Large well leakage treatment method
By using a gel-cement plugging method, this technique addresses the issue of low plugging success rates in existing technologies, effectively controlling well leakage in formations with large fractures or fractures.
Patent Information
- Application Number
- CN202310609532.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-26
- Publication Date
- 2024-11-26
AI Technical Summary
Existing technologies lack effective prevention and rapid treatment methods for large fractures or fractured-vuggy formations with severe leakage, resulting in low success rates for plugging leaks, long plugging cycles, and difficulty in treating some complex well leaks, thus affecting the progress of oil and gas exploration and development.
The gel-cement plugging method was adopted. The gel plugging slurry was prepared by measuring the size of the fracture, and the amount of gel and cement slurry was calculated by combining parameters such as wellbore size and formation pressure. After pumping the gel plugging slurry into the well, the isolation fluid and cement slurry were injected to ensure that the gel and cement slurry were effectively squeezed into the leakage fracture. After pumping was stopped, the well was pulled out to wait for solidification and the plugging effect was tested.
It improved the success rate of plugging leaks in large fractures or fractured formations, shortened the treatment time, and improved the effectiveness and safety of well leakage control.
Smart Images

Figure CN119021632A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a large-scale well leakage treatment method, belonging to the technical field of petroleum drilling. Background Art
[0002] At home and abroad, plugging materials represented by bridging, high water loss, and curable materials have been developed, forming a series of drilling fluid pressure plugging technologies, which have effectively solved the problems of permeability and small and micro fracture well leakage. However, there is currently no effective prevention and rapid treatment method for large fracture / fracture-hole malignant leakage formations. The success rate of one-time plugging is low, the plugging cycle is long, and some complex well leakage is difficult to treat and can only be treated by strong drilling. Malignant well leakage in fractured formations has become a global problem that restricts the progress of oil and gas exploration and development. Improving the success rate of one-time plugging of malignant well leakage is an urgent need for oil fields around the world to ensure "safe, efficient, and economical" drilling. Summary of the invention
[0003] In view of the above technical problems existing in the prior art, the present invention proposes a large-scale well leakage control method, which can be used to control large cracks or fracture-cavity malignant leakage formations.
[0004] The present invention proposes a large-scale well leakage control method, comprising:
[0005] After a large leak occurs, measure and determine the size of the crack. When the crack width is not less than 7mm, use gel and cement to plug the leak.
[0006] Prepare gel plugging slurry according to the gel volume calculation data;
[0007] Place the drilling tool assembly a certain distance above the leaking layer, pump gel plugging slurry into the well, then pump a certain amount of isolation fluid, and then inject cement slurry;
[0008] Inject the isolation fluid, replace the well slurry, squeeze all the gel plugging slurry and most of the cement slurry into the leakage fracture, and leave a certain amount of cement slurry in the open hole section;
[0009] Stop the pump and start drilling to a safe position to wait for solidification;
[0010] Drill down to sweep the cement plug and circulate the well slurry to test the plugging effect.
[0011] A further improvement of the present invention is that the gel amount calculation data includes wellbore size, formation pressure, lost circulation pressure, drilling tool assembly, fracture opening size and inclination.
[0012] A further improvement of the present invention is that the amount of gel plugging slurry and cement plugging slurry is calculated according to the following formula:
[0013] Q tg =Q bg +Q ag (1)
[0014] Q bg =68.1×(1-0.52 d ) (2)
[0015] Q ag =40+0.01×OH+13×(1+0.3×(sinα) 1.6 +0.26×(1-0.4 Δp ) (3)
[0016] Δp=P d +P1 (4)
[0017]
[0018] In the formula, Q tg is the total amount of gel prepared, m 3 ;Q bg The basic amount for preparing gel, m 3 ;Q ag Added amount for preparing gel, m 3 ; OH is the diameter of the wellbore, mm; α is the minimum angle between the fracture surface and the horizontal plane, °; d is the fracture opening size, m; Δp is the difference between the formation pore pressure and the leakage pressure, MPa; P d is the formation pore pressure, MPa; P l is the formation leakage pressure, MPa; Qs is the amount of cement slurry, m 3 .
[0019] A further improvement of the present invention is that the gel plugging slurry is made of one or a combination of acrylamide, alkyl dimethyl allyl ammonium chloride, N-alkyl acrylamide or N-hydroxymethyl acrylamide.
