Method and device for determining safety risk of petroleum depot

Through the hierarchical analysis method, the oil depot safety risk assessment index system was constructed, and the weight values ​​of each indicator were determined, which solved the problem of lack of systematicity and professionalism of the oil depot safety risk assessment in the existing technology, and realized quantitative analysis and efficient oil depot safety risk assessment. manage.

CN119005667APending Publication Date: 2024-11-22PETROCHINA CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310566611.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-18
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing oil depot safety risk assessment lacks systematic and professionalism, and cannot effectively evaluate professional risks and management risks such as processes, equipment, instruments, electrical, fire protection, etc., resulting in insufficient targeted and effective risk assessment, and the inability to guide safety quickly and effectively Risk management work.

Method used

The hierarchical analysis method is used to build a safety risk assessment index system, and the index system is constructed through pre-collected experimental data, and the weight values ​​of each indicator are determined. Santy's 1-9 scale method is used to build a judgment matrix, calculate the weight vector and the maximum eigenvalue. Consistency test is carried out to determine the weight value of each indicator, and finally calculate the safety risk assessment risk value of the oil depot.

Benefits of technology

The quantitative analysis and judgment of oil depot safety risk assessment has been realized, the targetedness and efficiency of the assessment have been enhanced, and the safety risk management of oil depots can be guided quickly and accurately, avoiding the phenomenon of "avoiding the important and taking light".

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119005667A_ABST
    Figure CN119005667A_ABST
Patent Text Reader

Abstract

The invention discloses a method and device for determining the safety risk of a petroleum depot, and the method comprises the steps: constructing a safety risk assessment index system according to the risk influence factors of the petroleum depot; wherein the index system comprises indexes and mutual relations thereof; according to the constructed safety risk assessment index system and the actual data of the to-be-evaluated petroleum depot, determining the weight value of each index in the safety risk assessment index system of the to-be-evaluated petroleum depot by adopting a pre-established analytic hierarchy structure model; and according to the actual data of the to-be-evaluated petroleum depot, the weight value of each determined index and a predetermined safety risk assessment risk standard, determining a risk value of safety risk assessment of the petroleum depot.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of oil and gas field petroleum depots, and in particular to a method and device for determining the safety risk of a petroleum depot. Background Art

[0002] At present, 16 oil and gas field companies have built storage and transportation stations and warehouses such as the Nansan Oil Depot of the Daqing Oilfield Storage, Transportation and Sales Branch, the Xianyang Terminal of the First Oil Transportation Department of Changqing Oilfield, the Youfangzhuang Production and Operation Depot of the Third Oil Transportation Department of Changqing Oilfield, and the Wangjiagou Oil and Gas Storage and Transportation Center of Xinjiang Oilfield. In addition, upstream enterprises have also built a large number of urban gas supply and hazardous chemical storage facilities. The storage and transportation stations and warehouses under the Oil, Gas and New Energy Branch are large in scale and large in number, facing great safety risks. Based on the new national security requirements, how the oil depot establishes safety risk evaluation indicators and determines the safety risk level of the oil depot is crucial to ensure the safe and stable operation of the oil depots under the Oil, Gas and New Energy Branch.

[0003] At present, there is no specific assessment method for the safety risk assessment of oil depots. Most oil depot management units use the established safety checklists or daily inspection checklists as management tools to ensure the normal operation of oil depots. These checklists or inspection checklists mainly check the operating parameters of oil depot equipment and facilities, including tank liquid level temperature, pipeline pressure output, pump pressure temperature, and automatic control instrument detection data. Due to the single content of the checklists or checklists, the lack of professional comprehensiveness, and the lack of specific risk assessment links, it is impossible to effectively assess various professional risks (process, equipment, instrumentation, electrical, fire protection) and management risks (organizational structure, safety information, production operation, work permit, change management, contractor management, accident events, etc.), resulting in the phenomenon of "avoiding the important and focusing on the trivial". The above factors have affected the pertinence and effectiveness of risk assessment to a certain extent, and it is impossible to quickly and effectively guide the safety risk management of oil depots. Summary of the invention

[0004] The present application provides a method and device for determining the safety risk of an oil depot. The method implements a method based on the hierarchical analysis method to quantitatively analyze and judge the safety risk assessment risk of an oil depot, thereby enhancing the pertinence of the safety risk assessment prediction and improving the efficiency of the prediction.

[0005] The present application provides a method for determining the safety risk of an oil depot, the method comprising:

[0006] According to the safety risk assessment experimental data of the oil depot collected in advance, a safety risk assessment index system is constructed, wherein the index system includes various indicators and their mutual relations;

[0007] According to the constructed safety risk assessment index system and the actual data of the oil reservoir to be assessed, the pre-established hierarchical analysis structure model is used to determine the weight value of each index in the safety risk assessment index system of the oil reservoir to be assessed;

[0008] The risk value of the safety risk assessment of the oil depot is determined based on the actual data of the oil depot to be evaluated, the determined weight values ​​of various indicators and the predetermined safety risk assessment risk standards.

