Reliability optimization and improvement design method for soluble bridge plug for staged fracturing and key device
Through the adaptation and selection of soluble bridge plug well condition, identification of seating effectiveness and early warning methods for fracturing service status, the inconsistency of performance of soluble bridge plugs under different reservoir conditions and processes is solved, and the performance of soluble bridge plugs is achieved. Optimized selection and real-time monitoring of bridge plugs improve the reliability and stability of segmented fracturing.
Patent Information
- Application Number
- CN202411127054.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-26
AI Technical Summary
The existing soluble bridge plugs have inconsistent performance under different reservoir conditions and segmented fracturing processes, resulting in failure of seating, failure of sealing pressure and incomplete dissolution, which limits the expansion of the scale of technology application.
By constructing a soluble bridge plug well condition process adaptation selection method, a securing effectiveness identification method and a real-time monitoring and early warning method for fracturing service status, the soluble bridge plug selection and monitoring of its service status are optimized to ensure that the bridge plug is fracturing. Effectiveness and reliability in the process.
It improves the comprehensive performance and construction success rate of soluble bridge plugs, improves the reliability and stability of the bridge plugs throughout their life cycle, and ensures the safety and effectiveness of fracturing construction.
Smart Images

Figure CN119021636A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of oil and gas field development, and relates to a reliability optimization and improvement design method of a soluble bridge plug for staged fracturing and a key device. Background Art
[0002] Unconventional oil and gas resources are becoming the main energy source. Through further innovation, China has developed a staged fracturing technology based on "soluble bridge plug + multi-cluster perforation", which plays an increasingly important role in the development of unconventional oil and gas resources.
[0003] However, with the continuous acceleration of the pace of oil and gas field exploration and development, the application scale of soluble bridge plugs continues to expand, and the number of domestic and foreign manufacturers increases year by year. On the one hand, due to the different reservoir conditions and bottom hole conditions in various oil and gas areas, and even large differences between some areas, there are obvious differences in the staged fracturing construction process, which puts higher requirements on the comprehensive performance of soluble bridge plugs. A single type of soluble bridge plug cannot meet the increasingly diverse needs of staged fracturing technology. On the other hand, due to the lack of unified use standards, the existing soluble bridge plug models are diverse and the performance is uneven (in terms of pressure bearing performance, dissolution conditions, etc.), resulting in a certain degree of "use confusion", which in turn leads to the failure of the bridge plug to set the seal during field application, the failure of the seal to bear pressure, and the failure to completely dissolve within the designed time after pressure, which limits the further expansion of the application scale of this technology. The optimization and selection of customized soluble bridge plugs for different reservoir conditions and staged fracturing processes, and the full-process monitoring of the bridge plug service process, play an important role in improving the success rate of soluble bridge plug construction. Summary of the invention
[0004] The present invention involves a design method and key device for optimizing and improving the reliability of a soluble bridge plug for staged fracturing. The purpose is to optimize the selection of soluble bridge plugs before they are placed in the well, determine whether the soluble bridge plugs are successfully seated during seating, monitor whether leakage, slippage, displacement and other problems occur during fracturing, and provide early warning information and construction suggestions, so as to comprehensively improve the reliability of the soluble bridge plugs.
[0005] The technical solution of the present invention is as follows:
[0006] The present invention relates to a reliability optimization and improvement design method and key device for a soluble bridge plug for staged fracturing, which mainly include a reliability optimization and improvement design method for a soluble bridge plug for staged fracturing, and a key device for reliability optimization and improvement of a soluble bridge plug for staged fracturing.
[0007] The reliability optimization and improvement design method of the soluble bridge plug for staged fracturing mainly includes the following steps:
[0008] Soluble bridge plug well condition and process adaptation selection;
[0009] Identification of effectiveness of soluble bridge plug setting;
[0010] Real-time monitoring and early warning of the service status of soluble bridge plug fracturing;
[0011] It involves the bridge plug selection stage, the sealing stage and the fracturing service stage, and optimizes the reliability of the soluble bridge plug in the whole process from a logical order. The selection of soluble bridge plugs is optimized through the coupled analysis of the reservoir conditions, well depth conditions, bottom hole parameters and other aspects of the fracturing well itself; through the analysis of the sealing displacement and sealing load of the soluble bridge plug, it is judged whether the bridge plug is successfully sealed; through the optimization of the reliability of the soluble bridge plug for staged fracturing, the key device monitors the temperature, flow rate, vibration and other parameters of the bottom hole liquid during the service of the bridge plug, and judges whether the bridge plug has leakage, slippage, displacement and other problems during the fracturing service process, and monitors the service status of the soluble bridge plug in real time to improve the service reliability of the bridge plug.
