Power supply management circuit and power supply using same

By using a discharge unit in parallel with the relay in the automatic switching switch, fast switching and soft switching are achieved, the switching delay and safety hazards of traditional ATS relays are solved, and the stability of the power supply and the service life of the relay are improved.

CN119010307APending Publication Date: 2024-11-22CHICONY POWER TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310631296.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2023-05-22
Filing Date
2023-05-31
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

When traditional automatic switching switches (ATS) use relays as switching components, there are problems such as switching delay, arc, spark, bounce, high temperature, etc. Although semiconductor switches can shorten the conversion time, they are difficult to meet the insulation isolation specifications in safety regulations, resulting in safety hazards.

Method used

Design a power supply management circuit, which uses the discharge unit to connect it in parallel with the relay, and turns on the discharge unit to reduce the relay switching delay, and cut off after the relay completes the action, realizes rapid switching, allowing the relay to perform soft switching, avoid arcing and extend the relay contacts. Service life.

Benefits of technology

It realizes rapid switching of power supplies, reduces the demand for energy storage capacitors, extends the life of relay contacts, and overcomes the problem of insufficient pulse current and avalanche energy tolerance of semiconductor switches through high voltage and high current breaking capabilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119010307A_ABST
    Figure CN119010307A_ABST
Patent Text Reader

Abstract

The invention discloses a power supply management circuit and a power supply using the power supply management circuit. The power supply management circuit comprises a first contact, a second contact, a relay, a discharging unit and a starting unit. The first contact receives a transmission voltage. The second contact outputs a transmission voltage. The relay is coupled between the first contact and the second contact. The discharge unit is coupled in parallel with the relay. The starting unit is coupled to the discharging unit. When the power supply management circuit receives a control signal, the discharge unit is switched on or switched off, and the relay enters a switching program. When the control signal is a conduction signal, the starting unit generates a driving voltage to conduct the discharge unit, the relay enters a conduction program, and the transmission voltage is transmitted to the second contact through the discharge unit; after the conduction program is completed, the starting unit stops generating the driving voltage to cut off the discharging unit, and the transmission voltage is transmitted to the second contact through the relay.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a power supply management circuit, and in particular to a power supply management circuit in which a discharge unit is connected in parallel with a relay. Background Art

[0002] An automatic transfer switch (ATS) is a device used to automatically switch power sources. Its main function is to automatically select one of the multiple independent input power sources available to avoid power outages caused by the failure of a single power source. When the main power source is abnormal (such as interruption, undervoltage, overvoltage, or voltage drop), the digital signal processor (DSP) can detect the power abnormality and switch to the backup power source. When the main power source returns to normal, the DSP can further automatically switch back to the main power source, thereby ensuring the stability of the system's operation when facing an unstable power system.

[0003] In order to solve the problems that may be caused by using relays as switching elements in traditional ATS (such as switching delay (for example, up to 10 milliseconds), arcs, sparks, bounce, high temperature, sticking, etc.), semiconductor switches (such as MOSFET) are often used in current solutions to replace or assist relays as switching elements. Compared with relays, MOSFETs have less mechanical action delay time and bounce phenomenon in use, and can complete the conversion within a few milliseconds, so the conversion time can be greatly shortened and the stability of power supply feeding can be increased. However, these ATSs that use semiconductor components as the main switching switches all have safety risks. For example, the safety regulation UL62368 stipulates that all ATSs must comply with the insulation distance related specifications of UL 1008. Compared with relay switches, semiconductor switches such as common MOSFET, IGBT, SCR and other components do not achieve switching through actual spatial isolation, but switch through control channel cutoff, so they cannot meet the safety regulations such as creepage distance (creepage) and space distance (clearance), so they need to be verified by high potential (high-pot) test and thermal cycling test. Summary of the invention

[0004] In response to the above problems, the present invention proposes a power supply management circuit and a power supply using the power supply management circuit. When the power supply management circuit switches, the discharge unit will be turned on first (conduction is completed within a few milliseconds) to substantially short-circuit the main contact of the relay until the discharge unit is disconnected after the relay completes the action, thereby eliminating the switching delay caused by the mechanical action of the relay, so that the power supply management circuit has the ability to quickly switch the power supply, thereby ensuring that the power supply can complete the re-feeding within the holdup time, reducing the capacity requirement of the energy storage capacitor at the rear, and the power supply management circuit of the present invention allows the relay to substantially perform soft switching (soft switching), avoiding the arc generated by the relay bouncing phenomenon that shortens the service life of the relay contacts. Therefore, the power supply management circuit of the present invention can replace the existing ATS switching switch and power management method to improve the stability of the power supply.

