Open cut tunnel drainage ditch and design method thereof
By dividing the drainage area of open-dig tunnels into different sections and laying drainage ditches of corresponding sizes, the problem of unreasonable drainage system design in traditional technology is solved, and a more efficient and stable tunnel drainage system is achieved, ensuring the safety of tunnel operation and optimized use of resources.
Patent Information
- Application Number
- CN202411149066.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-21
AI Technical Summary
The use of uniform-sized drainage ditches in traditional open-dig tunnel drainage systems cannot adapt to the drainage needs of different sections in the tunnel, resulting in low drainage efficiency, waste of resources and increased safety risks.
The drainage area of the tunnel is divided into three sections: the section with small displacement, the section with large displacement and the transition section. The drainage ditch of different sizes and shapes are arranged, including small, large and transitional drainage ditches, and through The gutter fill layer is connected to ensure the continuity and adaptability of slope and dimensions.
It improves the accuracy, economy and stability of the drainage system, adapts to complex tunnel environments, ensures water flow continuity and safety, reduces construction and maintenance difficulties, and avoids water flow backflow and erosion problems.
Smart Images

Figure CN119021345A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of municipal engineering, in particular to an open-cut tunnel drainage ditch and a design method thereof. Background Art
[0002] As a tunnel construction technology widely used in areas with shallow surface burial depth, open-cut tunnel construction plays an important role in various tunnel projects. In the whole process of open-cut tunnel construction and later operation, it is very important to effectively manage the drainage of surface rainwater in the open section and various water sources such as cleaning water generated inside the tunnel. If the drainage facilities are not configured reasonably or operate poorly, it may cause water accumulation on the road surface inside the tunnel. Once the depth of water accumulation exceeds the safety threshold, it will greatly increase the risk of traffic safety accidents.
[0003] The traditional layout of the drainage system of the open-cut tunnel usually adopts drainage ditches of uniform size. This layout has the following shortcomings: it cannot adapt to the drainage needs of different sections in the tunnel. If drainage ditches of uniform size are used, the drainage needs of different sections cannot be met, affecting drainage efficiency and safety. Specifically, when the drainage ditch size is too large, it causes waste of materials and human resources. In the traditional layout method, in order to ensure the safety and reliability of the drainage system, a larger drainage ditch size is usually selected. However, this practice will lead to waste of materials and human resources and increase construction costs. When the drainage ditch size is too small, the drainage effect is affected. If the drainage ditch size is too small, the drainage capacity of the drainage ditch will not be able to meet the needs in sections with more groundwater or longer drainage distances, resulting in untimely drainage and affecting the safety of tunnel operations.
[0004] In summary, the existing technology lacks a scientific, reasonable, efficient and stable drainage system in the open-cut tunnel construction design stage. Summary of the invention
[0005] The present invention aims to provide an open-cut tunnel drainage ditch and a design method thereof, which can meet the drainage requirements of different sections in the tunnel.
[0006] According to one aspect of the present invention, there is provided an open-cut tunnel drainage ditch and a design method thereof, comprising the following steps: according to the drainage needs and structural requirements of the tunnel, the drainage area of the tunnel is divided into three sections, wherein the first section is a section with a small drainage volume, and its length is L1; the second section is a section with a large drainage volume, and its length is L2; the third section is a transition section between the first section and the second section, and its length is L3; drainage ditches of different sizes are arranged according to the divided drainage areas.
[0007] Preferably, according to the divided drainage areas, drainage ditches of different sizes are arranged, including: a small drainage ditch 2-4 is arranged in the first section, the small drainage ditch 2-4 is disc-shaped, and its longitudinal slope is i1%, and the i1% is consistent with the longitudinal slope of the tunnel; a large drainage ditch 2-1 is arranged in the second section, and the longitudinal slope of the large drainage ditch 2-1 is i1%; the i1% is consistent with the longitudinal slope of the tunnel; a transition type 1 drainage ditch 2-2 and a transition type 2 drainage ditch 2-3 are arranged in the third section, and the longitudinal slope of the transition type 1 drainage ditch 2-2 and the transition type 2 drainage ditch 2-3 is i2%, and i1%>i2%≥0.3%.
[0008] Preferably, arranging the transition type 1 drainage ditch 2-2 and the transition type 2 drainage ditch 2-3 in the third section includes: setting the transition type 1 drainage ditch 2-2 to connect with the large drainage ditch 2-1; setting the transition type 2 drainage ditch 2-3 to connect with the transition type 1 drainage ditch 2-2 and the small drainage ditch 2-4.