[0012] The specific method for selecting and adapting the soluble bridge plug to the well condition process is as follows: through coupling analysis of specific service conditions such as the working temperature, mineralization, pressure bearing strength, effective sealing time, and post-pressure dissolution cycle of the soluble bridge plug, the combined sealing mode, temperature resistance range, strength index, and dissolution rate of the bridge plug are optimized and selected. Based on the understanding of the service conditions of the bridge plug before fracturing, the soluble bridge plug is customized and designed, thereby improving the comprehensive performance of the soluble bridge plug in terms of effective temperature resistance, sealing pressure bearing, and post-pressure dissolution.
[0013] The specific method for identifying the effectiveness of soluble bridge plug setting is as follows: by optimizing the existing setting tool, the main parameters such as the setting displacement and the drop load can be obtained during the setting process of the bridge plug. Combined with the specific position of the bridge plug setting, the inner diameter of the casing, and the key dimensional data such as the length and maximum outer diameter of the bridge plug body, the deviation of the bridge plug setting displacement and the drop load from the design value is determined. If the deviation value is greater than 10%, it is preliminarily determined that the bridge plug setting has failed, and it is recommended to re-insert the soluble bridge plug. If the deviation value is within 10%, the pressure test can be started by pumping soluble balls or releasing the soluble balls that come with the bridge plug. When the bridge plug reaches the design pressure index, fracturing construction can be started. If the design pressure index is not reached, the soluble bridge plug is re-inserted.
[0014] The specific method of real-time monitoring and early warning of the service status of soluble bridge plug fracturing is: combined with the key device for optimizing the reliability of soluble bridge plugs for staged fracturing, the service status of the bridge plug is monitored in real time during the service of soluble bridge plug fracturing, and the fracturing curves of the adjacent wells and the same layer of the fracturing well are obtained before fracturing construction, which are mainly used as an important basis for judging and identifying the sudden changes in the fracturing curve throughout the process. Furthermore, by monitoring whether there is a one-way flow of fracturing at the bottom of the bridge plug through the key device for optimizing the reliability of soluble bridge plugs for staged fracturing, combined with judging whether the possibility of bridge plug slippage and leakage that causes the sudden change of the bridge plug fracturing curve is greater than 60%, the service status of the bridge plug is monitored and early-warned from these two aspects. The early warning is mainly divided into no monitoring early warning, general monitoring early warning and fracturing monitoring early warning according to the service status of the bridge plug, and corresponding work prompts are given according to different states to ensure the effective service of the bridge plug.
[0015] The key device for optimizing and improving the reliability of the soluble bridge plug for staged fracturing mainly includes: a soluble bridge plug is arranged in the wellbore casing; it also includes a bottom hole real-time monitoring device, a bottom hole signal transmitting device, a signal receiving relay, a signal receiving and sending relay, and a wellhead signal receiving device which are arranged on the wellbore casing in sequence; the wellhead signal receiving device is communicatively connected with the signal analysis and processing system, and the signal analysis and processing system is also connected with the bridge plug status display and early warning terminal and the fracturing construction command system in sequence; the bottom hole real-time monitoring device is designed at the lower part of the setting position of the soluble bridge plug, and is mainly provided with different parameter sensors such as temperature, flow, vibration, etc. During the staged fracturing construction, it can monitor in real time whether the soluble bridge plug has leakage, slippage, displacement, etc. The bottom hole real-time monitoring device and the bottom hole signal transmitting device, the signal receiving and sending relay, the wellhead signal receiving device, the signal analysis and processing system, and the bridge plug status display and early warning terminal constitute a complete system for sending, transmitting, receiving and analyzing bottom hole monitoring information, ensuring the effectiveness of real-time monitoring during fracturing construction, and finally transmitting the early warning information to the fracturing construction command system to provide suggestions for fracturing construction.
[0016] The reliability optimization and improvement design method and key device of the soluble bridge plug for staged fracturing provided by the present invention have the following characteristics and advantages:
[0017] (1) The invention provides a design method and key device for optimizing and improving the reliability of soluble bridge plugs for staged fracturing. The theoretical method is constructed in combination with the design of monitoring means to ensure that the theoretical method is feasible. At the same time, the monitoring means and hardware structure have good process adaptability. The reservoir conditions, construction technology, bridge plug selection optimization, and monitoring and identification are combined to provide effective theoretical methods and technical means for optimizing the performance and improving the reliability of bridge plugs.
