Prevention and control method for coal mining water disasters under strong aquifer of ancient river channel
Through the combination of directional drilling, freezing drilling and drainage drilling, a high-quality grouting curtain is formed, which solves the safety risks and resource waste of coal mining under strong aquifers in the ancient river channel, and achieves efficient and environmentally friendly water damage Prevention and treatment effect.
Patent Information
- Application Number
- CN202411041678.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-19
AI Technical Summary
Traditional methods have problems such as safety risks, waste of resources, environmental impact and low coal recovery rate when mining coal under strong aquifers of the ancient river channel, and cannot effectively prevent and control water damage.
The distribution area of the strong aquifer is determined by direct current method, and a high-quality grouting curtain is formed by combining directional drilling, freezing drilling and drainage drilling, which reduces the water level and blocks the ancient river channel, and improves the slurry with glass fibers. Resistant to flush.
It has achieved safe and efficient water damage prevention and control, reduced water resource waste and environmental impact, improved coal resource recovery rate, and no underground drainage system is required, and is environmentally friendly.
Smart Images

Figure CN118979784A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of mine hydrogeology and mining engineering, and specifically relates to a method for preventing and controlling water hazards in coal mining under a strong aquifer in an ancient river channel. Background Art
[0002] Many coal mines in my country are threatened by roof water damage, especially coal mining under strong aquifers in ancient river channels, which poses a huge risk of water damage. Therefore, water damage prevention and control measures need to be taken.
[0003] Traditional methods for this type of water disaster mainly include draining aquifers for coal mining, underground forced drainage mining, leaving coal pillars or implementing grouting curtains in the mine field, but there are the following problems:
[0004] 1) Draining aquifers for coal mining is relatively safe, but it cannot be implemented if the dynamic recharge of the ancient river channel is large. Therefore, it has certain limitations, and draining aquifers has a certain impact on the natural environment.
[0005] 2) Underground forced drainage mining is simple and easy to implement, but forced drainage has certain safety risks. In addition, it puts a heavy burden on the underground drainage system and is also a waste of water resources.
[0006] 3) Although leaving a coal pillar is relatively safe and easy to implement, it wastes coal resources and the resource recovery rate is not high.
[0007] 4) Implementing a grouting curtain in the mining area is a common method to control this type of water disaster, but the amount of curtain grouting work is huge. If one point is not fully blocked, there is a risk of water inrush. In addition, after the implementation of this type of project, coal pillars need to be left around the curtain to ensure the stability of the curtain.
[0008] In view of this, the inventor hopes to provide a new method for preventing and controlling water hazards in coal mining under strong aquifers in ancient river channels. Summary of the invention
[0009] The purpose of the present invention is to overcome the above-mentioned problems existing in the traditional technology and provide a method for preventing and controlling water hazards in coal mining under strong aquifers in ancient river channels.
[0010] In order to achieve the above technical objectives and the above technical effects, the present invention is implemented through the following technical solutions:
[0011] The present invention provides a method for preventing and controlling water hazards in coal mining under a strong aquifer in an ancient river channel, comprising the following steps:
[0012] S1. Use direct current method to delineate the distribution area of strong aquifer in ancient river channel;
[0013] S2. Observe the water level of the strong aquifer in the ancient river channel, and calculate the flow field of the strong aquifer in the ancient river channel by using the Kriging difference method;
[0014] S3. Set up grouting holes at the minimum cross section of the ancient river channel upstream of the coal mining area;
[0015] S4. Design a set of freezing boreholes 20 to 40 meters upstream of the grouting borehole;
[0016] S5. Design a set of drainage boreholes 20 to 40 meters upstream of the freezing borehole;
[0017] S6. Drill holes for drainage and pump water at maximum capacity;
[0018] S7, after the water level of the drainage borehole is stable, directional drilling is started;
[0019] S8, keeping the freezing borehole cooled and frozen, then injecting grout into the grouting borehole, and sealing the grouting hole after the grouting is completed;
[0020] S9. Keep the drainage boreholes drained and the freezing boreholes frozen, and conduct underground exploration and drainage of water in the coal mining area under the ancient river channel;
[0021] S10. After the coal mining in the ancient river channel area is completed, the drainage of drainage drilling holes and the freezing of freezing drilling holes shall be stopped.