[0020] A further improvement of the present invention is that the viscosity of the prepared gel plugging slurry can be greater than 30000 mPa.s.
[0021] A further improvement of the present invention is that an indoor experiment is conducted before the gel plugging slurry is injected into the well to obtain the dissolution time of the gel material, the time for the gel to reach the required viscosity and the time for the cement slurry to thicken.
[0022] A further improvement of the present invention is that the isolation liquid is a gel solution or clean water, and the amount of the isolation liquid between the gel plugging slurry and the cement is 1-2 cubic meters.
[0023] A further improvement of the present invention is that the drilling tool assembly is placed 250m-300m above the leaking layer.
[0024] A further improvement of the present invention is that the length of cement slurry left in the open hole is 100-300m.
[0025] A further improvement of the present invention is that when the cement slurry is injected, the cement slurry is pushed horizontally into the leaking layer.
[0026] Compared with the prior art, the advantages of the present invention are:
[0027] The large-scale well leakage control method of the present invention is aimed at controlling large cracks or fracture-hole-like malignant leakage formations, has a high one-time plugging success rate, and has a good effect of controlling well leakage.
[0028] By using the method according to the present invention, the gel+cement plugging method is used, and the preparation amount of various fluids can be calculated, and the plugging slurry amount is calculated according to the properties of the leaking layer, which is convenient for rapid calculation on site. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings, in which:
[0030] Figure 1 It is a construction schematic diagram of a large-scale well leakage control method according to an embodiment of the present invention;
[0031] In the drawings, the same components are provided with the same reference numerals.
[0032] The drawings are not drawn to scale.
[0033] The meanings of the reference numerals in the accompanying drawings are as follows:
[0034] 1. Drilling tools, 2. Wellbore, 3. Wellbore, 4. Formation, 5. Gel, 6. Cement. DETAILED DESCRIPTION
[0035] In order to make the technical solutions and advantages of the present invention more clearly understood, the exemplary embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than an exhaustive list of all the embodiments. In addition, the embodiments of the present invention and the features in the embodiments can be combined with each other without conflict.
[0036] At home and abroad, plugging materials represented by bridging, high water loss, and curable materials have been developed, forming a series of drilling fluid pressure plugging technologies, which have effectively solved the problems of permeability and small and micro fracture well leakage. However, there is currently no effective prevention and rapid treatment method for large fracture / fracture-hole malignant leakage formations. The success rate of one-time plugging is low, the plugging cycle is long, and some complex well leakage is difficult to treat and can only be treated by strong drilling. Malignant well leakage in fractured formations has become a global problem that restricts the progress of oil and gas exploration and development. Improving the success rate of one-time plugging of malignant well leakage is an urgent need for oil fields around the world to ensure "safe, efficient, and economical" drilling.
[0037] In order to solve the above problems, the present invention proposes a large-scale well leakage control method, which can be used to control large cracks or fracture-cavity malignant leakage formations.
[0038] Figure 1 A large-scale well leakage control method according to the present invention is schematically shown, comprising:
[0039] After a large leak occurs, measure and determine the size of the crack. When the crack width is not less than 7mm, use gel and cement to plug the leak.
[0040] Collect gel volume calculation data, and configure gel plugging slurry according to the gel volume calculation data.
[0041] Pump gel plugging slurry into the well, then pump a certain amount of isolation fluid, and then inject cement slurry;
[0042] Inject the isolation fluid, replace the well slurry, squeeze all the gel plugging slurry and most of the cement slurry into the leakage fracture, and leave a certain amount of cement slurry in the open hole section;
[0043] Stop the pump and start drilling to a safe position to wait for solidification;
[0044] Drill down to sweep the cement plug and circulate the well slurry to test the plugging effect.
[0045] In one embodiment, the gel amount calculation data includes wellbore size, formation pressure, lost circulation pressure, drilling tool assembly, fracture opening size and inclination.
[0046] In one embodiment, the amount of gel plugging slurry and cement plugging slurry is calculated according to the following formula:
[0047] Q tg =Q bg +Q ag (1)
[0048] Q bg =68.1×(1-0.52 d ) (2)
[0049] Q ag =40+0.01×OH+13×(1+0.3×(sinα) 1.6 +0.26×(1-0.4 Δp ) (3)
[0050] Δp=P d +P1 (4)
[0051]
[0052] In the formula, Q tg is the total amount of gel prepared, m 3 ;Q bgThe basic amount for preparing gel, m 3 ;Q ag Added amount for preparing gel, m 3 ; OH is the diameter of the wellbore, mm; α is the minimum angle between the fracture surface and the horizontal plane, °; d is the fracture opening size, m; Δp is the difference between the formation pore pressure and the leakage pressure, MPa; P d is the formation pore pressure, MPa; P l is the formation leakage pressure, MPa; Qs is the amount of cement slurry, m 3 .