[0018] (2) The invention provides a design method for optimizing and improving the reliability of soluble bridge plugs for staged fracturing. By constructing a method for selecting and matching soluble bridge plugs to well conditions and processes, a method for identifying the effectiveness of soluble bridge plug seating, and a method for real-time monitoring and early warning of the service status of soluble bridge plugs during fracturing, the invention optimizes the selection of soluble bridge plugs before they are put into service, determines whether the bridge plugs are successfully seated during seating, monitors whether leakage, slippage, displacement, and other problems occur during the fracturing process, and provides early warning information and suggestions for the next step of work, thereby comprehensively improving the reliability and stability of the bridge plugs throughout their life cycle.
[0019] (3) The invention provides a method for optimizing and improving the reliability of soluble bridge plugs for staged fracturing, which mainly includes a method for selecting and adapting soluble bridge plugs to well conditions, a method for identifying the effectiveness of soluble bridge plug seating, and a method for real-time monitoring and early warning of the service status of soluble bridge plugs for fracturing. These methods have good process connectivity and correlation with each other, comprehensively sort out the key influencing factors of the selection and design of soluble bridge plugs, conduct weighted coupling analysis, clarify the prominent manifestations of bridge plug seating and service status, and combine design reference values, monitoring feedback information and other bases to improve the safety and effectiveness of fracturing construction through early warning prompts and work suggestions.
[0020] (4) The invention provides a design method for optimizing and improving the reliability of soluble bridge plugs for staged fracturing, wherein the method for selecting soluble bridge plugs for well conditions and processes is optimized by analyzing the reservoir conditions such as the temperature, mineralization, formation stress gradient, and fracture pressure of the working wellbore of the bridge plug, and puts forward specific requirements for the mineralization resistance and temperature resistance range of the raw materials of the bridge plug; by analyzing the process requirements such as the pressure bearing strength and effective sealing time of the bridge plug, the strength index and dissolution rate index of the material are further clarified, and the material dissolution rate is further clarified in combination with the requirements for the dissolution cycle of the bridge plug after fracturing; by coupling the analysis of the above key indicators, the selection and design of the bridge plug is comprehensively optimized.
[0021] (5) The invention provides a design method for optimizing and improving the reliability of soluble bridge plugs for staged fracturing, and a method for selecting soluble bridge plugs to adapt to well conditions and processes. Through a comprehensive analysis of the operating environment of the bridge plug, key influencing factors are extracted, and the main components of the bridge plug are divided according to their functions. The influence of key influencing factors on the pressure-bearing sealing mechanism, anchoring mechanism, auxiliary sealing mechanism, state maintaining mechanism and other sub-mechanisms of the soluble bridge plug are detailed, providing a more specific and feasible improvement idea for the optimization of bridge plug selection.
[0022] (6) The invention provides a method for optimizing and improving the reliability of soluble bridge plugs for staged fracturing, including a method for identifying the effectiveness of soluble bridge plug seating. By optimizing the design of the soluble bridge plug seating tool, a real-time display and recording module for seating displacement and seating load is added to the seating tool, providing a technical means for obtaining key parameters of soluble bridge plug seating in real time during on-site construction.
[0023] (7) The invention provides a method for optimizing the reliability of soluble bridge plugs for staged fracturing, wherein the method for identifying the effectiveness of soluble bridge plug seating is to input in advance the main parameters such as the inner diameter of the seating casing, the specific location of the bridge plug in the horizontal wellbore, the length and outer diameter of the soluble bridge plug, and compare them with the seating displacement and load obtained by the seating tool during the seating process to determine whether the deviation between the displacement and load and the design value is less than 10%. The deviation value mainly refers to the median deviation between the historical seating data of the fracturing construction and the design value, thereby improving the accuracy of monitoring and identifying the soluble bridge plug seating process.
[0024] (8) The invention provides a method for optimizing the reliability of soluble bridge plugs for staged fracturing, including a method for identifying the effectiveness of soluble bridge plug seating. When the effectiveness of soluble bridge plug seating is identified as a failure, the soluble bridge plug needs to be reinserted. If the effectiveness of seating is identified as a success, the soluble balls are pumped or the self-contained soluble balls are released to start a pressure test on the bridge plug before fracturing. If the bridge plug can meet the design pressure index, formal fracturing construction begins. If the design pressure index of the bridge plug is not met, the soluble bridge plug needs to be reinserted and subsequent seating effectiveness identification operations are performed to ensure the reliable performance of the soluble bridge plug before fracturing construction.
