Method and device for identifying fault of power transformer based on leakage current of iron core clamp
By analyzing the leakage current fundamental wave and harmonic components of the core and clamp of the power transformer, identifying the power transformer faults, the problem of low accuracy and reliability of fault detection in the existing technology is solved, and weak and intermittent faults are achieved timely discovery.
Patent Information
- Application Number
- CN202411345916.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-26
- Publication Date
- 2024-11-19
AI Technical Summary
In the prior art, in the power transformer fault detection, the accuracy and reliability of the fault detection results are low, and it is particularly difficult to detect weak ground faults and intermittent faults in a timely manner.
By obtaining the fundamental and harmonic components of the leakage current of the iron core and clamp, calculate the effective value and harmonic content of each component, and determine whether the grounding current is abnormal, thereby identifying the fault of the power transformer. The method includes sampling, FFT calculation, harmonic content calculation and abnormality judgment, and current analysis is performed using iron core signal conditioning circuit, clamp signal conditioning circuit, parallel analog-to-digital conversion unit and central processing module.
It improves the accuracy and reliability of power transformer fault detection, can promptly detect weak grounding faults and intermittent faults, and reduces the false alarm rate and missed alarm rate.
Smart Images

Figure CN118980973A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of electric power, and in particular to a method and device for identifying power transformer faults based on core clamp leakage current. Background Art
[0002] The power transformer is a device that uses the principle of electromagnetic induction to change the AC voltage. Its main components are the primary coil, the secondary coil and the iron core. The iron core in the power transformer is usually made of hot-rolled or cold-rolled silicon steel sheets with a high silicon content. The iron core and the windings on it together form a complete electromagnetic induction system. The clamps in the power transformer are used to fasten the iron core, and support plates can be welded on it to fix the leads. In order to ensure the normal operation of the power transformer, the iron core and the clamps must have a reliable grounding point. If there is no grounding, the iron core and the clamps may form a suspended voltage on the terrain, resulting in intermittent discharge. If the iron core and the clamps are grounded at two or more points, the uneven potential will generate a circulating current between the grounding points, which will cause overheating failure. Therefore, the iron core and the clamps can only have one grounding point to avoid the risk of multiple grounding points.
[0003] In some scenarios, the internal faults of power transformers usually go through a gradual development process, and the early signs of faults are often weak and intermittent. When analyzing the faults of power transformers, the grounding current of the core and clamps of the power transformer can be analyzed to analyze whether the power transformer is faulty. When analyzing the grounding current of the core and clamps of the power transformer, the traditional method mainly focuses on the full current of the power transformer and determines whether there is an abnormality through periodic measurement. The alarm is triggered only when the full current exceeds the preset threshold, but this often fails to detect weaker grounding faults and intermittent faults in time, and the accuracy and reliability of the fault detection results of the power transformer are low. Summary of the invention
[0004] The purpose of the embodiments of the present application is to provide a method and device for identifying power transformer faults based on core clamp leakage current, so as to solve the problem of low accuracy and reliability of power transformer fault detection results.
[0005] In order to solve the above technical problems, the embodiments of the present application are implemented as follows:
[0006] In a first aspect, an embodiment of the present application provides a method for identifying a fault of a power transformer based on a leakage current of a core clamp, and the method for identifying a fault of a power transformer based on a leakage current of a core clamp comprises: respectively obtaining a first effective value of a fundamental wave of a first leakage current of a core of the power transformer, a second effective value of a fundamental wave of a second leakage current of a clamp for fixing the core, a third effective value of a harmonic of the first leakage current, and a fourth effective value of a harmonic of the second leakage current; determining a first harmonic content of the core according to the first effective value and the third effective value, and determining a second harmonic content of the clamp according to the second effective value and the fourth effective value; determining whether a grounding current of the core is abnormal according to the first effective value and the first harmonic content, and determining whether a grounding current of the clamp is abnormal according to the second effective value and the second harmonic content; identifying a fault of the power transformer according to the abnormality of the grounding current of the core and / or the abnormality of the grounding current of the clamp.
[0007] In the second aspect, an embodiment of the present application provides a device for identifying power transformer faults based on core clamp leakage current, and the device for identifying power transformer faults based on core clamp leakage current includes: a core signal conditioning circuit, a clamp signal conditioning circuit, a parallel analog-to-digital conversion unit and a central processing module; one end of the core signal conditioning circuit and one end of the clamp signal conditioning circuit are both connected to the three-phase current transformer, the other end of the core signal conditioning circuit and the other end of the clamp signal conditioning circuit are both connected to one end of the parallel analog-to-digital conversion unit, and the other end of the parallel analog-to-digital conversion unit is connected to the central processing module; the core signal conditioning circuit is used to detect the first leakage current of the core output by the three-phase current transformer. The fundamental wave is conditioned and the harmonics of the first leakage current are conditioned to determine the first effective value of the fundamental wave and the third effective value of the harmonics of the first leakage current; the clamp signal conditioning circuit is used to condition the fundamental wave of the second leakage current of the clamp output by the three-phase current transformer and the harmonics of the second leakage current to determine the second effective value of the fundamental wave of the second leakage current and the fourth effective value of the harmonics of the second leakage current; the parallel analog-to-digital conversion unit is used to convert the first leakage current and the second leakage current into analog-to-digital conversion and input them into the central processing module; the central processing module is used to execute the steps of the method for identifying power transformer faults based on core clamp leakage current as mentioned in the first aspect.
