Large-span steel box girder welding temperature control method, device, equipment and medium

By establishing a parameterized model and simulated welding process, and obtaining simulated melt pool data for comparison, the problem of inaccurate welding temperature control in large-span steel box beam welding is solved, and the precise control of welding temperature and the improvement of welding quality is achieved.

CN118989694APending Publication Date: 2024-11-22THE NO 6 ENG CO LTD OF CHINA RAILWAY 20TH BUREAU GRP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411094133.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The prior art cannot accurately control the welding temperature during the welding process of large-span steel box beams, which affects the welding quality.

Method used

By establishing a parameterized model, simulating the welding process, obtaining the simulated melt pool data and comparing the actual data, adjusting the welding temperature to meet the preset conditions, and achieving precise control.

Benefits of technology

Accurate control of the welding temperature of large-span steel box girders is achieved, and the welding quality and efficiency are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118989694A_ABST
    Figure CN118989694A_ABST
Patent Text Reader

Abstract

The invention discloses a large-span steel box girder welding temperature control method, device and equipment and a medium, a parameterized model corresponding to a steel box girder is established according to structural parameter information of the steel box girder, a simulation welding instruction is executed on the parameterized model along a preset welding path, and the welding temperature of the steel box girder is controlled. Performing simulated welding connection on the first simulated welding seam and the second simulated welding seam, respectively acquiring simulated molten pool data corresponding to the first simulated welding seam and the second simulated welding seam along a preset welding path, and performing comparative analysis on the simulated molten pool data and the actual molten pool data to obtain the simulated welding seam. According to the method, the welding temperature of the large-span steel box girder can be accurately acquired to determine whether the temperature field simulation result corresponding to the welding simulation instruction meets the preset condition, and when the preset condition is met, the welding temperature is controlled to be the welding simulation instruction on the construction site, and welding construction is performed on the large-span steel box girder, so that the welding temperature of the large-span steel box girder can be accurately acquired. And during welding, the large-span steel box girder can be directly welded according to the welding temperature.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge construction, and in particular to a method, device, equipment and medium for controlling the welding temperature of a large-span steel box girder. Background Art

[0002] The bridge deck of a bridge project is usually constructed by on-site casting or prefabricated assembly. The bridge deck mainly includes steel box girder bridge deck and concrete bridge deck. In the process of prefabricated assembly, the jacking method is a new assembly technology. The specific process of the jacking method is: a construction site is set up on land in the area where the bridge head is located, and the bridge deck is prefabricated on the construction site. After the prefabrication of the bridge deck is completed, the bridge deck is pushed onto the pier using jacks and other jacking mechanisms to complete the construction of the bridge deck.

[0003] In the process of welding steel box girders, welding temperature will become an important factor affecting the welding quality of large-span steel box girders. In related technologies, the influence of temperature on the welding quality of large-span steel box girders is usually reduced by directly controlling the welding temperature. Although this method can reduce the influence of welding temperature, it also has the problem of being unable to accurately control the welding temperature. Summary of the invention

[0004] The main purpose of the present invention is to provide a method, device, equipment and medium for controlling the welding temperature of a large-span steel box girder, aiming to solve the technical problem that the welding temperature cannot be accurately controlled by directly controlling the welding temperature in the related art to reduce the influence of temperature on the welding quality of large-span steel box girders.

[0005] To achieve the above object, in a first aspect, the present invention provides a method for controlling the welding temperature of a large-span steel box girder, comprising the following steps:

[0006] According to the structural parameter information of the steel box girder, a parametric model corresponding to the steel box girder is established; wherein the parametric model is made by simulating welding and splicing two part models, and the simulated welding positions corresponding to the two part models form a first simulated weld and a second simulated weld distributed at intervals;

[0007] Executing a simulated welding instruction on the parameterized model along a preset welding path to simulate welding the first simulated weld and the second simulated weld; wherein the simulated welding instruction includes a simulated welding temperature and a simulated welding speed;

[0008] Acquire simulated molten pool data corresponding to the first simulated weld and the second simulated weld respectively along the preset welding path; the simulated molten pool data includes corresponding cross-sectional shape data of the simulated molten pool;

[0009] Comparing and analyzing the simulated molten pool data with the actual molten pool data to determine whether the temperature field simulation result corresponding to the simulated welding instruction meets the preset conditions;

[0010] When the preset conditions are met, the welding temperature is controlled to the simulated welding instruction at the construction site and the welding construction of the long-span steel box girder is carried out.