[0025] (9) The invention provides a method for optimizing the reliability of soluble bridge plugs for staged fracturing, wherein the method for real-time monitoring and early warning of the service status of soluble bridge plugs for fracturing is combined with monitoring and analysis of the service status of soluble bridge plugs and identification of sudden changes in the whole process of fracturing curves to monitor and identify the failure of soluble bridge plugs during fracturing and issue early warning prompts. By obtaining and analyzing the fracturing curves of adjacent wells and the same layer of the fracturing well in advance, it is effectively avoided that the sudden pressure drop caused by the expansion of reservoir cracks and other reasons will mislead the monitoring and analysis system. When the bridge plug fracturing curve suddenly changes, it is judged based on historical fracturing data whether the possibility of bridge plug leakage, slippage, etc. is greater than 60%. At the same time, based on the monitoring technology of the service status of the soluble bridge plug to monitor whether there is unidirectional flow of fracturing fluid under the bridge plug, it is comprehensively judged whether the bridge plug has leakage, slippage, etc. When it is judged that the bridge plug is leaking or slipping, the system prompts to stop the pump as soon as possible and re-insert the soluble bridge plug to ensure the effectiveness of the single-stage fracturing construction.
[0026] (10) The invention provides a method for optimizing the reliability of soluble bridge plugs for staged fracturing, wherein the method includes real-time monitoring and early warning of the service status of soluble bridge plugs for fracturing, and the coupling of monitoring and analysis of the service status of soluble bridge plugs and identification of sudden changes in the whole process of fracturing curves. This can effectively avoid the randomness brought by a single monitoring method and improve the accuracy of monitoring. At the same time, according to the differences between the monitoring and analysis of the service status of soluble bridge plugs and the identification of sudden changes in the whole process of fracturing curves, the monitoring and early warning are divided into no monitoring and early warning, general monitoring and early warning, and fracturing monitoring and early warning, which further improves the scientific nature of the monitoring method and minimizes the interference with the normal fracturing construction process while ensuring the effectiveness of the construction.
[0027] (11) The invention is a key device for optimizing the reliability of the soluble bridge plug for staged fracturing. The bottom hole real-time monitoring device, bottom hole signal transmitting device, and signal receiving and transmitting relay are lowered into the bottom hole together with the casing string during casing lowering and well completion. They are mainly powered by long-life batteries. When there is no fracturing construction, the devices are in a dormant state. During fracturing construction, the devices are activated and start to operate normally, reducing useless power consumption.
[0028] (12) The invention is a key device for optimizing the reliability of soluble bridge plugs for staged fracturing. The temperature, flow rate, vibration and other information monitored at the bottom of the well are transmitted in real time to the signal analysis and processing system through the wellhead signal receiving device, thereby entering the real-time monitoring and early warning method process of the service status of the soluble bridge plug fracturing. The bridge plug status display and early warning terminal issues an early warning and proposes the next construction suggestion to the fracturing construction command system, forming a closed loop of the system in terms of software and hardware, ensuring the fidelity of signal transmission and the real-time monitoring and identification of the service status of the bridge plug.
[0029] (13) The invention is a key device for optimizing and improving the reliability of the soluble bridge plug for staged fracturing. The real-time monitoring device at the bottom of the well can monitor the temperature, flow rate, vibration and other data information of the lower part of the bridge plug in real time. At the same time, the upper part of the bridge plug also has a monitoring device preset for the next stage of fracturing, which can provide upper data information for comparison with the lower data information, providing auxiliary reference for signal analysis and processing.
[0030] (14) The invention is a key device for optimizing the reliability of soluble bridge plugs for staged fracturing. The bottom hole signal transmitter itself can send signals to the wellhead signal receiver, and can also send and relay signals synchronously through a signal receiving and transmitting relay, thereby increasing the signal transmission channel and ensuring the stability of transmission.
[0031] (15) The invention is a key device for optimizing the reliability of soluble bridge plugs for staged fracturing. The bridge plug status display and warning terminal can provide multiple interfaces such as remote monitoring, on-site host, portable terminal, etc., which improves the convenience of data display.
