Foundation pit temporary supporting method

By alternately using steel and concrete support in foundation pits, the problems of long support time and insufficient bearing capacity during foundation pit excavation construction are solved, stable support and cost reduction of foundation pit enclosure are achieved, and excavation is improved efficiency.

CN118997176APending Publication Date: 2024-11-22SHANGHAI MECHANIZED CONSTR GRP

Patent Information

Application Number
CN202411347472.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

During the excavation and construction of foundation pits, the concrete supports for a long time in the prior art and cannot quickly form support. The steel support capacity is insufficient and the cost is high, making it difficult to meet the bearing capacity requirements of large and deep foundation pits, resulting in the foundation pit being in a long time. Unsupported state, deformation occurs and the operating cost is high.

Method used

By using the method of alternately using steel and concrete support, by placing support devices and pouring concrete blocks in the foundation pit, steel and concrete support are alternately provided, the foundation pit exposure time is shortened, and the foundation pit enclosure is carried out under stable support state. Work, and reduce costs and improve excavation efficiency through the alternating use of steel and concrete support.

Benefits of technology

The rapid formation and stable support of foundation pit enclosure are achieved, the foundation pit deformation is avoided, the operation cost is reduced, the excavation efficiency is improved, and the bearing capacity requirements of large and deep foundation pits are met.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997176A_ABST
    Figure CN118997176A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of foundation pit engineering construction, and discloses a foundation pit temporary supporting method which comprises the following steps that a foundation pit supporting device is placed in a foundation pit, so that the foundation pit supporting device provides steel support for the foundation pit; concrete is poured into the foundation pit to form a concrete block, so that the concrete block provides concrete support for the foundation pit; and alternately using the foundation pit supporting device and the concrete block to alternately provide steel support and concrete support for the foundation pit. Steel support is provided for the foundation pit through the foundation pit supporting device, concrete support is provided for the foundation pit after the concrete blocks are formed through concrete pouring, and the steel support and the concrete support can be alternately provided for the foundation pit under alternate use of the foundation pit supporting device and the concrete blocks, so that the exposure time of the foundation pit is shortened, and the temporary supporting effect is achieved; therefore, deformation of the foundation pit support is resisted, it is guaranteed that the foundation pit support structure always works in a stable and strong supporting state, the manufacturing cost is low, the cost is reduced, and meanwhile the excavation efficiency of the foundation pit is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of foundation pit engineering construction, and in particular to a temporary support method for a foundation pit. Background Art

[0002] At present, in the conventional foundation pit excavation construction process, concrete support or steel support can be used as foundation pit support. Figure 1 As shown in the figure, concrete support has the advantages of large bearing capacity and economical cost. However, it needs to go through the process of construction from the bottom form of the cushion layer, steel bar tying, concrete pouring, and curing to reach the target strength. This process is not only long (usually takes more than seven days), but also cannot form support quickly within the elevation range during this process. The entire foundation pit will be in an unsupported working condition in the excavation layer, that is, the foundation pit will deform during this period of time. On the other hand, combined with the attached Figure 2 As shown, although the steel support equipped with the servo axial force compensation system has a short installation time (usually six hours) and can quickly form support, when the lower earthwork is continued to be excavated, due to the material characteristics of the steel support, the bearing capacity it provides is too low to meet the bearing capacity requirements of large and deep foundation pits, and it is difficult to recycle and the cost is high. Therefore, how to ensure that the foundation pit can be quickly supported after excavation to the corresponding elevation, avoid the foundation pit being exposed for a long time and causing large deformation, and effectively reduce the operating cost and improve the operating efficiency are the problems that people in this field need to solve. Summary of the invention

[0003] The purpose of the present invention is to provide a temporary support method for a foundation pit, so as to ensure that support can be quickly formed after the foundation pit is excavated to a corresponding elevation by alternately providing steel support and concrete support to the foundation pit, thereby avoiding the foundation pit from being exposed for a long time and causing large deformation, and effectively reducing operating costs and improving operating efficiency.

[0004] To achieve this object, the present invention adopts the following technical solutions:

[0005] A temporary support method for a foundation pit, comprising the following steps:

[0006] A foundation pit support device is placed in the foundation pit to provide steel support for the foundation pit;

[0007] Concrete is poured in the foundation pit to form concrete blocks, so that they provide concrete support for the foundation pit;

[0008] The foundation pit support devices and concrete blocks are used alternately to provide steel support and concrete support to the foundation pit alternately.

[0009] Optionally, the foundation pit supporting device and the concrete blocks are both located above the earth to be excavated.