[0005] In some embodiments, the power supply management circuit includes a first contact, a second contact, a relay, a discharge unit, and a start-up unit. The first contact is configured to receive a transmission voltage. The second contact is configured to output a transmission voltage. The relay is coupled between the first contact and the second contact. The discharge unit is coupled between the first contact and the second contact, and is coupled to the relay in parallel. The start-up unit is coupled to the discharge unit. When the power supply management circuit receives a control signal, the discharge unit is turned on or off, and the relay enters a switching procedure, and the switching procedure includes a turn-on procedure and a turn-off procedure. When the control signal is a turn-on signal, the start-up unit generates a driving voltage to turn on the discharge unit, the relay enters a turn-on procedure, and the transmission voltage is transmitted to the second contact via the discharge unit; after the turn-on procedure is completed, the start-up unit stops generating the driving voltage to turn off the discharge unit, and the transmission voltage is transmitted to the second contact via the relay.

[0006] In some embodiments, the power supply includes a first power supply circuit, a second power supply circuit and a power conversion unit. The first power supply circuit is coupled to the first power supply and includes a first live wire and a first ground wire. The second power supply circuit is coupled to the second power supply and includes a second live wire and a second ground wire. The first live wire, the first ground wire, the second live wire and the second ground wire each include the aforementioned power supply management circuit. The second live wire is coupled to the first live wire, and the second live wire has a live wire contact at the coupling point with the first live wire. The second ground wire is coupled to the first ground wire, and the second ground wire has a ground wire contact at the coupling point with the first ground wire. The power conversion unit couples the live wire contact and the ground wire contact.

[0007] In summary, the power supply management circuit and power supply proposed in the present invention use the discharge element as an auxiliary switch with high speed and high voltage and large current starting and breaking capabilities. Compared with the channel of the semiconductor switch, the discharge element can withstand stronger pulse current and avalanche energy tolerance to overcome the problem of the semiconductor switch element as a relay auxiliary switch. In this way, the power supply management circuit has the ability to quickly switch the power supply, reduce the capacity requirement of the energy storage capacitor behind, and the service life of the relay contact can be extended. BRIEF DESCRIPTION OF THE DRAWINGS

[0008] Figure 1 is a schematic block diagram of a power supply connected to a first power source and a second power source according to some embodiments of the present invention;

[0009] Figure 2 is a block diagram of a power supply management circuit of the present invention;

[0010] Figure 3 is a schematic diagram of a first embodiment of a starting unit of the present invention;

[0011] Figure 4 is a schematic diagram of a second embodiment of a starting unit of the present invention;

[0012] Figure 5 is a waveform timing diagram of some signals of an exemplary operation of the startup unit of the present invention;

[0013] Figure 6 is a waveform timing diagram of some signals of an exemplary operation (I) of the power supply of the present invention; and

[0014] Figure 7 FIG. 2 is a waveform timing diagram of some signals of an exemplary operation (II) of the power supply of the present invention.

[0015]

