Energy storage management system and method for electric energy storage and discharge optimization
By establishing a power consumption change curve model in data management centers and power storage and discharge stations, and real-time allocation of power energy storage and discharge, the problem of imbalance in power supply and demand in the existing technology is solved, and the optimal allocation of power grid resources and the reduction of power waste is achieved. .
Patent Information
- Application Number
- CN202411157452.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-11-19
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing industrial and commercial energy storage systems are unable to adjust their power usage strategies according to seasonal and weather changes, resulting in an imbalance in power supply and demand, resulting in insufficient power supply during peak periods and waste of electricity during trough periods.
Establish a data management center and power storage and discharge station, establish a power consumption change curve model through historical power consumption data and weather forecast information, allocate power storage and discharge in real time, use power storage containers to supplement or store power, and optimize power consumption management.
It realizes the precise allocation of power grid resources, reduces power waste, improves the efficiency and reliability of the power system, and adapts to the seasonal and weather changes of power consumption demand.
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of energy storage management, and in particular to an energy storage management system and method for optimizing electric energy storage and release. Background Art
[0002] With the sustained and rapid development of my country's national economy, the power consumption on the user demand side has gradually increased, and the contradiction between power supply and demand has become increasingly prominent. In the power system, the power load of the user group represented by industrial and commercial users often shows a large peak-to-valley difference, resulting in frequent overload power supply during peak power consumption periods and a large amount of excess power wasted during valley periods. With the continuous increase in the peak-to-valley difference of the current power grid, how to use the existing power facilities, give full play to the subjective initiative of users, and design a more scientific, reasonable and refined electricity price system for power grid companies, so that users can use electricity reasonably according to their own needs and wishes, actively adjust the load, reduce peaks and fill valleys, and achieve the optimal allocation of power grid resources, has important academic value and social significance. The current industrial and commercial energy storage system often relies on simple rules or static strategies to control the charging and discharging behavior of the energy storage system. However, it is impossible to make corresponding changes according to the impact of seasonal and weather changes on urban electricity consumption, and it is impossible to achieve the best use of electricity.
[0003] Due to seasonal and weather changes, residential electricity consumption varies significantly, and it is difficult for power stations to make accurate power supply adjustments based on seasonal and weather changes, resulting in power waste. For large factories, their electricity consumption is large and the fluctuations in electricity consumption are also large. The electricity consumption of large factories has a great impact on urban electricity consumption, and it is difficult to regulate. In many cases, large power-consuming factories will have insufficient power supply in the city, resulting in a lack of electricity for the factory. Summary of the invention
[0004] The present invention aims to solve at least one of the technical problems in the related art to a certain extent. To this end, one purpose of the present invention is to propose an energy storage management method and method for optimizing the storage and release of electric energy, which solves the problems of troublesome urban electricity management, electricity waste, and inability to allocate electricity.
[0005] According to the present invention, a method for energy storage management for optimizing electric energy storage and release is provided, comprising:
[0006] 1. Establish a data management center
[0007] The data management center includes a data server, a monitoring station and a monitoring display screen group. The monitoring station and the monitoring display screen group are connected to the data server. The data server is provided with a historical database, a storage module and an early warning module. The historical database stores historical power consumption data. The storage module includes a total storage unit and a temporary storage unit. The temporary storage unit is used to store power consumption data collected every day in a city. The temporary storage unit stores power consumption data for one day and automatically backs it up to the total storage unit at a fixed time of one day. The early warning module is used to monitor whether the power consumption data collected every day is abnormal.
