By obtaining enterprise data from the enterprise internal control system, determining the risk control scoring strategy and rating it, the problems of inefficient and incorrect scoring of traditional risk control assessments are solved, and the visualization and accuracy of risk control assessments are improved.
Patent Information
- Application Number
- CN202410981010.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-19
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional risk control assessment methods are inefficient and prone to scoring errors, which affects the scoring visualization process.
By obtaining enterprise data from the enterprise internal control system, determining the risk control scoring strategy, classifying and scoring the data based on project nodes, determining whether the scoring results meet the target conditions, performing scoring display operations, and reducing errors.
It improves the efficiency and accuracy of risk control assessment scores, realizes the visualization of risk control assessment scores, and reduces the situation of grading errors.
Smart Images

Figure CN118982230A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of enterprise risk control management, and in particular to a visualization method and device for enterprise risk control assessment and scoring. Background Art
[0002] Traditional risk control assessment methods mostly involve submitting materials offline, followed by manual assessment and scoring. In other words, the existing risk control assessment and scoring methods are basically based on manual operations by auditors, which are inefficient. In addition, due to the limited energy and ability of auditors themselves, there is a risk of errors in the scoring process, which can easily lead to serious impact on the subsequent scoring visualization process.
[0003] It can be seen that it is particularly important to propose a technical solution that can improve the scoring efficiency of enterprise risk control assessment while reducing the occurrence of scoring errors. Summary of the invention
[0004] The present invention provides a method and device for visualizing enterprise risk control assessment scoring, which can improve the scoring efficiency of enterprise risk control assessment and reduce the occurrence of assessment scoring errors, so as to accurately realize the visualization of risk control assessment scoring.
[0005] In order to solve the above technical problems, the first aspect of the present invention discloses a visualization method for enterprise risk control assessment scoring, the method comprising:
[0006] Acquire an enterprise data set corresponding to the enterprise internal control system, wherein the enterprise data set includes enterprise data of each of a plurality of enterprises corresponding to the enterprise internal control system;
[0007] Determine a risk control scoring strategy set based on the enterprise internal control system, wherein the risk control scoring strategy set includes a scoring strategy corresponding to each of the risk control assessment items in the predetermined plurality of risk control assessment items;
[0008] Based on the preset project nodes and according to the risk control scoring strategy set, the enterprise data of each enterprise is classified to obtain the project data of each enterprise in each risk control assessment project;
[0009] Scoring each of the enterprises according to the scoring strategies corresponding to all the risk control assessment items and the project data of each enterprise in all the risk control assessment items, and obtaining the risk control assessment scoring results corresponding to each of the enterprises;
[0010] According to the risk control assessment and scoring results corresponding to all the enterprises, it is determined whether the internal control system of the enterprise currently meets the target conditions for displaying the risk control score;
[0011] When it is determined that the enterprise internal control system currently meets the target conditions for risk control scoring display, the corresponding scoring display operation is performed on the enterprise internal control system according to the risk control assessment scoring results corresponding to all the enterprises.
[0012] As an optional implementation manner, in the first aspect of the present invention, scoring each of the enterprises is performed according to the scoring strategies corresponding to all the risk control assessment items and the project data of each of the enterprises in all the risk control assessment items, and the risk control assessment scoring result corresponding to each of the enterprises is obtained, including:
[0013] According to the scoring strategies corresponding to all the risk control assessment items, all the risk control assessment items are classified to obtain classification results, wherein the classification results include first-category risk control assessment items and second-category risk control assessment items, the first-category risk control assessment items are empty or all the risk control assessment items included in the first-category risk control assessment items are items that need to be assessed by the online risk control assessment system corresponding to the enterprise internal control system, and the second-category risk control assessment items are empty or all the risk control assessment items included in the second-category risk control assessment items are items that need to be assessed by the auditors corresponding to the enterprise internal control system;
[0014] Calculate a first scoring result of each of the enterprises in the first type of risk control assessment items according to the scoring strategy corresponding to the first type of risk control assessment items and all project data of each of the enterprises in the first type of risk control assessment items;
[0015] Calculate a second scoring result of each of the enterprises in the second type of risk control assessment items according to the scoring strategy corresponding to the first type of risk control assessment items, the determined audit credibility of the auditors, and all project data of each of the enterprises in the second type of risk control assessment items;
[0016] Based on the first scoring result corresponding to each of the enterprises and the second scoring result corresponding to each of the enterprises, the risk control assessment scoring result corresponding to each of the enterprises is comprehensively analyzed.
[0017] As an optional implementation manner, in the first aspect of the present invention, the second scoring result of each of the enterprises in the second type of risk control assessment items is calculated according to the scoring strategy corresponding to the first type of risk control assessment items, the determined audit credibility of the auditors, and all project data of each of the enterprises in the second type of risk control assessment items, including:
[0018] When the number of the auditors is greater than 1, a weight coefficient corresponding to each of the auditors is calculated according to the determined audit credibility of the auditors;
[0019] Generate scoring reminder information for each of the auditors for the second type of risk control assessment items according to the scoring strategy corresponding to the second type of risk control assessment items and all project data of each of the enterprises in the second type of risk control assessment items, wherein the scoring reminder information is used to remind the corresponding auditors to perform scoring operations according to the content of the scoring reminder information;
[0020] receiving scoring information of each auditor for the second type of risk control assessment items after each auditor completes the scoring operation;
[0021] Based on the scoring information corresponding to all the auditors and the weight coefficients corresponding to all the auditors, a second scoring result of each of the enterprises in the second type of risk control assessment items is calculated.
[0022] As an optional implementation, in the first aspect of the present invention, before performing a corresponding scoring display operation on the enterprise internal control system according to the risk control assessment scoring results corresponding to all the enterprises, the method further includes:
[0023] According to the previously determined list of historically unqualified enterprises, determine the enterprise type of each enterprise, wherein the enterprise type includes a qualified type or an unqualified type, and the enterprises in the historically unqualified enterprise list are enterprises that were evaluated as unqualified in the historical risk control assessment process;
[0024] All the enterprises are ranked according to their enterprise types and the corresponding risk control assessment score results, and the target ranking results corresponding to the internal control systems of the enterprises are obtained.
[0025] As an optional implementation, in the first aspect of the present invention, all the enterprises are sorted according to their enterprise types and the risk control assessment score results corresponding to all the enterprises to obtain the target sorting results corresponding to the internal control systems of the enterprises, including:
[0026] For all first enterprises whose enterprise type is the qualified type, all the first enterprises are sorted according to the risk control assessment score results corresponding to all the first enterprises to obtain a first enterprise sorting result;
[0027] For all second enterprises whose enterprise type is the unqualified type, obtaining the unqualified situation of each second enterprise, wherein the unqualified situation includes the number of unqualified times of the corresponding second enterprise and the qualified distance value between the score value of the corresponding second enterprise at each unqualified time and the preset qualified score value;
[0028] According to the unqualified conditions of all the second enterprises, all the second enterprises are ranked to obtain a ranking result of the second enterprises;
[0029] The first enterprise ranking result and the second enterprise ranking result are determined as target ranking results of the enterprise internal control system.
[0030] As an optional implementation manner, in the first aspect of the present invention, judging whether the internal control system of the enterprise currently meets the target conditions for displaying the risk control score according to the risk control assessment score results corresponding to all the enterprises includes:
[0031] Determine whether there is at least one triggered target button among the multiple buttons configured by the risk control assessment and scoring display system corresponding to the enterprise internal control system, which is recorded as the first judgment condition; or,
[0032] Determining whether a display instruction for the risk control assessment and scoring display system sent by the user terminal is received, which is recorded as the second judgment condition; or,
[0033] Determine whether there is a target user within a preset range of the risk control assessment score display system, and the target user's continuous contact time with the risk control assessment score display system is greater than or equal to a preset contact detection time, which is recorded as the third judgment condition;
[0034] Among them, when at least one of the first judgment condition, the second judgment condition and the third judgment condition is met, it is determined that the enterprise internal control system currently meets the target conditions for displaying the risk control score; when the first judgment condition, the second judgment condition and the third judgment condition are all not met, it is determined that the enterprise internal control system currently does not meet the target conditions for displaying the risk control score.
[0035] As an optional implementation manner, in the first aspect of the present invention, the execution priority of the first judgment operation corresponding to the first judgment condition is the same as the execution priority of the second judgment operation corresponding to the second judgment condition, and both are higher than the execution priority of the third judgment operation corresponding to the third judgment condition;
[0036] And, according to the risk control assessment and scoring results corresponding to all the enterprises, the corresponding scoring and display operations are performed on the internal control system of the enterprise, including:
[0037] According to the target conditions satisfied by the enterprise internal control system, target information matching the target conditions is determined, wherein the target information includes button information corresponding to the first judgment condition and / or instruction information corresponding to the second judgment condition;
[0038] According to the target information, a target enterprise to be scored and displayed is determined from all the enterprises;
[0039] Based on the risk control assessment scoring display system, a scoring display operation is performed on the target risk control assessment scoring result corresponding to the target enterprise.
[0040] The second aspect of the present invention discloses a visualization device for enterprise risk control assessment and scoring, the device comprising:
[0041] An acquisition module, used to acquire an enterprise data set corresponding to the enterprise internal control system, wherein the enterprise data set includes enterprise data of each of the multiple enterprises corresponding to the enterprise internal control system;
[0042] A determination module, configured to determine a risk control scoring strategy set based on the enterprise internal control system, wherein the risk control scoring strategy set includes a scoring strategy corresponding to each of the risk control assessment items in a plurality of pre-determined risk control assessment items;
[0043] A classification module, for classifying the enterprise data of each enterprise based on a preset project node and according to the risk control scoring strategy set, to obtain the project data of each enterprise in each risk control assessment project;
[0044] A scoring module is used to score each enterprise according to the scoring strategies corresponding to all the risk control assessment items and the project data of each enterprise in all the risk control assessment items, so as to obtain the risk control assessment scoring result corresponding to each enterprise;
[0045] A judgment module, used to judge whether the internal control system of the enterprise currently meets the target conditions for displaying the risk control score according to the risk control assessment score results corresponding to all the enterprises;
[0046] The display module is used to perform corresponding scoring display operations on the internal control system of the enterprise according to the corresponding risk control assessment scoring results of all the enterprises when the judgment module determines that the internal control system of the enterprise currently meets the target conditions for displaying the risk control scores.