[0009] In an exemplary embodiment, the security risk assessment index system includes two levels of indicators, namely: primary indicators and secondary indicators;

[0010] Among them, the first-level indicators include: professional safety risks and management safety risks;

[0011] The secondary indicators of professional safety risks include: enterprise site selection and general layout safety risks, process safety risks, equipment safety risks, instrument safety risks, electrical safety risks, fire and emergency safety risks;

[0012] The secondary indicators for managing safety risks include: safety management organization and responsibility management risks, safety information management risks, production operation management risks, work permit management risks, equipment integrity management risks, pre-feeding safety inspection management risks, change management risks, contractor management risks, accident event management risks, and emergency response management risks;.

[0013] In an exemplary embodiment, the hierarchical analysis structure model includes a target layer, a criterion layer and a solution layer;

[0014] The target layer is the weight value of each indicator in the safety risk assessment indicator system of the oil depot.

[0015] The criterion layer is a multi-level indicator and its relationship with each other;

[0016] The solution layer is the actual data of the oil reservoir to be evaluated.

[0017] In an exemplary embodiment, the weight value of each indicator in the safety risk assessment index system of the oil reservoir to be evaluated is determined by using a pre-established hierarchical analysis structure model based on the constructed safety risk assessment index system and the actual data of the oil reservoir to be evaluated, including:

[0018] According to the constructed safety risk assessment index system and the actual data of the oil reservoir to be evaluated, the elements in the judgment matrix are determined using Santy's 1-9 scaling method, and the judgment matrix is ​​constructed;

[0019] The following calculations are performed for each judgment matrix constructed:

[0020] Calculate the weight vector of the judgment matrix;

[0021] Determine the maximum eigenvalue of the judgment matrix according to the weight vector;

[0022] Performing a consistency check on the maximum eigenvalue;

[0023] When the consistency check is passed, the current weight vector is determined as the weight value of the indicator in the security risk assessment indicator system.

[0024] In an exemplary embodiment, the calculating of the weight vector of the judgment matrix includes:

[0025] Normalizing the column vectors of the judgment matrix;

[0026] The normalized column vectors are summed up in rows, and the sum is normalized again to obtain the weight vector of the judgment matrix.

[0027] In an exemplary embodiment, determining the maximum eigenvalue of the judgment matrix according to the weight vector includes:

[0028] According to the weight vector, the maximum eigenvalue of the judgment matrix is ​​calculated using the maximum eigenvalue calculation formula in the judgment matrix;

[0029] The maximum eigenvalue calculation formula in the judgment matrix is:

[0030]

[0031] In the above formula, λ max is the maximum eigenvalue in the judgment matrix, w is the weight vector, n is the order of the judgment matrix, and A is the judgment matrix.

[0032] In an exemplary embodiment, the performing consistency check on the maximum eigenvalue includes:

[0033] Calculating a deviation consistency index according to the maximum eigenvalue;

[0034] Calculating the random consistency ratio using a consistency test formula according to the deviation consistency index and the random consistency index;

[0035] Determining whether the random consistency ratio is less than a preset threshold;

[0036] When the random consistency ratio is less than the preset threshold, it is determined that the judgment matrix satisfies the consistency check.

[0037] In an exemplary embodiment, the step of calculating the deviation consistency index according to the maximum eigenvalue includes:

[0038]

[0039] In the above formula, CI is the deviation consistency index, λ max is the maximum eigenvalue in the judgment matrix, and n is the order of the judgment matrix.

[0040] In an exemplary embodiment, the consistency check formula is:

[0041]

[0042] In the above formula, CR is the random consistency ratio, CI is the deviation consistency index, and RI is the random consistency index, which corresponds to the matrix order n.

[0043] The present application also provides a device for determining safety risk of an oil depot, comprising: a memory and a processor;

[0044] The memory is used to store a program for determining the safety risk of the oil depot;

[0045] The processor is used to read and execute the program for determining the safety risk of an oil depot, and perform the method for determining the safety risk of an oil depot described in any one of the above embodiments.

[0046] Compared with the related art, the embodiment of the present application provides a method and device for determining the safety risk of an oil depot, the method comprising: constructing a safety risk assessment index system based on the safety risk assessment experimental data of the oil depot collected in advance; the index system includes various indicators and their mutual relationships; according to the constructed safety risk assessment index system and the actual data of the oil depot to be evaluated, using a pre-established hierarchical analysis structure model, determining the weight value of each indicator in the safety risk assessment index system of the oil depot to be evaluated; according to the actual data of the oil depot to be evaluated, the weight value of each indicator determined and the pre-determined safety risk assessment risk standard, determining the risk value of the safety risk assessment of the oil depot. Through the technical solution of the present invention, a method for quantitatively analyzing and judging the safety risk assessment risk of an oil depot is realized based on the hierarchical analysis method, which enhances the pertinence of the safety risk assessment prediction and improves the efficiency of the prediction.

