Transformer substation safety measure range determination method and system based on network topology
Through the network topology-based substation security scope determination method and system, the connection between the resource business module and the asset management module is used to automatically process equipment information, the problems of low intelligence and low efficiency caused by manual reporting are solved, and the security scope is achieved efficient and accurate determination.
Patent Information
- Application Number
- CN202411009139.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-22
AI Technical Summary
In the prior art, the determination of the scope of substation safety measures depends on manual filling, which leads to low intelligence and prone to errors. Especially when the power outage range is large, the filling efficiency is low, and there is a lack of specific determination methods.
The substation security scope determination method and system is adopted based on network topology, and the asset management module is connected to the resource business module, and the equipment information is obtained and processed, and the security scope is automatically determined, including the power outage rules for terminal equipment and non-terminal equipment and Find rules to achieve automated and efficient scope determination.
It realizes efficient and accurate automatic determination of the scope of safety measures, improves the efficiency of filling out work tickets, and ensures the accuracy and safety of the scope of safety measures.
Smart Images

Figure CN119003588A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power system automation, and in particular to a method and system for determining a substation installation range based on network topology. Background Art
[0002] The first type of work ticket for substation is a written basis for allowing power outage work on electrical equipment. It is also an organizational measure to clarify safety responsibilities, provide safety briefings to staff, and ensure the safety of staff. Currently, the safety measures involved in the first type of substation ticket need to be manually filled in the lean management system of equipment assets, including the need to pull the circuit breaker (switch), disconnector (knife switch), install the grounding wire, close the grounding knife switch (specify the exact location, name and grounding wire number*), set up barriers, hang signs, and prevent accidental contact with the secondary circuit.
[0003] In the related art, the first type of work ticket for substation is usually filled out manually.
[0004] However, the degree of intelligence in manual reporting is low. When the power outage range is large, the reporting content is large, which is prone to errors and the efficiency of filling out work tickets is low. In other words, the relevant technology lacks a specific method for determining the scope of safety measures. Summary of the invention
[0005] The present invention relates to a method and system for determining the scope of substation security measures based on network topology, which can efficiently and accurately determine the scope of security measures. The technical solution is as follows: On the one hand, a method for determining a substation security scope based on network topology is provided, and the method is applied to a substation security scope determination system based on network topology, and the substation security scope determination system based on network topology includes a resource business module and an asset management module; The resource business module is connected to the asset management module; Methods include: Obtain resource business information in the resource business module through the asset management module, the resource business information includes power outage working equipment information; Determine the type of working equipment based on the power outage working equipment information through the asset management module; Through the asset management module, based on the type of working equipment, determine the scope of safety measures corresponding to the power outage working equipment information.
[0006] In an optional embodiment, before the resource business information in the resource business module is acquired through the asset management module, the following steps are included: Acquire business information through a resource business module, where the business information includes at least one of measurement status information, image model data information, operation content information, and equipment status information; Generate resource business information based on business information through the resource business module.
[0007] In an optional embodiment, the resource business information is implemented as visual chart information; Generate resource business information based on business information through the resource business module, including: Through the resource business module, chart annotation is performed based on business information to generate resource business information.
[0008] In an optional embodiment, the working device types include terminal type devices and non-terminal type devices.
[0009] In an optional embodiment, the asset management module determines the scope of security measures corresponding to the power outage working equipment information based on the working equipment type, including: In response to the working device type being a terminal device, determining, by the asset management module, a first safety measure scope corresponding to the power-off working device information based on a power-off rule for terminal devices; In response to the working device type being a non-terminal device, determining a second security measure range through the asset management module based on the terminal type of the non-terminal device and in combination with a security measure range search rule; The asset management module determines the safety measure scope corresponding to the power outage working equipment information based on the first safety measure scope and the second safety measure scope.
[0010] In an optional embodiment, in response to the working device type being a non-terminal device, the asset management module determines the second security measure scope based on the terminal type of the non-terminal device and in combination with the security measure scope search rule, including: In response to the working device type being a non-terminal device, a preliminary security range search is performed based on the working device information by the asset management module to obtain a preliminary security range search result, wherein the preliminary security range search is used to search for a first key device within the security range, and the first key device is implemented as a switch control device; Perform a secondary security scope search on the working equipment based on the preliminary security scope search result through the asset management module to obtain the secondary security scope search result; Determine and combine the secondary security measures scope search results through the asset management module, and determine the security measures scope determination results corresponding to the secondary security measures scope search results based on the security measures scope determination rules; A second security measure range is generated based on the security measure range determination result.
[0011] In an optional embodiment, the preliminary safety range search is based on the search of the isolating switch and the trolley; Secondary security range search is implemented as a topology-based search.
[0012] In an optional embodiment, the asset management module determines the scope of security measures corresponding to the power outage working equipment information based on the working equipment type. Through the asset management module, the security measures processing flow information corresponding to the working equipment is determined based on the security measures scope.
[0013] On the other hand, a system for determining the scope of substation security measures based on network topology is provided, the system comprising a resource business module and an asset management module; The resource business module is connected to the asset management module; The system for determining the scope of substation security measures based on network topology is used to execute any of the above methods for determining the scope of substation security measures based on network topology.
