Management method and system of electric vehicle charging station, storage medium and electronic equipment
By dynamically evaluating the leakage and fire risks of electric vehicle charging stations, issuing early warnings and adjusting the operating status of the charging stations, the problem of insufficient safety in the existing technology is solved and the overall safety of the charging stations is improved.
Patent Information
- Application Number
- CN202410966373.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-07-18
AI Technical Summary
The existing electric vehicle charging station management system lacks a dynamic assessment mechanism when facing leakage and fire risks, resulting in low overall safety and difficulty in adapting to dynamic changes in risks.
By dynamically determining the charging mode based on the current time, combining the charging information and environmental information obtained in real time, the leakage and fire risk values are calculated, and an early warning prompt is issued when the risk value exceeds the threshold, dynamically adjusting the operating status of the charging station to reduce risks.
It has realized the continuous dynamic assessment of leakage and fire risks of electric vehicle charging stations, timely warnings and response measures, improved the overall safety of the charging stations, and avoided the occurrence of safety accidents.
Smart Images

Figure CN118977600A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of charging management technology, and in particular to a management method, system, storage medium and electronic equipment for an electric vehicle charging station. Background Art
[0002] With the rapid development of the new energy vehicle industry, electric vehicle charging stations, as important infrastructure, play an increasingly important role in urban transportation systems. Charging stations not only provide the necessary energy supply for electric vehicles, but are also the key link to ensure the continuous and stable operation of electric vehicles.
[0003] As the number of charging stations increases and the frequency of use increases, charging safety issues are becoming increasingly prominent. Existing charging station management systems mainly focus on charging efficiency and user convenience, and lack a comprehensive and dynamic assessment mechanism for potential safety risks, such as leakage and fire hazards. Existing management methods often use static safety standards, which are difficult to adapt to the safety needs of dynamically changing risks, resulting in low overall safety of charging stations. Summary of the invention
[0004] The present application provides a management method, system, storage medium and electronic device for an electric vehicle charging station, which can improve the overall safety of the charging station.
[0005] In a first aspect, the present application provides a method for managing an electric vehicle charging station, the method comprising: determining a current charging mode of the target charging station based on the current time; In the current charging mode, determining a first charging pile in operation in the target charging station; Obtaining charging information and current environment information of each of the first charging piles; Calculating a leakage risk value and a fire risk value of the target charging station based on the charging information of each of the first charging piles, the environmental information, and the number of the first charging piles; When the leakage risk value or the fire risk value is greater than the corresponding risk threshold, an early warning prompt message is issued.
[0006] By adopting the above technical solution, the charging mode is dynamically determined based on the current time. Combined with the charging information and environmental information obtained in real time, the leakage and fire risks can be continuously and dynamically evaluated, and the leakage risk value and fire risk value of the target charging station can be accurately quantified. When the risk value exceeds the preset threshold, the system can issue an early warning prompt in time to remind the management personnel to take countermeasures, thereby effectively avoiding and reducing the occurrence of safety accidents. Compared with the existing technology, this solution can dynamically evaluate the safety risks faced by charging stations, and is no longer limited to static safety standards, thereby improving the overall safety of charging stations.
[0007] Optionally, the method further includes: Obtaining a historical charging order set of the target charging station, wherein the historical charging order set includes all daily charging orders within a preset time period; Determine the average charging quantity for each time period in a day based on each of the daily charging orders; The time period during which the average charging quantity is not greater than the charging quantity threshold is used as a first time period; The time period during which the average charging quantity is greater than the charging quantity threshold is taken as the second time period.
[0008] By adopting the above technical solution, by obtaining the historical charging order data of the target charging station and analyzing all daily charging orders within the preset time period, the average charging quantity in each time period of the day can be accurately determined, and the time period can be reasonably divided into a first time period in which the average charging quantity is not greater than a threshold, and a second time period in which the average charging quantity is greater than the threshold. The time period division method based on historical data analysis can be more in line with the actual power consumption of the charging station, ensuring the scientificity and rationality of the time period division.
[0009] Optionally, determining the current charging mode of the target charging station based on the current time includes: Determine the time period to which the current time belongs; If the time period belongs to the first time period, determining that the current charging mode is a fast charging mode; If the time period belongs to the second time period, determining that the current charging mode is a slow charging mode; If the time period is a preset third time period, it is determined that the current charging mode is a suspended charging mode.
[0010] By adopting the above technical solution, the operating status of the charging station can be automatically adjusted according to the actual power consumption level in different time periods. The fast charging mode is adopted in the first time period when the average charging number is low, which can improve the charging efficiency; the slow charging mode is adopted in the second time period when the average charging number is high, which can avoid the safety hazards caused by overload operation; and the charging is directly suspended in the preset third time period, which is conducive to saving energy and maintaining equipment.
[0011] Optionally, the charging information includes charging voltage, charging current, and charging time, and the environmental information includes ambient temperature and ambient humidity. The calculating of the leakage risk value and the fire risk value of the target charging station based on the charging information of each of the first charging piles, the environmental information, and the number of the first charging piles includes: In the current charging mode, obtaining the charging output power of each of the first charging piles; Calculating a leakage risk value of the target charging station based on the charging voltage and the charging current of each of the first charging piles, the ambient humidity, and the number of the first charging piles; The fire risk value of the target charging station is calculated based on the charging voltage, charging current, charging duration of each of the first charging piles, the ambient temperature, the number of the first charging piles, and the charging output power.
