Municipal road slope protection structure with efficient seepage and drainage functions and construction method
By setting up multi-stage penetration mechanisms and telescopic rod-driven protective plates on the slopes of municipal roads, the problems of poor drainage of rainwater wells and inconvenient slope protection devices are solved, rapid seepage and slope protection are achieved, and road safety is improved and portability.
Patent Information
- Application Number
- CN202411249319.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The drainage pipes of existing municipal road rainwater wells cannot be discharged in time during heavy rain, resulting in water accumulation, the manhole cover lacks a self-supporting structure and is complex in operation, which poses a safety threat. The existing slope protection device is complex in structure and is inconvenient to use.
Design a municipal road slope protection structure with efficient permeability and discharge, realize multi-stage penetration by setting up the first and second permeability mechanisms, and use telescopic rods and motor-driven protective plates to stand up, combine permeable asphalt and filter layers for rainwater treatment. After collecting water, it is discharged through the outlet pipe. The protective plate can prevent rockfalls and alert citizens.
It realizes rapid and effective rainwater discharging, simplifies the operation and use of manhole covers, improves the portability and safety of slope protection, and avoids traffic jams and personnel dangers caused by water accumulation.
Smart Images

Figure CN118997190A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of municipal road protection, and in particular to a municipal road slope protection structure with high efficiency seepage and drainage and a construction method. Background Art
[0002] Urban roads are designed to drain water quickly when it rains. Rainwater wells are set up beside the roads. As a type of road infiltration and drainage device, rainwater on the road flows into the rainwater wells, and the water in the rainwater wells is discharged into the municipal drainage network through drainage pipes.
[0003] The drainage pipes installed in the existing rainwater wells have the function of drainage. When the rainfall is too heavy, the normal rainwater drainage pipes are unable to drain in time, resulting in water accumulation in urban roads. If it is not handled in time, the accumulated water will become more and more, causing the urban roads to be impassable due to excessive water accumulation.
[0004] The existing manhole covers (protective covers) do not have a self-supporting structure, so people need to use other tools to support them when they are opened for a long time. The operation is complicated and cannot be responded to quickly. In addition, warning signs need to be placed after the manhole covers are opened. Most of the existing warning signs are placed separately near the manhole covers and then pressed down with heavy objects. However, when draining large amounts of water, there is still a risk of being washed away by the water flow, posing a safety threat to citizens.
[0005] Municipal road slope protection devices mainly protect the slope sections of municipal roads, preventing rocks or mud from falling on the road, and ensuring people's safety. Therefore, people have higher and higher requirements for municipal road slope protection devices. Existing slope protection devices have complex structures and large sizes, which are inconvenient to carry when needed. Summary of the invention
[0006] The purpose of the present invention is to provide a municipal road slope protection structure and construction method with high efficiency infiltration and drainage. The structure is simple, and multi-stage infiltration is performed by setting a first infiltration mechanism and a second infiltration mechanism, so as to achieve the effect of high efficiency infiltration and drainage. By setting a protective device, the slope can be protected and personnel can be alerted. When in use, there is no need to carry it. The telescopic rod is driven to be extended and retracted by starting a motor, so that the protective plate can protect against dangerous situations.
[0007] To achieve the above-mentioned purpose, the present invention provides a municipal road slope protection structure with high efficiency infiltration and drainage, including a roadbed, on which an infiltration device and a protection device are provided, the protection device includes a protection plate, the protection plate is connected to a telescopic rod, the telescopic rod is placed in a receiving groove of the roadbed, and the infiltration device includes a first infiltration mechanism and a second infiltration mechanism.
[0008] Preferably, the first infiltration mechanism is provided at two surfaces of the roadbed parallel to the ground, and the second infiltration mechanism is placed on the slope between the two planes.
[0009] Preferably, the first infiltration mechanism includes a first infiltration component and a second infiltration component, the first infiltration component is fixed in the roadbed, and the first infiltration component includes a first infiltration layer and a first filtration layer.
[0010] Preferably, the first permeable layer is made of permeable asphalt, the first filter layer includes a first permeable board and a second permeable board, and a coarse sand layer is between the first permeable board and the second permeable board.