[0022] Furthermore, in step S3, grouting drilling is implemented by directional drilling, and the center of the grouting drilling is located in the coarse-grained sandstone section in the ancient river channel aquifer. If there is no coarse-grained sandstone section, horizontal drilling is maintained; the grouting drilling inclination section is outside the ancient river channel distribution area, and the horizontal drilling section passes through the ancient river channel distribution area.
[0023] Furthermore, in step S4, freeze drilling refers to conventional drilling performed from the ground to the bottom of the coarse-grained sandstone section in the ancient river channel.
[0024] Furthermore, in step S4, the freezing boreholes are distributed along the grouting boreholes, and the distance between adjacent freezing boreholes is 10 to 100 meters; cooling pipes are arranged in all freezing boreholes, and the cooling pipes can freeze the water in the boreholes.
[0025] Furthermore, in step S5, the drainage drilling refers to conventional drilling implemented from the ground, which is drilled to the bottom of the coarse-grained sandstone section in the ancient river channel.
[0026] Furthermore, in step S5, the drainage borehole is divided into two halves based on the orientation of the intersection line of the minimum section of the ancient river channel and the ground; the half facing the grouting borehole is set as a permeable flower pipe, and the half facing away from the grouting borehole is set as a waterproof casing; the spacing between adjacent drainage boreholes is 40 to 100 meters; water pumps are installed in all drainage boreholes, and under the maximum pumping capacity of the water pump, the water level can drop by more than half.
[0027] Furthermore, in step S7, the stable water level of the drainage borehole pumping means that the water level change within 2 hours is less than 1% of the original water level.
[0028] Furthermore, in step S7, the water inflow of the borehole is observed during the directional drilling process, and the observation is performed once every 10 meters of drilling;
[0029] If the increase in water inflow from the borehole is less than 1L / s, continue drilling;
[0030] If the increment is greater than or equal to 1L / s, the three freezing boreholes closest to the observation point will be cooled and frozen;
[0031] If the increase in water volume is still greater than 1L / s after stabilization, the number of frozen boreholes will be expanded to 4; if the number of frozen boreholes is insufficient, the number of frozen boreholes will be increased until the increase is less than 1L / s.
[0032] Furthermore, in step S8, the injected slurry includes cement, clay, water glass, glass fiber and water, and the mass ratio of solid to liquid is 0.5 to 3:1.
[0033] Furthermore, the mass ratio of cement, clay, water glass and glass fiber is 0.5-2:0.5-2:0.5-2:0.05-0.1.
[0034] The beneficial effects of the present invention are:
[0035] 1. The present invention mainly considers the strong water conductivity of the ancient river channel and performs grouting and plugging. Among them, the use of directional drilling can achieve the formation of continuous plugging, avoiding the disadvantage of unstable diffusion radius of conventional boreholes. However, due to the poor dynamic water grouting ability of directional drilling, drainage is carried out in conjunction with drainage holes for drainage and flow reduction. Among them, due to the large amount of water in the ancient river channel, the drainage effect of general boreholes cannot be satisfied, so the method of annular non-complete wells is adopted to mainly drain the water volume downstream. Under the same borehole aperture, the dynamic water volume can be reduced more. If the water drainage and pressure reduction are still not satisfied, local freezing of aquifers is adopted to reduce hydrodynamic conditions and provide better conditions for directional drilling grouting. In addition, glass fiber and the like are added to the grouting borehole to improve the scouring resistance of the slurry. In summary, according to the characteristics of the ancient river channel (the lower coarse-grained section is the main water passage), a high-quality grouting curtain is formed by directional drilling grouting, freezing and drainage, which provides reliable conditions for coal mining under the ancient river channel tax-included lifting.
[0036] 2. Compared with the prior art, the advantages of the present invention are: 1) simple and easy to implement; 2) relatively low cost; 3) high coal resource recovery rate; 4) relatively small amount of water resource discharge, and without passing through the mine, the environment is more friendly; 5) high safety.
[0037] Of course, any product implementing the present invention does not necessarily need to achieve all of the above advantages at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0039] Figure 1 It is a flowchart of the method for preventing and controlling water hazards in coal mining under strong aquifers in ancient river channels of the present invention. DETAILED DESCRIPTION
[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] like Figure 1 As shown, a method for preventing and controlling water hazards in coal mining under a strong aquifer in an ancient river channel comprises the following steps:
[0042] S1. Use direct current method to delineate the distribution area of strong aquifer in ancient river channel.