[0047] As an optional implementation, in the second aspect of the present invention, the scoring module scores each of the enterprises according to the scoring strategies corresponding to all the risk control assessment items and the project data of each of the enterprises in all the risk control assessment items, and the method of obtaining the risk control assessment scoring result corresponding to each of the enterprises specifically includes:
[0048] According to the scoring strategies corresponding to all the risk control assessment items, all the risk control assessment items are classified to obtain classification results, wherein the classification results include first-category risk control assessment items and second-category risk control assessment items, the first-category risk control assessment items are empty or all the risk control assessment items included in the first-category risk control assessment items are items that need to be assessed by the online risk control assessment system corresponding to the enterprise internal control system, and the second-category risk control assessment items are empty or all the risk control assessment items included in the second-category risk control assessment items are items that need to be assessed by the auditors corresponding to the enterprise internal control system;
[0049] Calculate a first scoring result of each of the enterprises in the first type of risk control assessment items according to the scoring strategy corresponding to the first type of risk control assessment items and all project data of each of the enterprises in the first type of risk control assessment items;
[0050] Calculate a second scoring result of each of the enterprises in the second type of risk control assessment items according to the scoring strategy corresponding to the first type of risk control assessment items, the determined audit credibility of the auditors, and all project data of each of the enterprises in the second type of risk control assessment items;
[0051] Based on the first scoring result corresponding to each of the enterprises and the second scoring result corresponding to each of the enterprises, the risk control assessment scoring result corresponding to each of the enterprises is comprehensively analyzed.
[0052] As an optional implementation manner, in the second aspect of the present invention, the scoring module calculates the second scoring result of each of the enterprises in the second type of risk control assessment items according to the scoring strategy corresponding to the first type of risk control assessment items, the determined audit credibility of the auditors, and all project data of each of the enterprises in the second type of risk control assessment items, specifically including:
[0053] When the number of the auditors is greater than 1, a weight coefficient corresponding to each of the auditors is calculated according to the determined audit credibility of the auditors;
[0054] Generate scoring reminder information for each of the auditors for the second type of risk control assessment items according to the scoring strategy corresponding to the second type of risk control assessment items and all project data of each of the enterprises in the second type of risk control assessment items, wherein the scoring reminder information is used to remind the corresponding auditors to perform scoring operations according to the content of the scoring reminder information;
[0055] receiving scoring information of each auditor for the second type of risk control assessment items after each auditor completes the scoring operation;
[0056] Based on the scoring information corresponding to all the auditors and the weight coefficients corresponding to all the auditors, a second scoring result of each of the enterprises in the second type of risk control assessment items is calculated.
[0057] As an optional implementation, in the second aspect of the present invention, the determination module is further used to determine the enterprise type of each of the enterprises according to a predetermined list of historical unqualified enterprises before the display module performs a corresponding score display operation on the internal control system of the enterprise according to the risk control assessment score results corresponding to all the enterprises, the enterprise type including a qualified type or an unqualified type, and the enterprises in the historical unqualified enterprise list are enterprises that were evaluated as unqualified in the historical risk control assessment process;
[0058] And, the device also includes:
[0059] The sorting module is used to sort all the enterprises according to their enterprise types and the risk control assessment score results corresponding to all the enterprises, and obtain the target sorting results corresponding to the internal control systems of the enterprises.
[0060] As an optional implementation, in the second aspect of the present invention, the ranking module ranks all the enterprises according to the enterprise types of all the enterprises and the risk control assessment score results corresponding to all the enterprises, and the method of obtaining the target ranking results corresponding to the internal control system of the enterprise specifically includes:
[0061] For all first enterprises whose enterprise type is the qualified type, all the first enterprises are sorted according to the risk control assessment score results corresponding to all the first enterprises to obtain a first enterprise sorting result;
[0062] For all second enterprises whose enterprise type is the unqualified type, obtaining the unqualified situation of each second enterprise, wherein the unqualified situation includes the number of unqualified times of the corresponding second enterprise and the qualified distance value between the score value of the corresponding second enterprise at each unqualified time and the preset qualified score value;
[0063] According to the unqualified conditions of all the second enterprises, all the second enterprises are ranked to obtain a ranking result of the second enterprises;
[0064] The first enterprise ranking result and the second enterprise ranking result are determined as target ranking results of the enterprise internal control system.
[0065] As an optional implementation, in the second aspect of the present invention, the judgment module determines whether the internal control system of the enterprise currently meets the target conditions for displaying the risk control score according to the risk control assessment score results corresponding to all the enterprises, specifically including:
[0066] Determine whether there is at least one triggered target button among the multiple buttons configured by the risk control assessment and scoring display system corresponding to the enterprise internal control system, which is recorded as the first judgment condition; or,
[0067] Determining whether a display instruction for the risk control assessment and scoring display system sent by the user terminal is received, which is recorded as the second judgment condition; or,
[0068] Determine whether there is a target user within a preset range of the risk control assessment score display system, and the target user's continuous contact time with the risk control assessment score display system is greater than or equal to a preset contact detection time, which is recorded as the third judgment condition;
[0069] Among them, when at least one of the first judgment condition, the second judgment condition and the third judgment condition is met, it is determined that the enterprise internal control system currently meets the target conditions for displaying the risk control score; when the first judgment condition, the second judgment condition and the third judgment condition are all not met, it is determined that the enterprise internal control system currently does not meet the target conditions for displaying the risk control score.
[0070] As an optional implementation, in the second aspect of the present invention, the execution priority of the first judgment operation corresponding to the first judgment condition is the same as the execution priority of the second judgment operation corresponding to the second judgment condition, and both are higher than the execution priority of the third judgment operation corresponding to the third judgment condition;
[0071] And, the display module performs corresponding scoring display operations on the internal control system of the enterprise according to the risk control assessment scoring results corresponding to all the enterprises, specifically including:
[0072] According to the target conditions satisfied by the enterprise internal control system, target information matching the target conditions is determined, wherein the target information includes button information corresponding to the first judgment condition and / or instruction information corresponding to the second judgment condition;
[0073] According to the target information, a target enterprise to be scored and displayed is determined from all the enterprises;
[0074] Based on the risk control assessment scoring display system, a scoring display operation is performed on the target risk control assessment scoring result corresponding to the target enterprise.
[0075] The third aspect of the present invention discloses another visualization device for enterprise risk control assessment and scoring, the device comprising:
[0076] A memory storing executable program code;
[0077] a processor coupled to the memory;
[0078] The processor calls the executable program code stored in the memory to execute the method for visualizing enterprise risk control assessment and scoring disclosed in the first aspect of the present invention.
[0079] The fourth aspect of the present invention discloses a computer storage medium, which stores computer instructions. When the computer instructions are called, they are used to execute the visualization method of enterprise risk control assessment scoring disclosed in the first aspect of the present invention.
[0080] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:
[0081] In an embodiment of the present invention, an enterprise data set corresponding to an enterprise internal control system is obtained, the enterprise data set including enterprise data of each enterprise in a plurality of enterprises corresponding to the enterprise internal control system; a risk control scoring strategy set based on the enterprise internal control system is determined, the risk control scoring strategy set including a scoring strategy corresponding to each risk control assessment item in a plurality of predetermined risk control assessment items; based on preset project nodes, the enterprise data of each enterprise is classified according to the risk control scoring strategy set to obtain project data of each enterprise in each risk control assessment item; each enterprise is scored according to the scoring strategies corresponding to all risk control assessment items and the project data of each enterprise in all risk control assessment items to obtain a risk control assessment scoring result corresponding to each enterprise; based on the risk control assessment scoring results corresponding to all enterprises, it is determined whether the enterprise internal control system currently meets the target conditions for displaying the risk control scoring; when it is determined that the enterprise internal control system currently meets the target conditions for displaying the risk control scoring, a corresponding scoring display operation is performed on the enterprise internal control system according to the risk control assessment scoring results corresponding to all enterprises. It can be seen that the implementation of the present invention can obtain the enterprise data set corresponding to the enterprise internal control system, and automatically determine the risk control scoring strategy set based on the enterprise internal control system, and then classify the enterprise data of each enterprise based on the preset project nodes and the risk control scoring strategy set, thereby improving the classification accuracy of the enterprise data of each enterprise, and then score each enterprise according to the risk control scoring strategy set and the accurately classified project data of each enterprise in all risk control assessment projects to obtain the corresponding risk control assessment scoring results, thereby improving the scoring accuracy and scoring efficiency of the enterprise risk control assessment, and can reduce the occurrence of assessment scoring errors based on the risk control scoring strategy set, and then judge whether the enterprise internal control system currently meets the target conditions for displaying the risk control scores based on the risk control assessment scoring results corresponding to all enterprises obtained by accurate scoring, and when it is judged that it meets the conditions, the corresponding scoring display operation is performed on the enterprise internal control system according to the risk control assessment scoring results corresponding to all enterprises, and the visualization of the risk control assessment scores can be accurately realized based on the accurate enterprise risk control assessment scores. BRIEF DESCRIPTION OF THE DRAWINGS
[0082] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0083] Figure 1 It is a flow chart of a visualization method for enterprise risk control assessment and scoring disclosed in an embodiment of the present invention;
[0084] Figure 2 It is a table schematic diagram of a scoring data table of an enterprise risk control assessment project disclosed in an embodiment of the present invention;
[0085] Figure 3 It is a flow chart of another visualization method for enterprise risk control assessment and scoring disclosed in an embodiment of the present invention;
[0086] Figure 4 It is a structural schematic diagram of a visualization device for enterprise risk control assessment and scoring disclosed in an embodiment of the present invention;
[0087] Figure 5 It is a structural schematic diagram of another device for visualizing enterprise risk control assessment and scoring disclosed in an embodiment of the present invention;
[0088] Figure 6 It is a structural schematic diagram of another visualization device for enterprise risk control assessment and scoring disclosed in an embodiment of the present invention. DETAILED DESCRIPTION
[0089] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0090] The terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish different objects rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, device, product or end including a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units that are not listed, or may optionally include other steps or units inherent to these processes, methods, products or ends.