[0032] (16) The invention optimizes the reliability of the soluble bridge plug for staged fracturing, which is a key device. There is no need to make large-scale changes to the fracturing construction command system. At the same time, to ensure construction safety, the monitoring and early warning prompt information is only a construction suggestion, and there is no construction command authority. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 This is a schematic diagram of a design method for optimizing and improving the reliability of a soluble bridge plug for staged fracturing according to the present invention;
[0034] Figure 2 This is a schematic diagram of the method for selecting a soluble bridge plug for well condition process adaptation of the present invention;
[0035] Figure 3It is a schematic diagram of the effectiveness identification method of the soluble bridge plug setting of the present invention;
[0036] Figure 4 This is a principle diagram of the real-time monitoring and early warning method for the service status of the soluble bridge plug fracturing of the present invention;
[0037] Figure 5 This is a schematic diagram of a key device for optimizing and improving the reliability of the soluble bridge plug for staged fracturing according to the present invention. DETAILED DESCRIPTION
[0038] A design method for optimizing and improving the reliability of a soluble bridge plug for staged fracturing and a schematic diagram of a key device of the present invention are described in detail as follows:
[0039] The principle of the design method for optimizing the reliability of soluble bridge plugs for staged fracturing is as follows: Figure 1 As shown, it mainly includes the selection of soluble bridge plug well condition process adaptation, the identification of the effectiveness of soluble bridge plug setting and the real-time monitoring and early warning of the soluble bridge plug fracturing service status. The three steps have a sequential and connected order in implementation.
[0040] The principle diagram of the method for selecting the soluble bridge plug for well conditions and process adaptation is as follows: Figure 2 As shown in the figure, during the optimization process of bridge plug selection before fracturing, weighted coupling analysis of working temperature, mineralization, pressure bearing strength, effective sealing time, and post-fracturing dissolution cycle is used to guide the selection of bridge plug sealing methods and raw materials, thereby improving the adaptability and reliability of bridge plug technology.
[0041] The specific method is: through coupling analysis of specific service conditions such as the working temperature, mineralization, pressure bearing strength, effective sealing time, and post-fracturing dissolution cycle of the soluble bridge plug, optimized selection is made for the bridge plug combination sealing mode, temperature resistance range, strength index, and dissolution rate. On the basis of understanding the service conditions of the bridge plug before fracturing, customized selection and design of the soluble bridge plug is achieved, thereby improving the comprehensive performance of the soluble bridge plug in terms of effective temperature resistance, sealing pressure bearing, and post-fracturing dissolution.
[0042] The principle diagram of the method for identifying the effectiveness of soluble bridge plug setting is shown in the figure below. Figure 3 As shown in the figure, by analyzing the deviation between the design value and the monitoring value of the key parameters of the soluble bridge plug, the effectiveness of the setting is preliminarily identified, and the effectiveness of the setting is further verified through the soluble ball seating pressure test to ensure the reliable performance of the bridge plug before fracturing.
[0043] The specific method is as follows: by optimizing the existing setting tool, the main parameters such as the setting displacement and the release load can be obtained during the setting process of the bridge plug. Combined with the specific position of the bridge plug, the inner diameter of the casing, and the key dimensional data such as the length and maximum outer diameter of the bridge plug body, the deviation of the bridge plug setting displacement and the release load from the design value is determined. If the deviation value is greater than 10%, it is preliminarily determined that the bridge plug has failed to set, and it is recommended to re-insert a soluble bridge plug. If the deviation value is within 10%, the pressure test can be started by pumping soluble balls or releasing the soluble balls that come with the bridge plug. When the bridge plug reaches the design pressure index, fracturing construction can be started. If the design pressure index is not reached, the soluble bridge plug can be re-inserted.
[0044] Real-time monitoring and early warning method for the service status of soluble bridge plug fracturing Figure 4 As shown, by combining the service status monitoring and analysis (multi-parameter real-time monitoring) and the sudden change identification of the whole process of the fracturing curve, the service status of the soluble bridge plug can be comprehensively judged in real time, and monitoring and early warning prompt information can be given according to the monitoring situation.