Explanation of symbols

[0016] 100: Power supply

[0017] 110: First power supply line

[0018] 111: First Line

[0019] 112: First Ground Line

[0020] 120: Second power supply line

[0021] 121: Second Fire Line

[0022] 122: Second ground line

[0023] 130: Live wire contact

[0024] 140: Ground contact

[0025] 150: Power conversion unit

[0026] 151: Control circuit

[0027] 160:EMI level

[0028] 170: PFC level

[0029] 180:DC / DC Converter

[0030] 200: Power supply management circuit

[0031] 210: First contact

[0032] 220: Second contact

[0033] 230: Relay

[0034] 240: discharge unit

[0035] 241: First End

[0036] 242: Second End

[0037] 243: The Third End

[0038] 300: Start unit

[0039] 310: first output terminal

[0040] 320: Second output terminal

[0041] 330: Drive end

[0042] 340: Auxiliary power supply

[0043] 400: Transformer

[0044] 410: Primary winding

[0045] 420: Secondary winding

[0046] 500:Driver Group

[0047] 510: Control unit

[0048] 520: Toggle switch

[0049] 530: Current feedback circuit

[0050] 600: Coil

[0051] 700:Driver Group

[0052] 710: Control unit

[0053] 720: Control group

[0054] 721: Independent power supply

[0055] 722: Sensing unit

[0056] 723: Toggle switch

[0057] 810: First Power Source

[0058] 820: Second power supply

[0059] I: Current detection signal

[0060] s0: control signal

[0061] s01: first control signal

[0062] s02: second control signal

[0063] s11: first control signal of the first power supply line

[0064] s12: the second control signal of the first power supply line

[0065] s21: the first control signal of the second power supply line

[0066] s22: second control signal of the second power supply line

[0067] s3: driving signal

[0068] T0~T5,t1~t4: time

[0069] V0: Transmission voltage

[0070] V1: First power supply voltage

[0071] V2: Second power supply voltage

[0072] V3: Input voltage

[0073] V4: driving voltage DETAILED DESCRIPTION

[0074] Please refer to Figure 1 . The power supply 100 in some embodiments of the present invention includes a first power supply circuit 110, a second power supply circuit 120 and a power conversion unit 150. The power supply 100 can accept two sets of independent power feeds. In addition, in addition to overcoming the problems of traditional power supplies using relays (such as relay switching delay (for example, up to 10 milliseconds), arcs, sparks, bounces, high temperatures, sticking, etc.), the power supply 100 can also overcome the problems of power supplies using semiconductor switching elements to replace or assist relays (such as limitations on insulation isolation), which will be described in detail later. Figure 1In the embodiment shown, because the power supply 100 is connected to two power sources (such as the first power source 810 and the second power source 820), the power supply 100 includes two power supply lines (i.e., the first power supply line 110 and the second power supply line 120), but the number of power supply lines can be further increased as required, and the present invention is not limited thereto. For example, if in actual application, the power supply 100 is connected to more than two power sources, the power supply 100 can further include a third power supply line, a fourth power supply line, and so on.

[0075] The first power supply circuit 110 is coupled to the first power source 810 and includes a first live wire 111 and a first ground wire 112. The second power supply circuit 120 is coupled to the second power source 820 and includes a second live wire 121 and a second ground wire 122. When the first power supply circuit 110 is turned on, it transmits the first power voltage V1 provided by the first power source 810 to the subsequent stage (for example, but not limited to the EMI stage 160, the PFC stage 170, and the DC / DC converter 180). When the second power supply circuit 120 is turned on, it transmits the second power voltage V2 from the second power source 820 to the subsequent stage, thereby replacing the first power voltage V1 from the first power source 810 when necessary. For example, if the first power supply 810 is the main power supply and the second power supply 820 is the backup power supply, when the first power supply 810 is abnormal (such as interruption, undervoltage, overvoltage, or voltage drop), the power supply 100 cuts off the first power supply line 110 and turns on the second power supply line 120, so that the second power supply voltage V2 from the second power supply 820 replaces the first power supply voltage V1 from the first power supply 810.

[0076] Specifically, the architecture of the power supply 100 that enables switching between the first power supply line 110 and the second power supply line 120 is as follows: the first live wire 111, the first ground wire 112, the second live wire 121 and the second ground wire 122 are each connected to a power management circuit 200; the second live wire 121 is coupled to the first live wire 111, and the coupling point between the second live wire 121 and the first live wire 111 has a live wire contact 130; the second ground wire 122 is coupled to the first ground wire 112, and the coupling point between the second ground wire 122 and the first ground wire 112 has a ground wire contact 140; the power conversion unit 150 is coupled to the live wire contact 130 and the ground wire contact 140. Through this architecture, the input voltage V3 of the power conversion unit 150 can be used to determine whether the first power supply voltage V1 from the first power supply 810 is abnormal (for example, power supply abnormality is detected according to the phase frequency detector), and the aforementioned switching is performed when the first power supply voltage V1 is abnormal and the abnormality is relieved, which will be described in detail later.

[0077] The power conversion unit 150 includes a control circuit 151. The control circuit 151 can be implemented by a digital signal processor (DSP), but the present invention is not limited thereto. The control circuit 151 is configured to detect the power supply status of the first power supply 810 and the second power supply 820. For example, the control circuit 151 can detect power supply anomalies based on a phase frequency detector. When the first power supply 810 is interrupted or the power supply is abnormal, the control circuit 151 provides a cutoff signal to the power supply management circuit 200 of the first live wire 111 and the power supply management circuit 200 of the first ground wire 112 to actuate the relay 230 (such as Figure 2 ) and the relay 230 of the first ground line 112 (as shown Figure 2 ) interrupts the connection between the first power source 810 and the power conversion unit 150, and provides a conduction signal to the power supply management circuit 200 of the second live wire 121 and the power supply management circuit 200 of the second ground wire 122 to actuate the relay 230 of the second live wire 121 (as shown in FIG. Figure 2 ) and the relay 230 of the second ground line 122 (as shown Figure 2 ) establishes a connection between the second power source 820 and the power conversion unit 150. The switching of the relay 230 of each power management circuit 200 will be described in detail later.

[0078] Please refer to Figure 2 The power management circuit 200 includes a first contact 210, a second contact 220, a relay 230, a discharge unit 240, and a start unit 300. The first contact 210 is configured to receive a transmission voltage V0. The second contact 220 is configured to output the transmission voltage V0. The power management circuit 200 is used to control the conduction of the path between the first contact 210 and the second contact 220, so as to transmit the transmission voltage V0 from the first contact 210 to the second contact 220 in the conduction state.