[0010] Optionally, where a plurality of partitions are provided in the foundation pit, when the partitions are excavated in sequence, the foundation pit support devices can be installed accordingly without having to wait until all the partition excavation surfaces are completed before installation.

[0011] Optionally, a concrete formwork is provided on the foundation pit supporting device, and concrete can be poured into the concrete formwork and demoulded to form concrete blocks after solidification.

[0012] Optionally, the foundation pit support device can be lifted and lowered in the foundation pit to achieve the casting and forming of multiple concrete blocks.

[0013] Optionally, the foundation pit supporting device can adaptively apply force to the side wall of the foundation pit to provide alternate steel support and concrete support to the foundation pit.

[0014] As an option, the foundation pit support device is located below the concrete block.

[0015] Optionally, a plurality of lattice columns are arranged in the foundation pit, and the foundation pit supporting device is sleeved on the outside of the lattice columns and can be lifted and moved along the lattice columns.

[0016] Optionally, the method further comprises the following steps:

[0017] After the last layer of earth excavation is completed, the foundation pit support device will be lowered as a whole to the bottom plate of the foundation pit for dismantling and disassembly, and then lifted and transported out using lifting machinery.

[0018] Optionally, an unobstructed space is set up next to the foundation pit, and the foundation pit support device can be hoisted and transported out in the unobstructed space after being dismantled and disassembled, or part of the structure of the foundation pit support device is permanently buried in the bottom plate, and the remaining structure is hoisted and transported out.

[0019] Beneficial effects of the present invention:

[0020] In the present invention, a foundation pit support device is used to provide steel support for the foundation pit, and concrete is poured to form concrete blocks to provide concrete support for the foundation pit. By alternating the use of the two, steel support and concrete support can be alternately provided to the foundation pit, thereby shortening the exposure time of the foundation pit and achieving a temporary support effect, thereby resisting the deformation of the foundation pit enclosure, ensuring that the foundation pit enclosure structure always operates in a stable and strong support state, and the cost is economical and the cost is reduced. At the same time, the excavation efficiency of the foundation pit can be effectively improved by alternating the use of steel support and concrete support, and large deformation of the foundation pit can be avoided. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of a structure using concrete support in the prior art;

[0022] Figure 2 It is a schematic diagram of a structure using steel support in the prior art;

[0023] Figure 3 is a schematic top view of a foundation pit support device according to an embodiment of the present invention;

[0024] Figure 4 is a schematic top view of a foundation pit according to an embodiment of the present invention;

[0025] Figure 5 is a schematic diagram of a foundation pit support device according to an embodiment of the present invention being placed in a foundation pit;

[0026] Figure 6 is a front view schematic diagram of a foundation pit support device according to an embodiment of the present invention;

[0027] Figure 7 is a partial structural schematic diagram of a foundation pit support device according to an embodiment of the present invention;

[0028] Figure 8 is a schematic diagram of the first step in the temporary support method for a foundation pit according to an embodiment of the present invention;

[0029] Fig. 9 is a schematic diagram of the second step in the temporary support method for a foundation pit according to an embodiment of the present invention;

[0030] Fig.10 is another schematic diagram of the second step in the temporary support method for a foundation pit according to an embodiment of the present invention;

[0031] Fig.11 is another schematic diagram of the second step in the temporary support method for a foundation pit according to an embodiment of the present invention;

[0032] Fig.12 is another schematic diagram of the second step in the temporary support method for a foundation pit according to an embodiment of the present invention;

[0033] Fig.13 It is a schematic diagram of the second step in the temporary support method for a foundation pit described in an embodiment of the present invention.

[0034] In the figure:

[0035] 100-concrete; 100'-concrete support block; 200-lattice column; 300-earth to be excavated; 401-foundation pit; 402-unobstructed space;

[0036] 10-temporary support system; 20-lifting system; 30-axis force servo system;

[0037] 11-steel support system; 12-concrete formwork; 13-bracket; 111-connecting rod; 112-steel support structure; 121-first chamber; 122-second chamber; 123-third chamber;

[0038] 21-reaction beam; 22-hydraulic pump station; 23-jack; 24-steel strand; 201-root anchor. DETAILED DESCRIPTION

