Mounting device for ship equipment
By designing the installation device of the ship equipment, using components such as balls, oil cylinders and universal joint support to achieve accurate installation, and combining laser positioning, the equipment installation efficiency and hull aesthetics in the existing technology are solved, and the installation accuracy and efficiency are improved. Shortened the construction cycle.
Patent Information
- Application Number
- CN202411349813.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-26
- Publication Date
- 2024-11-19
AI Technical Summary
The prior art requires a lot of manpower and material resources during the installation of large-scale ship equipment, and the outer hull plates are prone to deform after construction, affecting the aesthetics and quality.
A marine equipment installation device is designed, including mounting base, steering assembly, bracket and fastener. The equipment is accurately installed and adjusted through balls, oil cylinders and universal joint support, and positioning detection is carried out in combination with laser emitters. Simplifies the installation process.
It improves the accuracy and efficiency of equipment installation, reduces manpower demand, ensures the integrity and flatness of the outer surface of the hull, and shortens the ship construction cycle.
Smart Images

Figure CN118977825A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of shipbuilding, and in particular to an installation device for ship equipment. Background Art
[0002] For the installation of rudder blades and other equipment on large ships, the current method is to weld the lifting brackets for lifting on the outside of the ship structure, and at the same time build a large number of scaffolding in the construction area for equipment installation to carry out the construction work of the lifting brackets and other projects. After the above-mentioned projects are completed, some scaffolding is removed to carry out the equipment lifting. After the entire operation is completed, the lifting brackets are cut and repaired and the scaffolding is removed. The entire project requires a lot of manpower and material resources. At the same time, the outer plate of the hull will also produce certain deformation after construction, affecting the aesthetics of the hull.
[0003] In summary, it is necessary to provide an improved technical solution to address the above-mentioned deficiencies in the prior art. Summary of the invention
[0004] The purpose of the embodiments of the present application is to provide a device for installing ship equipment, which can assist in the installation of ship equipment and improve the installation accuracy and efficiency of the ship equipment.
[0005] The present application specifically provides a device for installing ship equipment, including:
[0006] An installation base, used for fixed connection with the vehicle panel of the module vehicle;
[0007] A steering assembly is arranged on the top surface of the mounting base, and includes a device turntable; a rotating cylinder is arranged on the side of the device turntable, and the rotating cylinder is used to control the rotation of the device turntable;
[0008] A first bracket, one end of the first bracket is a hinged end, the hinged end is hinged to the equipment turntable, a first jacking cylinder is arranged at the bottom of the first bracket, and the bottom of the first jacking cylinder is fixedly connected to the equipment turntable; a support frame is arranged at one side of the hinged end of the first bracket, the support frame is arranged in a vertical direction, and the support frame and the first bracket form an L-shaped support surface;
[0009] The second bracket is arranged on the top of the first bracket, and the upper surface of the second bracket is used for installing ship equipment; the support frame is fixedly connected to a pushing cylinder, and the telescopic rod of the pushing cylinder is connected to the second bracket for pushing the second bracket out along the length direction of the first bracket.
[0010] In one feasible manner, a first axle seat is arranged on the upper surface of the equipment turntable, and the hinged end is hinged to the first axle seat; a first lifting cylinder is arranged on the upper surface of the equipment turntable, and the free end of the telescopic rod of the first lifting cylinder is fixedly connected to the bottom surface of the first bracket, and the first lifting cylinder causes the first bracket to rotate upward or downward with the hinged end as a fulcrum through telescopic movement.
[0011] In an practicable manner, two rotating cylinders are arranged on the mounting base, and the two rotating cylinders control the rotation angle of the equipment turntable by controlling the extension and contraction amount of the rotating cylinders.
[0012] In one feasible manner, a plurality of balls are evenly distributed between the mounting base and the equipment turntable, and a plurality of arc grooves are arranged on the bottom surface of the equipment turntable and the top surface of the mounting base, each of the arc grooves corresponds to the ball, the depth of the arc groove is smaller than the radius of the ball, and the top and bottom of the ball are respectively arranged in the arc groove.
[0013] In one practicable manner, an auxiliary bracket is arranged between the second bracket and the first bracket; the auxiliary bracket is used to assist the first bracket to move on the second bracket when the driving cylinder pushes the first bracket.
