Soft foundation automatic construction system and construction method
Through the design of the soft foundation automated construction system, the multi-end control and early warning closed loop of pile construction supervision platform, front-end controller and mobile terminal are used to solve the risks of soft foundation construction quality control and the reliance on human operations, and the intelligent construction process is realized Monitoring and abnormal handling improve the controllability of construction quality.
Patent Information
- Application Number
- CN202411413811.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-11
- Publication Date
- 2024-11-26
AI Technical Summary
There are risks in soft foundation construction quality control, relying on human operations, quality evaluation is lagging behind, making it difficult to discover and deal with problems in construction in a timely manner.
Design a soft-based automated construction system, including a pile construction supervision platform, front-end controller and mobile terminal, collect construction parameters through sensors and monitor them in real time, realize early warning configuration and disposal, and ensure intelligent management of the construction process.
Through multi-end control and early warning closed-loop design, the risk of construction quality control is reduced, intelligent monitoring of the construction process and timely handling of abnormal situations are realized, and the controllability and reliability of construction quality are improved.
Smart Images

Figure CN119021213A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a soft foundation automated construction system and a construction method, belonging to intelligent road construction technology. Background Art
[0002] Soft foundation construction is highly concealed. Factors such as soil conditions, construction technology, and construction level will affect the construction and quality of mixing piles. The quality evaluation of soft foundation construction is lagging, and problems found after the piles are formed are difficult to remedy. Soft foundation construction technology is extremely widely used in engineering, including cement soil mixing piles, high-pressure rotary jet piles, PHC pipe piles, etc. In recent years, some improved new technologies have emerged, but the implementation process is still highly dependent on manual operation, and is relatively backward in quality control, quality assessment, and intelligent information management and control. For different sites and formations, different surrounding conditions and engineering requirements, the experience of designers is almost the only basis for construction. On-site construction also depends on the sense of responsibility of construction personnel. There are still certain risks in the quality control of soft foundation construction. Summary of the invention
[0003] Purpose of the invention: In order to overcome the deficiencies in the prior art, the present invention provides a soft foundation automated construction system and construction method, which can automatically collect various parameters in the soft foundation construction process and report them in a classified manner, so that operators, supervisors, etc. can understand the construction process in a timely and clear manner and make timely and appropriate construction adjustments.
[0004] Technical solution: To achieve the above purpose, the technical solution adopted by the present invention is: A soft foundation automated construction system comprises a pile construction supervision platform, a front-end controller, a sensor and a mobile terminal; the sensor is installed on the pile driver, collects the location information and real-time construction information of the pile driver and sends it to the front-end controller, and the front-end controller is connected to the sensors on the pile driver at the construction site; the pile construction supervision platform makes an overall plan for the construction project, determines the pile type and pile position, plans the total construction volume and the construction volume of each pile driver, makes early warning configuration, counts early warning information and project progress information, makes early warning disposal for the early warning situation according to the early warning disposal strategy and sends the early warning disposal information to the front-end controller and the mobile terminal, and the early warning configuration comprises setting early warning parameters, early warning thresholds, early warning levels, early warning disposal strategies and Early warning closed-loop strategy; the front-end controller controls the pile driver at the construction site, locally stores and uploads all sensor detection data and control records of the current pile, monitors the sensor detection data in real time according to the early warning configuration, and when an early warning occurs, handles the early warning according to the early warning disposal strategy and sends the early warning disposal information to the pile construction supervision platform and the mobile terminal; the mobile terminal reviews and displays the overall construction progress, the construction records of a single pile driver and the production and construction records of a single pile, handles the early warning according to the early warning disposal strategy and sends the early warning disposal information to the pile construction supervision platform and the front-end controller; when the early warning situation completes all early warning disposal according to the early warning disposal strategy, the early warning closed loop is realized.
[0005] In this case, the end-to-end control method was adopted to manage the entire pile production process. First, the project was established and allocated on the pile construction supervision platform, and then the pile driver was controlled at the construction site through the front-end controller to realize pile production. The process data was detected by sensors. If an early warning occurred, it was handled according to the early warning disposal strategy. In order to avoid the early warning disposal not being confirmed by all responsible personnel, an early warning closed-loop strategy was adopted to determine whether the early warning processing was completed. The early warning closed-loop strategy sends the early warning situation and early warning disposal information to the pile construction supervision platform and related mobile terminals according to the early warning situation (including the early warning level), notifies relevant personnel to handle the early warning situation according to the early warning disposal strategy, and reports and broadcasts it on the pile construction supervision platform and related mobile terminals; when the early warning situation completes all early warning disposal according to the early warning disposal strategy, the early warning closed loop is realized, that is, all relevant personnel complete the early warning disposal and report and broadcast according to the early warning disposal strategy, then the early warning closed loop indicates that the early warning situation has been resolved and normal production can be resumed. The early warning disposal strategy sets out the disposal methods that need to be taken for the early warning situation, such as cause analysis, on-site disposal, measure improvement, etc.; since many disposal methods are not achieved by adjusting the parameter settings of the equipment, but also involve on-site confirmation and adjustment methods, it is sufficient to collect the early warning disposal results by confirmation and broadcasting, but the disposal experience information and disposal suggestion information still need to be prompted according to the situation.