[0039] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar parts or parts having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0040] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection, it can be a mechanical connection or an electrical connection, it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0041] In the description of the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include the first feature being in direct contact with the second feature, or may include the first feature being in contact with the second feature through another feature between them instead of being in direct contact. Moreover, a first feature being "above", "above" and "above" a second feature includes the first feature being directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes the first feature being directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0042] At present, in the conventional foundation pit excavation construction process, concrete support or steel support can be used as foundation pit support. Figure 1 As shown in the figure, concrete support has the advantages of large bearing capacity and economical cost. However, it needs to go through the process of construction from the bottom form of the cushion layer, steel bar tying, concrete pouring, and curing to reach the target strength. This process is not only long (usually takes more than seven days), but also cannot form support quickly within the elevation range during this process. The entire foundation pit will be in an unsupported working condition in the excavation layer, that is, the foundation pit will deform during this period of time. On the other hand, combined with the attached Figure 2As shown, although the steel support equipped with the servo axial force compensation system has a short installation time (usually six hours) and can quickly form support, when the lower earthwork is continued to be excavated, due to the material characteristics of the steel support, the bearing capacity it provides is too low to meet the bearing capacity requirements of large and deep foundation pits, and it is difficult to recycle and the cost is high. Therefore, how to ensure that the foundation pit can be quickly supported after excavation to the corresponding elevation, avoid the foundation pit being exposed for a long time and causing large deformation, and effectively reduce the operating cost and improve the operating efficiency are the problems that people in this field need to solve.

[0043] The technical solution of this embodiment is further explained below with reference to the accompanying drawings and through specific implementation methods.

[0044] like Figure 3-Figure 13 As shown, this embodiment provides a temporary support method for a foundation pit, comprising the following steps:

[0045] A foundation pit support device is placed in the foundation pit 401 to provide steel support for the foundation pit 401;

[0046] Concrete 100 is poured in the foundation pit 401 to form concrete blocks, so as to provide concrete support for the foundation pit 401;

[0047] The foundation pit supporting devices and concrete blocks are used alternately to provide steel support and concrete support to the foundation pit 401 alternately.

[0048] Specifically, in this embodiment, a foundation pit support device is used to provide steel support for the foundation pit 401, and concrete is poured to form concrete blocks to provide concrete support for the foundation pit 401. By alternating the use of the two, steel support and concrete support can be alternately provided to the foundation pit 401, thereby shortening the exposure time of the foundation pit 401 and achieving a temporary support effect, thereby resisting the deformation of the foundation pit enclosure and ensuring that the foundation pit enclosure structure is always operated in a stable and strong support state. The cost is economical and the cost is reduced. At the same time, the excavation efficiency of the foundation pit 401 can be effectively improved by alternating the use of steel support and concrete support, and large deformation of the foundation pit 401 can be avoided.

[0049] The specific contents of the temporary support method for foundation pit in this embodiment are described below.

[0050] Combination Figure 4-Figure 8As shown, the foundation pit support device in this embodiment includes a temporary support system 10, a lifting system 20 and an axial force servo system 30. Specifically, the foundation pit support device is mainly used for supporting and protecting the foundation pit 401 during excavation, so as to provide a higher bearing capacity for a large and deep foundation pit 401 and reduce the deformation of the foundation pit 401. At the same time, each system in the foundation pit support device in this embodiment can be reused, which can effectively save operating costs. Optionally, the lifting system 20 is arranged at the top of the foundation pit 401, and the temporary support system 10 can provide concrete support or steel support for it in the foundation pit 401. Compared with the single support scheme in the prior art, it can improve the higher bearing capacity and have the advantages of rapid support to meet the needs of different foundation pits 401. Specifically, in this embodiment, the lifting system 20 can drive the temporary support system 10 to move up and down in the foundation pit 401, so as to support different positions inside the foundation pit 401. Furthermore, the axial force servo system 30 is arranged on the temporary support system 10 and is detachably connected to the side wall of the foundation pit 401, so as to ensure the stability of the steel support provided by the temporary support system 10 to the foundation pit 401, and enable the lifting system 20 to drive the temporary support system 10 and the axial force servo system 30 to move up and down as a whole in the foundation pit 401 after unloading the axial force servo system 30.

[0051] Combination Figure 3 and Figure 6-Figure 8 As shown, in this embodiment, a plurality of lattice columns 200 are arranged at intervals in the foundation pit 401, and the plurality of lattice columns 200 are arranged parallel to and perpendicular to the bottom of the foundation pit 401. In this embodiment, the temporary support system 10 is sleeved on the lattice columns 200, so that the temporary support system 10 can be guided and limited by the lattice columns 200, and corresponding support can also be provided to the temporary support system 10 to prevent its position from shaking and affecting the subsequent support effect. Further, in this embodiment, the temporary support system 10 and the lattice columns 200 are arranged perpendicular to each other.