[0009] Preferably, setting a transition type 1 drainage ditch 2-2 so that it is connected with the large drainage ditch 2-1 includes: backfilling a ditch filling layer 3-1 at the bottom of the transition type 1 drainage ditch 2-2 for adjusting in the vertical direction to connect with the large drainage ditch 2-1; connecting the small drainage ditch 2-4 with the transition type 2 drainage ditch 2-3 includes: backfilling a ditch filling layer 3-1 at the bottom of the transition type 2 drainage ditch 2-3, and backfilling a ditch filling layer 3-1 on the side of the transition type 2 drainage ditch 2-3 adjacent to the side wall 1-7 of the large drainage ditch, for adjusting in the vertical and horizontal directions to connect with the small drainage ditch 2-4.
[0010] Preferably, the net width of the large drainage ditch 2-1 is B1, and the net height is H1; the net width of the small drainage ditch 2-4 is b1, and the net height is h1; the net width of the transition type 1 drainage ditch 2-2 is B1, and the net height is H2, wherein H2 is a change value, and H2 is calculated according to the following formula: H2=H1-I×(i1%-i2%), I is the horizontal distance from any position in the third section to the ditch gradient starting point 4-1, I≤L3; the net width of the transition type 2 drainage ditch 2-3 is B2, and the net height is H3, wherein B2 is a change value, and B2 is calculated according to the following formula: B2=b1+2×(L3-I)×(B1-b1) / L3; H3 is a change value, and H3 is calculated according to the following formula: H3=H1-I×(i1%-i2%).
[0011] Preferably, the flow cross-section A of the drainage ditch is calculated according to the following formula: A=Q / V, wherein Q is the drainage volume, and V is the design flow velocity, and the design flow velocity V is less than or equal to 4 m / s.
[0012] Preferably, the drainage demand includes rainwater, fire drainage, and tunnel internal cleaning water; the structural requirements include the topography and drainage load of the tunnel.
[0013] According to another aspect of the present invention, there is provided an open-cut tunnel drainage ditch, comprising: a first section, which is a section of the tunnel with a small drainage volume, and has a length of L1; a second section, which is a section of the tunnel with a large drainage volume, and has a length of L2; and a third section, which is a transition section between the first section and the second section, and has a length of L3.
[0014] Preferably, a small drainage ditch 2-4 is arranged in the first section, and the small drainage ditch 2-4 is disc-shaped and has a longitudinal slope of i1%, which is consistent with the longitudinal slope of the tunnel; a large drainage ditch 2-1 is arranged in the second section, and the longitudinal slope of the large drainage ditch 2-1 is i1%, which is consistent with the longitudinal slope of the tunnel; a transition type 1 drainage ditch 2-2 and a transition type 2 drainage ditch 2-3 are arranged in the third section, and the longitudinal slope of the transition type 1 drainage ditch 2-2 and the transition type 2 drainage ditch 2-3 is i2%, and i1%>i2%≥0.3%.
[0015] Preferably, the bottom of the transition type 1 drainage ditch 2-2 is backfilled with a ditch filling layer 3-1, which is used for adjustment in the vertical direction to connect with the large drainage ditch 2-1; the bottom of the transition type 2 drainage ditch 2-3 is backfilled with a ditch filling layer 3-1, and the side of the transition type 2 drainage ditch 2-3 adjacent to the large drainage ditch side wall 1-7 is backfilled with a ditch filling layer 3-1, which is used for adjustment in the vertical and horizontal directions to connect with the small drainage ditch 2-4.
[0016] The present invention discloses a drainage ditch of an open-cut tunnel and a design method thereof, the method comprising the following steps: according to the drainage demand and structural requirements of the tunnel, the drainage area of the tunnel is divided into three sections, wherein the first section is a section with a small drainage volume, and its length is L1; the second section is a section with a large drainage volume, and its length is L2; the third section is a transition section between the first section and the second section, and its length is L3; according to the divided drainage areas, drainage ditches of different sizes are arranged. The present invention can solve the problem of unreasonable drainage system design in the open-cut tunnel construction design stage, and adapt to the drainage needs of different sections in the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0018] Figure 1 is a plan view of drainage ditch layout of an open-cut tunnel according to an embodiment of the present invention;
[0019] Figure 2 It is a elevational layout diagram of drainage ditches in an open-cut tunnel according to an embodiment of the present invention;
[0020] Figure 3 It is a cross-sectional view of the drainage ditch of an open-cut tunnel according to an embodiment of the present invention, Ⅰ-Ⅰ;
[0021] Figure 4 It is a cross-sectional view of the drainage ditch II-II of an open-cut tunnel according to an embodiment of the present invention;
[0022] Figure 5 is a cross-sectional view of a drainage ditch of an open-cut tunnel according to an embodiment of the present invention; and
[0023] Figure 6 It is a cross-sectional view of IV-IV of an open-cut tunnel drainage ditch according to an embodiment of the present invention.