[0079] The relay 230 is coupled between the first contact 210 and the second contact 220. When the relay 230 is turned on, the transmission voltage V0 is transmitted to the second contact 220 through the relay 230. In some embodiments, although a single relay 230 is used for description, the present invention is not limited thereto, and a plurality of relays 230 connected in parallel and / or in series may be used to prevent the relay 230 from being unable to be turned off due to sticking and / or unable to be turned on due to bouncing.

[0080] The discharge unit 240 is coupled between the first contact 210 and the second contact 220 and is coupled in parallel to the relay 230. The start unit 300 is coupled to the discharge unit 240. When the discharge unit 240 is turned on, the transmission voltage V0 is transmitted to the second contact 220 through the discharge unit 240. Through such a configuration, the discharge unit 240 can be used as an auxiliary switch and turned on before the relay 230 is switched to reduce the stress of the relay 230 when switching. Specifically, before the relay 230 is switched, the discharge unit 240 is driven first, so that the current of the load can be transferred to the discharge unit 240 during the switching process of the contact of the relay 230, and the cross-voltage when the relay 230 is switched is only the cross-voltage when the discharge unit 240 is in arc discharge (to be described in detail later) (based on the characteristics of the discharge unit 240). Here, the conduction time of the discharge unit 240 is usually the switching time of the relay 230 known during the design, thereby further eliminating the stress on the contacts of the relay 230 when switching, achieving soft switching of the relay 230, thereby achieving the advantages of extending the life of the relay 230 and avoiding the contact sticking of the relay 230. In some embodiments, the discharge unit 240 is implemented as a gas discharge tube. By driving the discharge unit 240 by the starter unit 300, the discharge unit 240 is maintained in an arc discharge state and turned on (to be described in detail later), so that the transmission voltage V0 can be transmitted to the second contact 220 through the discharge unit 240.

[0081] In some embodiments, the discharge unit 240 is composed of a three-electrode gas discharge tube, which realizes the function of a switch through the principle of gas discharge, and its structure is similar to a triggered spark gap. A gas discharge tube is a switch based on the principle of gas discharge and high voltage drive, and its conduction and cutoff principles are different from those of a mechanical switch and a semiconductor switch. A gas discharge tube has the advantages of a mechanical switch: there is spatial insulation between the contacts, which can meet the requirements of the ATS safety regulations for spatial distance, but there are no disadvantages such as mechanical action delay and bouncing. In addition, the gas discharge tube has the advantage of high-speed switching, which can meet the requirements of the ATS safety regulations for creepage distance, but there is no disadvantage of insufficient spatial insulation of semiconductor switches. In the present invention, the discharge unit 240 is used as an auxiliary switch of the relay 230, so that the power supply management circuit 200 has the ability to quickly switch power sources and extremely high instantaneous load capacity.

[0082] Specifically, in some embodiments, the discharge unit 240 includes a first terminal 241, a second terminal 242, and a third terminal 243, and the relay 230 is coupled in parallel to the first terminal 241 and the second terminal 242 of the discharge unit 240. In some embodiments, the start unit 300 includes a driving terminal 330, a first output terminal 310, and a second output terminal 320, the first output terminal 310 and the second output terminal 320 are respectively coupled to the first terminal 241 and the third terminal 243 of the discharge unit, and the start unit 300 receives a control signal s0 (specifically, a first control signal s01, which will be described in detail later) through the driving terminal 330 to drive the discharge unit 240 to be turned on or off.

[0083] Please refer to Figure 3 . In some embodiments, the startup unit 300 further includes a transformer 400 and a driving group 500. The transformer 400 includes a primary winding 410 and a secondary winding 420. The driving group 500 is coupled to the primary winding 410 and includes a control unit 510, a switch 520 and a current feedback circuit 530. The control unit 510 is configured to receive a control signal s0 (specifically a first control signal s01, which will be described in detail later) and to issue a driving signal s3 according to the control signal s0. The switch 520 is coupled to the control unit 510 and the primary winding 410 of the transformer 400 and is configured to be turned on or off according to the driving signal s3. The current feedback circuit 530 is coupled to the switch 520 and the control unit 510 and is configured to detect the current flowing through the switch 520 and feed back the current detection signal I to the control unit 510. The transformer 400 generates a driving voltage V4 through the secondary winding 420 according to the switching action of the switch 520. The auxiliary power supply 340 of the startup unit 300 can be realized by using the internal power supply of the ATS or other methods. After receiving the control signal s0, the control unit 510 drives the switch 520 in a constant frequency manner, and uses the voltage of the current feedback circuit 530 to perform peak current control through the current feedback function.

