PCS test system and method
By using low-voltage power grid and CLLC bidirectional converter in PCS testing system, combined with the control of the industrial control machine, a full voltage range aging test is realized independently of the battery voltage, which solves the problems of high cost and long cycle of PCS unit testing, and improves the Test efficiency and coverage.
Patent Information
- Application Number
- CN202411300130.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-18
- Publication Date
- 2024-11-22
AI Technical Summary
Existing PCS units require external batteries during testing and aging verification, which is costly and affected by battery characteristics, and the deep charge and discharge verification cycle is long.
Provide a PCS testing system, including a low-voltage power grid, a PCS unit to be tested, a CLLC bidirectional converter, a power acquisition unit and an industrial control machine. Power supply is provided through a low-voltage power grid. The CLLC bidirectional converter controls the power flow direction, and the industrial control machine issues test control commands. And receive test data to realize full voltage range aging test independent of the battery voltage.
It improves the production testing efficiency of PCS units, shortens the test cycle, reduces costs, and covers the aging and functional testing of the full voltage range.
Smart Images

Figure CN119001301A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the field of power electronics technology, and in particular to a PCS testing system and method. Background Art
[0002] Energy storage power stations are moving from the 100 MWh era to the GWh era. High-voltage cascade energy storage systems can be directly connected to 6KV, 10KV, 35KV and above voltage grids without going through transformers. Especially in large-scale energy storage power stations, they have significant advantages such as high comprehensive efficiency, small footprint, and high investment returns. The advantages of high-voltage cascade technology in large power stations with high power and large capacity are particularly prominent, and the penetration rate is expected to increase rapidly. At present, PCS units require external batteries during testing and aging verification, which is costly. At the same time, affected by battery characteristics, the deep charge and discharge verification cycle of PCS units is relatively long. Summary of the invention
[0003] The embodiments of the present disclosure at least provide a PCS testing system and method, which can improve the production testing efficiency of PCS units.
[0004] The embodiment of the present disclosure provides a PCS test system, including: a low-voltage power grid, a first PCS unit to be tested, a second PCS unit to be tested, a CLLC bidirectional converter, a first power collection unit, a second power collection unit, and an industrial computer;
[0005] The low voltage power grid is respectively connected to the first PCS unit to be tested and the second PCS unit to be tested;
[0006] The industrial computer is respectively connected to the first PCS unit to be tested, the second PCS unit to be tested, the CLLC bidirectional converter, the first power collection unit and the second power collection unit;
[0007] The first power collection unit is arranged between the first PCS unit to be tested and the CLLC bidirectional converter;
[0008] The second power collection unit is arranged between the second PCS unit to be tested and the CLLC bidirectional converter.
[0009] In an optional implementation manner, the low-voltage power grid is used to supply power to the first PCS unit to be tested and the second PCS unit to be tested;
[0010] The first power collection unit is used to detect the power size and flow direction of the first PCS unit to be tested; the second power collection unit is used to detect the power size and flow direction of the second PCS unit to be tested;
[0011] The CLLC bidirectional converter is used to control the power flow between the first PCS unit to be tested and the second PCS unit to be tested;
[0012] The industrial computer is used to send test control instructions to the first PCS unit to be tested, the second PCS unit to be tested and the CLLC bidirectional converter, and receive test data collected by the first power collection unit and the second power collection unit.
[0013] In an optional implementation manner, the industrial computer is specifically used for:
[0014] Sending a charging instruction to the first PCS unit to be tested to control the first PCS unit to be tested to be charged to a first target voltage;
[0015] Sending a first power flow direction instruction to the CLLC bidirectional converter, so that the CLLC bidirectional converter controls the power flow direction according to the first power flow direction instruction;
[0016] Sending a discharge instruction to the second PCS unit to be tested to control the second PCS unit to be tested to discharge according to the first target power;
[0017] The test data collected by the first power collection unit and the second power collection unit are received, wherein the test data at least includes voltage data, current data, power data, and power flow direction.