[0047] Other features and advantages of the present application will be described in the following description, and partly become apparent from the description, or be understood by implementing the present application. Other advantages of the present application can be realized and obtained by the schemes described in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] The accompanying drawings are used to provide an understanding of the technical solution of the present application and constitute a part of the specification. Together with the embodiments of the present application, they are used to explain the technical solution of the present application and do not constitute a limitation on the technical solution of the present application.

[0049] Figure 1 This is a flow chart of a method for determining a safety risk assessment of an oil depot according to an embodiment of the present application;

[0050] Figure 2 Schematic diagram of a device for determining safety risk of an oil depot according to an embodiment of the present application. DETAILED DESCRIPTION

[0051] The present application describes multiple embodiments, but the description is exemplary rather than restrictive, and it is obvious to those skilled in the art that there may be more embodiments and implementations within the scope of the embodiments described in the present application. Although many possible feature combinations are shown in the drawings and discussed in the specific embodiments, many other combinations of the disclosed features are also possible. Unless specifically limited, any feature or element of any embodiment may be used in combination with any other feature or element in any other embodiment, or may replace any other feature or element in any other embodiment.

[0052] The present application includes and contemplates combinations of features and elements known to those of ordinary skill in the art. The embodiments, features and elements disclosed in the present application may also be combined with any conventional features or elements to form a unique invention scheme defined by the claims. Any features or elements of any embodiment may also be combined with features or elements from other invention schemes to form another unique invention scheme defined by the claims. Therefore, it should be understood that any feature shown and / or discussed in the present application may be implemented individually or in any appropriate combination. Therefore, except for the limitations made according to the attached claims and their equivalents, the embodiments are not subject to other restrictions. In addition, various modifications and changes may be made within the scope of protection of the attached claims.

[0053] In addition, when describing representative embodiments, the specification may have presented the method and / or process as a specific sequence of steps. However, to the extent that the method or process does not rely on the specific order of the steps described herein, the method or process should not be limited to the steps of the specific order described. As will be understood by those of ordinary skill in the art, other sequences of steps are also possible. Therefore, the specific sequence of the steps set forth in the specification should not be interpreted as a limitation to the claims. In addition, the claims for the method and / or process should not be limited to the steps of performing them in the order written, and those skilled in the art can easily understand that these sequences can be changed and still remain within the spirit and scope of the embodiments of the present application.

[0054] The disclosed embodiment provides a method for determining the safety risk of an oil depot, such as Figure 1As shown, the method includes steps S100-S120, which are specifically as follows:

[0055] S100. Construct a safety risk assessment indicator system based on the safety risk assessment experimental data of the oil depot collected in advance;

[0056] S110. According to the constructed safety risk assessment index system and the actual data of the oil reservoir to be evaluated, the weight value of each index in the safety risk assessment index system of the oil reservoir to be evaluated is determined by using the pre-established hierarchical analysis structure model;

[0057] S120. Determine the risk value of the safety risk assessment of the oil depot according to the actual data of the oil depot to be evaluated, the determined weight values ​​of the indicators, and the predetermined safety risk assessment risk standard.

[0058] In an exemplary embodiment, based on the main influencing factors of different oil depot risks, a secondary evaluation index and system for oil depot safety risk is constructed. The constructed safety risk assessment index system includes two levels of indicators, namely: primary indicators and secondary indicators; among which, the primary indicators include: professional safety risks and management safety risks.

[0059] Secondary indicators: Professional safety risks are composed of 6 secondary indicators, including: enterprise site selection and general layout safety risks, process safety risks, equipment safety risks, instrument safety risks, electrical safety risks, fire and emergency safety risks; management safety risks are composed of 10 secondary indicators, including: safety management organization and responsibility management risks, safety information management risks, production operation management risks, work permit management risks, equipment integrity management risks, pre-feeding safety inspection management risks, change management risks, contractor management risks, accident event management risks, and emergency response management risks.

[0060] In an exemplary embodiment, the hierarchical analysis structure model includes a target layer, a criterion layer and a solution layer; wherein the target layer is the weight value of each indicator in the safety risk assessment index system of the oil depot, the criterion layer is the multi-level indicators and their relationships; and the solution layer is the actual data of the oil depot to be evaluated.