[0006] Specifically, the construction monitoring platform includes a dynamic simulation pile production model library, an early warning configuration module, a project planning module, a pile production process database, a pile production demonstration module, an early warning module and a data reporting module; the dynamic simulation pile production model library stores production models of various types of piles, and uses the sensor detection data and control records of the pile production construction process as dynamic parameters of the pile production model; the early warning configuration module is used to set early warning parameters, early warning thresholds, early warning levels, early warning disposal strategies and early warning closed-loop strategies; the project planning module plans the total construction volume and the construction volume of each pile driver, and marks the positions of all piles and the pile numbers on the electronic map, distinguishes between different types of piles, distinguishes between piles that have been completed, are under construction and have not started construction, divides all piles into zones and plans to use the same pile driver for production within the same zone; the pile production process database allocates pile production operations according to the pile driver and pile number. The sensor detection data and control records of the construction process are stored, and the control record is the action record of the pile driver; the pile production demonstration module retrieves the production model of the corresponding type of pile from the dynamic simulation pile production model library according to the pile number, and retrieves the sensor detection data and control records of the corresponding pile production construction process from the pile production process database to form a pile production demonstration animation; the early warning module summarizes and displays all early warning situations and the corresponding early warning disposal strategies and early warning disposal information, performs early warning disposal on the early warning situation according to the early warning disposal strategy, and sends the early warning disposal information to the front-end controller and the mobile terminal; when the early warning situation completes all early warning disposal according to the early warning disposal strategy, the early warning closed loop is realized; the data reporting module retrieves the pile production process database, summarizes the construction volume of each pile driver according to the time period and displays it in pictures, texts and tables, and summarizes the total construction volume according to the time period and displays it in pictures, texts and tables.
[0007] This case designs a pile production model, which, combined with the detection data of the sensor, can display the pile production process through animation, so that relevant personnel can intuitively understand whether the pile production process is stable, whether there is interruption, continuous driving or repeated driving, etc., and the time delayed by early warning processing; this case uses the project planning module to plan the project as a whole, and uses color, shape, background and other methods to distinguish and display different piles, different pile drivers, whether the generation is completed and other information, so that relevant personnel can intuitively understand the project progress; this case uses the early warning module and data reporting module to report important production information in a classified manner. In addition, the construction monitoring platform should also be equipped with relevant modules such as authority authentication to facilitate information tracking.
[0008] Specifically, the front-end controller includes a pile driver setting module, a pile number selection module, a control and prompt module, a key data display module, an early warning module, a local storage module and a wireless transmission module; the pile driver setting module is used to select a pile driver and establish a communication connection with each sensor on the pile driver, and configure parameters for each sensor; the pile number selection module establishes a pile number selection list according to all piles planned to be produced using the pile driver, and selects the pile number of the current pile from the selection list; determines whether the pile number selection is correct according to the correspondence between the position information detected by the positioning sensor and the pile number; the control and prompt module controls the pile driver according to the production process or early warning disposal strategy and prompts the pile driver's current action, including control and prompts of start, pause, end, continue driving, repeat driving, and ticket stub printing; the key data display module selects the key data form of the corresponding type of pile according to the production type of the pile driver, displays the real-time sensor detection data through the key data form, and displays the pile production process at the same time; the early warning module The sensor detection data is monitored in real time, and when an early warning situation occurs, an alarm message is triggered or the pile driver is triggered to automatically perform a corresponding action according to the early warning disposal strategy, and the early warning situation, early warning disposal strategy and early warning disposal information are sent to the construction monitoring platform and the mobile terminal according to the early warning closed-loop strategy, and the early warning disposal information sent by the construction monitoring platform and the mobile terminal is received; when the early warning situation completes all early warning disposal according to the early warning disposal strategy, the early warning closed loop is realized; the local storage module is used to store all sensor detection data and control records of the current pile, and after the pile driver setting module and the pile number selection module are set, all sensor detection data and control records of the previous pile are cleared; the wireless transmission module establishes a communication connection between the front-end controller and the pile construction supervision platform and the mobile terminal, receives the pile driver construction volume and early warning configuration information from the pile construction supervision platform, sends real-time sensor detection data and control records to the pile construction supervision platform, sends early warning situation, early warning disposal strategy and early warning disposal information to the pile construction supervision platform and the mobile terminal, and receives early warning disposal information from the mobile terminal.
[0009] Specifically, the front-end controller partitions and displays each visual module through a display interface; except for permission information, other information is operated by clicking buttons or drop-down menus, and the click buttons are displayed in a highlighted manner, and the minimum size of each click button and drop-down option is limited; key data forms and control buttons, and current action prompts of the pile driver are displayed on the same interface, and the control buttons include start, pause, end, resume, repeat, and ticket stub printing; warning information is reminded through pop-up windows.
[0010] In this case, the users of the front-end controller are mainly on-site operators. Taking into account the age and educational level of the current on-site construction workers and the operability of the front-end controller, great attention is paid to the design of the display interface. On the one hand, in order to avoid incorrect operations, only buttons are used for control, and no keyboards (including electronic keyboards), handwriting and other difficult information input methods are designed; at the same time, as few buttons as possible are used, and they are large buttons; when an early warning occurs, in addition to designing light or alarm reminders, pop-up windows are used on the display screen for large subtitle reminders, which also takes into account the actual situation of the on-site operators.