[0011] Optionally, the step of respectively acquiring simulated molten pool data corresponding to the first simulated weld and the second simulated weld along the preset welding path includes:

[0012] Along the preset welding path, the state parameters, shape parameters, area parameters and distance parameters between the simulated molten pool corresponding to the first simulated weld and the second simulated weld and the actual weld are respectively obtained to obtain the corresponding simulated molten pool data.

[0013] Optionally, the step of respectively acquiring state parameters, shape parameters, area parameters and distance parameters from actual welds of the simulated molten pools corresponding to the first simulated weld and the second simulated weld along the preset welding path to obtain the corresponding simulated molten pool data includes:

[0014] Along the preset welding path, a plurality of spaced collection positions are respectively set on the first simulated weld and the second simulated weld;

[0015] The state parameters, shape parameters, area parameters and distance parameters between the simulated molten pool and the actual weld at each of the acquisition positions corresponding to the first simulated weld and the second simulated weld are respectively obtained to obtain the corresponding simulated molten pool data.

[0016] Optionally, the step of setting a plurality of spaced collection positions on the first simulated weld and the second simulated weld respectively along the preset welding path comprises:

[0017] Dividing a plurality of preset collection moments along the preset welding path;

[0018] According to the preset collection time, a plurality of collection positions distributed at intervals are respectively set on the first simulated weld and the second simulated weld.

[0019] Optionally, after the step of respectively acquiring the state parameters, shape parameters, area parameters and distance parameters from the actual weld of the simulated molten pool at each of the acquisition positions corresponding to the first simulated weld and the second simulated weld to obtain the corresponding simulated molten pool data, the step further includes:

[0020] According to the simulated molten pool data, a temperature field cloud diagram corresponding to the first simulated weld and the second simulated weld is generated;

[0021] According to the temperature field cloud map, the temperature field distribution results corresponding to the first simulated weld and the second simulated weld are obtained.

[0022] Optionally, before the step of obtaining the temperature field distribution results corresponding to the first simulated weld and the second simulated weld according to the temperature field cloud map, the method further includes:

[0023] Mapping each of the preset collection moments to the temperature field cloud map respectively;

[0024] Respectively obtaining the temperature field cloud map corresponding to each of the preset acquisition moments in the first simulated weld and the temperature field cloud map corresponding to the second simulated weld;

[0025] According to the temperature field cloud map, the temperature field distribution results corresponding to each of the preset collection moments are obtained respectively.

[0026] Optionally, after the step of respectively acquiring the temperature field distribution results corresponding to each of the preset acquisition moments according to the temperature field cloud map, the method further includes:

[0027] Analyze the temperature field distribution results corresponding to each of the preset acquisition moments to obtain a temperature change curve diagram of the position corresponding to each of the preset acquisition moments;

[0028] According to the temperature variation curve, the interval welding time of the first simulated weld and the second simulated weld is obtained.

[0029] Based on the same technical concept, in a second aspect, the present invention proposes a large-span steel box girder welding temperature control device, comprising:

[0030] A modeling module, used for establishing a parameterized model corresponding to the steel box girder according to the structural parameter information of the steel box girder;

[0031] An instruction execution module, configured to execute a simulated welding instruction on the parameterized model along a preset welding path, so as to perform simulated welding connection on the first simulated weld and the second simulated weld;

[0032] A data acquisition module, used for acquiring simulated molten pool data corresponding to the first simulated weld and the second simulated weld respectively along the preset welding path;

[0033] An analysis module, used for comparing and analyzing the simulated molten pool data with the actual molten pool data to determine whether the temperature field simulation result corresponding to the simulated welding instruction meets the preset conditions;

[0034] The welding execution module is used to control the welding temperature to the simulated welding instruction and perform welding construction on the large-span steel box girder at the construction site when the preset conditions are met.

