Beverage preparation machine and beverage brewing process control method and device thereof
By using the state change information of the flow meter in the beverage preparation machine to determine the pressure maintenance stage, and combining it with PID control, the problem of inaccurate beverage dispensing in the beverage preparation machine is solved, and more accurate beverage dispensing control is achieved.
Patent Information
- Application Number
- CN202310591469.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-23
- Publication Date
- 2024-11-26
AI Technical Summary
Existing beverage preparation machines, such as coffee machines, do not accurately dispense beverages during the brewing process, resulting in a significant discrepancy between the actual output and the set output.
By installing flow meters in the water supply pipeline, the status change information of the flow meters is used to determine whether the brewing unit has entered the pressure maintenance stage, and the amount of beverage is started to be measured in this stage. Combined with PID control to adjust the water supply, the accuracy of the beverage output is ensured.
This improves the accuracy of beverage output from the beverage preparation machine, avoids the impact of the filling and pressurization stages on the beverage output, and achieves more precise beverage quantity control.
Smart Images

Figure CN119014711A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of small household appliances, and in particular relates to a beverage preparation machine and a beverage brewing process control method and device thereof. Background Art
[0002] In order to meet the requirements of automatic heating, brewing, adding water to the coffee machine, and washing the coffee machine, a fully automatic coffee machine was designed. A fully automatic coffee machine can make a cup of coffee by simply pressing the start button, realizing the automation of the entire process from grinding coffee beans to brewing coffee with hot water.
[0003] At present, when a fully automatic coffee machine starts brewing coffee, as long as the start button is pressed, the water pump is started and the flow meter starts counting at the same time. Then the flow meter stops after reaching the set number of revolutions, and the amount of coffee dispensed is the set amount of coffee. The deviation between the actual amount of coffee dispensed and the set amount of coffee is large. Therefore, the current beverage preparation machines (such as coffee machines, soybean milk machines, etc.) do not accurately dispense beverages. Summary of the invention
[0004] The embodiment of the present invention provides a beverage preparation machine and a beverage brewing process control method and device thereof, which at least to a certain extent solve the technical problem of inaccurate beverage output by the beverage preparation machine.
[0005] In a first aspect, an embodiment of the present invention provides a beverage brewing process control method, which is applied to a beverage preparation machine, wherein the brewing unit of the beverage preparation machine includes a boosting element for generating pressure in the brewing unit during the beverage brewing process, and a flow meter is provided in a pipeline for supplying water to the brewing unit. The method includes: supplying water to the brewing unit in response to a start signal of a current beverage brewing, and obtaining state change information of the flow meter, wherein the state change information is used to characterize a speed change trend of the flow meter during the current beverage brewing process; when it is determined according to the state change information that the brewing unit enters a pressure maintenance stage, triggering the start of metering of a beverage output of the current beverage brewing; and when the measured beverage output reaches a target beverage output, stopping the supply of water to the brewing unit.
[0006] In combination with the first aspect, in some embodiments, the method further includes: if the state change information indicates that the rotation speed of the flow meter is at an inflection point of changing from a decreasing rotation speed to an increasing rotation speed, determining that the brewing unit enters a pressure maintenance stage.
[0007] In combination with the first aspect, in some embodiments, obtaining the state change information of the flow meter includes: in response to the start signal of the current beverage brewing, obtaining the speed characterization parameters of the flow meter according to a preset period; each time the speed characterization parameters of the flow meter are obtained, comparing the speed characterization parameters currently obtained with the speed characterization parameters obtained last time, to determine the state change information of the flow meter during the current beverage brewing process.
[0008] In combination with the first aspect, in some embodiments, the speed characterization parameter is the time parameter for the flow meter to make one revolution, and the method further includes: if the state change information satisfies that the time parameter for the flow meter to make one revolution currently obtained is not greater than the difference between the time parameter for the flow meter to make one revolution last obtained and a preset correction constant, and the time parameter for the flow meter to make one revolution last obtained is not less than the sum of the preset correction constant and the time parameter for the flow meter to make one revolution last obtained, it is determined that the speed of the flow meter is at an inflection point of change from a decreasing speed to an increasing speed.
[0009] In combination with the first aspect, in some embodiments, the speed characterization parameters of the flow meter are obtained according to a preset period, including: in each period, the speed of the flow meter or the time value of one revolution is sampled according to a preset sampling interval, and correspondingly n time values or n speed values are obtained in the current period; the average of the n time values or n speed values in the current period is calculated to obtain the speed characterization parameters of the flow meter in the current period.
[0010] In combination with the first aspect, in some embodiments, the trigger starts measuring the amount of beverage output from the current beverage brewing, including: triggering the start of counting the number of revolutions of the flow meter; when the number of revolutions of the flow meter reaches the target number of revolutions, determining that the measured amount of beverage output reaches the target amount of beverage.
[0011] In combination with the first aspect, in some embodiments, the method further includes: when it is determined that the brewing unit enters the boosting stage according to the state change information, obtaining the brewing duration before the brewing unit enters the boosting stage; and determining the solid material containment state in the brewing unit according to the brewing duration.
[0012] In combination with the first aspect, in some embodiments, determining the solid material content status in the brewing unit based on the brewing duration includes: if the brewing duration is less than a preset time threshold, determining that solid material is contained in the brewing unit; if the brewing duration is not less than the preset time threshold, determining that the brewing unit is in an empty warehouse state.
[0013] In combination with the first aspect, in some embodiments, determining the solid material holding state in the brewing unit according to the brewing duration includes: comparing the brewing duration with a plurality of pre-constructed brewing time intervals, determining the brewing time interval in which the brewing duration is located, wherein each brewing time interval corresponds to a solid material remaining parameter; determining the solid material remaining in the brewing unit according to the brewing time interval in which the brewing duration is located.