[0011] Specifically, the mobile terminal includes a total construction progress statistics module, a single pile driver construction record module, a single pile production construction record module and an early warning module; the total construction progress statistics module accesses the pile production process database, and combines the total construction volume to summarize and display the total construction progress in the form of pictures, texts and tables; the single pile driver construction record module accesses the production process data of the corresponding pile driver in the pile production process database, and summarizes and displays the single pile driver construction record in the form of pictures, texts and tables; the single pile production construction record module accesses the production process data of the corresponding pile in the pile production process database, and summarizes and displays the single pile driver construction record in the form of pictures, texts and tables; the early warning module summarizes and displays all early warning situations and corresponding early warning disposal strategies and early warning disposal information, performs early warning disposal on the early warning situation according to the early warning disposal strategy, and sends the early warning disposal information to the pile construction supervision platform and the front-end controller; when the early warning situation completes all early warning disposal according to the early warning disposal strategy, the early warning closed loop is realized.
[0012] In this case, the mobile terminal is designed to facilitate the relevant personnel who are not on site to understand the overall progress of the project in a timely manner and to handle early warning information in a timely manner. In addition to the modules listed, it also includes a search function; at the same time, it is also configured with relevant modules such as permission authentication to facilitate information tracking.
[0013] Specifically, the types of piles include cement mixing piles, high-pressure rotary jet piles, hammer piles, static pressure piles and plastic drainage sheet piles; the sensors installed on the pile driver for producing cement mixing piles include flow meters, inclination sensors, pile length sensors, paddle volume sensors, current sensors and positioning sensors; the sensors installed on the pile driver for producing high-pressure rotary jet piles include flow meters, slurry pressure sensors, air flow sensors, inclination sensors, pile length sensors, current sensors and positioning sensors; the sensors installed on the pile driver for producing hammer piles include inclination sensors, depth sensors and positioning sensors; the sensors installed on the pile driver for producing static pressure piles include pile holding force sensors, pile length sensors, inclination sensors, pile pressure force sensors and positioning sensors; the sensors installed on the pile driver for producing plastic drainage sheet piles include displacement sensors and positioning sensors.
[0014] A soft foundation automated construction method comprises the following steps: Step 1, plan the total construction volume and the construction volume of each pile driver through the pile construction supervision platform, mark all pile positions and pile numbers on the electronic map, distinguish different types of piles, distinguish piles that have been completed, are under construction, and have not started construction, divide all piles into zones, and plan to use the same pile driver for production in the same zone; perform early warning configuration, set early warning parameters, early warning thresholds, early warning levels, early warning disposal strategies, and early warning closed-loop strategies; send the construction volume of each pile driver and the corresponding early warning configuration information to the front-end controller that is connected to the corresponding pile driver; the early warning closed-loop strategy sends the early warning situation to the pile construction supervision platform and the relevant mobile terminal, notifies the relevant personnel to carry out early warning disposal of the early warning situation according to the early warning disposal strategy, and after the relevant personnel complete the early warning disposal according to the early warning disposal strategy, the relevant personnel broadcast the early warning disposal information through the pile construction supervision platform, the front-end controller or the mobile terminal; the early warning disposal strategy sets an early warning disposal task list for different early warning situations, and the relevant personnel can be considered to have completed the early warning disposal according to the early warning disposal strategy when they complete the specified tasks in the early warning disposal task list. Usually, some experience suggestions will be given in the early warning disposal task list so that the relevant personnel can quickly complete the specified tasks; Step 2: Install the sensor on the pile driver, use the sensor to collect the location information and real-time construction information of the pile driver and send it to the front-end controller; the front-end controller communicates with the sensors on the pile driver at the construction site; Step 3, set up the pile driver on the front-end controller, establish a communication connection between the front-end controller and each sensor on the corresponding pile driver, and configure the parameters of each sensor; select the pile number on the front-end controller, and determine whether the pile number selection is correct based on the corresponding relationship between the position information detected by the positioning sensor and the pile number; after completing the pile driver setting and pile number selection, the front-end controller clears all sensor detection data and control records of the previous pile stored locally; Step 4: The sensor collects real-time construction information of the pile driver. The front-end controller starts to store all sensor detection data and control records of the current pile locally, and starts to send real-time sensor detection data and control records to the pile construction supervision platform. The construction supervision platform stores the sensor detection data and control records according to the pile driver and pile number. Step 5. According to the production process or early warning disposal strategy, the pile driver is controlled on the front-end controller, including the control of start, pause, end, continue driving, repeat driving, and ticket stub printing; in the pile production process, the sensor detection data is monitored in real time according to the early warning parameters, early warning thresholds and early warning levels. When an early warning occurs, the alarm information is triggered or the pile driver is triggered to automatically perform the corresponding action according to the early warning disposal strategy, and the early warning situation, early warning disposal strategy and early warning disposal information are sent to the construction monitoring platform and mobile terminal according to the early warning closed-loop strategy; Step 6. The construction monitoring platform performs early warning treatment on the early warning situation according to the early warning treatment strategy and sends early warning treatment information to the front-end controller and the mobile terminal; the mobile terminal performs early warning treatment on the early warning situation according to the early warning treatment strategy and sends early warning treatment information to the pile construction supervision platform and the front-end controller; Step 7. When all warning situations are handled according to the warning handling strategy, the warning closed loop is realized, the production process is restored, and the process returns to Step 5.
[0015] Specifically, the construction monitoring platform includes a dynamic simulation pile production model library, an early warning configuration module, a project planning module, a pile production process database, a pile production demonstration module, an early warning module and a data reporting module; the front-end controller includes a pile driver setting module, a pile number selection module, a control and prompt module, a key data display module, an early warning module, a local storage module and a wireless transmission module; the mobile terminal includes a total construction process statistics module, a single pile driver construction record module, a single pile production construction record module, and an early warning module.
