Channel non-cutoff rapid repairing method
Through the assembly of modular cofferdams and the use of load balance mechanisms, the installation difficulties and safety risks of cofferdams during large-area channels in water diversion and diversion projects have been solved, and efficient and safe channels are repaired continuously.
Patent Information
- Application Number
- CN202411331961.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2024-11-19
AI Technical Summary
In the existing water diversion and diversion project, the cofferdam cannot cover all repair areas at once when repairing large-area channels are damaged. There are safety risks such as insufficient traction, limited space for lifting equipment, and uneven support displacement load during installation, resulting in repair efficiency. Low and safety hazards.
The cofferdam adopts a modular assembly structure, through the load balance mechanism, uniformly distributes the support force, and uses the assembly process of floating installation and slope installation, equipped with mobile wheels and track-type support to achieve rapid assembly and safe and stable dry-ground construction. environment.
It has achieved continuous water repair of different slope ratios, water heads, and damaged areas, reduced the capacity of installation and traction equipment, improved the repair efficiency and safety, and solved the problem of excessively long repair period on large areas.
Smart Images

Figure CN118979465A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water conservancy project operation and maintenance, and in particular to a method for quickly repairing a channel without interrupting flow. Background Art
[0002] Water diversion and regulation projects have effectively alleviated the severe situation of uneven distribution of water resources in my country. At present, there are more and more large-scale long-distance water diversion and regulation projects under construction and in operation. The main canal of the water diversion and regulation project is a single-line operation. As an irreplaceable water source for the receiving area, it does not have the conditions for water suspension and maintenance. Therefore, the non-stop water cofferdam dry land repair process is often used. However, due to the constraints of transportation and installation conditions, the existing cofferdam is small in size and can generally only cover an area of 9m in length along the direction of the water flow. When the area of the channel damage area is large, the existing cofferdam cannot cover all the repair areas at once, and it is difficult to form an effective water stop at the damaged area. Therefore, it cannot be repaired by repairing in batches. In addition, the cofferdam customized according to the inclination angle of the channel slope cannot be used for the repair of other channel slopes, resulting in great waste. Secondly, when the cofferdam is assembled on the shore and then installed underwater, it relies on traction equipment to move into place, and the traction force must be greater than the component of the cofferdam's own weight along the slope. The horseway at the top of the channel slope is usually narrow, and there is not enough space to set up large-tonnage traction equipment. When the weight of the cofferdam is too large, it will not be able to be assembled and used. After it is in place, the water inside the cofferdam needs to be pumped out to form a dry construction environment. At this time, the water pressure is transmitted to the channel foundation through the support. When the load is transmitted unevenly, it is easy to cause secondary damage to the slope lining. Thirdly, due to the large area of the cofferdam, the existing water-stop structure often cannot meet the requirements of the cofferdam to form a dry environment. Finally, the lifting equipment used for the installation of the cofferdam assembly blocks is limited by the relatively narrow horseway next to the channel, and there are often problems such as difficult to control the assembly blocks and a long installation period. In addition, during the displacement of the support of the existing cofferdam, the cofferdam structure and the channel foundation under the cofferdam face safety risks such as a sharp increase in unit load due to the reduction in the number of supports. Summary of the invention
[0003] In order to solve the above problems, the present invention provides a method for rapid repair of a channel without interruption of flow, which can specifically adopt the following technical solutions: The method for rapid repair of a channel without interruption of flow described in the present invention is carried out according to the steps of pretreatment, cofferdam assembly in place and dry land repair: The cofferdam comprises a channel bottom cofferdam, a slope cofferdam and an angle adaptor connecting the two. The bottom water-passing surface of the channel bottom cofferdam is vertically arranged, the connection surface between the channel bottom cofferdam and the angle adaptor is inclined, and the connection surface between the angle adaptor and the slope cofferdam is perpendicular to the channel slope. The channel bottom cofferdam, the slope cofferdam and the angle adaptor are all composed of assembly units, and the assembly units are all composed of panel components and bottom supports. A first water-stopping structure is arranged between the panel components, a load-sharing balancing mechanism is arranged at the bottom of the bottom support, a second water-stopping structure is arranged between the load-sharing balancing mechanism and the channel bottom surface, and a lifting movable wheel is arranged on the slope cofferdam. The pre-processing comprises: S101, clean up the debris in the area to be repaired in the channel and count the distribution area and number of damaged linings; S102, measuring the actual slope ratio of the channel and determining the channel water depth during the construction period; S103, according to the channel slope ratio, channel water depth, and distribution of the area to be repaired, select assembly units of appropriate specifications and quantity to form the channel bottom cofferdam, side slope cofferdam, and angle adaptation section, so that the top of the assembled cofferdam is 0.3-0.5 meters above the water surface after entering the channel; The cofferdam assembly in place includes: S201, symmetrically install four azimuth-adjusting traction devices on the horseways on both sides of the channel, and install a sliding slope traction device between two azimuth-adjusting traction devices on the side close to the cofferdam, each sliding slope traction device corresponds to a row of assembly units; S202, arranging the assembly units constituting the cofferdam in the order from upstream to downstream and from the bottom of the water to the shore, and pre-pressing the load-balancing chamber of the load-balancing mechanism with water, the pre-pressing value being 0.4 times the standard value; S203, placing the first assembly unit into the channel by means of a hoisting device, and when the first assembly unit is in a stable floating state under the action of the load-reducing bin in the load-balancing mechanism, fixing its position by means of an orientation-adjusting traction device and a slope-sliding traction device; S204, placing the second assembly unit into the channel by means of a lifting device, connecting it to a corresponding slope sliding traction device, and assembling it with the first assembly unit in a floating state; S205, hoisting the remaining assembly units according to the method of step 204, completing the assembly of the channel bottom cofferdam, and adjusting the connection points of the azimuth adjustment traction equipment to the four corners of the channel bottom cofferdam; S206, installing the first assembly unit of the angle adaptor section on the cofferdam at the bottom of the channel according to the method of step 204, and hoisting the remaining assembly units in sequence to complete the assembly of the angle adaptor section; S207, according to the method of step 204, the first assembly unit of the slope cofferdam is installed on the angle adaptation section, and the remaining assembly units are hoisted in sequence to complete the assembly of the first row of slope cofferdams; S208, adjusting the length of the traction rope of the slope sliding traction equipment, using the moving wheel to make the assembled cofferdam slide down a certain distance as a whole, and then completing the assembly of the second row of slope cofferdams according to the method of step 207; S209, assemble all the cofferdams according to the method of step 208, and then move the cofferdam down by the slope sliding traction equipment until the angle adaptation section is located at the junction of the channel bottom and the slope. At this time, the moving wheel is raised to make the bottom surface of each load-balancing mechanism contact with the slope lining, and the cofferdam is put in place; S210, draining the inside of the cofferdam by using a water pump, and pressurizing the load-balancing bins of each assembly unit until the water is pumped out and the pressure of the load-balancing bins reaches the standard value, thus completing the construction of a dry land construction environment in the cofferdam; The dry land restoration includes: S301, repair the slope linings in rows between the bottom supports in order from upstream to downstream; S302, when the repair of the first and second rows of slope linings is completed, the repair of the third row of slope linings and the displacement of the bottom support of the repaired area are performed simultaneously; S303, repair the remaining slope linings and shift the bottom supports according to the method described in step 302 until all construction is completed.