[0014] In a second aspect, an embodiment of the present invention provides a beverage brewing process control device, which is applied to a beverage preparation machine, wherein the brewing unit of the beverage preparation machine includes a boosting element for generating pressure in the brewing unit during the beverage brewing process, and a flow meter is provided in a pipeline for supplying water to the brewing unit. The beverage brewing process control device includes: an information acquisition unit, which is used to supply water to the brewing unit in response to a start signal of a current beverage brewing, and to acquire state change information of the flow meter, wherein the state change information is used to characterize a speed change trend of the flow meter during the current beverage brewing process; a metering trigger unit, which is used to trigger the start of metering of the beverage output of the current beverage brewing when determining that the brewing unit enters a pressure maintenance stage according to the state change information; and a stop control unit, which is used to stop supplying water to the brewing unit when the measured beverage output reaches a target beverage amount.
[0015] In a third aspect, an embodiment of the present invention provides a beverage preparation machine, comprising: a brewing unit, for brewing beverages using solid materials, a boosting element being provided at an outlet of the brewing unit, the boosting element being used to generate pressure in the brewing unit during the beverage brewing process; a water supply unit, a water supply pipeline of the water supply unit being provided with a flow meter, the water supply unit being used to supply water to the brewing unit during the beverage brewing process of the brewing unit; a controller, the controller comprising: one or more processors and one or more memories, the one or more memories storing at least one program code, the at least one program code being loaded and executed by the one or more processors to implement any one of the methods described in claims 1-9.
[0016] In conjunction with the third aspect, in some embodiments, the beverage preparation machine is a coffee machine.
[0017] One or more technical solutions provided by the embodiment of the present invention have at least the following technical effects or advantages: the embodiment of the present invention is applicable to a beverage preparation machine in which the brewing unit includes a boosting element for generating pressure in the brewing unit during the beverage brewing process, and a flowmeter is provided in the water supply pipeline. Since the boosting element causes the brewing unit to generate pressure during the beverage brewing process, it is turned on when the pressure reaches the upper limit pressure of the boosting element, and the pressure is maintained stable. The embodiment of the present invention utilizes the flowmeter provided in the pipeline for supplying water to the brewing unit, and determines whether the brewing unit enters the pressure maintenance stage according to the state change information of the flowmeter during the current beverage brewing process; when it is determined that the brewing unit enters the pressure maintenance stage, it triggers the start of measuring the output of the current beverage brewing; when the measured output reaches the target beverage amount, the water supply to the brewing unit is stopped. In this way, the influence of the filling stage and the boosting stage on the output of the beverage is avoided, the output of the beverage can be measured more accurately, and the accuracy of the output of the beverage is improved, and no additional detection element is required, and it can be achieved by using the flowmeter of the original water supply pipeline. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0019] Figure 1 shows a partial structure of a beverage preparation machine in an embodiment of the present invention;
[0020] Figure 2 The flow chart of the beverage brewing process control method in the embodiment of the present invention is shown;
[0021] Figure 3 The figure shows the time variation of the flow meter making one revolution during the beverage brewing process according to the embodiment of the present invention;
[0022] Figure 4 The functional modules of the beverage brewing process control device in the embodiment of the present invention are shown;
[0023] Figure 5 Shows Figure 1 The structure of a controller in a beverage preparation machine. DETAILED DESCRIPTION
[0024] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is only a part of the embodiment of the present invention, not all the embodiments. Based on the embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] The embodiment of the present invention provides a beverage preparation machine, which can be a product such as a coffee machine, a soybean milk machine, etc. that requires water supply and generates a certain pressure during the brewing process. Figure 1 As shown, the beverage preparation machine includes a water supply unit 10, a brewing unit 20 and a controller 30. The brewing unit 20 includes a pressure-boosting element 220 for generating pressure in the brewing unit 20 during the beverage brewing process. For example, the brewing unit 20 may include a brewing chamber 210, which is used to squeeze the powder solid material (such as coffee powder) that falls into it up and down by movement to form a powder cake, and the brewing chamber 210 is provided with a water inlet and a water outlet, and the other positions of the brewing chamber 210 are sealed, and the water outlet of the brewing chamber 210 is provided with a back pressure valve, which serves as a pressure-boosting element 220 for generating pressure in the brewing unit 20 during the beverage brewing process.
[0026] The water supply unit 10 is used to provide the brewing unit 20 with water required for the current beverage brewing process during the beverage brewing process. The water supply unit 10 at least includes a water source 110, a water supply pipeline connected between the water source 110 and the water inlet of the brewing chamber 210, and a flow meter 120 and a water pump 130 are arranged on the water supply pipeline. The flow meter 120 and the water pump 130 are both electrically connected to the controller 30, and the controller 30 controls the water pump 130 to pump water from the water source 110 to the brewing chamber 210.
[0027] The controller 30 controls the water pump 130 to pump water from the water source 110 to the brewing chamber 210: the water pump 130 works according to the power given by the controller 30, and the flow meter 120 rotates during the pumping process of the water pump 130. Each time the flow meter 120 rotates one circle, a pulse signal is generated, and the generated pulse signal is transmitted to the controller 30 through the circuit board. The controller 30 calculates the time T1 for the flow meter 120 to rotate one circle based on the pulse signal fed back by the flow meter 120, and uses PID (proportional-integral-derivative control) control and the calculated time T1 for the flow meter 120 to rotate one circle to perform closed-loop control of the power of the water pump 130, so that the flow rate of water supplied to the brewing unit 20 is stabilized at the set value.
[0028] The embodiment of the present invention provides a beverage brewing process control method, which can be applied to Figure 1 Beverage preparation machine shown. Figure 2 As shown, the beverage brewing process control method provided by the embodiment of the present invention includes the following steps:
[0029] S101: In response to a start signal of the current beverage brewing, water is supplied to the brewing unit 20, and state change information of the flow meter 120 is obtained, where the state change information is used to characterize a rotation speed change trend of the flow meter 120 during the current beverage brewing process.
[0030] It is understandable that the start signal of the current beverage brewing may be generated based on the user's operation of the start button. In response to the start signal of the current beverage brewing, the controller 30 controls the water pump 130 to start, so that the water pump 130 pumps water from the water source 110 to the brewing unit 20. The start signal of the current beverage brewing also triggers the start of obtaining the state change information of the flow meter 120.