[0008] 2. Establishing an energy storage and discharge station
[0009] An energy storage and discharge station is established in each district of a city, and an electricity consumption data collection unit, an energy distribution grid and several storage containers are established in each of the energy storage and discharge stations. The power station of this city supplies power to the energy distribution grid of each district through a high-voltage line group. The electricity consumption data collection unit is used to collect the total power provided by the power station to the corresponding district, collect the real-time power consumption of the corresponding district and collect the charging and discharging data of the storage container. The data server is connected to the electricity consumption data collection unit through a network so as to receive the data collected by the electricity consumption data collection unit in real time;
[0010] 3. Model seasonal and weather changes and electricity consumption changes
[0011] Based on historical data, establish the electricity consumption curve model L for each district in each season t Then, the influence of different weather conditions on electricity consumption in different seasons under the electricity consumption curve model is used to evaluate the coefficient η of the influence of each weather change on electricity consumption in the corresponding season. n-n , where L t where t is the week of the year, η n-n The first n in nn is the weather type, and the second n is the weather intensity of the corresponding weather type. η in the next few weeks is calculated based on the weather forecast information. n-n Digital, combined with seasonal electricity consumption curve model L t , we get the electricity consumption model L = η for the next few weeks n-n *L t .
[0012] In some embodiments of the present invention, the power consumption model L=η is estimated based on the power consumption of each district in the next few weeks. n-n *L t , supply electricity to each zone;
[0013] If the electricity consumption model used is L = η n-n *L tIf the electricity provided cannot meet the electricity demand of the area every day, the storage containers in the energy storage and discharge station in the area will be used to supplement the electricity to meet the electricity demand of the area;
[0014] If the electricity consumption model used is L = η n-n *L t If the electricity provided exceeds the electricity demand of the area every day, the excess electricity will be used to charge the energy storage containers one by one through the electricity distribution grid.
[0015] In some other embodiments of the present invention, according to the power consumption model L=η n-n *L t To set the warning value, set the area's daily electricity consumption to be lower than the electricity consumption model L = η n-n *L t If the calculated value is 20% or higher, a warning message will be issued.
[0016] In some other embodiments of the present invention, the power consumption model L=η n-n *L t The daily electricity consumption is calculated on a daily basis. The electricity consumption during the day is greater than that at night, so the storage containers in the energy storage and discharge station are charged at night.
[0017] In other embodiments of the present invention, water tanks for energy storage are built in stations, subway stations and large shopping malls in each district. In summer and winter, when the electricity consumption model L=η n-n *L t When the provided electric energy is greater than the actual electric energy used in the area, the excess electric energy is used to convert the water in the water tank into cold water in summer for use in central air conditioning cooling, and the excess electric energy is used to convert the water in the water tank into hot water in winter to provide hot water.
[0018] In some other embodiments of the present invention, large power-consuming factories in each district are numbered, and factory power consumption models G are established for these large factories. m-n , where m is the factory number and n is the total historical electricity consumption of the corresponding factory in the nth week of the year;
[0019] If the power consumption of a large power-consuming factory exceeds the previous power consumption by more than 20% in the next week or more, the power consumption information will be reported to the data management center, and the data management center will calculate the excess power consumption model α of the large power-consuming factory. m G m-n , then for the electricity consumption model L = η n-n *L t Correction is performed, and the power consumption model L of a certain area after correction is 矫 =η n-n *L t +(α 1 -1)G 1-n +(α2 -1)G 2-n +…+(α m -1)G m-n .
[0020] In some other embodiments of the present invention, the storage containers in the electric energy storage and discharging station are numbered in sequence, and the charging and discharging of a plurality of the storage containers are performed in the order of the numbers.
[0021] An energy storage management system for optimizing electric energy storage and release, comprising:
[0022] A data management center, the data management center includes a data server, a monitoring station and a monitoring display screen group, the monitoring station and the monitoring display screen group are connected to the data server, the data server is provided with a historical database, a storage module and an early warning module, the historical database stores historical power consumption data, and the storage module includes a total storage unit and a temporary storage unit;
[0023] An electric energy storage and discharge station is established in each district of a city. A power consumption data collection unit, an electric energy distribution grid and several electric storage containers are established in each of the electric energy storage and discharge stations. The power station of this city supplies power to the electric energy distribution grid of each district through a high-voltage line group. The power consumption data collection unit is used to collect the total power provided by the power station to the corresponding district, collect the real-time power consumption of the corresponding district and collect the charging and discharging data of the electric storage container. The data server is connected to the power consumption data collection unit through a network so as to receive the data collected by the power consumption data collection unit in real time;
[0024] The electricity consumption change model of each district is established based on historical data. The electricity consumption change curve model L of each district in each season t Then, the influence of different weather conditions on electricity consumption in different seasons under the electricity consumption curve model is used to evaluate the coefficient η of the influence of each weather change on electricity consumption in the corresponding season. n-n , where L t where t is the week of the year, η n-n The first n in nn is the weather type, and the second n is the weather intensity of the corresponding weather type. η in the next few weeks is calculated based on the weather forecast information. n-n Digital, combined with seasonal electricity consumption curve model L t , we get the electricity consumption model L = η for the next few weeks n-n *L t .