[0012] By adopting the above technical solutions, the calculation of leakage risk value is based on charging voltage, current, combined with ambient humidity and the number of charging piles; and the calculation of fire risk value is based on charging voltage, current, duration, ambient temperature and the number of charging piles, and also introduces charging output power as an important parameter. These calculation methods are relatively scientific and reasonable, and can accurately quantify the corresponding risk values.
[0013] Optionally, the calculating the leakage risk value of the target charging station based on the charging voltage and the charging current of each of the first charging piles, the ambient humidity, and the number of the first charging piles includes: Substituting the charging voltage, the charging current, the humidity, and the number of the first charging piles into a first calculation formula to obtain a leakage risk value of the target charging station; The first calculation formula is: in, In the formula, R is the leakage risk value, N is the number of the first charging piles, and R i is the leakage risk value of the first charging pile of the i-th charging pile, λ is the additional influencing factor, μ is the charging pile quantity adjustment factor, K is the proportional constant, V i is the charging voltage of the i-th first charging pile, I i is the charging current of the i-th first charging pile, α is the current adjustment factor, β is the humidity adjustment factor, and H is the ambient humidity.
[0014] By adopting the above technical solution, the leakage risk value of each charging pile is first considered, and the key factors such as charging voltage, charging current and environmental humidity are comprehensively calculated. At the same time, by introducing the adjustment factors and, the influence weights of current and humidity on leakage risk can be dynamically adjusted according to the actual situation, and the leakage risk values of all charging piles are further accumulated to obtain a preliminary leakage risk value. In order to reflect the impact of the number of charging piles on leakage risk, the formula introduces the charging pile number adjustment factor and additional influence factor. When the number of charging piles increases, the risk value will be further amplified, and the leakage risk value of the target charging station in the current operating state can be quantified and accurately calculated.
[0015] Optionally, the calculating the fire risk value of the target charging station based on the charging voltage, charging current, charging duration, and ambient temperature of each of the first charging piles, the number of the first charging piles, and the charging output power includes: Substituting the charging voltage, the charging current, the charging time, the ambient temperature, the number of the first charging piles, and the charging output power into a second calculation formula to obtain a fire risk value of the target charging station; The second calculation formula is: Where F is the fire risk value, N is the number of the first charging piles, and F i is the fire risk value of the first charging pile of the i-th charging pile, j is the impact factor of the number of charging piles, a is the proportional adjustment factor, V i is the charging voltage of the i-th first charging pile, I i is the charging current of the first charging pile at i, t i is the charging time of the first charging pile of the i-th charging station, b1 is the voltage factor, b2 is the current factor, b3 is the time factor, T i is the temperature of the first charging pile of the i-th charging station, T is the ambient temperature, d is the power factor, P i is the charging output power of the i-th first charging pile.
[0016] By adopting the above technical solution, the fire risk value of each charging pile is introduced, and the voltage, current, charging time, temperature and charging power of each charging pile are reasonably combined and calculated. At the same time, by introducing adjustment factors, the weight of the influence of each parameter on the fire risk can be dynamically adjusted according to the actual situation. On the basis of calculating a single charging pile, the fire risk values of all charging piles are accumulated to obtain a preliminary fire risk value. In order to reflect the impact of the number of charging piles on the fire risk, the formula introduces the impact factor of the number of charging piles. When the number of charging piles increases, the risk value will be further amplified, and the fire risk value of the target charging station in the current operating state can be quantified and accurately calculated.
[0017] Optionally, the method further includes: When the leakage risk value or the fire risk value is not greater than the corresponding risk threshold, determining a risk level based on the leakage risk value and the fire risk value; If the risk level is level 1, reducing the charging power of the target charging station; If the risk level is the second level, the second charging piles that are in a non-operating state are determined, and the charging interface of each of the second charging piles is closed to limit new charging requests.
[0018] By adopting the above technical solution, when the calculated leakage risk value and fire risk value are not greater than the corresponding risk threshold, the risk level can be further subdivided into the first level and the second level according to the size of the specific risk value. For the first level risk, the charging power of the charging station is reduced, and the operating intensity is appropriately reduced, thereby reducing the risk that may be caused by continued operation. For the second level risk, the charging interface of the charging pile in the non-operating state is closed, and new charging requests are restricted from entering, fundamentally avoiding the further expansion of the risk.
[0019] In a second aspect of the present application, a management system for an electric vehicle charging station is provided, the system comprising: A charging mode determination module, configured to determine a current charging mode of a target charging station based on a current time; A charging pile determination module, configured to determine, in the current charging mode, a first charging pile in operation in the target charging station; An information acquisition module, used to acquire charging information and current environment information of each of the first charging piles; a risk value calculation module, configured to calculate a leakage risk value and a fire risk value of the target charging station based on the charging information of each of the first charging piles, the environmental information, and the number of the first charging piles; The early warning prompt module is used to issue an early warning prompt message when the leakage risk value or the fire risk value is greater than the corresponding risk threshold.
[0020] In a third aspect of the present application, a computer storage medium is provided, wherein the computer storage medium stores a plurality of instructions, wherein the instructions are suitable for being loaded by a processor and executing the above method steps.
[0021] In a fourth aspect of the present application, an electronic device is provided, comprising: a processor and a memory; wherein the memory stores a computer program, and the computer program is suitable for being loaded by the processor and executing the above-mentioned method steps.