[0052] like Figure 4 and Figure 8As shown, in this embodiment, there is earth 300 to be excavated in the foundation pit 401, and the temporary support system 10 is always located above the earth 300 to be excavated, so that the excavated area of ​​the foundation pit 401 can be supported, thereby ensuring the smooth progress of subsequent excavation operations. For example, in this embodiment, both sides of the temporary support system 10 are provided with a lifting system 20, so that the lifting system 20 can simultaneously lift the entire temporary support system 10 to ensure the stable movement of the temporary support system 10 in the foundation pit 401. Further, in this embodiment, after the excavation of the foundation pit 401 is completed, part of the structure of the temporary support system 10 can also be permanently buried in the foundation pit 401 to ensure that the foundation pit 401 can be constructed under the condition of support and ensure the overall construction safety, or, after the excavation of the foundation pit 401 is completed, the entire structure of the temporary support system 10 can be completely disassembled in the foundation pit 401, and then taken out of the foundation pit 401 by a hoisting machine, so as to achieve the reuse of the foundation pit support device and improve the economy of the operation.

[0053] like Figure 6-Figure 8 As shown, specifically, the temporary support system 10 in this embodiment includes a steel support system 11, a concrete formwork 12 and a bracket 13. Optionally, the concrete 100 can be poured in the concrete formwork 12, and can provide concrete support for the foundation pit 401 after the concrete 100 is solidified. Further, the steel support system 11 is located below the concrete formwork 12, and can provide steel support for the foundation pit 401, so that the foundation pit support device can provide a concrete pouring formwork in the foundation pit 401 through the concrete formwork 12 and the steel support system 11 to achieve the effects of concrete support and steel support. Exemplarily, in this embodiment, the concrete 100 formed in the concrete formwork 12 and the steel support system 11 can alternately provide support for the foundation pit 401, that is, after the concrete 100 solidifies and takes shape in the concrete formwork 12 to gradually provide concrete support for the foundation pit 401, the steel support system 11 unloads force at both ends so that only concrete support exists in the foundation pit 401 until the steel support system 11 moves down to pour concrete at the next position, and the steel support system 11 provides steel support effect for the foundation pit 401 again, thereby reducing the deformation of the foundation pit 401 and effectively extending the service life of the foundation pit support device, improving the quality and efficiency of the support protection, and thereby improving the efficiency of the excavation operation. Exemplarily, an axial force servo system 30 is provided at both ends of the steel support system 11, thereby ensuring the steel support effect of the steel support system 11 on the inner wall of the foundation pit 401 at both ends, and after the force is unloaded and disassembled between the axial force servo system 30 and the side wall of the foundation pit 401, the steel support system 11 and the axial force servo system 30 can move synchronously until they are in the next position to provide steel support to the foundation pit 401 again through the axial force servo system 30.

[0054] like Figure 3 and Figure 7As shown, in this embodiment, the steel support system 11 includes a connecting rod 111 and a steel support structure 112. Specifically, the connecting rod 111 and the steel support structure 112 are arranged perpendicular to each other, and each steel support system 11 is provided with a plurality of connecting rods 111 and steel support structures 112. Exemplarily, a plurality of steel support structures 112 are arranged in parallel and at intervals, and every two steel support structures 112 are arranged as a group, and an axial force servo system 30 is arranged at both ends of each group of steel support structures 112, so that the axial force servo system 30 can realize the stable placement of the steel support structure 112 in the foundation pit 401 to provide a stable steel support effect for the foundation pit 401. Furthermore, a plurality of connecting rods 111 are arranged in parallel and at intervals on the steel support structure 112 to connect all the steel support structures 112, that is, the steel support structure 112 and the connecting rod 111 constitute a horizontal and vertical combination. Specifically, the steel support structures 112, the connecting rods 111 and the lattice columns 200 are arranged perpendicular to each other in pairs, and the two ends of the connecting rods 111 are respectively connected to the lifting system 20, so that when the connecting rods 111 are lifted and moved by the lifting system 20, all the steel support structures 112 can be driven to move synchronously with them, thereby realizing the synchronous movement of the entire steel support system 11. Optionally, each group of steel support structures 112 is arranged corresponding to the same column of lattice columns 200. Exemplarily, a steel support structure 112 is arranged on both sides of each column of lattice columns 200, and a bracket 13 is sleeved on the outside of each lattice column 200, and the bottom of each group of steel support structures 112 is erected above a bracket 13, so as to ensure a stable connection between the steel support system 11 and the lattice column 200.