[0014] The beneficial effects brought about by the technical solution provided by the present invention include at least: In the process of determining the scope of security measures, in the asset management module, the scope of security measures is determined based on the specific type of working equipment, which realizes the automation of the determination of the scope of security measures and ensures the efficiency of the determination of the scope of security measures. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0016] Figure 1 A schematic flow chart of a system for determining a substation safety range based on network topology is shown according to an exemplary embodiment of the present application.
[0017] Figure 2 A flow chart of a method for determining a substation installation scope based on network topology provided by an exemplary embodiment of the present application is shown. DETAILED DESCRIPTION
[0018] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.
[0019] Figure 1A flow chart of a substation safety range determination system based on network topology provided by an exemplary embodiment of the present application is shown, the system includes a resource business module 110 and an asset management module 120, and the resource business module and the asset management module are communicatively connected. Among them, the resource business module can be implemented as a middle-office device for power resource business, and the middle-office device is used to obtain resource information corresponding to the power grid. The asset management module is implemented as a lean management system for equipment assets, which is used to process data. In one example, the asset management module can realize the filling of the first type of work ticket for substation.
[0020] Figure 2 A schematic diagram of a flow chart of a method for determining a substation installation range based on network topology provided by an exemplary embodiment of the present application is shown, and the method is applied to Figure 1 Taking the system shown in FIG. 1 as an example, the method includes: Step 201: Acquire resource business information in a resource business module through an asset management module.
[0021] In the embodiment of the present application, the resource service information includes power outage working equipment information, and the power outage working equipment information is used to indicate specific electrical appliances or electrical appliance terminals that are experiencing a power outage within a range.
[0022] It should be noted that in an embodiment of the present application, before the asset management module obtains business resource information, business information is obtained through the resource business module, and the business information includes at least one of measurement status information, image data information, operation content information and equipment status information; and the resource business information is generated based on the business information through the resource business module.
[0023] In one example, using the operation task as a carrier, the power grid resource business middle station generates and calls substation diagram data, equipment status, measurement status, operation content and other information as resource business information.
[0024] In the embodiment of the present application, resource business information is generated by annotating business information with graphs.
[0025] Step 202: Determine the type of working equipment based on the power outage working equipment information through the asset management module.
[0026] It should be noted that in the embodiment of the present application, the working device types include terminal devices and non-terminal devices.
[0027] Step 203: Determine the scope of safety measures corresponding to the power outage working equipment information based on the working equipment type through the asset management module.
[0028] Combined with what is shown in step 202, in this process, in response to the working device type being a terminal device, a first safety measure range corresponding to the power outage working device information is determined through the asset management module based on the power off rules for terminal devices; in response to the working device type being a non-terminal device, a second safety measure range is determined through the asset management module based on the terminal type of the non-terminal device in combination with the safety measure range search rules; and the safety measure range corresponding to the power outage working device information is determined through the asset management module based on the first safety measure range and the second safety measure range.
[0029] In the embodiment of the present application, the terminal equipment includes capacitors, reactors, grounding transformers, grounding switches, voltage transformers and outgoing lines. In this case: in the case where the working equipment only includes a bus voltage transformer, the power outage scope is only the bus voltage transformer; for cases such as capacitors, reactors, and grounding transformers, the switch interval and the terminal equipment interval of the terminal equipment should be included in the power outage scope; in the case where the working equipment includes a grounding switch of a certain device, the power outage scope of the grounding switch is consistent with the power outage scope of the device, and the power outage scope of the grounding switch can be determined according to the search method of the power outage scope of the device; in the case where the working equipment includes outgoing lines or outgoing line equipment (including outgoing line voltage transformers or outgoing line grounding switches), the power outage scope of the outgoing line equipment is consistent with the power outage scope of the outgoing line, that is, the outgoing line switch interval and the outgoing line should be included in the power outage scope.
[0030] For non-terminal devices, the scope of security measures can be determined according to two search processes.
[0031] 1. First search Starting from the working device, in the topological form, find the connected disconnectors or trolleys in all directions, ignoring all other devices found in the middle, and all the disconnectors or trolleys found will be searched again. If the disconnector or trolley cannot be found in a certain direction, all devices in that direction until the end of the topology are included in the power outage scope. The working device and all devices found during the first search are all included in the power outage scope.
[0032] 2. Secondary search Take the first found disconnector or trolley as the starting point, take the primary wiring diagram as the topology, and continue searching along the search direction (the direction in which the working equipment points to the disconnector or trolley), ignoring the grounding disconnector and current transformer found in the middle. The key points of the secondary search are as follows: (1) If the secondary search finds a busbar, an outlet point, an isolating trolley, a single isolating switch, or a circuit breaker and an isolating switch at the same time, the power outage range will end with the isolating switch or trolley found for the first time.
[0033] (2) If the secondary search finds a switch trolley or a single circuit breaker, the power outage range should also include the switch trolley (the trolley can be turned to the test position) or the circuit breaker bay.