[0004] The assembly unit includes a channel bottom foundation unit on the water-facing side and a channel bottom foundation unit on the back-facing side that constitute a channel bottom enclosure, and a side slope enclosure consisting of a water-facing side slope foundation unit, a back-facing side slope foundation unit and an entrance unit; or, the assembly unit includes a channel bottom foundation unit on the water-facing side, a channel bottom foundation unit on the back-facing side and at least one group of channel bottom extension units located therebetween that constitute a channel bottom enclosure, and a side slope enclosure consisting of a water-facing side slope foundation unit, a back-facing side slope foundation unit, at least one side slope extension unit located therebetween and an entrance unit.
[0005] The bottom supports of the channel bottom foundation unit on the water-facing side, the channel bottom foundation unit on the water-receiving side, the channel bottom extension unit and the inlet unit are all fixed structures; the bottom support of the slope extension unit is a movable structure, and each slope extension unit includes two bottom supports arranged at intervals along the water flow direction; each of the water-facing side slope foundation unit and the water-receiving side slope foundation unit is provided with two bottom supports, one of which is a fixed structure, and the other is a movable structure.
[0006] The moving wheels are arranged on both sides of the water-facing side slope foundation unit and the water-receiving side slope foundation unit, on the outside of the panel of the inlet unit, and on the bottom of the movable bottom support.
[0007] The movable bottom support and panel assembly are assembled on the horseway.
[0008] The load-balancing mechanism includes a load-reducing bin with a cavity structure, a load-balancing bin is arranged below the load-reducing bin, and the load-balancing cavity of the load-balancing bin is enclosed by the bottom plate of the load-reducing bin, a flexible load-balancing plate arranged below the load-balancing bin, and a mounting seat connecting the two; a water pipe whose bottom is connected to the load-balancing cavity is arranged in the load-reducing bin, and two branch pipes are arranged on the top of the water pipe, which pass through the side wall of the load-reducing bin and extend outward, one of the branch pipes is connected to the water filling valve, and the other is connected to the pressure regulating valve.
[0009] The bottom plate of the load-reducing bin is a flat steel plate, the flexible load-balancing plate is a pressure-resistant composite rubber plate, the mounting seat is composed of a seat body, a pressure plate and bolts connecting the two, the seat body includes a vertical plate arranged in a circumferential direction along the periphery of the bottom plate of the load-reducing bin and welded thereto, the bottom of the vertical plate extends horizontally inward to form a support plate, a sealing protrusion is arranged on the bottom surface of the support plate, the pressure plate is a closed annular plate, a sealing groove matching the sealing protrusion is arranged thereon, the flexible load-balancing plate is arranged between the support plate and the pressure plate and connected by the bolts.
[0010] The first water-stop structure includes a water-stop seat, a first water-stop rubber and a second water-stop rubber. The water-stop seat is arranged in the joint of adjacent panel units, the first water-stop rubber is arranged on the top of the panel unit and covers the joint, the second water-stop rubber is arranged between the water-stop seat and the first water-stop rubber, the top surface of the second water-stop rubber is a planar structure provided with a non-return groove, the bottom surface of the second water-stop rubber is an arc structure connected to the water-stop seat, the two sides of the second water-stop rubber are sealed with the panel unit, and the middle part of the second water-stop rubber is provided with a first deformation cavity.
[0011] Anti-warping arc edges are arranged on both sides of the top surface of the first water-stop rubber, and magnetic powder that is magnetically connected to the panel unit is evenly arranged on the bottom surface of the first water-stop rubber; a plurality of anti-slip grooves are arranged on the side surfaces of the second water-stop rubber; the anti-reverse grooves are arranged on both sides of the top surface of the second water-stop rubber and along the extension direction of the splicing seam; the first deformation cavity is a circular through hole extending longitudinally along the splicing seam.
[0012] During the dry land repair process, the bottom support displacement is achieved with the aid of a pair of crawler-type mobile supports; the crawler-type mobile supports include steel pipe column supports arranged on a crawler chassis, and a supporting hydraulic cylinder for connecting a panel assembly is arranged on the top of the steel pipe column support.