[0031] It should be noted that the flow meter 120 in the embodiment of the present invention is of a type that needs to convert the water supply flow rate into a rotation speed for flow detection, such as a turbine flow meter or a rotary flow meter. In the specific implementation process, the state change information can be the change in time for the flow meter 120 to rotate one circle, or it can be directly the change in the rotation speed of the flow meter 120.
[0032] It should be noted that the reference Figure 3 As shown, from the start of brewing, the brewing unit 20 of the beverage preparation machine will go through the filling stage, the pressure-increasing stage and the pressure-maintaining stage in sequence. It should be explained that the filling stage refers to the stage of supplying water to the brewing unit 20 and filling the air in the brewing unit 20 (including the brewing chamber 220 and its pipeline). Since the pressure-increasing element 220 has not yet taken effect during the filling process, the pressure in the brewing unit 20 will not rise. The pressure-increasing stage refers to the stage in which the pressure in the brewing unit 20 is in a continuously rising state due to the action of the pressure-increasing element 220 after the filling is completed, and the pressure-maintaining stage is the stage in which the pressure in the brewing unit 20 is turned on when the pressure in the brewing unit 20 reaches the upper limit pressure of the pressure-increasing element 220, and the pressure in the brewing unit 20 is maintained stable.
[0033] In response to the start signal of the current beverage brewing, the first phase is the filling phase: the water supply unit 10 starts to supply water to the brewing unit 20, filling the air in the brewing unit 20 (including the brewing chamber 220 and its pipeline). The controller 30 calculates the time (or speed) for the flow meter 120 to rotate one circle according to the pulse signal fed back by the flow meter 120, and PID adjusts the power of the water pump 130 according to the calculated time (or speed) for the flow meter 120 to rotate one circle, so that the flow of the flow meter 120 is stable at the set value. At this time, the time for the flow meter 120 to rotate one circle is T2. After the filling is completed, under the boosting effect of the boosting element 220, the brewing unit 20 will enter the boosting phase: the pressure in the brewing chamber 220 of the brewing unit 20 will increase, and the pressure increase will force the flow of the water supply to slow down, the speed of the flow meter 120 to slow down, and the time for the flow meter 120 to rotate one circle will gradually increase to T3 (T3>T2). When the pressure in the brewing chamber 210 reaches the upper pressure limit of the boosting element 220, the pressure in the brewing unit 20 stops rising, so that the pressure in the brewing unit 20 remains stable and enters the pressure maintenance stage. In the pressure maintenance stage: as the PID control adjusts, the flow rate of water supplied to the brewing unit 20 returns to the set value, and the time for the flow meter 120 to rotate once is gradually shortened from T3 to T2. Therefore, if Figure 3 As shown: from the beginning of brewing, the time for the flow meter 120 to rotate once will be maintained at T2 for a period of time due to PID control, and then it will gradually increase from T2 to T3 due to pressure, and after the pressure stabilizes, it will be shortened from T3 to T2 due to PID control. Therefore, when entering the pressure maintenance stage, it is the time point when the speed of the flow meter 120 changes from an increasing state to a decreasing state. At this time, the time for the flow meter 120 to rotate once reaches the maximum value, and this time point can be used as the time point when the brewing unit 20 enters the pressure maintenance stage.
[0034] It can be understood that in order to obtain the state change information of the flow meter 120 during the current brewing process, the speed characterization parameters of the flow meter 120 are obtained according to a preset period in response to the start signal of the current beverage brewing; each time the speed characterization parameters of the flow meter 120 are obtained, the speed characterization parameters currently obtained are compared with the speed characterization parameters obtained last time to determine the state change information of the flow meter 120 during the current beverage brewing process.
[0035] Specifically, the speed characterization parameter may be the speed of the flow meter 120 or the time parameter for one revolution of the flow meter 120. Each time the speed characterization parameter of the flow meter 120 is obtained, the following steps are triggered: the speed characterization parameter currently obtained is compared with the speed characterization parameter obtained last time to determine whether the speed of the flow meter 120 has changed or whether the time for one revolution of the flow meter 120 has changed, thereby determining the state change information of the flow meter 120 in the current beverage brewing process.
[0036] Since the rotational speed of the flow meter 120 fluctuates, in order to improve the accuracy of the rotational speed characterization parameters, the rotational speed characterization parameters obtained each time are the average values of multiple consecutive sampling values: in response to the start signal of the current beverage brewing, the rotational speed of the flow meter 120 or the time value of one revolution is sampled according to the preset sampling interval, and correspondingly n time values or rotational speed values in the current cycle are obtained. The n time values or n rotational speed values sampled in the current cycle are averaged to obtain the rotational speed characterization parameters of the flow meter 120 in the current cycle, where n is an integer greater than 1.
[0037] S102: When it is determined according to the state change information that the brewing unit 20 has entered the pressure maintenance stage, a trigger is provided to start measuring the output amount of the current beverage brewing.
[0038] It can be understood that if the state change information indicates that the rotation speed of the flow meter 120 is at an inflection point from a decreasing rotation speed to an increasing rotation speed, it is determined that the brewing unit 20 enters the pressure maintenance stage.
[0039] If the speed characterizing parameter is the time parameter for one revolution of the flow meter 120, then if the state change information satisfies that the time parameter for one revolution of the flow meter 120 currently obtained is not greater than the difference between the time parameter for one revolution of the flow meter 120 last obtained and a preset correction constant, and the time parameter for one revolution of the flow meter 120 last obtained is not less than the sum of the time parameter for one revolution of the flow meter 120 last obtained and the preset correction constant, it indicates that the speed of the flow meter 120 is at the inflection point of the change from a decreasing speed to an increasing speed, and further, it can be determined that the brewing unit 20 enters the pressure maintenance stage.