[0016] Specifically, the front-end controller partitions and displays each visual module through a display interface; except for permission information, other information is operated by clicking buttons or drop-down menus, and the click buttons are displayed in a highlighted manner, and the minimum size of each click button and drop-down option is limited; key data forms and control buttons, and current action prompts of the pile driver are displayed on the same interface, and the control buttons include start, pause, end, resume, repeat, and ticket stub printing; warning information is reminded through pop-up windows.
[0017] Specifically, the front-end controller is provided with a power-off resume module and a network-off resume module; the power-off resume module means that when a power outage occurs during the construction process, the front-end controller automatically saves the construction status before the power outage, and after the power is restored, the construction is continued based on the saved construction status; the network-off resume module means that the front-end controller adopts a dual-card dual-server data backup mechanism, when a network outage occurs during the construction process, the front-end controller continues to store the data locally, and after the network is restored, the data is resumed based on the local storage to ensure that the data is not lost.
[0018] Beneficial effects: The soft foundation automated construction system and construction method provided by the present invention, in view of the problem that pile production in the prior art is highly dependent on human operation, adopts a multi-terminal control method to intelligently control pile production, conducts project planning and overview through a pile construction supervision platform, realizes on-site operation and data detection through a front-end controller, enables non-site related personnel to understand the construction progress through a mobile terminal, and ensures multi-terminal confirmation of abnormal situation handling during the construction process through the design of an early warning closed loop; intelligent monitoring is achieved through sensors and front-end controllers during normal construction, and closed-loop management is achieved through intelligent means in abnormal situations, reducing the risk of soft foundation construction quality control; when designing the front-end controller, the interface and control design are carried out in consideration of the specific circumstances of the actual users, which is conducive to the popularization and promotion of the product. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a structural block diagram of the system of the present invention; Figure 2 It is a schematic diagram of the process of the present invention. DETAILED DESCRIPTION
[0020] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0021] As a hidden project, the construction quality and effect of soft foundation treatment cannot be directly obtained and evaluated during the construction process. In order to achieve real-time control and monitoring of construction quality and pipe parameters during the construction process, this case designed a soft foundation automation construction system to control and analyze the construction process. The soft foundation automation construction system can record key construction quality data in real time, and the collected data can be uploaded through the wireless network. Relevant personnel can view the on-site construction situation in real time through the pile construction supervision platform and mobile terminal, so as to achieve real and effective monitoring of the whole process, all time periods and multiple data, and timely discover problems, and effectively evaluate single piles and the overall treatment section.
[0022] like Figure 1The figure shows a structural block diagram of a soft foundation automated construction system, which includes three main parts: a pile construction supervision platform, a front-end controller and a mobile terminal, and also includes detection equipment such as sensors; the sensor is installed on the pile driver, collects the location information and real-time construction information of the pile driver and sends it to the front-end controller, and the front-end controller communicates with the sensors on the pile driver at the construction site; the pile construction supervision platform makes an overall plan for the construction project, determines the pile type and pile location, plans the total construction volume and the construction volume of each pile driver, performs early warning configuration, counts early warning information and project progress information, performs early warning disposal on the early warning situation according to the early warning disposal strategy, and sends the early warning disposal information to the front-end controller and the mobile terminal, and the early warning configuration includes setting early warning parameters, early warning thresholds, early warning, etc. Alarm level, early warning disposal strategy and early warning closed-loop strategy; the front-end controller controls the pile driver at the construction site, locally stores and uploads all sensor detection data and control records of the current pile, monitors the sensor detection data in real time according to the early warning configuration, and when an early warning occurs, it handles the early warning according to the early warning disposal strategy and sends the early warning disposal information to the pile construction supervision platform and the mobile terminal; the mobile terminal checks and displays the total construction progress, the construction records of a single pile driver and the production and construction records of a single pile, handles the early warning according to the early warning disposal strategy and sends the early warning disposal information to the pile construction supervision platform and the front-end controller; when the early warning situation completes all early warning disposal according to the early warning disposal strategy, the early warning closed-loop is realized.
[0023] The types of piles applicable to this case include cement mixing piles, high-pressure jet grouting piles, hammer piles, static pressure piles and plastic drainage sheet piles. The main monitoring parameters during the construction of cement mixing piles include pile depth, drilling speed, drilling speed, current, water-cement ratio, slurry volume (total slurry volume, segment slurry volume), pile driver verticality, pile time, drilling / drilling status, grouting status, air mixing depth, designed pile length, pile driver number, pile number, mileage section number, start time, end time, etc. Therefore, the sensors installed on the pile driver for producing cement mixing piles mainly include flow meters, inclination sensors, pile length sensors, paddle volume sensors, current sensors and positioning sensors. The sensors installed on the pile driver for producing high-pressure jet grouting piles mainly include flow meters, slurry pressure sensors, air flow sensors, inclination sensors, pile length sensors, current sensors and positioning sensors. The sensors installed on the pile driver for producing hammer piles mainly include inclination sensors, depth sensors and positioning sensors. The sensors installed on the pile driver for producing static pressure piles mainly include pile holding force sensors, pile length sensors, inclination sensors, pile pressure force sensors and positioning sensors. The sensors installed on the pile driver for producing plastic drainage sheet piles mainly include displacement sensors and positioning sensors.