[0043] S2. Observe the water level of the strong aquifer in the ancient river channel and calculate the flow field of the strong aquifer in the ancient river channel using the Kriging difference method.
[0044] S3. Set up grouting holes at the minimum cross section of the ancient river channel upstream of the coal mining area. Directional drilling is used for grouting drilling. The center of the grouting hole is located in the coarse-grained sandstone section of the ancient river channel aquifer. If there is no coarse-grained sandstone section, horizontal drilling is maintained. The grouting drilling section is outside the distribution area of the ancient river channel, and the horizontal drilling section passes through the distribution area of the ancient river channel.
[0045] S4. A group of freezing boreholes are designed 20 to 40 meters upstream of the grouting borehole. The freezing boreholes are conventionally drilled from the ground and drilled to the bottom of the coarse-grained sandstone section in the ancient river channel. The freezing boreholes are distributed along the grouting boreholes, and the spacing between adjacent freezing boreholes is 10 to 100 meters. Cooling pipes are set in all freezing boreholes, which can freeze the water in the borehole.
[0046] S5. Design a group of drainage boreholes 20 to 40 meters upstream of the freezing borehole. The drainage boreholes are conventionally drilled from the ground to the bottom of the coarse-grained sandstone section in the ancient river channel. The drainage borehole is divided into two halves based on the orientation of the intersection line between the minimum section of the ancient river channel and the ground. The half facing the grouting borehole is set as a permeable flower pipe, and the half facing the back of the grouting borehole is set as a waterproof casing. The spacing between adjacent drainage boreholes is 40 to 100 meters. Water pumps are installed in all drainage boreholes, and the water level can drop by more than half at the maximum pumping capacity of the water pump.
[0047] S6. Drill holes for drainage and pump water at maximum capacity.
[0048] S7. The water level of the drainage borehole is stable, that is, the water level change within 2 hours is less than 1% of the original water level. Then, directional drilling is started. During the implementation of directional drilling, the water inflow of the borehole is observed once every 10 meters of drilling. If the increase in water inflow of the borehole is less than 1L / s, drilling will continue. If the increase is greater than or equal to 1L / s, the 3 frozen boreholes closest to the observation point will be cooled and frozen. If the increase is still greater than 1L / s after the water volume stabilizes, it will be expanded to 4 frozen boreholes (if the number of frozen boreholes is insufficient, the frozen boreholes will be increased) until the increase is less than 1L / s.
[0049] S8. Keep the freezing borehole frozen, and then inject grout into the grouting borehole. The injected slurry contains cement, clay, water glass, glass fiber and water. Among them, the mass ratio of solid to liquid is 0.5:1~3:1. The mass ratio of cement, clay, water glass and glass fiber is: 0.5~2:0.5~2:0.5~2:0.05~0.1. After the grouting is completed, the grouting hole is sealed.
[0050] S9. Keep the drainage boreholes drained and the freezing boreholes frozen, and conduct underground exploration and water drainage in the coal mining area under the ancient river channel.
[0051] S10. After the coal mining in the ancient river channel area is completed, the drainage of drainage drilling holes and the freezing of freezing drilling holes shall be stopped.
[0052] How it works:
[0053] The present invention mainly considers the strong water conductivity of the ancient river channel and performs grouting and plugging. Among them, the use of directional drilling can achieve the formation of continuous plugging, avoiding the disadvantage of unstable diffusion radius of conventional boreholes. However, due to the poor dynamic water grouting ability of directional drilling, drainage drilling with drainage and flow reduction is used. Among them, due to the large amount of water in the ancient river channel, the drainage effect of the general borehole cannot be satisfied, so the method of annular non-complete wells is adopted to mainly drain the water volume downstream. Under the same borehole aperture, the dynamic water volume can be reduced more. If the water drainage and pressure reduction are still not satisfied, the local freezing of the aquifer is adopted to reduce the hydrodynamic conditions and provide better conditions for directional drilling grouting. In addition, glass fiber and the like are added to the grouting borehole to improve the anti-scouring property of the slurry. In summary, according to the characteristics of the ancient river channel (the lower coarse-grained section is the main water passage), a high-quality grouting curtain is formed by directional drilling grouting, freezing and drainage, which provides reliable conditions for coal mining under the tax-included lifting of the ancient river channel.
