Side wall production line
By introducing re-welding robots and handling robots into the side-circuit production line, the efficiency and space optimization of welding work are improved, and the problems of slow production beats and large site occupation in the existing technology are solved.
Patent Information
- Application Number
- CN202411296071.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-11-26
AI Technical Summary
The existing side-circular production lines are unreasonable, resulting in slow production beats and large site occupancy.
A side-circumference production line is designed, including a top piece work station, assembly line, a first handling robot and a re-welding robot. It is completed by transferring part of the welding work of the top piece work station to a re-welding robot, and air re-fill is performed during the handling process. Welding improves time utilization efficiency and production rhythm and reduces site occupation.
The production rhythm is improved, the welding quality requirements are reduced, and the air welding robot is used to perform air welding during the handling process, reducing the overall site area of the side production line.
Smart Images

Figure CN119016925A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of automobile production, and in particular to a side panel production line. Background Art
[0002] In the side panel production line, multiple workpieces are usually assembled and welded, and the welding of the workpieces is generally completed by welding robots. The existing side panel production line is not arranged reasonably, resulting in a slow production cycle and a large overall site occupation of the side panel production line. Summary of the invention
[0003] The present application provides a side panel production line to improve the production rhythm of the side panel production line and reduce the site area of the side panel production line.
[0004] The present application provides a side panel production line, which includes:
[0005] A loading station, the loading station comprising a loading side and a welding side which are arranged opposite to each other, the loading side is provided with a first loading robot, and the welding side is provided with a first welding robot;
[0006] An assembly line is arranged downstream of the loading station, and the assembly line is equipped with vehicle model tooling;
[0007] A first handling robot is disposed between the loading station and the assembly line, and is used to carry the workpiece welded at the loading station to the vehicle model tooling;
[0008] The repair welding robot is arranged between the loading station and the first assembling station, and the repair welding robot and the transport robot are docked with each other to realize repair welding during the transport process.
[0009] Optionally, the assembly line comprises a first side and a second side arranged opposite to each other, and along the assembly line are provided:
[0010] A storage area, arranged on the first side, and used for storing components to be assembled;
[0011] A second assembly robot is disposed between the assembly line and the storage area, and is used to grab the components to be assembled and assemble the components to be assembled into the workpiece;
[0012] The second welding robot is arranged on the first side and the second side, and is used for welding the components to be assembled to the workpiece.
[0013] Optionally, the side panel production line further includes a first tooling switching line, and the first tooling switching line is arranged on the second side;
[0014] The first tooling switching line is arranged in parallel with the assembly line, and the first tooling switching line and the assembly line are interconnected.
[0015] Optionally, the second side is provided with an aerial platform, the aerial platform is erected above the first tooling switching line, and at least a part of the second welding robots are arranged on the aerial platform.
[0016] Optionally, the side panel production line further includes a second tooling switching line, and the second tooling switching line is arranged at one end of the assembly line;
[0017] The second tooling switching line is arranged perpendicularly to the assembly line, the vehicle model tooling placed on the second tooling switching line and the vehicle model tooling placed on the assembly line are parallel to each other, and the second tooling switching line is connected to the assembly line.
[0018] Optionally, the pipeline includes:
[0019] an assembly station, along which the storage area, the second assembly robot and the second welding robot are arranged;
[0020] The repair welding station is arranged downstream of the assembling station, and the second welding robot is arranged along the repair welding station.
[0021] Optionally, at least a portion of the second assembly robots have a composite gripper, and the composite gripper is used to grasp at least two components to be assembled and simultaneously carry the components to be assembled.
[0022] Optionally, the repair welding station is provided with at least one third welding robot, and the third welding robot comprises a replaceable welding gun and a roller head.
[0023] Optionally, the vehicle type tooling is pre-installed with a gripper, the gripper is adapted to the corresponding vehicle type, and the gripper can be installed and unloaded on the second assembly robot.
[0024] Optionally, the side panel production line further includes:
[0025] An offline gluing device is arranged downstream of the assembly line;
[0026] The offline robot is arranged between the assembly line and the offline gluing device, and is used to carry the workpiece welded on the assembly line to the offline gluing device for gluing.
