Distributed resource operation regulation and control simulation integrated system for novel power distribution system

Through the integrated system of distributed resource operation and regulation simulation for new distribution systems, combined with real-time monitoring and historical data, dynamically adjusting the simulation topology structure, the problems of insufficient integrity and poor connectivity of distributed resource operation and regulation historical data are solved, and the problem of insufficient connectivity of distributed resource operation and regulation historical data is realized. Accurate evaluation and risk prediction of future simulation scenarios improve the reliability and energy utilization efficiency of the distribution system.

CN118970933AActive Publication Date: 2024-11-15STATE GRID SHANDONG ELECTRIC POWER CO +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411075095.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-11-15
Estimated Expiration
2044-08-07

AI Technical Summary

Technical Problem

In the existing technology, the historical data of distributed resource operation and regulation is insufficient, and it is impossible to truly simulate future simulation scenarios. The connection between distributed resource operation and regulation and simulation tools is poor, resulting in inaccurate simulation results, affecting the stability and reliability of the power system. .

Method used

A distributed resource operation and regulation simulation integrated system for new distribution systems is designed, including regulation service control, simulation service control, topology service device and topology adjustment service device. By combining real-time monitoring data and historical data, simulation is dynamically adjusted. Topological structure diagram, perform load prediction and voltage state analysis, automatically generate adjustment strategies, and realize real-time monitoring and optimization control of distributed resources.

Benefits of technology

Improve the operation and control accuracy of distributed resources and the reliability of power distribution systems, support accurate assessment and risk prediction of future simulation scenarios, optimize the access strategy of distributed resources and distribution network system planning, and reduce faults and Energy loss.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118970933A_ABST
    Figure CN118970933A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of distributed resource operation regulation and control, in particular to a distributed resource operation regulation and control simulation integrated system oriented to a novel power distribution system. The distributed resource operation regulation and simulation integrated system comprises a regulation service control, a simulation service control, a topology service device, a topology control service device and a topology regulation service device. The system receives operation data of monitoring equipment in real time, performs power distribution network simulation analysis, and draws a dynamically adjusted simulation topological structure diagram. Through integration of various simulation scene algorithms, the system can flexibly adjust the configuration of monitoring equipment, carries out load prediction and voltage analysis based on the current operation state, automatically generates a topology adjustment strategy, and achieves the efficient operation regulation and control of the power distribution network. According to the invention, efficient and intelligent operation regulation and simulation analysis of the power distribution system are realized, and the management level and the operation efficiency of the power distribution network are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of distributed resource operation and control, and in particular to a distributed resource operation and control simulation integrated system for a new type of power distribution system. Background Art

[0002] With the continuous development of distributed resources, new distribution systems play an important role in the operation and regulation of distributed resources, and distribution network simulation technology is one of the important tools to achieve this goal. In the current environment, distributed resources are characterized by huge quantity, wide variety and uneven geographical distribution, and various forms of distributed energy such as solar photovoltaic, wind power generation, and small hydropower are becoming more and more popular, which brings more severe challenges to the operation of distribution networks and distribution network simulation technology.

[0003] Considering the characteristics of distributed resources and a series of problems brought about by large-scale distributed resource access, most existing technologies adopt the construction of distributed resource equipment models. For example, distributed resource equipment models such as solar panels, wind turbines and energy storage systems are established, and simulation models that conform to the actual operating environment are constructed based on real operating data and parameters.

[0004] After the distributed resource modeling is completed, the existing system uses third-party simulation tools to simulate different operating conditions, including the power generated by solar photovoltaic panels under different weather and light conditions, or simulate the seasonal changes in power loads, etc., to regulate distributed resources and provide optimization solutions to test and verify the performance of the power system under different load conditions and its response capabilities in different situations.

[0005] Although the above methods play a vital role in the simulation of the operation of the distribution network with distributed resource access and effectively improve the performance and reliability of the power system, the operation and control of distributed resource access needs to consider the complexity of multiple factors and the seamless connection and interoperability between the distributed resource operation and control system and the existing traditional distribution network simulation system still need to be solved. Specifically, there are the following issues:

[0006] First, the integrity of historical data on operation and control of distributed resource access: Based on the distributed resource model, real-time simulation through historical data such as temperature, wind speed, humidity, season, and load is not sufficient to support potential future simulation scenarios, and it is impossible to truly simulate and evaluate future operation simulation scenarios.