[0091] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0092] The present invention discloses a visualization method and device for enterprise risk control assessment and scoring, which can obtain an enterprise data set corresponding to an enterprise internal control system, and automatically determine a risk control scoring strategy set based on the enterprise internal control system, and then classify the enterprise data of each enterprise based on the preset project node and the risk control scoring strategy set, thereby improving the classification accuracy of the enterprise data of each enterprise, and then score each enterprise according to the risk control scoring strategy set and the project data of each enterprise in all risk control assessment projects obtained by accurate classification, and obtain the corresponding risk control assessment scoring result, thereby improving the scoring accuracy and scoring efficiency of the enterprise risk control assessment, and can reduce the occurrence of assessment and scoring errors based on the risk control scoring strategy set, and then judge whether the enterprise internal control system currently meets the target conditions for displaying the risk control score according to the risk control assessment scoring results corresponding to all enterprises obtained by accurate scoring, and when it is judged that it meets the target conditions, according to the risk control assessment scoring results corresponding to all enterprises, perform the corresponding scoring display operation on the enterprise internal control system, and can accurately realize the visualization of the risk control assessment score based on the accurate enterprise risk control assessment score. The following are detailed descriptions.
[0093] Embodiment 1
[0094] See also Figure 1 , Figure 1 It is a flow chart of a visualization method for enterprise risk control assessment and scoring disclosed in an embodiment of the present invention. Figure 1 The described visualization method of enterprise risk control assessment scoring can be applied to a visualization device for enterprise risk control assessment scoring, wherein the device may include a visualization device or a visualization server, wherein the visualization server may include a cloud server or a local server, which is not limited in the embodiments of the present invention. Figure 1 As shown, the visualization method of the enterprise risk control assessment score may include the following operations:
[0095] 101. Obtain the enterprise data set corresponding to the enterprise’s internal control system.
[0096] In an embodiment of the present invention, the enterprise data set may include enterprise data of each enterprise in a plurality of enterprises corresponding to the enterprise internal control system, wherein the enterprise data of each enterprise may include at least one system construction of each enterprise, the construction type of the corresponding system construction, and the construction content of the corresponding construction type.
[0097] 102. Determine a set of risk control scoring strategies based on the enterprise’s internal control system.
[0098] In an embodiment of the present invention, the risk control scoring strategy set includes a scoring strategy corresponding to each of the plurality of risk control assessment items determined in advance. Specifically, determining the risk control scoring strategy set based on the enterprise internal control system may include:
[0099] Acquire a historical enterprise data set corresponding to the enterprise internal control system, the historical enterprise data set including one or more historical enterprise data, wherein each historical enterprise data includes historical data of one or more enterprises;
[0100] Obtain the historical scoring data corresponding to each historical enterprise data;
[0101] Generate a historical scoring strategy set corresponding to each historical enterprise data according to all historical enterprise data and the historical scoring data corresponding to all historical enterprise data, wherein the historical scoring strategy set includes a historical scoring strategy corresponding to each risk control assessment item in a plurality of predetermined risk control assessment items;
[0102] Input all historical enterprise data and the historical scoring strategy set corresponding to all historical enterprise data into the pre-built training model for training, and obtain the scoring strategy determination model corresponding to the enterprise internal control system;
[0103] The enterprise data set corresponding to the enterprise internal control system is input into the above-mentioned scoring strategy determination model for determination, and a risk control scoring strategy set based on the enterprise internal control system is obtained. In this way, the current scoring strategy set can be accurately determined through the scoring strategy determination model based on historical enterprise data.
[0104] Indicatively, the risk control assessment items may include assessment items corresponding to the construction of the organizational system and assessment items corresponding to the construction of the institutional system. Among them, the construction of the organizational system can be classified into the type of organizational operation and the type of full-time professional personnel, and the assessment items corresponding to the construction of the organizational system may include sub-assessment items corresponding to the type of organizational operation (such as: items for the normal operation of the organizational structure and items for the board of directors to listen to the internal control system work report and major risk assessment report, etc.) and sub-assessment items corresponding to the configuration of full-time professional personnel. The construction of the institutional system can be classified into the type of internal control / risk-related management system and the type of system publicity and implementation, and the assessment items corresponding to the construction of the institutional system may include sub-assessment items corresponding to the internal control / risk-related management system (such as: items for the soundness of the system matching the company's management, items for the timeliness of the system update, and items for the content of the system regulations matching the company's management, etc.) and sub-assessment items corresponding to the publicity and implementation of the system (such as: publicity and implementation rate).
[0105] Furthermore, when the assessment project is a project for the normal operation of an organization, its scoring strategy is: if the leadership group documents and department responsibility documents of the organization's direct units within the assessment year have been uploaded, the system defaults to a score of 3 points, otherwise the system defaults to a score of zero; when the assessment project is a project for the board of directors to hear the internal control system work report and the major risk assessment report, its scoring strategy is: if the topic materials and meeting minutes of the board of directors hearing the internal control system work report and the major risk assessment report are uploaded, the system scores zero points, if one of the topic materials and meeting minutes of the report is missing, 1.5 points will be deducted; when the assessment project is the configuration of full-time professionals, its scoring strategy is: if the risk control leadership group list of the direct unit within the assessment year has two or more personnel data, the system defaults to a score of 2 points, if one personnel data is missing, 1 point will be deducted (for example: when there is only one personnel data, the system defaults to a score of 1 point, and when there is no personnel data, the system defaults to a score of The default score is zero); when the assessment item is a project on the matching of sound system and company management, the scoring strategy is: obtain the uploaded file type of the system, if the files of risk, internal control and risk event types all exist, 2 points will be scored, if one type is missing, 1 point will be deducted, and a maximum of 2 points will be deducted; when the assessment item is a project on the timeliness of system update, the scoring strategy is: if the system is updated in time, the system default score is zero, if the system is not updated in time, 1 point will be deducted; when the assessment item is a project on the matching of system regulations and company management, the scoring strategy is: if the system regulations match the company management, zero points will be scored, if the system regulations do not match the company management, -2 points will be scored; when the assessment item is a project on the publicity and implementation rate, the scoring strategy is: if the publicity rate is ≥95%, 8 points will be scored, if 90%≤publicity and implementation rate<95%, 5 points will be scored, if 70%≤publicity and implementation rate<90%, 3 points will be scored, if the publicity and implementation rate<70%, 0 points will be scored.
[0106] 103. Based on the preset project nodes and according to the risk control scoring strategy set, the enterprise data of each enterprise is classified to obtain the project data of each enterprise in each risk control assessment project.
[0107] For example, assuming that the enterprise data of an enterprise contains data related to the implementation rate, the data related to the implementation rate of the enterprise will be classified as project data in the project of the implementation rate; assuming that the enterprise data of the enterprise contains data related to full-time professionals, the data related to the full-time professionals of the enterprise will be classified as project data in the project of configuring full-time professionals, and so on, until the enterprise data of the enterprise is completely classified.
[0108] 104. Based on the scoring strategies corresponding to all risk control assessment items and the project data of each enterprise in all risk control assessment items, each enterprise is scored to obtain the corresponding risk control assessment score results for each enterprise.
[0109] In the embodiment of the present invention, specifically, scoring each enterprise according to the scoring strategies corresponding to all risk control assessment items and the project data of each enterprise in all risk control assessment items, and obtaining the risk control assessment scoring result corresponding to each enterprise may include:
[0110] Evaluate the score of an enterprise in each risk control assessment item based on the scoring strategy corresponding to each risk control assessment item and the project data of each enterprise in the risk control assessment item;
[0111] According to the scoring strategy corresponding to all risk control assessment items, analyze the importance of each risk control assessment item, and assign values to all risk control assessment items according to their importance, and obtain the corresponding weight coefficient of each risk control assessment item;
[0112] Calculate the target score of the enterprise in each risk control assessment item based on the weight coefficient corresponding to each risk control assessment item and the enterprise's score in each risk control assessment item;
[0113] According to the target scores of the enterprise in all risk control assessment items, the total scores of the enterprise in all risk control assessment items are calculated as the corresponding risk control assessment score results of the enterprise. In this way, all project data of each enterprise can be processed in a series of ways through the scoring strategies corresponding to all risk control assessment items to improve the accuracy and reliability of the scores of each enterprise in risk control assessment.
[0114] 105. Based on the corresponding risk control assessment and scoring results of all enterprises, determine whether the enterprise’s internal control system currently meets the target conditions for displaying risk control scores.
[0115] In the embodiment of the present invention, optionally, the target condition may include at least one of a preset first judgment condition, a second judgment condition, and a third judgment condition. The first judgment condition may be used to indicate a trigger condition corresponding to a button configured by a risk control assessment and scoring display system corresponding to the enterprise internal control system, the second judgment condition may be used to indicate a receiving condition corresponding to a display instruction sent by a user terminal, and the third judgment condition may be used to indicate a continuous contact condition corresponding to a target user in the risk control assessment and scoring display system, which is not limited in the embodiment of the present invention.