[0011] Preferably, the second permeable component includes a second permeable layer and a second filter layer, the second permeable layer is made of the same material as the first permeable layer, the second filter layer has the same structure as the first filter layer, a water storage ditch is provided under the second filter layer, the water storage ditch is connected to the water collection pool, and a water outlet pipe is provided at the outlet of the water collection pool.
[0012] Preferably, the second infiltration mechanism comprises an infiltration groove, which is a groove, a plurality of infiltration holes are arranged in the middle of the infiltration groove, a delivery pipe is connected below the infiltration holes, and the delivery pipe is communicated with the water storage ditch.
[0013] Preferably, the protective plate is hinged to the side of the roadbed.
[0014] Preferably, the telescopic rod and the protective plate are connected via a slider, a slide rail is provided on the protective plate, the slider is placed in the slide rail, the slider and the telescopic rod are hinged, and the slider and the protective plate are slidably connected.
[0015] Preferably, the telescopic rod is connected to a motor.
[0016] The present invention provides a construction method for a municipal road slope protection structure with high efficiency seepage and drainage, comprising the following steps:
[0017] Step 1: firstly, a first filter layer and a second filter layer are arranged on the roadbed, a first permeation layer is arranged above the first filter layer, and a second permeation layer is arranged above the second filter layer;
[0018] Step 2: Arrange a second penetration mechanism on the inclined surface between the first penetration component and the second penetration component;
[0019] Step 3: When there is too much rain, start the motor, the motor drives the telescopic rod to extend, the telescopic rod pushes the protective plate outward, and the protective plate stands up under the action of the telescopic rod;
[0020] Step 4: The first infiltration component infiltrates rainwater, and the remaining rainwater that has not infiltrated reaches the second infiltration mechanism and enters the delivery pipe through the infiltration holes in the infiltration groove. The remaining rainwater enters the second infiltration component for infiltration and enters the water collection tank through the water storage ditch below. The water in the water collection tank is discharged through the outlet pipe.
[0021] Therefore, the present invention adopts the above-mentioned municipal road slope protection structure and construction method with high efficiency infiltration and drainage, which has a simple structure and realizes multi-stage infiltration by setting a first infiltration mechanism and a second infiltration mechanism, thereby achieving the effect of high efficiency infiltration and drainage. By setting a protective device, the slope can be protected and personnel can be alerted. When in use, there is no need to carry it. The telescopic rod can be extended and retracted by starting the motor, so that the protective plate can protect against dangerous situations.
[0022] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a three-dimensional structural schematic diagram of an embodiment of a municipal road slope protection structure and a construction method for efficient infiltration and drainage according to the present invention;
[0024] Figure 2 It is a cross-sectional view of a roadbed and an infiltration device of an embodiment of a municipal road slope protection structure and a construction method for efficient infiltration and drainage according to the present invention;
[0025] Figure 3 It is a schematic diagram of the three-dimensional structure of the roadbed and the infiltration device of an embodiment of a municipal road slope protection structure and a construction method for high-efficiency infiltration and drainage according to the present invention.
[0026] Reference numerals
[0027] 1. Roadbed; 2. First infiltration component; 3. Second infiltration mechanism; 4. Second infiltration component; 5. First infiltration layer; 6. First filtration layer; 7. Second infiltration layer; 8. Second filtration layer; 9. Reservoir; 10. Collection tank; 11. Outlet pipe; 12. Infiltration trough; 13. Infiltration hole; 14. Delivery pipe; 15. Protective plate; 16. Telescopic rod. DETAILED DESCRIPTION
[0028] The technical solution of the present invention is further described below through the accompanying drawings and embodiments.
[0029] Unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0030] Embodiment 1
[0031] like Figures 1 to 3 As shown, the present invention provides a municipal road slope protection structure with high efficiency infiltration and drainage, including a roadbed 1, on which an infiltration device and a protection device are provided. The infiltration device is used to infiltrate rainwater under the roadbed 1 and transport it away, and the protection device is used to protect and alert personnel.