[0035] Based on the same technical concept, in the third aspect, the present invention proposes a large-span steel box girder welding temperature control device, the large-span steel box girder welding temperature control device includes a processor and a memory, the memory stores a large-span steel box girder welding temperature control program, and when the large-span steel box girder welding temperature control program is executed by the processor, the large-span steel box girder welding temperature control method described in the first aspect is implemented.

[0036] Based on the same technical concept, in the fourth aspect, the present invention proposes a computer storage medium, on which a computer program is stored. When the computer program is executed by one or more processors, the large-span steel box girder welding temperature control method described in the first aspect is implemented.

[0037] The technical solution of the present invention establishes a parametric model corresponding to the steel box girder according to the structural parameter information of the steel box girder, executes a simulated welding instruction on the parametric model along a preset welding path to simulate the welding connection of the first simulated weld and the second simulated weld, obtains the simulated molten pool data corresponding to the first simulated weld and the second simulated weld along the preset welding path, compares and analyzes the simulated molten pool data with the actual molten pool data to determine whether the temperature field simulation result corresponding to the simulated welding instruction meets the preset conditions. When the preset conditions are met, the welding temperature is controlled to the simulated welding instruction at the construction site and the large-span steel box girder is welded. When the present invention is used, the welding temperature of the large-span steel box girder can be accurately obtained, and the large-span steel box girder can be welded directly according to the welding temperature during welding. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.

[0039] Figure 1 A flow chart of a method for controlling welding temperature of a large-span steel box girder according to an example of the present invention;

[0040] Figure 2 for Figure 1 Flow chart of step S310 in the example;

[0041] Figure 3 for Figure 1 Flow chart of step S311 in the example;

[0042] Figure 4 for Figure 3 Flow charts of some specific embodiments of step S310 exemplified in FIG.

[0043] Figure 5 A simulated molten pool shape diagram corresponding to the first simulated weld of the present invention;

[0044] Figure 6 for Figure 5 The temperature field distribution diagram corresponding to the preset acquisition time of 0.5s in the example;

[0045] Figure 7 for Figure 5 The temperature field distribution diagram corresponding to the preset acquisition time of 1.5s in the example;

[0046] Figure 8 for Figure 5 The temperature field distribution diagram corresponding to the preset acquisition time of 8s in the example;

[0047] Fig. 9 for Figure 5 The temperature field distribution diagram corresponding to the preset acquisition time of 12s in the example;

[0048] Fig.10 for Figure 5 The temperature field distribution diagram corresponding to the preset acquisition time of 16s in the example;

[0049] Fig.11 for Figure 5 The temperature field distribution diagram corresponding to the preset acquisition time of 18.75s in the example;

[0050] Fig.12 for Figure 5 The temperature field distribution diagram corresponding to the preset acquisition time of 30s in the example;

[0051] Fig.13 for Figure 5 The temperature field distribution diagram corresponding to the preset acquisition time of 48.75s in the example;

[0052] Fig.14 A simulated molten pool shape diagram corresponding to the second simulated weld seam of the present invention;

[0053] Fig.15 for Fig.14 The temperature field distribution diagram corresponding to the preset acquisition time of 49.25s in the example;

[0054] Fig.16 for Fig.14 The temperature field distribution diagram corresponding to the preset acquisition time of 50.25s in the example;

[0055] Fig.17 for Fig.14 The temperature field distribution diagram corresponding to the preset acquisition time of 56s in the example;

[0056] Fig.18 for Fig.14 The temperature field distribution diagram corresponding to the preset acquisition time of 60s in the example;

[0057] Fig.19 for Fig.14 The temperature field distribution diagram corresponding to the preset acquisition time of 65s in the example;

[0058] Fig. 20 for Fig.14 The temperature field distribution diagram corresponding to the preset acquisition time of 67.5s in the example;

[0059] Fig.21 for Fig.14 The temperature field distribution diagram corresponding to the preset acquisition time of 800s in the example;

[0060] Fig. 22 for Fig.14 The temperature field distribution diagram corresponding to the preset acquisition time of 4067.5s in the example;

[0061] Fig.23 This is a schematic diagram of the arrangement of preset collection moments along the horizontal direction according to an example of the present invention;

[0062] Fig.24 for Fig.23 The temperature field curve diagram corresponding to each preset acquisition time in the example;

[0063] Fig.25 This is a schematic diagram of the arrangement of preset acquisition moments perpendicular to the horizontal direction of the weld according to an example of the present invention;

[0064] Fig.26 for Fig.25 The temperature field curve diagram corresponding to each preset acquisition time in the example;

[0065] Fig. 27 The figure is a schematic diagram of the structure of a large-span steel box girder welding temperature control device according to an example of the present invention.