[0116] In the embodiment of the present invention, when the judgment result of step 105 is yes, step 106 is triggered to be executed; when the judgment result of step 105 is no, the process can be terminated, which is not limited in the embodiment of the present invention.
[0117] 106. Based on the corresponding risk control assessment and scoring results of all enterprises, perform corresponding scoring and display operations on the enterprise’s internal control system.
[0118] In the embodiment of the present invention, specifically, according to the risk control assessment and scoring results corresponding to all enterprises, performing corresponding scoring and display operations on the internal control system of the enterprise may include:
[0119] According to the total scores of all enterprises included in the risk control assessment and scoring results corresponding to all enterprises, the total scores of all enterprises are sorted to obtain the score sorting results of all enterprises, and all enterprises are displayed according to the score sorting results; or,
[0120] Based on the project categories corresponding to the preset risk control assessment items, the project contents corresponding to each project classification and the scoring rules corresponding to each project content, according to the project scores of all enterprises in all risk control assessment items included in the risk control assessment scoring results corresponding to all enterprises, a scoring data table corresponding to each enterprise is constructed, and all enterprises are displayed according to the scoring data table corresponding to all enterprises.
[0121] For example, Figure 2 is a table schematic diagram of a scoring data table of an enterprise risk control assessment project disclosed in an embodiment of the present invention, wherein: Figure 2 The scoring data table described is a scoring data table for the assessment items of a certain enterprise in terms of organizational system construction and institutional system construction.
[0122] It can be seen that the implementation Figure 1 The described visualization method for enterprise risk control assessment and scoring can obtain the enterprise data set corresponding to the enterprise internal control system, and automatically determine the risk control scoring strategy set based on the enterprise internal control system, and then classify the enterprise data of each enterprise based on the preset project node and the risk control scoring strategy set, thereby improving the classification accuracy of the enterprise data of each enterprise, and then score each enterprise according to the risk control scoring strategy set and the project data of each enterprise in all risk control assessment projects obtained by accurate classification to obtain the corresponding risk control assessment scoring result, thereby improving the scoring accuracy and scoring efficiency of the enterprise risk control assessment, and can reduce the occurrence of assessment and scoring errors based on the risk control scoring strategy set, and then judge whether the enterprise internal control system currently meets the target conditions for displaying the risk control scoring according to the risk control assessment scoring results corresponding to all enterprises obtained by accurate scoring, and when it is judged that it meets the target conditions, the corresponding scoring display operation is performed on the enterprise internal control system according to the risk control assessment scoring results corresponding to all enterprises, and the visualization of the risk control assessment scoring can be accurately realized based on the accurate enterprise risk control assessment scoring.
[0123] In an optional embodiment, the above step 104 scores each enterprise according to the scoring strategies corresponding to all risk control assessment items and the project data of each enterprise in all risk control assessment items to obtain the risk control assessment score result corresponding to each enterprise, including:
[0124] According to the scoring strategies corresponding to all risk control assessment items, all risk control assessment items are classified to obtain classification results, which include first-category risk control assessment items and second-category risk control assessment items;
[0125] Calculate the first scoring result of each enterprise in the first category of risk control assessment project based on the scoring strategy corresponding to the first category of risk control assessment project and all project data of each enterprise in the first category of risk control assessment project;
[0126] Calculate the second scoring result of each enterprise in the second risk control assessment project based on the scoring strategy corresponding to the first risk control assessment project, the determined audit credibility of the auditor, and all project data of each enterprise in the second risk control assessment project;
[0127] Based on the first scoring result corresponding to each enterprise and the second scoring result corresponding to each enterprise, the risk control assessment scoring result corresponding to each enterprise is comprehensively analyzed.
[0128] In an embodiment of the present invention, the first category of risk control assessment items is empty or all risk control assessment items included in the first category of risk control assessment items are items that need to be assessed by an online risk control assessment system corresponding to the enterprise's internal control system, and the second category of risk control assessment items is empty or all risk control assessment items included in the second category of risk control assessment items are items that need to be assessed by auditors corresponding to the enterprise's internal control system.
[0129] In the embodiment of the present invention, specifically, according to the scoring strategy corresponding to the first type of risk control assessment project and all project data of each enterprise in the first type of risk control assessment project, calculating the first scoring result of each enterprise in the first type of risk control assessment project may include:
[0130] According to the scoring strategy corresponding to each risk control assessment item included in the first category of risk control assessment items and the project data of each enterprise in the risk control assessment item, the score of the enterprise in the risk control assessment item is evaluated, and the scores of the enterprise in all risk control assessment items included in the first category of risk control assessment items are counted to obtain the first scoring result of the enterprise in the first category of risk control assessment items. This can improve the accuracy and reliability of the scoring of the first category of risk control assessment items of the enterprise.
[0131] In the embodiment of the present invention, specifically, the risk control assessment score corresponding to each enterprise can be obtained by counting the first score corresponding to each enterprise and the second score corresponding to the enterprise. For example, assuming that the first score corresponding to a certain enterprise is 46 points, and the second score corresponding to the enterprise is 38 points, the risk control assessment score corresponding to the enterprise can be counted as 84 points.
[0132] It can be seen that this optional embodiment can classify all risk control assessment items according to the scoring strategies corresponding to all risk control assessment items, obtain classification results (the classification results include first-category risk control assessment items and second-category risk control assessment items), improve the classification accuracy of all risk control assessment items, and calculate the first scoring result of each enterprise in the first-category risk control assessment item according to the scoring strategy corresponding to the accurately classified first-category assessment items and all project data of each enterprise in the first-category risk control assessment item, thereby improving the scoring accuracy and efficiency of each enterprise in the first-category risk control assessment item, and calculate the second scoring result of each enterprise in the second-category risk control assessment item according to the scoring strategy corresponding to the accurately classified second-category assessment item, the determined audit credibility of the auditor, and all project data of each enterprise in the second-category risk control assessment item, thereby improving the scoring accuracy and efficiency of each enterprise in the second-category risk control assessment item, and can also improve the diversity and flexibility of scoring methods for different types of risk control assessment items based on the classification of all risk control assessment items, and then comprehensively analyze the risk control assessment scoring results corresponding to each enterprise according to the first scoring results and the second scoring results corresponding to each enterprise obtained by accurate scoring, thereby improving the scoring accuracy and reliability of the enterprise risk control assessment.
[0133] In this optional embodiment, as an optional implementation method, according to the scoring strategy corresponding to the first type of risk control assessment project, the determined audit credibility of the auditor, and all project data of each enterprise in the second type of risk control assessment project, calculating the second scoring result of each enterprise in the second type of risk control assessment project may include:
[0134] When the number of auditors is greater than 1, the weight coefficient corresponding to each auditor is calculated based on the audit credibility of the determined auditors;
[0135] Based on the scoring strategy corresponding to the second-category risk control assessment items and all project data of each enterprise in the second-category risk control assessment items, generate scoring reminder information for each auditor for the second-category risk control assessment items;
[0136] Receive the scoring information of each auditor for the second type of risk control assessment items after the auditor completes the scoring operation;
[0137] Based on the corresponding scoring information of all auditors and the corresponding weight coefficients of all auditors, the second scoring result of each enterprise in the second type of risk control assessment project is calculated.
[0138] In the embodiment of the present invention, the scoring reminder information is used to remind the corresponding auditor to perform the scoring operation according to the content of the scoring reminder information.
[0139] Specifically, after generating scoring reminder information for each auditor for the second type of risk control assessment items according to the scoring strategy corresponding to the second type of risk control assessment items and all project data of each enterprise in the second type of risk control assessment items, and before receiving the scoring information for the second type of risk control assessment items obtained by each auditor after the auditor completes the scoring operation, the method may further include:
[0140] Each auditor evaluates the enterprise's score in the risk control assessment item according to the project data of each risk control assessment item included in the second category of risk control assessment items and the scoring strategy corresponding to the risk control assessment item, which serves as the auditor's initial score for the enterprise in the risk control assessment item;
[0141] Determine the initial scores of the auditor for all enterprises in all risk control assessment items included in the second category of risk control assessment items as the auditor's scoring information for the second category of risk control assessment items, and send the scoring information of each auditor for the second category of risk control assessment items (e.g., send it to the scoring system corresponding to the second category of risk control assessment items). In this way, corresponding scoring reminder information can be sent to the auditor to improve the accuracy and reliability of the auditor's scoring.
[0142] Specifically, according to the scoring information corresponding to all auditors and the weight coefficients corresponding to all auditors, the second scoring result of each enterprise in the second type of risk control assessment project is calculated, which may include:
[0143] Based on the weight coefficients corresponding to all auditors, a weighted average is calculated for the initial scores of all auditors in each risk control assessment item included in the second category of risk control assessment items for each enterprise, to obtain the target score of the enterprise in the risk control assessment item;
[0144] The target scores of the enterprise in all risk control assessment items included in the second type of risk control assessment items are counted to obtain the second scoring result of the enterprise in the second type of risk control assessment items. This can improve the accuracy and reliability of the scoring of the enterprise's second type of risk control assessment items.