[0040] Because the rotation speed of the flow meter 120 fluctuates, in order to improve accuracy, a correction constant can be set to more accurately determine whether the rotation speed of the flow meter 120 is at an inflection point of changing from a decreasing speed to an increasing speed: if the state change information satisfies that the time parameter for one revolution of the flow meter 120 currently obtained is not greater than the difference between the time parameter for one revolution of the flow meter 120 obtained last time and a preset correction constant, and the time parameter for one revolution of the flow meter 120 obtained last time is not less than the sum of the preset correction constant and the time parameter for one revolution of the flow meter 120 obtained last time, it is determined that the rotation speed of the flow meter 120 is at an inflection point of changing from a decreasing speed to an increasing speed, and further, it can be determined that the brewing unit 20 enters the pressure maintenance stage.
[0041] refer to Figure 3 As shown, the time parameter for one revolution of the flow meter 120 obtained last time is represented as M1, the time parameter for one revolution of the flow meter 120 obtained last time is represented as M2, and the preset correction constant is represented as α for example: if M1+α<=M2 is satisfied, it indicates that the brewing unit 20 is in the pressure boost stage; if M2<=M1-α is satisfied after the time parameter for one revolution of the flow meter 120 is collected next time, it indicates that the speed of the flow meter 120 has an inflection point from a decreasing speed to an increasing speed, indicating that the brewing unit 20 has entered the pressure maintenance stage.
[0042] According to the above implementation principle, it can be known that when the speed characterization parameter is the speed of the flow meter 120, how to accurately judge whether the speed of the flow meter 120 is at the inflection point of changing from a decreasing speed to an increasing speed, and then accurately judge whether the brewing unit 20 has entered the pressure maintenance stage. For the sake of brevity of the specification, it will not be repeated again.
[0043] In step S102, triggering the start of measuring the amount of beverage produced in the current beverage brewing may include triggering the start of counting the number of revolutions of the flow meter 120; when the number of revolutions counted for the flow meter 120 reaches the target number of revolutions, determining that the amount of beverage produced reaches the target amount of beverage. It should be noted that the target amount of beverage may be an amount set by the user for the current beverage brewing, or may be a fixed value used for each beverage brewing.
[0044] S103 : When the measured beverage output volume reaches the target beverage volume, stop supplying water to the brewing unit 20 .
[0045] When the measured beverage output reaches the target beverage output, the water pump 130 is controlled to stop, and the water supply unit 10 stops supplying water to the brewing unit 20, and the beverage outlet no longer continues to output beverage.
[0046] Since the revolutions of the flow meter 120 are counted only when the pressure maintenance stage is entered, it is avoided that the revolutions of the flow meter 120 in the filling stage and the pressure boosting stage are counted into the beverage output. In fact, although the flow meter 120 is rotating in the filling stage and the pressure boosting stage, no beverage is discharged from the beverage outlet. In addition, the filling amount of water will be different due to different structural pipelines in the filling stage, and the counting of the flow meter 120 will be unstable in the pressure boosting stage. Therefore, counting the revolutions of the flow meter 120 in the filling stage and the pressure boosting stage into the beverage output will result in a large flow deviation. The embodiment of the present invention uses the original flow meter 120 to determine the time point of entering the pressure maintenance stage without adding hardware, so as to accurately start measuring the beverage output, thereby improving the accuracy of the beverage output.
[0047] It is understandable that after step S101, the following steps S104 to S105 may also be included:
[0048] S104. When it is determined according to the state change information that the brewing unit 20 enters the pressure boosting stage, the brewing duration before the brewing unit 20 enters the pressure boosting stage is obtained.
[0049] It can be understood that the rotation speed characterization information is used as the time parameter for the flow meter 120 to make one revolution. If the state change information satisfies that the time parameter of the flow meter 120 obtained currently is greater than the time parameter of the flow meter 120 obtained last time, indicating that the time for the flow meter 120 to make one revolution becomes longer, it is determined that the brewing unit 20 enters the boost stage.
[0050] Because the speed of the flow meter 120 fluctuates, in order to improve accuracy, a correction constant can be set to more accurately determine whether the brewing unit 20 enters the boost stage. Therefore, determining whether the brewing unit 20 enters the boost stage according to the state change information of the flow meter 120 may include: if the first speed change characterizing information indicates that the time parameter of the flow meter 120 currently obtained is greater than the sum of the time parameter of the flow meter 120 obtained last time and the preset correction constant, it indicates that the speed of the flow meter 120 is in a deceleration state, and it is determined that the brewing unit 20 enters the boost stage; if the state change information indicates that the time parameter of the flow meter 120 for one revolution currently obtained is not greater than the sum of the preset correction constant and the time parameter of the flow meter 120 obtained last time, and is not less than the difference between the time parameter of the flow meter 120 obtained last time and the preset correction constant, it indicates that the speed of the flow meter 120 is in a stable state, and it is determined that the brewing unit 20 has not entered the boost stage, but is still in the filling stage.
[0051] Based on the above implementation principle, it can be known that if the speed characterization parameter is the speed of the flow meter 120, how to accurately judge the time point when the speed of the flow meter 120 changes from stable speed to decreasing speed, and then accurately judge the time point when the brewing unit 20 enters the boost stage. For the sake of brevity of the specification, it will not be repeated again.
[0052] It is understandable that obtaining the brewing duration before the brewing unit 20 enters the boosting stage in step S104 may include: in response to the start signal of the current beverage brewing, starting the timer to count the brewing time of the current beverage brewing; when it is determined that the brewing unit 20 enters the boosting stage according to the state change information of the flow meter 120, obtaining the current timing duration of the timer; and using the current timing duration of the timer as the brewing duration of the brewing unit 20. It should be noted that, referring to Figure 3 As shown, the brewing duration is the time elapsed from the start of brewing to the time before the brewing unit 20 enters the pressure boosting stage during the current beverage brewing process, that is, the time the brewing unit 20 is in the filling stage.
[0053] S105. Determine the solid material holding state in the brewing unit 20 according to the brewing duration.