[0066] The purpose, features and advantages of the present invention will be further described with reference to the accompanying drawings in conjunction with the embodiments. DETAILED DESCRIPTION

[0067] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0068] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between various mechanisms under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0069] In the present invention, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0070] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in the field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0071] The inventive concept of the present invention is further described below in conjunction with some specific implementation methods.

[0072] See also Figures 1 to 9 The present invention proposes some embodiments of a method, device, equipment and medium for controlling the welding temperature of a large-span steel box girder.

[0073] See also Figures 1 to 9 The welding temperature control method of this type of large-span steel box girder includes the following steps:

[0074] S100, establishing a parametric model corresponding to the steel box girder according to the structural parameter information of the steel box girder; wherein the parametric model is made by simulating welding and splicing two part models, and the simulated welding positions corresponding to the two part models form a first simulated weld and a second simulated weld distributed at intervals;

[0075] S200, executing a simulated welding instruction on the parameterized model along a preset welding path to simulate welding the first simulated weld and the second simulated weld; wherein the simulated welding instruction includes a simulated welding temperature and a simulated welding speed;

[0076] S300, along the preset welding path, respectively acquiring simulated molten pool data corresponding to the first simulated weld and the second simulated weld; the simulated molten pool data including corresponding cross-sectional shape data of the simulated molten pool;

[0077] S400, comparing and analyzing the simulated molten pool data with the actual molten pool data to determine whether the temperature field simulation result corresponding to the simulated welding instruction meets the preset conditions;

[0078] S500: When the preset conditions are met, the welding temperature is controlled to the simulated welding instruction at the construction site and welding construction is performed on the large-span steel box girder.

[0079] In this embodiment, a parametric model corresponding to the steel box girder is established according to the structural parameter information of the steel box girder, and a simulated welding instruction is executed on the parametric model along a preset welding path to simulate the welding connection of the first simulated weld and the second simulated weld. Simulated molten pool data corresponding to the first simulated weld and the second simulated weld are respectively obtained along the preset welding path, and the simulated molten pool data are compared and analyzed with the actual molten pool data to determine whether the temperature field simulation result corresponding to the simulated welding instruction meets the preset conditions. When the preset conditions are met, the welding temperature is controlled to the simulated welding instruction at the construction site and the large-span steel box girder is welded. When the present invention is used, the welding temperature of the large-span steel box girder can be accurately obtained, and the large-span steel box girder can be welded directly according to the welding temperature during welding.

[0080] In some specific embodiments, step S300 includes:

[0081] S310. Along the preset welding path, respectively obtain the state parameters, shape parameters, area parameters and distance parameters between the simulated molten pool corresponding to the first simulated weld and the second simulated weld and the actual weld, and obtain the corresponding simulated molten pool data.

[0082] Specifically, step S310 includes:

[0083] S311, setting a plurality of spaced collection positions on the first simulated weld and the second simulated weld respectively along the preset welding path;

[0084] S312, respectively obtaining the state parameters, shape parameters, area parameters and distance parameters between the simulated molten pool and the actual weld at each of the acquisition positions corresponding to the first simulated weld and the second simulated weld, and obtaining the corresponding simulated molten pool data.

[0085] Exemplarily, step S311 includes:

[0086] S311a, dividing a plurality of preset collection moments along the preset welding path;

[0087] S311b. According to the preset collection time, set a plurality of collection positions distributed at intervals on the first simulated weld and the second simulated weld respectively.

[0088] In some specific embodiments, after step S312, the method further includes:

[0089] S313, generating a temperature field cloud map corresponding to the first simulated weld and the second simulated weld according to the simulated molten pool data;

[0090] S314. Obtain temperature field distribution results corresponding to the first simulated weld and the second simulated weld according to the temperature field cloud map.