[0008] Through the technical solution disclosed in the embodiment of the present application, first, a first effective value of the fundamental wave of the first leakage current of the iron core of the power transformer, a second effective value of the fundamental wave of the second leakage current of the clamp used to fix the iron core, a third effective value of the harmonic of the first leakage current, and a fourth effective value of the harmonic of the second leakage current are respectively obtained; then, the first harmonic content of the iron core is determined according to the first effective value and the third effective value, and the second harmonic content of the clamp is determined according to the second effective value and the fourth effective value; then, whether the grounding current of the iron core is abnormal is determined according to the first effective value and the first harmonic content, and whether the grounding current of the clamp is abnormal is determined according to the second effective value and the second harmonic content; finally, according to the abnormal situation of the grounding current of the iron core and / or the abnormal situation of the grounding current of the clamp, the fault of the power transformer is identified.
[0009] In this way, the embodiment of the present application can simultaneously monitor the leakage current of the iron core and the clamp of the power transformer, and judge whether the grounding current is abnormal by analyzing the fundamental component and harmonic component of the leakage current. If the fundamental component or the harmonic component shows that the grounding current of the clamp or the iron core is abnormal, it means that the power transformer has a fault. In this way, weaker grounding faults and intermittent faults can be discovered in time, and the accuracy and reliability of the fault detection results of the power transformer are improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0011] Figure 1 A schematic flow chart of a method for identifying power transformer faults based on core clamp leakage current provided in an embodiment of the present application;
[0012] Figure 2 A schematic diagram of the structure of a device for identifying power transformer faults based on core clamp leakage current provided in an embodiment of the present application. DETAILED DESCRIPTION
[0013] The purpose of the embodiments of the present application is to provide a method and device for identifying power transformer faults based on core clamp leakage current, thereby improving the accuracy and reliability of power transformer fault detection results.
[0014] In order to enable those skilled in the art to better understand the technical solutions in this application, the technical solutions in the embodiments of this application will be clearly and completely described below in conjunction with the drawings in the embodiments of this application. Obviously, the described embodiments are only part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this application.
[0015] For example, Figure 1 As shown, an embodiment of the present application provides a method for identifying a power transformer fault based on a core clamp leakage current. The method for identifying a power transformer fault based on a core clamp leakage current may specifically include the following steps:
[0016] In step S101, a first effective value of a fundamental wave of a first leakage current of an iron core of a power transformer, a second effective value of a fundamental wave of a second leakage current of a clamp for fixing the iron core, a third effective value of a harmonic of the first leakage current, and a fourth effective value of a harmonic of the second leakage current are respectively obtained.
[0017] Specifically, a 16-bit AD sampler can be used to sample the leakage current of the core and the clamp of the power transformer. The sampling frequency can be 12.8KHZ, and the 127th harmonic can be measured. In the embodiment of the present application, the first effective value of the fundamental wave of the first leakage current of the core of the power transformer is recorded as A t1 , the second effective value of the fundamental wave of the second leakage current of the clamp is recorded as A j1 , the third effective value of the harmonic of the first leakage current is recorded as A tn , the fourth effective value of the harmonic of the second leakage current is recorded as A jn The first effective value, the second effective value, the third effective value and the fourth effective value can be calculated using the FFT method. tn Represents the third effective value of the nth harmonic of the first leakage current, A jn represents the fourth effective value of the nth harmonic of the second leakage current.
[0018] In step S102, the first harmonic content of the core is determined according to the first effective value and the third effective value, and the second harmonic content of the clamp is determined according to the second effective value and the fourth effective value.
[0019] Specifically, in the embodiment of the present application, the first harmonic content of the nth harmonic of the core is recorded as P tn , the second harmonic content of the nth harmonic of the clamp is recorded as P jn Among them, the harmonic content refers to the ratio of each harmonic to the fundamental wave value, that is, the proportion of each harmonic to the fundamental wave.
[0020] Further, when determining the first harmonic content of the iron core, as an optional embodiment of the present application, a ratio of the third effective value to the first effective value is determined as the first harmonic content of the iron core.