[0055] Combination Figure 8As shown, in this embodiment, the concrete formwork 12 is arranged above the steel support system 11, and the concrete 100 can be poured in the concrete formwork 12. Exemplarily, in this embodiment, the concrete formwork 12 includes a first chamber 121, a second chamber 122 and a third chamber 123. Specifically, the first chamber 121 is arranged between the steel support structure 112 on both sides of the steel support system 11 and the outer side of the lattice column 200, the second chamber 122 is arranged between the steel support structure 112 on both sides of the steel support system 11 and the inner side of the lattice column 200, and the third chamber 123 is arranged on both sides of the lattice column 200 corresponding to the steel support structure 112 located in the middle of the steel support system 11. Specifically, the first chamber 121, the second chamber 122 and the third chamber 123 are interconnected, and the three are arranged along the length direction of the steel support structure 112. Furthermore, the outer wall of the first chamber 121 is higher than the side walls of the second chamber 122 and the third chamber 123, and the concrete formwork 12 is integrated, so that after the concrete 100 fills the first chamber 121, the second chamber 122 and the third chamber 123, under the enclosure of the outer wall of the first chamber 121, it can be continuously poured above the first chamber 121, the second chamber 122 and the third chamber 123 until the concrete 100 in the three chambers is connected to form a whole. Furthermore, after all the concrete 100 is poured and solidified, the concrete formwork 12 is demolded. At this time, the formed concrete 100 can provide concrete support for the foundation pit 401, avoiding deformation of the foundation pit 401. At the same time, it is convenient for the concrete formwork 12 and the steel support system 11 to move together in the foundation pit 401 to perform new pouring and solidification operations of concrete 100 at the next position, until multiple layers of formed concrete 100 are arranged from the top surface to the bottom surface in the foundation pit 401, thereby ensuring the stability of the foundation pit 401 and reducing deformation.

[0056] For example, before the first chamber 121, the second chamber 122 and the third chamber 123 are poured with concrete 100, the foundation pit support device mainly supports the foundation pit 401 with steel through the steel support system 11 and the axial force servo systems 30 at both ends; when the concrete 100 in the concrete formwork 12 is solidified and formed and can support the foundation pit 401 with concrete, the axial force servo systems 30 at both ends of the steel support system 11 are adaptively unloaded, so that the foundation pit 401 is mainly supported by concrete, thereby realizing the alternating effect of concrete support and steel support. Furthermore, the steel support system 11 and the axial force servo system 30 can be simultaneously lowered to the next position of the foundation pit 401 through the lifting system 20, and then the above steps can be repeated to realize multi-layer concrete support, and the steel support and concrete support at each position can act alternately, effectively reducing the deformation of the foundation pit 401.

[0057] Combination Figure 7 and Fig.12As shown, illustratively, in this embodiment, the bracket 13 and the steel support system 11 are detachably connected, so that when the concrete 100 is solidified and formed, the bracket 13 can be lowered to the next position first, and it can be set and fixed on the lattice column 200, and then after the concrete formwork 12 is demoulded, the steel support system 11 and the concrete formwork 12 can be stably erected on the bracket 13 after being lowered to the target position, so as to ensure the stability of the temporary support system 10. Optionally, the cross-section of the bracket 13 in this embodiment is triangular to improve the stability of the support for the steel support system 11. Exemplarily, the bracket 13 is also arranged along the length direction of the steel support structure 112, and a bracket 13 is correspondingly arranged on each column of the lattice column 200, that is, a bracket 13 is correspondingly arranged on each group of steel support structures 112, so as to ensure the stability of the entire structure. Further, the bracket 13 is always located above the earthwork 300 to be excavated. In other embodiments, a bracket 13 may be provided on each lattice column 200, and the size of the bracket 13 may be set as required, which is not limited here. For example, in the temporary support system 10 of this embodiment, the steel support system 11, the concrete formwork 12 and the bracket 13 can all be disassembled, and the corresponding disassembly method can be set according to actual needs, which will not be described in detail here.

[0058] like Figure 7 As shown, in this embodiment, the lifting system 20 includes a reaction beam 21, a hydraulic pump station 22, a jack 23 and a steel strand 24, and the steel strand 24 is connected to one end of the temporary support system 10 and is provided with a root anchor 201. Figure 6 As shown, specifically, in this embodiment, the reaction beam 21 is arranged in the concrete 100 at the top layer of the foundation pit 401, and is located above the steel support structures 112 on both sides of the steel support system 11, so as to ensure the stable placement of the lifting system 20 in the foundation pit 401. Further, the hydraulic pump station 22 and the jack 23 are both arranged on the reaction beam 21, and the jack 23 is arranged as a through-type jack, and the through-type jack is connected to the hydraulic pump station 22 through an oil pipe and a communication line to obtain a power source and an operation instruction.