[0018] In an optional implementation manner, the power flow direction indicated by the first power flow direction instruction is from the first PCS unit to be tested to the second PCS unit to be tested.
[0019] In an optional implementation manner, the industrial computer is further used for:
[0020] Sending a charging instruction to the second PCS unit to be tested to control the first PCS unit to be tested to be charged to a second target voltage;
[0021] issuing a second power flow direction instruction to the CLLC bidirectional converter, so that the CLLC bidirectional converter controls the power flow direction according to the second power flow direction instruction;
[0022] Sending a discharge instruction to the first PCS unit to be tested to control the first PCS unit to be tested to discharge according to a second target power;
[0023] The test data collected by the first power collection unit and the second power collection unit are received, wherein the test data at least includes voltage data, current data, power data, and power flow direction.
[0024] In an optional implementation manner, the power flow direction indicated by the second power flow direction instruction is from the second PCS unit to be tested to the first PCS unit to be tested.
[0025] The present disclosure also provides a PCS test method, which is applied to the industrial computer in any of the PCS test systems in the above embodiments, wherein the PCS test system further includes the low-voltage power grid, the first PCS unit to be tested, the second PCS unit to be tested, the CLLC bidirectional converter, the first power collection unit, and the second power collection unit. The method includes:
[0026] Sending a test control instruction to the first PCS unit to be tested, the second PCS unit to be tested, and the CLLC bidirectional converter;
[0027] Controlling the low-voltage power grid to supply power to the first PCS unit to be tested and the second PCS unit to be tested;
[0028] Controlling the first power collection unit to detect the power size and flow direction of the first PCS unit to be tested;
[0029] Controlling the second power collection unit to detect the power size and flow direction of the second PCS unit to be tested;
[0030] The CLLC bidirectional converter is controlled to control the power flow between the first PCS unit to be tested and the second PCS unit to be tested.
[0031] An embodiment of the present disclosure also provides an electronic device, including: a processor, a memory and a bus, wherein the memory stores machine-readable instructions executable by the processor, and when the electronic device is running, the processor and the memory communicate through the bus, and when the machine-readable instructions are executed by the processor, the steps in the above-mentioned PCS test method are performed.
[0032] The embodiment of the present disclosure further provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned PCS test method are executed.
[0033] The embodiment of the present disclosure also provides a computer program product, including a computer program / instructions, which implement the steps of the above-mentioned PCS test method when executed by a processor.
[0034] A PCS test system and method provided by the embodiment of the present disclosure includes: a low-voltage power grid, a first PCS unit to be tested, a second PCS unit to be tested, a CLLC bidirectional converter, a first power collection unit, a second power collection unit and an industrial computer; the low-voltage power grid is respectively connected to the first PCS unit to be tested and the second PCS unit to be tested; the industrial computer is respectively connected to the first PCS unit to be tested, the second PCS unit to be tested, the CLLC bidirectional converter, the first power collection unit and the second power collection unit; the first power collection unit is arranged between the first PCS unit to be tested and the CLLC bidirectional converter; the second power collection unit is arranged between the second PCS unit to be tested and the CLLC bidirectional converter. The production test efficiency of PCS units can be improved.
[0035] In order to make the above-mentioned objectives, features and advantages of the present disclosure more obvious and easy to understand, preferred embodiments are specifically cited below and described in detail with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the technical solutions of the embodiments of the present disclosure, the following is a brief introduction to the drawings required for use in the embodiments. The drawings herein are incorporated into the specification and constitute a part of the specification. These drawings illustrate embodiments consistent with the present disclosure and are used together with the specification to illustrate the technical solutions of the present disclosure. It should be understood that the following drawings only illustrate certain embodiments of the present disclosure and should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can also be obtained based on these drawings without creative work.