[0024] In this case, the inclination sensor uses an industrial-grade digital dual-axis inclination sensor with a built-in MCU microcontroller. The gravity-type inclinometer sensor is corrected and compensated by the N-order filtering fusion algorithm to output high-precision angle values with a measurement accuracy of ±0.01°. Before each pile driver is constructed, the verticality of the pile driver can be strictly calibrated according to the inclination sensor. The flow meter adopts an intelligent protective head design with stronger anti-interference ability and accurate and stable data. It uses a thickened alloy lining to resist corrosion, water seepage, and cracking. It can support instantaneous flow and cumulative flow monitoring. The measurement accuracy is required to reach ±0.5%R (five thousandths) and is calibrated by an authoritative measurement department. The pile length sensor uses an imported encoder with the advantages of strong anti-interference ability and stable output waveform. The structural design uses a prestressed pulley block to avoid loose wire ropes in hard soil layers and poor pulley contact. The measurement accuracy is ±3mm.
[0025] like Figure 1 As shown, the construction monitoring platform includes a dynamic simulation pile production model library, an early warning configuration module, a project planning module, a pile production process database, a pile production demonstration module, an early warning module and a data reporting module; the dynamic simulation pile production model library stores production models of various types of piles, and uses the sensor detection data and control records of the pile production construction process as dynamic parameters of the pile production model; the early warning configuration module is used to set early warning parameters, early warning thresholds, early warning levels, early warning disposal strategies and early warning closed-loop strategies; the project planning module plans the total construction volume and the construction volume of each pile driver, and marks all pile locations and pile numbers on an electronic map, distinguishes different types of piles, distinguishes between completed, under construction and not yet started piles, divides all piles into zones and plans to use the same pile driver for production in the same zone; the pile production process database allocates pile production operations according to the pile driver and pile number. The sensor detection data and control records of the construction process are stored, and the control record is the action record of the pile driver; the pile production demonstration module retrieves the production model of the corresponding type of pile from the dynamic simulation pile production model library according to the pile number, and retrieves the sensor detection data and control records of the corresponding pile production construction process from the pile production process database to form a pile production demonstration animation; the early warning module summarizes and displays all early warning situations and the corresponding early warning disposal strategies and early warning disposal information, performs early warning disposal on the early warning situation according to the early warning disposal strategy, and sends the early warning disposal information to the front-end controller and the mobile terminal; when the early warning situation completes all early warning disposal according to the early warning disposal strategy, the early warning closed loop is realized; the data reporting module retrieves the pile production process database, summarizes the construction volume of each pile driver according to the time period and displays it in pictures, texts and tables, and summarizes the total construction volume according to the time period and displays it in pictures, texts and tables.
[0026] like Figure 1As shown, the front-end controller includes a pile driver setting module, a pile number selection module, a control and prompt module, a key data display module, an early warning module, a local storage module and a wireless transmission module; the pile driver setting module is used to select a pile driver and establish a communication connection with each sensor on the pile driver, and configure parameters for each sensor; the pile number selection module establishes a pile number selection list according to all piles planned to be produced using the pile driver, and selects the pile number of the current pile from the selection list; determines whether the pile number selection is correct according to the corresponding relationship between the position information detected by the positioning sensor and the pile number; the control and prompt module controls the pile driver according to the production process or early warning disposal strategy and prompts the pile driver's current action, including control and prompts of start, pause, end, continue driving, repeat driving, and ticket stub printing; the key data display module selects the key data form of the corresponding type of pile according to the production type of the pile driver, displays the real-time sensor detection data through the key data form, and displays the pile production process at the same time; the early warning module The sensor detection data is monitored in real time, and when an early warning situation occurs, an alarm message is triggered or the pile driver is triggered to automatically perform a corresponding action according to the early warning disposal strategy, and the early warning situation, early warning disposal strategy and early warning disposal information are sent to the construction monitoring platform and the mobile terminal according to the early warning closed-loop strategy, and the early warning disposal information sent by the construction monitoring platform and the mobile terminal is received; when the early warning situation completes all early warning disposal according to the early warning disposal strategy, the early warning closed loop is realized; the local storage module is used to store all sensor detection data and control records of the current pile, and after the pile driver setting module and the pile number selection module are set, all sensor detection data and control records of the previous pile are cleared; the wireless transmission module establishes a communication connection between the front-end controller and the pile construction supervision platform and the mobile terminal, receives the pile driver construction volume and early warning configuration information from the pile construction supervision platform, sends real-time sensor detection data and control records to the pile construction supervision platform, sends early warning situation, early warning disposal strategy and early warning disposal information to the pile construction supervision platform and the mobile terminal, and receives early warning disposal information from the mobile terminal.
[0027] The front-end controller of this case uses the display interface to display each visual module in a partitioned manner. Except for the permission information, other information is operated by clicking buttons or drop-down menus to avoid errors. In terms of number selection, it can also be selected by adding or subtracting ascending or descending methods. The click buttons are displayed in a highlighted manner, and the minimum size of each click button and drop-down option is limited. Key data forms, control buttons, and current action prompts of the pile driver are displayed on the same interface. The control buttons include start, pause, end, continue, repeat, and ticket stub printing. Early warning information is reminded through pop-up windows. Construction workers are generally older, have poor eyesight and concentration, and there may be errors in data information acquisition. The pop-up reminder function pops up a dialog box with enlarged font according to the data exceeding the limit, effectively reminding construction workers to take timely and effective disposal measures.