[0059] like Figure 6 As shown, in this embodiment, the steel strand 24 is connected to the central axis of the jack 23 to ensure its mechanical strength. In other embodiments, other materials may be selected, which is not limited here. Specifically, one end of the steel strand 24 is fixed to the jack 23 of the lifting system 20, and the other end is fixed to the connecting rod 111 of the temporary support system 10, and the jack 23 can lift or lower the steel strand 24, so that the connecting rod 111 can be driven by the steel strand 24 to move up and down in the foundation pit 401, thereby achieving the synchronous lifting of the steel support structure 112 and the concrete formwork 12 above it, and realizing the lifting and lowering of the temporary support system 10 in the foundation pit 401. Figure 3 and Figure 4 As shown, each lifting system 20 is provided with four reaction beams 21, four jacks 23, four hydraulic pump stations 22 and four steel strands 24, which are arranged at intervals and located above the connecting rod 111, so that the connecting rod 111 can be lifted at multiple points to ensure the synchronization of its lifting and lowering movement. Furthermore, the steel strands 24 in each lifting system 20 are respectively connected to the two ends of the connecting rod 111, and are fixed to the connecting rod 111 through the root anchor 201 to avoid falling off during the lifting and lowering of the connecting rod 111, causing greater safety accidents. For example, after the foundation pit excavation operation is completed, the connecting rod 111 and the root anchor 201 can be dismantled, so that the temporary support system 10 and the lifting system 20 are separated, which is convenient for subsequent recycling and reuse, and will not be repeated here.

[0060] Exemplarily, in this embodiment, the axial force servo system 30 can also be set as a jack structure to ensure that the steel support system 11 provides stable steel support for the foundation pit 401. In other embodiments, other power devices can also be selected to ensure the axial force applied to the foundation pit 401 by both ends of the steel support structure 112.

[0061] The temporary support method for foundation pit in this embodiment includes:

[0062] A foundation pit support device is placed in the foundation pit 401 to provide steel support for the foundation pit 401;

[0063] Concrete 100 is poured in the foundation pit 401 to form concrete blocks, so as to provide concrete support for the foundation pit 401;

[0064] Alternately use the foundation pit support device and the concrete blocks to alternately provide steel support and concrete support to the foundation pit 401;

[0065] After the last layer of earth excavation is completed, the foundation pit support device is lowered as a whole to the bottom plate of the foundation pit 401 for dismantling and disassembly, and then hoisted and transported out using a lifting machinery.

[0066] Optionally, the foundation pit support device and the concrete blocks are both located above the earth to be excavated 300, so as to avoid interference with the foundation pit excavation operation. Further, the foundation pit support device can be lifted and moved in the foundation pit, and the concrete template 12 provided on the foundation pit support device can be used for casting and forming the concrete 100, and after solidification, it can be demoulded to form a concrete block for concrete support, and multiple concrete blocks can provide multiple concrete supports for the foundation pit 401. Exemplarily, a plurality of lattice columns 200 are provided in the foundation pit 401, and the foundation pit support device is sleeved on the outer side of the lattice column 200, so as to be able to lift and move along the lattice column 200. Further, the foundation pit support device adaptively applies a force to the side wall of the foundation pit 401, so as to achieve the effect of alternately providing steel support and concrete support to the foundation pit 401.

[0067] Specifically, the temporary support method for foundation pit mainly includes the following steps:

[0068] S1. Install the support assembly in the foundation pit support device in the foundation pit 401 and place it above the earth to be excavated 300 to provide steel support for the foundation pit 401;

[0069] S2, pouring concrete 100 into the foundation pit support device, and excavating the earth 300 to be excavated to the target depth;

[0070] S3, after the concrete 100 reaches the supporting strength, a concrete support block 100' is formed to provide concrete support for the foundation pit 401, and at the same time, the supporting assembly unloads and moves to above the target depth, and then provides steel support for the foundation pit 401 again;

[0071] S4, pouring concrete 100 into the foundation pit support device again, and excavating the earth 300 to be excavated to the next target depth;

[0072] S5, repeating steps S3 and S4 until the excavation of the foundation pit 401 is completed;

[0073] S6. The supporting assembly part structure is buried at the bottom of the foundation pit 401, or it is disassembled and hoisted out in the unobstructed space 402 for reuse.

[0074] like Figure 8 As shown, further, step S1 includes:

[0075] S1.1. Install the steel support system 11 and the axial force servo system 30 in the foundation pit support device in the foundation pit 401, and both are located above the earthwork 300 to be excavated, so that the axial force servo system 30 presses against the side wall of the foundation pit 401 to provide steel support thereto;

[0076] S1.2, assembling the concrete formwork 12 onto the steel support system 11.