[0054] The relevant application examples of the present invention are as follows:
[0055] In a large mining area in Northwest my country, there is an ancient river channel. The existing coal mining has a huge amount of water inflow. After years of forced drainage, the water level of the ancient river channel aquifer has not dropped significantly. In order to mine a large amount of coal resources, the following methods are used:
[0056] S1. The direct current method was used to delineate the distribution area of the strong aquifer in the ancient river channel, and it was found that the distribution range of the strong aquifer in the ancient river channel was huge.
[0057] S2. Observe the water level of the strong aquifer in the ancient river channel, and use the Kriging difference method to calculate the flow field of the strong aquifer in the ancient river channel. It is found that the upstream of the coal mining area is in the direction of 15° north-west.
[0058] S3. Grouting drilling is set at the minimum section of the ancient river channel upstream of the coal mining area. Directional drilling is used for grouting drilling. The center of the grouting drilling is located in the coarse-grained sandstone section of the ancient river channel aquifer. If there is no coarse-grained sandstone section, horizontal drilling is maintained. The grouting drilling section is outside the distribution area of the ancient river channel, and the horizontal drilling section passes through the distribution area of the ancient river channel.
[0059] S4. A group of freezing boreholes are designed 30 meters upstream of the grouting borehole. The freezing boreholes are conventionally drilled from the ground to the bottom of the coarse-grained sandstone section in the ancient river channel. The freezing boreholes are distributed along the grouting boreholes, and the spacing between adjacent freezing boreholes varies from 10 to 100 meters. Cooling pipes are set in all freezing boreholes, which can freeze the water in the borehole.
[0060] S5. Design a group of drainage boreholes 30 meters upstream of the freezing borehole. The drainage boreholes are conventionally drilled from the ground and drilled to the bottom of the coarse-grained sandstone section in the ancient river channel. The drainage borehole is divided into two halves based on the orientation of the intersection line of the minimum section of the ancient river channel and the ground. The half facing the grouting borehole is set as a permeable flower pipe, and the half facing the back of the grouting borehole is set as a waterproof casing. The spacing between adjacent drainage boreholes varies, ranging from 40 to 100 meters. Water pumps are installed in all drainage boreholes, and the water level can drop by more than half at the maximum pumping capacity of the water pump.
[0061] S6. Drill holes for drainage and pump water at maximum capacity.
[0062] S7. After the water level of the drainage borehole is stable, directional drilling is started. During the directional drilling process, the water inflow of the borehole is observed, and the observation is made once every 10 meters. If the water inflow increment of the borehole is less than 1L / s, the drilling is continued. If there are 4 increments greater than or equal to 1L / s, the 3 frozen boreholes closest to the observation point are cooled and frozen. If the increment of one of them is still greater than 1L / s after the water volume is stabilized, it is expanded to 4 frozen boreholes until the increment is less than 1L / s.
[0063] S8. Keep the freezing borehole frozen, and then inject grout into the grouting borehole. The injected slurry contains cement, clay, water glass, glass fiber and water. The mass ratio of solid to liquid is 1-1. The mass ratio of cement, clay, water glass and glass fiber is 1:1:1:0.1. After the grouting is completed, the grouting hole is sealed.
[0064] S9. Keep the drainage boreholes drained and the freezing boreholes frozen, and conduct underground exploration and water drainage in the coal mining area under the ancient river channel.
[0065] S10. After the coal mining in the ancient river channel area is completed, the drainage of drainage drilling holes and the freezing of freezing drilling holes shall be stopped.
[0066] This project carried out regional governance and liberated about 1 billion tons of coal resources in the downstream. During the mining of related coal resources, no water inrush from the ancient river channel with strong water content in the roof occurred.