[0021] Specifically, the first harmonic content of the core can be calculated using the following formula:
[0022] P tn =A tn / A t1 *100%
[0023] In the above formula, P tn A is the first harmonic content of the nth harmonic of the iron core. tn A represents the third effective value of the nth harmonic of the first leakage current. t1 Indicates a first effective value of a fundamental wave of a first leakage current of the iron core.
[0024] Further, when determining the second harmonic content of the clamp, as an optional embodiment of the present application, the ratio of the fourth effective value to the second effective value is determined as the second harmonic content of the clamp.
[0025] Specifically, the second harmonic content of the clamp can be calculated using the following formula:
[0026] P jn =A jn / A j1 *100%
[0027] In the above formula, P jn A is the second harmonic content of the nth harmonic of the clamp. jn A represents the fourth effective value of the nth harmonic of the second leakage current. j1 The second effective value of the fundamental wave of the second leakage current of the clamp is represented.
[0028] In step S103, whether the grounding current of the core is abnormal is determined based on the first effective value and the first harmonic content, and whether the grounding current of the clamp is abnormal is determined based on the second effective value and the second harmonic content.
[0029] Specifically, when determining whether the grounding current of the iron core is abnormal, as an optional embodiment of the present application, when any one of the following conditions is met, the grounding current of the iron core is determined to be abnormal. That is, when the first effective value exceeds the fundamental fault threshold of the leakage current of the iron core, the grounding current of the iron core is determined to be abnormal; or, when the proportion of the first harmonic content of the triple harmonic of the iron core exceeds the threshold of the triple harmonic proportion of the leakage current of the iron core, the grounding current of the iron core is determined to be abnormal; or, when the proportion of the first harmonic content of the odd harmonic of the iron core exceeds the threshold of the odd harmonic proportion of the leakage current of the iron core, the grounding current of the iron core is determined to be abnormal; or, when the proportion of the first harmonic content of the total harmonic of the iron core exceeds the threshold of the total harmonic proportion of the leakage current of the iron core, the grounding current of the iron core is determined to be abnormal.
[0030] Specifically, in the embodiment of the present application, the fundamental fault threshold of the leakage current of the core is recorded as when When , it is determined that the grounding current of the core is abnormal.
[0031] Furthermore, in the embodiment of the present application, the proportion of the first harmonic content of the triple harmonic of the core is recorded as P t_triple , which can be expressed as Calculate. Among them, A3 to A 123 A1 represents the effective value of the fundamental wave. In the embodiment of the present application, the threshold of the triple harmonic proportion of the leakage current of the core is recorded as exist When , it is determined that the grounding current of the core is abnormal.
[0032] Further, in the embodiment of the present application, the proportion of the first harmonic content of the odd harmonics of the core is recorded as The odd harmonic proportion threshold of the core leakage current is recorded as exist When , it is determined that the grounding current of the core is abnormal. Wherein, k = 1 to 63 and 2k + 1 is not a multiple of 3.
[0033] Furthermore, in the embodiment of the present application, the proportion of the first harmonic content of the total harmonics of the core is recorded as It can be expressed as Indicates. Among them, A3 to A n Indicates the effective value of each harmonic. A1 indicates the effective value of the fundamental wave. In the embodiment of the present application, the total harmonic proportion threshold of the leakage current of the core is recorded as exist When , it is determined that the grounding current of the core is abnormal.
[0034] Further, when determining whether the grounding current of the clamp is abnormal based on the second effective value and the second harmonic content, as an optional embodiment of the present application, when the second effective value exceeds the fundamental fault threshold of the leakage current of the clamp, the grounding current of the clamp is determined to be abnormal; or, when the proportion of the second harmonic content of the triple harmonic of the clamp exceeds the triple harmonic proportion threshold of the leakage current of the clamp, the grounding current of the clamp is determined to be abnormal; or, when the proportion of the second harmonic content of the odd harmonics of the clamp exceeds the odd harmonic proportion threshold of the leakage current of the clamp, the grounding current of the clamp is determined to be abnormal; or, when the proportion of the second harmonic content of the total harmonic of the clamp exceeds the total harmonic proportion threshold of the leakage current of the clamp, the grounding current of the clamp is determined to be abnormal.
[0035] Specifically, in the embodiment of the present application, the fundamental fault threshold of the leakage current of the clamp is recorded as th j1 , in A j1 >th j1 When , it is judged that the grounding current of the clamp is abnormal.
[0036] Furthermore, in the embodiment of the present application, the proportion of the second harmonic content of the triple harmonic of the clamp is recorded as P j_triple , which can be expressed as Calculate. Among them, A3 to A 123 A1 represents the effective value of the fundamental wave. In the embodiment of the present application, the threshold of the triple harmonic proportion of the leakage current of the clamp is recorded as exist When , it is determined that the grounding current of the clamp is abnormal.