[0054] It is understandable that the determination of the solid material containing state of the brewing unit 20 through step S105 may be to determine only the two containing states of the presence or absence of solid material in the brewing unit 20. If the brewing duration is less than the preset time threshold, it is determined that the brewing unit 20 contains solid material; if the brewing timing duration is not less than the preset time threshold, it is determined that there is no solid material in the brewing unit 20, that is, it is in an empty state.
[0055] It should be noted that the preset time threshold is determined in advance: when the brewing unit 20 is in an empty state, the beverage preparation machine is controlled to perform an empty chamber test process; the first test change information of the flow meter 120 during the empty chamber test process is obtained, and when it is determined that the brewing unit 20 enters the boosting stage according to the first test change information, the first brewing time of the brewing unit 20 is obtained as the preset time threshold. Specifically, the first brewing time represents the time elapsed from the start of brewing to the time before the brewing unit 20 enters the boosting stage during the empty chamber test, that is, the time when the brewing unit 20 is in the filling stage when the brewing unit 20 is in an empty chamber state.
[0056] During the specific implementation process, in response to the trigger signal that controls the beverage preparation machine to execute the empty chamber test process, the timer is started for timing; when it is determined according to the first test change information that the brewing unit 20 enters the boost stage during the empty chamber test, the current timing duration of the timer is obtained as the preset time threshold.
[0057] For example, after the empty chamber test process, the preset time threshold is 15 seconds. If the brewing duration is less than 15 seconds, it is determined that there is solid material in the brewing unit 20; if the brewing duration is not less than 15 seconds, it is determined that there is no solid material in the brewing unit 20 and it is in an empty chamber state.
[0058] More precisely, determining the solid material holding state in the brewing unit 20 through step S105 may also be: determining the solid material remaining amount in the brewing unit 20. Comparing the brewing duration with a plurality of pre-constructed brewing time intervals to determine the brewing time interval in which the brewing duration is located, wherein each brewing time interval corresponds to a solid material remaining amount parameter; determining the solid material remaining amount in the brewing unit 20 according to the brewing time interval in which the brewing duration is located.
[0059] It should be noted that the more brewing time intervals are pre-constructed, the more accurate the detection of the solid residue in the brewing unit 20 is when executing step S105. Three or more brewing time intervals can be pre-constructed, wherein each brewing time interval corresponds to a solid residue parameter one-to-one. Taking the case where three brewing time intervals are pre-constructed as an example, the solid residue parameters corresponding to the three brewing time intervals are: full warehouse state, half warehouse state, empty warehouse state. Taking the case where four brewing time intervals are pre-constructed as an example, the solid residue parameters corresponding to the four brewing time intervals are: full warehouse state, 2 / 3 warehouse state, 1 / 3 warehouse state, empty warehouse state. Taking the case where five brewing time intervals are pre-constructed as an example, the solid residue parameters corresponding to the five brewing time intervals are: full warehouse state, 3 / 4 warehouse state, 2 / 4 warehouse state, 1 / 4 warehouse state, empty warehouse state.
[0060] Take three pre-constructed brewing time intervals A, B, and C with increasing brewing time in sequence as an example: if the brewing duration is within interval A, the brewing unit 20 is determined to be in a full warehouse state; if the brewing duration is within interval B, the brewing unit 20 is determined to be in a 1 / 2 warehouse state; if the brewing duration is within interval C, the brewing unit 20 is determined to be in an empty warehouse state.
[0061] It is understandable that a plurality of brewing time intervals may be pre-constructed and written into the memory of the beverage preparation machine. The process of pre-constructing a plurality of brewing time intervals may include the following steps S201 to S203:
[0062] Step S201: When the brewing unit 20 is in an empty chamber state, control the beverage preparation machine to perform an empty chamber test process; obtain the first test change information of the flow meter 120 during the empty chamber test process; determine whether the brewing unit 20 enters the boost stage according to the first test change information, and when it is determined that the brewing unit 20 enters the boost stage according to the first test change information, obtain the first brewing time of the brewing unit 20.
[0063] The first test change information is used to characterize the speed change trend of the flow meter 120 during the empty chamber test. It can be understood that in response to the trigger signal for starting the empty chamber test process, the timer is started to count; according to the first test change information of the flow meter 120 during the empty chamber test process, it is determined whether the brewing unit 20 enters the boost stage, and when it is determined that the brewing unit 20 enters the boost stage according to the first test change information, the current timing duration of the timer is obtained as the first brewing duration.
[0064] Step S202: When the brewing unit 20 is in a full-warehouse state, control the beverage preparation machine to execute a full-warehouse test process, and obtain the second test change information of the flow meter 120 during the full-warehouse test process; determine whether the brewing unit 20 enters the boosting stage according to the second test change information, and when it is determined that the brewing unit 20 enters the boosting stage according to the second test change information, obtain the second brewing time of the brewing unit 20.
[0065] The second test change information is used to characterize the speed change trend of the flow meter 120 during the full-warehouse test. It can be understood that in response to the trigger signal for starting the full-warehouse test process, the timer is started for timing; according to the second test change information of the flow meter 120 during the full-warehouse test process, it is determined whether the brewing unit 20 enters the boost stage, and when it is determined that the brewing unit 20 enters the boost stage according to the second test change information, the current timing duration of the timer is obtained as the second brewing duration.
[0066] It should be noted that, in the full warehouse test process and the empty warehouse test process of steps S201 and S202, the specific implementation method adopted for determining whether the brewing unit 20 enters the pressure boosting stage according to the state change information of the flow meter 120 can refer to the specific implementation method of determining whether the brewing unit 20 enters the pressure maintenance stage in the current beverage brewing process in step S102: in the full warehouse test process (empty warehouse test process), the time parameters of the flow meter 120 are obtained according to a preset period; the time parameters obtained twice adjacently are compared to determine the state change information of the flow meter 120 in the full warehouse test process (empty warehouse test process). For more implementation details, please refer to the specific description of step S102 in the previous text. For the sake of brevity of the specification, they will not be repeated here.