[0022] In summary, one or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages: This application dynamically determines the charging mode based on the current time, and combined with the real-time charging information and environmental information, it can conduct continuous dynamic assessment of leakage and fire risks, and can accurately quantify the leakage risk value and fire risk value of the target charging station. When the risk value is monitored to exceed the preset threshold, the system can promptly issue an early warning prompt to remind management personnel to take countermeasures, thereby effectively avoiding and reducing the occurrence of safety accidents. Compared with the existing technology, this solution can dynamically assess the safety risks faced by charging stations, and is no longer limited to static safety standards, thereby improving the overall safety of charging stations. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a flowchart of a method for managing an electric vehicle charging station provided in an embodiment of the present application; Figure 2 It is a module schematic diagram of a management system for an electric vehicle charging station provided in an embodiment of the present application; Figure 3 It is a structural schematic diagram of an electronic device provided in an embodiment of the present application.
[0024] Description of reference numerals: 300, electronic device; 301, processor; 302, communication bus; 303, user interface; 304, network interface; 305, memory. DETAILED DESCRIPTION
[0025] In order to enable technicians in this field to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments.
[0026] In the description of the embodiments of the present application, words such as "for example" or "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "for example" or "for example" is intended to present related concepts in a specific way.
[0027] In the description of the embodiments of the present application, the meaning of the term "multiple" refers to two or more. For example, multiple systems refer to two or more systems, and multiple screen terminals refer to two or more screen terminals. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. The terms "include", "comprise", "have" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.
[0028] The following will provide a clear and complete description of the technical solutions in the embodiments of the present application in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments.
[0029] Please refer to Figure 1, a flow chart of a management method for an electric vehicle charging station is proposed, the method can be implemented by a computer program, can be implemented by a single-chip microcomputer, or can be run on a management system of an electric vehicle charging station, the computer program can be integrated in a management platform, or can be run as an independent tool application, specifically, the method includes steps 10 to 50, the above steps are as follows: Step 10: Determine the current charging mode of the target charging station based on the current time.
[0030] In the embodiment itself, the target charging station refers to the charging station location to be managed, which has multiple charging piles and has the function of adjusting the charging mode, etc.
[0031] The current charging mode refers to a fast charging mode, a slow charging mode or a pause charging mode determined according to the current time period.
[0032] Specifically, to obtain the current time, the system will query the pre-set time period division table, which divides 24 hours a day into multiple time periods, and each time period corresponds to a charging mode. For example, 6:00 am to 10:00 pm may be set as the first time period, corresponding to the fast charging mode; 10:00 pm to 0:00 am is set as the second time period, corresponding to the slow charging mode; and 0:00 am to 6:00 am the next morning may be set as the third time period, corresponding to the suspended charging mode. Compare the current time with these preset time periods to determine the current charging mode that the target charging station should adopt. If the current time falls within the first time period, the system will set the current charging mode to the fast charging mode; if it falls within the second time period, it will be set to the slow charging mode; if it falls within the third time period, it will be set to the suspended charging mode.
[0033] Based on the above embodiment, as an optional embodiment, before the step of determining the current charging mode of the target charging station based on the current time, a process of dividing the charging time based on historical charging orders is also included. The specific process is as follows: Specifically, in order to divide the charging time period more scientifically and optimize the operation strategy of the charging station, the system will first obtain the historical charging order set of the target charging station. This historical charging order set usually includes all daily charging orders in the past period of time (such as nearly 3 months or half a year), and each daily charging order records key information such as the start time, end time, and charging amount of charging.
[0034] After obtaining the historical charging order set, the system will divide the 24 hours of a day into several time periods (for example, one time period per hour), and then count the average number of charging orders in each time period. This process is actually calculating the average charging demand in each time period of a day. In this way, a data curve that reflects the daily usage pattern of the charging station can be obtained. The system will set a charging quantity threshold, which is usually based on factors such as the actual capacity of the charging station, the load capacity of the power grid, and safety considerations. The system divides the time period when the average charging quantity is not greater than this threshold into the first time period, and the time period when the average charging quantity is greater than this threshold into the second time period.
[0035] This division method can automatically identify the peak and valley periods of charging according to the actual usage of the charging station. The first time period actually represents the period of relatively low charging demand, while the second time period represents the period of high charging demand. This dynamic division method based on historical data can more accurately reflect the actual usage pattern of the charging station compared to the fixed time period division.
[0036] Based on the above embodiment, as an optional embodiment, the step of determining the current charging mode of the target charging station based on the current time may further include the following steps: Step 101: Determine the time period to which the current time belongs.
[0037] Specifically, the system will obtain the current time in real time, usually accurate to the minute level, and compare the current time with the preset time period. The preset time period can be one hour per time period. By determining which time period the current time falls within, the time period to which the current time belongs can be obtained. For example, if the current time is 9:35, then the time period to which it belongs is 9:00-10:00.
[0038] Step 102: If the time period belongs to the first time period, determine that the current charging mode is the fast charging mode.
[0039] Specifically, the system will check whether the time period to which the current time belongs falls within the range defined as the first time period. If the current time does belong to the first time period, the system will set the current charging mode to the fast charging mode. The first time period usually corresponds to a period of relatively low charging demand. There are multiple advantages to using the fast charging mode during this period: first, due to the low charging demand, the overall load of the charging station is small, and the use of the fast charging mode will not cause excessive pressure on the power grid; second, the fast charging mode can significantly shorten the single charging time and increase the turnover rate of the charging pile, thereby better meeting user needs; third, providing fast charging services during low-demand periods can attract more users to choose to charge during this period, which helps to balance the usage rate of the charging station throughout the day.
[0040] Step 103: If the time period belongs to the second time period, determine that the current charging mode is a slow charging mode.