[0013] The method for rapid repair of a channel without interruption of flow provided by the present invention adopts a cofferdam with a modular assembly structure, which is easy to transport. The corresponding number of modules can be selected according to the channel slope ratio, the application water depth and the size of the repair area for rapid assembly and placement; secondly, the assembled cofferdam can make the supporting bottom surface closely contact with the channel lining through the load-balancing mechanism, and balance the pressure of the cofferdam on the channel lining, while avoiding the local pressure of the cofferdam support exceeding the bearing capacity of the channel foundation, ensuring the safety of underwater buildings; through the load-reducing cabin in the load-balancing mechanism, buoyancy is generated during the sliding process of the cofferdam installation, greatly reducing the capacity of the traction equipment required for the cofferdam installation, so that large-scale cofferdam repair can be applied. Thirdly, the performance of the water-stopping structure between the panels of the cofferdam assembly blocks and between the cofferdam and the channel lining is improved, providing a safe and stable dry land construction environment for the repair of the channel without interruption of flow, and solving the problem of non-stop water repair after large-scale damage to the channel slope.
[0014] Compared with the prior art, the advantages of the present invention are: 1) This construction method is suitable for non-stop water repair of channels with different slope ratios, water heads, and damaged areas. It has low requirements for channel top space and is easy to arrange; 2) When repairing a large area, the overall shape and weight of the canal bottom enclosure are large. The assembly process combining floating installation and canal slope installation is adopted to solve the problem of difficult position adjustment of the assembly blocks in a narrow space for the lifting equipment, thus improving the assembly efficiency; 3) The support shifting method assisted by two sets of mobile supports is used to eliminate the unfavorable situation of increased force on beams and columns and increased stress on the base caused by the sudden increase in the original support span during the shifting operation, thereby improving the economic benefits of cofferdam repair; 4) The channel slope repair construction and support displacement operations are carried out sequentially and simultaneously without affecting each other, which solves the problem of long construction period for large-scale repairs and greatly improves the repair efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a structural schematic diagram of the cofferdam described in the present invention.
[0016] Figure 2 yes Figure 1 Schematic diagram of the structure after it is in place on the channel slope.
[0017] Figure 3 yes Figure 2 Right view of .
[0018] Figure 4 yes Figure 3 Cross-sectional view of .
[0019] Figure 5a yes Figure 4 AA cross-section diagram.
[0020] Figure 5byes Figure 4 Enlarged view of part B.
[0021] Figure 5c yes Figure 4 Enlarged view of part C.
[0022] Figure 6a , Figure 6b , Figure 6c It is a schematic diagram of the cofferdam assembly with different angle adaptation sections selected according to the slope of the channel.
[0023] Figure 7a It is a force diagram of the retaining structure of the cofferdam described in this application.
[0024] Figure 7b It is a force diagram of the retaining structure of the existing cofferdam.
[0025] Figure 8a , Figure 8b , Figure 8c It is a schematic diagram of a cofferdam constructed of different assembly units according to the present invention.
[0026] Figure 9a It is a structural schematic diagram of the load-sharing balancing mechanism in the present invention.
[0027] Figure 9b yes Figure 9a Enlarged view of part D in .
[0028] Fig.10a yes Figure 5a Enlarged view of part E in .
[0029] Fig.10b yes Fig.10a Schematic diagram of the structure of the second water-stop rubber.
[0030] Fig.10c yes Figure 5a Exploded and enlarged view of part F in the middle.
[0031] Fig.11 It is a structural schematic diagram of the crawler-type mobile support in the present invention.
[0032] Figure 12a-12g It is a schematic diagram of the process of bottom support displacement in the present invention. DETAILED DESCRIPTION
[0033] The following is a detailed description of an embodiment of the present invention in conjunction with the accompanying drawings. This embodiment is implemented on the premise of the technical solution of the present invention, and a detailed implementation method and a specific construction process are given, but the protection scope of the present invention is not limited to the following embodiment.
[0034] The method for rapid repairing a channel without interrupting flow of the present invention is carried out according to the steps of pretreatment, assembling the cofferdam in place and repairing on dry land.
[0035] like Figure 1-Figure 10c As shown, the cofferdam includes an angle adaptor 1, the water side of the angle adaptor 1 is a near-horizontal plane 1a connected to the channel bottom enclosure 2, and the shore side of the angle adaptor 1 is a near-shore plane 1b connected to the slope enclosure 3. The channel bottom enclosure 2 is arranged on the channel bottom plane, the water-facing surface and the back-water surface of the channel bottom enclosure 2 are both arranged in an arc shape (to reduce water resistance), the bottom water-passing surface 2c of the channel bottom enclosure 2 is arranged vertically (to reduce the horizontal thrust of water pressure), and the connection surface between the channel bottom enclosure 2 and the near-horizontal plane 1a of the angle adaptor 1 is arranged inclined; the slope enclosure 3 is arranged along the slope, the water-facing surface and the back-water surface of the slope enclosure 3 are both arranged in an arc shape, and the connection surface between the slope enclosure 3 and the near-shore plane 1b of the angle adaptor 1 is arranged perpendicular to the slope.
[0036] The above-mentioned angle adaptation section 1 is arranged in sections along the direction of the water flow, and the angle between the near-horizontal plane 1a and the near-shore plane 1b is determined according to the slope inclination (see Figure 6a , Figure 6b , Figure 6c That is, the angle adaptor 1 is selected according to the specific angle of the slope inclination, and the installation angle of the slope enclosure 3 is adjusted through the angle adaptor 1, so that the top surface of the slope enclosure 3 can be parallel to the channel slope, thereby facilitating maintenance personnel to enter the cofferdam and ensuring sufficient maintenance operation space.
[0037] The channel bottom enclosure 2 is composed of a channel bottom foundation unit 21 on the water front side and a channel bottom foundation unit 22 on the water back side, or a channel bottom foundation unit 21 on the water front side, a channel bottom foundation unit 22 on the water back side, and at least one group of channel bottom extension units 23 located between the two. Whether to use the channel bottom extension unit 23 and how many channel bottom extension units 23 to use along the water flow direction are determined according to the area of the channel slope repair, so that the final assembled cofferdam can cover all the parts to be repaired. The bottoms of the channel bottom foundation unit 21 on the water front side, the channel bottom foundation unit 22 on the water back side, and the channel bottom extension unit 23 are all vertically arranged water passing surfaces 2c (see Figure 7a ), compared with the existing cofferdam bottom surface perpendicular to the channel slope (see Figure 7b ), the present invention improves the overall force distribution, specifically, reduces the lateral thrust of water pressure along the slope, while increasing the positive pressure on the vertical top surface, correspondingly increasing the friction force, and greatly improving the slope stability of the cofferdam.