[0053] In one embodiment, the gel plugging slurry is made of one or a combination of acrylamide, alkyl dimethyl allyl ammonium chloride, N-alkyl acrylamide or N-hydroxymethyl acrylamide, etc., and no material can be selected for preparation. The viscosity of the prepared gel can be greater than 30000mPa.s.
[0054] In one embodiment, indoor experiments are conducted before the gel plugging slurry is injected into the well to fully understand the time required for the material to fully dissolve, the time required for the gel to reach the required viscosity, and the time required for the cement slurry to thicken. The injection timing, construction displacement and other parameters are determined based on the gelation time of the formulated material and the thickening time of the cement slurry to prevent solidification in the water hole of the drill bit from causing complicated downhole accidents.
[0055] In one embodiment, the isolation liquid is glue or clean water, and the amount of the isolation liquid between the gel plugging slurry and the cement is 1-2 cubic meters.
[0056] Preferably, the drilling tool assembly is placed 250-300 m above the leaking layer to improve safety.
[0057] After the well is leaking, the downhole pressure changes greatly, the probability of well wall collapse is high, and the risk of drilling is high. The drilling tool cannot be lowered to the leaking layer; at the same time, the drilling tool assembly cannot be lowered too shallowly, because this may cause a large amount of mixed slurry in the well and affect the performance of the plugging slurry. In order to ensure safe construction and ensure that the drilling tool assembly is as close to the leaking layer as possible to improve the plugging effect, the drilling tool assembly is lowered to 250-300m above the leaking layer.
[0058] In one embodiment, the spacer fluid is injected to replace the well slurry to squeeze all the gel plugging slurry and most of the cement slurry into the leakage fractures, and the amount of cement slurry left in the open hole is 100-300m.
[0059] In one embodiment, when injecting cement slurry, due to the large density difference between gel and cement slurry, when cement enters the leaking layer, the displacement is reduced while ensuring safety, so that the cement slurry can be pushed into the leaking layer as smoothly as possible.
[0060] In a specific embodiment, the large-scale well leakage treatment method is used to plug a large-scale well leakage accident, which includes the following steps:
[0061] After a leak occurs, first collect data on wellbore size, formation pressure, leak pressure, drilling tool assembly, crack opening size and inclination; determine the crack size, and use gel and cement to plug leaks when the crack width is not less than 7mm;
[0062] Prepare gel plugging slurry according to the data, and test the full dissolution of gel plugging slurry, the time for gel to reach required viscosity and the time for cement slurry to thicken in the laboratory;
[0063] The gel can be prepared by using one or more synthetic materials such as acrylamide, alkyl dimethyl allyl ammonium chloride, N-alkyl acrylamide or N-hydroxymethyl acrylamide. No material can be selected, and the viscosity of the prepared gel can be greater than 30000mPa.s. Conventional materials can be used to prepare cement slurry, and there are no special requirements.
[0064] Place the drilling tool assembly 300 meters above the leaking layer, and use a cement truck or fracturing truck to pump gel plugging slurry into the well. The injection process cannot be stopped midway; then pump 1-2m 3 Glue or clean water is used as isolation liquid.
[0065] Then cement slurry is injected. Due to the large difference in density between gel and cement slurry, when cement enters the leaking layer, the displacement is reduced while ensuring safety, and the cement slurry is pushed into the leaking layer as smoothly as possible.
[0066] Then inject the isolation fluid to replace the well slurry to squeeze all the gel and most of the cement slurry into the leakage fractures, leaving 100-300m of cement slurry in the open hole.
[0067] Stop the pump and immediately pull up the drill bit to a safe position to wait for solidification.
[0068] Drill down to sweep the cement plug and circulate the well slurry to test the plugging effect.
[0069] It should be understood that the embodiments disclosed in the present invention are not limited to the specific structures, processing steps or materials disclosed herein, but should be extended to equivalent substitutions of these features understood by ordinary technicians in the relevant field. It should also be understood that the terms used herein are only used for the purpose of describing specific embodiments and are not meant to be limiting.