[0014] In an practicable manner, the auxiliary bracket includes a channel steel assembly, a plurality of roller structures and a connecting frame; the channel steel assembly and the connecting frame are arranged along the length direction of the first bracket;
[0015] The channel steel assembly includes two vertical channel steels and two transverse channel steels, the two vertical channel steels are respectively arranged on both sides of the width direction of the first bracket, and the openings of the two vertical channel steels are arranged opposite to each other; the two transverse channel steels are evenly distributed between the two vertical channel steels, and the openings of the two transverse channel steels are arranged upward;
[0016] Each set of roller structures includes a connecting shaft, which is vertically arranged with the channel steel assembly; 4 rollers are evenly distributed on the connecting shaft, the rollers arranged at the ends of the connecting shaft are clamped in the vertical channel steel, and the rollers arranged in the middle of the connecting shaft are clamped in the transverse channel steels respectively;
[0017] The bottom of the connecting frame is fixedly connected to the first bracket and is arranged on the central axis of the first bracket. Multiple connecting shafts are inserted into the connecting frame and are rotatably connected to the connecting frame. Multiple universal joint supports are evenly distributed on the connecting frame. The top surface of the universal joint support abuts against the second bracket.
[0018] In an practicable manner, a plurality of adjustment plates are arranged along the length direction on the outer side of the vertical channel steel, and each of the adjustment plates is arranged along the vertical direction;
[0019] A positioning threaded hole is set at the lower part of the adjustment plate, and the lower part of the adjustment plate is fixedly connected to the vertical channel steel by setting a first fastening bolt in the positioning threaded hole; a long hole is set at the upper part of the adjustment plate, and the upper part of the adjustment plate is fixedly connected to the side of the second bracket by setting a second fastening bolt in the long hole.
[0020] In one feasible manner, a plurality of adjusting bolts are provided at the bottom of the second bracket, and the adjusting bolts are provided on both sides in the width direction of the second bracket; a guide wheel is provided at the bottom of the adjusting bolt, an adjusting nut is sleeved on the adjusting bolt and extends upward, and the top of the adjusting bolt is threadedly connected to the second bracket.
[0021] In one practicable manner, a fastener is provided on the second bracket, and the fastener includes at least an equipment lashing strap, and a locking cylinder is provided at the end of the equipment lashing strap; the equipment lashing strap is provided around the ship equipment; and the telescopic rod of the locking cylinder is fixedly connected to the end of the equipment lashing strap.
[0022] In one feasible manner, a folding bracket is arranged at the rotating end of the first bracket, a second axle seat is arranged between the folding bracket and the first bracket, and the folding bracket and the first bracket are hinged through the second axle seat; a second lifting cylinder is arranged at the bottom of the first bracket, and the telescopic rod of the second lifting cylinder is fixedly connected to the bottom surface of the folding bracket.
[0023] Compared with the prior art, the beneficial effects of this application are:
[0024] This application has a simple structure, is easy to operate, and can be reused. It can be used with a modular vehicle to load and lift ship equipment and accessories to ensure smooth installation. It has high installation accuracy, saves a lot of manpower, and is conducive to promotion and use. Compared with welding hanging codes and building scaffolding, it ensures the integrity and flatness of the outer surface of ship equipment, can save processes, and can also ensure the quality of the ship and shorten the ship construction period.
[0025] By arranging the second bracket and the pushing cylinder, the ship equipment can be pushed out along the length direction of the second bracket.
[0026] By setting the auxiliary bracket, the pushing process of the second bracket is made smoother.
[0027] By arranging the adjusting plate, the adjusting bolt and the universal joint support, the heights of both ends of the second bracket in the width direction can be accurately adjusted to ensure the installation accuracy of the ship equipment.
[0028] By setting the locking cylinder and the equipment lashing belt, after the precision adjustment of the ship equipment is completed, the ship equipment is fixed by the locking cylinder.
[0029] By setting the rotating assembly, the rotating angle of the ship equipment on the horizontal plane can be adjusted, and the installation can be completed on the side of the module car to avoid the module car being too long to affect the installation.
[0030] By setting up the laser transmitter, the installation position of the ship equipment can be located and detected to further ensure the installation accuracy. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a schematic structural diagram of an installation device for ship equipment according to an embodiment of the present invention.
[0032] Figure 2 It is a front view of the second bracket in the installation device of the ship equipment according to the embodiment of the present invention.