[0037] Figure 1 A schematic diagram of a PCS test system provided by an embodiment of the present disclosure is shown;
[0038] Figure 2 A flow chart of a PCS testing method provided by an embodiment of the present disclosure is shown;
[0039] Figure 3 A schematic diagram of a PCS testing device provided by an embodiment of the present disclosure is shown;
[0040] Figure 4 A schematic diagram of an electronic device provided by an embodiment of the present disclosure is shown. DETAILED DESCRIPTION
[0041] In order to make the purpose, technical scheme and advantages of the embodiments of the present disclosure clearer, the technical scheme in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings in the embodiments of the present disclosure. Obviously, the described embodiments are only part of the embodiments of the present disclosure, rather than all of the embodiments. The components of the embodiments of the present disclosure generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present disclosure provided in the drawings is not intended to limit the scope of the present disclosure for protection, but merely represents the selected embodiments of the present disclosure. Based on the embodiments of the present disclosure, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present disclosure.
[0042] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0043] The term "and / or" herein only describes an association relationship, indicating that three relationships may exist. For example, A and / or B may represent the following three situations: A exists alone, A and B exist at the same time, and B exists alone. In addition, the term "at least one" herein represents any combination of at least two of any one or more of a plurality of. For example, including at least one of A, B, and C may represent including any one or more elements selected from the set consisting of A, B, and C.
[0044] Research has found that energy storage power stations are moving from the 100 MWh era to the GWh era. High-voltage cascade energy storage systems can be directly connected to 6KV, 10KV, 35KV and above voltage grids without going through transformers. Especially in large-scale energy storage power stations, they have significant advantages such as high comprehensive efficiency, small footprint, and high investment returns. The advantages of high-voltage cascade technology in large power stations with high power and large capacity are particularly prominent, and the penetration rate is expected to increase rapidly. At present, PCS units require external batteries during testing and aging verification, which is costly. At the same time, affected by battery characteristics, the PCS unit has a long deep charge and discharge verification cycle.
[0045] Based on the above research, the present disclosure provides a PCS test system and method, including: a low-voltage power grid, a first PCS unit to be tested, a second PCS unit to be tested, a CLLC bidirectional converter, a first power collection unit, a second power collection unit and an industrial computer; the low-voltage power grid is respectively connected to the first PCS unit to be tested and the second PCS unit to be tested; the industrial computer is respectively connected to the first PCS unit to be tested, the second PCS unit to be tested, the CLLC bidirectional converter, the first power collection unit and the second power collection unit; the first power collection unit is arranged between the first PCS unit to be tested and the CLLC bidirectional converter; the second power collection unit is arranged between the second PCS unit to be tested and the CLLC bidirectional converter. The production test efficiency of PCS units can be improved.
[0046] To facilitate understanding of this embodiment, a PCS test system disclosed in the embodiment of the present disclosure is first described in detail. Figure 1 , which is a schematic diagram of a PCS test system provided in an embodiment of the present disclosure.
[0047] like Figure 1 As shown in , the PCS test system includes: a low-voltage power grid, a first PCS unit to be tested, a second PCS unit to be tested, a CLLC bidirectional converter, a first power collection unit, a second power collection unit and an industrial computer.
[0048] Specifically, the low-voltage power grid is respectively connected to the first PCS unit to be tested and the second PCS unit to be tested; the industrial computer is respectively connected to the first PCS unit to be tested, the second PCS unit to be tested, the CLLC bidirectional converter, the first power collection unit and the second power collection unit; the first power collection unit is arranged between the first PCS unit to be tested and the CLLC bidirectional converter; the second power collection unit is arranged between the second PCS unit to be tested and the CLLC bidirectional converter.
[0049] In a specific implementation, a low-voltage power grid is used to supply power to a first PCS unit to be tested and a second unit to be tested; a first power collection unit is used to detect the power size and flow direction of the first PCS unit to be tested; a second power collection unit is used to detect the power size and flow direction of the second PCS unit to be tested; a CLLC bidirectional converter is used to control the power flow direction between the first PCS unit to be tested and the second PCS unit to be tested; an industrial computer is used to issue test control instructions to the first PCS unit to be tested, the second PCS unit to be tested and the CLLC bidirectional converter, and receive test data collected by the first power collection unit and the second power collection unit.