[0070] In the description of the present invention, unless otherwise specified, "plurality" means two or more than two; the orientations or positional relationships indicated by the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0071] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0072] Certain terms are used throughout this specification to refer to specific system components. As will be appreciated by those skilled in the art, different names may be used to refer to the same component, and thus this specification is not intended to distinguish between components that differ only in name and not in function. References to "one embodiment" or "an embodiment" in the specification mean that a particular feature, structure, or characteristic described in conjunction with the embodiment is included in at least one embodiment of the invention. Therefore, the phrases "one embodiment" or "an embodiment" appearing in various places throughout the specification do not necessarily all refer to the same embodiment.
[0073] The embodiments of the present invention are given for the purpose of illustration and description, and are not intended to be exhaustive or to limit the invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.
[0074] Although the preferred embodiments of the present invention have been described, those skilled in the art may make additional changes and modifications to these embodiments once they are aware of the basic creative concepts. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and / or modifications that fall within the scope of the present invention, and changes and / or modifications made according to the embodiments of the present invention should be included within the scope of protection of the present invention.
Claims
1. A method for treating large-scale well leakage, characterized in that: include: After a large leak occurs, measure and determine the size of the crack. When the crack width is not less than 7mm, use gel and cement to plug the leak. Prepare gel plugging slurry according to the gel volume calculation data; Place the drilling tool assembly a certain distance above the leaking layer, pump gel plugging slurry into the well, then pump a certain amount of isolation fluid, and then inject cement slurry; Inject the isolation fluid, replace the well slurry, squeeze all the gel plugging slurry and most of the cement slurry into the leakage fracture, and leave a certain amount of cement slurry in the open hole section; Stop the pump and start drilling to a safe position to wait for solidification; Drill down to sweep the cement plug and circulate the well slurry to test the plugging effect.
2. The large-scale well leakage control method according to claim 1 is characterized in that: The gel volume calculation data include wellbore size, formation pressure, lost circulation pressure, drilling tool assembly, fracture opening size and inclination.
3. The large-scale well leakage control method according to claim 2 is characterized in that: The amount of gel plugging slurry and cement plugging slurry is calculated as follows: Q tg =Q bg +Q ag (1) Q bg =68.1×(1-0.52 d ) (2) Q ag =40+0.01×OH+13×(1+0.3×(sinα) 1.6 +0.26×(1-0.4 Δp ) (3) Δp=P d +P1 (4) In the formula, Q tg is the total amount of gel prepared, m 3 ;Q bg The basic amount for preparing gel, m 3 ;Q ag Added amount for preparing gel, m 3 ; OH is the diameter of the wellbore, mm; α is the minimum angle between the fracture surface and the horizontal plane, °; d, the fracture opening size, m; Δp is the difference between the formation pore pressure and the leakage pressure, MPa; P d is the formation pore pressure, MPa; P l is the formation leakage pressure, MPa; Qs is the amount of cement slurry, m 3 .
4. The large-scale well leakage control method according to claim 3 is characterized in that: The gel plugging slurry is made of one or a combination of acrylamide, alkyl dimethyl allyl ammonium chloride, N-alkyl acrylamide or N-hydroxymethyl acrylamide.
5. The large-scale well leakage control method according to claim 4 is characterized in that: The viscosity of the prepared gel plugging slurry can be greater than 30000mPa.s.
6. The large-scale well leakage control method according to claim 5 is characterized in that: Before injecting the gel plugging slurry into the well, indoor experiments are carried out to obtain the dissolution time of the gel material, the time it takes for the gel to reach the required viscosity, and the time it takes for the cement slurry to thicken.
7. The method for treating large well leakage according to claim 6, characterized in that: The spacer liquid is 1-2% carboxymethyl cellulose glue or clean water, and the amount of the spacer liquid between the gel plugging slurry and the cement is 1-2 cubic meters.
8. The large-scale well leakage control method according to claim 6 is characterized in that: The drilling tool assembly is placed 250m-300m above the leaking layer.
9. The method for treating large-scale well leakage according to claim 8, characterized in that: The length of cement slurry left in the open hole is 100-300m.
10. The large-scale well leakage control method according to claim 9, characterized in that: When injecting cement slurry, push the cement slurry smoothly into the leaking layer.