[0007] Second, the interoperability of distributed resource operation and control and simulation tools: The interoperability of distributed resource operation and control and simulation tools still uses data exchange, model fusion, and the establishment of unified protocols and interface standards as well as model frameworks for distribution network simulation. During this simulation process, if problems such as data missing and data type mismatch occur, accurate simulation results cannot be fed back, affecting the stability and reliability of the power system. Summary of the invention

[0008] To this end, the technical problem to be solved by the present invention is to overcome the problem in the prior art that historical data integrity is insufficient, making it difficult to support the simulation of future complex simulation scenarios, and the poor connectivity between operation control and simulation tools leads to inaccurate simulation results.

[0009] In order to solve the above technical problems, the present invention provides a distributed resource operation control simulation integrated system for a new type of power distribution system, comprising:

[0010] A control service control, used to connect multiple monitoring devices in the distribution network, receive and process the operating data of the multiple monitoring devices in real time, and obtain the operating status parameters of the distribution network;

[0011] A simulation service control, used for the operating state parameters, to simulate the distribution network, and based on the simulation results, obtain grid load analysis, power quality assessment and power loss calculation results;

[0012] A topology service device is used to draw a simulation topology structure diagram based on the regulation service control and the simulation service control, taking the monitoring equipment in the distribution network as nodes, the operating status, connection relationship and operating parameters of the monitoring equipment as attributes of the nodes, and the connection relationship between the monitoring equipment as edges, and being able to dynamically adjust the simulation topology structure diagram according to the structural changes of the distribution network;

[0013] A topology control service device, used to switch, isolate or merge various monitoring devices in the distribution network and adjust the structural configuration and parameter configuration of the simulation topology structure diagram by using various simulation scenario algorithms integrated in the simulation service control;

[0014] A topology adjustment service device is used to receive monitoring data of each node in the simulation topology structure diagram, obtain current operating status parameters of the distribution network, perform load forecasting and voltage status analysis on the simulation topology structure diagram based on the current operating status parameters, and automatically generate a topology adjustment strategy.

[0015] In one embodiment of the present invention, the simulation service control carries a simulation model carrier and a simulation calculation carrier; wherein the simulation model carrier includes a modeling engine, and the topology service device uses the modeling engine to draw a simulation topology diagram of the distribution network.

[0016] In one embodiment of the present invention, the simulation computing carrier includes an algorithm engine, and the topology control service device calculates the capacity and load level of the active load transmitted in the distribution network through the algorithm engine, evaluates the reactive load level of the compensation circuit and power supply in the distribution network, combines historical data and real-time monitoring data, predicts and prevents risks in future time periods of the distribution network, evaluates multi-dimensional indicators based on distributed resource access in the distribution network, and guides the reasonable access and scheduling of distributed resources.

[0017] In one embodiment of the present invention, the algorithm engine is configured to carry an active power algorithm, an active power algorithm, a risk prevention algorithm, a carrying capacity assessment algorithm, and a fault diagnosis simulation algorithm.

[0018] In one embodiment of the present invention, the topology control service device includes a risk prevention controller, a grid verification controller, a bearing capacity assessment controller and a fault diagnosis controller; wherein the risk prevention controller is used to collect and analyze various monitoring data in the distribution network, and compare them with historical data and models, identify fault risks or abnormal conditions through the risk prevention algorithm, and obtain risk response plans based on the fault risks or abnormal conditions.

[0019] In one embodiment of the present invention, the grid verification controller is used to analyze and calculate the simulation topology diagram, equipment parameters and circuit connectivity, determine whether the connection and ratio are reasonable, and analyze whether its load-bearing capacity meets the power load demand.

[0020] In one embodiment of the present invention, the capacity assessment controller is used to analyze real-time monitoring data of the distribution network, calculate the load conditions and potential bottleneck locations of the power grid through the capacity assessment algorithm, and determine the maximum capacity of the distributed power source.

[0021] In one embodiment of the present invention, the fault diagnosis controller is used to analyze the real-time monitoring data and historical data of the power system. When an abnormality occurs in the power grid, the abnormal signal is automatically detected, and the fault is preliminarily diagnosed using the fault diagnosis simulation algorithm. Combined with the simulation topology diagram and equipment status information, the type and location of the fault are predicted, and a fault report is generated.