[0145] It can be seen that this optional implementation method can calculate the weight coefficient corresponding to each auditor according to the determined audit credibility of the auditor when the number of auditors is greater than 1, thereby improving the calculation accuracy of the scoring ratio of each auditor, and accurately generating scoring reminder information for each auditor for the second type of risk control assessment items according to the scoring strategy corresponding to the second type of risk control assessment items and all project data of each enterprise in the second type of risk control assessment items, which can improve the reminder accuracy of each auditor, and is conducive to improving the scoring accuracy of subsequent auditors based on the accurately generated reminder information. Subsequently, the scoring information of each auditor for the second type of risk control assessment items obtained after the auditor performs the scoring operation through the scoring reminder information is received, and the second scoring result of each enterprise in the second type of risk control assessment items is calculated according to the scoring information of all personnel and the accurately calculated corresponding weight coefficients of all personnel, which can improve the scoring accuracy of the second type of risk control assessment items of the enterprise, thereby facilitating improving the scoring accuracy of subsequent enterprise risk control assessments.
[0146] Embodiment 2
[0147] See also Figure 3 , Figure 3 It is a flow chart of a visualization method for enterprise risk control assessment and scoring disclosed in an embodiment of the present invention. Figure 3 The described visualization method of enterprise risk control assessment scoring can be applied to a visualization device for enterprise risk control assessment scoring, wherein the device may include a visualization device or a visualization server, wherein the visualization server may include a cloud server or a local server, which is not limited in the embodiments of the present invention. Figure 3 As shown, the visualization method of the enterprise risk control assessment score may include the following operations:
[0148] 201. Obtain the enterprise data set corresponding to the enterprise internal control system.
[0149] 202. Determine a set of risk control scoring strategies based on the enterprise's internal control system.
[0150] 203. Based on the preset project nodes and according to the risk control scoring strategy set, the enterprise data of each enterprise is classified to obtain the project data of each enterprise in each risk control assessment project.
[0151] 204. Based on the scoring strategies corresponding to all risk control assessment items and the project data of each enterprise in all risk control assessment items, each enterprise is scored to obtain the corresponding risk control assessment score results for each enterprise.
[0152] 205. Based on the corresponding risk control assessment and scoring results of all enterprises, determine whether the enterprise’s internal control system currently meets the target conditions for displaying risk control scores.
[0153] In the embodiment of the present invention, when the judgment result of step 205 is yes, step 206 is triggered to be executed; when the judgment result of step 205 is no, the process can be terminated, which is not limited in the embodiment of the present invention.
[0154] 206. Determine the enterprise type of each enterprise based on the pre-determined list of historically unqualified enterprises.
[0155] In the embodiment of the present invention, the enterprise type may include a qualified type or an unqualified type, and the enterprises in the historical unqualified enterprise list are enterprises that were evaluated as unqualified in the historical risk control assessment process.
[0156] In the embodiment of the present invention, specifically, determining the enterprise type of each enterprise according to the predetermined list of historically unqualified enterprises may include:
[0157] Obtaining identification information of each enterprise, the identification information may include enterprise name and / or enterprise serial number;
[0158] Based on the identification information of each enterprise, determine whether the enterprise belongs to the pre-determined list of historically unqualified enterprises;
[0159] When it is determined that the enterprise belongs to the list of historically unqualified enterprises, the enterprise type of the enterprise is determined as an unqualified type;
[0160] When it is determined that the enterprise does not belong to the list of historically unqualified enterprises, the risk control assessment score results corresponding to the enterprise are judged to determine whether the risk control assessment score results corresponding to the enterprise meet the results corresponding to the preset qualified score line;
[0161] When it is determined that the risk control assessment score result corresponding to the enterprise does not meet the result corresponding to the above-mentioned qualified score line, the enterprise type of the enterprise is determined as an unqualified type;
[0162] When it is determined that the risk control assessment score corresponding to the enterprise meets the result corresponding to the above-mentioned qualified score line, the enterprise type of the enterprise is determined as a qualified type. This can improve the accuracy of determining the enterprise type of each enterprise, which is conducive to improving the accuracy of subsequent sorting of all enterprises based on enterprise type.
[0163] 207. All enterprises are ranked according to their enterprise types and the corresponding risk control assessment score results to obtain the target ranking results corresponding to the enterprise internal control system.
[0164] 208. Based on the corresponding risk control assessment and scoring results of all enterprises, perform corresponding scoring and display operations on the enterprise’s internal control system.
[0165] In the embodiment of the present invention, specifically, performing corresponding scoring display operations on the enterprise internal control system according to the risk control assessment scoring results corresponding to all enterprises may include: performing corresponding scoring display operations on the enterprise internal control system according to the risk control assessment scoring results corresponding to all enterprises based on the target sorting results corresponding to the enterprise internal control system. In this way, the scoring display of all enterprises can be realized efficiently and accurately based on the sorting of all enterprises.
[0166] In the embodiment of the present invention, for other descriptions of step 201 to step 205, namely step 208, please refer to the detailed description of step 101 to step 106 in the first embodiment, and the embodiment of the present invention will not be repeated.
[0167] It can be seen that the implementation Figure 3 The described visualization method for enterprise risk control assessment and scoring can obtain the enterprise data set corresponding to the enterprise internal control system, and automatically determine the risk control scoring strategy set based on the enterprise internal control system, and then classify the enterprise data of each enterprise based on the preset project node and the risk control scoring strategy set, thereby improving the classification accuracy of the enterprise data of each enterprise, and then score each enterprise according to the risk control scoring strategy set and the project data of each enterprise in all risk control assessment projects obtained by accurate classification to obtain the corresponding risk control assessment scoring result, thereby improving the scoring accuracy and scoring efficiency of the enterprise risk control assessment, and can reduce the occurrence of assessment and scoring errors based on the risk control scoring strategy set, and then judge whether the enterprise internal control system currently meets the target conditions for displaying the risk control scoring according to the risk control assessment scoring results corresponding to all enterprises obtained by accurate scoring, and when it is judged that it meets the target conditions, the corresponding scoring display operation is performed on the enterprise internal control system according to the risk control assessment scoring results corresponding to all enterprises, and the visualization of the risk control assessment scoring can be accurately realized based on the accurate enterprise risk control assessment scoring. In addition, it is also possible to determine the enterprise type of each enterprise based on a predetermined list of historically unqualified enterprises, thereby improving the accuracy of enterprise classification, and to rank all enterprises based on the risk control assessment score results corresponding to the accurately classified different types of enterprises, thereby improving the accuracy of enterprise ranking, which is conducive to improving the subsequent display accuracy of all enterprise scores based on accurate ranking of enterprises.
[0168] In an optional embodiment, the above step 207 ranks all enterprises according to their enterprise types and the risk control assessment and scoring results corresponding to all enterprises to obtain the target ranking results corresponding to the enterprise internal control systems, which may include:
[0169] For all first enterprises whose enterprise types are qualified, all first enterprises are ranked according to the risk control assessment score results corresponding to all first enterprises to obtain the ranking results of the first enterprises;
[0170] For all second enterprises whose enterprise type is the unqualified type, obtain the unqualified status of each second enterprise;
[0171] According to the unqualified conditions of all the second enterprises, all the second enterprises are ranked to obtain the ranking results of the second enterprises;
[0172] The first enterprise ranking result and the second enterprise ranking result are determined as target ranking results of the enterprise internal control system.
[0173] In the embodiment of the present invention, the unqualified situation includes the number of unqualified times of the corresponding second enterprise and the qualified distance value between the score value of the corresponding second enterprise at each unqualified time and the preset qualified score value. Specifically, according to the unqualified situations of all second enterprises, all second enterprises are sorted to obtain the second enterprise sorting result, which may include:
[0174] According to the number of failures of all second enterprises, analyze the failure degree of each second enterprise;
[0175] Generate a corresponding unqualified coefficient for each second enterprise according to the qualified distance value between the score value of each second enterprise at each unqualified time and the preset qualified score value;
[0176] According to the unqualified coefficient corresponding to each second enterprise, the unqualified degree corresponding to each second enterprise is adjusted to obtain the target unqualified degree corresponding to each second enterprise;
[0177] According to the target unqualified degrees corresponding to all the second enterprises, all the second enterprises are sorted according to the preset sorting order to obtain the second enterprise sorting result. The sorting order may include a large to small order or a small to large order. In this way, the accuracy and reliability of the sorting of all the second enterprises can be improved through a series of processing of the unqualified conditions of all the second enterprises.
[0178] It can be seen that this optional implementation example can, for all first enterprises whose enterprise types are qualified types, sort all first enterprises according to the risk control assessment score results corresponding to all first enterprises, and obtain the first enterprise sorting results, thereby improving the sorting speed and efficiency of all first enterprises; and for all second enterprises whose enterprise types are unqualified types, sort all second enterprises according to the unqualified conditions of all second enterprises obtained, and obtain the second enterprise sorting results, thereby improving the sorting accuracy and reliability of all second enterprises, and can also improve the diversity and flexibility of the sorting methods for different types of enterprises.
[0179] In another optional embodiment, the above step 205, judging whether the enterprise internal control system currently meets the target condition for displaying the risk control score according to the risk control assessment score results corresponding to all enterprises, may include:
[0180] Determine whether there is at least one triggered target button among the multiple buttons configured by the risk control assessment score display system corresponding to the enterprise internal control system, which is recorded as the first judgment condition; or,
[0181] Determine whether a display instruction for the risk control assessment score display system sent by the user terminal is received, which is recorded as the second judgment condition; or,
[0182] Determine whether there is a target user within the preset range of the risk control assessment score display system, and the target user's continuous contact time with the risk control assessment score display system is greater than or equal to the preset contact detection time, which is recorded as the third judgment condition;
[0183] Among them, when at least one of the first judgment condition, the second judgment condition and the third judgment condition is met, it is determined that the enterprise internal control system currently meets the target conditions for displaying the risk control score; when the first judgment condition, the second judgment condition and the third judgment condition are all not met, it is determined that the enterprise internal control system currently does not meet the target conditions for displaying the risk control score.