[0050] Here, the low-voltage power grid is used to provide initial energy to power the first PCS unit to be tested and the second PCS unit to be tested in the system. The first PCS unit to be tested and the second PCS unit to be tested are used as the devices under test, and they perform charging and discharging operations respectively during each aging test. Each PCS can control its operating state through the industrial computer. The CLLC bidirectional converter is a bidirectional DC / DC converter, which is responsible for transmitting energy between the first PCS unit to be tested and the second PCS unit to be tested, and isolating their DC parts. The converter can adjust the power flow and target voltage according to the instructions of the industrial computer.
[0051] Among them, the first power acquisition unit and the second power acquisition unit are responsible for monitoring the power size and energy flow direction of the first PCS unit to be tested and the second PCS unit to be tested, and transmitting the voltage, current, power and other data to the industrial computer in real time. As the control center, the industrial computer is responsible for issuing instructions and collecting and displaying the electrical parameters of the system in real time. It can also communicate with the host computer and store test records for subsequent traceability and performance evaluation.
[0052] In the specific implementation, the industrial computer first sends a charging instruction to the first PCS unit to be tested to control the first PCS unit to be tested to charge to the first target voltage; sends a first power flow instruction to the CLLC bidirectional converter to enable the CLLC bidirectional converter to control the power flow according to the first power flow instruction; sends a discharge instruction to the second PCS unit to be tested to control the second PCS unit to be tested to discharge according to the first target power; receives the test data collected by the first power collection unit and the second power collection unit, and the test data includes at least voltage data, current data, power data and power flow.
[0053] The power flow direction indicated by the first power flow direction instruction is from the first to-be-tested PCS unit to the second to-be-tested PCS unit.
[0054] Here, the system is powered on first, and the low-voltage power grid supplies power to the first PCS unit to be tested and the second PCS unit to be tested, so that they are in standby state. After that, the industrial computer issues instructions, issues charging instructions to the first PCS unit to be tested, and sets the target voltage. The power flow direction (from the first PCS unit to be tested to the second PCS unit to be tested) and the DC input target voltage of the second PCS unit to be tested are issued to the CLLC converter.
[0055] Secondly, a discharge instruction is issued to the second PCS unit to be tested, and the target power is set. During this process, the industrial computer monitors the first power acquisition unit and the second power acquisition unit in real time to confirm whether the voltage, current, power and energy flow are consistent with expectations.
[0056] After that, within the preset time range (2 to 4 hours), the PCS unit performs an aging test. Voltage and other parameters are controlled according to the instructions issued by the industrial computer, and the entire process is independent of the battery voltage, which can cover the aging and functional tests of the full voltage range.
[0057] Furthermore, a shutdown command is issued to the first PCS unit to be tested, the CLLC converter, and the second PCS unit to be tested to end the current aging process, and a charging command is issued to the second PCS unit to be tested to control the first PCS unit to be tested to charge to the second target voltage; a second power flow direction command is issued to the CLLC bidirectional converter to enable the CLLC bidirectional converter to control the power flow according to the second power flow direction command; a discharge command is issued to the first PCS unit to be tested to control the first PCS unit to be tested to discharge according to the second target power; and test data collected by the first power collection unit and the second power collection unit are received, and the test data includes at least voltage data, current data, power data, and power flow.
[0058] The power flow direction indicated by the second power flow direction instruction is from the second PCS unit to be tested to the first PCS unit to be tested.
[0059] Here, first send a charging instruction to the second PCS unit to be tested and set the target voltage. Send the reverse power flow (from the second PCS unit to be tested to the first PCS unit to be tested) and the target voltage of the first PCS unit to be tested to the CLLC converter. Send a discharge instruction and target power to the first PCS unit to be tested. Monitor the power collection unit again to confirm whether the voltage, current, power and energy flow are consistent with expectations.
[0060] After that, the aging test is carried out for another 2 to 4 hours. After the test is completed, the industrial computer issues a shutdown command to the system, ending the entire testing process.