[0091] In some preferred embodiments, before step S314, the method further includes:

[0092] S315, mapping each of the preset collection moments to the temperature field cloud map;

[0093] S316, respectively obtaining the temperature field cloud map corresponding to each of the preset acquisition moments in the first simulated weld and the temperature field cloud map corresponding to the second simulated weld;

[0094] S317. According to the temperature field cloud map, respectively obtain the temperature field distribution results corresponding to each of the preset collection moments.

[0095] Of course, in some exemplary embodiments, after step S317, the following steps are further included:

[0096] S318, analyzing the temperature field distribution results corresponding to each of the preset collection moments to obtain a temperature change curve diagram of the position corresponding to each of the preset collection moments;

[0097] S319. Obtain the interval welding time between the first simulated weld and the second simulated weld according to the temperature change curve.

[0098] Specifically, the state, shape, and size of the molten pool obtained through numerical simulation of the software are close to the actual weld area, which is one of the bases for the accuracy of the results of the welding temperature field analysis. The welding simulation used in this paper is Q345 steel with a melting point of 1530°C. That is, when the temperature of the welding process exceeds 1530°C, the welding material will enter a molten state. Therefore, the accuracy of the temperature field simulation results can be judged by comparing the shape distribution of the molten pool at the weld, the size of the molten pool depth and width with the molten pool cross-section of the actual weld. The molten pools of the first weld and the second weld are as follows: Figure 5 , Fig.15 shown.

[0099] The time required for welding the first weld is 18.75s, and the cooling time between the first weld and the second weld is 30s. The time nodes are extracted from the welding and cooling process of the first weld: 0.5s, 1.5s, 8s, 12s, 16s, 18.75s, 30s, and 48.75s to study the distribution of the temperature field, where 0.5s and 2s are the welding start stage, 8s and 10s are the middle time points of the welding process, 16s and 18.75s are the welding completion time points, and 30s and 48.75s are the cooling stage. The specific temperature field distribution is as follows Figures 6 to 14 shown.

[0100] From the temperature field cloud map of the first weld, it can be seen that the welding temperature field is not evenly distributed. In the process of the heat source moving along the weld, the center of the heat source reaches the peak temperature, and the temperature distribution near the heat source is close to an ellipse. The temperature fluctuation in front of the heat source is large, and the temperature fluctuation behind it is small. This is close to the actual welding situation and can truly reflect the welding process. After the first weld of the structure is completed, the U rib begins to enter the cooling process. At 30s, the temperature of the U rib weld cools to about 470℃. At 48.75s, the structural weld cools to about 250℃, and the second weld is welded on this basis.

[0101] The welding start time of the second weld is 48.75s, and the welding time is the same as the first weld, which is 18.75s. The cooling time after the second weld is completed is set to 4000s. By selecting the time nodes: 49.25s and 50.25s at the start of the second weld, 56s and 60s in the middle stage, 65s and 67.5s near the end stage, and 800s and 4067.5s in the cooling stage, the temperature field distribution during the welding process of the second weld is studied. The specific results are as follows: Figures 16 to 23 shown.

[0102] from Figures 6 to 14 From a to f in the figure, we can see that the temperature of the second weld rises to 2500℃ within 1.5s after the start of welding, and enters a relatively stable quasi-steady-state temperature field at about 2700℃ from 52s to 65s, and finally rises again to about 3100℃ near the end of welding. The cooling process of welding starts at 67.5s, cools to about 50℃ at 800s, and cools to 22.2℃ at 4000s, close to room temperature, indicating that the double-layer welding of the U-rib of the bridge deck is basically completed.

[0103] In order to conduct a more comprehensive study on the variation of the temperature field of the U-rib welding of the steel bridge deck, the temperature data of different positions of the weld and the different positions of the top plate edge perpendicular to the weld during the entire welding time history were extracted for analysis. The length of the selected U-rib weld is 150mm. By setting five measuring points at 30mm, 60mm, 90mm, 120mm, and 150mm from the starting end of the welding, the variation of the temperature of the structure during the entire welding process is studied. The measurement point layout is as follows: Fig.24 shown.

[0104] The changes of the five measuring points N1 to N5 over time are as follows Fig.25 shown.