[0025] In some other embodiments of the present invention, large power-consuming factories in each district are numbered, and factory power consumption models G are established for these large factories. m-n, where m is the factory number and n is the total historical electricity consumption of the corresponding factory in the nth week of the year;
[0026] Establishing a model for excess electricity consumption in large power-consuming factories m G m-n , then for the electricity consumption model L = η n-n *L t Correction is performed, and the power consumption model L of a certain area after correction is 矫 =η n-n *L t +(α 1 -1)G 1-n +(α 2 -1)G 2-n +…+(α m -1)G m-n .
[0027] In the present invention, an electricity consumption curve model is developed based on the historical electricity consumption data of the city and the influence of seasonal changes and weather changes on electricity consumption. By using the model to adjust electricity consumption, the power station will generate electricity more accurately, and then the electricity storage and discharge station is used to adjust the electricity consumption of each district. Excess electricity is stored in a number of storage containers. When the power supply is insufficient, a number of storage containers are used to supplement the electricity, so as to best meet the power supply demand and reduce the waste of electricity.
[0028] Large-scale electricity-consuming factories are numbered. When their electricity consumption is abnormal, the factories need to report it in advance and provide electricity consumption data. An excess electricity consumption model is formulated based on future electricity consumption data to correct the electricity consumption change curve model, in order to solve the problem that large factories have a great impact on electricity consumption and that urban electricity consumption cannot be better controlled due to its unpredictable changes. DETAILED DESCRIPTION
[0029] The technical solutions in the embodiments of the present invention will be clearly and completely described below in combination with the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0030] The present invention proposes an energy storage management method for optimizing electric energy storage and release, comprising:
[0031] 1. Establish a data management center
[0032] The data management center includes a data server, a monitoring station and a monitoring display screen group. The monitoring station and the monitoring display screen group are connected to the data server. The data server is provided with a historical database, a storage module and an early warning module. The historical database stores historical electricity consumption data. The storage module includes a total storage unit and a temporary storage unit. The temporary storage unit is used to store the electricity consumption data collected every day in a city. The temporary storage unit stores the electricity consumption data for one day and automatically backs it up to the total storage unit at a fixed time of one day. The early warning module is used to monitor whether the electricity consumption data collected every day is abnormal. The monitoring station can monitor the electricity consumption of the entire city in real time. The monitoring display screen group includes a plurality of monitoring display screen walls distributed in a matrix, which can display the electricity consumption information in each area and classify and display the electricity consumption type. The storage module has a large capacity and can store electricity consumption data for at least 5 years. The temporary storage unit can store at least one week of electricity consumption data, but the electricity consumption data must be backed up to the total storage unit (total storage partition) every day, and the temporary storage unit will delete the electricity consumption data that exceeds one week.
[0033] 2. Establishing an energy storage and discharge station
[0034] An energy storage and discharge station is established in each district of a city, and an electricity consumption data collection unit, an energy distribution grid and several storage containers are established in each of the energy storage and discharge stations. The power station of this city supplies power to the energy distribution grid of each district through a high-voltage line group. The electricity consumption data collection unit is used to collect the total power provided by the power station to the corresponding district, collect the real-time power consumption of the corresponding district and collect the charging and discharging data of the storage container. The data server is connected to the electricity consumption data collection unit through a network so as to receive the data collected by the electricity consumption data collection unit in real time;
[0035] The energy storage and discharge station is built in a temperature-controlled indoor or basement to control the ambient temperature of the energy storage container. The energy storage container is used to store electricity when the power supply in each area is in excess. When the power supply is insufficient, it can also supplement the power supply to coordinate the power supply of the power station and solve the problem of unbalanced electricity consumption among residents during peak and off-peak periods.