[0032] The protective device includes a protective plate 15, which can protect personnel. The protective plate 15 is hinged to the side of the roadbed 1 for easy folding and opening. A reminder is written on the protective plate 15 to serve as a warning to personnel. The protective plate 15 is connected to a telescopic rod 16, which is placed in a storage groove of the roadbed 1. The telescopic rod 16 is used to drive the protective plate 15 to open or close. The telescopic rod 16 is connected to a motor, which is used to provide power for the extension and retraction of the telescopic rod 16. The telescopic rod 16 and the protective plate 15 are connected by a slider, and a slide rail is provided on the protective plate 15. The slider is placed in the slide rail, and the slide rail provides a track for the movement of the slider. The slider and the telescopic rod 16 are hinged, and the slider and the protective plate 15 are slidably connected.
[0033] The infiltration device comprises a first infiltration mechanism and a second infiltration mechanism 3. The first infiltration mechanism is arranged at two surfaces of the roadbed 1 parallel to the ground, and the second infiltration mechanism 3 is arranged on the slope between the two planes.
[0034] The first infiltration mechanism includes a first infiltration component 2 and a second infiltration component 4. The first infiltration component 2 is used to infiltrate rainwater for the first time, and the rest enters the second infiltration mechanism 3. The rainwater that has not been infiltrated by the second infiltration mechanism 3 enters the second infiltration component 4 for infiltration, and infiltration is performed at multiple positions to achieve the effect of efficient infiltration. The first infiltration component 2 is fixed in the roadbed 1. The first infiltration component 2 includes a first infiltration layer 5 and a first filtration layer 6. The first infiltration layer 5 is used to infiltrate rainwater, and the first filtration layer 6 is used to filter out large particles.
[0035] The first permeable layer 5 is made of permeable asphalt, which can achieve the function of road permeability and drainage. The first filter layer 6 includes a first permeable board and a second permeable board, and a coarse sand layer is between the first permeable board and the second permeable board. The first permeable board and the second permeable board and the coarse sand layer between them can filter rainwater and discharge large particles outside.
[0036] The second permeable component 4 includes a second permeable layer 7 and a second filter layer 8. The second permeable layer 7 is made of the same material as the first permeable layer 5. The second filter layer 8 is structured in the same manner as the first filter layer 6. A water storage ditch 9 is provided below the second filter layer 8. The water storage ditch 9 is used to collect infiltrated rainwater. The water storage ditch 9 is connected to a water collecting tank 10. An outlet pipe 11 is provided at the outlet of the water collecting tank 10. Water in the water storage ditch 9 is discharged through the outlet pipe 11 of the water collecting tank 10.
[0037] The second infiltration mechanism 3 includes an infiltration groove 12, which is a groove for allowing rainwater to flow through the groove. A plurality of infiltration holes 13 are provided in the middle of the infiltration groove 12, and a filter net of the same shape is laid in the infiltration groove 12 to prevent leaves, sand and stones from blocking the infiltration holes 13. A delivery pipe 14 is connected below the infiltration holes 13, and the delivery pipe 14 is connected to the water storage ditch 9. The infiltration holes 13 are used to infiltrate rainwater into the water storage ditch 9 through the delivery pipe 14.
[0038] The present invention provides a construction method for a municipal road slope protection structure with high efficiency seepage and drainage, comprising the following steps:
[0039] Step 1: First, a first filter layer 6 and a second filter layer 8 are arranged on the roadbed 1, a first permeable layer 5 is arranged above the first filter layer 6, and a second permeable layer 7 is arranged above the second filter layer 8;
[0040] Step 2: Arrange a second infiltration mechanism 3 on the inclined surface between the first infiltration component 2 and the second infiltration component 4;
[0041] Step 3: When there is too much rain, the motor is started, the motor drives the telescopic rod 16 to extend, the telescopic rod 16 pushes the protective plate 15 outward, and the protective plate 15 stands up under the action of the telescopic rod 16;
[0042] Step 4: The first infiltration component 2 infiltrates rainwater, and the remaining rainwater that has not infiltrated reaches the second infiltration mechanism 3, enters the delivery pipe 14 through the infiltration hole 13 in the infiltration groove 12, and the remaining rainwater enters the second infiltration component 4 for infiltration, and enters the water collection tank 10 through the water storage ditch 9 below. The water in the water collection tank 10 is discharged through the outlet pipe 11.