[0041] Specifically, the system will determine whether the time period to which the current time belongs falls within the range defined as the second time period. If the current time does belong to the second time period, the system will set the current charging mode to slow charging mode. The second time period usually corresponds to a period of time with higher charging demand. The use of slow charging mode during this period is mainly based on the following considerations: First, the slow charging mode can reduce the power output of a single charging pile, which helps to balance the power load of the entire charging station and avoid excessive pressure on the power grid due to simultaneous fast charging of multiple charging piles; second, the charging process in slow charging mode is more stable, which can reduce equipment overheating and other safety risks; third, the use of slow charging mode during high-demand periods can enable more users to use charging services at the same time, improving overall service capabilities.
[0042] Step 104: If the time period is a preset third time period, determine that the current charging mode is a pause charging mode.
[0043] Specifically, the system will determine whether the time period to which the current time belongs falls within the range defined as the third time period. If the current time does belong to the third time period, the system will set the current charging mode to the suspended charging mode. In the embodiment of the present application, the third time period can be from 0:00 a.m. at night to 6:00 a.m. the next day. The setting of the suspended charging mode in the third time period is mainly based on the following considerations: First, the period from midnight to morning is usually the period with the lowest charging demand, and suspending charging can reduce the operating costs of the charging station; secondly, this period can be used for daily maintenance and inspection of charging equipment to ensure that the equipment can operate stably during peak hours; thirdly, since the monitoring intensity is relatively low at night and safety incidents are prone to occur, suspending charging at night can reduce the occurrence of safety accidents from the source.
[0044] Step 20: Under the current charging mode, determine the first charging pile in operation in the target charging station.
[0045] The first charging pile in the embodiment of the present application refers to the charging pile currently in operation in the target charging station, that is, the charging equipment that is currently charging the electric vehicle.
[0046] Specifically, the charging piles in operation will be screened first according to the previously determined current charging mode (such as fast charging mode, slow charging mode or pause charging mode). Then, the system will establish a connection with all the charging piles in the charging station through a real-time communication protocol to obtain their working status information, which usually includes the switch status of the charging pile, whether there is a vehicle connected, whether charging is in progress, etc. Based on this status information, the system will identify the charging piles that are currently charging electric vehicles and mark them as "first charging piles". Because the operating status of the charging station is constantly changing. Some charging piles may have just started charging, while others may have just finished charging. By determining the first charging pile in operation in real time, the system can always grasp the latest operating status of the charging station. After determining the first charging pile, the system will assign a unique identifier to each first charging pile and record their location information, charging power and other basic parameters, which will be used in the subsequent data collection and analysis process.
[0047] Step 30: Obtain charging information and current environment information of each first charging pile.
[0048] In the embodiment of the present application, charging information refers to data directly related to the charging process, including but not limited to: charging voltage: the voltage value currently output by the charging pile; charging current: the current value currently output by the charging pile; charging time: the time that this charging has lasted; charging power: the output power of the current charging pile; charging amount: the amount of electricity transmitted during this charging process; charging status: such as charging, charging completed, charging abnormality, etc.
[0049] Environmental information in this embodiment of the application refers to the environmental conditions of the charging station and its surroundings, mainly including: Ambient temperature: the current temperature of the charging station; Ambient humidity: the current humidity level of the charging station; Weather conditions: such as sunny, rainy, snowy, etc.
[0050] Specifically, first, a real-time data connection is established with each first charging pile previously determined. Through these connections, the system can continuously obtain charging information, including key parameters such as charging voltage, charging current, charging time, charging power and charging amount. These data are usually collected at a high frequency (such as every second or every few seconds) to ensure that instantaneous changes in the charging process can be captured. At the same time, the system will also obtain environmental information from the environmental monitoring equipment deployed in the charging station, mainly including ambient temperature, ambient humidity, air quality index, etc. The collection frequency of these environmental data may be relatively low (such as every half an hour or every 15 minutes) because environmental conditions usually change slowly. Charging information directly reflects the state and efficiency of the charging process and can be used to evaluate the performance of the charging pile and the charging needs of electric vehicles. For example, by monitoring the charging current and voltage, the system can identify possible charging anomalies, such as overcurrent or undervoltage. Secondly, environmental information is crucial for evaluating charging safety. High temperature or high humidity environment may increase the risk of equipment overheating or leakage, so real-time monitoring is required. Furthermore, the comprehensive analysis of this information can help the system predict potential safety hazards, such as timely adjusting the charging power when the temperature rises to prevent the equipment from overheating.
[0051] Step 40: Based on the charging information and environmental information of each first charging pile and the number of first charging piles, the leakage risk value and the fire risk value of the target charging station are calculated.
[0052] The leakage risk value in the embodiment of the present application refers to the possibility of a leakage accident occurring in the target charging station at the current time. This value is usually a value calculated after comprehensive consideration of multiple factors, and reflects the current electrical safety status of the charging station.
[0053] The fire risk value in the embodiment of the present application refers to the possibility of a fire occurring in the target charging station at the current time. This value is also calculated based on a comprehensive analysis of multiple factors and reflects the current fire safety status of the charging station.
[0054] Specifically, first integrate the previously acquired charging information (including charging voltage, charging current, charging time, etc.) and environmental information (such as ambient temperature, humidity, etc.) of each first charging pile. Then use the preset risk assessment algorithm, combined with the number of first charging piles, to calculate the leakage risk value and the fire risk value respectively. For the calculation of the leakage risk value, the leakage risk value of the target charging station is calculated based on the charging voltage, charging current, ambient humidity, and number of first charging piles of each first charging pile. For the fire risk value, the fire risk value of the target charging station is calculated based on the charging voltage, charging current, charging time, ambient temperature, number of first charging piles, and charging output power of each first charging pile. The evaluation of a single factor may ignore potential risks, and the present application comprehensively considers multiple factors to better capture various possible safety hazards. At the same time, incorporating the number of first charging piles into the calculation can reflect the impact of the overall load of the charging station on safety risks.