[0061] In an exemplary embodiment, based on the constructed safety risk assessment index system and the actual data of the oil reservoir to be evaluated, a pre-established hierarchical analysis structure model is used to determine the weight value of each indicator in the safety risk assessment index system of the oil reservoir to be evaluated, including:

[0062] The first step is to determine the elements in the judgment matrix using Santy's 1-9 scale method based on the constructed safety risk assessment index system and the actual data of the oil reservoir to be evaluated, and to construct the judgment matrix; the judgment matrix is ​​a comparison of the relative importance of all factors in this layer to a factor in the previous layer. The element a of the judgment matrix ij The comparison result is determined by using Santy's 1-9 scaling method, that is, the comparison result is scaled with an integer between 0 and 9, and its meaning is shown in Table 1 below.

[0063] Table 1 The scale and meaning of the "1-9 scale" method

[0064]

[0065] The second step is to perform the following calculations for each constructed judgment matrix:

[0066] 1. Calculate the weight vector of the judgment matrix;

[0067] In this step 1, the weight vector of the judgment matrix is ​​calculated, including:

[0068] Normalizing the column vectors of the judgment matrix;

[0069] The normalized column vectors are summed up in rows, and the sum is normalized again to obtain the weight vector of the judgment matrix

[0070] 2. Determine the maximum eigenvalue of the judgment matrix according to the weight vector;

[0071] In this step 2, the maximum eigenvalue of the judgment matrix is ​​determined according to the weight vector, including:

[0072] According to the weight vector, the maximum eigenvalue of the judgment matrix is ​​calculated using the maximum eigenvalue calculation formula in the judgment matrix;

[0073] The maximum eigenvalue calculation formula in the judgment matrix is:

[0074]

[0075] In the above formula, λ max is the maximum eigenvalue in the judgment matrix, w is the weight vector, n is the order of the judgment matrix, and A is the judgment matrix.

[0076] 3. Performing a consistency check on the maximum eigenvalue;

[0077] In this step 3, the consistency check of the maximum eigenvalue is performed, including:

[0078] Step 31. Calculate the deviation consistency index according to the maximum eigenvalue;

[0079] Step 32. Calculate the random consistency ratio using the consistency test formula according to the deviation consistency index and the random consistency index;

[0080] Step 33: Determine whether the random consistency ratio is less than a preset threshold;

[0081] Step 34: When the random consistency ratio is less than the preset threshold, it is determined that the judgment matrix satisfies the consistency check.

[0082] In step 31, calculating the deviation consistency index according to the maximum eigenvalue includes:

[0083]

[0084] In the above formula, CI is the deviation consistency index, λ max is the maximum eigenvalue in the judgment matrix, and n is the order of the judgment matrix.

[0085] In step 32, the consistency check formula is:

[0086]

[0087] In the above formula, CR is the random consistency ratio, CI is the deviation consistency index, and RI is the random consistency index, which corresponds to the matrix order n. The corresponding relationship between RI and the matrix order n is shown in Table 2.

[0088] Table 2 Random consistency RI table

[0089] nth order 3 4 5 6 7 8 9 10 11 12 13 RI value 0.52 0.89 1.12 1.26 1.36 1.41 1.46 1.49 1.52 1.54 1.56 nth order 14 15 16 17 18 19 20 21 22 23 24 RI value 1.58 1.59 1.5943 1.6064 1.6133 1.6207 1.6292 1.6358 1.6403 1.6462 1.6497

[0090] 4. When the consistency check is passed, the current weight vector is determined as the weight value of the indicator in the security risk assessment indicator system; that is, after the judgment matrix passes the consistency check, the weights of each first-level indicator and second-level indicator can be determined according to the judgment matrix;

[0091] 5. When there is inconsistency, it is necessary to return to the first step to rebuild the judgment matrix.

[0092] In step S120, the risk value of the safety risk assessment of the oil depot is determined according to the actual data of the oil depot to be evaluated, the weight values ​​of the determined indicators and the predetermined safety risk assessment risk standard. The specific implementation process is as follows:

[0093] Step 1: The total score of all indicators (excluding "other factors" in the first-level indicators and their subordinate indicators) ranges from 0 to 1000. The lower limit of the score range of each indicator is 0 points, and the upper limit is calculated as follows: that is, the lower limit of the score range of each indicator in the safety risk assessment indicator system is determined to be 0 points, and the upper limit is the product of the total score of the previous indicator (total score 1000 × weight of the upper indicator) and the weight of the lower indicator:

[0094] (1) Upper limit of the score range of the first-level indicator

[0095] E Bi =1000 W Bi (i=1, 2)

[0096] Where: E Bi is the upper limit of the score of the first-level indicator Bi, W Bi is the weight coefficient of the first-level indicator Bi.

[0097] (2) Upper limit of the score range of the secondary indicator

[0098] E Ci =E Bi ·W Ci (i=1、2、3、4、5、6)

[0099] E Di =E Bi ·W Di (i=1, 2, 3, 4, 5, 6, 7, 8, 9, 10)

[0100] Where: E Ci 、E Di 、E Ei is the upper limit of the scores of the secondary indicators Ci, Di, and Ei, W Ci , W Ci , W Ei It is the weight coefficient of the secondary indicators Ci, Di, and Ei.