[0061] In this way, the PCS test system controls the voltage through the instructions of the industrial computer without being limited by the battery voltage, and can perform aging tests in the full voltage frequency band. The system can perform charging aging on one PCS unit and discharging aging on another PCS unit at the same time. The system can communicate with the host computer and store test records to facilitate later analysis and calculation of the work efficiency of the test personnel.
[0062] A PCS test system provided by an embodiment of the present disclosure includes: a low-voltage power grid, a first PCS unit to be tested, a second PCS unit to be tested, a CLLC bidirectional converter, a first power collection unit, a second power collection unit, and an industrial computer; the low-voltage power grid is respectively connected to the first PCS unit to be tested and the second PCS unit to be tested; the industrial computer is respectively connected to the first PCS unit to be tested, the second PCS unit to be tested, the CLLC bidirectional converter, the first power collection unit, and the second power collection unit; the first power collection unit is arranged between the first PCS unit to be tested and the CLLC bidirectional converter; the second power collection unit is arranged between the second PCS unit to be tested and the CLLC bidirectional converter. The production test efficiency of PCS units can be improved.
[0063] See also Figure 2 As shown, it is a flowchart of a PCS test method provided by an embodiment of the present disclosure. The execution subject of the PCS test method provided by the embodiment of the present disclosure is Figure 1 The industrial computer in the PCS test system shown in the figure, since the principle of solving the problem by the method in the embodiment of the present disclosure is similar to that of the PCS test system in the embodiment of the present disclosure, the implementation of the method can refer to the implementation of the method, and the repeated parts will not be repeated. The method includes steps S201 to S204, wherein:
[0064] S201. Issue a test control instruction to the first PCS unit to be tested, the second PCS unit to be tested, and the CLLC bidirectional converter.
[0065] S202: Control the low-voltage power grid to supply power to the first PCS unit to be tested and the second PCS unit to be tested.
[0066] S203: Control the first power collection unit to detect the power size and flow direction of the first PCS unit to be tested. Control the second power collection unit to detect the power size and flow direction of the second PCS unit to be tested.
[0067] S204: Control the CLLC bidirectional converter to control the power flow between the first PCS unit to be tested and the second PCS unit to be tested.
[0068] For the description of the processing flow of each step in the method, reference can be made to the relevant description in the above system embodiment, which will not be described in detail here.
[0069] Those skilled in the art will appreciate that, in the above method of specific implementation, the order in which the steps are written does not imply a strict execution order and does not constitute any limitation on the implementation process. The specific execution order of the steps should be determined by their functions and possible internal logic.
[0070] A PCS test method provided by an embodiment of the present disclosure is applied to the industrial computer in the PCS test system, wherein the PCS test system further comprises the low-voltage power grid, the first PCS unit to be tested, the second PCS unit to be tested, the CLLC bidirectional converter, the first power collection unit and the second power collection unit, and the method comprises: issuing a test control instruction to the first PCS unit to be tested, the second PCS unit to be tested and the CLLC bidirectional converter; controlling the low-voltage power grid to supply power to the first PCS unit to be tested and the second unit to be tested; controlling the first power collection unit to detect the power size and flow direction of the first PCS unit to be tested; controlling the second power collection unit to detect the power size and flow direction of the second PCS unit to be tested; and controlling the CLLC bidirectional converter to control the power flow direction between the first PCS unit to be tested and the second PCS unit to be tested. The production test efficiency of PCS units can be improved.
[0071] Based on the same inventive concept, a PCS testing device corresponding to the PCS testing method is also provided in the embodiment of the present disclosure, which is applied to the industrial computer in the PCS testing system. Since the principle of solving the problem by the device in the embodiment of the present disclosure is similar to the above-mentioned PCS testing method in the embodiment of the present disclosure, the repeated parts will not be repeated.