[0024] In the figure: 1. Open-cut main tunnel; 1-1. Tunnel side walls; 1-2. Tunnel middle wall; 1-3. Tunnel floor; 1-4. Tunnel roof; 1-5. Tunnel pavement; 1-6. Tunnel crash pier; 1-7: Large drainage ditch side walls; 1-8: Small drainage ditch side walls; 2-1. Large drainage ditch; 2-2. Transition type 1 drainage ditch; 2-3. Transition type 2 drainage ditch; 2-4. Small drainage ditch; 3-1. Ditch filling layer; 4-1: Ditch gradient starting point; 4-2: Ditch gradient end point. DETAILED DESCRIPTION
[0025] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0026] Reference will now be made in detail to various embodiments of the present invention, examples of which are shown in the accompanying drawings and described below. For ease of interpretation and precise definition in the appended claims, the terms "upper", "lower", "inner" and "outer" are used to describe features of the exemplary embodiments shown in the drawings with reference to their positions.
[0027] An embodiment of the present invention provides a method for designing a drainage ditch in an open-cut tunnel, comprising the following steps: according to the drainage needs and structural requirements of the tunnel, the drainage area of the tunnel is divided into three sections, wherein the first section is a section with a small drainage volume, and its length is L1; the second section is a section with a large drainage volume, and its length is L2; the third section is a transition section between the first section and the second section, and its length is L3; drainage ditches of different sizes are arranged according to the divided drainage areas.
[0028] In the prior art, the drainage system layout usually adopts drainage ditches of uniform size, which cannot adapt to the drainage needs of different sections in the tunnel. In the embodiment of the present invention, by dividing the drainage area of the tunnel into a first section with a small drainage volume, a second section with a large drainage volume, and a transition section between the first section and the second section, drainage ditches of different sizes are arranged respectively, which solves the problems of low drainage efficiency, waste of resources and lack of flexibility caused by the use of drainage ditches of uniform size in the prior art, making the drainage system more accurate, economical and adaptable to complex tunnel environments. In addition, the present invention can also be divided into four sections or more according to drainage needs, structural requirements, etc.
[0029] According to an embodiment of the present invention, drainage ditches of different sizes are arranged according to the divided drainage areas, including: a small drainage ditch 2-4 is arranged in the first section, the small drainage ditch 2-4 is disc-shaped, and its longitudinal slope is i1%, and the i1% is consistent with the longitudinal slope of the tunnel; a large drainage ditch 2-1 is arranged in the second section, and the longitudinal slope of the large drainage ditch 2-1 is i1%, and the i1% is consistent with the longitudinal slope of the tunnel; a transition type 1 drainage ditch 2-2 and a transition type 2 drainage ditch 2-3 are arranged in the third section, and the longitudinal slope of the transition type 1 drainage ditch 2-2 and the transition type 2 drainage ditch 2-3 is i2%, and i1%>i2%≥0.3%.
[0030] In the embodiment of the present invention, by arranging drainage ditches of corresponding sizes and shapes in different drainage areas, the problem of single drainage ditch design in the prior art and inability to fully adapt to the drainage needs of each section of the tunnel is solved. Specifically, a small dish-shaped drainage ditch is arranged in the first section with a small drainage volume, so that it is consistent with the longitudinal slope of the tunnel to ensure smooth drainage; a large drainage ditch is arranged in the second section with a large drainage volume to cope with high drainage needs; a transitional drainage ditch is arranged in the third section, and the continuity and smoothness of drainage in each section are ensured by setting an adaptive longitudinal slope. The design of the small drainage ditch 2-4 with the large drainage ditch 2-1 having the same slope helps to maintain the continuity of the water flow and avoid the problem of water backflow or scouring caused by the difference in slope, thereby simplifying the construction, reducing the difficulty of maintenance, and improving the efficiency and stability of the entire drainage system. The slope design of i1%>i2%≥0.3% can effectively control the water flow speed and reduce the scouring force by reducing the slope of the drainage ditch in the transition section, thereby avoiding damage to the drainage ditch structure. In addition, ensuring that i2% is not less than 0.3% can also ensure the smooth discharge of water, prevent water accumulation and silt deposition, and improve the overall stability and efficiency of the drainage system.