[0184] In the embodiment of the present invention, the button configured by the risk control assessment score display system may be a virtual button, such as a web link (a corresponding score display page may pop up by clicking the web link). Optionally, the preset contact detection time may be 1 minute, 2 minutes, or any other preset value, which is not limited in the embodiment of the present invention.
[0185] It can be seen that this optional embodiment can determine whether there is at least one triggered target button among the multiple buttons configured by the risk control assessment scoring display system corresponding to the enterprise internal control system, which is recorded as the first judgment condition; or, determine whether a display instruction for the risk control assessment scoring display system sent by the user terminal is received, which is recorded as the second judgment condition; or, determine whether there is a target user within the preset range of the risk control assessment scoring display system, and the continuous contact time between the target user and the risk control assessment scoring display system is greater than or equal to the preset contact detection time, which is recorded as the third judgment condition; and when at least one of the first judgment condition, the second judgment condition and the third judgment condition is met, determine that the enterprise internal control system currently meets the target condition for displaying the risk control score, thereby improving the accuracy of determining whether the enterprise internal control system currently meets the target condition for displaying the risk control score; and when all of the above conditions are not met, determine that the enterprise internal control system currently does not meet the target condition for displaying the risk control score, thereby improving the accuracy of determining that the enterprise internal control system currently does not meet the target condition for displaying the risk control score, and also improving the diversity and flexibility of the judgment method of whether the enterprise internal control system currently meets the target condition for displaying the risk control score.
[0186] In this optional embodiment, as an optional implementation, the execution priority of the first judgment operation corresponding to the first judgment condition is the same as the execution priority of the second judgment operation corresponding to the second judgment condition, and both are higher than the execution priority of the third judgment operation corresponding to the third judgment condition. And, the above step 208, according to the risk control assessment score results corresponding to all enterprises, performs the corresponding score display operation on the enterprise internal control system, which may include:
[0187] According to the target conditions met by the enterprise's internal control system, determine the target information that matches the target conditions;
[0188] According to the target information, the target enterprises to be scored and displayed are determined from all enterprises;
[0189] Based on the risk control assessment scoring display system, the scoring display operation is performed on the target risk control assessment scoring results corresponding to the target enterprise.
[0190] In the embodiment of the present invention, the target information includes button information corresponding to the first judgment condition and / or instruction information corresponding to the second judgment condition, wherein both the button information and the instruction information may include identification information of a certain enterprise, and the identification information is used to determine the target enterprise to be scored and displayed. Specifically, according to the target conditions satisfied by the enterprise internal control system, the target information matching the target conditions is determined, which may include:
[0191] When the enterprise internal control system meets the first judgment condition, button information associated with the target button is determined as target information matching the target condition;
[0192] When the enterprise internal control system meets the second judgment condition, the instruction information associated with the display instruction is determined as the target information matching the target condition.
[0193] Specifically, based on the risk control assessment scoring display system, performing a scoring display operation on the target risk control assessment scoring result corresponding to the target enterprise may include:
[0194] According to the target information, analyze the content that the target enterprise needs to display. The content that the target enterprise needs to display may include the total score of the target enterprise or the score of the target enterprise in a certain risk control assessment item;
[0195] Based on the risk control assessment scoring display system, according to the content required to be displayed by the target enterprise, the scoring display operation is performed on the target risk control assessment scoring results corresponding to the target enterprise.
[0196] It can be seen that this optional implementation method can determine the target information that matches the target conditions based on the target conditions satisfied by the enterprise's internal control system, thereby improving the accuracy of determining the target information, and based on the determined accurate target information, determine the target enterprise to be scored and displayed from all enterprises, thereby improving the screening accuracy of the enterprises to be displayed for scoring, and based on the risk control assessment scoring display system, perform scoring display operations on the target risk control assessment scoring results corresponding to the target enterprise, thereby improving the display accuracy and reliability of the target enterprise's scoring.
[0197] Embodiment 3
[0198] See also Figure 4 , Figure 4 This is a schematic diagram of the structure of a visualization device for enterprise risk control assessment and scoring disclosed in an embodiment of the present invention. Figure 4 The visualization device for enterprise risk control assessment and scoring described may include a visualization device or a visualization server, wherein the visualization server may include a cloud server or a local server, which is not limited in the embodiment of the present invention. Figure 4 As shown, the visualization device for enterprise risk control assessment and scoring may include:
[0199] The acquisition module 301 is used to acquire an enterprise data set corresponding to the enterprise internal control system, where the enterprise data set includes enterprise data of each enterprise in a plurality of enterprises corresponding to the enterprise internal control system.
[0200] The determination module 302 is used to determine a risk control scoring strategy set based on the enterprise internal control system. The risk control scoring strategy set includes a scoring strategy corresponding to each risk control assessment item in a plurality of pre-determined risk control assessment items.
[0201] The classification module 303 is used to classify the enterprise data of each enterprise based on the preset project nodes and the risk control scoring strategy set, and obtain the project data of each enterprise in each risk control assessment project.
[0202] The scoring module 304 is used to score each enterprise according to the scoring strategies corresponding to all risk control assessment items and the project data of each enterprise in all risk control assessment items, and obtain the risk control assessment scoring result corresponding to each enterprise.
[0203] The judgment module 305 is used to judge whether the internal control system of the enterprise currently meets the target conditions for displaying the risk control score according to the risk control assessment score results corresponding to all enterprises.
[0204] The display module 306 is used to perform corresponding scoring display operations on the enterprise internal control system according to the corresponding risk control assessment scoring results of all enterprises when the judgment module 305 determines that the enterprise internal control system currently meets the target conditions for risk control scoring display.
[0205] It can be seen that the implementation Figure 4 The described visualization device for enterprise risk control assessment and scoring can obtain the enterprise data set corresponding to the enterprise internal control system, and automatically determine the risk control scoring strategy set based on the enterprise internal control system, and then classify the enterprise data of each enterprise based on the preset project nodes and the risk control scoring strategy set, thereby improving the classification accuracy of the enterprise data of each enterprise, and then score each enterprise according to the risk control scoring strategy set and the project data of each enterprise in all risk control assessment projects obtained by accurate classification to obtain the corresponding risk control assessment scoring results, thereby improving the scoring accuracy and scoring efficiency of the enterprise risk control assessment, and can reduce the occurrence of assessment and scoring errors based on the risk control scoring strategy set, and then judge whether the enterprise internal control system currently meets the target conditions for risk control scoring display based on the risk control assessment scoring results corresponding to all enterprises obtained by accurate scoring, and when it is judged that it meets the conditions, the corresponding scoring display operation is performed on the enterprise internal control system according to the risk control assessment scoring results corresponding to all enterprises, and the visualization of risk control assessment scoring can be accurately realized based on the accurate enterprise risk control assessment scoring.
[0206] In an optional embodiment, the scoring module 304 scores each enterprise according to the scoring strategies corresponding to all risk control assessment items and the project data of each enterprise in all risk control assessment items. The method of obtaining the risk control assessment score result corresponding to each enterprise may specifically include:
[0207] According to the scoring strategies corresponding to all risk control assessment items, all risk control assessment items are classified to obtain classification results, which include first-category risk control assessment items and second-category risk control assessment items. The first-category risk control assessment items are empty or all risk control assessment items included in the first-category risk control assessment items are items that need to be assessed by the online risk control assessment system corresponding to the enterprise's internal control system. The second-category risk control assessment items are empty or all risk control assessment items included in the second-category risk control assessment items are items that need to be assessed by the auditors corresponding to the enterprise's internal control system.
[0208] Calculate the first scoring result of each enterprise in the first category of risk control assessment project based on the scoring strategy corresponding to the first category of risk control assessment project and all project data of each enterprise in the first category of risk control assessment project;
[0209] Calculate the second scoring result of each enterprise in the second risk control assessment project based on the scoring strategy corresponding to the first risk control assessment project, the determined audit credibility of the auditor, and all project data of each enterprise in the second risk control assessment project;
[0210] Based on the first scoring result corresponding to each enterprise and the second scoring result corresponding to each enterprise, the risk control assessment scoring result corresponding to each enterprise is comprehensively analyzed.
[0211] It can be seen that this optional embodiment can classify all risk control assessment items according to the scoring strategies corresponding to all risk control assessment items, obtain classification results (the classification results include first-category risk control assessment items and second-category risk control assessment items), improve the classification accuracy of all risk control assessment items, and calculate the first scoring result of each enterprise in the first-category risk control assessment item according to the scoring strategy corresponding to the accurately classified first-category assessment items and all project data of each enterprise in the first-category risk control assessment item, thereby improving the scoring accuracy and efficiency of each enterprise in the first-category risk control assessment item, and calculate the second scoring result of each enterprise in the second-category risk control assessment item according to the scoring strategy corresponding to the accurately classified second-category assessment item, the determined audit credibility of the auditor, and all project data of each enterprise in the second-category risk control assessment item, thereby improving the scoring accuracy and efficiency of each enterprise in the second-category risk control assessment item, and can also improve the diversity and flexibility of scoring methods for different types of risk control assessment items based on the classification of all risk control assessment items, and then comprehensively analyze the risk control assessment scoring results corresponding to each enterprise according to the first scoring results and the second scoring results corresponding to each enterprise obtained by accurate scoring, thereby improving the scoring accuracy and reliability of the enterprise risk control assessment.