[0077] Exemplarily, several partitions are provided in the foundation pit 401. During the process of sequentially excavating the partitions, the temporary support systems 10 and the axial force servo systems 30 corresponding to the partitions can be installed sequentially without waiting for the excavation surfaces of all the partitions to be completed before installing the temporary support systems 10 and the axial force servo systems 30, thereby improving the efficiency of the entire excavation operation. Specifically, in this embodiment, when installing the temporary support system 10, the steel support system 11 and the axial force servo system 30 are installed first, so that steel support can be provided to the foundation pit 401, ensuring that the foundation pit 401 is supported by the axial force before the concrete 100 is poured and will not be deformed, thereby ensuring the excavation accuracy and quality. Optionally, each partition of the foundation pit 401 is excavated to a depth slightly lower than the depth of the support combination support. In this embodiment, the depth is at least greater than the cross-sectional height of a steel support system 11, and then the steel support system 11 and the axial force servo system 30 are installed.

[0078] Combination Figure 9-11 As shown, further, step S2 includes:

[0079] S2.1, embedding the lifting system 20 in the concrete formwork 12;

[0080] S2.2, pouring concrete 100 into the concrete formwork 12 in the foundation pit supporting device, and excavating the earth 300 to be excavated to the target depth.

[0081] Specifically, in this embodiment, the lifting system 20 is connected to the steel support system 11, and is used to lift or lower the steel support system 11, thereby enabling the lifting and lowering of the support assembly in the foundation pit 401 driven by the steel support system 11, and thus enabling the steel support and concrete support to be alternately provided at different depths of the foundation pit 401. Exemplarily, the lifting system 20 is provided with a temporary bracket, and before the lifting system 20 is installed, its temporary bracket needs to be pre-buried in the concrete formwork 12, and then the concrete 100 is poured, thereby ensuring the subsequent stable placement of the lifting system 20 at the top of the foundation pit 401, thereby achieving stable movement of the support assembly in the foundation pit 401.

[0082] Combination Figure 12-13 As shown, further, step S3 includes:

[0083] S3.1, after the concrete 100 reaches the supporting strength, a concrete support block 100' is formed, and after it is demoulded from the concrete formwork 12, the concrete support block 100' provides concrete support for the foundation pit 401;

[0084] S3.2, the axial force servo system 30 adaptively unloads the force until it is separated from the side wall of the foundation pit 401, and then moves to above the target depth together with the temporary support system 10 through the lifting system 20;

[0085] S3.3, the axial force servo system 30 is pressed against the side wall of the foundation pit 401 again to provide steel support therefor.

[0086] Specifically, during the maintenance of the concrete support strength in this embodiment, the excavation of the lower earthwork can be carried out at the same time, and the stability of the foundation pit 401 is mainly guaranteed by the steel support. Exemplarily, the lifting system 20 can be installed and fixed on a temporary bracket during the maintenance of the concrete support strength. Specifically, the lifting system 20 includes a reaction beam 21, a hydraulic pump station 22, a jack 23 and a steel strand 24. During installation, the hydraulic pump station 22 and the jack 23 are first installed on the reaction beam 21, and then one end of the steel strand 24 is fixed on the jack 23, and the other end is fixed on the steel support system 11. Furthermore, an oil pipe and a control line are connected between the hydraulic pump station 22 and the jack 23 to ensure the winding and release of the steel strand 24. This can avoid the situation in the prior art where only concrete support is used, where there is no support or reinforcement in the foundation pit 401 during the seven-day concrete curing period. In addition, in this embodiment, the concrete curing period does not occupy an absolute time, and the lower layer of earth can be excavated continuously. At this time, the steel support provided by the steel support system 11 to the foundation pit 401 is safe and reliable enough.

[0087] Furthermore, after the support strength of the concrete 100 reaches the requirement, the concrete formwork 12 is checked and processed, thereby realizing the demoulding operation of the concrete formwork 12. For example, when the concrete 100 is solidified and formed, the bracket 13 can be lowered to above the target depth first, and it can be fixed on the lattice column 200, and then after the concrete formwork 12 is demoulded, the steel support system 11, the concrete formwork 12 and the axial force servo system 30 are lowered together until they are stably mounted on the bracket 13, thereby ensuring the stability of the temporary support system 10 at this position. Correspondingly, the axial force servo system 30 can adaptively unload the force on the side wall of the foundation pit 401 until only concrete support exists in the foundation pit 401 at this time, thereby ensuring that the foundation pit 401 will not be deformed. The lifting system 20 allows the steel support system 11, the concrete formwork 12 and its axial force servo system 30 to be synchronously descended in the foundation pit 401 until above the target depth and quickly form support, providing steel support for the foundation pit 401 again to control the deformation of the foundation pit 401 and to produce the concrete support block 100' at the next position.