[0031] According to an embodiment of the present invention, arranging the transition type 1 drainage ditch 2-2 and the transition type 2 drainage ditch 2-3 in the third section includes: setting the transition type 1 drainage ditch 2-2 to connect with the large drainage ditch 2-1; setting the transition type 2 drainage ditch 2-3 to connect with the transition type 1 drainage ditch 2-2 and the small drainage ditch 2-4.
[0032] According to an embodiment of the present invention, setting a transition type 1 drainage ditch 2-2 so as to connect with the large drainage ditch 2-1 includes: backfilling a ditch filling layer 3-1 at the bottom of the transition type 1 drainage ditch 2-2 for adjusting in the vertical direction to connect with the large drainage ditch 2-1; connecting the small drainage ditch 2-4 with the transition type 2 drainage ditch 2-3 includes: backfilling a ditch filling layer 3-1 at the bottom of the transition type 2 drainage ditch 2-3, and backfilling a ditch filling layer 3-1 at the side of the transition type 2 drainage ditch 2-3 adjacent to the side wall 1-7 of the large drainage ditch, for adjusting in the vertical and horizontal directions to connect with the small drainage ditch 2-4.
[0033] In the embodiment of the present invention, a ditch filling layer is provided at the bottom or side of the transition type 1 drainage ditch and the transition type 2 drainage ditch, thereby solving the height difference and discontinuity problem when connecting drainage ditches of different sizes in the prior art. Specifically, by backfilling the ditch filling layer at the bottom of the transition type 1 drainage ditch, it is smoothly connected with the large drainage ditch in the vertical direction, and at the same time, the ditch filling layer is backfilled at the bottom and side of the transition type 2 drainage ditch to ensure a smooth transition with the small drainage ditch in the vertical and horizontal directions, thereby ensuring the continuity and stability of the entire drainage system and improving the drainage efficiency and reliability of the tunnel drainage system.
[0034] According to an embodiment of the present invention, the net width of the large drainage ditch 2-1 is B1, and the net height is H1; the net width of the small drainage ditch 2-4 is b1, and the net height is h1; the net width of the transition type 1 drainage ditch 2-2 is B1, and the net height is H2, wherein H2 is a change value, and H2 is calculated according to the following formula: H2=H1-I×(i1%-i2%), I is the horizontal distance from any position in the third section to the ditch gradient starting point 4-1, I≤L3; the net width of the transition type 2 drainage ditch 2-3 is B2, and the net height is H3, wherein B2 is a change value, and B2 is calculated according to the following formula: B2=b1+2×(L3-I)×(B1-b1) / L3; H3 is a change value, and H3 is calculated according to the following formula: H3=H1-I×(i1%-i2%).
[0035] In the embodiment of the present invention, by accurately calculating and setting the net width and net height of large drainage ditches, small drainage ditches and transitional drainage ditches, the problems of poor drainage and discontinuous connection caused by the mismatch of sizes between different drainage ditches in the prior art are solved. Specifically, the calculation formula of the net height H2 of the transitional type 1 drainage ditch 2-2 and the net height H3 of the transitional type 2 drainage ditch 2-3 gradually reduces the height as the horizontal distance I increases by considering the slope difference (i1%-i2%) at different positions of the tunnel. This design ensures that the height transition of the drainage ditch in different slope areas is natural, avoiding water flow impact or structural instability caused by sudden changes in the height of the drainage ditch, thereby ensuring the stability and efficiency of the drainage system. The calculation formula of the net width B2 of the transitional type 2 drainage ditch 2-3 gradually transitions from the width b1 of the small drainage ditch to the width B1 of the large drainage ditch according to the length L3 of the transition section and the horizontal distance I from the starting point of the gradual change of the ditch. Through this gradual change design, the width of the drainage ditch can be naturally transitioned, avoiding water flow turbulence or structural stress concentration caused by sudden changes in width, thereby ensuring the stability and fluidity of the drainage system.