[0027] Optionally, the vehicle model tooling is automatically switched by an AGV trolley.
[0028] The technical solution provided by this application can achieve the following beneficial effects:
[0029] The side panel production line provided by the present application includes a loading station, an assembly line, a first handling robot and a repair welding robot. The assembly line is arranged downstream of the loading station, and the assembly line is equipped with a vehicle model tooling; the first handling robot is arranged between the loading station and the assembly line, and is used to carry the workpiece welded at the loading station to the vehicle model tooling, and the workpiece is carried and positioned by the vehicle model tooling; the repair welding robot is arranged between the loading station and the first assembly station, and the repair welding robot and the first handling robot are docked with each other to achieve repair welding during the handling process. The present application transfers part of the welding work of the loading station to the repair welding robot for completion, appropriately reduces the original welding time of the loading station, and reduces the original welding quality requirements of the loading station. Moreover, the repair welding robot uses the time when the first handling robot holds the workpiece for repair welding, which improves the time utilization efficiency and makes the production rhythm more compact. The repair welding robot performs repair welding in the air during the handling process, and does not occupy the ground site, thereby reducing the overall site area occupied by the side panel production line.
[0030] It should be understood that the foregoing general description and the following detailed description are exemplary only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 A schematic diagram of the plan layout of a side panel production line provided in an embodiment of the present application;
[0032] Figure 2 for Figure 1 Structural diagram without aerial platform.
[0033] Reference numerals:
[0034] 1-Loading station;
[0035] 11- The first assembly robot;
[0036] 12-First welding robot;
[0037] 13- First track;
[0038] 14-Lineside positioning device;
[0039] 15-workpiece position;
[0040] 2- assembly line;
[0041] 2a-first side;
[0042] 2b - second side;
[0043] 2c-Assembly station;
[0044] 2d-repair welding station;
[0045] 21- Storage area;
[0046] 22- the second loading robot;
[0047] 23- Second welding robot;
[0048] 24- second handling robot;
[0049] 25-the third welding robot;
[0050] 3- The first handling robot;
[0051] 4-Repair welding robot;
[0052] 5-Offline robot;
[0053] 6-First tooling switching line;
[0054] 7- The second tooling switching line;
[0055] 8- Aerial platform.
[0056] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application. DETAILED DESCRIPTION
[0057] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0058] In the description of this application, unless otherwise clearly specified and limited, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance; unless otherwise specified or explained, the term "plurality" refers to two or more; the terms "connected" and "fixed" should be understood in a broad sense, for example, "connected" can be a fixed connection, a detachable connection, an integral connection, or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0059] In the description of this specification, it should be understood that the directional words such as "upper" and "lower" described in the embodiments of the present application are described at the angles shown in the accompanying drawings and should not be understood as limiting the embodiments of the present application. In addition, in the context, it should also be understood that when it is mentioned that an element is connected to another element "upper" or "lower", it can not only be directly connected to another element "upper" or "lower", but also indirectly connected to another element "upper" or "lower" through an intermediate element.
[0060] like Figure 1 and Figure 2 As shown, the embodiment of the present application provides a side panel production line, which includes a loading station 1, an assembly line 2, a first handling robot 3 and a repair welding robot 4. The loading station 1 is used to assemble and weld multiple workpieces. The loading station 1 includes a loading side and a welding side that are relatively arranged. The loading side is arranged with a first loading robot 11, and the welding side is arranged with a first welding robot 12; the assembly line 2 is arranged downstream of the loading station 1, and the assembly line 2 is installed with a vehicle model tooling; the first handling robot 3 is arranged between the loading station 1 and the assembly line 2, and is used to transport the workpiece welded by the loading station 1 to the vehicle model tooling, and the workpiece is carried and positioned by the vehicle model tooling; the repair welding robot 4 is arranged between the loading station 1 and the first assembly station 2c, and the repair welding robot 4 and the first handling robot 3 are docked with each other to achieve repair welding during the handling process. It can be seen from this that the embodiment of the present application transfers part of the welding work of the loading station 1 to the repair welding robot 4 for completion, which appropriately reduces the original welding time of the loading station 1 and reduces the original welding quality requirements of the loading station 1. Moreover, the repair welding robot 4 uses the time when the first handling robot 3 holds the workpiece for repair welding, which improves the time utilization efficiency and makes the production rhythm more compact. The repair welding robot 4 performs repair welding in the air during the handling process and does not occupy the ground space, thereby reducing the overall site area occupied by the side enclosure production line.