[0037] Further, in the embodiment of the present application, the proportion of the second harmonic content of the odd harmonics of the clamp is recorded as The odd harmonic proportion threshold of the leakage current of the clamp is recorded as exist When , it is determined that the grounding current of the clamp is abnormal. Wherein, k = 1 to 63 and 2k + 1 is not a multiple of 3.
[0038] Furthermore, in the embodiment of the present application, the proportion of the second harmonic content of the total harmonic of the clamp is recorded as P jtotal , which can be expressed as Indicates. Among them, A3 to A n Indicates the effective value of each harmonic. A1 indicates the effective value of the fundamental wave. In the embodiment of the present application, the total harmonic proportion threshold of the leakage current of the clamp is recorded as exist When , it is determined that the grounding current of the clamp is abnormal.
[0039] In step S104, a fault of the power transformer is identified according to an abnormality of the grounding current of the core and / or an abnormality of the grounding current of the clamp.
[0040] Specifically, when at least one of the grounding current of the core and the grounding current of the clamp is determined to be abnormal through the above embodiments of the present application, it can be determined that the power transformer is faulty, so that the operation and maintenance personnel are notified in time to perform maintenance and troubleshooting.
[0041] The embodiment of the present application can simultaneously monitor the leakage current of the iron core and the clamp of the power transformer, and judge whether the ground current is abnormal by analyzing the fundamental component and harmonic component of the leakage current. If the fundamental component or the harmonic component shows that the ground current of the clamp or the iron core is abnormal, it means that the power transformer has a fault. Thus, weaker ground faults and intermittent faults are discovered in time, and the accuracy and reliability of the fault detection results of the power transformer are improved.
[0042] Furthermore, in order to further improve the accuracy of fault identification of power transformers. As an optional embodiment of the present application, before determining the first harmonic content of the iron core according to the first effective value and the third effective value, and determining the second harmonic content of the clamp according to the second effective value and the fourth effective value, the method also includes: determining the first synthetic zero-sequence current of the iron core according to the three-phase current vector of the first leakage current; determining the first reference current vector difference of the iron core according to the first synthetic zero-sequence current and the first virtual phase reference current vector of the iron core; determining the first reference current phase difference of the iron core according to the first reference current vector difference; and using the first synthetic zero-sequence current and the first reference current phase difference to determine whether to perform fault identification on the power transformer.
[0043] Specifically, the three-phase current vector of the first leakage current in the embodiment of the present application includes the A-phase current, the B-phase current and the C-phase current. In the embodiment of the present application, the A-phase current of the first leakage current is recorded as The B-phase current of the first leakage current is recorded as The C-phase current of the first leakage current is recorded as
[0044] Furthermore, when determining the first synthetic zero-sequence current of the core, the A-phase current vector, the B-phase current vector and the C-phase current vector in the three-phase current vector are superimposed to obtain the first synthetic zero-sequence current. The first synthetic zero-sequence current can be expressed as Calculate. Among them, Represents the first synthetic zero-sequence current.
[0045] Furthermore, in the embodiment of the present application, the first virtual phase reference current vector of the core is recorded as The first reference current vector difference of the core is recorded as The first reference current vector difference The following formula can be used for calculation:
[0046] Furthermore, the first reference current phase difference of the core refers to the angle between the vector of the first reference current vector difference of the core and the real axis. In the embodiment of the present application, the first reference current phase difference of the core is recorded as Phase t_diff .
[0047] Further, when using the first synthetic zero-sequence current and the first reference current phase difference to determine whether to identify the fault of the power transformer, as an optional embodiment of the present application, when the first synthetic zero-sequence current is higher than the first amplitude threshold, the count is increased by 1, and when the first synthetic zero-sequence current is lower than the first amplitude threshold, the count is reduced by 1 to obtain a first counting result; the degree of change of the first reference current phase difference of the iron core is determined according to the first reference current phase difference at adjacent moments; when the degree of change of the first reference current phase difference is higher than the first phase difference change rate threshold, the count is increased by 1, and when the degree of change of the first reference current phase difference is lower than the first phase difference change rate threshold, the count is reduced by 1 to obtain a second counting result; the first counting result and the second counting result are weightedly summed to obtain a third counting result; when the third counting result is greater than or equal to the first counting weighted threshold, the power transformer is fault identified.
[0048] Specifically, in the embodiment of the present application, the first amplitude threshold is recorded as th t_I0 The counter comparing the first synthetic zero-sequence current of the core with the first amplitude threshold is recorded as count t_I0 .exist Above the first amplitude threshold th t_I0 , count count t_I0 Add 1, when Below the first amplitude threshold th t_I0 count t_I0 Minus one. count t_I0 The initial value is 0 and the lower limit is 0.