[0084] Figure 3The architecture of the startup unit 300 adopts a boost-type flyback converter circuit architecture, but the application and control method are different from those of a conventional flyback converter. Conventional flyback converters are usually applied to fixed voltage outputs and maintain the stability of the output voltage by feedback control. However, the purpose of the application of the flyback converter in the startup unit 300 is to generate a high voltage power supply (driving voltage V4) in the secondary winding 420 of the transformer 400 through a transformer 400 with a high turns ratio, and to limit the current flowing through the discharge unit 240 by peak current control after the discharge unit 240 is triggered, thereby maintaining the voltage required to maintain arc discharge between the electrodes of the discharge unit 240 (between the first end 241 and the second end 242). This is a control method and application with high voltage triggering, low voltage maintenance and current limiting protection.

[0085] Before the starting unit 300 triggers the discharge unit 240, because the discharge unit 240 has not been turned on, the secondary side of the flyback converter (i.e., the first output terminal 310 and the second output terminal 320 coupled to the secondary winding 420) is in an open circuit and has no load. At this time, the excitation current of the transformer 400 of the flyback converter will rise and fall at a no-load standard current slope known during design, and the control unit 510 is provided with a threshold to limit the current peak to protect the semiconductor switching element (switching switch 520) of the flyback converter. After the starting unit 300 completes triggering the discharge unit 240, since the discharge unit 240 is in a conducting state, the arc discharge voltage and equivalent impedance between the electrodes of the discharge unit 240 when the arc discharge state is present on the secondary side of the starting unit 300, which is the same as a circuit load. At this time, the excitation current of the transformer 400 of the flyback converter will rise and fall at a non-no-load standard current slope (such as Figure 5 As shown, the slopes of the current detection signal I before and after time t2 are different). In addition, after the control unit 510 determines that the discharge unit 240 has completed triggering, the peak current threshold will be further narrowed, and the energy consumption of maintaining the arc discharge state of the discharge unit 240 will be reduced by reducing the magnitude of the excitation current and the energy transmitted to the secondary winding 420, but the discharge unit 240 is still maintained in the arc discharge state.

[0086] Please refer to Figure 4. Another embodiment of the start-up unit 300 includes a coil 600 and a driving group 700. The coil 600 is coupled in parallel to the first end 241 and the third end 243 of the discharge unit 240. The driving group 700 includes a control unit 710 and a control group 720. The control unit 710 is configured to receive a control signal s0 (specifically, a first control signal s01, which will be described in detail later) and to issue a driving signal s3 according to the control signal s0. The control group 720 includes an independent power supply 721, a sensing unit 722, and a switching switch 723. The independent power supply 721 is coupled in series to the sensing unit 722. The sensing unit 722 is coupled in series to the switching switch 723. The switching switch 723 is coupled to the control unit 710. The control group 720 is coupled in parallel to the first end 241 and the third end 243 of the discharge unit 240. The switching switch 723 is configured to be turned on or off according to the driving signal s3. The coil 600 generates a driving voltage V4 according to the switching action of the switching switch 723. This structure can also achieve the aforementioned effect of reducing the energy consumption when maintaining the arc discharge state of the discharge unit 240, but the discharge unit 240 is still maintained in the arc discharge state.

[0087] Please also refer to Figures 3 to 5 . The conduction process of the gas discharge tube (discharge unit 240) is described as follows. At time t1, the start unit 300 starts to establish a high voltage at the first end 241 and the second end 242 of the discharge unit 240 by switching the switch 520 / 723, so that the gas inside the discharge unit 240 is ionized. When the voltage exceeds the breakdown voltage of the discharge unit 240 (time t2), the first end 241 and the second end 242 generate arc discharge. At this time, the first end 241, the second end 242 and the third end 243 are in a conduction state due to the gas discharge effect inside the discharge unit 240, and the arc discharge state is maintained by the start unit 300, so the discharge unit 240 is a controllable switch. Since the voltage in the arc discharge state is relatively low (e.g., from time t3 to time t4), after the discharge unit 240 is turned on, the control unit 510 / 710 reduces the output duty cycle of the driving signal s3 of the control unit 510 / 710 under the condition that the discharge unit 240 is allowed to remain turned on, so as to reduce the driving voltage V4 and reduce the power output. When the discharge unit 240 should be turned off (e.g., at time t4), the second control signal s02 (included in the control signal s0, which will be described in detail later) no longer activates the control unit 510 / 710 to drive the switch 520 / 723, so that the discharge unit 240 is turned off.

[0088] Please refer to Figure 1 and Figure 2When the power management circuit 200 receives the control signal s0, the discharge unit 240 is turned on or off, and the relay 230 enters the switching procedure. The switching procedure includes a turn-on procedure and a turn-off procedure, which means that the relay 230 will also be turned on or off. Because the discharge unit 240 is implemented by a component such as a gas discharge tube, the time required for switching (i.e., turning on or off) the discharge unit 240 is shorter than the switching procedure of the relay 230. Therefore, the turn-on or turn-off of the discharge unit 240 will be completed earlier than the switching procedure of the relay 230.