[0072] See also Figure 3 , Figure 3 Schematic diagram of a PCS test device provided by an embodiment of the present disclosure. Figure 3 As shown in FIG. , the PCS test device 300 provided in the embodiment of the present disclosure includes:
[0073] The instruction issuing module 310 issues a test control instruction to the first PCS unit to be tested, the second PCS unit to be tested and the CLLC bidirectional converter.
[0074] The power supply control unit 320 is used to control the low voltage power grid to supply power to the first PCS unit to be tested and the second PCS unit to be tested.
[0075] The data monitoring module 330 is used to control the first power collection unit to detect the power size and flow direction of the first PCS unit to be tested; and control the second power collection unit to detect the power size and flow direction of the second PCS unit to be tested.
[0076] The power flow control module 340 is used to control the CLLC bidirectional converter to control the power flow between the first PCS unit to be tested and the second PCS unit to be tested.
[0077] A PCS test method provided by the embodiment of the present disclosure is applied to an industrial computer in a PCS test system, by issuing a test control instruction to the first PCS unit to be tested, the second PCS unit to be tested, and the CLLC bidirectional converter; controlling the low-voltage power grid to supply power to the first PCS unit to be tested and the second PCS unit to be tested; controlling the first power collection unit to detect the power size and flow direction of the first PCS unit to be tested; controlling the second power collection unit to detect the power size and flow direction of the second PCS unit to be tested; and controlling the CLLC bidirectional converter to control the power flow direction between the first PCS unit to be tested and the second PCS unit to be tested. The production test efficiency of PCS units can be improved.
[0078] Corresponds to Figure 2 The PCS test method in the present disclosure also provides an electronic device 400, such as Figure 4 FIG. 4 is a schematic diagram of the structure of an electronic device 400 provided in an embodiment of the present disclosure, including:
[0079] Processor 41, memory 42, and bus 43; memory 42 is used to store execution instructions, including memory 421 and external memory 422; memory 421 here is also called internal memory, which is used to temporarily store operation data in processor 41 and data exchanged with external memory 422 such as hard disk. Processor 41 exchanges data with external memory 422 through memory 421. When the electronic device 400 is running, the processor 41 communicates with the memory 42 through bus 43, so that the processor 41 executes Figure 2 The steps of the PCS test method.
[0080] The present disclosure also provides a computer-readable storage medium, which stores a computer program, and when the computer program is executed by a processor, the steps of the PCS test method described in the above method embodiment are executed. The storage medium can be a volatile or non-volatile computer-readable storage medium.
[0081] The present disclosure also provides a computer program product, which includes computer instructions. When the computer instructions are executed by a processor, the steps of the PCS test method described in the above method embodiment can be executed. For details, please refer to the above method embodiment, which will not be repeated here.
[0082] The computer program product may be implemented in hardware, software or a combination thereof. In one optional embodiment, the computer program product is implemented as a computer storage medium. In another optional embodiment, the computer program product is implemented as a software product, such as a software development kit (SDK).
[0083] Those skilled in the art can clearly understand that, for the convenience and simplicity of description, the specific working process of the device described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here. In the several embodiments provided in the present disclosure, it should be understood that the disclosed device and method can be implemented in other ways. The device embodiments described above are merely schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some communication interfaces, and the indirect coupling or communication connection of the device or unit can be electrical, mechanical or other forms.
[0084] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0085] In addition, each functional unit in each embodiment of the present disclosure may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0086] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a non-volatile computer-readable storage medium that is executable by a processor. Based on this understanding, the technical solution of the present disclosure, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present disclosure. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.
[0087] Finally, it should be noted that the above-described embodiments are only specific implementation methods of the present disclosure, which are used to illustrate the technical solutions of the present disclosure, rather than to limit them. The protection scope of the present disclosure is not limited thereto. Although the present disclosure is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed in the present disclosure, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present disclosure, and should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.