[0212] In this optional embodiment, as an optional implementation, the scoring module 304 calculates the second scoring result of each enterprise in the second type of risk control assessment project according to the scoring strategy corresponding to the first type of risk control assessment project, the determined audit credibility of the auditor, and all project data of each enterprise in the second type of risk control assessment project, and specifically includes:
[0213] When the number of auditors is greater than 1, the weight coefficient corresponding to each auditor is calculated based on the audit credibility of the determined auditors;
[0214] According to the scoring strategy corresponding to the second-category risk control assessment items and all project data of each enterprise in the second-category risk control assessment items, scoring reminder information for each auditor for the second-category risk control assessment items is generated, and the scoring reminder information is used to remind the corresponding auditor to perform scoring operations according to the content of the scoring reminder information;
[0215] Receive the scoring information of each auditor for the second type of risk control assessment items after the auditor completes the scoring operation;
[0216] Based on the corresponding scoring information of all auditors and the corresponding weight coefficients of all auditors, the second scoring result of each enterprise in the second type of risk control assessment project is calculated.
[0217] It can be seen that this optional implementation method can calculate the weight coefficient corresponding to each auditor according to the determined audit credibility of the auditor when the number of auditors is greater than 1, thereby improving the calculation accuracy of the scoring ratio of each auditor, and accurately generating scoring reminder information for each auditor for the second type of risk control assessment items according to the scoring strategy corresponding to the second type of risk control assessment items and all project data of each enterprise in the second type of risk control assessment items, which can improve the reminder accuracy of each auditor, and is conducive to improving the scoring accuracy of subsequent auditors based on the accurately generated reminder information. Subsequently, the scoring information of each auditor for the second type of risk control assessment items obtained after the auditor performs the scoring operation through the scoring reminder information is received, and the second scoring result of each enterprise in the second type of risk control assessment items is calculated according to the scoring information of all personnel and the accurately calculated corresponding weight coefficients of all personnel, which can improve the scoring accuracy of the second type of risk control assessment items of the enterprise, thereby facilitating improving the scoring accuracy of subsequent enterprise risk control assessments.
[0218] In another optional embodiment, the determination module 302 is further used to determine the enterprise type of each enterprise according to a predetermined list of historical unqualified enterprises before the display module 306 performs a corresponding score display operation on the enterprise internal control system according to the risk control assessment score results corresponding to all enterprises, and the enterprise type includes a qualified type or an unqualified type. The enterprises in the historical unqualified enterprise list are enterprises that were evaluated as unqualified in the historical risk control assessment process. And, Figure 5 As shown, the device may also include:
[0219] The sorting module 307 is used to sort all enterprises according to their enterprise types and the risk control assessment and scoring results corresponding to all enterprises, and obtain the target sorting results corresponding to the enterprise internal control systems.
[0220] It can be seen that this optional embodiment can determine the enterprise type of each enterprise based on a predetermined list of historically unqualified enterprises, thereby improving the accuracy of enterprise classification, and can sort all enterprises according to the risk control assessment score results corresponding to the accurately classified different types of enterprises, thereby improving the accuracy of enterprise sorting, thereby facilitating improving the subsequent display accuracy of all enterprise scores based on the accurate sorting of enterprises.
[0221] In this optional embodiment, as an optional implementation, the sorting module 307 sorts all enterprises according to the enterprise types of all enterprises and the risk control assessment score results corresponding to all enterprises, and the method of obtaining the target sorting results corresponding to the enterprise internal control system may specifically include:
[0222] For all first enterprises whose enterprise types are qualified, all first enterprises are ranked according to the risk control assessment score results corresponding to all first enterprises to obtain the ranking results of the first enterprises;
[0223] For all second enterprises whose enterprise type is the unqualified type, the unqualified situation of each second enterprise is obtained, and the unqualified situation includes the number of unqualified times of the corresponding second enterprise and the qualified distance value between the score value of the corresponding second enterprise at each unqualified time and the preset qualified score value;
[0224] According to the unqualified conditions of all the second enterprises, all the second enterprises are ranked to obtain the ranking results of the second enterprises;
[0225] The first enterprise ranking result and the second enterprise ranking result are determined as target ranking results of the enterprise internal control system.
[0226] It can be seen that this optional implementation method can, for all first enterprises whose enterprise types are qualified types, sort all first enterprises according to the corresponding risk control assessment score results of all first enterprises, and obtain the first enterprise sorting results, thereby improving the sorting speed and efficiency of all first enterprises; and for all second enterprises whose enterprise types are unqualified types, sort all second enterprises according to the obtained unqualified conditions of all second enterprises, and obtain the second enterprise sorting results, thereby improving the accuracy and reliability of the sorting of all second enterprises, and can also improve the diversity and flexibility of the sorting methods for different types of enterprises.
[0227] In another optional embodiment, the judgment module 305 judges whether the enterprise internal control system currently meets the target condition for displaying the risk control score according to the risk control assessment score results corresponding to all enterprises, and the method may specifically include:
[0228] Determine whether there is at least one triggered target button among the multiple buttons configured by the risk control assessment score display system corresponding to the enterprise internal control system, which is recorded as the first judgment condition; or,
[0229] Determine whether a display instruction for the risk control assessment score display system sent by the user terminal is received, which is recorded as the second judgment condition; or,
[0230] Determine whether there is a target user within the preset range of the risk control assessment score display system, and the target user's continuous contact time with the risk control assessment score display system is greater than or equal to the preset contact detection time, which is recorded as the third judgment condition;
[0231] Among them, when at least one of the first judgment condition, the second judgment condition and the third judgment condition is met, it is determined that the enterprise internal control system currently meets the target conditions for displaying the risk control score; when the first judgment condition, the second judgment condition and the third judgment condition are all not met, it is determined that the enterprise internal control system currently does not meet the target conditions for displaying the risk control score.
[0232] It can be seen that this optional embodiment can determine whether there is at least one triggered target button among the multiple buttons configured by the risk control assessment scoring display system corresponding to the enterprise internal control system, which is recorded as the first judgment condition; or, determine whether a display instruction for the risk control assessment scoring display system sent by the user terminal is received, which is recorded as the second judgment condition; or, determine whether there is a target user within the preset range of the risk control assessment scoring display system, and the continuous contact time between the target user and the risk control assessment scoring display system is greater than or equal to the preset contact detection time, which is recorded as the third judgment condition; and when at least one of the first judgment condition, the second judgment condition and the third judgment condition is met, determine that the enterprise internal control system currently meets the target condition for displaying the risk control score, thereby improving the accuracy of determining whether the enterprise internal control system currently meets the target condition for displaying the risk control score; and when all of the above conditions are not met, determine that the enterprise internal control system currently does not meet the target condition for displaying the risk control score, thereby improving the accuracy of determining that the enterprise internal control system currently does not meet the target condition for displaying the risk control score, and also improving the diversity and flexibility of the judgment method of whether the enterprise internal control system currently meets the target condition for displaying the risk control score.
[0233] In this optional embodiment, as an optional implementation, the execution priority of the first judgment operation corresponding to the first judgment condition is the same as the execution priority of the second judgment operation corresponding to the second judgment condition, and both are higher than the execution priority of the third judgment operation corresponding to the third judgment condition. And, the display module 306 performs the corresponding scoring display operation on the enterprise internal control system according to the risk control assessment scoring results corresponding to all enterprises, which may specifically include:
[0234] According to the target conditions satisfied by the enterprise internal control system, target information matching the target conditions is determined, where the target information includes button information corresponding to the first judgment condition and / or instruction information corresponding to the second judgment condition;
[0235] According to the target information, the target enterprises to be scored and displayed are determined from all enterprises;
[0236] Based on the risk control assessment scoring display system, the scoring display operation is performed on the target risk control assessment scoring results corresponding to the target enterprise.
[0237] It can be seen that this optional implementation method can determine the target information that matches the target conditions based on the target conditions satisfied by the enterprise's internal control system, thereby improving the accuracy of determining the target information, and based on the determined accurate target information, determine the target enterprise to be scored and displayed from all enterprises, thereby improving the screening accuracy of the enterprises to be displayed for scoring, and based on the risk control assessment scoring display system, perform scoring display operations on the target risk control assessment scoring results corresponding to the target enterprise, thereby improving the display accuracy and reliability of the target enterprise's scoring.
[0238] Embodiment 4
[0239] See also Figure 6 , Figure 6 Schematic diagram of another visualization device for enterprise risk control assessment and scoring disclosed in an embodiment of the present invention. Figure 6 As shown, the visualization device for enterprise risk control assessment and scoring may include:
[0240] A memory 401 storing executable program codes;
[0241] a processor 402 coupled to the memory 401;
[0242] The processor 402 calls the executable program code stored in the memory 401 to execute the steps in the method for visualizing enterprise risk control assessment and scoring described in the first embodiment of the present invention or the second embodiment of the present invention.
[0243] Embodiment 5
[0244] An embodiment of the present invention discloses a computer storage medium, which stores computer instructions. When the computer instructions are called, they are used to execute the steps in the visualization method of enterprise risk control assessment scoring described in Embodiment 1 or Embodiment 2 of the present invention.
[0245] Embodiment 6
[0246] An embodiment of the present invention discloses a computer program product, which includes a non-transitory computer-readable storage medium storing a computer program, and the computer program is operable to enable a computer to execute the steps in the method for visualizing enterprise risk control assessment scores described in Example 1 or Example 2.
[0247] The device embodiments described above are only illustrative, wherein the modules described as separate components may or may not be physically separated, and the components displayed as modules may or may not be physical modules, i.e., they may be located in one place, or they may be distributed on multiple network modules. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Those of ordinary skill in the art may understand and implement it without creative work.
[0248] Through the specific description of the above embodiments, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on such an understanding, the above technical solution can be essentially or partly contributed to the prior art in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, and the storage medium includes a read-only memory (ROM), a random access memory (RAM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), a one-time programmable read-only memory (OTPROM), an electronically erasable rewritable read-only memory (EEPROM), a compact disc (CD-ROM) or other optical disc storage, magnetic disk storage, magnetic tape storage, or any other computer-readable medium that can be used to carry or store data.