[0067] Step S203: constructing a plurality of brewing time intervals according to the second brewing time and the first brewing time.
[0068] It can be understood that if the number of brewing time intervals to be constructed is M, where M is an integer greater than 2, step S203 may include the following steps S2031 to S2032:
[0069] Step S2031: According to the first brewing time and the second brewing time, determine the brewing time difference value representing the brewing unit 20 in different accommodation states. The difference between the first brewing time and the second brewing time can be directly used as the brewing time difference value. For example, taking the first brewing time as T2a and the second brewing time as T2b as an example, the difference between the first brewing time and the second brewing time is T2a-T2b.
[0070] Step S2032: Determine M-1 brewing time levels according to the second brewing time, the brewing time difference and the proportional constant corresponding to each brewing time level.
[0071] It should be noted that the proportional constant corresponding to each brewing time level in the M-1 brewing time levels is different, and the proportional constant of each brewing time level is set according to the number of brewing time intervals to be constructed. Specifically, the proportional constant corresponding to each brewing time level can be set to i / M, where i represents the i-th brewing time level in the M-1 brewing time levels.
[0072] Taking the example of three brewing time intervals with gradually increasing duration that need to be pre-built, it is necessary to set up two brewing time levels, and the proportional constant corresponding to one brewing time level is 1 / 3, and the proportional constant corresponding to the other brewing time level is 2 / 3. Taking the example of four brewing time intervals with gradually increasing duration that need to be pre-built, it is necessary to set up three brewing time levels, and the corresponding proportional constants are 1 / 4, 2 / 4, and 3 / 4, respectively. Taking the example of five brewing time intervals with gradually increasing duration that need to be pre-built, it is necessary to set up four brewing time levels, and the corresponding proportional constants are 1 / 5, 2 / 5, 3 / 5, and 4 / 5, respectively. And so on, no matter how many brewing time intervals need to be built, the proportional constant corresponding to each brewing time level can be determined.
[0073] By multiplying each proportional constant with the brewing time difference (T2a-T2b), M-1 product results are obtained; the M-1 product results are added to the second brewing time to obtain M-1 brewing time level:
[0074] T2b+i(T2a-T2b) / M, i is 1 to M-1
[0075] That is, the obtained M-1 brewing time levels are: T2b+(T2a-T2b) / M, T2b+2*(T2a-T2b) / M, T2b+3*(T2a-T2b) / M, T2b+4*(T2a-T2b) / M, ...
[0076] Step S2033: construct M brewing time intervals using M-1 brewing time levels as interval boundaries.
[0077] The M constructed brewing time intervals are in sequence: t < T2b + (T2a - T2b) / M, T2b + 1*(T2a - T2b) / M ≤ t ≤ T2b + 2*(T2a - T2b) / M, T2b + 2*(T2a - T2b) / M ≤ t ≤ T2a + 3*(T2a - T2b) / M, T2b + 3*(T2a - T2b) / M ≤ t ≤ T2b + 4*(T2a - T2b) / M, T2b + 4*(T2a - T2b) / M ≤ t ≤ T2b + 5*(T2a - T2b) / M, and so on. For the convenience of understanding, taking the construction of five brewing time intervals as an example, it is described with reference to Table 1 below:
[0078] Table 1.
[0079]
[0080]
[0081] Taking the pre-constructed 5 brewing time intervals as shown in Table 1 above as an example: If the brewing duration t satisfies t < T2b + (T2a - T2b) / 5, it is determined that the brewing unit 20 is in a full bin state; if the brewing duration t satisfies T2b + 1*(T2a - T2b) / 5 ≤ t ≤ T2b + 2*(T2a - T2b) / 5, it is determined that the brewing unit 20 is in a 3 / 4 bin state, that is, there is currently 3 / 4 of the powder amount remaining in the brewing unit 20; if the brewing duration t satisfies T2b + 2*(T2a - T2b) / 5 ≤ t ≤ T2b + 3*(T2a - T2b) / 5, it is determined that the brewing unit 20 is in a 2 / 4 bin state, that is, there is currently 2 / 4 of the powder amount remaining in the brewing unit 20; if the brewing duration t satisfies T2b + 3*(T2a - T2b) / 5 ≤ t ≤ T2b + 4*(T2a - T2b) / 5, it is determined that the brewing unit 20 is in a 1 / 4 bin state, that is, there is currently 1 / 4 of the powder amount remaining in the brewing unit 20; if the brewing duration t satisfies T > T2b + 4*(T2a - T2b) / 5, it is determined that the brewing unit 20 is in an empty bin state, that is, there is currently no solid material in the brewing unit 20.
[0082] To facilitate the understanding of the technical solution provided by the embodiments of the present invention, taking the beverage preparation machine as a coffee machine as an example below, the water supply unit 10 of the coffee machine sequentially includes a water tank, a flow meter 120, a water pump 130, and a heating plate for heating the water supply, which are sequentially connected through a water supply pipeline. The water outlet of the heating plate is connected to the water inlet of the brewing bin 210 of the brewing unit 20. A back pressure valve is provided at the water outlet of the brewing bin 210, and the coffee outlet is behind the back pressure valve. The control of the coffee brewing process of the coffee machine is described below:
[0083] First, the user operates the start button of the coffee machine to start brewing the current coffee, and the following multiple controls are triggered synchronously: 1. The water pump 130 is controlled to start, and the controller 30 controls the operating power of the water pump 130 to stabilize the flow rate at the set value; 2. The time for the flow meter 120 to rotate once every ΔT is recorded, and the record is continuously recorded n times and then the average value is calculated as the speed characterization parameter M2 obtained for the current time. 3. The timer is started to time the brewing;
[0084] Each time a speed characterization parameter M2 is obtained, it is compared with the speed characterization parameter M2 obtained last time:
[0085] Filling stage: M1-α<=M2<=M1+α;
[0086] Boost stage: M1+α<=M2;
[0087] Pressure maintenance stage: M2 <= M1-α;
[0088] When M1+α<=M2 is satisfied for the first time, it is determined that the filling stage is finished and the time point for entering the boost stage is obtained. The current timing duration of the timer is obtained, and the remaining coffee powder in the brewing chamber 210 is determined based on the current timing duration. When M2<=M1-α is satisfied for the first time, it is used as the starting point for calculating the amount of coffee, and the number of revolutions of the flow meter 120 is started to be counted. When the count reaches the set number of revolutions, the water pump 130 is controlled to stop, completing the current coffee brewing.