[0089] For example, when the control signal s0 is a conduction signal (i.e., the power management circuit 200 needs to be turned on), the start-up unit 300 generates a driving voltage V4 to turn on the discharge unit 240, and the relay 230 enters the conduction procedure. At this time, because the discharge unit 240 is turned on first, the transmission voltage V0 is transmitted to the second contact 220 via the discharge unit 240. After the conduction procedure of the relay 230 is completed, the start-up unit 300 stops generating the driving voltage V4 to turn off the discharge unit 240. At this time, the transmission voltage V0 is transmitted to the second contact 220 via the relay 230.

[0090] Specifically, the control signal s0 includes a first control signal s01 and a second control signal s02. When the control signal s0 is a conduction signal, the first control signal s01 activates the start-up unit 300 to generate the driving voltage V4 so that the discharge unit 240 is turned on, and the second control signal s02 activates the relay 230 to enter the conduction procedure. At this time, the transmission voltage V0 is transmitted to the second contact 220 via the discharge unit 240. After the conduction procedure of the relay 230 is completed, the first control signal s01 causes the start-up unit 300 to stop generating the driving voltage V4, so that the discharge unit 240 is turned off. At this time, the transmission voltage V0 is transmitted to the second contact 220 via the relay 230.

[0091] When the power management circuit 200 needs to be turned off, the control signal s0 transmitted by the control circuit 151 will activate the power management circuit 200 to perform different actions according to whether the connected power source is providing power, as described below.

[0092] When the power supply management circuit 200 needs to be cut off (the control signal s0 is a cut-off signal) and the connected power supply is not powered, the specific switching action is described as follows. The first control signal s01 does not actuate the start unit 300 to generate the driving voltage V4, and the second control signal s02 actuates the relay 230 to enter the cut-off procedure. After the cut-off procedure of the relay 230 is completed, the electrical connection between the first contact 210 and the second contact 220 is disconnected. In this application scenario, because the connected power supply is not powered, the relay 230 does not need the assistance of an auxiliary switch (i.e., the discharge unit 240) to avoid potential problems of direct switching of high voltage and large current. Therefore, in this application scenario, there is no need to turn on the discharge unit 240.

[0093] When the power management circuit 200 needs to be cut off (the control signal s0 is a cut-off signal) and the connected power source is powered, the specific switching action is as follows. The first control signal s01 activates the start unit 300 to generate the driving voltage V4 so that the discharge unit 240 is turned on, and the second control signal s02 activates the relay 230 to enter the cut-off procedure. At this time, the transmission voltage V0 is transmitted to the second contact 220 via the discharge unit 240. After the cut-off procedure of the relay 230 is completed, the first control signal s01 causes the start unit 300 to stop generating the driving voltage V4, so that the discharge unit 240 is cut off. When the power management circuit 200 needs to be cut off and the connected power source is powered, it means that the user or operator wants to temporarily or permanently stop using the currently connected power source. Such conditions include, but are not limited to: (1) the connected power source has a non-power-off abnormality (such as overvoltage, undervoltage or voltage drop); (2) it is necessary to switch to another power source (such as the connected power source is a backup power source and the main power source has resumed normal power supply; or it is necessary to switch to another backup power source); or (3) the connected power source needs to be maintained or inspected. At this time, the power supply 100 can select the backup power source (such as the second power source 820) as the voltage input source of the subsequent stage according to the setting of the power conversion unit 150.

[0094] Please also refer to Figure 1 , Figure 2 and Figure 6 The following instructions are based on Figure 6Take the exemplary scenario of as an example. The first power supply 810 interrupts the power supply at time T0, so the first power supply voltage V1 drops to 0. At this time, the control circuit 151 sends a control signal s0 indicating cutoff (the first control signal s11 of the first power supply line and the second control signal s12 of the first power supply line) to the power supply management circuit 200 of the first power supply line 110. Since the first power supply voltage V1 has dropped to 0 at time T0, the first control signal s11 of the first power supply line will not turn on the discharge unit 240 of the first power supply line 110. The relay 230 of the first power supply line 110 enters the cutoff procedure in response to the second control signal s12 of the first power supply line indicating cutoff. At time T1, the cutoff procedure of the relay 230 of the first power supply line 110 is completed.