[0022] In one embodiment of the present invention, the topology regulation service device includes an active power regulation group and a reactive power regulation group; wherein, the active power regulation group is used to set the active power regulation status in the simulation topology structure diagram, identify the real-time power consumption of each load point through historical data, real-time data or system feedback, perform load forecasting based on data and algorithm models, and perform on / off and load increase / decrease operations on key equipment in the simulation topology structure diagram.

[0023] In one embodiment of the present invention, the reactive power regulation group is used to set the power grid control and regulation reactive device in the simulation topology diagram, and by analyzing the voltage state and reactive power situation in the simulation topology diagram, algorithms and strategies are used to control the distribution and output of reactive power, and based on the calculation results, corresponding control strategies are generated and executed.

[0024] The above technical solution of the present invention has the following advantages compared with the prior art:

[0025] The present invention proposes a distributed resource operation control simulation integrated system for a new distribution system, which combines the distributed resource operation control with the distribution network simulation to solve the problems of data exchange and model fusion. Through this method, the distributed resources in the new distribution system are effectively operated, controlled and simulated, and the real-time monitoring, state evaluation, optimization control and risk prediction of distributed resources are realized to evaluate the future distribution network operation simulation scenario. At the same time, the key issues such as the access strategy of distributed resources and the distribution network system planning are simulated and analyzed to help optimize the system design and decision-making, and improve the reliability, stability and economy of the distribution system. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to make the content of the present invention more clearly understood, the present invention is further described in detail below according to specific embodiments of the present invention in conjunction with the accompanying drawings, wherein

[0027] Figure 1 It is a structural diagram of a distributed resource operation control simulation integrated system for a new power distribution system provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0028] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments so that those skilled in the art can better understand the present invention and implement it, but the embodiments are not intended to limit the present invention.

[0029] Reference Figure 1 As shown, the present invention provides a distributed resource operation control simulation integrated system for a new power distribution system, including the following module configurations:

[0030] A control service control, used to connect multiple monitoring devices in the distribution network, receive and process the operating data of the multiple monitoring devices in real time, and obtain the operating status parameters of the distribution network;

[0031] A simulation service control, used for the operating state parameters, to simulate the distribution network, and based on the simulation results, obtain grid load analysis, power quality assessment and power loss calculation results;

[0032] A topology service device is used to draw a simulation topology structure diagram based on the regulation service control and the simulation service control, taking the monitoring equipment in the distribution network as nodes, the operating status, connection relationship and operating parameters of the monitoring equipment as attributes of the nodes, and the connection relationship between the monitoring equipment as edges, and being able to dynamically adjust the simulation topology structure diagram according to the structural changes of the distribution network;

[0033] A topology control service device, used to switch, isolate or merge various monitoring devices in the distribution network and adjust the structural configuration and parameter configuration of the simulation topology structure diagram by using various simulation scenario algorithms integrated in the simulation service control;

[0034] A topology adjustment service device is used to receive monitoring data of each node in the simulation topology structure diagram, obtain current operating status parameters of the distribution network, perform load forecasting and voltage status analysis on the simulation topology structure diagram based on the current operating status parameters, and automatically generate a topology adjustment strategy.

[0035] From the above technical solutions, it can be seen that the present invention realizes the combination of distributed resource regulation and distribution network simulation, real-time monitoring and status evaluation of distributed resources, improves the reliability and safety of the distribution system, reduces the occurrence rate of faults and power outages, and at the same time performs fine regulation of distributed resources, improves energy utilization, reduces energy loss, and helps to build a reliable, efficient, safe and environmentally friendly distribution system.

[0036] Specifically, the regulation service control is used as a topology regulation service device, a topology control service device, and a base service control of a topology service device to associate the monitoring equipment in the distribution network with the power grid topology, and receive and process real-time data, such as voltage, current, power, etc. It diagnoses faults in the power grid and generates corresponding alarm information. By analyzing and processing these data, the operation status of the distribution network can be monitored in real time, and based on information such as power grid load and demand forecast, power regulation and optimization solutions can be provided to simulate real-time adjustment of the operation status of the power grid.

[0037] Furthermore, the simulation service control carries a simulation model carrier and a simulation calculation carrier, and simulates the behavior of the power system under various working conditions, including voltage, current, power flow, etc. Based on the simulation results, grid load analysis, power quality assessment, and power loss calculation are performed.

[0038] The simulation model carrier includes a modeling engine, which is based on the relationships and characteristics between various components of the power system, and contains information such as various parameters, electrical characteristics, control logic, etc., such as generators, transmission lines, transformers, switches and loads.