[0067] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A method for preventing and controlling water hazards in coal mining under strong aquifers in ancient river channels. It is characterized in that The steps include: S1. Use direct current method to delineate the distribution area of strong aquifer in ancient river channel; S2. Observe the water level of the strong aquifer in the ancient river channel, and calculate the flow field of the strong aquifer in the ancient river channel by using the Kriging difference method; S3. Set up grouting holes at the minimum cross section of the ancient river channel upstream of the coal mining area; S4. Design a set of freezing boreholes 20 to 40 meters upstream of the grouting borehole; S5. Design a set of drainage boreholes 20 to 40 meters upstream of the freezing borehole; S6. Drill holes for drainage and pump water at maximum capacity; S7, after the water level of the drainage borehole is stable, directional drilling is started; S8, keeping the freezing borehole cooled and frozen, then injecting grout into the grouting borehole, and sealing the grouting hole after the grouting is completed; S9. Keep the drainage boreholes drained and the freezing boreholes frozen, and conduct underground exploration and drainage of water in the coal mining area under the ancient river channel; S10. After the coal mining in the ancient river channel area is completed, the drainage of drainage drilling holes and the freezing of freezing drilling holes shall be stopped.
2. The method for preventing and controlling water hazards in coal mining under strong aquifers in ancient river channels according to claim 1, It is characterized in that In step S3, grouting drilling is implemented by directional drilling, and the center of the grouting drilling is located in the coarse-grained sandstone section in the ancient river channel aquifer. If there is no coarse-grained sandstone section, horizontal drilling is maintained; the grouting drilling inclination section is outside the ancient river channel distribution area, and the horizontal drilling section passes through the ancient river channel distribution area.
3. The method for preventing and controlling water hazards in coal mining under strong aquifers in ancient river channels according to claim 1, It is characterized in that In step S4, freeze drilling refers to conventional drilling performed from the ground to the bottom of the coarse-grained sandstone section in the ancient river channel.
4. The method for preventing and controlling water hazards in coal mining under strong aquifers in ancient river channels according to claim 1, It is characterized in that In step S4, freezing boreholes are distributed along the grouting boreholes, and the distance between adjacent freezing boreholes is 10 to 100 meters; cooling pipes are arranged in all freezing boreholes, and the cooling pipes can freeze the water in the boreholes.
5. The method for preventing and controlling water hazards in coal mining under strong aquifers in ancient river channels according to claim 1, It is characterized in that In step S5, the drainage drilling refers to conventional drilling implemented from the ground, which is drilled to the bottom of the coarse-grained sandstone section in the ancient river channel.
6. The method for preventing and controlling water hazards in coal mining under strong aquifers in ancient river channels according to claim 1, It is characterized in that In step S5, the drainage borehole is divided into two halves based on the orientation of the intersection line of the minimum section of the ancient river channel and the ground; the half facing the grouting borehole is set as a permeable flower pipe, and the half facing away from the grouting borehole is set as a waterproof casing; the spacing between adjacent drainage boreholes is 40 to 100 meters; water pumps are installed in all drainage boreholes, and under the maximum pumping capacity of the water pump, the water level can drop by more than half.
7. The method for preventing and controlling water hazards in coal mining under strong aquifers in ancient river channels according to claim 1, It is characterized in that In step S7, the stable water level of the drainage borehole pumping means that the water level change within 2 hours is less than 1% of the original water level.
8. The method for preventing and controlling water hazards in coal mining under strong aquifers in ancient river channels according to claim 1, It is characterized in that In step S7, the water inflow of the borehole is observed during the directional drilling process, and the observation is performed once every 10 meters of drilling; If the increase in water inflow from the borehole is less than 1L / s, continue drilling; If the increment is greater than or equal to 1L / s, the three freezing boreholes closest to the observation point will be cooled and frozen; If the increase in water volume is still greater than 1L / s after stabilization, the number of frozen boreholes will be expanded to 4; if the number of frozen boreholes is insufficient, the number of frozen boreholes will be increased until the increase is less than 1L / s.
9. The method for preventing and controlling water hazards in coal mining under strong aquifers in ancient river channels according to claim 1, It is characterized in that In step S8, the injected slurry includes cement, clay, water glass, glass fiber and water, and the mass ratio of solid to liquid is 0.5 to 3:
1.
10. The method for preventing and controlling water hazards in coal mining under strong aquifers in ancient river channels according to claim 9, It is characterized in that The mass ratio of cement, clay, water glass and glass fiber is 0.5-2:0.5-2:0.5-2:0.05-0.1.
Citation Information
Cited By
Roadway roof supporting method
CN119878185A