[0028] The re-driving function, when data exceeds the limit or pile driver fails during the construction process, the construction personnel can select the "re-driving" button to avoid triggering the early warning and wait for the re-driving to re-evaluate the pile quality; it can greatly reduce the false alarms caused by special circumstances such as power outages, pipe exposure, and pile driver maintenance. The continued driving function is mainly to continue driving after power outages. When a power outage occurs during the construction process, the construction personnel do not need to perform any operations on the equipment. The system automatically saves the construction status before the power outage and can continue construction after the power is restored. The continued transmission function is mainly to continue transmission after network disconnection. The system adopts a dual-card dual-server data backup mechanism. Generally, there will be no network disconnection. Even if there is a short network disconnection under special working conditions, the system will save the monitoring data locally and continue to transmit the data after the network is restored to ensure that the data is not lost.
[0029] like Figure 1 As shown, the mobile terminal includes a total construction process statistics module, a single pile driver construction record module, a single pile production construction record module and an early warning module; the total construction process statistics module accesses the pile production process database, combines the total construction volume, and summarizes and displays the total construction process in the form of pictures, texts and tables; the single pile driver construction record module accesses the production process data of the corresponding pile driver in the pile production process database, and summarizes and displays the construction records of the single pile driver in the form of pictures, texts and tables; the single pile production construction record module accesses the production process data of the corresponding pile in the pile production process database, and summarizes and displays the construction records of the single pile driver in the form of pictures, texts and tables; the early warning module summarizes and displays all early warning situations and corresponding early warning disposal strategies and early warning disposal information, performs early warning disposal on the early warning situation according to the early warning disposal strategy, and sends the early warning disposal information to the pile construction supervision platform and the front-end controller; when the early warning situation completes all early warning disposal according to the early warning disposal strategy, the early warning closed loop is realized.
[0030] like Figure 2 As shown, a method applicable to the above-mentioned soft foundation automated construction system comprises the following steps: Step 1. Plan the total construction volume and the construction volume of each pile driver through the pile construction supervision platform, mark all pile locations and pile numbers on the electronic map, distinguish different types of piles, distinguish completed piles, piles under construction and piles that have not started construction, divide all piles into zones and use the same pile driver for production of piles in the same zone; perform early warning configuration, set early warning parameters, early warning thresholds, early warning levels, early warning disposal strategies and early warning closed-loop strategies; send the construction volume of each pile driver and the corresponding early warning configuration information to the front-end controller connected to the corresponding pile driver; Step 2: Install the sensor on the pile driver, use the sensor to collect the location information and real-time construction information of the pile driver and send it to the front-end controller; the front-end controller communicates with the sensors on the pile driver at the construction site; Step 3, set up the pile driver on the front-end controller, establish a communication connection between the front-end controller and each sensor on the corresponding pile driver, and configure the parameters of each sensor; select the pile number on the front-end controller, and determine whether the pile number selection is correct based on the corresponding relationship between the position information detected by the positioning sensor and the pile number; after completing the pile driver setting and pile number selection, the front-end controller clears all sensor detection data and control records of the previous pile stored locally; Step 4: The sensor collects real-time construction information of the pile driver. The front-end controller starts to store all sensor detection data and control records of the current pile locally, and starts to send real-time sensor detection data and control records to the pile construction supervision platform. The construction supervision platform stores the sensor detection data and control records according to the pile driver and pile number. Step 5. According to the production process or early warning disposal strategy, the pile driver is controlled on the front-end controller, including the control of start, pause, end, continue driving, repeat driving, and ticket stub printing; in the pile production process, the sensor detection data is monitored in real time according to the early warning parameters, early warning thresholds and early warning levels. When an early warning occurs, the alarm information is triggered or the pile driver is triggered to automatically perform the corresponding action according to the early warning disposal strategy, and the early warning situation, early warning disposal strategy and early warning disposal information are sent to the construction monitoring platform and mobile terminal according to the early warning closed-loop strategy; Step 6. The construction monitoring platform performs early warning treatment on the early warning situation according to the early warning treatment strategy and sends early warning treatment information to the front-end controller and the mobile terminal; the mobile terminal performs early warning treatment on the early warning situation according to the early warning treatment strategy and sends early warning treatment information to the pile construction supervision platform and the front-end controller; Step 7. When all warning situations are handled according to the warning handling strategy, the warning closed loop is realized, the production process is restored, and the process returns to Step 5.
[0031] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the above embodiments do not limit the present invention in any form, and any technical solution obtained by equivalent replacement or equivalent transformation falls within the protection scope of the present invention.
Claims
1. A soft foundation automated construction system, characterized in that: It includes a pile construction supervision platform, a front-end controller, a sensor and a mobile terminal; the sensor is installed on the pile driver, collects the location information and real-time construction information of the pile driver and sends it to the front-end controller, and the front-end controller communicates with the sensors on the pile driver at the construction site; The pile construction supervision platform carries out overall planning of the construction project, determines the pile type and pile position, plans the total construction volume and the construction volume of each pile driver, performs early warning configuration, collects early warning information and project progress information, performs early warning disposal on the early warning situation according to the early warning disposal strategy, and sends the early warning disposal information to the front-end controller and the mobile terminal, wherein the early warning configuration includes setting early warning parameters, early warning thresholds, early warning levels, early warning disposal strategies and early warning closed-loop strategies; the front-end controller controls the pile driver at the construction site, locally stores and uploads all sensor detection data and control records of the current pile, monitors the sensor detection data in real time according to the early warning configuration, performs early warning disposal on the early warning situation according to the early warning disposal strategy when an early warning situation occurs, and sends the early warning disposal information to the pile construction supervision platform and the mobile terminal; the mobile terminal checks and displays the total construction process, the construction record of a single pile driver and the production construction record of a single pile, performs early warning disposal on the early warning situation according to the early warning disposal strategy, and sends the early warning disposal information to the pile construction supervision platform and the front-end controller; when the early warning situation completes all early warning disposal according to the early warning disposal strategy, the early warning closed loop is realized.