[0061] Specifically, the loading station 1 includes a turntable, and the top of the turntable includes two parallel workpiece positions 15, one of which is close to the loading side, and the other is close to the welding side. The turntable can reciprocate around its own axis, so that the two workpiece positions 15 move alternately to the loading side and the welding side, thereby achieving continuous loading and welding, and reducing the idle time of the loading station 1. A line-side positioning device 14 can be set on one side of the loading station 1 to facilitate positioning of the AGV trolley at the loading station 1 to achieve automatic loading.
[0062] Furthermore, the number of the first assembly robots 11 can be reasonably set according to the production rhythm requirements. The first assembly robots 11 can be fixed on the ground or move on the ground along a predetermined path. In this embodiment, the number of the first assembly robots 11 is three; two of the first assembly robots 11 are fixed on the ground to achieve the grasping and assembly of large parts, ensuring the stability of the grasping of large parts; the other first assembly robot 11 can reciprocate along the first track 13 to achieve the grasping and assembly of small parts, as well as the work of gluing on the line and other work with high flexibility, and can adapt to a variety of different vehicle models.
[0063] Furthermore, the number of the first welding robots 12 can be reasonably set according to the production cycle requirements.
[0064] The assembly line 2 extends along the length direction of the venue, that is, the extension direction of the assembly line 2 is the length direction of the venue, and the width direction of the assembly line 2 is the width direction of the venue. The assembly line 2 includes a first side 2a and a second side 2b that are arranged opposite to each other, the first side 2a and the second side 2b extend along the length direction of the venue, and the first side 2a and the second side 2b are arranged opposite to each other along the width direction of the venue.
[0065] Furthermore, a storage area 21, a second assembly robot 22, and a second welding robot 23 are also provided along the assembly line 2. The storage area 21 is provided on the first side 2a of the assembly line 2, and is used to store the components to be assembled; the second assembly robot 22 is provided between the assembly line 2 and the storage area 21, and is used to grab the components to be assembled, and assemble the components to be assembled to the workpiece, thereby supplementing the assembly on the assembly line 2; the second welding robot 23 is provided on the first side 2a and the second side 2b, and is used to weld the components to be assembled to the workpiece, thereby simultaneously welding on both sides of the assembly line 2, thereby improving the welding efficiency. It can be understood that in other embodiments, the second welding robot 23 can be provided only on the first side 2a, or only on the second side 2b.
[0066] Furthermore, the second welding robot 23 on the first side 2a is staggered in height from the welding robot on the second side 2b. For example, the second welding robot 23 on the first side 2a is directly arranged on the ground, and the second welding robot 23 on the second side 2b is raised by adding a base or the like, so that the second welding robots 23 are arranged in a spatially staggered manner. This can not only reduce the plane distance between adjacent second welding robots 23, thereby increasing the number of second welding robots 23 within a limited plane area, but also reduce the interference between the second welding robots 23, so that multiple second welding robots 23 can perform welding at the same time, effectively improving welding efficiency and ensuring welding quality.
[0067] Furthermore, the assembly line 2 includes a plurality of stations arranged in sequence along the length direction, each station is equipped with a vehicle model tooling, and the vehicle model tooling of each station is different. The workpiece is placed on the vehicle model tooling, and the vehicle model tooling can be slid along the assembly line 2 for switching. The workpiece passes through each station in turn for assembly or welding, and multiple workpieces are placed in each station in turn, so that multiple workpieces can be produced at the same time, effectively improving production efficiency. A second handling robot 24 can be set between adjacent stations of the assembly line 2, that is, the second handling robot 24 is used to transport the workpiece welded at one station of the assembly line 2 to the next station, thereby realizing the automatic handling of the workpiece.