[0049] Furthermore, in the embodiment of the present application, the first reference current phase differences at adjacent moments are recorded as and The change degree of the first reference current phase difference of the core is recorded as The change degree of the first reference current phase difference of the core can be expressed by the formula In the embodiment of the present application, the counter for comparing the first reference current phase difference change degree with the first phase difference change rate threshold is recorded as count t_Δ The first phase difference change rate threshold is recorded as th t_Δ .when Above the threshold th t_Δ , then count count t_Δ Add one, when Below the threshold t_Δ , then count count t_Δ Minus one. count t_Δ The initial value is 0 and the lower limit is 0.
[0050] Furthermore, in the embodiment of the present application, the third counting result is recorded as sum t_weight The first counting result and the second counting result are weighted and summed to obtain the third counting result. The formula sum can be used. t_weight =w t_Δ *count t_Δ +w t_I0 *count t_I0 Calculate. Among them, w t_Δ The amplitude discrimination weight representing the degree of change of the first reference current phase difference. t_I0 Represents the amplitude discrimination weight of the first synthetic zero-sequence current of the iron core.
[0051] Furthermore, in the embodiment of the present application, the first counting weighted threshold is recorded as th t_weight In sum t_weight ≥th t_weight When the fault occurs, the power transformer is diagnosed to be faulty, that is, the process goes to step S102 to step S104.
[0052] Furthermore, in order to further improve the accuracy of fault identification of power transformers. As an optional embodiment of the present application, before determining the first harmonic content of the iron core according to the first effective value and the third effective value, and determining the second harmonic content of the clamp according to the second effective value and the fourth effective value, the method also includes: determining the second synthetic zero-sequence current of the clamp according to the three-phase current vector of the second leakage current; determining the second reference current vector difference of the clamp according to the second synthetic zero-sequence current and the second virtual phase reference current vector of the clamp; determining the second reference current phase difference of the clamp according to the second reference current vector difference; and using the second synthetic zero-sequence current and the second reference current phase difference to determine whether to perform fault identification on the power transformer.
[0053] Specifically, the three-phase current vector of the second leakage current in the embodiment of the present application includes the A-phase current, the B-phase current and the C-phase current. In the embodiment of the present application, the A-phase current of the second leakage current is recorded as The B-phase current of the second leakage current is recorded as The C phase current of the second leakage current is recorded as
[0054] Furthermore, when determining the second synthetic zero-sequence current of the clamp, the A-phase current vector, the B-phase current vector and the C-phase current vector in the three-phase current vector are superimposed to obtain the second synthetic zero-sequence current. The second synthetic zero-sequence current can be expressed as Calculate. Among them, Represents the second synthetic zero-sequence current.
[0055] Furthermore, in the embodiment of the present application, the second virtual phase reference current vector of the clamp is recorded as The second reference current vector difference of the clamp is recorded as The second reference current vector difference The following formula can be used for calculation:
[0056] Furthermore, the second reference current phase difference of the clamp refers to the angle between the vector of the second reference current vector difference of the clamp and the real axis. In the embodiment of the present application, the second reference current phase difference of the clamp is recorded as Phase J_diff .
[0057] Furthermore, when using the second synthetic zero-sequence current and the second reference current phase difference to determine whether to identify the fault of the power transformer, when the second synthetic zero-sequence current is higher than the second amplitude threshold, the count is increased by 1, and when the second synthetic zero-sequence current is lower than the second amplitude threshold, the count is reduced by 1 to obtain a fourth counting result; the degree of change of the second reference current phase difference of the clamp is determined according to the second reference current phase difference at adjacent moments; when the degree of change of the second reference current phase difference is higher than the second phase difference change rate threshold, the count is increased by 1, and when the degree of change of the second reference current phase difference is lower than the second phase difference change rate threshold, the count is reduced by 1 to obtain a fifth counting result; the fourth counting result and the fifth counting result are weightedly summed to obtain a sixth counting result; when the sixth counting result exceeds the second counting weighted threshold, the power transformer is fault identified.
[0058] Specifically, in the embodiment of the present application, the second amplitude threshold is recorded as th j_I0 The counter comparing the second synthetic zero-sequence current of the clamp with the second amplitude threshold is recorded as count j_I0 .exist Higher than the second amplitude threshold th j_I0 , count count j_I0 Add 1, when Below the second amplitude threshold th t_I0 count j_I0 Minus one. count j_I0 The initial value is 0 and the lower limit is 0.
[0059] Furthermore, in the embodiment of the present application, the second reference current phase differences at adjacent moments are recorded as and The change degree of the second reference current phase difference of the clamp is recorded as The change degree of the second reference current phase difference of the clamp can be expressed as In the embodiment of the present application, the counter for comparing the second reference current phase difference change degree with the second phase difference change rate threshold is recorded as count j_Δ The second phase difference change rate threshold is recorded as th j_Δ .when Above the threshold th j_Δ , then count count j_Δ Add one, when Below the threshold j_Δ , then count coun j_Δ Minus one. count j_Δ The initial value is 0 and the lower limit is 0.