[0036] The electricity consumption data collection units are some electricity power meters (which can display and record the electricity consumption of a region) and electricity quantity monitoring devices in power storage containers. These monitoring (information collection equipment) are connected to the network and the data is transmitted to the data server for display and storage.
[0037] 3. Model seasonal and weather changes and electricity consumption changes
[0038] Based on historical data, establish the electricity consumption change curve model L for each district in each season tThen, the influence of different weather conditions on electricity consumption in different seasons under the electricity consumption curve model is used to evaluate the coefficient η of the influence of each weather change on electricity consumption in the corresponding season. n-n , where L t where t is the week of the year, η n-n The first n in nn is the weather type, and the second n is the weather intensity of the corresponding weather type. η in the next few weeks is calculated based on the weather forecast information. n-n Digital, combined with seasonal electricity consumption curve model L t , we get the electricity consumption model L = η for the next few weeks n-n *L t .
[0039] Residents' electricity consumption varies greatly due to seasonal changes. For example, air conditioners are used for cooling in the summer and heating in the winter, as well as other power demand caused by seasonal influences.
[0040] For the impact of weather changes, for example, if it rains and how heavy it rains, people may go out less and use more electricity at home. If it snows and how heavy it snows, the use of heating equipment (floor heating, air conditioning) in cities varies greatly, as does the intensity of the sun (in summer), and the degree of cooling when the air conditioner is turned on will also be different.
[0041] The electricity consumption model L = η is estimated based on the electricity consumption of each district in the next few weeks. n-n *L t , supply electricity to each zone;
[0042] If the electricity consumption model used is L = η n-n *L t If the electricity provided cannot meet the electricity demand of the area every day, the storage containers in the energy storage and discharge station in the area will be used to supplement the electricity to meet the electricity demand of the area;
[0043] If the electricity consumption model used is L = η n-n *L t If the electricity provided exceeds the electricity demand of the area every day, the excess electricity will be used to charge the energy storage containers one by one through the electricity distribution grid.
[0044] Since electricity consumption varies significantly during the day, the daytime power supply is generally slightly greater than or equal to the power consumption of a district. When power consumption is low at night, the power storage container is charged. When there is a negative power supply during the day, the power storage container is used to supplement the power supply of a district. If the power supply during the day exceeds or is basically the same for a period of time, appropriate adjustments will be made later, and the power storage container will be used as the main power supply for a period of time to reduce the power supply of the power plant. η n-nThe value of η may be different in different weeks of the same weather in a year. For example, under the same light, it may be hotter in summer, more people turn on the air conditioner, and the power consumption increases. In winter, the air conditioner may be turned off due to sufficient sunshine and no heating is needed. On rainy days, it may be cooler in summer and fewer people turn on the air conditioner, but on rainy days in winter, it may be colder and more people turn on the air conditioner. Therefore, under the same weather, at different times (different weeks) of the year, its η n-n It will be different.
[0045] According to the electricity consumption model L = η n-n *L t To set the warning value, set the area's daily electricity consumption to be lower than the electricity consumption model L = η n-n *L t If the calculated value is 20% or higher, a warning message will be issued.
[0046] The power supply of power plants is generally unchanged for a period of time. Changing the power supply will affect the power generation efficiency. Therefore, the power supply of power plants is constant throughout the day. As residents consume a lot of electricity during the day, especially between 17:00 and 24:00, some large-scale electrical equipment in factories is generally started at night (sometimes suspended during the day) to adjust the imbalance of electricity consumption. However, there will still be fluctuations in electricity consumption during the day. Therefore, electricity fluctuation monitoring is set up. When the power supply of a district exceeds 20% or is lower than 20% of the electricity consumption of the district, an early warning will be issued to enable timely response or adjustment of electricity consumption.