2. The soft foundation automated construction system according to claim 1, characterized in that: The construction monitoring platform includes a dynamic simulation pile production model library, an early warning configuration module, a project planning module, a pile production process database, a pile production demonstration module, an early warning module and a data reporting module; The dynamic simulation pile production model library stores production models of various types of piles, and uses sensor detection data and control records of the pile production construction process as dynamic parameters of the pile production model; The warning configuration module is used to set warning parameters, warning thresholds, warning levels, warning disposal strategies and warning closed-loop strategies; The project planning module plans the total construction volume and the construction volume of each pile driver, and marks the positions of all piles and the pile numbers on the electronic map, distinguishes different types of piles, distinguishes completed piles, piles under construction, and piles that have not started construction, divides all piles into zones, and plans to use the same pile driver to produce piles in the same zone; The pile production process database stores sensor detection data and control records of the pile production construction process according to the pile driver and the pile number, wherein the control record is an action record of the pile driver; The pile production demonstration module retrieves the production model of the corresponding type of pile from the dynamic simulation pile production model library according to the pile number, retrieves the sensor detection data and control records of the corresponding pile production construction process from the pile production process database, and forms a pile production demonstration animation; The warning module summarizes and displays all warning situations and corresponding warning handling strategies and warning handling information, handles the warning situations according to the warning handling strategies, and sends the warning handling information to the front-end controller and the mobile terminal; When all warning situations are handled according to the warning handling strategy, the warning closed loop is achieved; The data reporting module retrieves the pile production process database, summarizes the construction volume of each pile driver according to the time period and displays it in pictures, texts and tables, and summarizes the total construction volume according to the time period and displays it in pictures, texts and tables.
3. The soft foundation automated construction system according to claim 1, characterized in that: The front-end controller includes a pile driver setting module, a pile number selection module, a control and prompt module, a key data display module, an early warning module, a local storage module and a wireless transmission module; The pile driver setting module is used to select a pile driver and establish a communication connection with each sensor on the pile driver, and configure parameters of each sensor; The pile number selection module establishes a pile number selection list according to all piles planned to be produced by the pile driver, and selects the pile number of the current pile from the selection list; Determine whether the pile number selection is correct based on the corresponding relationship between the position information detected by the positioning sensor and the pile number; The control and prompt module controls the pile driver according to the production process or early warning disposal strategy and prompts the current action of the pile driver, including the control and prompts of start, pause, end, continue driving, repeat driving, and ticket stub printing; The key data display module is used to select a key data form for a pile of a corresponding type according to the production type of the pile driver, and to display real-time sensor detection data and the pile production process through the key data form; The early warning module monitors the sensor detection data in real time according to the early warning parameters, early warning thresholds and early warning levels, triggers alarm information or triggers the pile driver to automatically perform corresponding actions according to the early warning disposal strategy when an early warning situation occurs, and sends the early warning situation, early warning disposal strategy and early warning disposal information to the construction monitoring platform and the mobile terminal according to the early warning closed-loop strategy, and receives the early warning disposal information sent by the construction monitoring platform and the mobile terminal; when the early warning situation completes all early warning disposal according to the early warning disposal strategy, the early warning closed-loop is realized; The local storage module is used to store all sensor detection data and control records of the current pile, and clear all sensor detection data and control records of the previous pile after the pile driver setting module and the pile number selection module complete the setting; The wireless transmission module establishes a communication connection between the front-end controller and the pile construction supervision platform and the mobile terminal, receives the pile driver construction volume and early warning configuration information from the pile construction supervision platform, sends real-time sensor detection data and control records to the pile construction supervision platform, sends early warning conditions, early warning disposal strategies and early warning disposal information to the pile construction supervision platform and the mobile terminal, and receives early warning disposal information from the mobile terminal.
4. The soft foundation automated construction system according to claim 3, characterized in that: The front-end controller partitions and displays each visual module through a display interface; except for the permission information, other information is operated by clicking buttons or drop-down menus, and the click buttons are displayed in a highlighted manner, and the minimum size of each click button and drop-down option is limited; Key data forms, control buttons, and current action prompts of the pile driver are displayed on the same interface. The control buttons include start, pause, end, continue, repeat, and ticket stub printing; early warning information is reminded through pop-up windows.
5. The soft foundation automated construction system according to claim 1, characterized in that: The mobile terminal includes a total construction progress statistics module, a single pile driver construction record module, a single pile production construction record module and an early warning module; The total construction progress statistics module accesses the pile production process database, combines the total construction volume, and summarizes and displays the total construction progress in the form of pictures, texts, and tables; The single pile driver construction record module accesses the production process data of the corresponding pile driver in the pile production process database, and summarizes and displays the single pile driver construction record in the form of pictures, texts and tables; The single pile production construction record module accesses the production process data of the corresponding pile in the pile production process database, and summarizes and displays the single pile driver construction record in the form of pictures, texts and tables; The early warning module summarizes and displays all early warning situations and corresponding early warning disposal strategies and early warning disposal information, performs early warning disposal on the early warning situation according to the early warning disposal strategy and sends the early warning disposal information to the pile construction supervision platform and the front-end controller; when all early warning disposals are completed according to the early warning disposal strategy, the early warning closed loop is realized.