[0055] Based on the above embodiment, as an optional embodiment, the step of calculating the leakage risk value and the fire risk value of the target charging station based on the charging information, environmental information and the number of the first charging piles may further include the following steps: Step 401: Under the current charging mode, the charging output power of each first charging pile is obtained.
[0056] Specifically, the data acquisition parameters are set according to the previously determined current charging mode (such as fast charging mode, slow charging mode). The system then establishes a real-time data connection with each device marked as the first charging pile. Through these connections, the system can directly read the real-time output voltage and current values of each charging pile. The charging output power is obtained by multiplying the voltage value and the current value, that is, P=V*I, where P is power, V is voltage, and I is current. The charging power directly reflects the intensity and efficiency of the charging process. In fast charging mode, the charging power is usually higher and may reach 100kW or more; in slow charging mode, the power may drop to 50kW or less. By monitoring these power values, the system can ensure that each charging pile operates within its design parameters to avoid overload or underload.
[0057] Step 402: Calculate the leakage risk value of the target charging station based on the charging voltage and charging current of each first charging pile, as well as the ambient humidity and the number of first charging piles.
[0058] Specifically, the charging voltage, the charging current, the humidity, and the number of the first charging piles are substituted into the first calculation formula to obtain the leakage risk value of the target charging station.
[0059] The first calculation formula is: in, In the formula, R is the leakage risk value, N is the number of the first charging piles, and R i is the leakage risk value of the first charging pile of the i-th charging pile, λ is the additional influencing factor, μ is the charging pile quantity adjustment factor, K is the proportional constant, V i is the charging voltage of the i-th first charging pile, I i is the charging current of the i-th first charging pile, α is the current adjustment factor, β is the humidity adjustment factor, and H is the ambient humidity.
[0060] The calculation formula is divided into the total target charging station leakage risk value and the leakage risk value of each first charging pile. For the total target charging station leakage risk value, the formula consists of two parts: This part is the sum of the leakage risks of all charging piles. The leakage risk of each charging pile is calculated independently and then added up. -μN ) represents the additional impact of the number of charging piles on the total risk. As the number of charging piles increases, the value of this term gradually increases, and the rate of increase is controlled by μ. λ is a proportional constant that determines the maximum potential increase in this impact.
[0061] For the leakage risk value of each first charging pile, Here the ln function is used to smooth the voltage V i The influence of V i The problem of the logarithmic function when I is 0 reflects the nonlinear effect of voltage on leakage risk. i α This part of the current I i The influence of is adjusted by the exponent α, indicating that the influence of current on leakage risk may be nonlinear. The βH part is the influence of ambient humidity H on leakage risk through the coefficient β. This design takes into account the role of humidity in increasing conductivity and leakage risk.
[0062] In summary, this formula combines voltage, current, humidity and the number of charging piles, and can more comprehensively reflect the leakage risk of the charging station. By performing nonlinear processing on voltage and current, it can more accurately simulate the actual impact of voltage and current changes on leakage risk in actual situations. Taking environmental humidity into consideration improves the applicability and accuracy of the formula, making risk assessment more in line with the actual working environment. By dynamically adjusting the additional impact of the number of charging piles, it can cope with the risk assessment of large-scale charging facilities and is suitable for charging stations of different sizes.
[0063] Step 403: Calculate the fire risk value of the target charging station based on the charging voltage, charging current, charging time, and ambient temperature of each first charging pile, the number of first charging piles, and the charging output power.
[0064] Specifically, the charging voltage, charging current, charging time, ambient temperature, the number of first charging piles, and charging output power are substituted into the second calculation formula to obtain the fire risk value of the target charging station; The second calculation formula is: Where F is the fire risk value, N is the number of the first charging piles, and F i is the fire risk value of the first charging pile of the i-th charging pile, j is the impact factor of the number of charging piles, a is the proportional adjustment factor, V i is the charging voltage of the i-th first charging pile, I i is the charging current of the first charging pile at i, t i is the charging time of the first charging pile of the i-th charging station, b1 is the voltage factor, b2 is the current factor, b3 is the time factor, T i is the temperature of the first charging pile of the i-th charging station, T is the ambient temperature, d is the power factor, P i is the charging output power of the i-th first charging pile.
[0065] The calculation formula is divided into the fire risk value of the total target charging station and the fire risk value of each first charging pile. For the fire risk value of the total target charging station, the formula consists of two parts: This part is the sum of the fire risks of all charging piles. The fire risk of each charging pile is calculated independently and then added up. This part is the collective impact value, where ln N Taking the logarithm of the number of charging piles N can control the marginal diminishing effect of a large number of charging piles on the increased risk. It is a saturation function, which ensures that when there are a large number of charging piles, their overall impact on the fire risk will not increase infinitely.
[0066] For the fire risk value of each first charging pile, These terms reflect the impact of voltage, current and charging time on fire risk, where b1, b2 and b3 are the weight factors of their respective factors. By raising them to powers, this form of expression can strengthen or weaken the impact of specific parameters to adapt to their actual contribution to fire risk. is a logistic function used to adjust T according to the difference from the ambient temperature T i The influence of , where c regulates the sensitivity of temperature differences. dcos(P i ) considers the effect of charging output power on fire risk, and the cosine function may be used to simulate periodic or directional effects, such as diurnal variations.