[0047] The electricity consumption model L = η n-n *L t The daily electricity consumption is calculated on a daily basis. The electricity consumption during the day is greater than that at night. The charging of the storage containers in the energy storage and discharge station is selected at night. The energy storage and discharge station mainly responds to power fluctuations. After the model is established, the total electricity consumption is easy to control, and the impact of fluctuations on power supply demand is adjusted through the energy storage and discharge station.
[0048] Energy storage water tanks are built in stations, subway stations and large shopping malls in each district. In summer and winter, when the electricity consumption model L = η n-n *L t When the provided electric energy is greater than the actual electric energy used in the area, the excess electric energy is used to convert the water in the water tank into cold water in summer for use in central air conditioning cooling, and the excess electric energy is used to convert the water in the water tank into hot water in winter to provide hot water.
[0049] The energy storage tank has a heat preservation effect. Some places need to build large-scale central air-conditioning and hot water storage stations. For these places, they can compress and prepare cold water for heat preservation during low-peak electricity consumption, and use it for central air-conditioning during the day. For hot water supply (bathrooms, hotels, and centrally heated communities), they can heat water and keep it warm to achieve hot water supply during low-peak electricity consumption.
[0050] Number the large power-consuming factories in each district and establish a factory power consumption model G for these large factories m-n , where m is the factory number and n is the total historical electricity consumption of the corresponding factory in the nth week of the year;
[0051] If the power consumption of a large power-consuming factory exceeds the previous power consumption by more than 20% in the next week or more, the power consumption information will be reported to the data management center, and the data management center will calculate the excess power consumption model α of the large power-consuming factory. m G m-n , then for the electricity consumption model L = η n-n *L t Correction is performed, and the power consumption model L of a certain area after correction is 矫 =η n-n *L t +(α 1 -1)G 1-n +(α 2 -1)G 2-n +…+(α m -1)G m-n .
[0052] If a large power-consuming factory does not consume excess electricity in the next few weeks, its α m =1, that is (α 2 -1) is equal to zero. For example, the large power-consuming factories numbered 1, 2, and 5 will exceed their power consumption in the future. 矫 =η n-n *L t +(α 1 -1)G 1-n +(α 2 -1)G 2-n +(α 5 -1)G m-n .
[0053] The storage containers in the electric energy storage and discharge station are numbered in sequence, and the charging and discharging of the plurality of storage containers are performed in the order of the numbers.
[0054] For example, when charging, the last time the No. 1-5 storage containers were charged and fully charged, but when charging next time, some of the No. 1-5 storage containers are not fully charged (or the power is less than 50%), and the following No. 6-10 storage containers are also not fully charged. When charging, charge from No. 6-10 in sequence first, and then cycle to the front No. 1-5.
[0055] Similarly, during the discharge process, the last time, the batteries were discharged sequentially from 1 to 5, but in the next discharge, some or all of the batteries from 1 to 5 are fully charged, and the batteries are discharged sequentially from 6 to 10, unless the batteries from 6 to 10 are insufficient. This ensures that each storage container is charged and discharged evenly.
[0056] An energy storage management system for optimizing electric energy storage and release, comprising:
[0057] A data management center, the data management center includes a data server, a monitoring station and a monitoring display screen group, the monitoring station and the monitoring display screen group are connected to the data server, the data server is provided with a historical database, a storage module and an early warning module, the historical database stores historical power consumption data, and the storage module includes a total storage unit and a temporary storage unit;
[0058] An electric energy storage and discharge station is established in each district of a city. A power consumption data collection unit, an electric energy distribution grid and several electric storage containers are established in each of the electric energy storage and discharge stations. The power station of this city supplies power to the electric energy distribution grid of each district through a high-voltage line group. The power consumption data collection unit is used to collect the total power provided by the power station to the corresponding district, collect the real-time power consumption of the corresponding district and collect the charging and discharging data of the electric storage container. The data server is connected to the power consumption data collection unit through a network so as to receive the data collected by the power consumption data collection unit in real time;
[0059] The electricity consumption change model of each district is established based on historical data. The electricity consumption change curve model L of each district in each season t Then, the influence of different weather conditions on electricity consumption in different seasons under the electricity consumption curve model is used to evaluate the coefficient η of the influence of each weather change on electricity consumption in the corresponding season. n-n , where L t where t is the week of the year, η n-n The first n in nn is the weather type, and the second n is the weather intensity of the corresponding weather type. η in the next few weeks is calculated based on the weather forecast information. n-n Digital, combined with seasonal electricity consumption curve model L t , we get the electricity consumption model L = η for the next few weeks n-n *L t .