[0060] Furthermore, in the embodiment of the present application, the sixth counting result is recorded as sum j_weight The fourth counting result and the fifth counting result are weighted and summed to obtain the sixth counting result. The formula sum can be used. j_weigAt =w j_Δ *count j_Δ +w j_I0 *count j_I0 Calculate. Among them, w j_Δ The amplitude discrimination weight representing the degree of change of the second reference current phase difference. j_I0 Represents the amplitude discrimination weight of the second synthetic zero-sequence current of the clamp.
[0061] Further, in the embodiment of the present application, the second counting weighted threshold is recorded as th j_weight In sum j_weight ≥th j_weight When the fault occurs, the power transformer is diagnosed to be faulty, that is, the process goes to step S102 to step S104.
[0062] Corresponding to the method for identifying power transformer faults based on core clamp leakage current provided in the above embodiment, based on the same technical concept, the embodiment of the present application also provides a device for identifying power transformer faults based on core clamp leakage current. Figure 2 A schematic diagram of the structure of a device for identifying a power transformer fault based on a core clamp leakage current provided in an embodiment of the present application, wherein the device for identifying a power transformer fault based on a core clamp leakage current is used to perform Figure 1 The method described in the paper for identifying power transformer faults based on the leakage current of core clamps is as follows: Figure 2As shown, the device 200 for identifying power transformer faults based on core clamp leakage current includes: a core signal conditioning circuit 201, a clamp signal conditioning circuit 202, a parallel analog-to-digital conversion unit 203 and a central processing module 204; one end of the core signal conditioning circuit 201 and one end of the clamp signal conditioning circuit 202 are both connected to the three-phase current transformer, the other end of the core signal conditioning circuit 201 and the other end of the clamp signal conditioning circuit 202 are both connected to one end of the parallel analog-to-digital conversion unit 203, and the other end of the parallel analog-to-digital conversion unit 203 is connected to the central processing module 204; the core signal conditioning circuit 201 is used to The first leakage current of the output core is conditioned by the fundamental wave and the harmonic of the first leakage current is conditioned to determine the first effective value of the fundamental wave and the third effective value of the harmonic of the first leakage current; the clamp signal conditioning circuit 202 is used to condition the fundamental wave of the second leakage current of the clamp output by the three-phase current transformer and the harmonic of the second leakage current to determine the second effective value of the fundamental wave of the second leakage current and the fourth effective value of the harmonic of the second leakage current; the parallel analog-to-digital conversion unit 203 is used to convert the first leakage current and the second leakage current into analog-to-digital conversion and input them to the central processing module 204; the central processing module 204 is used to perform the following steps: Figure 1 The steps of the method for identifying power transformer faults based on core clamp leakage current are shown.
[0063] Specifically, if Figure 2 As shown, the core signal conditioning circuit 201 includes four current signal conditioning units, which are respectively used for the A-phase current of the first leakage current of the core The first leakage current is the B phase current The first leakage current is the C phase current And the first synthetic zero sequence current of the core The clamp signal conditioning circuit 202 also includes four current signal conditioning units, which are respectively used to condition the A phase current of the second leakage current of the clamp The second leakage current is the phase B current The second leakage current is the C phase current And the second synthetic zero sequence current of the clamp The core signal conditioning circuit 201 and the clamp signal conditioning circuit 202 are used to perform de-jittering, filtering, protection and amplification processing on the current signal.
[0064] The parallel analog-to-digital conversion unit 203 is used to perform analog-to-digital conversion on the first leakage current and the second leakage current, and is also used to convert the first virtual phase reference current vector of the core and the second virtual phase reference current vector of the clamp Perform analog-to-digital conversion.
[0065] The central processing module 204 includes: a frequency calculation unit: used to calculate and adjust the frequency according to the standard time pulse. A frequency control unit: used to automatically adjust the frequency of the voltage-controlled crystal oscillator according to the result of the frequency calculation unit. Voltage-controlled crystal oscillator: eliminates frequency offset in real time through automatic frequency control to achieve high-precision synchronous acquisition, and the synchronization accuracy can be controlled within 1 microsecond. Start / recording unit: the recording sampling frequency is not less than 12.8kHz, and the sampling bit width is not less than 16 bits. The synchronization accuracy between devices is maintained within 1 microsecond. Analysis / judgment unit: based on the collected first leakage current of the core, the second leakage current of the clamp, the first virtual phase reference current vector of the clamp, and the second virtual phase reference current vector of the clamp, a vector diagram of the three-phase leakage current waveform is calculated, and the early small grounding fault of the power transformer is judged in combination with the vector diagram, the fundamental wave and harmonics of the leakage current.