[0249] Finally, it should be noted that the method and device for visualizing enterprise risk control assessment and scoring disclosed in the embodiments of the present invention only disclose the preferred embodiments of the present invention, which are only used to illustrate the technical scheme of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, it should be understood by those skilled in the art that the technical schemes described in the aforementioned embodiments may still be modified, or some of the technical features therein may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical schemes from the spirit and scope of the technical schemes of the embodiments of the present invention.
Claims
1. A visualization method for enterprise risk control assessment and scoring, characterized in that: The method comprises: Acquire an enterprise data set corresponding to the enterprise internal control system, wherein the enterprise data set includes enterprise data of each of a plurality of enterprises corresponding to the enterprise internal control system; Determine a risk control scoring strategy set based on the enterprise internal control system, wherein the risk control scoring strategy set includes a scoring strategy corresponding to each of the risk control assessment items in the predetermined plurality of risk control assessment items; Based on the preset project nodes and according to the risk control scoring strategy set, the enterprise data of each enterprise is classified to obtain the project data of each enterprise in each risk control assessment project; Scoring each of the enterprises according to the scoring strategies corresponding to all the risk control assessment items and the project data of each enterprise in all the risk control assessment items, and obtaining the risk control assessment scoring results corresponding to each of the enterprises; According to the risk control assessment and scoring results corresponding to all the enterprises, it is determined whether the internal control system of the enterprise currently meets the target conditions for displaying the risk control score; When it is determined that the enterprise internal control system currently meets the target conditions for risk control scoring display, the corresponding scoring display operation is performed on the enterprise internal control system according to the risk control assessment scoring results corresponding to all the enterprises.
2. The visualization method for enterprise risk control assessment and scoring according to claim 1 is characterized in that: Scoring each enterprise according to the scoring strategies corresponding to all the risk control assessment items and the project data of each enterprise in all the risk control assessment items to obtain the risk control assessment scoring results corresponding to each enterprise, including: According to the scoring strategies corresponding to all the risk control assessment items, all the risk control assessment items are classified to obtain classification results, wherein the classification results include first-category risk control assessment items and second-category risk control assessment items, the first-category risk control assessment items are empty or all the risk control assessment items included in the first-category risk control assessment items are items that need to be assessed by the online risk control assessment system corresponding to the enterprise internal control system, and the second-category risk control assessment items are empty or all the risk control assessment items included in the second-category risk control assessment items are items that need to be assessed by the auditors corresponding to the enterprise internal control system; Calculate a first scoring result of each of the enterprises in the first type of risk control assessment items according to the scoring strategy corresponding to the first type of risk control assessment items and all project data of each of the enterprises in the first type of risk control assessment items; Calculate a second scoring result of each of the enterprises in the second type of risk control assessment items according to the scoring strategy corresponding to the first type of risk control assessment items, the determined audit credibility of the auditors, and all project data of each of the enterprises in the second type of risk control assessment items; Based on the first scoring result corresponding to each of the enterprises and the second scoring result corresponding to each of the enterprises, the risk control assessment scoring result corresponding to each of the enterprises is comprehensively analyzed.
3. The visualization method for enterprise risk control assessment and scoring according to claim 2 is characterized in that: The calculating of the second scoring result of each enterprise in the second type of risk control assessment project according to the scoring strategy corresponding to the first type of risk control assessment project, the determined audit credibility of the auditor, and all project data of each enterprise in the second type of risk control assessment project includes: When the number of the auditors is greater than 1, a weight coefficient corresponding to each of the auditors is calculated according to the determined audit credibility of the auditors; Generate scoring reminder information for each of the auditors for the second type of risk control assessment items according to the scoring strategy corresponding to the second type of risk control assessment items and all project data of each of the enterprises in the second type of risk control assessment items, wherein the scoring reminder information is used to remind the corresponding auditors to perform scoring operations according to the content of the scoring reminder information; receiving scoring information of each auditor for the second type of risk control assessment items after each auditor completes the scoring operation; Based on the scoring information corresponding to all the auditors and the weight coefficients corresponding to all the auditors, a second scoring result of each of the enterprises in the second type of risk control assessment items is calculated.
4. The visualization method for enterprise risk control assessment and scoring according to any one of claims 1 to 3, characterized in that: Before performing a corresponding scoring display operation on the enterprise internal control system according to the risk control assessment scoring results corresponding to all the enterprises, the method further includes: According to the previously determined list of historically unqualified enterprises, determine the enterprise type of each enterprise, wherein the enterprise type includes a qualified type or an unqualified type, and the enterprises in the historically unqualified enterprise list are enterprises that were evaluated as unqualified in the historical risk control assessment process; All the enterprises are ranked according to their enterprise types and the corresponding risk control assessment score results, and the target ranking results corresponding to the internal control systems of the enterprises are obtained.
5. The visualization method for enterprise risk control assessment and scoring according to claim 4 is characterized in that: The step of ranking all the enterprises according to their enterprise types and the corresponding risk control assessment and scoring results of all the enterprises, and obtaining the target ranking results corresponding to the internal control systems of the enterprises, includes: For all first enterprises whose enterprise type is the qualified type, all the first enterprises are sorted according to the risk control assessment score results corresponding to all the first enterprises to obtain a first enterprise sorting result; For all second enterprises whose enterprise type is the unqualified type, obtaining the unqualified situation of each second enterprise, wherein the unqualified situation includes the number of unqualified times of the corresponding second enterprise and the qualified distance value between the score value of the corresponding second enterprise at each unqualified time and the preset qualified score value; According to the unqualified conditions of all the second enterprises, all the second enterprises are ranked to obtain a ranking result of the second enterprises; The first enterprise ranking result and the second enterprise ranking result are determined as target ranking results of the enterprise internal control system.
6. The visualization method for enterprise risk control assessment and scoring according to claim 1, 2, 3 or 5, characterized in that: The step of judging whether the internal control system of the enterprise currently meets the target conditions for displaying the risk control score according to the risk control assessment score results corresponding to all the enterprises includes: Determine whether there is at least one triggered target button among the multiple buttons configured by the risk control assessment and scoring display system corresponding to the enterprise internal control system, which is recorded as the first judgment condition; or, Determining whether a display instruction for the risk control assessment and scoring display system sent by the user terminal is received, which is recorded as the second judgment condition; or, Determine whether there is a target user within a preset range of the risk control assessment score display system, and the target user's continuous contact time with the risk control assessment score display system is greater than or equal to a preset contact detection time, which is recorded as a third judgment condition; Among them, when at least one of the first judgment condition, the second judgment condition and the third judgment condition is met, it is determined that the enterprise internal control system currently meets the target conditions for displaying the risk control score; when the first judgment condition, the second judgment condition and the third judgment condition are all not met, it is determined that the enterprise internal control system currently does not meet the target conditions for displaying the risk control score.
7. The visualization method for enterprise risk control assessment and scoring according to claim 6 is characterized in that: The execution priority of the first judgment operation corresponding to the first judgment condition is the same as the execution priority of the second judgment operation corresponding to the second judgment condition, and both are higher than the execution priority of the third judgment operation corresponding to the third judgment condition; And, according to the risk control assessment and scoring results corresponding to all the enterprises, the corresponding scoring and display operations are performed on the internal control system of the enterprise, including: According to the target conditions satisfied by the enterprise internal control system, target information matching the target conditions is determined, wherein the target information includes button information corresponding to the first judgment condition and / or instruction information corresponding to the second judgment condition; According to the target information, a target enterprise to be scored and displayed is determined from all the enterprises; Based on the risk control assessment scoring display system, a scoring display operation is performed on the target risk control assessment scoring result corresponding to the target enterprise.
8. A visualization device for enterprise risk control assessment and scoring, characterized in that: The device comprises: An acquisition module, used to acquire an enterprise data set corresponding to the enterprise internal control system, wherein the enterprise data set includes enterprise data of each of the multiple enterprises corresponding to the enterprise internal control system; A determination module, configured to determine a risk control scoring strategy set based on the enterprise internal control system, wherein the risk control scoring strategy set includes a scoring strategy corresponding to each of the risk control assessment items in a plurality of pre-determined risk control assessment items; A classification module, for classifying the enterprise data of each enterprise based on a preset project node and according to the risk control scoring strategy set, to obtain the project data of each enterprise in each risk control assessment project; A scoring module is used to score each enterprise according to the scoring strategies corresponding to all the risk control assessment items and the project data of each enterprise in all the risk control assessment items, so as to obtain the risk control assessment scoring result corresponding to each enterprise; A judgment module, used to judge whether the internal control system of the enterprise currently meets the target conditions for displaying the risk control score according to the risk control assessment score results corresponding to all the enterprises; The display module is used to perform corresponding scoring display operations on the internal control system of the enterprise according to the corresponding risk control assessment scoring results of all the enterprises when the judgment module determines that the internal control system of the enterprise currently meets the target conditions for displaying the risk control scores.
9. A visualization device for enterprise risk control assessment and scoring, characterized in that: The device comprises: A memory storing executable program code; a processor coupled to the memory; The processor calls the executable program code stored in the memory to execute the visualization method for enterprise risk control assessment scoring as described in any one of claims 1-7.
10. A computer storage medium, characterized in that: The computer storage medium stores computer instructions, which, when called, are used to execute the visualization method for enterprise risk control assessment and scoring as described in any one of claims 1 to 7.
Citation Information
Patent Citations
Visual enterprise risk assessment method based on knowledge graph
CN114266455A
Evaluation method and device for multi-dimensional electric power safety assessment
CN116362926A
Visual enterprise risk assessment method based on artificial intelligence
CN117010697A
Risk evaluation analysis method using risk evaluation analysis system
JP2019125336A
A system and a method for generating insurance policyavoiding investment risk for enterprise
KR1020010113931A