[0060] The weather types are numbered, for example, rain is numbered 1, snow is numbered 2, sleet is numbered 3, and so on. According to the weather classification number, each numbered weather is further classified into multiple intensity categories, and the impact of these weather conditions on electricity consumption is recorded to create a model, η n-n It is the weather influence coefficient.
[0061] Number the large power-consuming factories in each district and establish a factory power consumption model G for these large factories m-n , where m is the factory number and n is the total historical electricity consumption of the corresponding factory in the nth week of the year;
[0062] Establishing a model for excess electricity consumption in large power-consuming factories m G m-n , then for the electricity consumption model L = η n-n *L t Correction is performed, and the power consumption model L of a certain area after correction is 矫 =η n-n *L t +(α 1 -1)G 1-n +(α 2 -1)G 2-n +…+(α m -1)G m-n The purpose of the correction is that power plants may increase their power generation capacity in the next few weeks to accommodate the excess power consumption of some large power-consuming factories, so as to prevent excessive power consumption in factories and affect residents' power consumption.
[0063] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A method for energy storage management for optimizing electric energy storage and release, characterized in that: include:
1. Establish a data management center The data management center includes a data server, a monitoring station and a monitoring display screen group. The monitoring station and the monitoring display screen group are connected to the data server. The data server is provided with a historical database, a storage module and an early warning module. The historical database stores historical power consumption data. The storage module includes a total storage unit and a temporary storage unit. The temporary storage unit is used to store power consumption data collected every day in a city. The temporary storage unit stores power consumption data for one day and automatically backs it up to the total storage unit at a fixed time of one day. The early warning module is used to monitor whether the power consumption data collected every day is abnormal.
2. Establishing an energy storage and discharge station An energy storage and discharge station is established in each district of a city, and an electricity consumption data collection unit, an energy distribution grid and several storage containers are established in each of the energy storage and discharge stations. The power station of this city supplies power to the energy distribution grid of each district through a high-voltage line group. The electricity consumption data collection unit is used to collect the total power provided by the power station to the corresponding district, collect the real-time power consumption of the corresponding district and collect the charging and discharging data of the storage container. The data server is connected to the electricity consumption data collection unit through a network so as to receive the data collected by the electricity consumption data collection unit in real time; 3. Model seasonal and weather changes and electricity consumption changes Based on historical data, establish the electricity consumption curve model L for each district in each season t Then, the influence of different weather conditions on electricity consumption in different seasons under the electricity consumption curve model is used to evaluate the coefficient η of the influence of each weather change on electricity consumption in the corresponding season. n-n , where L t where t is the week of the year, η n-n The first n in nn is the weather type, and the second n is the weather intensity of the corresponding weather type. η in the next few weeks is calculated based on the weather forecast information. n-n Digital, combined with seasonal electricity consumption curve model L t , we get the electricity consumption model L = η for the next few weeks n-n *L t .
2. The energy storage management method for optimizing electric energy storage and release according to claim 1, characterized in that: The electricity consumption model L = η is estimated based on the electricity consumption of each district in the next few weeks. n-n *L t , supply electricity to each zone; If the electricity consumption model used is L = η n-n *L t If the electricity provided cannot meet the electricity demand of the area every day, the storage containers in the energy storage and discharge station in the area will be used to supplement the electricity to meet the electricity demand of the area; If the electricity consumption model used is L = η n-n *L t If the electricity provided exceeds the electricity demand of the area every day, the excess electricity will be used to charge the energy storage containers one by one through the electricity distribution grid.
3. The energy storage management method for optimizing electric energy storage and release according to claim 2, characterized in that: According to the electricity consumption model L = η n-n *L t To set the warning value, set the area's daily electricity consumption to be lower than the electricity consumption model L = η n-n *L t If the calculated value is 20% or higher, a warning message will be issued.