[0038] The above-mentioned slope enclosure 3 is composed of the upstream slope basic unit 31, the downstream slope basic unit 32 and the inlet unit 33, or is composed of the upstream slope basic unit 31, the downstream slope basic unit 32, at least one slope extension unit 34 located therebetween, and the inlet unit 33. Generally, the upstream slope basic unit 31 and the upstream channel bottom basic unit 21 have the same splicing length in the water flow direction, the downstream slope basic unit 32 and the downstream channel bottom basic unit 22 have the same splicing length in the water flow direction, and each slope extension unit 34 corresponds to three channel bottom extension units 23 (i.e., one group). The upwelling slope foundation unit 31, the backwater slope foundation unit 32 and the slope extension unit 34 are first spliced into groups according to the water flow length of the channel bottom enclosure 2, and then spliced in sequence from bottom to top along the channel slope. After that, the inlet unit 33 is installed on the top upwelling slope foundation unit 31 and the backwater slope foundation unit 32. The number of slope enclosure units is determined according to the channel water depth, so that the backwater side of the slope enclosure has a safety super height of 0.3-0.5m from the water surface line (see Figure 3 ). Figure 8a The cofferdam shown is composed only of the foundation units and inlet units on the water-facing and water-receiving sides, without involving the extension units; Figure 8b The cofferdam shown is Figure 8a On the basis of the cofferdam shown, three channel bottom expansion units 23 and a row of slope expansion units 34 are added; Figure 8c The cofferdam shown is Figure 8a On the basis of the cofferdam shown, six channel bottom extension units 23 and two rows of slope extension units 34 are used.
[0039] The above-mentioned channel bottom foundation unit 21 on the water front side, channel bottom foundation unit 22 on the water back side, channel bottom extension unit 23, water front side slope foundation unit 31, water back side slope foundation unit 32, slope extension unit 34 and inlet unit 33 (collectively referred to as splicing units) are all composed of a panel assembly 4 and a bottom support 5. Among them, the panel assembly 4 includes a main beam arranged along the water flow direction and a secondary beam arranged perpendicular to the water flow direction. The ends of the main beam and the secondary beam are both provided with end plates 41, and the end plates 41 and the top of the beams are welded with panels 42; the angle adaptation section 1 also adopts the above-mentioned beam-plate structure. In the present invention, the connection between the angle adaptation section 1 and the splicing unit, and the connection between the splicing units are realized by connecting adjacent end plates 41. At the same time, a first water-stopping structure is arranged in the panel splicing seam above the end plate 41 to realize the water sealing of the cofferdam surface.
[0040] The above-mentioned end plate 41 connection includes two modes: rigid connection and flexible connection. Specifically, Figure 5b As shown, a plurality of bolts 43 are used between adjacent end plates 41 arranged along the water flow direction to rigidly connect the pair of panel assemblies 4; Figure 5cAs shown, between adjacent end plates 41 arranged perpendicular to the water flow direction, the pair of panel assemblies are flexibly connected by hinged connection between a pin 44 and a double-ear plate 45, thereby increasing the adaptability of the splicing unit to the uneven slope lining in the damaged area.
[0041] The bottom support 5 of the above-mentioned channel bottom foundation unit 21 on the water front side, the channel bottom foundation unit 22 on the water back side, the channel bottom extension unit 23 and the inlet unit 33 is a fixed structure connected to the panel assembly 4 (see Figure 4 ), the upper part of which is frame-type, the lower part is a load-balancing mechanism 6 in contact with the channel surface, and a second water-stopping structure is arranged on the periphery. Two bottom supports 5 are arranged below the panel assembly 4 of each water-facing side slope foundation unit 31, water-receiving side slope foundation unit 32, and slope extension unit 34, wherein the bottom support 5 on the side close to the curved panel of the water-facing side slope foundation unit 31 and water-receiving side slope foundation unit 32 is a fixed structure connected to the panel assembly 4, and the bottom surface is a load-balancing mechanism 6 in contact with the channel surface, and the inner edge and outer edge of the above-mentioned bottom support 5 are respectively provided with a second water-stopping structure; the bottom support 5 on the other side of the water-facing side slope foundation unit 31 and water-receiving side slope foundation unit 32, and the two bottom supports 5 of the slope extension unit 34 are all movable structures, including one or more hydraulic cylinder-column assemblies 51 connected to the panel assembly 4, and a load-balancing mechanism 6 connected to the channel is arranged below the hydraulic cylinder-column assembly 51. In order to improve the structural stability, two inclined rods 52 are arranged between each hydraulic cylinder-column assembly 51 and the panel assembly 4, and the inclined rods 52 are arranged in the plane where the water flow direction is located; at the same time, a connecting rod 53 perpendicular to the water flow direction is arranged between adjacent hydraulic cylinder-column assemblies 51, and a longitudinal shear device 54 is arranged between the connecting rod 53 and the panel assembly 4. The arrangement of the above-mentioned movable bottom support 5 strengthens the support between the cofferdam panel and the channel slope, improves the overall structural stability of the large-area assembled cofferdam, and, without affecting the overall structure, one or more movable bottom supports 5 can be displaced to meet the channel slope repair requirements.