[0089] Based on the same inventive concept, an embodiment of the present invention provides a beverage brewing process control device, which is applied to a beverage preparation machine, referring to Figure 1 As shown, the brewing unit 20 of the beverage preparation machine includes a pressure-increasing element for generating pressure in the brewing unit 20 during the beverage brewing process, and a flow meter 120 is provided in the pipeline for supplying water to the brewing unit 20. Figure 4 As shown, the beverage brewing process control device includes: an information acquisition unit 401, which is used to supply water to the brewing unit 20 in response to the start signal of the current beverage brewing, and obtain the state change information of the flow meter 120, the state change information is used to characterize the rotation speed change trend of the flow meter 120 during the current beverage brewing process; a metering trigger unit 402, which is used to determine that the brewing unit 20 enters the pressure maintenance stage according to the state change information, and trigger the start of metering the beverage output of the current beverage brewing; a stop control unit 403, which is used to stop supplying water to the brewing unit 20 when the measured beverage output reaches the target beverage amount.
[0090] It is understandable that the beverage brewing process control device also includes: a stage judgment unit for determining that the brewing unit 20 enters the pressure maintenance stage if the state change information indicates that the rotation speed of the flow meter 120 is at an inflection point from a decreasing rotation speed to an increasing rotation speed.
[0091] It can be understood that the information acquisition unit 401 is specifically used to: respond to the start signal of the current beverage brewing, obtain the speed characterization parameters of the flow meter 120 according to a preset period; each time the speed characterization parameters of the flow meter 120 are obtained, compare the speed characterization parameters currently obtained with the speed characterization parameters obtained last time, and determine the state change information of the flow meter 120 during the current beverage brewing process.
[0092] It can be understood that the speed characterization parameter is the time parameter for the flow meter 120 to make one revolution, and the stage judgment unit is specifically used for: if the state change information satisfies that the time parameter for the flow meter 120 to make one revolution currently obtained is not greater than the difference between the time parameter for the flow meter 120 to make one revolution last obtained and the preset correction constant, and the time parameter for the flow meter 120 to make one revolution last obtained is not less than the sum of the preset correction constant and the time parameter for the flow meter 120 to make one revolution last obtained, it is determined that the speed of the flow meter 120 is at the inflection point of the change from a decreasing speed to an increasing speed.
[0093] It can be understood that the information acquisition unit 401 is specifically used to: within each cycle, sample the rotational speed or the time value of one revolution of the flow meter 120 according to a preset sampling interval, and obtain corresponding n time values or n rotational speed values within the current cycle; calculate the average of the n time values or n rotational speed values within the current cycle to obtain the rotational speed characterization parameters of the flow meter 120 in the current cycle.
[0094] It can be understood that the metering trigger unit 402 is specifically used to: trigger the start of counting the number of revolutions of the flow meter 120; and when the number of revolutions counted by the flow meter 120 reaches a target number of revolutions, determine that the metered output beverage volume reaches the target beverage volume.
[0095] It can be understood that the beverage brewing process control device also includes: a duration determination unit, which is used to obtain the brewing duration before the brewing unit 20 enters the boost stage when it is determined that the brewing unit 20 enters the boost stage based on the state change information; a state determination unit, which is used to determine the solid material containment state in the brewing unit 20 based on the brewing duration.
[0096] It can be understood that the state determination unit is specifically used to: if the brewing duration is less than the preset time threshold, determine that there is solid material in the brewing unit 20; if the brewing duration is not less than the preset time threshold, determine that the brewing unit 20 is in an empty warehouse state.
[0097] It can be understood that the state determination unit is specifically used to: compare the brewing duration with multiple pre-constructed brewing time intervals, determine the brewing time interval in which the brewing duration is located, wherein each brewing time interval corresponds to a solid material residue parameter; and determine the solid material residue in the brewing unit 20 according to the brewing time interval in which the brewing duration is located.
[0098] In this embodiment, the beverage brewing process control device is used to implement the aforementioned beverage brewing process control method. Therefore, more implementation details of the above-mentioned beverage brewing process control device can refer to the aforementioned beverage brewing process control method, and for the sake of brevity of the specification, they will not be repeated here.
[0099] refer to Figure 5 As shown, the beverage preparation machine provided in an embodiment of the present invention, the controller 30 includes one or more processors 302 and one or more memories 304, at least one program code is stored in the one or more memories 304, and the at least one program code is loaded and executed by the one or more processors 302 to implement the beverage brewing process control method of any embodiment of the first aspect.
[0100] Among them, Figure 5 In the embodiment of the present invention, a bus architecture (represented by bus 300) is shown, which may include any number of interconnected buses and bridges, and bus 300 links various circuits including one or more processors represented by processor 302 and memory represented by memory 304. Bus 300 may also link various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. Bus interface 305 provides an interface between bus 300 and receiver 301 and transmitter 303. Receiver 301 and transmitter 303 may be the same element, namely a transceiver, providing a unit for communicating with various other devices over a transmission medium. Processor 302 is responsible for managing bus 300 and general processing, while memory 304 may be used to store data used by processor 302 when performing operations.
[0101] The functions described herein may be implemented in hardware, software executed by a processor, firmware, or any combination thereof. If implemented in software executed by a processor, the functions may be stored as one or more instructions or codes on a computer-readable medium or transmitted via a computer-readable medium. Other examples and implementations are within the scope and spirit of the present invention and the appended claims. For example, due to the nature of software, the functions described above may be implemented using software executed by a processor, hardware, firmware, hard wiring, or a combination of any of these. In addition, each functional unit may be integrated into a processing unit, each unit may exist physically separately, or two or more units may be integrated into one unit.