[0039] The topology service device calls the operating status parameters of the distribution network calculated by the regulation service control through the modeling engine, analyzes and deduce through mathematical models and algorithms, simulates and simulates the actual power system, and draws a final simulation topology diagram of the distribution network.

[0040] The simulation calculation carrier includes an algorithm engine, which calculates and maps the power system grid model as the power grid topology, statically calculates and analyzes the voltage, current, power and other parameters of the power system in a steady state, and dynamically calculates and simulates the behavior of the power system in a changing state.

[0041] The topology control service device calculates the capacity and load level of the active load transmitted in the distribution network through the algorithm engine, evaluates the reactive load level of the compensation circuit and power supply in the distribution network, combines historical data and real-time monitoring data, predicts and prevents possible risks of the distribution network in the future, evaluates multi-dimensional indicators based on distributed resource access in the distribution network, and guides the reasonable access and scheduling of distributed resources.

[0042] In this embodiment, the algorithm engine is configured to carry active power algorithm, active power algorithm, risk prevention algorithm, distributed power access capacity assessment algorithm and fault diagnosis simulation algorithm. The algorithm engine calculates the capacity and load level of active loads transmitted in the distribution network, evaluates the reactive load level of the compensation circuit and power supply in the distribution network, combines historical data and real-time monitoring data, predicts and prevents possible risks in the distribution network in the future through risk measurement and risk control methods, evaluates multi-dimensional indicators based on distributed resource access in the distribution network, guides the reasonable access and scheduling of distributed resources, and performs fault simulation and simulation calculations through information such as distribution network topology and power devices.

[0043] Furthermore, the topology control service device can intelligently switch, isolate or merge cables, switches, transformers and other equipment in the distribution network according to factors such as grid load level, power supply and demand balance, faults and maintenance requirements, and adjust the topology and configuration of the distribution network to achieve reasonable distribution and flow of electricity.

[0044] The topology control service device specifically includes: a risk prevention controller, a grid verification controller, a bearing capacity assessment controller and a fault diagnosis controller.

[0045] Among them, the risk prevention controller is used to collect and analyze various monitoring data in the distribution network, including current, voltage, power, frequency, etc., and compare them with historical data and models. Through the risk prevention algorithm, potential fault risks or abnormal conditions are identified, risk response plans are provided, and corresponding control measures are automatically taken to provide early warning and prevent potential faults.

[0046] The grid verification controller is used to verify and evaluate whether the structure and configuration of the distribution network meet the design requirements and specifications. By analyzing and calculating the simulation topology diagram, equipment parameters and circuit connectivity, and inspecting key equipment such as lines, switches and transformers of the distribution network, it is determined whether the connection and ratio are reasonable, and analyzes whether its load capacity meets the power load demand. Using algorithms and models, key indicators such as current, power, short circuit, voltage drop, etc. are calculated and simulated.

[0047] The load capacity assessment controller is used to assess the ability of the distribution network to accommodate distributed power sources. By analyzing the real-time monitoring data of the distribution network, such as current, voltage, load and other parameters, the load condition and potential bottleneck position of the power grid are calculated through the load capacity assessment algorithm, and the power balance, stability, voltage level and other factors of the power grid are comprehensively considered, and the maximum capacity of carrying distributed power sources is determined with reference to national specifications and standards.

[0048] The fault diagnosis controller is used to analyze the real-time monitoring data and historical data of the power system to quickly identify and locate the distribution network fault, and use models and algorithms to monitor and analyze key parameters such as current, voltage, power, etc. in real time, and compare them with the preset power grid state. When an abnormality occurs in the power grid, the abnormal signal is automatically detected, and the fault diagnosis simulation algorithm is used to perform a preliminary diagnosis of the fault. Combined with the simulation topology diagram and equipment status information, the type and location of the fault are predicted, and a fault report is generated. The content of the fault report includes but is not limited to information such as the fault type, location, and possible impact range.

[0049] Furthermore, the topology adjustment service device is used to adjust and optimize the topology structure of the distribution network. The topology adjustment service device receives the topology data of the distribution network, and monitors and analyzes important parameters such as power supply, load, and line, identifies faults, load imbalance, line overload and other problems in the power grid, monitors the state of the power grid, analyzes the load, power supply and line conditions of the distribution network, executes active power adjustment group instructions or reactive power adjustment group instructions, and automatically generates topology adjustment strategies by adjusting the connection status of the line and the operation of the switch device. These strategies may include operations such as changing the line connection status, opening and closing the switch device, and adjusting the power distribution to optimize the topology structure of the power grid and realize flexible adjustment of the distribution network topology.