[0101] The second step is to comprehensively analyze the influence of various indicators on safety risk assessment, and use the Delphi method to determine the secondary indicators (enterprise site selection and general layout safety risk, process safety risk, equipment safety risk, instrument safety risk, electrical safety risk, fire and emergency safety risk, safety management organization and responsibility management risk, safety information management risk, production operation management risk, work permit management risk, equipment integrity management risk, pre-feeding safety inspection management risk, change management risk, contractor management risk, accident event management risk, emergency response management risk):

[0102] (1) Professional safety risk (0 to upper limit of score)

[0103] ① Enterprise site selection and overall layout safety risk assessment (0 to upper limit of score)

[0104]

[0105]

[0106]

[0107]

[0108] ②Process safety risk assessment (0 to upper limit of score)

[0109]

[0110]

[0111] ③ Equipment safety risk assessment (0 to upper limit of score)

[0112]

[0113]

[0114]

[0115]

[0116] ④Instrument safety risk assessment (0 to upper limit of score)

[0117]

[0118]

[0119]

[0120]

[0121]

[0122] ⑤Electrical safety risk assessment (0 to upper limit of score)

[0123]

[0124]

[0125]

[0126]

[0127] ⑥ Fire and emergency safety risk assessment (0 to upper limit of score)

[0128]

[0129]

[0130]

[0131]

[0132] (2) Manage safety risks (0 to upper limit of score)

[0133] ① Safety management organization and responsibility system assessment (0 to upper limit of score)

[0134]

[0135]

[0136]

[0137]

[0138]

[0139] ② Safety information management assessment (0 to upper limit of score)

[0140]

[0141]

[0142] ③Production operation management assessment (0 to upper limit of score)

[0143]

[0144]

[0145]

[0146]

[0147] ④ Work permit management assessment (0 to upper limit of score)

[0148]

[0149] ⑤ Equipment integrity management assessment (0 to upper limit of score)

[0150]

[0151]

[0152]

[0153]

[0154] ⑥ Safety inspection management assessment before feeding (0 to upper limit of score)

[0155]

[0156]

[0157] ⑦Change management assessment (0 to upper limit of score)

[0158]

[0159]

[0160] ⑧Contractor management evaluation (0 to upper limit of score)

[0161]

[0162]

[0163] ⑨Accident management assessment (0 to upper limit of score)

[0164]

[0165] ⑩Emergency response assessment (0 to upper limit of score)

[0166]

[0167] Step 3: Based on the scoring criteria in step 2, the risk assessment scores of the oil depots to be evaluated are summarized and the risk level of the oil depots is determined. Single item compliance rate = (compliant items / total assessment items) × 100%, single item score = single item compliance rate × single item score upper limit, and the risk level classification table is as follows:

[0168] Table 3 Safety risk level classification table

[0169] Serial number Risk Level Score 1 High-risk enterprises Score ≤ 700 points 2 Higher risk enterprises 700 points<score≤850 points 3 Medium Risk Enterprises 850 points<score≤900 points 4 Low risk business Score>900 points

[0170] The present application also provides a device for determining the safety risk of an oil depot, such as Figure 2 As shown, it includes: a memory 210 and a processor 220; the memory is used to store a program for determining the safety risk of an oil depot; the processor is used to read and execute the program for determining the safety risk of an oil depot, and perform the method for determining the safety risk of an oil depot described in any one of the above embodiments.

[0171] Example 1

[0172] Wangjiagou Oil and Gas Storage and Transportation Center is located in Touhunhe District, Urumqi City, Xinjiang Uygur Autonomous Region, with a total area of ​​1.41 million square meters. The oil depot is located in a strategic location, energy-intensive, and has a huge throughput. It mainly receives and sends finished oil from the three major refineries of Dushanzi Petrochemical, Urumqi Petrochemical, and Karamay Petrochemical, as well as imported crude oil from Kazakhstan and crude oil from Xinjiang Oilfield. It has three external transportation methods: pipeline, railway, and road. It is a hub for the collection, transportation, storage, and transit of finished oil and crude oil in northern Xinjiang. Wangjiagou Oil and Gas Storage and Transportation Center was built in 1958. The predecessor of the finished oil depot was the Wangjiagou Oil Storage Station of the Economic and Trade Department of the Autonomous Region, and the crude oil depot was the Wangjiagou Crude Oil Transfer Station of the Xinjiang Petroleum Administration Bureau, which was put into operation in July 1963. Over the past 60 years, the Wangjiagou Oil Depot has undergone many transfers and has been managed by China Petroleum Xinjiang Oilfield Branch, Northwest Sales Company, and Western Pipeline Company. In September 2020, the Wangjiagou Oil Depot was transferred to the Oil and Gas Storage and Transportation Company of China Petroleum Xinjiang Oilfield Branch. On January 12, 2021, the Xinjiang Oilfield Wangjiagou Oil and Gas Storage and Transportation Center was established, responsible for the production, operation and management of the oil depot. There are currently 325 registered employees.