[0036] According to an embodiment of the present invention, the flow cross-section A of the drainage ditch is calculated according to the following formula: A=Q / V, wherein Q is the drainage volume, and V is the design flow velocity, and the design flow velocity V is less than or equal to 4 m / s.
[0037] In the embodiment of the present invention, by introducing the calculation formula of the flow cross section, the problem of mismatch between flow velocity and drainage volume in the design of drainage ditches in the prior art is solved. Specifically, by using the formula A=Q / V to calculate the flow cross section of the drainage ditch, the design flow velocity V is strictly controlled to be no more than 4m / s, ensuring that the drainage system can drain water efficiently while avoiding scouring and structural damage caused by excessive flow velocity, thereby improving the stability and service life of the tunnel drainage system.
[0038] According to an embodiment of the present invention, the drainage demand includes rainwater, fire drainage, and tunnel internal cleaning water; the structural requirements include the topography of the tunnel and the drainage load.
[0039] According to another embodiment of the present invention, there is provided an open-cut tunnel drainage ditch, comprising: a first section, which is a section of the tunnel with a small drainage volume, and has a length of L1; a second section, which is a section of the tunnel with a large drainage volume, and has a length of L2; and a third section, which is a transition section between the first section and the second section, and has a length of L3.
[0040] In the prior art, the drainage system layout usually adopts drainage ditches of uniform size, which cannot adapt to the drainage needs of different sections in the tunnel. In the embodiment of the present invention, by dividing the drainage area of the tunnel into a first section with a small drainage volume, a second section with a large drainage volume, and a transition section between the first section and the second section, drainage ditches of different sizes are arranged respectively, which solves the problems of low drainage efficiency, waste of resources and lack of flexibility caused by the use of drainage ditches of uniform size in the prior art, making the drainage system more accurate, economical and adaptable to complex tunnel environments. In addition, the present invention can also be divided into four sections or more according to drainage needs, structural requirements, etc.
[0041] According to an embodiment of the present invention, a small drainage ditch 2-4 is arranged in the first section, and the small drainage ditch 2-4 is disc-shaped, and its longitudinal slope is i1%, and the i1% is consistent with the longitudinal slope of the tunnel; a large drainage ditch 2-1 is arranged in the second section, and the longitudinal slope of the large drainage ditch 2-1 is i1%, and the i1% is consistent with the longitudinal slope of the tunnel; a transition type 1 drainage ditch 2-2 and a transition type 2 drainage ditch 2-3 are arranged in the third section, and the longitudinal slope of the transition type 1 drainage ditch 2-2 and the transition type 2 drainage ditch 2-3 is i2%, and i1%>i2%≥0.3%.
[0042] According to an embodiment of the present invention, the bottom of the transition type 1 drainage ditch 2-2 is backfilled with a ditch filling layer 3-1, which is used for adjusting in the vertical direction to connect with the large drainage ditch 2-1; the bottom of the transition type 2 drainage ditch 2-3 is backfilled with a ditch filling layer 3-1, and the side of the transition type 2 drainage ditch 2-3 adjacent to the large drainage ditch side wall 1-7 is backfilled with a ditch filling layer 3-1, which is used for adjusting in the vertical and horizontal directions to connect with the small drainage ditch 2-4.
[0043] The method of the present invention is further described in detail below in conjunction with specific implementation modes and drawings.
[0044] The design method and steps of the open-cut tunnel drainage ditch are as follows:
[0045] (1) Drainage area division: During the design phase of an open-cut tunnel, the tunnel is first divided into several drainage areas based on the drainage requirements of different sections in the tunnel. The division of each drainage area should take into account factors such as rainwater, fire drainage, and tunnel internal cleaning water.
[0046] Figure 1 is a plan view of a drainage ditch according to an embodiment of the present invention, Figure 2 The elevational layout diagram of the drainage ditch according to an embodiment of the present invention is shown as follows: Figure 1 , Figure 2As shown, the connecting section of the large drainage ditch and the small drainage ditch is divided into three sections. Section 1 is L1 long and is the small drainage ditch section. Section 2 is L2 long and is the large drainage ditch section. Section 3 is L3 long and is the transition section, which is divided into transition section 1 and transition section 2. Transition section 1 is a vertical transition section, and transition section 2 is a horizontal and vertical transition section.
[0047] (2) Determination of drainage ditch dimensions: For each drainage area, designers need to calculate the required drainage ditch dimensions based on parameters such as drainage volume, drainage distance, and drainage time, using hydraulic principles and drainage system design experience. These dimensions include the width, depth, and slope of the drainage ditch to ensure that the drainage ditch can effectively collect and transport groundwater in the area.