[0066] In addition, the device 200 for identifying power transformer faults based on core clamp leakage current also includes: a time configuration unit, which is used to provide a standard time pulse for use by an internal precise clock module for time synchronization.
[0067] The embodiment of the present application can simultaneously monitor the leakage current of the iron core and the clamp of the power transformer, and judge whether the ground current is abnormal by analyzing the fundamental component and harmonic component of the leakage current. If the fundamental component or the harmonic component shows that the ground current of the clamp or the iron core is abnormal, it means that the power transformer has a fault. Thus, weaker ground faults and intermittent faults are discovered in time, and the accuracy and reliability of the fault detection results of the power transformer are improved.
[0068] It should be noted that the device for identifying power transformer faults based on core clamp leakage current provided in the embodiment of the present application and the method for identifying power transformer faults based on core clamp leakage current provided in the embodiment of the present application are based on the same application concept. Therefore, the specific implementation of this embodiment can refer to the implementation of the aforementioned method for identifying power transformer faults based on core clamp leakage current, and has the same or similar beneficial effects, and the repeated parts will not be repeated.
[0069] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, devices, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.
[0070] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0071] In a typical configuration, an electronic device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0072] The memory may include non-permanent storage in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0073] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0074] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, devices or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment combining software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.
[0075] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.
Claims
1. A method for identifying power transformer faults based on core clamp leakage current, characterized in that: Respectively obtaining a first effective value of a fundamental wave of a first leakage current of an iron core of a power transformer, a second effective value of a fundamental wave of a second leakage current of a clamp for fixing the iron core, a third effective value of a harmonic of the first leakage current, and a fourth effective value of a harmonic of the second leakage current; Determine the first harmonic content of the core according to the first effective value and the third effective value, and determine the second harmonic content of the clamp according to the second effective value and the fourth effective value; Determine whether the grounding current of the core is abnormal according to the first effective value and the first harmonic content, and determine whether the grounding current of the clamp is abnormal according to the second effective value and the second harmonic content; According to the abnormality of the grounding current of the core and / or the abnormality of the grounding current of the clamp, a fault of the power transformer is identified.
2. The method for identifying power transformer faults based on core clamp leakage current according to claim 1, characterized in that: Before determining the first harmonic content of the core according to the first effective value and the third effective value, and determining the second harmonic content of the clamp according to the second effective value and the fourth effective value, the method further includes: Determine a first synthetic zero-sequence current of the iron core according to a three-phase current vector of the first leakage current; Determine a first reference current vector difference of the iron core according to the first synthetic zero-sequence current and a first virtual phase reference current vector of the iron core; Determining a first reference current phase difference of the core according to the first reference current vector difference; A phase difference between the first synthetic zero-sequence current and the first reference current is used to determine whether to perform fault identification on the power transformer.
3. The method for identifying power transformer faults based on core clamp leakage current according to claim 2, characterized in that: The determining whether to perform fault identification on the power transformer by using the phase difference between the first synthetic zero-sequence current and the first reference current comprises: When the first synthesized zero-sequence current is higher than the first amplitude threshold, the count is increased by 1, and when the first synthesized zero-sequence current is lower than the first amplitude threshold, the count is decreased by 1 to obtain a first counting result; Determining a change degree of a first reference current phase difference of the iron core according to the first reference current phase differences at adjacent moments; When the change degree of the first reference current phase difference is higher than the first phase difference change rate threshold, the count is increased by 1, and when the change degree of the first reference current phase difference is lower than the first phase difference change rate threshold, the count is decreased by 1 to obtain a second counting result; Performing a weighted summation on the first counting result and the second counting result to obtain a third counting result; When the third counting result is greater than or equal to the first counting weighted threshold, fault identification is performed on the power transformer.
4. The method for identifying power transformer faults based on core clamp leakage current according to claim 2, characterized in that: The determining of the first synthetic zero-sequence current of the iron core according to the three-phase current vector of the first leakage current comprises: The A-phase current vector, the B-phase current vector and the C-phase current vector in the three-phase current vector are superimposed to obtain the first synthetic zero-sequence current.
5. The method for identifying power transformer faults based on core clamp leakage current according to claim 1, characterized in that: Before determining the first harmonic content of the core according to the first effective value and the third effective value, and determining the second harmonic content of the clamp according to the second effective value and the fourth effective value, the method further includes: determining a second synthetic zero-sequence current of the clamp according to the three-phase current vector of the second leakage current; Determine a second reference current vector difference of the clamp according to the second synthetic zero-sequence current and a second virtual phase reference current vector of the clamp; determining a second reference current phase difference of the clamp according to the second reference current vector difference; The phase difference between the second synthetic zero-sequence current and the second reference current is used to determine whether to perform fault identification on the power transformer.