[0173] At present, the oil and gas storage and transportation center has 61 storage tanks with a total storage capacity of 162.45×104m3, including a crude oil storage capacity of 69×104m3 (2 tanks of 20,000 cubic meters and 13 tanks of 50,000 cubic meters); a finished oil storage capacity of 93.45×104m3 (7 tanks of 50,000 cubic meters, 10 tanks of 30,000 cubic meters, 10 tanks of 20,000 cubic meters, 6 tanks of 10,000 cubic meters, 3 tanks of 3,000 cubic meters, 5 tanks of 2,000 cubic meters, 1 tank of 1,500 cubic meters and 4 tanks of 1,000 cubic meters); there are 13 pipelines in and out of the oil depot (6 crude oil pipelines and 7 finished oil pipelines).

[0174] It has 2 railway loading trestle bridges, with a total length of 7.4 kilometers of dedicated lines, 9 sets of railway loading cranes, 11 sets of automobile loading cranes, and an annual shipping capacity of 5 million tons. Among them: the North Trestle Bridge can deliver 54 cars per batch, two batches per day, and each batch can load about 2,500 tons; the South Trestle Bridge can deliver 30 cars per batch, and each batch can load about 1,500 tons. The railway shipment is mainly destined for Xinjiang Sales' southern Xinjiang oil depots, railway locomotive oil, etc. There is 1 set of highway loading system, with 8 automobile loading islands, designed to be 450 cubic meters per hour, and an average of about 80 cars are loaded per day, about 1,300 tons per day, mainly destined for Xinjiang Sales' Wuchang area gas stations.

[0175] Step 1: Build a security risk assessment indicator system

[0176] According to the collected safety risk assessment experimental data of the oil reservoir, a safety risk assessment index system is constructed, wherein the safety risk assessment index system includes two levels of indicators, namely: primary indicators, secondary indicators and;

[0177] First-level indicators: professional safety risk (B1), management safety risk (B2);

[0178] Secondary indicators: Professional safety risks are composed of 6 secondary indicators, including: enterprise site selection and general layout safety risks (C1), process safety risks (C2), equipment safety risks (C3), instrument safety risks (C4), electrical safety risks (C5), fire and emergency safety risks (C6); management safety risks are composed of 10 secondary indicators, including: safety management organization and responsibility management risks (D1), safety information management risks (D2), production and operation management risks (D3), work permit management risks (D4), equipment integrity management risks (D5), pre-feeding safety inspection management risks (D6), change management risks (D7), contractor management risks (D8), accident event management risks (D9), and emergency response management risks (D10).

[0179] Step 2: Establishing a hierarchical analysis structure model

[0180] The decision-making goal (risk score of the oil reservoir safety risk assessment), the factors to be considered (index system) and the decision-making object (the oil reservoir to be evaluated) are divided into the goal layer, the criterion layer and the program layer according to their mutual relationship, and a hierarchical model is established.

[0181] a) Target layer (A): represents the final safety risk assessment risk score of the oil depot.

[0182] b) Criteria layer (B, C, D): represents 2 level 1 indicators and 16 level 2 indicators.

[0183] c) Scenario layer (lowest layer): represents the actual production status of the oil reservoir to be evaluated.

[0184] Step 3: Construct the judgment matrix of the criterion layer and the target layer through the hierarchical analysis method

[0185] According to the constructed safety risk assessment index system and the actual production status of the oil reservoir to be evaluated, Santy's 1-9 scaling method is used to determine the elements in the judgment matrix and construct the judgment matrix; the judgment matrix is ​​a comparison of the relative importance of all factors in this layer to a certain factor in the previous layer, and the elements of the judgment matrix are determined using Santy's 1-9 scaling method.

[0186] In this step, the specific process of constructing the judgment matrix is ​​as follows:

[0187] 1) Establish the judgment matrix of the criterion layer B to the target layer A:

[0188]

[0189] 2) Judgment matrix of C1~C6 on B1 in the criterion layer:

[0190]

[0191] 3) Judgment matrix of D1~D10 on B2 in the criterion layer:

[0192]

[0193] Step 4: Calculate the weight of each indicator in the safety risk assessment index system of the oil reservoir to be evaluated

[0194] Calculate the weight vector of the judgment matrix, including:

[0195] 1) Normalizing the column vectors of the judgment matrix;

[0196] 2) Perform row summation on the normalized column vectors and normalize the sum again to obtain the weight vector of the judgment matrix.