[0033] Figure 3 It is a top view of the second bracket in the installation device of the ship equipment according to the embodiment of the present invention.
[0034] Figure 4 It is a structural schematic diagram of a first bracket in the installation device of ship equipment according to an embodiment of the present invention.
[0035] Figure 5 It is a structural schematic diagram of an auxiliary bracket in the installation device of the ship equipment according to an embodiment of the present invention.
[0036] Figure 6 It is a structural schematic diagram of a construction folding ladder in an installation device for ship equipment according to an embodiment of the present invention.
[0037] Figure 7 It is an AA cross-sectional view of an auxiliary bracket in the installation device for ship equipment according to an embodiment of the present invention.
[0038] Figure 8 It is a structural schematic diagram of a steering assembly in an installation device for ship equipment according to an embodiment of the present invention.
[0039] Fig. 9 It is a structural schematic diagram of a universal joint support in an installation device for ship equipment according to an embodiment of the present invention.
[0040] Fig.10 It is a front view of a laser transmitter mounting frame in the installation device of the ship equipment according to an embodiment of the present invention.
[0041] Fig.11 It is a side view of a laser transmitter mounting frame in a mounting device for ship equipment according to an embodiment of the present invention.
[0042] Fig.12 It is a top view of a laser transmitter mounting frame in a mounting device for ship equipment according to an embodiment of the present invention.
[0043] Fig.13 It is a front view of step S2 in the installation device for ship equipment according to an embodiment of the present invention.
[0044] Fig.14 It is a top view of step S2 in the installation device for ship equipment according to an embodiment of the present invention.
[0045] Fig.15 It is a structural diagram of step S4 in the installation device for ship equipment according to an embodiment of the present invention.
[0046] Fig.16 It is a structural schematic diagram of step S5 in the installation device for ship equipment according to an embodiment of the present invention.
[0047] Fig.17 This is another structural schematic diagram of step S5 in the installation device for ship equipment according to an embodiment of the present invention.
[0048] The reference numerals are described as follows:
[0049] 1. Installation base; 2. Module car; 3. Equipment turntable; 4. Rotating cylinder; 5. First bracket; 6. First lifting cylinder; 7. Support frame; 8. First axle seat; 9. Second bracket; 10. Pushing cylinder; 11. Ball; 12. Connecting frame; 13. Vertical channel steel; 14. Horizontal channel steel; 15. Connecting shaft; 16. Roller; 17. Adjusting plate; 18. Universal joint support; 19. Adjusting bolt; 20. Guide wheel; 21. Adjusting nut; 22. Equipment binding belt; 23. Locking cylinder; 24. Construction folding ladder; 25. Folding bracket; 26. Second axle seat; 27. Second lifting cylinder; 28. Insert column; 29. Positioning plate; 30. Installation sleeve; 31. Laser transmitter; 32. Ship equipment; 33. Ballast. DETAILED DESCRIPTION
[0050] The specific embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings. These embodiments are only used to illustrate the present invention, but not to limit the present invention.
[0051] In the description of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0052] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0053] Furthermore, in the description of the present invention, unless otherwise specified, “plurality” means two or more.
[0054] See also Figure 1 and Fig.17 The present application provides a device for installing ship equipment, comprising:
[0055] An installation base 1 is used for fixed connection with a vehicle plate of a module vehicle 2;
[0056] It should be noted that the mounting base 1 and the module vehicle 2 are fixedly connected by bolts.
[0057] A steering assembly is arranged on the top surface of the mounting base 1, and includes a device turntable 3; a rotating cylinder 4 is arranged on the side of the device turntable 3, and the rotating cylinder 4 is used to control the rotation of the device turntable 3;
[0058] It should be noted that if Figure 8 As shown, two rotating cylinders 4 are arranged on the mounting base 1 , and the two rotating cylinders 4 control the rotation angle of the equipment turntable 3 by controlling the extension and contraction amount of the rotating cylinders 4 respectively.
