with the corresponding technical solution in the prior art in principle, and the part is not described in detail, so as not to repeat too much.

[0124] Although the above describes the specific implementation of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. For those skilled in the art, other different forms of modifications or deformations can be made on the basis of the above description. It is not necessary and impossible to list all the implementation methods here. On the basis of the technical solution of the present invention, various modifications or deformations that can be made by those skilled in the art without creative work are still within the scope of protection of the present invention.

Claims

1. A substation operation decision-making assistance method, characterized in that: The following steps are involved: Receiving a substation operation task; collecting substation environment information, electrical equipment status information, safety tool information, personnel information and geographic location information according to the received substation operation task; Judging whether the substation environment is normal according to the substation environment information; judging whether the location of the electrical equipment complies with the five-defense logic and meets the operating conditions according to the electrical equipment status information; Determine the type and quantity of the required tools according to the safety tool information; And optimize the selection of personnel and driving routes based on personnel information and geographic location information; When the substation environment is normal, the electrical equipment is in normal condition, and the tools and personnel meet the preset requirements, perform substation operations.

2. A substation operation decision-making assistance method according to claim 1, characterized in that: The substation environmental information includes ambient temperature, ambient humidity, infrared and GIS gas chamber SF6 gas density.

3. A substation operation decision-making assistance method according to claim 1, characterized in that: The electrical equipment status information includes the circuit breaker opening and closing positions, the disconnector opening and closing positions and the earthing switch opening and closing positions of different electrical equipment.

4. A substation operation decision-making assistance method according to claim 1, characterized in that: The safety tools include a safety helmet, insulating gloves, an operating rod, a grounding gun and a tester; The personnel information includes personnel skill level and familiarity with different substations; The geographic location information includes the warehouse where the safety tools are located and the real-time location information of the personnel.

5. A substation operation decision-making assistance method according to claim 2, characterized in that: Judging whether the substation environment is normal according to the substation environment information specifically includes: If it is judged that the ambient temperature and humidity of the substation are normal, and there is no infrared discharge and SF6 gas leakage, then the substation environment is normal and substation operations can be performed; If it is judged that the ambient temperature or humidity of the substation is abnormal, but no infrared discharge or SF6 gas leakage occurs, ventilation or dehumidification work can still be performed, and the substation operation can still be performed; If it is determined that infrared discharge or SF6 gas leakage has occurred, the operating equipment will be locked and an alarm will be sounded, and no operation will be allowed.

6. A substation operation decision-making assistance method according to claim 3, characterized in that: The determining whether the position of the electrical equipment complies with the five-protection logic and whether the operating conditions are met based on the electrical equipment status information specifically includes: using electrical equipment sensors to respectively obtain the circuit breaker opening and closing positions, disconnector opening and closing positions and earthing switch positions of the operated equipment and related equipment, and respectively determining whether the circuit breaker opening and closing positions, disconnector opening and closing positions and earthing switch opening and closing positions are located at corresponding positions; if they are all located at corresponding positions and meet the five-protection logic, substation operation can be performed; otherwise, the operating equipment is locked and an alarm is issued, and no operation is allowed.

7. A substation operation decision-making assistance method according to claim 4, characterized in that: Determine the type and quantity of the required tools according to the safety tool information; And optimizing the selection of personnel and driving routes based on personnel information and geographic location information, including: judging the required tool type and quantity through operators, obtaining safety tool information in different warehouses through safety tool sensors; if the tools in the warehouse meet the required tool type and quantity, substation operation can be performed; if not, the substation operation task is updated.

8. A substation operation decision-making assistance method according to claim 7, characterized in that: The process of optimizing the selection of personnel includes: grading the operation tasks according to the difficulty of the operation tasks, and assigning the operation workers according to the grades of the operation tasks on the basis of meeting the operation requirements; The process of optimizing the driving route includes: optimizing the shortest path from the operation and maintenance center to the warehouse and then to the substation, and from the substation back to the warehouse and then back to the operation and maintenance center.

9. A substation operation decision support system, characterized in that: include: Acquisition module, judgment module and decision module; The acquisition module is used to receive substation operation tasks; According to the received substation operation task, collect substation environment information, electrical equipment status information, safety tool information, personnel information and geographic location information; The judgment module is used to judge whether the substation environment is normal according to the substation environment information; and judge whether the location of the electrical equipment complies with the five-defense logic and meets the operating conditions according to the electrical equipment status information; Determine the type and quantity of the required tools according to the safety tool information; And optimize the selection of personnel and driving routes based on personnel information and geographic location information; The decision module is used to execute substation operations when the substation environment is normal, the electrical equipment is in normal status, and the tools and personnel meet the preset requirements.

10. A substation operation decision-making auxiliary device, characterized in that: include: Memory for storing computer programs; A processor, configured to implement the method steps according to any one of claims 1 to 8 when executing the computer program.