4. The energy storage management method for optimizing electric energy storage and release according to claim 2, characterized in that: The electricity consumption model L = η n-n *L t The daily electricity consumption is calculated on a daily basis. The electricity consumption during the day is greater than that at night, so the storage containers in the energy storage and discharge station are charged at night.
5. The energy storage management method for optimizing electric energy storage and release according to claim 1, characterized in that: Energy storage water tanks are built in stations, subway stations and large shopping malls in each district. In summer and winter, when the electricity consumption model L = η n-n *L t When the provided electric energy is greater than the actual electric energy used in the area, the excess electric energy is used to convert the water in the water tank into cold water in summer for use in central air conditioning cooling, and the excess electric energy is used to convert the water in the water tank into hot water in winter to provide hot water.
6. The energy storage management method for optimizing electric energy storage and release according to claim 1, characterized in that: Number the large power-consuming factories in each district and establish a factory power consumption model G for these large factories m-n , where m is the factory number and n is the total historical electricity consumption of the corresponding factory in the nth week of the year; If the power consumption of a large power-consuming factory exceeds the previous power consumption by more than 20% in the next week or more, the power consumption information will be reported to the data management center, and the data management center will calculate the excess power consumption model α of the large power-consuming factory. m G m-n , then for the electricity consumption model L = η n-n *L t Correction is performed, and the power consumption model L of a certain area after correction is 矫 =η n-n *L t +(α1-1)G 1-n +(α2-1)G 2-n +…+(α m -1)G m-n .
7. The energy storage management method for optimizing electric energy storage and release according to claim 1, characterized in that: The storage containers in the electric energy storage and discharge station are numbered in sequence, and the charging and discharging of the plurality of storage containers are performed in the order of the numbers.
8. An energy storage management system for optimizing electric energy storage and release, characterized in that: include: A data management center, the data management center includes a data server, a monitoring station and a monitoring display screen group, the monitoring station and the monitoring display screen group are connected to the data server, the data server is provided with a historical database, a storage module and an early warning module, the historical database stores historical power consumption data, and the storage module includes a total storage unit and a temporary storage unit; An electric energy storage and discharge station is established in each district of a city. A power consumption data collection unit, an electric energy distribution grid and several electric storage containers are established in each of the electric energy storage and discharge stations. The power station of this city supplies power to the electric energy distribution grid of each district through a high-voltage line group. The power consumption data collection unit is used to collect the total power provided by the power station to the corresponding district, collect the real-time power consumption of the corresponding district and collect the charging and discharging data of the electric storage container. The data server is connected to the power consumption data collection unit through a network so as to receive the data collected by the power consumption data collection unit in real time; The electricity consumption change model of each district is established based on historical data. The electricity consumption change curve model L of each district in each season t Then, the influence of different weather conditions on electricity consumption in different seasons under the electricity consumption curve model is used to evaluate the coefficient η of the influence of each weather change on electricity consumption in the corresponding season. n-n , where L t where t is the week of the year, η n-n The first n in nn is the weather type, and the second n is the weather intensity of the corresponding weather type. η in the next few weeks is calculated based on the weather forecast information. n-n Digital, combined with seasonal electricity consumption curve model L t , we get the electricity consumption model L = η for the next few weeks n-n *L t .
9. The energy storage management system for optimizing electric energy storage and release according to claim 8, characterized in that: Number the large power-consuming factories in each district and establish a factory power consumption model G for these large factories m-n , where m is the factory number and n is the total historical electricity consumption of the corresponding factory in the nth week of the year; Establishing a model for excess power consumption in large power-consuming factories m G m-n , then for the electricity consumption model L = η n-n *L t Correction is performed, and the power consumption model L of a certain area after correction is 矫 =η n-n *L t +(α1-1)G 1-n +(α2-1)G 2-n +…+(α m -1)G m-n .
Citation Information
Patent Citations
Method and device for predicating electricity consumption of residential area
CN102930354A
Container-type energy-storage power station
CN204144962U
Method and apparatus for delivering power using external data
US20140049109A1