[0067] In summary, the formula achieves a comprehensive assessment of the fire risk of charging stations by integrating multiple key parameters such as voltage, current, charging time, temperature and output power. The use of logistic and cosine functions ensures dynamic and smooth adjustment of parameter effects, enhancing the adaptability and sensitivity of the model. By processing the logarithm and saturation of the number of charging piles, it can be effectively applied to charging stations of different sizes, from small sites to large sites. Combining nonlinear and periodic adjustments improves the accuracy of prediction and better reflects the actual risk situation.
[0068] Step 50: When the leakage risk value or the fire risk value is greater than the corresponding risk threshold, a warning prompt message is issued.
[0069] Specifically, two key thresholds are set first: leakage risk threshold and fire risk threshold. These thresholds are usually set based on the safety standards of the charging station, historical data analysis, and expert experience. Each time a new leakage risk value R and fire risk value F are calculated, the system will immediately compare them with the corresponding thresholds. When the leakage risk value is greater than the corresponding leakage risk threshold or the fire risk value is greater than the corresponding fire risk threshold, an early warning message is issued. The prompt information can be sent to multiple terminals at the same time: the central console of the charging station management system so that managers can immediately notice and take action; the mobile devices of on-site staff to ensure that front-line personnel can respond quickly; the mobile applications of users who are using the affected charging piles to remind them of possible risks.
[0070] Based on the above embodiment, as an optional embodiment, a management method for an electric vehicle charging station may further include the following process: Specifically, the current risk level will be determined based on the calculated leakage risk value and fire risk value, combined with the preset risk assessment matrix. For example, a two-dimensional risk assessment matrix can be defined, with the horizontal axis representing the leakage risk value and the vertical axis representing the fire risk value. The matrix is divided into multiple areas, each of which corresponds to a risk level.
[0071] The risk level may be divided into multiple levels. In this embodiment, the focus is on the first and second level risks. The risk level may be determined by the following method: two intermediate thresholds are set, namely the leakage risk intermediate threshold and the fire risk intermediate threshold, and both intermediate thresholds are less than the corresponding risk thresholds. When the maximum value of the ratio of the leakage risk value to the leakage risk threshold or the ratio of the fire risk value to the fire risk threshold is greater than 0.8, it is determined to be a first level risk; when the maximum value is greater than 0.6 and not greater than 0.8, it is determined to be a second level risk.
[0072] When the risk level is determined to be level 1, measures will be taken to reduce the charging power of the target charging station. The system first calculates the ratio of the current total charging power to the rated safety power, and then determines the percentage of power reduction based on this ratio, for example, a reduction of 10% to 20%. Subsequently, the system sends a power adjustment instruction to all running first charging piles, requiring them to reduce the output power according to the calculated ratio. The system will continue to monitor the changes in the risk value after the power reduction to evaluate the effectiveness of the measures.
[0073] When the risk level is determined to be the second level, a strategy to restrict new charging requests will be adopted. The system first scans the status of all charging piles, identifies the charging piles that are currently in a non-operating state, and marks them as second charging piles. Then it sends instructions to these second charging piles, asking them to close the charging interface. At the same time, the system updates the status of the charging station management system and marks these charging piles as temporarily unavailable. For newly arrived charging requests, the system will guide them to charging piles that are still in operation, or inform the user that the service is currently unavailable.
[0074] By implementing hierarchical risk management when the risk value does not exceed the threshold, the charging station management system achieves more refined and proactive safety control. This approach not only improves the safety of the charging process, but also optimizes the resource utilization efficiency of the charging station, providing strong support for the sustainable development of electric vehicle charging infrastructure.
[0075] See also Figure 2 , is a module diagram of a management system of an electric vehicle charging station provided in an embodiment of the present application. The management system of the electric vehicle charging station may include: a charging mode determination module, a charging pile determination module, an information acquisition module, a risk value calculation module and an early warning prompt module, wherein: A charging mode determination module, configured to determine a current charging mode of a target charging station based on a current time; A charging pile determination module, configured to determine, in the current charging mode, a first charging pile in operation in the target charging station; An information acquisition module, used to acquire charging information and current environment information of each of the first charging piles; a risk value calculation module, configured to calculate a leakage risk value and a fire risk value of the target charging station based on the charging information of each of the first charging piles, the environmental information, and the number of the first charging piles; The early warning prompt module is used to issue an early warning prompt message when the leakage risk value or the fire risk value is greater than the corresponding risk threshold.
[0076] Optionally, a management system for an electric vehicle charging station further includes a time division module, which is used to obtain a historical charging order set for the target charging station, the historical charging order set including all daily charging orders within a preset time period; determine the average charging quantity for each time period within a day based on each of the daily charging orders; take the time period when the average charging quantity is not greater than the charging quantity threshold as the first time period; and take the time period when the average charging quantity is greater than the charging quantity threshold as the second time period.
[0077] Optionally, the charging mode determination module is also used to determine the time period to which the current time belongs; if the time period belongs to the first time period, the current charging mode is determined to be a fast charging mode; if the time period belongs to the second time period, the current charging mode is determined to be a slow charging mode; if the time period is a preset third time period, the current charging mode is determined to be a paused charging mode.
[0078] Optionally, the risk value calculation module is also used to obtain the charging output power of each of the first charging piles in the current charging mode; calculate the leakage risk value of the target charging station based on the charging voltage, charging current, ambient humidity, and the number of the first charging piles of each of the first charging piles; calculate the fire risk value of the target charging station based on the charging voltage, charging current, charging time, ambient temperature, the number of the first charging piles, and the charging output power of each of the first charging piles.