[0034] (3) If the main transformer is found in the secondary search, first determine whether the main transformer is a 220kV three-circuit transformer. If not, the power outage range should also include the main transformer and the circuit breaker bays on both sides of the main transformer. If so, continue to determine the number of times the main transformer is found in the secondary search. If it is 1, the power outage range ends at the disconnector found for the first time. If not, the power outage range should also include the main transformer and the circuit breaker bays on both sides of the main transformer.
[0035] (4) If the secondary search finds a capacitor, reactor, grounding transformer or voltage transformer, the capacitor, reactor, grounding transformer or voltage transformer must be included in the power outage scope.
[0036] That is, in the embodiment of the present application, the preliminary safety range search is based on the search of the isolating switch and the trolley; the secondary safety range search is implemented as a search based on the topology.
[0037] By combining the first safety measure scope corresponding to the terminal type equipment and the second safety measure scope corresponding to the non-terminal type equipment, the safety measure scope corresponding to the power outage working equipment information can be determined.
[0038] Optionally, after the asset management module determines the scope of safety measures corresponding to the power outage working equipment information based on the type of working equipment, it includes determining the safety measures processing flow information corresponding to the working equipment based on the safety measures scope. In one example, for trolley-type equipment, it is only necessary to pull the trolley to the experimental position or the maintenance position. For non-trolley-type equipment, grounding should be performed between the working equipment and the isolating switch and trolley switch found for the first time in all directions. After excluding the unselectable grounding switch (such as the isolating switch maintenance cannot close the auxiliary grounding switch), close the grounding switch if there is one, and connect the grounding wire if there is no grounding switch.
[0039] To sum up, the method provided in the embodiment of the present application, during the process of determining the scope of security measures, determines the scope of security measures based on the specific type of working equipment in the asset management module, thereby realizing the automation of the determination of the scope of security measures and ensuring the efficiency of the determination of the scope of security measures.
[0040] The above are only optional embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for determining the scope of substation installation based on network topology, characterized in that: The method is applied to a substation safety range determination system based on network topology, and the substation safety range determination system based on network topology includes a resource business module and an asset management module; The resource business module is connected to the asset management module; The method comprises: Acquiring resource business information in a resource business module through the asset management module, wherein the resource business information includes power outage working equipment information; Determine the type of working equipment based on the power outage working equipment information by the asset management module; The asset management module determines the scope of safety measures corresponding to the power outage working equipment information based on the working equipment type.
2. The method for determining the substation installation scope based on network topology according to claim 1 is characterized in that: Before obtaining the resource business information in the resource business module through the asset management module, the method includes: Acquire business information through a resource business module, wherein the business information includes at least one of measurement status information, image model data information, operation content information, and equipment status information; The resource service information is generated based on the service information by a resource service module.
3. The method for determining the substation installation scope based on network topology according to claim 2 is characterized in that: The resource business information is implemented as visual chart information; The generating the resource service information based on the service information by the resource service module includes: The resource business information is generated by performing chart annotation based on the business information through the resource business module.
4. The method for determining the substation installation range based on network topology according to claim 1, characterized in that: The working device types include terminal devices and non-terminal devices.
5. The method for determining the substation installation range based on network topology according to claim 4 is characterized in that: The determining, by the asset management module, a scope of safety measures corresponding to the power outage working equipment information based on the working equipment type includes: In response to the working device type being a terminal device, determining, by the asset management module, a first safety measure range corresponding to the power-off working device information based on a power-off rule for terminal devices; In response to the working device type being a non-terminal device, determining a second security measure range by the asset management module based on the terminal type of the non-terminal device and in combination with a security measure range search rule; The asset management module determines the safety measure scope corresponding to the power outage working equipment information based on the first safety measure scope and the second safety measure scope.
6. The method for determining the substation installation scope based on network topology according to claim 5, characterized in that: In response to the working device type being a non-terminal device, determining the second security measure scope by the asset management module based on the terminal type of the non-terminal device and in combination with a security measure scope search rule, includes: In response to the working device type being a non-terminal device, performing a preliminary security range search based on the working device information by the asset management module to obtain a preliminary security range search result, wherein the preliminary security range search is used to search for a first key device within the security range, and the first key device is implemented as a switch control device; Performing a secondary security range search on the working equipment based on the preliminary security range search result by the asset management module to obtain a secondary security range search result; Determine, by the asset management module, the security measure range determination result corresponding to the secondary security measure range search result based on the security measure range determination rule; The second security measure range is generated based on the security measure range determination result.
7. The method for determining the substation installation range based on network topology according to claim 6, characterized in that: The preliminary safety measures scope search is based on the search of disconnectors and trolleys; The secondary security range search is implemented as a topology-based search.
8. The method for determining the substation installation scope based on network topology according to claim 1, characterized in that: After determining the scope of the safety measures corresponding to the power outage working equipment information based on the working equipment type by the asset management module, the method includes: The asset management module determines the security measure processing flow information corresponding to the working equipment based on the security measure scope.
9. A substation security range determination system based on network topology, characterized in that: The system includes a resource business module and an asset management module; The resource business module is connected to the asset management module; The substation installation scope determination system based on network topology is used to execute the substation installation scope determination method based on network topology as described in any one of claims 1 to 8.