[0105] As can be seen from the figure above, when the welding heat source passes through the test point during movement, the temperature reaches the highest value at this time. When the heat source gradually moves away from the test point, the temperature will gradually decrease. The temperature change rate of each test point before reaching the peak temperature is large, and the temperature change rate after the peak temperature is small. In addition, it can be seen from the figure that during the welding process, the peak temperature of N1 is lower than that of the other test points. This is because N1 is closer to the welding starting point, and the other four test points have entered the steady-state temperature field stage; secondly, since the model uses two welds to complete the welding, the temperature curve has two peaks, which is consistent with the actual situation of the double-layer welding process. The measuring point is closer to the first weld and farther from the second weld, so the temperature of the first peak is higher than the temperature of the second peak.

[0106] In the direction perpendicular to the weld section, five measuring points with intervals of 4mm, 5mm, 3mm, 4mm, and 4mm are set. The arrangement is as follows: Fig.26 shown.

[0107] The temperature changes of the five measuring points N1 to N5 over time are as follows Fig. 27 shown.

[0108] As can be seen from the figure above, when the welding heat source approaches the test point during the movement, the temperature of each test point rises rapidly. After reaching the peak temperature, as the test moves farther and farther away from the center of the heat source, the temperature begins to gradually decrease until it approaches room temperature, and its rate of decrease is less than the rate of increase. Because the model requires two weldings to complete, the temperature curve has two peaks. Comparing N2 to N5, it can be seen that the maximum temperature becomes lower and lower as it is farther away from the center of the weld, and it can also be seen that the peak temperature of the second weld is higher than the peak temperature of the first weld. This is because the four test points N2 to N5 are closer to the center of the second weld than the first weld, and the peak temperature of the first weld at the N1 test point is higher than that of the second weld.

[0109] Based on the same technical concept, in a second aspect, the present invention proposes a large-span steel box girder welding temperature control device, comprising:

[0110] A modeling module, used for establishing a parameterized model corresponding to the steel box girder according to the structural parameter information of the steel box girder;

[0111] An instruction execution module, configured to execute a simulated welding instruction on the parameterized model along a preset welding path, so as to perform simulated welding connection on the first simulated weld and the second simulated weld;

[0112] A data acquisition module, used for acquiring simulated molten pool data corresponding to the first simulated weld and the second simulated weld respectively along the preset welding path;

[0113] An analysis module, used for comparing and analyzing the simulated molten pool data with the actual molten pool data to determine whether the temperature field simulation result corresponding to the simulated welding instruction meets the preset conditions;

[0114] The welding execution module is used to control the welding temperature to the simulated welding instruction and perform welding construction on the large-span steel box girder at the construction site when the preset conditions are met.

[0115] It should be noted that the functions that can be realized by each module in the large-span steel box girder welding temperature control device provided in this embodiment and the corresponding technical effects achieved can refer to the description of the specific implementation methods in each embodiment of the large-span steel box girder welding temperature control method of the present invention. For the sake of brevity of the specification, they will not be repeated here.

[0116] Based on the same technical concept, in the third aspect, the present invention proposes a large-span steel box girder welding temperature control device, the large-span steel box girder welding temperature control device includes a processor and a memory, the memory stores a large-span steel box girder welding temperature control program, and when the large-span steel box girder welding temperature control program is executed by the processor, the large-span steel box girder welding temperature control method described in the first aspect is implemented.

[0117] The large-span steel box girder welding temperature control equipment refers to a terminal device or network device that can achieve network connection. The large-span steel box girder welding temperature control equipment can be a terminal device such as a mobile phone, computer, tablet computer, embedded industrial computer, or a network device such as a server or cloud platform.

[0118] like Fig. 27 The hardware structure diagram of the large-span steel box girder welding temperature control device is shown in FIG. The large-span steel box girder welding temperature control device may include: a processor 1001, such as a CPU (Central Processing Unit), a communication bus 1002, a user interface 1003, a network interface 1004, and a memory 1005.

[0119] Those skilled in the art will understand that Figure 8 The hardware structure shown in the figure does not constitute a limitation on the large-span steel box girder welding temperature control device of the present invention, and may include more or fewer components than shown in the figure, or combine certain components, or arrange the components differently.