[0095] At time T2, the control circuit 151 sends a control signal s0 indicating conduction (a first control signal s21 for the second power supply line and a second control signal s22 for the second power supply line) to the power supply management circuit 200 of the second power supply line 120. The first control signal s21 for the second power supply line turns on the discharge unit 240 of the second power supply line 120. The relay 230 of the second power supply line 120 enters the conduction procedure in response to the second control signal s22 for the second power supply line indicating conduction. After the conduction procedure of the relay 230 of the second power supply line 120 is completed for a period of time (for example, after the conduction of the relay 230 is stable), the first control signal s21 for the second power supply line turns off the discharge unit 240 of the second power supply line 120. Therefore, the second power supply voltage V2 is transmitted to the subsequent stage through the second power supply line 120. In this way, the system is powered by the second power supply 820 instead.

[0096] At time T3, the first power source 810 resumes normal power supply, so the control circuit 151 sends a control signal s0 indicating cutoff to the power management circuit 200 of the second power supply circuit 120. The second power supply circuit first control signal s21 turns on the discharge unit 240 of the second power supply circuit 120. The relay 230 of the second power supply circuit 120 enters the cutoff procedure in response to the second power supply circuit second control signal s22 indicating cutoff. After the relay 230 of the second power supply circuit 120 completes the cutoff procedure at time T4, the second power supply circuit first control signal s21 simultaneously turns off the discharge unit 240 of the second power supply circuit 120.

[0097] At time T5, the control circuit 151 sends a control signal s0 indicating conduction to the power supply management circuit 200 of the first power supply line 110. The first control signal s11 of the first power supply line turns on the discharge unit 240 of the first power supply line 110. The relay 230 of the first power supply line 110 enters the conduction procedure in response to the second control signal s12 of the first power supply line indicating conduction. After the conduction procedure of the relay 230 of the first power supply line 110 is completed for a period of time (for example, after the conduction of the relay 230 is stable), the first control signal s11 of the first power supply line turns off the discharge unit 240 of the first power supply line 110. Therefore, the first power supply voltage V1 is transmitted to the subsequent stage through the first power supply line 110. In this way, the system is restored to be powered by the first power supply 810.

[0098] Please also refer to Figure 1 , Figure 2 and Figure 7 . Figure 7 Example scenarios and Figure 6 The difference is that the first power supply 810 does not interrupt the power supply, but the aforementioned situation of temporarily or permanently stopping the use of the currently connected power supply occurs. Therefore, in this exemplary scenario, the difference in the control of the power supply management circuit 200 is only in the interval from time T0 to time T1. At time T0, the control circuit 151 sends a control signal s0 indicating cutoff to the power supply management circuit 200 of the first power supply line 110. The first control signal s11 of the first power supply line turns on the discharge unit 240 of the first power supply line 110. The relay 230 of the first power supply line 110 enters the cutoff procedure in response to the second control signal s12 of the first power supply line indicating cutoff. After the turn-on procedure of the relay 230 of the first power supply line 110 is completed (time T1), the first control signal s11 of the first power supply line turns off the discharge unit 240 of the first power supply line 110. In this way, the first power supply voltage V1 is no longer transmitted to the subsequent stage through the first power supply line 110. The control method of the subsequent time is the same as Figure 6 The control method of the exemplary scenario is the same as that of the exemplary scenario, so that the second power source 820 is used for power supply for a period of time, and then the first power source 810 is restored for power supply.

[0099] In summary, the power supply management circuit and power supply proposed in the present invention use the discharge element as an auxiliary switch with high speed and high voltage and large current starting and breaking capabilities. Compared with the channel of the semiconductor switch, the discharge element can withstand stronger pulse current and avalanche energy tolerance to overcome the problem of the semiconductor switch element as a relay auxiliary switch. In this way, the power supply management circuit has the ability to quickly switch the power supply, reduce the capacity requirement of the energy storage capacitor behind, and the service life of the relay contact can be extended.

Claims

1. A power supply management circuit, characterized in that: Include: a first contact configured to receive a transmission voltage; a second contact configured to output the transmission voltage; a relay coupled between the first contact and the second contact; a discharge unit coupled between the first contact and the second contact and coupled in parallel to the relay; and A start-up unit is coupled to the discharge unit; wherein, When the power supply management circuit receives a control signal, the discharge unit is turned on or off, and the relay enters a switching procedure, and the switching procedure includes a turning-on procedure and a turning-off procedure; and When the control signal is a conduction signal, the start-up unit generates a driving voltage to turn on the discharge unit, the relay enters the conduction procedure, and the transmission voltage is transmitted to the second contact via the discharge unit; after the conduction procedure is completed, the start-up unit stops generating the driving voltage to turn off the discharge unit, and the transmission voltage is transmitted to the second contact via the relay.