6. The soft foundation automated construction system according to claim 1, characterized in that: The types of piles include cement mixing piles, high-pressure rotary jet piles, hammer piles, static pressure piles and plastic drainage sheet piles; the sensors installed on the pile driver for producing cement mixing piles include flow meters, inclination sensors, pile length sensors, paddle volume sensors, current sensors and positioning sensors; the sensors installed on the pile driver for producing high-pressure rotary jet piles include flow meters, slurry pressure sensors, air flow sensors, inclination sensors, pile length sensors, current sensors and positioning sensors; the sensors installed on the pile driver for producing hammer piles include inclination sensors, depth sensors and positioning sensors; the sensors installed on the pile driver for producing static pressure piles include pile holding force sensors, pile length sensors, inclination sensors, pile pressure force sensors and positioning sensors; the sensors installed on the pile driver for producing plastic drainage sheet piles include displacement sensors and positioning sensors.
7. A soft foundation automated construction method, characterized in that: The steps include: Step 1. Plan the total construction volume and the construction volume of each pile driver through the pile construction supervision platform, mark all pile locations and pile numbers on the electronic map, distinguish different types of piles, distinguish completed piles, piles under construction and piles that have not started construction, divide all piles into zones and plan to use the same pile driver for production in the same zone; perform early warning configuration, set early warning parameters, early warning thresholds, early warning levels, early warning disposal strategies and early warning closed-loop strategies; Sending the construction volume of each pile driver and the corresponding warning configuration information to the front-end controller connected to the corresponding pile driver; Step 2: Install the sensor on the pile driver, use the sensor to collect the location information and real-time construction information of the pile driver and send it to the front-end controller; the front-end controller communicates with the sensors on the pile driver at the construction site; Step 3, set up the pile driver on the front-end controller, establish a communication connection between the front-end controller and each sensor on the corresponding pile driver, and configure the parameters of each sensor; select the pile number on the front-end controller, and determine whether the pile number selection is correct based on the corresponding relationship between the position information detected by the positioning sensor and the pile number; after completing the pile driver setting and pile number selection, the front-end controller clears all sensor detection data and control records of the previous pile stored locally; Step 4: The sensor collects real-time construction information of the pile driver. The front-end controller starts to store all sensor detection data and control records of the current pile locally, and starts to send real-time sensor detection data and control records to the pile construction supervision platform. The construction supervision platform stores the sensor detection data and control records according to the pile driver and pile number. Step 5. According to the production process or early warning disposal strategy, the pile driver is controlled on the front-end controller, including the control of start, pause, end, continue driving, repeat driving, and ticket stub printing; in the pile production process, the sensor detection data is monitored in real time according to the early warning parameters, early warning thresholds and early warning levels. When an early warning occurs, the alarm information is triggered or the pile driver is triggered to automatically perform the corresponding action according to the early warning disposal strategy, and the early warning situation, early warning disposal strategy and early warning disposal information are sent to the construction monitoring platform and mobile terminal according to the early warning closed-loop strategy; Step 6: The construction monitoring platform handles the warning situation according to the warning handling strategy and sends the warning handling information to the front-end controller and the mobile terminal; The mobile terminal handles the warning situation according to the warning handling strategy and sends the warning handling information to the pile construction supervision platform and the front-end controller; Step 7. When all warning situations are handled according to the warning handling strategy, the warning closed loop is realized, the production process is restored, and the process returns to Step 5.
8. The method for automated soft foundation construction according to claim 7, characterized in that: The construction monitoring platform includes a dynamic simulation pile production model library, an early warning configuration module, a project planning module, a pile production process database, a pile production demonstration module, an early warning module and a data reporting module; the front-end controller includes a pile driver setting module, a pile number selection module, a control and prompt module, a key data display module, an early warning module, a local storage module and a wireless transmission module; the mobile terminal includes a total construction process statistics module, a single pile driver construction record module, a single pile production construction record module, and an early warning module.
9. The method for automated soft foundation construction according to claim 7, characterized in that: The front-end controller partitions and displays each visual module through a display interface; except for the permission information, other information is operated by clicking buttons or drop-down menus, and the click buttons are displayed in a highlighted manner, and the minimum size of each click button and drop-down option is limited; Key data forms, control buttons, and current action prompts of the pile driver are displayed on the same interface. The control buttons include start, pause, end, continue, repeat, and ticket stub printing; early warning information is reminded through pop-up windows.
10. The method for automated soft foundation construction according to claim 7, characterized in that: The front-end controller is provided with a power-off resume module and a network disconnection resume module; the power-off resume module means that when a power outage occurs during the construction process, the front-end controller automatically saves the construction status before the power outage, and after the power is restored, the construction is continued based on the saved construction status; the network disconnection resume module means that the front-end controller adopts a dual-card dual-server data backup mechanism, when a network disconnection occurs during the construction process, the front-end controller continues to store the data locally, and after the network is restored, the data is resumed based on the local storage to ensure that the data is not lost.