[0197] Specifically, taking the judgment matrix of criterion layer B to target layer A as an example, the weight vector is calculated:

[0198] The judgment matrix of criterion layer B on target layer A:

[0199] Normalize the column vector of the judgment matrix:

[0200] Find the row and normalize:

[0201] Through the above calculation, the judgment matrix weight vector of the criterion layer B to the target layer A is obtained as: w = (0.60, 0.40) T

[0202] Step 5: Perform consistency test based on the maximum eigenvalue of the judgment matrix

[0203] First, the maximum eigenvalue in the judgment matrix is ​​calculated according to the corresponding weight vector calculated for each judgment matrix in step 4, wherein the maximum eigenvalue calculation formula is:

[0204]

[0205] In the above formula, λ max is the maximum eigenvalue in the judgment matrix, w is the weight vector, n is the order of the judgment matrix, and A is the judgment matrix.

[0206] Next, we conduct a consistency check.

[0207] 1) Consistency test of judgment matrix of criterion layer B on target layer A

[0208] Weight vector w = (0.60 0.40) T,Since the second-order matrix itself is consistent, the judgment matrix of the criterion layer B on the target layer A passes the consistency test.

[0209] 2) Consistency test of judgment matrix of C1~C6 on B1 in criterion layer

[0210] Weight vector w = (0.14 0.20 0.15 0.18 0.17 0.16) T , the maximum eigenvalue λ max =8.135, deviation consistency index CI=0.019, random consistency ratio CR=0.014<0.1, passed the consistency test.

[0211] 3) Consistency test of judgment matrix of D1~D10 on B2 in criterion layer

[0212] Weight vector w = (0.08 0.12 0.09 0.11 0.07 0.08 0.09 0.11 0.12 0.13) T , the maximum eigenvalue λ max =3.152, deviation consistency index CI = 0.016, random consistency ratio CR = 0.011, passed the consistency test.

[0213] According to the above calculation results, the weight coefficients of various evaluation indicators are shown in the following table.

[0214] Table 4 Weight coefficient table of various indicators

[0215]

[0216]

[0217] Step 6: Determine the upper limit of each indicator score

[0218] According to the above method, the upper limit of each indicator score is determined, and the score range of each indicator is determined, as shown in Table 4:

[0219] Table 5 Score range of each indicator

[0220]

[0221] Step 7: Determine the score

[0222] The oilfield management unit determined the score based on the current operating status of the oil reservoir characteristics, environment, medium properties, etc.

[0223] Table 6 Score range of each indicator

[0224]

[0225] According to the scoring criteria, the oil depot's safety risk score is 864.6 points. Based on the safety risk classification requirements, the oil depot is classified as medium risk.

[0226] Table 7 Safety risk level classification table

[0227] Serial number Risk Level Score 1 High-risk enterprises Score ≤ 700 points 2 Higher risk enterprises 700 points<score≤850 points 3 Medium Risk Enterprises 850 points<score≤900 points 4 Low risk business Score>900 points

[0228] The embodiment of the present application provides a method for safety risk assessment of oil depots based on the analytic hierarchy process, which combines the analytic hierarchy process with the main control factors of safety risk assessment, makes full use of professional safety risks, manages safety risks, establishes safety risk assessment indicators and systems, and uses the analytic hierarchy process to determine the weights of the main control factors of safety risk assessment, and finally establishes a comprehensive evaluation table for safety risk assessment, thereby realizing a fast and convenient safety risk assessment risk prediction method, which not only avoids the blindness and randomness of the selection of target oil depots, but also reduces the workload and capital investment of safety risk assessment prediction, and improves workload efficiency. There is no need for a third party to conduct indoor testing and analysis, which is crucial to improving the pertinence of safety risk assessment prediction of oil depots and the level of safety risk assessment management.

[0229] It will be appreciated by those skilled in the art that all or some of the steps, systems, and functional modules / units in the methods disclosed above may be implemented as software, firmware, hardware, and appropriate combinations thereof. In hardware implementations, the division between the functional modules / units mentioned in the above description does not necessarily correspond to the division of physical components; for example, a physical component may have multiple functions, or a function or step may be performed by several physical components in cooperation. Some or all components may be implemented as software executed by a processor, such as a digital signal processor or a microprocessor, or implemented as hardware, or implemented as an integrated circuit, such as an application-specific integrated circuit. Such software may be distributed on a computer-readable medium, which may include a computer storage medium (or non-transitory medium) and a communication medium (or temporary medium). As known to those skilled in the art, the term computer storage medium includes volatile and non-volatile, removable and non-removable media implemented in any method or technology for storing information (such as computer-readable instructions, data structures, program modules, or other data). Computer storage media include, but are not limited to, RAM, ROM, EEPROM, flash memory or other memory technology, CD-ROM, digital versatile disks (DVD) or other optical disk storage, magnetic cassettes, magnetic tapes, magnetic disk storage or other magnetic storage devices, or any other medium that can be used to store the desired information and can be accessed by a computer. In addition, it is well known to those of ordinary skill in the art that communication media typically contain computer-readable instructions, data structures, program modules, or other data in a modulated data signal such as a carrier wave or other transport mechanism, and may include any information delivery media.