[0048] A large drainage ditch 2-1 is used in the section with larger drainage volume. Its longitudinal slope is i1%, which is consistent with the longitudinal slope of the tunnel. Its clear width is B1 and its clear height is H1.
[0049] Small drainage ditches 2-4 are used in smaller sections of the drainage ditch. The small drainage ditch 2-4 is disc-shaped, and its longitudinal slope is i1%, which is consistent with the longitudinal slope of the tunnel, with a net width of b1 and a net height of h1.
[0050] The vertical transition section adopts transition type 1 drainage ditch 2-2 with a longitudinal slope of i2%, and i1%>i2%≥0.3%, a net width of B1, and a net height of H2, wherein H2 is a change value and is calculated according to the following formula: H2=H1-I×(i1%-i2%), I is the horizontal distance from any position in the third section to the starting point 4-1 of the ditch gradient, and I≤L3.
[0051] The horizontal and vertical transition sections use transition type 2 drainage ditches 2-3 with a longitudinal slope of i2%, and i1%>i2%≥0.3%. The net width is B2 and the net height is H3, among which B2 is a variable value, and B2 is calculated according to the following formula: B2=b1+2×(L3-I)×(B1-b1) / L3; H3 is a variable value, and H3 is calculated according to the following formula: H3=H1-I×(i1%-i2%).
[0052] The flow section A can be calculated using the following formula: A=Q / V, where A is the ditch area, Q is the discharge volume, and V is the design flow velocity. The maximum design flow velocity shall not exceed 4m / s.
[0053] (3) Drainage ditch setting: Based on the determined drainage ditch size, drainage ditches are set in each drainage area by prefabrication or cast-in-place method.
[0054] Arrange small drainage ditches 2-4 in the first section;
[0055] Arrange a large drainage ditch 2-1 in the second section;
[0056] Arrange transition type 1 drainage ditch 2-2 and transition type 2 drainage ditch 2-3 in the third section;
[0057] Backfill the ditch filling layer 3-1 at the bottom of the transition type 1 drainage ditch 2-2 for adjusting in the vertical direction to connect with the large drainage ditch 2-1;
[0058] The ditch filling layer 3-1 is backfilled at the bottom of the transition type 2 drainage ditch 2-3, and the ditch filling layer 3-1 is backfilled at the side of the transition type 2 drainage ditch 2-3 adjacent to the large drainage ditch side wall 1-7 for adjustment in the vertical and horizontal directions to connect with the small drainage ditch 2-4.
[0059] Through the implementation of the above technical solutions, the present invention can reasonably set the size and layout of the drainage ditch according to the specific conditions of different sections in the tunnel, thereby improving the overall performance and efficiency of the drainage system, ensuring the safety of tunnel operation, and maximizing the project investment benefits.
[0060] The above embodiments are only examples for clearly explaining the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, other different forms of changes or modifications may be made based on the following description, and these various changes, modifications, substitutions and deformations derived from the principles and spirit of the present invention still fall within the scope of protection of the present invention.
Claims
1. A method for designing drainage ditches in open-cut tunnels, characterized in that: The following steps are involved: According to the drainage needs and structural requirements of the tunnel, the drainage area of the tunnel is divided into three sections, among which: The first section is the section with small displacement, and its length is L1; The second section is the section with large displacement, and its length is L2; The third section is a transition section between the first section and the second section, and has a length of L3; Drainage ditches of different sizes are arranged according to the divided drainage areas.
2. The design method according to claim 1, characterized in that: According to the divided drainage area, drainage ditches of different sizes are arranged, including: Arranging a small drainage ditch (2-4) in the first section, wherein the small drainage ditch (2-4) is disc-shaped and has a longitudinal slope of i1%, wherein the i1% is consistent with the longitudinal slope of the tunnel; A large drainage ditch (2-1) is arranged in the second section, wherein the longitudinal slope of the large drainage ditch (2-1) is i1%; the i1% is consistent with the longitudinal slope of the tunnel; A transition type 1 drainage ditch (2-2) and a transition type 2 drainage ditch (2-3) are arranged in the third section, and the longitudinal slope of the transition type 1 drainage ditch (2-2) and the transition type 2 drainage ditch (2-3) is i2%, and i1%>i2%≥0.3%.