[0120] Specifically, the communication bus 1002 is used to realize the connection and communication between these components;

[0121] The user interface 1003 is used to connect to the client and perform data communication with the client. The user interface 1003 may include an output unit, such as a display screen, and an input unit, such as a keyboard;

[0122] The network interface 1004 is used to connect to the backend server and perform data communication with the backend server. The network interface 1004 may include an input / output interface, such as a standard wired interface, a wireless interface, such as a Wi-Fi interface;

[0123] The memory 1005 is used to store various types of data, which may include, for example, instructions for any application or method in the long-span steel box girder welding temperature control device, as well as data related to the application. The memory 1005 may be a high-speed RAM memory or a stable memory, such as a disk memory. Optionally, the memory 1005 may also be a storage device independent of the processor 1001, and further reference is made to Figure 8, the memory 1005 may include an operating system, a network communication module, a user interface module, and a large-span steel box girder welding temperature control program;

[0124] The processor 1001 is used to call the long-span steel box girder welding temperature control program stored in the memory 1005, and perform the following operations:

[0125] S100, establishing a parameterized model corresponding to the steel box girder according to the structural parameter information of the steel box girder;

[0126] S200, executing a simulated welding instruction on the parameterized model along a preset welding path to perform simulated welding connection on the first simulated weld and the second simulated weld;

[0127] S300, along the preset welding path, respectively acquiring simulated molten pool data corresponding to the first simulated weld and the second simulated weld;

[0128] S400, comparing and analyzing the simulated molten pool data with the actual molten pool data to determine whether the temperature field simulation result corresponding to the simulated welding instruction meets the preset conditions;

[0129] S500: When the preset conditions are met, the welding temperature is controlled to the simulated welding instruction at the construction site and welding construction is performed on the large-span steel box girder.

[0130] Based on the same technical concept, in the fourth aspect, the present invention proposes a computer storage medium, on which a computer program is stored. When the computer program is executed by one or more processors, the large-span steel box girder welding temperature control method described in the first aspect is implemented.

[0131] Based on the same inventive concept, this embodiment provides a computer-readable storage medium, such as a flash memory, a hard disk, a multimedia card, a card-type memory (for example, an SD or DX memory, etc.), a random access memory (RAM), a static random access memory (SRAM), a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), a magnetic memory, a disk, an optical disk, a server, etc., wherein a computer program is stored on the storage medium, and the computer program can be executed by one or more processors. When the computer program is executed by the processor, all or part of the steps of each embodiment of the large-span steel box girder welding temperature control method of the present invention can be implemented.

[0132] The above descriptions are only optional embodiments of the present invention, and are not intended to limit the patent scope of the present invention. All equivalent structural changes made using the contents of the present invention's specification and drawings, or directly / indirectly applied in other related technical fields, are included in the patent protection scope of the present invention.

Claims

1. A method for controlling welding temperature of a large-span steel box girder. It is characterized in that The steps include: According to the structural parameter information of the steel box girder, a parametric model corresponding to the steel box girder is established; wherein the parametric model is made by simulating welding and splicing two part models, and the simulated welding positions corresponding to the two part models form a first simulated weld and a second simulated weld distributed at intervals; Executing a simulated welding instruction on the parameterized model along a preset welding path to simulate welding the first simulated weld and the second simulated weld; wherein the simulated welding instruction includes a simulated welding temperature and a simulated welding speed; Acquire simulated molten pool data corresponding to the first simulated weld and the second simulated weld respectively along the preset welding path; the simulated molten pool data includes corresponding cross-sectional shape data of the simulated molten pool; Comparing and analyzing the simulated molten pool data with the actual molten pool data to determine whether the temperature field simulation result corresponding to the simulated welding instruction meets the preset conditions; When the preset conditions are met, the welding temperature is controlled to the simulated welding instruction at the construction site and the welding construction of the long-span steel box girder is carried out.

2. The method for controlling the welding temperature of a large-span steel box girder according to claim 1, It is characterized in that The step of respectively acquiring simulated molten pool data corresponding to the first simulated weld and the second simulated weld along the preset welding path comprises: Along the preset welding path, the state parameters, shape parameters, area parameters and distance parameters between the simulated molten pool corresponding to the first simulated weld and the second simulated weld and the actual weld are respectively obtained to obtain the corresponding simulated molten pool data.