[0042] like Figure 9a , Figure 9b As shown, the load balancing mechanism 6 includes a load-reducing bin 61 with a cavity structure and a load-balancing bin 62 located below it. The load-balancing cavity of the load-balancing bin 62 is enclosed by a bottom plate 621 of the load-reducing bin 61, a flexible load-balancing plate 622 connected to the channel lining, and a mounting seat connecting the two. Specifically, the bottom plate 621 of the load-reducing bin 61 is made of a flat steel plate, the flexible load-balancing plate 622 is made of a pressure-resistant composite rubber plate for rubber dams, and the mounting seat is composed of a steel seat body 623, a pressure plate 624, and bolts 625 connecting the two. The cross section of the seat body 623 is an L-shaped structure (see Figure 9b), which includes a vertical plate welded to the periphery of the unloading bin bottom plate 621 and arranged in a circumferential direction, the bottom of the vertical plate has an integrated horizontally inwardly extending support plate, and a sealing protrusion 626 is arranged on the bottom surface of the support plate; the pressure plate 624 is a closed annular plate with the same shape as the support plate, and a sealing groove 627 matching the sealing protrusion 626 is arranged on it. The above-mentioned support plate and pressure plate 624 are provided with bolt holes at corresponding intervals, and nuts are welded to the inner upper edge of the L-shaped structure after drilling. When installing the flexible load-balancing plate 622, the flexible load-balancing plate 622 is placed on the support plate of the seat body 623, and then the pressure plate 624 is pressed on the edge of the flexible load-balancing plate 622. The support plate, the flexible load-balancing plate 622 and the pressure plate 624 are fastened together by bolts 625, and the sealing protrusion 626 and the sealing groove 627 press the flexible load-balancing plate 622 and engage to achieve the water tightness of the load-balancing tank. The above-mentioned unloading bin 61 is provided with a water pipe 631 whose bottom is connected to the load equalization chamber. The top of the water pipe 631 is provided with two branches that pass through the side wall of the unloading bin 61 and extend outward, one of which is connected to the water filling valve 632, and the other is connected to the pressure regulating valve 633.
[0043] The pressure regulating valve 633 is used to adjust the pressure value of the load-balancing chamber 62. It calculates the pressure value at the bottom of each splicing unit after the cofferdam is evacuated according to the application conditions of the cofferdam, and is preset before assembly. Under normal circumstances, during the installation of the cofferdam underwater, the buoyancy center of each splicing unit of the channel bottom cofferdam 2 is made to coincide with the center of gravity, and the height is consistent, and its buoyancy is 1.1-1.2 times the gravity, so that the channel bottom cofferdam can be installed in the channel by floating, and then the angle adaptation section 1 is installed, and finally the slope cofferdam 3 is installed on the slope. The setting of the unloading chamber 61 enables the floating installation of the channel bottom cofferdam, avoiding the bottom surface leveling problem faced during the slope installation; at the same time, the buoyancy of each splicing unit of the slope cofferdam 3 is made 0.7-0.8 times the gravity, thereby reducing the total capacity of the cofferdam's sliding traction system. After the cofferdam is in place, water is pumped inside the cofferdam, and as the water level inside the cofferdam drops, the load-balancing chamber 62 is pressurized through the filling valves 632 of each load-balancing balancing mechanism. When the bottom supports 5 of the cofferdam are connected to the channel lining, since the medium in the load-balancing chamber 62 is water and the load-balancing chamber 62 is in contact with the channel lining through the flexible load-balancing plate 622, the upper load can be evenly transferred to the channel slope, avoiding secondary damage to the channel lining caused by excessive local load.
[0044] like Fig.10a , Fig.10bAs shown, the first water-stopping structure includes a water-stopping seat 71, a first water-stopping rubber 72 and a second water-stopping rubber 73. Generally, the water-stopping seat 71 is made of a square steel profile that is easy to process. It is installed in the splicing seam of the panel 41 of the adjacent splicing unit and is welded to the end plates 41 on both sides. After the end plates 41 are spliced, a square water-stopping groove is formed at the splicing seam. The first water-stopping rubber 72 is installed above the water-stopping groove. It is a flat rubber laid on the top of the adjacent panel 41. During manufacturing, the lower surface is evenly filled with magnetic powder, so that it can be magnetically fixed to the top surface of the panel 41. Furthermore, anti-warping arc edges are provided on both sides of the top surface of the first water-stopping rubber 72. After the cofferdam enters the water, under the action of water pressure, the first water-stopping rubber 72 is close to the panel 41 of the splicing unit, thereby forming a seal. In order to prevent the first water-stopping rubber 72 from failing, a second water-stopping rubber 73 is also installed between the water-stopping seat 71 and the first water-stopping rubber 72. The middle part of the second waterproof rubber 73 is provided with a deformation cavity 74, which is a circular through hole extending longitudinally along the joint seam in this embodiment. Fig.10b ) is a planar structure with a non-return groove 75, which is connected to the bottom surface of the first water-stop rubber 72; the bottom surface is an arc-shaped structure, which is connected to the water-stop seat 71. The second water-stop rubber 73 is sealed with the two end plates 41 on both sides. In order to prevent it from falling off, a plurality of anti-skid grooves 76 are provided on the side of the second water-stop rubber 73. The above-mentioned non-return groove 75 is provided on both sides of the top surface of the second water-stop rubber 73, and both are V-shaped grooves provided along the extension direction of the joint. When the first water-stop rubber 72 fails to be waterproof, the top surface is compressed and deformed, and the rubber outside the non-return groove 75 is squeezed toward the end plates 41 on both sides, which improves the tightness of the connection between the two, thereby improving the water-stopping effect.
[0045] like Fig.10c As shown, the second water-stopping structure uses the inverted channel steel welded on the fixed bottom support 5 as a mounting seat 81, in which a third water-stopping rubber 82 whose bottom is connected to the bottom surface of the channel is installed. The top of the third water-stopping rubber 82 is provided with a chamfer, and the side is provided with a corrugated groove 83, so that it can fit tightly and not fall off after being pressed into the mounting seat 81. The cross-section of the third water-stopping rubber 82 below the corrugated groove 83 is a triangular structure, which is located outside the mounting seat 81. This part is provided with a second deformation cavity 84, so that the third water-stopping rubber 82 has a certain amount of pre-compression after being placed on the channel, thereby forming a good seal with the bottom surface of the channel. Furthermore, a third deformation cavity 85 is also provided above the second deformation cavity 84.