[0059] The first bracket 5, such as Figure 1 and Figure 4 As shown, one end of the first bracket 5 is a hinged end, and the hinged end is hinged to the equipment turntable 3. A first jacking cylinder 6 is arranged at the bottom of the first bracket 5, and the bottom of the first jacking cylinder 6 is fixedly connected to the equipment turntable 3; a support frame 7 is arranged at one side of the hinged end of the first bracket 5, and the support frame 7 is arranged in the vertical direction, and the support frame 7 and the first bracket 5 form an L-shaped support surface;
[0060] Specifically, Figure 8 As shown, a first axle seat 8 is arranged on the upper surface of the equipment turntable 3, and the hinged end is hinged to the first axle seat 8; a first lifting cylinder 6 is arranged on the upper surface of the equipment turntable 3, and the free end of the telescopic rod of the first lifting cylinder 6 is fixedly connected to the bottom surface of the first bracket 5, and the first lifting cylinder 6 enables the first bracket 5 to rotate upward or downward with the hinged end as a fulcrum through telescoping, and the end of the first bracket 5 that rotates upward or downward is configured as a rotating end.
[0061] The second bracket 9, such as Figure 2 and Figure 3 As shown, the second bracket 9 is arranged on the top of the first bracket 5, and the upper surface of the second bracket 9 is used to install the ship equipment 32; the pushing cylinder 10 is fixedly connected to the support frame 7, and the telescopic rod of the pushing cylinder 10 is connected to the second bracket 9, which is used to push the second bracket 9 along the length direction of the first bracket 5.
[0062] In the installation device of the ship equipment 32 provided in the present application, the rotation angle of the first bracket 5 on the horizontal plane is adjusted by setting the steering assembly. In this embodiment, the first bracket 5 is adjusted by 90 degrees so that the length direction of the first bracket 5 is perpendicular to the length direction of the module vehicle 2, which is convenient for the installation of the equipment. By setting the first jacking cylinder 6, the rotation angle of the first bracket 5 on the vertical plane is adjusted to meet the installation requirements of the rudder system equipment. By setting the support frame 7, when the first bracket 5 is tilted on the vertical plane, a support surface is provided for the equipment. By setting the push cylinder 10, the equipment is pushed to the installation position for subsequent installation.
[0063] In an practicable manner, a plurality of balls 11 are evenly distributed between the mounting base 1 and the device turntable 3 . The arrangement of the balls 11 can assist the device turntable 3 to rotate more smoothly.
[0064] It should be noted that a plurality of arc grooves are arranged on the bottom surface of the equipment turntable 3 and the top surface of the mounting base 1, each of the arc grooves corresponds to the ball 11, the depth of the arc groove is smaller than the radius of the ball 11, and the top and bottom of the ball 11 are respectively arranged in the arc grooves.
[0065] In an practicable manner, an auxiliary bracket is disposed between the second bracket 9 and the first bracket 5 ; the auxiliary bracket is used to assist the first bracket 5 to move on the second bracket 9 when the oil cylinder 10 pushes the first bracket 5 .
[0066] Specifically, Figures 4 to 7 As shown, the auxiliary bracket includes a channel steel assembly, a plurality of roller 16 structures and a connecting frame 12; the channel steel assembly and the connecting frame 12 are arranged along the length direction of the first bracket 5;
[0067] like Figure 5 and Figure 7 As shown, the channel steel assembly includes two vertical channel steels 13 and two transverse channel steels 14. The two vertical channel steels 13 are respectively arranged on both sides of the width direction of the first bracket 5, and the openings of the two vertical channel steels 13 are arranged opposite to each other; the two transverse channel steels 14 are evenly distributed between the two vertical channel steels 13, and the openings of the two transverse channel steels 14 are arranged upward.
[0068] like Figure 5 and Figure 7 As shown, each group of roller 16 structures includes a connecting shaft 15, and the connecting shaft 15 is vertically arranged with the channel steel assembly; 4 rollers 16 are evenly distributed on the connecting shaft 15, and the rollers 16 arranged at the ends of the connecting shaft 15 are clamped in the vertical channel steel 13, and the rollers 16 arranged in the middle of the connecting shaft 15 are respectively clamped in the transverse channel steel 14. The roller 16 structure provides auxiliary force when pushing out the second bracket 9, so as to make the pushing smoother.
[0069] The bottom of the connecting frame 12 is fixedly connected to the first bracket 5 and is arranged on the central axis of the first bracket 5. A plurality of connecting shafts 15 are inserted into the connecting frame 12 and are rotatably connected to the connecting frame 12. A plurality of universal joint supports 18 are evenly distributed on the connecting frame 12.