[0088] Exemplarily, the excavation of the entire foundation pit 401 can be completed by cyclically operating step S3 and step S4 until the excavation of the last layer of earthwork of the foundation pit 401 is completed. Exemplarily, in this embodiment, the lifting system 20 is always located on the concrete support block 100' at the top of the foundation pit 401 to provide a stable lifting effect for the steel support system 11. Further, after the excavation of the last layer of earthwork is completed, the support assembly can be lowered as a whole to the bottom plate of the foundation pit 401, and disassembled and removed, and hoisted and transported out using a lifting machinery in the unobstructed space 402 next to the foundation pit 401, so as to achieve repeated use and save operating costs; alternatively, the steel support system 11 can also be permanently buried in the bottom plate of the foundation pit 401 as a part of the foundation pit 401, so that the foundation pit 401 is always constructed under support conditions to ensure its stability. Optionally, the lifting system 20 is finally dismantled as a whole for easy use next time.

[0089] Specifically, the temporary foundation pit support method in this embodiment can not only quickly form support in the foundation pit 401, compensating for the adverse effects of the long-term maintenance of the concrete support on the deformation of the foundation pit 401, but also the axial force servo system 30 and the steel support system 11 can adjust the axial force of their support in real time according to actual use needs to ensure safe construction in the foundation pit 401. Furthermore, in this embodiment, the construction requirements of multi-layer foundation pit 401 support can be achieved only by the foundation pit support device, which has good economy.

[0090] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.

Claims

1. A temporary support method for a foundation pit, characterized in that: The following steps are involved: Placing a foundation pit support device in the foundation pit (401) to provide steel support for the foundation pit (401); Pouring concrete (100) in the foundation pit (401) to form concrete blocks, so as to provide concrete support for the foundation pit (401); The foundation pit support device and the concrete blocks are used alternately to provide steel support and concrete support to the foundation pit (401) alternately.

2. The temporary support method for foundation pit according to claim 1, characterized in that: The foundation pit support device and the concrete block are both located above the earth (300) to be excavated.

3. The temporary support method for foundation pit according to claim 1, characterized in that: A plurality of partitions are arranged in the foundation pit (401). When the partitions are excavated in sequence, the foundation pit support device can be installed accordingly without having to wait until all the partition excavation surfaces are completed before installation.

4. The temporary support method for foundation pit according to claim 1, characterized in that: A concrete template (12) is arranged on the foundation pit support device, and the concrete (100) can be poured into the concrete template (12) and demoulded to form the concrete block after solidification.

5. The temporary support method for foundation pit according to claim 4, characterized in that: The foundation pit support device can be lifted and moved in the foundation pit (401) to achieve the casting and forming of multiple concrete blocks.

6. The temporary support method for foundation pit according to claim 4, characterized in that: The foundation pit support device can adaptively apply a force to the side wall of the foundation pit (401) to achieve alternate provision of steel support and concrete support to the foundation pit (401).

7. The temporary support method for foundation pit according to claim 1, characterized in that: The foundation pit supporting device is located below the concrete block.

8. The temporary support method for foundation pit according to claim 1, characterized in that: A plurality of lattice columns (200) are arranged in the foundation pit (401), and the foundation pit support device is sleeved on the outside of the lattice columns (200) and can be lifted and moved along the lattice columns (200).

9. The temporary support method for foundation pit according to claim 1, characterized in that: The following steps are also included: After the excavation of the last layer of earthwork is completed, the foundation pit support device is lowered as a whole to the bottom plate of the foundation pit (401) for dismantling and disassembly, and then hoisted and transported out using a lifting machinery.

10. The temporary support method for foundation pit according to claim 9, characterized in that: An unobstructed space (402) is provided beside the foundation pit (401), and the foundation pit support device can be hoisted and transported out in the unobstructed space (402) after being dismantled and disassembled, or part of the structure of the foundation pit support device is permanently buried in the bottom plate, and the remaining structure is hoisted and transported out.

Citation Information

Patent Citations

  • Deep foundation pit sliding-falling type rapid pre-supporting system

    CN113373938A

  • Construction method of sliding-descending type rapid pre-supporting system of deep foundation pit

    CN113389204A

  • Double-support platform structure for foundation pit engineering and construction method

    CN114263188A

  • Construction method of small ultra-deep foundation pit applying front steel supporting system

    CN116335149A

  • Construction method of support direct descending movable type deep foundation pit variable-spacing support

    CN117536237A

Cited By

  • Foundation pit steel supporting bracket and construction method thereof

    CN119824923A

  • A foundation pit steel support bracket and a construction method thereof

    CN119824923B

  • Foundation pit supporting device and foundation pit construction method

    CN121138303A