6. The method for identifying power transformer faults based on core clamp leakage current according to claim 5, characterized in that: The determining whether to perform fault identification on the power transformer by using the phase difference between the second synthetic zero-sequence current and the second reference current comprises: When the second synthetic zero-sequence current is higher than the second amplitude threshold, the count is increased by 1, and when the second synthetic zero-sequence current is lower than the second amplitude threshold, the count is decreased by 1 to obtain a fourth counting result; Determining a change degree of the second reference current phase difference of the clamp according to the second reference current phase differences at adjacent moments; When the second reference current phase difference change degree is higher than the second phase difference change rate threshold, the count is increased by 1, and when the second reference current phase difference change degree is lower than the second phase difference change rate threshold, the count is decreased by 1 to obtain a fifth counting result; Performing a weighted summation on the fourth counting result and the fifth counting result to obtain a sixth counting result; When the sixth counting result exceeds the second counting weighted threshold, fault identification is performed on the power transformer.
7. The method for identifying power transformer faults based on core clamp leakage current according to claim 1, characterized in that: Determining the first harmonic content of the iron core according to the first effective value and the third effective value comprises: Determine the ratio of the third effective value to the first effective value as the first harmonic content of the iron core; Determining the second harmonic content of the clamp according to the second effective value and the fourth effective value comprises: The ratio of the fourth effective value to the second effective value is determined as the second harmonic content of the clamp.
8. The method for identifying power transformer faults based on core clamp leakage current according to any one of claims 1 to 7, characterized in that: The determining whether the grounding current of the core is abnormal according to the first effective value and the first harmonic content includes: When the first effective value exceeds the fundamental wave fault threshold of the leakage current of the iron core, determining that the grounding current of the iron core is abnormal; Alternatively, when the proportion of the first harmonic content of the triple harmonic of the core exceeds the triple harmonic proportion threshold of the leakage current of the core, it is determined that the grounding current of the core is abnormal; Alternatively, when the proportion of the first harmonic content of the odd harmonics of the iron core exceeds the threshold of the proportion of the odd harmonics of the leakage current of the iron core, it is determined that the grounding current of the iron core is abnormal; Alternatively, when the proportion of the first harmonic content of the total harmonics of the iron core exceeds the total harmonic proportion threshold of the leakage current of the iron core, it is determined that the grounding current of the iron core is abnormal.
9. The method for identifying power transformer faults based on core clamp leakage current according to any one of claims 1 to 7, characterized in that: The step of determining whether the ground current of the clamp is abnormal according to the second effective value and the second harmonic content includes: In the case where the second effective value exceeds the leakage current fundamental fault threshold of the clamp, determining that the ground current of the clamp is abnormal; Alternatively, when the proportion of the second harmonic content of the triple harmonic of the clamp exceeds the triple harmonic proportion threshold of the leakage current of the clamp, it is determined that the ground current of the clamp is abnormal; Alternatively, when the proportion of the second harmonic content of the odd harmonics of the clamp exceeds the odd harmonic proportion threshold of the leakage current of the clamp, it is determined that the ground current of the clamp is abnormal; Alternatively, when the proportion of the second harmonic content of the total harmonics of the clamp exceeds the total harmonic proportion threshold of the leakage current of the clamp, it is determined that the grounding current of the clamp is abnormal.
10. A device for identifying power transformer faults based on core clamp leakage current, characterized in that: include: An iron core signal conditioning circuit, a clamp signal conditioning circuit, a parallel analog-to-digital conversion unit and a central processing module; one end of the iron core signal conditioning circuit and one end of the clamp signal conditioning circuit are both connected to a three-phase current transformer, the other end of the iron core signal conditioning circuit and the other end of the clamp signal conditioning circuit are both connected to one end of the parallel analog-to-digital conversion unit, and the other end of the parallel analog-to-digital conversion unit is connected to the central processing module; The core signal conditioning circuit is used to condition the fundamental wave of the first leakage current of the core output by the three-phase current transformer and the harmonic of the first leakage current to determine the first effective value of the fundamental wave and the third effective value of the harmonic of the first leakage current; The clamp signal conditioning circuit is used to condition the fundamental wave of the second leakage current of the clamp output by the three-phase current transformer and the harmonic of the second leakage current to determine the second effective value of the fundamental wave of the second leakage current and the fourth effective value of the harmonic of the second leakage current; The parallel analog-to-digital conversion unit is used to convert the first leakage current and the second leakage current into analog-to-digital conversion and then input them into the central processing module; The central processing module is used to execute the steps of the method for identifying power transformer faults based on core clamp leakage current as described in any one of claims 1 to 9.