[0068] Furthermore, the assembly line 2 includes at least one assembly station 2c, along which a storage area 21, a second assembly robot 22 and a second welding robot 23 are provided. That is to say, at the assembly station 2c, the loading and welding of the parts to be assembled need to be completed. After the second assembly robot 22 assembles the parts to be assembled to the workpiece, the welding robot directly performs welding, thereby shortening the interval waiting time between assembly and welding and improving the production rhythm. The assembly and welding are performed at the same assembly station 2c, thereby realizing the sharing of the assembly table and the welding table, reducing the setting of special assembly tables, reducing production costs, and improving the utilization rate of vehicle model tooling.
[0069] The assembly line 2 may be provided with only one assembly station 2c, so that the components to be assembled are assembled to the workpiece at one time. The assembly line 2 may be provided with at least two assembly stations 2c, so that the components to be assembled are assembled to the workpiece in steps, further shortening the time spent by a single station and improving the production rhythm.
[0070] Furthermore, the second assembly robot 22 has a compound gripper, which is used to grab at least two parts to be assembled and move each part to be assembled onto the assembly line at the same time. That is to say, the second assembly robot 22 positions or assembles at least two parts to be assembled outside the assembly line 2, so that the assembly of at least two components to be assembled can be completed through one loading action, reducing the time occupied by the second assembly robot 22 on the assembly line 2, thereby extending the effective welding time and making the production rhythm more compact.
[0071] Specifically, a detailed description is given by taking a composite gripper grabbing two parts to be assembled as an example. The second assembly robot 22 can have two different grippers, that is, two different grippers are installed on the second assembly robot 22 at the same time to form a composite gripper, and the two different grippers grab and position one part to be assembled respectively, so that the two parts to be assembled are transported to the assembly line 2 at the same time and assembled in sequence. The second assembly robot 22 can have a gripper, which has a positioning mechanism corresponding to the two parts to be assembled to form a composite gripper, so that the two parts to be assembled can form an assembly component through the gripper, so that the two parts to be assembled are transported to the assembly line 2 at the same time and assembled at the same time.
[0072] Furthermore, the assembly line 2 includes a repair welding station 2d, which is arranged downstream of the last assembly station 2c. A second welding robot 23 is arranged along the repair welding station 2d. That is to say, supplementary welding is performed on the workpiece that is finally assembled at the repair welding station 2d to further improve the welding quality.
[0073] Furthermore, the repair welding station 2d is provided with at least one third welding robot 25, and the third welding robot 25 includes a replaceable welding gun and a roller head, so that it can provide electric welding process or rolling process as needed to meet the side panel production requirements of different vehicle models.
[0074] Furthermore, the side panel production line also includes an offline gluing device and an offline robot 5. The offline gluing device is arranged downstream of the assembly line 2, that is, the workpiece that is finally welded needs to be glued; the offline robot 5 is arranged between the assembly line 2 and the offline gluing device, and the offline robot 5 is used to carry the workpiece welded by the assembly line 2 to the offline gluing device for gluing, thereby completing the offline gluing process outside the area of the assembly line 2.
[0075] Furthermore, the side panel production line also includes at least one tooling switching line (for example, the first tooling switching line 6 or the second tooling switching line 7), and the vehicle model tooling can be switched by sliding along the tooling switching line. The tooling switching line and the assembly line 2 are arranged in two different plane areas to ensure that the vehicle model tooling switching and the work of the assembly line 2 do not interfere with each other, that is, the vehicle model tooling switching and the assembly and welding of the workpiece can be carried out at the same time, which can not only improve the switching efficiency of the vehicle model tooling, but also improve the effective production time of the assembly line 2, thereby making the production rhythm more compact.