[0102] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0103] The units described as separate components may or may not be physically separated, and the components of the control device may or may not be physical units, that is, they may be located in one place or distributed in multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0104] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.
[0105] The above description is only an embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent substitution, improvement, etc. made within the spirit and principle of the present invention shall be included in the scope of the claims of the present invention.
Claims
1. A beverage brewing process control method, characterized in that: Applied to a beverage preparation machine, the brewing unit of the beverage preparation machine includes a pressure-boosting element for generating pressure in the brewing unit during the beverage brewing process, and a pipeline for supplying water to the brewing unit is provided with a flow meter, and the method includes: In response to a start signal of a current beverage brewing, water is supplied to the brewing unit, and state change information of the flow meter is obtained, wherein the state change information is used to characterize a rotation speed change trend of the flow meter during the current beverage brewing process; When it is determined according to the state change information that the brewing unit enters the pressure maintenance stage, triggering the start of measuring the output amount of the current beverage brewing; When the measured amount of beverage output reaches the target amount of beverage, the water supply to the brewing unit is stopped.
2. The method according to claim 1, characterized in that The method further comprises: If the state change information indicates that the rotation speed of the flow meter is at an inflection point of changing from a decreasing rotation speed to an increasing rotation speed, it is determined that the brewing unit enters a pressure maintenance stage.
3. The method according to claim 2, characterized in that The obtaining of the state change information of the flow meter includes: In response to a start signal of current beverage brewing, obtaining a rotation speed characterizing parameter of the flow meter according to a preset cycle; Each time the rotation speed characterizing parameter of the flow meter is obtained, the rotation speed characterizing parameter currently obtained is compared with the rotation speed characterizing parameter obtained last time to determine the state change information of the flow meter in the current beverage brewing process.
4. The method according to claim 3, characterized in that The speed characterization parameter is a time parameter for one rotation of the flow meter, and the method further includes: If the state change information satisfies that the time parameter for one rotation of the flow meter currently obtained is not greater than the difference between the time parameter for one rotation of the flow meter last obtained and the preset correction constant, and the time parameter for one rotation of the flow meter last obtained is not less than the sum of the preset correction constant and the time parameter for one rotation of the flow meter last obtained, it is determined that the rotation speed of the flow meter is at the inflection point of the change from a decreasing speed to an increasing speed.
5. The method according to claim 3, characterized in that The step of obtaining the speed characterizing parameter of the flow meter according to a preset period includes: In each cycle, the speed of the flow meter or the time value of one revolution is sampled according to a preset sampling interval, and n time values or n speed values in the current cycle are obtained accordingly; The n time values or n rotation speed values in the current cycle are averaged to obtain the rotation speed characterization parameter of the flow meter in the current cycle.
6. The method according to claim 1, characterized in that The triggering starts measuring the amount of the beverage produced during the current beverage brewing, including: Triggering to start counting the number of revolutions of the flow meter; When the revolution count of the flow meter reaches the target revolution count, it is determined that the measured output beverage amount reaches the target beverage amount.
7. The method according to claim 1, characterized in that Also includes: When it is determined according to the state change information that the brewing unit enters the boosting stage, obtaining the brewing duration before the brewing unit enters the boosting stage; The solid material holding state in the brewing unit is determined according to the brewing duration.
8. The method according to claim 7, characterized in that The step of determining the solid material containing state in the brewing unit according to the brewing duration includes: If the brewing duration is less than a preset time threshold, it is determined that solid material is contained in the brewing unit; If the brewing duration is not less than the preset time threshold, it is determined that the brewing unit is in an empty state.
9. The method according to claim 7, characterized in that The step of determining the solid material containing state in the brewing unit according to the brewing duration includes: Comparing the brewing duration with a plurality of pre-constructed brewing time intervals to determine the brewing time interval in which the brewing duration is located, wherein each brewing time interval corresponds to a solid material remainder parameter; The remaining amount of solid material in the brewing unit is determined according to the brewing time interval in which the brewing duration falls.
10. A beverage brewing process control device, characterized in that: Applied to a beverage preparation machine, the brewing unit of the beverage preparation machine includes a pressure-boosting element for generating pressure in the brewing unit during the beverage brewing process, a pipeline for supplying water to the brewing unit is provided with a flow meter, and the beverage brewing process control device includes: an information acquisition unit, for supplying water to the brewing unit in response to a start signal of the current beverage brewing, and acquiring state change information of the flow meter, wherein the state change information is used to characterize a rotation speed change trend of the flow meter during the current beverage brewing process; a metering trigger unit, configured to trigger the start of metering of the output amount of the current beverage brewing when determining that the brewing unit has entered the pressure maintenance stage according to the state change information; The stop control unit is used to stop supplying water to the brewing unit when the measured beverage output amount reaches the target beverage amount.
11. A beverage preparation machine, characterized in that: include: A brewing unit, used for brewing a beverage using a solid material, wherein a pressure-boosting element is provided at the outlet of the brewing unit, and the pressure-boosting element is used for generating pressure in the brewing unit during the beverage brewing process; A water supply unit, wherein a water supply pipeline of the water supply unit is provided with a flow meter, and the water supply unit is used to supply water to the brewing unit during a beverage brewing process of the brewing unit; A controller, the controller comprising: one or more processors and one or more memories, the one or more memories storing at least one program code, the at least one program code being loaded and executed by the one or more processors to implement any of the methods described in claims 1-9.
12. The beverage preparation machine according to claim 11, characterized in that The beverage preparation machine is a coffee machine.
Citation Information
Patent Citations
Automated dose control for espresso maker
CN101355898A
Beverage brewing device and method
CN104116412A
Flow speed adjusting method of beverage machine
CN112716294A
Control method of flow velocity and brewing maker
CN113721671A
Professional espresso machine
CN114502046A