[0046] The first waterproof rubber 72, the second waterproof rubber 73 and the third waterproof rubber 82 are all spliced by cold gluing after Z-shaped staggered overlap.
[0047] Since the cofferdam needs to slide down along the channel slope during assembly, lifting wheels 9 are provided on both sides of the water-facing side slope foundation unit 31 and the back-facing side slope foundation unit 32, on the outside of the panel of the inlet unit 33, and on the bottom of the movable bottom support 5. The above-mentioned moving wheels 9 are connected to the hydraulic system, and the vertical lifting of the moving wheels 9 is controlled by the hydraulic system. When the cofferdam is in the state of sliding down for assembly and rising for dismantling, the moving wheels 9 are in a supporting state in contact with the channel slope; after the cofferdam is in place, the moving wheels 9 are in a retracted state, and their lower edges are separated from the channel slope.
[0048] During construction, pretreatment is first carried out, which includes the following work contents: S101, clean up the debris in the area to be repaired in the channel and count the distribution area and number of damaged linings; S102, measuring the actual slope ratio of the channel and determining the channel water depth during the construction period; S103, according to the channel slope ratio, channel water depth, and distribution of the area to be repaired, select assembly units of appropriate specifications and quantity to form the channel bottom cofferdam 2, the slope cofferdam 3, and the angle adaptation section 1, so that the top of the assembled cofferdam is 0.3-0.5 meters above the water surface after entering the channel.
[0049] Next, the cofferdam is assembled in place, which includes the following steps: S201, such as Figure 2 As shown, four azimuth adjustment traction devices K are symmetrically installed on the horseways on both sides of the channel. Usually, the azimuth adjustment device K is located 40-50m upstream and downstream of the cofferdam. In addition, a sliding traction device P is installed between the two azimuth adjustment traction devices K on one side of the cofferdam, and each sliding traction device P corresponds to a column of assembly units.
[0050] S202, the assembly units constituting the cofferdam are arranged in order from upstream to downstream and from the bottom of the water to the shore, and the load-balancing chamber 62 of the load-balancing mechanism 6 is pre-pressurized with water, and the pre-pressurization value is 0.4 times the standard value. The above standard value refers to the working pressure value in the load-balancing chamber 62 when the cofferdam maintains a dry construction environment inside.
[0051] S203, the first assembly unit (i.e., the channel bottom foundation unit 21 on the water-facing surface) is placed into the channel by means of a lifting device. When the first assembly unit is in a stable floating state under the action of the unloading bin 61 in the load-balancing mechanism, its position is fixed by means of an azimuth-adjusting traction device K and a slope-sliding traction device P.
[0052] S204, put the second assembly unit (ie, the channel bottom expansion unit 23) into the channel by means of a lifting device, connect it to the corresponding slope sliding traction device P, and assemble it with the first assembly unit in a floating state. The assembly process includes the installation of the first water stop structure.
[0053] S205, hoist the remaining assembly units (i.e., the channel bottom expansion unit 23 and the back-water channel bottom foundation unit 22) according to the method of step 204, complete the assembly of the channel bottom cofferdam 2, and adjust the connection points of the azimuth adjustment traction device P to the four corners of the channel bottom cofferdam 2. At this time, the bottom of the channel bottom cofferdam 2 is vertically arranged above the water surface.
[0054] S206, according to the method of step 204, the first assembly unit of the angle adapting section 1 is installed on the channel bottom cofferdam 2, and the remaining assembly units are hoisted in sequence to complete the assembly of the angle adapting section 1. At this time, the nearshore plane 1b of the angle adapting section 1 is perpendicular to the channel slope.
[0055] S207 , according to the method of step 204 , the first assembly unit of the slope cofferdam 3 is installed on the angle adaption section 1 , and the remaining assembly units are hoisted in sequence to complete the assembly of the first row of slope cofferdams 3 .
[0056] S208, adjusting the length of the traction rope of the slope sliding traction device P, using the moving wheel 9 to make the assembled cofferdam slide down a certain distance as a whole, and then completing the assembly of the second row of slope cofferdams 3 according to the method of step 207.
[0057] S209, assemble all the cofferdams according to the method of step 208, and then move the cofferdam down by the slope sliding traction equipment P until the angle adaptation section 1 is located at the junction of the channel bottom and the slope. At this time, the moving wheel 9 is raised to make the bottom surface of each load-balancing mechanism 6 connect with the slope lining, and the cofferdam is put in place.
[0058] S210, drain the inside of the cofferdam through a water pump, and at the same time pressurize the equalizing bin 62 of each assembly unit until the water is pumped out and the pressure in the equalizing bin 62 reaches the standard value, thus completing the construction of a dry land construction environment in the cofferdam.
[0059] When the road surface is narrow, the above-mentioned lifting equipment uses a crawler crane or a tower crane; when the road surface is wide, the lifting equipment uses a truck crane. Usually, the assembly unit of the movable bottom support 5 is involved, and the assembly of the movable bottom support 5 and the panel assembly 4 is completed on the road.
[0060] Finally, dry land restoration work is carried out, which includes the following steps: S301, repairing the slope linings in rows between the bottom supports 5 in order from upstream to downstream; S302, when the repair of the first and second rows of slope linings is completed, the repair of the third row of slope linings and the displacement of the bottom support 5 of the repaired area are performed simultaneously; S303, repair the remaining slope linings and shift the bottom support 5 according to the method described in step 302 until all the construction is completed.
[0061] In the above dry land restoration process, the displacement of the bottom support 5 is achieved by means of a pair of crawler-type mobile supports 10. Fig.11 As shown, the crawler type mobile support 10 comprises a steel pipe column support 102 arranged on a crawler chassis 101 , and a supporting hydraulic cylinder 103 for connecting the panel assembly 4 is arranged on the top of the steel pipe column support 102 .