[0070] It should be noted that if Fig. 9 As shown, the top surface of the universal joint support 18 is fixedly connected to the second bracket 9 via an upper connecting flange, the bottom surface of the universal joint support 18 is fixedly connected to the connecting frame 12 via a lower connecting flange, and a rotating shaft is arranged between the upper connecting flange and the lower connecting flange. The upper connecting flange can realize the adjustment of a predetermined angle.
[0071] In an practicable manner, a plurality of adjustment plates 17 are arranged along the length direction on the outer side of the vertical channel steel 13, and each of the adjustment plates 17 is arranged along the vertical direction;
[0072] A positioning threaded hole is provided at the lower part of the adjustment plate 17, and a first fastening bolt is provided in the positioning threaded hole to fix the lower part of the adjustment plate 17 to the vertical channel steel 13; a long hole is provided at the upper part of the adjustment plate 17, and a second fastening bolt is provided in the long hole to fix the upper part of the adjustment plate 17 to the side of the second bracket 9. The height of both sides of the second bracket 9 is adjusted by adjusting the position of the second fastening bolt in the long hole.
[0073] It should be noted that, in this embodiment, the height of the side of the second bracket 9 is adjusted by 1-10 mm through the adjustment plate 17 .
[0074] In one feasible manner, a plurality of adjusting bolts 19 are provided at the bottom of the second bracket 9, and the adjusting bolts 19 are provided on both sides in the width direction of the second bracket 9; a guide wheel 20 is provided at the bottom of the adjusting bolt 19, and an adjusting nut 21 is sleeved on the adjusting bolt 19 and extends upward, and the top of the adjusting bolt 19 is threadedly connected to the second bracket 9, and the height of both sides of the first bracket 5 can be fine-tuned by rotating the adjusting nut 21.
[0075] In one practicable manner, a fastener is provided on the second bracket 9, and the fastener includes at least an equipment lashing belt 22, and a locking cylinder 23 is provided at the end of the equipment lashing belt 22; the equipment lashing belt 22 is arranged around the ship equipment 32; the telescopic rod of the locking cylinder 23 is fixedly connected to the end of the equipment lashing belt 22, and after the adjustment of the second bracket 9 is completed, the equipment lashing belt 22 is fastened to the ship equipment 32 by contracting the telescopic rod.
[0076] It should be noted that one end of the equipment binding belt 22 is fixedly connected to the second bracket 9, and the other end of the equipment binding belt 22 is fixedly connected to the telescopic rod of the locking cylinder 23; or both ends of the equipment binding belt 22 are fixedly connected to the telescopic rod of the locking cylinder 23.
[0077] In one practicable manner, if Figure 6 As shown, a construction folding ladder 24 is provided on the side in the width direction of the first bracket 5, and the construction folding ladder 24 includes a folded state and an unfolded state. When the position of the ship equipment 32 is adjusted, the construction folding ladder 24 is in the folded state, and when the equipment is installed, the construction folding ladder 24 is in the unfolded state. The staff can climb to the installation site via the construction folding ladder 24 to install the equipment.
[0078] In an practicable manner, a folding bracket 25 is provided at the rotating end of the first bracket 5, a second shaft seat 26 is provided between the folding bracket 25 and the first bracket 5, and a connecting shaft 15 is inserted in the second shaft seat 26, so that the folding bracket 25 and the first bracket 5 are hinged. A second jacking oil cylinder 27 is provided at the bottom between the folding bracket 25 and the first bracket 5, the oil cylinder of the second jacking oil cylinder 27 is fixedly connected to the bottom surface of the first bracket 5, and the telescopic rod of the second jacking oil cylinder 27 is fixedly connected to the bottom surface of the folding bracket 25, and the folding of the folding bracket 25 is controlled by the second jacking oil cylinder 27. When the second bracket 9 is pushed to the end of the flipping bracket, the folding bracket 25 is flipped and folded, and one end of the ship equipment 32 is supported by the L-shaped support surface, and the other end of the ship equipment 32 extends outward, ensuring that the installation end of the ship equipment 32 has sufficient installation space for installation.
[0079] In one practicable manner, the present application further includes a laser emitter mounting bracket, which is used to mount a laser emitter 31. The laser emitter 31 is used to locate the installation position of the ship equipment 32, and after the ship equipment 32 is fixed, is used to assist in detecting whether the installation position is accurate.