[0050] The topology regulation service device includes an active power regulation group and a reactive power regulation group. The active power regulation group is used to set the active power regulation status in the simulation topology diagram, identify the real-time power consumption of each load point through historical data, real-time data or system feedback, perform load forecasting based on data and algorithm models, and perform on / off and load increase / decrease operations on key equipment in the simulation topology diagram to achieve the preset active power regulation target.

[0051] In the case of active power regulation, the control variable is set to the active power of the distributed generation, and the objective function is the penalty function of the equipment current carrying capacity overload rate; the constraints are Kirchhoff current constraint and Kirchhoff voltage constraint:

[0052]

[0053] In the formula, x gp is the control variable of the active power of distributed generation, P j g is the active power of the jth distributed generation, n4 is the number of distributed generation; f4 is the objective function of equipment safety, c p is the penalty constant, the default value is 1000000; l i r (x gp ) is the load rate of distribution network equipment i, and the equipment includes lines, transformers, switches, voltage regulators, etc., with a total number of n2.

[0054] The reactive power regulation group is used to set the power grid control and reactive power regulation device in the simulation topology diagram. By analyzing the voltage state and reactive power situation in the simulation topology diagram, the algorithm and strategy are used to control the distribution and output of reactive power, so as to maintain the stable operation of the power grid, and according to the calculation results, the corresponding control strategy is generated and executed to adjust the operating state and power output of the connected equipment (such as capacitors, reactive power compensation devices, etc.) in the topology power grid to achieve intelligent regulation.

[0055] In the case of reactive power regulation, the control variables are set to the reactive power of the reactive compensation device and the reactive power of the distributed generation, and the objective function is the network loss:

[0056]

[0057] In the formula, x q is the control variable of the reactive power of distributed generation and compensation device, Q j is the reactive power of the jth distributed power source or reactive power compensation device, n5 is the total number of distributed power sources and reactive power compensation devices; f5 is the objective function of network loss, V i (x q ) is the node voltage matrix of distribution network equipment i, and its value can be based on the control variable x q Calculated by power flow calculation, Y i is the node admittance matrix of distribution network equipment i; the superscripts T and * represent transpose and conjugate, respectively.

[0058] The constraints include Kirchhoff current constraint and Kirchhoff voltage constraint. The inequality constraints include equipment capacity limit, reactive power compensation device output limit and distributed power reactive power constraint. The expression of distributed power reactive power constraint is:

[0059] |Q g |≤P g tanθ

[0060] In the formula, Q g is the reactive power of distributed generation, P g is the active power of distributed generation, and θ is the power angle corresponding to the minimum power factor of distributed generation.

[0061] In summary, the distributed resource operation and control simulation integrated system for the new distribution system provided by the present invention can monitor the operating status of distributed resources in real time, including key parameters such as temperature, wind power, humidity, load, etc., and accurately evaluate these parameters through advanced algorithms, providing a reliable basis for subsequent optimization control and risk prediction, and automatically adjusting the control strategy according to environmental changes and system requirements, supporting simulation analysis of key issues such as access strategies for distributed resources and distribution network system planning; by simulating the system operation under different scenarios, the system can provide decision makers with comprehensive data analysis and evaluation reports to help optimize system design and decision making; it can not only improve the utilization efficiency of distributed resources, but also provide strong support for the sustainable development of the power system.

[0062] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0063] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0064] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0065] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0066] Obviously, the above embodiments are merely examples for clear explanation and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from them are still within the protection scope of the invention.

Claims

1. A distributed resource operation control simulation integrated system for a new power distribution system, characterized in that: include: A control service control, used to connect multiple monitoring devices in the distribution network, receive and process the operating data of the multiple monitoring devices in real time, and obtain the operating status parameters of the distribution network; A simulation service control, used for the operating state parameters, to simulate the distribution network, and based on the simulation results, obtain grid load analysis, power quality assessment and power loss calculation results; A topology service device is used to draw a simulation topology structure diagram based on the regulation service control and the simulation service control, taking the monitoring equipment in the distribution network as nodes, the operating status, connection relationship and operating parameters of the monitoring equipment as attributes of the nodes, and the connection relationship between the monitoring equipment as edges, and being able to dynamically adjust the simulation topology structure diagram according to the structural changes of the distribution network; A topology control service device, used to switch, isolate or merge various monitoring devices in the distribution network and adjust the structural configuration and parameter configuration of the simulation topology structure diagram by using various simulation scenario algorithms integrated in the simulation service control; A topology adjustment service device is used to receive monitoring data of each node in the simulation topology structure diagram, obtain current operating status parameters of the distribution network, perform load forecasting and voltage status analysis on the simulation topology structure diagram based on the current operating status parameters, and automatically generate a topology adjustment strategy.