Claims

1. A method for determining the safety risk of an oil depot, characterized in that: The method comprises: According to the risk influencing factors of the oil depot, a safety risk assessment index system is constructed; wherein the index system includes various indicators and their interrelationships; According to the constructed safety risk assessment index system and the actual data of the oil reservoir to be assessed, the pre-established hierarchical analysis structure model is used to determine the weight value of each index in the safety risk assessment index system of the oil reservoir to be assessed; The risk value of the safety risk assessment of the oil depot is determined based on the actual data of the oil depot to be evaluated, the weight value of each indicator determined, and the predetermined safety risk assessment risk standard.

2. The method for determining the safety risk of an oil depot according to claim 1, characterized in that: The safety risk assessment index system includes two levels of indicators, namely: primary indicators and secondary indicators; Among them, the first-level indicators include: professional safety risks and management safety risks; The secondary indicators of professional safety risks include: enterprise site selection and general layout safety risks, process safety risks, equipment safety risks, instrument safety risks, electrical safety risks, fire and emergency safety risks; The secondary indicators for managing safety risks include: safety management organization and responsibility management risks, safety information management risks, production operation management risks, work permit management risks, equipment integrity management risks, pre-feeding safety inspection management risks, change management risks, contractor management risks, accident event management risks, and emergency response management risks.

3. The method for determining the safety risk of an oil depot according to claim 2, characterized in that: The hierarchical analysis structure model includes a target layer, a criterion layer and a solution layer; The target layer is the weight value of each indicator in the safety risk assessment indicator system of the oil depot. The criterion layer is a multi-level indicator and its relationship with each other; The solution layer is the actual data of the oil reservoir to be evaluated.

4. The method for determining the safety risk of an oil depot according to claim 3, characterized in that: The method uses a pre-established hierarchical analysis structure model based on the constructed safety risk assessment index system and the actual data of the oil reservoir to be evaluated to determine the weight value of each index in the safety risk assessment index system of the oil reservoir to be evaluated, including: According to the constructed safety risk assessment index system and the actual data of the oil reservoir to be evaluated, the elements in the judgment matrix are determined using Santy's 1-9 scaling method, and the judgment matrix is ​​constructed; The following calculations are performed for each judgment matrix constructed: Calculate the weight vector of the judgment matrix; Determine the maximum eigenvalue of the judgment matrix according to the weight vector; Performing a consistency check on the maximum eigenvalue; When the consistency check is passed, the current weight vector is determined as the weight value of the indicator in the security risk assessment indicator system.

5. The method for determining the safety risk of an oil depot according to claim 4, characterized in that: The step of calculating the weight vector of the judgment matrix includes: Normalizing the column vectors of the judgment matrix; The normalized column vectors are summed up in rows, and the sum is normalized again to obtain the weight vector of the judgment matrix.

6. The method for determining the safety risk of an oil depot according to claim 5, characterized in that: Determining the maximum eigenvalue of the judgment matrix according to the weight vector includes: According to the weight vector, the maximum eigenvalue of the judgment matrix is ​​calculated using the maximum eigenvalue calculation formula in the judgment matrix; The maximum eigenvalue calculation formula in the judgment matrix is: In the above formula, λ max is the maximum eigenvalue in the judgment matrix, w is the weight vector, n is the order of the judgment matrix, and A is the judgment matrix.

7. The method for determining the safety risk of an oil depot according to claim 6, characterized in that: The performing consistency check on the maximum eigenvalue comprises: Calculating a deviation consistency index according to the maximum eigenvalue; Calculating the random consistency ratio using a consistency test formula according to the deviation consistency index and the random consistency index; Determining whether the random consistency ratio is less than a preset threshold; When the random consistency ratio is less than the preset threshold, it is determined that the judgment matrix satisfies the consistency check.

8. The method for determining the safety risk of an oil depot according to claim 7, characterized in that: Calculating the deviation consistency index according to the maximum eigenvalue includes: In the above formula, CI is the deviation consistency index, λ max is the maximum eigenvalue in the judgment matrix, and n is the order of the judgment matrix.

9. The method for determining the safety risk of an oil depot according to claim 8, characterized in that: The consistency check formula is: In the above formula, CR is the random consistency ratio, CI is the deviation consistency index, and RI is the random consistency index, which corresponds to the matrix order n.

10. A device for determining safety risk of an oil depot, characterized in that: include: Memory and processor; The memory is used to store a program for determining a method for safety risk of an oil depot; The processor is used to read and execute the program for the method for determining the safety risk of an oil depot, and perform the method for determining the safety risk of an oil depot as described in any one of claims 1-9.