[0080] Specifically, Figures 10 to 12As shown, the laser emitter mounting frame includes an insertion column 28, the diameter of which corresponds to the inner diameter of the rudder blade shaft hole, and a circle of positioning plates 29 are arranged on the extension of the insertion column 28, and the positioning plates 29 are used to limit the laser emitter mounting frame to be installed at the end of the shaft hole. A mounting sleeve 30 is arranged at the axis of the insertion column 28, and the mounting sleeve 30 is used to insert the laser emitter 31. A plurality of fastening bolts are arranged on the peripheral side of the mounting sleeve 30, and the laser emitter 31 is fixedly mounted on the laser emitter mounting frame by the fastening bolts.
[0081] It should be noted that, in this embodiment, when installing the rudder blade, the laser emitter mounting frame is inserted into the axial hole of the rudder blade for fixation, and the laser emitter 31 is installed on the laser emitter mounting frame.
[0082] In this embodiment, the ship equipment 32 may be a common ship equipment 32 or a rudder blade, etc. When used, the present application includes the following steps:
[0083] S1, hoist the present application onto the module vehicle 2, and fix it to the module vehicle 2. Hoist the ship equipment 32 onto the second bracket 9.
[0084] It should be noted that the ship equipment 32 is first installed on the equipment bracket and then hoisted onto the second bracket 9 .
[0085] S2, such as Fig.13 and Fig.14 As shown, the ship equipment 32 is fixed by fasteners.
[0086] S3, installing the laser transmitter 31 on the laser transmitter mounting frame, and installing the laser transmitter mounting frame into the positioning shaft hole of the ship equipment 32.
[0087] S4, the ship equipment 32 is moved to a predetermined position by the module vehicle 2, and the first bracket 5 is rotated to a predetermined angle by the rotating assembly according to the construction requirements, such as Fig.15 shown.
[0088] S5, such as Fig.16 and Fig.17 As shown, the rotating end of the first bracket 5 is lifted by the first lifting cylinder 6 so that the laser emitted by the laser emitter 31 is pre-aligned with the center of the installation position.
[0089] It should be noted that if Fig.17 As shown, in step S5 , when the first bracket 5 rotates to 90 degrees, a ballast member 33 needs to be provided on the equipment turntable 3 to balance the force on the equipment turntable 3 .
[0090] S6. Unfold the construction folding ladder 24. The construction personnel loosen the bolts in the long holes of the adjustment plate 17 and turn the adjustment nuts 21 on the adjustment bolts 19 to adjust the heights of both sides of the width direction of the ship equipment 32 to ensure that the laser emitted by the laser transmitter 31 is accurately aligned with the center of the installation position to ensure installation accuracy.
[0091] After the alignment is completed, the laser emitter 31 and the mounting bracket of the laser emitter 31 are taken out.
[0092] S7. Push the second bracket 9 to the installation position by pushing the oil cylinder 10, so that the installation shaft hole of the ship equipment 32 passes through the shaft rod at the installation position.
[0093] S8, loosen the fasteners and perform fixed installation of the ship equipment 32.
[0094] In summary, the present application has a simple structure, is easy to operate, and can be reused. It can be used with a modular vehicle to load and lift ship equipment and accessories to ensure smooth installation. It has high installation accuracy, saves a lot of manpower, and is conducive to popularization and use. Compared with processes such as welding hanging codes and building scaffolding, it ensures the integrity and flatness of the outer surface of ship equipment, can save processes, and can also ensure the quality of the ship and shorten the ship construction period.
[0095] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.
Claims
1. A device for installing ship equipment, It is characterized in that include: An installation base, used for fixed connection with the vehicle panel of the module vehicle; A steering assembly, disposed on the top surface of the mounting base, comprising a device turntable; A rotating cylinder is arranged on the side of the equipment turntable, and the rotating cylinder is used to control the equipment turntable to rotate; A first bracket, one end of the first bracket is a hinged end, the hinged end is hinged to the equipment turntable, a first jacking cylinder is arranged at the bottom of the first bracket, and the bottom of the first jacking cylinder is fixedly connected to the equipment turntable; a support frame is arranged at one side of the hinged end of the first bracket, the support frame is arranged in a vertical direction, and the support frame and the first bracket form an L-shaped support surface; The second bracket is arranged on the top of the first bracket, and the upper surface of the second bracket is used for installing ship equipment; the support frame is fixedly connected to a pushing cylinder, and the telescopic rod of the pushing cylinder is connected to the second bracket for pushing the second bracket out along the length direction of the first bracket.