Claims
1. A PCS test system, characterized in that: include: A low-voltage power grid, a first PCS unit to be tested, a second PCS unit to be tested, a CLLC bidirectional converter, a first power collection unit, a second power collection unit, and an industrial computer; The low voltage power grid is respectively connected to the first PCS unit to be tested and the second PCS unit to be tested; The industrial computer is respectively connected to the first PCS unit to be tested, the second PCS unit to be tested, the CLLC bidirectional converter, the first power collection unit and the second power collection unit; The first power collection unit is arranged between the first PCS unit to be tested and the CLLC bidirectional converter; The second power collection unit is arranged between the second PCS unit to be tested and the CLLC bidirectional converter.
2. The PCS test system according to claim 1, characterized in that: The low-voltage power grid is used to supply power to the first PCS unit to be tested and the second PCS unit to be tested; The first power collection unit is used to detect the power size and flow direction of the first PCS unit to be tested; the second power collection unit is used to detect the power size and flow direction of the second PCS unit to be tested; The CLLC bidirectional converter is used to control the power flow between the first PCS unit to be tested and the second PCS unit to be tested; The industrial computer is used to send test control instructions to the first PCS unit to be tested, the second PCS unit to be tested and the CLLC bidirectional converter, and receive test data collected by the first power collection unit and the second power collection unit.
3. The PCS test system according to claim 1, characterized in that: The industrial computer is specifically used for: Sending a charging instruction to the first PCS unit to be tested to control the first PCS unit to be tested to be charged to a first target voltage; Sending a first power flow direction instruction to the CLLC bidirectional converter, so that the CLLC bidirectional converter controls the power flow direction according to the first power flow direction instruction; Sending a discharge instruction to the second PCS unit to be tested to control the second PCS unit to be tested to discharge according to the first target power; The test data collected by the first power collection unit and the second power collection unit are received, wherein the test data at least includes voltage data, current data, power data, and power flow direction.
4. The PCS test system according to claim 3, characterized in that: The power flow direction indicated by the first power flow direction instruction is from the first to-be-tested PCS unit to the second to-be-tested PCS unit.
5. The PCS test system according to claim 1, characterized in that: The industrial computer is also specifically used for: Sending a charging instruction to the second PCS unit to be tested to control the first PCS unit to be tested to be charged to a second target voltage; issuing a second power flow direction instruction to the CLLC bidirectional converter, so that the CLLC bidirectional converter controls the power flow direction according to the second power flow direction instruction; Sending a discharge instruction to the first PCS unit to be tested to control the first PCS unit to be tested to discharge according to a second target power; The test data collected by the first power collection unit and the second power collection unit are received, wherein the test data at least includes voltage data, current data, power data, and power flow direction.
6. The PCS test system according to claim 5, characterized in that: The power flow direction indicated by the second power flow direction instruction is from the second PCS unit to be tested to the first PCS unit to be tested.
7. A PCS testing method, characterized in that: The industrial computer is applied to the PC in any one of claims 1 to 6, wherein the PCS test system further comprises the low-voltage power grid, the first PCS unit to be tested, the second PCS unit to be tested, the CLLC bidirectional converter, the first power collection unit and the second power collection unit, and the method comprises: Sending a test control instruction to the first PCS unit to be tested, the second PCS unit to be tested, and the CLLC bidirectional converter; Controlling the low-voltage power grid to supply power to the first PCS unit to be tested and the second PCS unit to be tested; Controlling the first power collection unit to detect the power size and flow direction of the first PCS unit to be tested; Controlling the second power collection unit to detect the power size and flow direction of the second PCS unit to be tested; The CLLC bidirectional converter is controlled to control the power flow between the first PCS unit to be tested and the second PCS unit to be tested.
8. An electronic device, characterized in that: include: A processor, a memory and a bus, wherein the memory stores machine-readable instructions executable by the processor, and when the electronic device is running, the processor and the memory communicate via the bus, and when the machine-readable instructions are executed by the processor, the steps of the PCS test method as described in claim 7 are performed.
9. A computer-readable storage medium, characterized in that: The computer readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the PCS testing method as claimed in claim 7 are executed.
10. A computer program product comprising computer instructions, characterized in that: When the computer instructions are executed by a processor, the steps of the PCS testing method described in claim 7 are implemented.