[0079] Optionally, the risk value calculation module is further used to substitute the charging voltage, the charging current, the humidity and the number of the first charging piles into a first calculation formula to obtain a leakage risk value of the target charging station; The first calculation formula is: in, In the formula, R is the leakage risk value, N is the number of the first charging piles, and R i is the leakage risk value of the first charging pile of the i-th charging pile, λ is the additional influencing factor, μ is the charging pile quantity adjustment factor, K is the proportional constant, V i is the charging voltage of the i-th first charging pile, I i is the charging current of the i-th first charging pile, α is the current adjustment factor, β is the humidity adjustment factor, and H is the ambient humidity.
[0080] Optionally, the risk value calculation module is further used to substitute the charging voltage, the charging current, the charging time, the ambient temperature, the number of the first charging piles, and the charging output power into a second calculation formula to obtain a fire risk value of the target charging station; The second calculation formula is: Where F is the fire risk value, N is the number of the first charging piles, and F i is the fire risk value of the first charging pile of the i-th charging pile, j is the impact factor of the number of charging piles, a is the proportional adjustment factor, V i is the charging voltage of the i-th first charging pile, I i is the charging current of the first charging pile at i, t i is the charging time of the first charging pile of the i-th charging station, b1 is the voltage factor, b2 is the current factor, b3 is the time factor, T i is the temperature of the first charging pile of the i-th charging station, T is the ambient temperature, d is the power factor, P i is the charging output power of the i-th first charging pile.
[0081] Optionally, a management system for an electric vehicle charging station further includes a policy execution module, which is used to determine the risk level based on the leakage risk value and the fire risk value when the leakage risk value or the fire risk value is not greater than the corresponding risk threshold; if the risk level is the first level, reducing the charging power of the target charging station; if the risk level is the second level, determining a second charging pile that is in a non-operating state, and closing the charging interface of each of the second charging piles to limit new charging requests.
[0082] It should be noted that: when the system provided in the above embodiment realizes its functions, only the division of the above functional modules is used as an example. In actual applications, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the system and method embodiments provided in the above embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.
[0083] An embodiment of the present application also provides a computer storage medium, which can store multiple instructions. The instructions are suitable for being loaded by a processor and executing a management method for an electric vehicle charging station of the above embodiment. The specific execution process can be found in the specific description of the above embodiment, which will not be repeated here.
[0084] Please refer to Figure 3 The application also discloses an electronic device. Figure 3 The electronic device 300 may include: at least one processor 301 , at least one network interface 304 , a user interface 303 , a memory 305 , and at least one communication bus 302 .
[0085] The communication bus 302 is used to realize the connection and communication between these components.
[0086] The user interface 303 may include a display screen (Display) and a camera (Camera). The optional user interface 303 may also include a standard wired interface and a wireless interface.
[0087] The network interface 304 may optionally include a standard wired interface or a wireless interface (such as a WI-FI interface).
[0088] Among them, the processor 301 may include one or more processing cores. The processor 301 uses various interfaces and lines to connect various parts in the entire server, and executes various functions of the server and processes data by running or executing instructions, programs, code sets or instruction sets stored in the memory 305, and calling data stored in the memory 305. Optionally, the processor 301 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field-Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The processor 301 can integrate one or a combination of a central processing unit (Central Processing Unit, CPU), a graphics processing unit (Graphics Processing Unit, GPU) and a modem. Among them, the CPU mainly processes the operating system, user interface and application programs; the GPU is responsible for rendering and drawing the content to be displayed on the display screen; the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor 301, and it can be implemented separately through a chip.
[0089] Among them, the memory 305 may include a random access memory (Random Access Memory, RAM) and may also include a read-only memory (Read-Only Memory). Optionally, the memory 305 includes a non-transitory computer-readable storage medium. The memory 305 can be used to store instructions, programs, codes, code sets or instruction sets. The memory 305 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc.; the data storage area may store data involved in the above-mentioned various method embodiments, etc. The memory 305 may optionally also be at least one storage device located away from the aforementioned processor 301. Refer to Figure 3 , the memory 305 as a computer storage medium may include an operating system, a network communication module, a user interface module and an application program of a method for managing an electric vehicle charging station.
[0090] exist Figure 3 In the electronic device 300 shown, the user interface 303 is mainly used to provide an input interface for the user and obtain the data input by the user; and the processor 301 can be used to call the application program of a management method of an electric vehicle charging station stored in the memory 305, and when executed by one or more processors 301, the electronic device 300 executes one or more of the methods described in the above embodiments. It should be noted that for the aforementioned method embodiments, for the sake of simple description, they are all expressed as a series of action combinations, but those skilled in the art should know that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also know that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required for the present application.
[0091] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0092] In the several embodiments provided in this application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.
[0093] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0094] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0095] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a memory and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the various embodiments of the present application. The aforementioned memory includes: various media that can store program codes, such as USB flash drives, mobile hard drives, magnetic disks or optical disks.
[0096] The above is only an exemplary embodiment of the present disclosure and cannot be used to limit the scope of the present disclosure. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the disclosure of the specification and the truth of practice, those skilled in the art will easily think of other embodiments of the present disclosure.
[0097] This application is intended to cover any variation, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the art not described in the present disclosure. The description and examples are to be regarded as exemplary only, and the scope and spirit of the present disclosure are defined by the claims.
Claims
1. A management method for an electric vehicle charging station, characterized in that: The method comprises: determining a current charging mode of the target charging station based on the current time; In the current charging mode, determining a first charging pile in operation in the target charging station; Obtaining charging information and current environment information of each of the first charging piles; Calculating a leakage risk value and a fire risk value of the target charging station based on the charging information of each of the first charging piles, the environmental information, and the number of the first charging piles; When the leakage risk value or the fire risk value is greater than the corresponding risk threshold, an early warning prompt message is issued.