[0062] The process of displacement of the bottom support 5 is described in detail below: After the cofferdam is assembled, the movable bottom supports 5 of adjacent assembly units are arranged in groups of two (see Fig.12a ); During construction, first repair the first row of slope lining on the left side of the No. ① movable bottom support and the second row of slope lining on the right side of the No. ② movable bottom support. After completion, move the No. ① and No. ② movable bottom supports; Figure 12b As shown, two crawler-type movable supports 10 are placed on both sides of the movable bottom supports No. ① and No. ②, wherein there is at least one bottom support installation position between the left crawler-type movable support 10 and the movable bottom support No. ①, so that the movable bottom support No. ① can be smoothly moved to the left side and moved to the repaired channel lining; then, as shown in FIG. Fig.12c As shown, the left crawler movable support 10 is moved to the position before the movement of the movable bottom support No. ①, and the right crawler movable support 10 is moved to the right by at least one position, and then the movable bottom support No. ② is also moved to the right until it reaches the repaired lining, completing the displacement of the movable bottom support No. ②; after the repair of the third row of slope lining on the right side of the movable bottom support No. ④ is completed, the movable bottom supports No. ③ and No. ④ are displaced, as shown in FIG. Fig.12d As shown, the left crawler mobile support 10 is moved to the left side of the movable bottom support No. ②, the right crawler mobile support 10 is moved to the right side of the movable bottom support No. ④, and then the movable bottom support No. ③ is moved to the left to the repaired slope lining on the right side of the movable bottom support No. ②, and then the left crawler mobile support 10 is moved to the position where the movable bottom support No. ③ was before being moved (see Fig.12e ), at the same time, first move the right crawler movable support 10 to the right by at least one position, and then move the movable bottom support No. ④ to the right, until it reaches the repaired lining, completing the displacement of the movable bottom support No. ④; according to the above steps, gradually complete the row-wise repair of the remaining slope linings, and at the same time, shift the bottom support 5 row by row (see Fig.12f ), and repair the slope lining in the area where the bottom support 5 of the row was located before the displacement, until the repair of the entire slope lining is completed (see Figure 12g ).
[0063] When the movable bottom support 5 is displaced, the connection between the diagonal tie rod 52, the longitudinal shear device 54 and the panel assembly 4 is first released, and then the piston rod of the hydraulic cylinder-column assembly 51 is retracted to separate from the panel assembly 4. At this time, the movable bottom support 5 is free to move. When the crawler type movable support 10 is moved, it only needs to retract the piston rod of the supporting hydraulic cylinder 103 to move freely through the crawler chassis 101.
[0064] The above-mentioned support shifting method using two sets of crawler mobile supports 10 for assistance eliminates the unfavorable conditions of a sharp increase in the original support span, increased forces on beams and columns, and increased base stress caused by the hydraulic cylinder of the mobile support being retracted and no longer sharing the bearing capacity during the shifting process, thereby improving the economic benefits of cofferdam repair; at the same time, the channel slope repair construction and support shifting operations can be carried out in sequence and simultaneously without affecting each other, thereby solving the problem of long construction period for large-scale repairs and greatly improving the repair efficiency.
[0065] It should be noted that, in the description of the present invention, terms indicating orientation or positional relationships, such as "front", "rear", "left", "right", "vertical", "horizontal", "inside", "outside", etc., are based on the orientation or positional relationships shown in the drawings and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
Claims
1. A method for rapid repair of a channel without interruption of flow, which is carried out according to the steps of pretreatment, cofferdam assembly and dry land repair, and is characterized by: The cofferdam comprises a channel bottom cofferdam, a slope cofferdam and an angle adaptor connecting the two. The bottom water-passing surface of the channel bottom cofferdam is vertically arranged, the connection surface between the channel bottom cofferdam and the angle adaptor is inclined, and the connection surface between the angle adaptor and the slope cofferdam is perpendicular to the channel slope. The channel bottom cofferdam, the slope cofferdam and the angle adaptor are all composed of assembly units, and the assembly units are all composed of panel components and bottom supports. A first water-stopping structure is arranged between the panel components, a load-sharing balancing mechanism is arranged at the bottom of the bottom support, a second water-stopping structure is arranged between the load-sharing balancing mechanism and the channel bottom surface, and a lifting movable wheel is arranged on the slope cofferdam. The pre-processing comprises: S101, clean up the debris in the area to be repaired in the channel and count the distribution area and number of damaged linings; S102, measuring the actual slope ratio of the channel and determining the channel water depth during the construction period; S103, according to the channel slope ratio, channel water depth, and distribution of the area to be repaired, select assembly units of appropriate specifications and quantity to form the channel bottom cofferdam, side slope cofferdam, and angle adaptation section, so that the top of the assembled cofferdam is 0.3-0.5 meters above the water surface after entering the channel; The cofferdam assembly in place includes: S201, symmetrically install four azimuth-adjusting traction devices on the horseways on both sides of the channel, and install a sliding slope traction device between two azimuth-adjusting traction devices on the side close to the cofferdam, each sliding slope traction device corresponds to a row of assembly units; S202, arranging the assembly units constituting the cofferdam in the order from upstream to downstream and from the bottom of the water to the shore, and pre-pressing the load-balancing chamber of the load-balancing mechanism with water, the pre-pressing value being 0.4 times the standard value; S203, placing the first assembly unit into the channel by means of a hoisting device, and when the first assembly unit is in a stable floating state under the action of the load-reducing bin in the load-balancing mechanism, fixing its position by means of an orientation-adjusting traction device and a slope-sliding traction device; S204, placing the second assembly unit into the channel by means of a lifting device, connecting it to a corresponding slope sliding traction device, and assembling it with the first assembly unit in a floating state; S205, hoisting the remaining assembly units according to the method of step 204, completing the assembly of the channel bottom cofferdam, and adjusting the connection points of the azimuth adjustment traction equipment to the four corners of the channel bottom cofferdam; S206, installing the first assembly unit of the angle adaptor section on the cofferdam at the bottom of the channel according to the method of step 204, and hoisting the remaining assembly units in sequence to complete the assembly of the angle adaptor section; S207, according to the method of step 204, the first assembly unit of the slope cofferdam is installed on the angle adaptation section, and the remaining assembly units are hoisted in sequence to complete the assembly of the first row of slope cofferdams; S208, adjusting the length of the traction rope of the slope sliding traction equipment, using the moving wheel to make the assembled cofferdam slide down a certain distance as a whole, and then completing the assembly of the second row of slope cofferdams according to the method of step 207; S209, assemble all the cofferdams according to the method of step 208, and then move the cofferdam down by the slope sliding traction equipment until the angle adaptation section is located at the junction of the channel bottom and the slope. At this time, the moving wheel is raised to make the bottom surface of each load-balancing mechanism contact with the slope lining, and the cofferdam is put in place; S210, draining the inside of the cofferdam by using a water pump, and pressurizing the load-balancing bins of each assembly unit until the water is pumped out and the pressure of the load-balancing bins reaches the standard value, thus completing the construction of a dry land construction environment in the cofferdam; The dry land restoration includes: S301, repair the slope linings in rows between the bottom supports in order from upstream to downstream; S302, when the repair of the first and second rows of slope linings is completed, the repair of the third row of slope linings and the displacement of the bottom support of the repaired area are performed simultaneously; S303, repair the remaining slope linings and shift the bottom supports according to the method described in step 302 until all construction is completed.