[0043] Therefore, the present invention adopts the above-mentioned municipal road slope protection structure and construction method with high efficiency infiltration and drainage, which has a simple structure and realizes multi-stage infiltration by setting a first infiltration mechanism and a second infiltration mechanism, thereby achieving the effect of high efficiency infiltration and drainage. By setting a protective device, the slope can be protected and personnel can be alerted. When in use, there is no need to carry it. The telescopic rod can be extended and retracted by starting the motor, so that the protective plate can protect against dangerous situations.
[0044] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.
Claims
1. A municipal road slope protection structure with high efficiency seepage and drainage, characterized by: It includes a roadbed, on which a penetration device and a protective device are arranged, wherein the protective device includes a protective plate, the protective plate is connected to a telescopic rod, the telescopic rod is placed in a receiving groove of the roadbed, and the penetration device includes a first penetration mechanism and a second penetration mechanism.
2. A municipal road slope protection structure with high efficiency seepage and drainage according to claim 1, characterized in that: The first penetration mechanism is arranged at two surfaces of the roadbed parallel to the ground, and the second penetration mechanism is arranged on the slope between the two planes.
3. The municipal road slope protection structure with high efficiency seepage and drainage according to claim 1 is characterized by: The first infiltration mechanism includes a first infiltration component and a second infiltration component. The first infiltration component is fixed in the roadbed. The first infiltration component includes a first infiltration layer and a first filtration layer.
4. The municipal road slope protection structure with high efficiency seepage and drainage according to claim 3 is characterized by: The first permeable layer is made of permeable asphalt, the first filter layer includes a first permeable board and a second permeable board, and a coarse sand layer is between the first permeable board and the second permeable board.
5. The municipal road slope protection structure with high efficiency seepage and drainage according to claim 4 is characterized by: The second permeable component includes a second permeable layer and a second filter layer. The second permeable layer is made of the same material as the first permeable layer. The second filter layer has the same structure as the first filter layer. A water storage ditch is provided under the second filter layer. The water storage ditch is connected to a water collection tank. An outlet pipe is provided at the outlet of the water collection tank.
6. The municipal road slope protection structure with high efficiency seepage and drainage according to claim 5 is characterized by: The second infiltration mechanism comprises an infiltration groove, which is a groove. A plurality of infiltration holes are arranged in the middle of the infiltration groove. A delivery pipe is connected below the infiltration holes, and the delivery pipe is communicated with the water storage ditch.
7. The municipal road slope protection structure with high efficiency seepage and drainage according to claim 1 is characterized by: The protective plate is hinged to the side of the roadbed.
8. The municipal road slope protection structure with high efficiency seepage and drainage according to claim 1 is characterized by: The telescopic rod is connected to the protective plate via a slider, a slide rail is provided on the protective plate, the slider is placed in the slide rail, the slider and the telescopic rod are hinged, and the slider and the protective plate are slidably connected.
9. The municipal road slope protection structure with high efficiency seepage and drainage according to claim 1 is characterized by: The telescopic rod is connected with the motor.
10. A construction method for a municipal road slope protection structure with high efficiency seepage and drainage according to any one of claims 1 to 9, characterized in that: The following steps are involved: Step 1: firstly, a first filter layer and a second filter layer are arranged on the roadbed, a first permeation layer is arranged above the first filter layer, and a second permeation layer is arranged above the second filter layer; Step 2: Arrange a second penetration mechanism on the inclined surface between the first penetration component and the second penetration component; Step 3: When there is too much rain, start the motor, the motor drives the telescopic rod to extend, the telescopic rod pushes the protective plate outward, and the protective plate stands up under the action of the telescopic rod; Step 4: The first infiltration component infiltrates rainwater, and the remaining rainwater that has not infiltrated reaches the second infiltration mechanism and enters the delivery pipe through the infiltration holes in the infiltration groove. The remaining rainwater enters the second infiltration component for infiltration and enters the water collection tank through the water storage ditch below. The water in the water collection tank is discharged through the outlet pipe.