3. The design method according to claim 2, characterized in that: Arranging the transition type 1 drainage ditch (2-2) and the transition type 2 drainage ditch (2-3) in the third section comprises: A transition type 1 drainage ditch (2-2) is provided to connect with the large drainage ditch (2-1); A transition type 2 drainage ditch (2-3) is provided to connect with the transition type 1 drainage ditch (2-2) and the small drainage ditch (2-4).
4. The design method according to claim 3, characterized in that: Providing a transition type 1 drainage ditch (2-2) so that it can be connected with the large drainage ditch (2-1) comprises: backfilling a ditch filling layer (3-1) at the bottom of the transition type 1 drainage ditch (2-2) for adjusting in a vertical direction so as to be connected with the large drainage ditch (2-1); Connecting the small drainage ditch (2-4) with the transition type 2 drainage ditch (2-3) comprises: backfilling a ditch filling layer (3-1) at the bottom of the transition type 2 drainage ditch (2-3), and backfilling a ditch filling layer (3-1) at the side of the transition type 2 drainage ditch (2-3) adjacent to the large drainage ditch side wall (1-7), for adjusting in the vertical and horizontal directions to connect with the small drainage ditch (2-4).
5. The design method according to claim 4, characterized in that: The large drainage ditch (2-1) has a net width of B1 and a net height of H1; The small drainage ditch (2-4) has a net width of b1 and a net height of h1; The net width of the transition type 1 drainage ditch (2-2) is B1, and the net height is H2, wherein H2 is a change value, and H2 is calculated according to the following formula: H2=H1-I×(i1%-i2%), I is the horizontal distance from any position in the third section to the starting point (4-1) of the ditch gradient, and I≤L3; The net width of the transition type 2 drainage ditch (2-3) is B2, and the net height is H3, wherein B2 is a variable value, and B2 is calculated according to the following formula: B2=b1+2×(L3-I)×(B1-b1) / L3; H3 is a variable value, and H3 is calculated according to the following formula: H3=H1-I×(i1%-i2%).
6. The design method according to claim 5, characterized in that: Calculate the flow cross section A of the drainage ditch according to the following formula: A=Q / V, wherein Q is the discharge volume, and V is the design flow velocity, and the design flow velocity V is less than or equal to 4 m / s.
7. The design method according to claim 1, characterized in that: The drainage requirements include rainwater, fire drainage, and tunnel internal cleaning water; The structural requirements include the topography and drainage loads of the tunnel.
8. An open-cut tunnel drainage ditch, characterized in that: include: The first section is a section of the tunnel with a small displacement, and has a length of L1; The second section is a section with a large displacement of the tunnel, with a length of L2; The third section is a transition section between the first section and the second section, and has a length of L3.
9. The drainage ditch according to claim 8, characterized in that: A small drainage ditch (2-4) is arranged in the first section, the small drainage ditch (2-4) is disc-shaped, and its longitudinal slope is i1%, and the i1% is consistent with the longitudinal slope of the tunnel; A large drainage ditch (2-1) is arranged in the second section, and the longitudinal slope of the large drainage ditch (2-1) is i1%; the i1% is consistent with the longitudinal slope of the tunnel; A transition type 1 drainage ditch (2-2) and a transition type 2 drainage ditch (2-3) are arranged in the third section. The longitudinal slope of the transition type 1 drainage ditch (2-2) and the transition type 2 drainage ditch (2-3) is i2%, and i1%>i2%≥0.3%.
10. The drainage ditch according to claim 9, characterized in that: The bottom of the transition type 1 drainage ditch (2-2) is backfilled with a ditch filling layer (3-1) for adjusting in the vertical direction to connect with the large drainage ditch (2-1); The bottom of the transition type 2 drainage ditch (2-3) is backfilled with a ditch filling layer (3-1), and the side of the transition type 2 drainage ditch (2-3) adjacent to the large drainage ditch side wall (1-7) is backfilled with a ditch filling layer (3-1) for adjusting in the vertical and horizontal directions to connect with the small drainage ditch (2-4).
Citation Information
Patent Citations
Tunnel base local deep-buried drainage ditch structure
CN105673074A
Method for cleaning, separating and draining water at interchange tunnel bifurcation
CN116677452A
Flat stone inlet for stom water
CN205604401U
Shallow disc type kerb
CN209890991U
Affiliated groove transition structure for flared single-line tunnel and flared double-line tunnel
CN213510739U