3. The welding temperature control method for a large-span steel box girder according to claim 2, It is characterized in that The step of respectively acquiring state parameters, shape parameters, area parameters and distance parameters between the simulated molten pools corresponding to the first simulated weld and the second simulated weld and the actual weld along the preset welding path to obtain the corresponding simulated molten pool data comprises: Along the preset welding path, a plurality of spaced collection positions are respectively set on the first simulated weld and the second simulated weld; The state parameters, shape parameters, area parameters and distance parameters between the simulated molten pool and the actual weld at each of the acquisition positions corresponding to the first simulated weld and the second simulated weld are respectively obtained to obtain the corresponding simulated molten pool data.

4. The welding temperature control method for a large-span steel box girder according to claim 3, It is characterized in that The step of setting a plurality of spaced collection positions on the first simulated weld and the second simulated weld respectively along the preset welding path comprises: Dividing a plurality of preset collection moments along the preset welding path; According to the preset collection time, a plurality of collection positions distributed at intervals are respectively set on the first simulated weld and the second simulated weld.

5. The method for controlling welding temperature of a large-span steel box girder according to claim 4, It is characterized in that After the step of respectively acquiring the state parameters, shape parameters, area parameters and distance parameters between the simulated molten pool and the actual weld at each of the acquisition positions corresponding to the first simulated weld and the second simulated weld to obtain the corresponding simulated molten pool data, the method further includes: According to the simulated molten pool data, a temperature field cloud diagram corresponding to the first simulated weld and the second simulated weld is generated; According to the temperature field cloud map, the temperature field distribution results corresponding to the first simulated weld and the second simulated weld are obtained.

6. The method for controlling welding temperature of a large-span steel box girder according to claim 5, It is characterized in that Before the step of obtaining the temperature field distribution results corresponding to the first simulated weld and the second simulated weld according to the temperature field cloud map, the method further includes: Mapping each of the preset collection moments to the temperature field cloud map respectively; Respectively obtaining the temperature field cloud map corresponding to each of the preset acquisition moments in the first simulated weld and the temperature field cloud map corresponding to the second simulated weld; According to the temperature field cloud map, the temperature field distribution results corresponding to each of the preset collection moments are obtained respectively.

7. The method for controlling welding temperature of a large-span steel box girder according to claim 6, It is characterized in that After the step of respectively acquiring the temperature field distribution results corresponding to each of the preset acquisition moments according to the temperature field cloud map, the method further includes: Analyze the temperature field distribution results corresponding to each of the preset acquisition moments to obtain a temperature change curve diagram of the position corresponding to each of the preset acquisition moments; According to the temperature variation curve, the interval welding time of the first simulated weld and the second simulated weld is obtained.

8. A temperature control device for welding large-span steel box beams. It is characterized in that include: A modeling module, used for establishing a parameterized model corresponding to the steel box girder according to the structural parameter information of the steel box girder; An instruction execution module, configured to execute a simulated welding instruction on the parameterized model along a preset welding path, so as to perform simulated welding connection on the first simulated weld and the second simulated weld; A data acquisition module, used for acquiring simulated molten pool data corresponding to the first simulated weld and the second simulated weld respectively along the preset welding path; An analysis module, used for comparing and analyzing the simulated molten pool data with the actual molten pool data to determine whether the temperature field simulation result corresponding to the simulated welding instruction meets the preset conditions; The welding execution module is used to control the welding temperature to the simulated welding instruction and perform welding construction on the large-span steel box girder at the construction site when the preset conditions are met.

9. A large-span steel box girder welding temperature control device, It is characterized in that The large-span steel box girder welding temperature control device includes a processor and a memory, and the memory stores a large-span steel box girder welding temperature control program. When the large-span steel box girder welding temperature control program is executed by the processor, the large-span steel box girder welding temperature control method as described in any one of claims 1 to 7 is implemented.

10. A computer storage medium, It is characterized in that The storage medium stores a computer program, and when the computer program is executed by one or more processors, the method for controlling the welding temperature of a large-span steel box girder according to any one of claims 1 to 7 is implemented.