2. The power supply management circuit according to claim 1, characterized in that: The control signal includes a first control signal and a second control signal; when the control signal is the conduction signal, the first control signal activates the start unit to generate the driving voltage so that the discharge unit is turned on, and the second control signal activates the relay to enter the conduction procedure, and the transmission voltage is transmitted to the second contact via the discharge unit; after the conduction procedure is completed, the first control signal causes the start unit to stop generating the driving voltage, so that the discharge unit is turned off, and the transmission voltage is transmitted to the second contact via the relay.

3. The power supply management circuit according to claim 1, characterized in that: The control signal includes a first control signal and a second control signal; when the control signal is a cut-off signal, the first control signal activates the start-up unit to generate the driving voltage so that the discharge unit is turned on, and the second control signal activates the relay to enter the cut-off procedure; after the cut-off procedure is completed, the first control signal causes the start-up unit to stop generating the driving voltage so that the discharge unit is cut off.

4. The power supply management circuit according to claim 1, characterized in that: The control signal includes a first control signal and a second control signal; when the control signal is a cut-off signal, the first control signal does not actuate the start-up unit to generate the driving voltage, and the second control signal actuates the relay to enter the cut-off procedure.

5. The power supply management circuit according to claim 1, characterized in that: The discharge unit includes a first end, a second end and a third end. The relay is coupled in parallel to the first end and the second end of the discharge unit.

6. The power supply management circuit according to claim 5, characterized in that: The startup unit includes a driving end, a first output end and a second output end. The first output end and the second output end are respectively coupled to the first end and the third end of the discharge unit. The startup unit receives the control signal through the driving end to drive the discharge unit to be turned on or off.

7. The power supply management circuit according to claim 6, characterized in that: The time from when the start-up unit generates the driving voltage to when the discharge unit is turned on or off is shorter than the switching process execution time of the relay.

8. The power supply management circuit according to claim 6, characterized in that: The startup unit also contains: A transformer comprising a primary winding and a secondary winding; and A driving group is coupled to the primary winding, wherein the driving group comprises: a control unit configured to receive the control signal and issue a driving signal according to the control signal; a switch coupled to the control unit and the primary winding of the transformer and configured to be turned on or off according to the driving signal; and a current feedback circuit coupled to the switch and the control unit and configured to detect a current flowing through the switch and feed back a current detection signal to the control unit; The transformer generates the driving voltage through the secondary winding according to all switching actions of the switching switch.

9. The power supply management circuit according to claim 8, characterized in that: After the discharge unit is turned on, the control unit reduces an output duty cycle of the control unit under the condition that the discharge unit is allowed to remain turned on.

10. The power supply management circuit according to claim 6, characterized in that: The startup unit also contains: a coil coupled in parallel to the first end and the third end of the discharge unit; and A drive group, including: a control unit configured to receive the control signal and issue a driving signal according to the control signal; and A control group includes an independent power supply, a sensing unit and a switching switch, wherein the independent power supply is coupled in series to the sensing unit, the sensing unit is coupled in series to the switching switch, the switching switch is coupled to the control unit, the control group is coupled in parallel to the first end and the third end of the discharge unit, the switching switch is configured to be turned on or off according to the driving signal, and the coil generates the driving voltage according to all switching actions of the switching switch.

11. The power supply management circuit according to claim 10, characterized in that: After the discharge unit is turned on, the control unit reduces an output duty cycle of the control unit under the condition that the discharge unit is allowed to remain turned on.

12. A power supply, characterized in that: Include: A first power supply circuit, coupled to a first power source, comprises: a first live wire, comprising the power management circuit as claimed in claim 1; and a first ground line, comprising the power management circuit as claimed in claim 1; A second power supply circuit, coupled to a second power source, comprises: A second live wire, comprising the power management circuit as claimed in claim 1, wherein the second live wire is coupled to the first live wire, and a live wire contact point is provided at the coupling point between the second live wire and the first live wire; and a second ground line, comprising the power management circuit as claimed in claim 1, wherein the second ground line is coupled to the first ground line, and a ground line contact is formed at the coupling point between the second ground line and the first ground line; and A power conversion unit is coupled to the live wire contact and the ground wire contact.

13. The power supply as claimed in claim 12, wherein: The power conversion unit includes a control circuit, which is configured to detect the power supply status of the first power supply and the second power supply. When the first power supply is interrupted or the power supply is abnormal, the control circuit provides a cut-off signal to the power supply management circuit of the first live wire and the power supply management circuit of the first ground wire to activate the relay of the first live wire and the relay of the first ground wire to interrupt the connection between the first power supply and the power conversion unit, and provides the conduction signal to the power supply management circuit of the second live wire and the relay of the second ground wire to activate the relay of the second live wire and the relay of the second ground wire to establish the connection between the second power supply and the power conversion unit.

14. The power supply device as claimed in claim 13, wherein: The time from when the start-up unit generates the driving voltage to when the discharge unit is turned on or off is shorter than the switching process execution time of the relay.