[0076] In one embodiment, the side panel production line includes a first tooling switching line 6, which is arranged on the second side 2b to avoid interference between tooling switching and component assembly, ensure the assembly efficiency of the components to be assembled, and thus meet the production rhythm requirements of the assembly line 2. The first tooling switching line 6 is arranged in parallel with the assembly line 2, that is, the first tooling switching line 6 is parallel to the extension direction of the assembly line 2, and the vehicle model tooling of the first tooling switching line 6 and the vehicle model tooling of the assembly line 2 are parallel to each other, so that the vehicle model tooling of the first tooling switching line 6 and the vehicle model tooling of the assembly line 2 are placed one by one, thereby reducing the risk of vehicle model tooling switching errors. The first tooling switching line 6 is interconnected with the assembly line 2, so that the vehicle model tooling replaced by the assembly line 2 can be transferred to the first tooling switching line 6 for storage or replacement, or the vehicle model tooling stored in the first tooling switching line 6 can be transferred to the assembly line 2 for use.
[0077] Furthermore, an aerial platform 8 is set up on the second side 2b, and the aerial platform 8 is set up above the first tooling switching line 6, and the second welding robot 23 on the second side 2b is set on the aerial platform 8. On the one hand, the first tooling switching line 6 and the second welding robot 23 are stacked up and down, so that the second welding robot 23 and the first tooling switching line 6 are located in the same plane area, thereby reducing the overall site area of the side enclosure production line; on the other hand, the positions of multiple second welding robots 23 on the second side 2b are raised as a whole through the aerial platform 8, and there is no need to set a separate base for each second welding robot 23, so that the overall structure is more concise and the layout cost of the side enclosure production line is reduced.
[0078] Furthermore, the aerial platform 8 includes a side platform and an end platform connected to each other. The side platform is set up above the first tooling switching line 6, and is used to carry the second welding robot 23 and the second handling robot 24, thereby reducing the overall width of the side enclosure production line. The end platform is set up at one end of the assembly line 2 away from the loading station 1, and is used to carry the offline robot 5, thereby reducing the overall length of the side enclosure production line.
[0079] In another embodiment, the side panel production line includes a second tooling switching line 7, which is arranged at one end of the assembly line 2 away from the loading station 1 to make full use of the space at the end of the assembly line 2, avoid tooling switching occupying the working area of the assembly line 2, and improve the site utilization rate. The second tooling switching line 7 is arranged vertically with the assembly line 2, and the vehicle model tooling placed on the second tooling switching line 7 is parallel to the vehicle model tooling placed on the assembly line 2, which can make the vehicle model tooling of the second tooling switching line 7 and the vehicle model tooling of the assembly line 2 placed in the same orientation, and there is no need to turn or turn around during the transfer of the vehicle model tooling. The vehicle model tooling placed on the second tooling switching line 7 enters the assembly line 2 in a translational manner, which reduces the difficulty of vehicle model tooling switching and can reduce the extension length of the second tooling switching line 7, thereby reducing the overall width of the site and improving the overall compactness of the side panel production line. The second tooling switching line 7 is interconnected with the assembly line 2, so that the vehicle model tooling replaced by the assembly line 2 can be transferred to the second tooling switching line 7 for storage or replacement, or the vehicle model tooling stored in the second tooling switching line 7 can be transferred to the assembly line 2 for use.
[0080] In another embodiment, the side panel production line includes a first tooling switching line 6 and a second tooling switching line 7. The first tooling switching line 6 is arranged on the second side 2b, and the end of the assembly line 2 close to the loading station 1 is interconnected with the first tooling switching line 6; the second tooling switching line 7 is arranged at the end of the assembly line 2 away from the loading station 1, and the end of the assembly line 2 away from the loading station 1 is interconnected with the second tooling switching line 7. When the side panel production line only produces two models, there is no need to switch the model tooling, and the model tooling only needs to be transferred between the first tooling switching line 6, the assembly line 2 and the second tooling switching line 7. When the side panel production line produces three or more models, the tooling switching can be completed on the first tooling switching line 6 or the second tooling switching line 7, and then the model tooling is transferred between the first tooling switching line 6, the assembly line 2 and the second tooling switching line 7.