2. The management method of an electric vehicle charging station according to claim 1, characterized in that: The method further comprises: Obtaining a historical charging order set of the target charging station, wherein the historical charging order set includes all daily charging orders within a preset time period; Determine the average charging quantity for each time period in a day based on each of the daily charging orders; The time period during which the average charging quantity is not greater than the charging quantity threshold is used as a first time period; The time period during which the average charging quantity is greater than the charging quantity threshold is taken as the second time period.
3. The management method of an electric vehicle charging station according to claim 2, characterized in that: The determining the current charging mode of the target charging station based on the current time includes: Determine the time period to which the current time belongs; If the time period belongs to the first time period, determining that the current charging mode is a fast charging mode; If the time period belongs to the second time period, determining that the current charging mode is a slow charging mode; If the time period is a preset third time period, it is determined that the current charging mode is a suspended charging mode.
4. The management method of an electric vehicle charging station according to claim 1, characterized in that: The charging information includes charging voltage, charging current, and charging duration; the environmental information includes ambient temperature and ambient humidity; and the calculating of the leakage risk value and the fire risk value of the target charging station based on the charging information of each of the first charging piles, the environmental information, and the number of the first charging piles includes: In the current charging mode, obtaining the charging output power of each of the first charging piles; Calculating a leakage risk value of the target charging station based on the charging voltage and the charging current of each of the first charging piles, the ambient humidity, and the number of the first charging piles; The fire risk value of the target charging station is calculated based on the charging voltage, charging current, charging duration of each of the first charging piles, the ambient temperature, the number of the first charging piles, and the charging output power.
5. The management method of an electric vehicle charging station according to claim 4, characterized in that: The calculating the leakage risk value of the target charging station based on the charging voltage and the charging current of each of the first charging piles, the environmental humidity, and the number of the first charging piles includes: Substituting the charging voltage, the charging current, the humidity, and the number of the first charging piles into a first calculation formula to obtain a leakage risk value of the target charging station; The first calculation formula is: in, In the formula, R is the leakage risk value, N is the number of the first charging piles, and R i is the leakage risk value of the first charging pile of the i-th charging pile, λ is the additional influencing factor, μ is the charging pile quantity adjustment factor, K is the proportional constant, V i is the charging voltage of the i-th first charging pile, I i is the charging current of the i-th first charging pile, α is the current adjustment factor, β is the humidity adjustment factor, and H is the ambient humidity.
6. The management method of an electric vehicle charging station according to claim 4, characterized in that: The calculating the fire risk value of the target charging station based on the charging voltage, charging current, charging duration, and ambient temperature of each of the first charging piles, the number of the first charging piles, and the charging output power includes: Substituting the charging voltage, the charging current, the charging time, the ambient temperature, the number of the first charging piles, and the charging output power into a second calculation formula to obtain a fire risk value of the target charging station; The second calculation formula is: Where F is the fire risk value, N is the number of the first charging piles, and F i is the fire risk value of the first charging pile of the i-th charging pile, j is the impact factor of the number of charging piles, a is the proportional adjustment factor, V i is the charging voltage of the i-th first charging pile, I i is the charging current of the first charging pile at i, t i is the charging time of the first charging pile of the i-th charging station, b1 is the voltage factor, b2 is the current factor, b3 is the time factor, T i is the temperature of the first charging pile of the i-th charging station, T is the ambient temperature, d is the power factor, P i is the charging output power of the i-th first charging pile.
7. The management method of an electric vehicle charging station according to claim 1, characterized in that: The method further comprises: When the leakage risk value or the fire risk value is not greater than the corresponding risk threshold, determining a risk level based on the leakage risk value and the fire risk value; If the risk level is level 1, reducing the charging power of the target charging station; If the risk level is the second level, the second charging piles that are in a non-operating state are determined, and the charging interface of each of the second charging piles is closed to limit new charging requests.
8. A management system for an electric vehicle charging station, characterized in that: The system comprises: A charging mode determination module, configured to determine a current charging mode of a target charging station based on a current time; A charging pile determination module, configured to determine, in the current charging mode, a first charging pile in operation in the target charging station; An information acquisition module, used to acquire charging information and current environment information of each of the first charging piles; a risk value calculation module, configured to calculate a leakage risk value and a fire risk value of the target charging station based on the charging information of each of the first charging piles, the environmental information, and the number of the first charging piles; The early warning prompt module is used to issue an early warning prompt message when the leakage risk value or the fire risk value is greater than the corresponding risk threshold.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a plurality of instructions, and the instructions are suitable for being loaded by a processor and executing the method according to any one of claims 1 to 7.
10. An electronic device, characterized in that: It includes a processor, a memory, a user interface and a network interface, the memory is used to store instructions, the user interface and the network interface are used to communicate with other devices, and the processor is used to execute the instructions stored in the memory so that the electronic device executes the method as described in any one of claims 1-7.
Citation Information
Patent Citations
Charging station monitoring regulation and control method and system, electronic equipment and storage medium
CN114333212A
Portable alternating current charging and discharging system, method and equipment for electric vehicle and storage medium
CN115158073A
Early warning monitoring system and method for electric vehicle charging station
CN116834592A
Charging early warning method and device for charging pile
CN117301928A
Electric vehicle charging safety early warning and fire extinguishing treatment integrated method and system
CN117339143A
Cited By
Charging information management method and system based on charging operation platform
CN119693190A
New energy automobile charging station fire early warning system based on AI algorithm
CN120510671A