2. The distributed resource operation control simulation integrated system for a new power distribution system according to claim 1 is characterized in that: The simulation service control carries a simulation model carrier and a simulation calculation carrier; wherein the simulation model carrier includes a modeling engine, and the topology service device uses the modeling engine to draw a simulation topology diagram of the distribution network.

3. The distributed resource operation control simulation integrated system for a new power distribution system according to claim 2 is characterized in that: The simulation calculation carrier includes an algorithm engine, and the topology control service device calculates the capacity and load level of the active load transmitted in the distribution network through the algorithm engine, evaluates the reactive load level of the compensation circuit and the power supply in the distribution network, combines historical data and real-time monitoring data, predicts and prevents risks of the distribution network in future time periods, evaluates multi-dimensional indicators based on distributed resource access in the distribution network, and guides the reasonable access and scheduling of distributed resources.

4. The integrated distributed resource operation control simulation system for a new power distribution system according to claim 2 is characterized in that: The algorithm engine is configured to carry an active power algorithm, an active power algorithm, a risk prevention algorithm, a carrying capacity assessment algorithm, and a fault diagnosis simulation algorithm.

5. The integrated distributed resource operation control simulation system for a new power distribution system according to claim 4 is characterized in that: The topology control service device includes a risk prevention controller, a grid verification controller, a bearing capacity assessment controller and a fault diagnosis controller; wherein the risk prevention controller is used to collect and analyze various monitoring data in the distribution network, and compare them with historical data and models, identify fault risks or abnormal conditions through the risk prevention algorithm, and obtain risk response plans based on the fault risks or abnormal conditions.

6. The integrated distributed resource operation control simulation system for a new power distribution system according to claim 5 is characterized in that: The grid verification controller is used to analyze and calculate the simulation topology diagram, equipment parameters and circuit connectivity, determine whether the connection and ratio are reasonable, and analyze whether its load-bearing capacity meets the power load demand.

7. The integrated distributed resource operation control simulation system for a new power distribution system according to claim 5 is characterized in that: The carrying capacity assessment controller is used to analyze the real-time monitoring data of the distribution network, calculate the load situation and potential bottleneck location of the power grid through the carrying capacity assessment algorithm, and determine the maximum capacity of the distributed power source.

8. The integrated distributed resource operation control simulation system for a new power distribution system according to claim 5 is characterized in that: The fault diagnosis controller is used to analyze the real-time monitoring data and historical data of the power system. When an abnormality occurs in the power grid, the abnormal signal is automatically detected, and the fault is preliminarily diagnosed using the fault diagnosis simulation algorithm. Combined with the simulation topology diagram and equipment status information, the type and location of the fault are predicted, and a fault report is generated.

9. The integrated distributed resource operation control simulation system for a new power distribution system according to claim 1 is characterized in that: The topology regulation service device includes an active power regulation group and a reactive power regulation group; wherein the active power regulation group is used to set the active power regulation status in the simulation topology structure diagram, identify the real-time power consumption of each load point through historical data, real-time data or system feedback, perform load forecasting based on data and algorithm models, and perform on / off and load increase / decrease operations on key equipment in the simulation topology structure diagram.

10. The integrated distributed resource operation control simulation system for a new power distribution system according to claim 9, characterized in that: The reactive power regulation group is used to set the power grid control and reactive regulation device in the simulation topology diagram, analyze the voltage state and reactive power situation in the simulation topology diagram, use algorithms and strategies to control the distribution and output of reactive power, and generate and execute corresponding control strategies based on the calculation results.

Citation Information

Patent Citations

  • Active power distribution network advanced application test method and system based on dynamic model simulation

    CN117674410A

  • Power distribution network state evaluation, regulation and control method and system based on field-circuit coupling simulation

    CN117895516A

  • Multi-level graph-model integration method and system for electric power system modeling

    CN118378448A