2. The method for rapid repair of a channel without interruption of flow according to claim 1, characterized in that: The assembly unit includes a channel bottom foundation unit on the water-facing side and a channel bottom foundation unit on the back-facing side that constitute a channel bottom enclosure, and a side slope enclosure consisting of a water-facing side slope foundation unit, a back-facing side slope foundation unit and an entrance unit; or, the assembly unit includes a channel bottom foundation unit on the water-facing side, a channel bottom foundation unit on the back-facing side and at least one group of channel bottom extension units located therebetween that constitute a channel bottom enclosure, and a side slope enclosure consisting of a water-facing side slope foundation unit, a back-facing side slope foundation unit, at least one side slope extension unit located therebetween and an entrance unit.
3. The method for rapid repair of a channel without interruption of flow according to claim 2, characterized in that: The bottom supports of the channel bottom foundation unit on the water-facing side, the channel bottom foundation unit on the water-receiving side, the channel bottom extension unit and the inlet unit are all fixed structures; the bottom support of the slope extension unit is a movable structure, and each slope extension unit includes two bottom supports arranged at intervals along the water flow direction; each of the water-facing side slope foundation unit and the water-receiving side slope foundation unit is provided with two bottom supports, one of which is a fixed structure, and the other is a movable structure.
4. The method for rapid repair of a channel without interruption of flow according to claim 3 is characterized in that: The moving wheels are arranged on both sides of the water-facing side slope foundation unit and the water-receiving side slope foundation unit, on the outside of the panel of the inlet unit, and on the bottom of the movable bottom support.
5. The method for rapid repair of a channel without interruption of flow according to claim 4, characterized in that: The movable bottom support and panel assembly are assembled on the horseway.
6. The method for rapid repair of a channel without interruption of flow according to claim 1, characterized in that: The load-balancing mechanism includes a load-reducing bin with a cavity structure, a load-balancing bin is arranged below the load-reducing bin, and the load-balancing cavity of the load-balancing bin is enclosed by the bottom plate of the load-reducing bin, a flexible load-balancing plate arranged below the load-balancing bin, and a mounting seat connecting the two; a water pipe whose bottom is connected to the load-balancing cavity is arranged in the load-reducing bin, and two branch pipes are arranged on the top of the water pipe, which pass through the side wall of the load-reducing bin and extend outward, one of the branch pipes is connected to the water filling valve, and the other is connected to the pressure regulating valve.
7. The method for rapid repair of a channel without interruption of flow according to claim 6, characterized in that: The bottom plate of the load-reducing bin is a flat steel plate, the flexible load-balancing plate is a pressure-resistant composite rubber plate, the mounting seat is composed of a seat body, a pressure plate and bolts connecting the two, the seat body includes a vertical plate arranged in a circumferential direction along the periphery of the bottom plate of the load-reducing bin and welded thereto, the bottom of the vertical plate extends horizontally inward to form a support plate, a sealing protrusion is arranged on the bottom surface of the support plate, the pressure plate is a closed annular plate, a sealing groove matching the sealing protrusion is arranged thereon, the flexible load-balancing plate is arranged between the support plate and the pressure plate and connected by the bolts.
8. The method for rapid repair of a channel without interruption of flow according to claim 1, characterized in that: The first water-stop structure includes a water-stop seat, a first water-stop rubber and a second water-stop rubber. The water-stop seat is arranged in the joint of adjacent panel units, the first water-stop rubber is arranged on the top of the panel unit and covers the joint, the second water-stop rubber is arranged between the water-stop seat and the first water-stop rubber, the top surface of the second water-stop rubber is a planar structure provided with a non-return groove, the bottom surface of the second water-stop rubber is an arc structure connected to the water-stop seat, the two sides of the second water-stop rubber are sealed with the panel unit, and the middle part of the second water-stop rubber is provided with a first deformation cavity.
9. The method for rapid repair of a channel without interruption of flow according to claim 8, characterized in that: Anti-warping arc edges are arranged on both sides of the top surface of the first water-stop rubber, and magnetic powder that is magnetically connected to the panel unit is evenly arranged on the bottom surface of the first water-stop rubber; a plurality of anti-slip grooves are arranged on the side surfaces of the second water-stop rubber; the anti-reverse grooves are arranged on both sides of the top surface of the second water-stop rubber and along the extension direction of the splicing seam; the first deformation cavity is a circular through hole extending longitudinally along the splicing seam.
10. The method for rapid repair of a channel without interruption of flow according to claim 1, characterized in that: During the dry land repair process, the bottom support displacement is achieved with the aid of a pair of crawler-type mobile supports; the crawler-type mobile supports include steel pipe column supports arranged on a crawler chassis, and a supporting hydraulic cylinder for connecting a panel assembly is arranged on the top of the steel pipe column support.