[0081] Furthermore, the vehicle model tooling is automatically switched through the AGV trolley. This can not only reduce the movement of personnel on the side panel production line and improve the safety of the side panel production line, but also complete the vehicle model tooling switch without affecting the normal production rhythm, improve the vehicle model tooling switch efficiency, and eliminate the impact of vehicle model tooling switch time on production.
[0082] Furthermore, the vehicle model tooling is pre-installed with a gripper, which is compatible with the corresponding vehicle model. The gripper can be installed and unloaded on the second assembly robot 22. The second assembly robot 22 grabs the gripper corresponding to the component to be assembled, and stores and transports it together with the vehicle model tooling. There is no need to set up a separate storage site and transportation tool for the gripper, thereby reducing the floor space of the side panel production line and improving the efficiency of gripper switching. In addition, since both the vehicle model tooling and the gripper need to be switched according to the vehicle model, the vehicle model tooling is pre-installed with a gripper, which can enable the gripper to switch synchronously with the vehicle model tooling, avoiding the mismatch between the gripper and the vehicle model and making it difficult to achieve the expected gripping effect.
[0083] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A side panel production line, characterized in that: include: A loading station, the loading station comprising a loading side and a welding side which are arranged opposite to each other, the loading side is provided with a first loading robot, and the welding side is provided with a first welding robot; An assembly line is arranged downstream of the loading station, and the assembly line is equipped with vehicle model tooling; A first handling robot is disposed between the loading station and the assembly line, and is used to carry the workpiece welded at the loading station to the vehicle model tooling; The repair welding robot is arranged between the loading station and the first assembling station, and the repair welding robot and the transport robot are docked with each other to realize repair welding during the transport process.
2. The side panel production line according to claim 1, characterized in that: The pipeline comprises a first side and a second side arranged opposite to each other, and is provided along the pipeline: A storage area, arranged on the first side, and used for storing components to be assembled; A second assembly robot is disposed between the assembly line and the storage area, and is used to grab the components to be assembled and assemble the components to be assembled into the workpiece; The second welding robot is arranged on the first side and the second side, and is used for welding the components to be assembled to the workpiece.
3. The side panel production line according to claim 2, characterized in that: The side panel production line further includes a first tooling switching line, and the first tooling switching line is arranged on the second side; The first tooling switching line is arranged in parallel with the assembly line, and the first tooling switching line and the assembly line are interconnected.
4. The side panel production line according to claim 3, characterized in that: The second side is provided with an aerial platform, the aerial platform is provided above the first tooling switching line, and at least a part of the second welding robots are arranged on the aerial platform.
5. The side panel production line according to claim 2, characterized in that: The side panel production line further includes a second tooling switching line, which is arranged at one end of the assembly line; The second tooling switching line is arranged perpendicularly to the assembly line, the vehicle model tooling placed on the second tooling switching line and the vehicle model tooling placed on the assembly line are parallel to each other, and the second tooling switching line is connected to the assembly line.
6. The side panel production line according to claim 2, characterized in that: The pipeline comprises: an assembly station, along which the storage area, the second assembly robot and the second welding robot are arranged; The repair welding station is arranged downstream of the assembling station, and the second welding robot is arranged along the repair welding station.
7. The side panel production line according to claim 6, characterized in that: At least a portion of the second assembly robots have a composite gripper, which is used to grasp at least two components to be assembled and simultaneously carry the components to be assembled.
8. The side panel production line according to claim 6, characterized in that: The repair welding station is provided with at least one third welding robot, and the third welding robot comprises a replaceable welding gun and a roller head.
9. The side panel production line according to claim 2, characterized in that: The vehicle type tooling is pre-installed with a gripper, which is adapted to the corresponding vehicle type and can be installed and unloaded by the second assembly robot.
10. The side panel production line according to any one of claims 1 to 9, characterized in that: The side panel production line also includes: An offline gluing device is arranged downstream of the assembly line; The offline robot is arranged between the assembly line and the offline gluing device, and is used to carry the workpiece welded on the assembly line to the offline gluing device for gluing.
11. The side panel production line according to any one of claims 1 to 9, characterized in that: The vehicle model tooling is automatically switched by the AGV trolley.