2. The installation device for ship equipment according to claim 1, It is characterized in that A first axle seat is arranged on the upper surface of the equipment turntable, and the hinged end is hinged to the first axle seat; a first lifting cylinder is arranged on the upper surface of the equipment turntable, and the free end of the telescopic rod of the first lifting cylinder is fixedly connected to the bottom surface of the first bracket, and the first lifting cylinder can make the first bracket rotate upward or downward with the hinged end as a fulcrum through telescoping.
3. The installation device for ship equipment according to claim 1, It is characterized in that Two rotating cylinders are arranged on the mounting base, and the two rotating cylinders control the rotating angle of the equipment turntable by controlling the extension and contraction amount of the rotating cylinders.
4. The installation device for ship equipment according to claim 3, It is characterized in that A plurality of balls are evenly distributed between the mounting base and the equipment turntable, and a plurality of arc grooves are arranged on the bottom surface of the equipment turntable and the top surface of the mounting base, each of the arc grooves corresponds to the ball, the depth of the arc groove is smaller than the radius of the ball, and the top and bottom of the ball are respectively arranged in the arc groove.
5. The installation device for ship equipment according to claim 1, It is characterized in that An auxiliary bracket is arranged between the second bracket and the first bracket; the auxiliary bracket is used to assist the first bracket to move on the second bracket when the driving cylinder pushes the first bracket.
6. The installation device for ship equipment according to claim 5, It is characterized in that The auxiliary bracket includes a channel steel assembly, a plurality of roller structures and a connecting frame; the channel steel assembly and the connecting frame are arranged along the length direction of the first bracket; The channel steel assembly includes two vertical channel steels and two transverse channel steels, the two vertical channel steels are respectively arranged on both sides of the width direction of the first bracket, and the openings of the two vertical channel steels are arranged opposite to each other; the two transverse channel steels are evenly distributed between the two vertical channel steels, and the openings of the two transverse channel steels are arranged upward; Each set of roller structures includes a connecting shaft, which is vertically arranged with the channel steel assembly; 4 rollers are evenly distributed on the connecting shaft, the rollers arranged at the ends of the connecting shaft are clamped in the vertical channel steel, and the rollers arranged in the middle of the connecting shaft are clamped in the transverse channel steels respectively; The bottom of the connecting frame is fixedly connected to the first bracket and is arranged on the central axis of the first bracket. Multiple connecting shafts are inserted into the connecting frame and are rotatably connected to the connecting frame. Multiple universal joint supports are evenly distributed on the connecting frame. The top surface of the universal joint support abuts against the second bracket.
7. The installation device for ship equipment according to claim 6, It is characterized in that A plurality of adjustment plates are arranged along the length direction on the outer side of the vertical channel steel, and each of the adjustment plates is arranged along the vertical direction; A positioning threaded hole is set at the lower part of the adjustment plate, and the lower part of the adjustment plate is fixedly connected to the vertical channel steel by setting a first fastening bolt in the positioning threaded hole; a long hole is set at the upper part of the adjustment plate, and the upper part of the adjustment plate is fixedly connected to the side of the second bracket by setting a second fastening bolt in the long hole.
8. The installation device for ship equipment according to claim 7, It is characterized in that A plurality of adjusting bolts are arranged at the bottom of the second bracket, and the adjusting bolts are arranged on both sides of the width direction of the second bracket; a guide wheel is arranged at the bottom of the adjusting bolt, and the adjusting bolt is sleeved with an adjusting nut and extends upward, and the top of the adjusting bolt is threadedly connected to the second bracket.
9. The installation device for ship equipment according to claim 8, It is characterized in that A fastener is arranged on the second bracket, and the fastener comprises at least an equipment lashing belt, and a locking cylinder is arranged at the end of the equipment lashing belt; the equipment lashing belt is arranged around the ship equipment; and the telescopic rod of the locking cylinder is fixedly connected to the end of the equipment lashing belt.
10. The installation device for ship equipment according to claim 1, It is characterized in that A folding bracket is arranged at the rotating end of the first bracket, a second axle seat is arranged between the folding bracket and the first bracket, and the folding bracket and the first bracket are hinged through the second axle seat; a second lifting cylinder is arranged at the bottom of the first bracket, and the telescopic rod of the second lifting cylinder is fixedly connected to the bottom surface of the folding bracket.