[0045] The specific method is: combined with the key device for optimizing the reliability of soluble bridge plugs for staged fracturing, the service status of the bridge plug is monitored in real time during the service of the soluble bridge plug fracturing, and the fracturing curves of the adjacent wells and the same layer of the fracturing well are obtained before the fracturing construction, which are mainly used as an important basis for judging and identifying the sudden changes in the fracturing curve during the whole process. Furthermore, by monitoring whether there is a one-way flow of fracturing at the bottom of the bridge plug through the key device for optimizing the reliability of soluble bridge plugs for staged fracturing, combined with judging whether the possibility of bridge plug slippage and leakage that causes the sudden change of the bridge plug fracturing curve is greater than 60%, the service status of the bridge plug is monitored and warned from these two aspects. The warning is mainly divided into no monitoring warning, general monitoring warning and fracturing monitoring warning according to the service status of the bridge plug, and corresponding work prompts are given according to different states to ensure the effective service of the bridge plug.
[0046] The reliability optimization and improvement of soluble bridge plugs for staged fracturing is mainly composed of key devices such as Figure 5 As shown: a soluble bridge plug 3 is arranged in the wellbore casing 4; it also includes a bottom hole real-time monitoring device 1, a bottom hole signal transmitting device 2, a signal receiving relay 5, a signal receiving and transmitting relay 6, and a wellhead signal receiving device 7 which are arranged on the wellbore casing 4 in sequence; the wellhead signal receiving device 7 is communicatively connected with a signal analysis and processing system 8, and the signal analysis and processing system 8 is also connected with a bridge plug status display and warning terminal 9 and a fracturing construction command system 10 in sequence.
[0047] The bottom hole real-time monitoring device 1 is designed at the lower part of the sealing position of the soluble bridge plug 3, and is provided with sensors of different parameters such as temperature, flow and vibration. During the staged fracturing construction, the soluble bridge plug is monitored in real time for leakage, slippage and displacement. The bottom hole real-time monitoring device 1 and the bottom hole signal transmitting device 2, signal receiving and transmitting relay 6, wellhead signal receiving device 7, signal analysis and processing system 8, and bridge plug status display and early warning terminal 9 constitute a complete system for sending, transmitting, receiving and analyzing the bottom hole monitoring information, and finally transmit the early warning information to the fracturing construction command system 10.
[0048] The operation process of the whole invention is as follows:
[0049] (1) Before carrying out staged fracturing construction on a certain oil and gas well, reservoir physical parameters such as bottom hole temperature, salinity, and formation pressure gradient are obtained based on previous drilling data.
[0050] (2) Based on the specific requirements of the fracturing construction design for the technical performance of soluble bridge plugs (including sealing pressure resistance level, effective sealing time, dissolution performance, etc.), a weighted analysis and optimization of the main sealing methods and raw materials of the bridge plugs are further performed.
[0051] (3) Improve the design of the soluble bridge plug setting tool so that it has the function of real-time monitoring and recording of setting displacement and setting load.
[0052] (4) The effectiveness of the bridge plug can be preliminarily identified by comparing the actual monitoring parameters of the soluble bridge plug with the design values. The effectiveness of the bridge plug can be further identified by combining the subsequent soluble ball seating pressure test. If the bridge plug fails to seal, the soluble bridge plug should be re-inserted in time.
[0053] (5) Before officially starting the fracturing construction, obtain the fracturing curves of the adjacent wells and the same layer of the fracturing well as the reference basis for the analysis software, combine the reliability optimization and improvement of the soluble bridge plug for staged fracturing with the key device to monitor the soluble bridge plug in real time, and identify the sudden changes in the whole process of the fracturing curve, comprehensively judge the service status of the bridge plug, and give targeted monitoring and early warning information. If it is a fracturing monitoring and early warning, it is suggested that the pump should be stopped as soon as possible, and the soluble bridge plug should be re-inserted before construction can continue.
Claims
1. A reliability optimization and improvement design method for soluble bridge plugs for staged fracturing, characterized in that: The following steps are involved: Soluble bridge plug well condition and process adaptation selection; Identification of effectiveness of soluble bridge plug setting; Real-time monitoring and early warning of the service status of soluble bridge plug fracturing; It involves the bridge plug selection stage, the setting stage and the fracturing service stage; Optimize the selection of soluble bridge plugs by coupling analysis of reservoir conditions, well depth and bottom hole parameters of the fracturing well itself; By analyzing the displacement and load of the soluble bridge plug, it is determined whether the bridge plug is successfully set. By optimizing the reliability of soluble bridge plugs for staged fracturing, the key device monitors different parameters of bottom hole liquid temperature, flow rate, and vibration when the bridge plug is in service, to determine whether the bridge plug has leakage, slippage, or displacement problems during the fracturing service process, and to monitor the stability of the soluble bridge plug in real time.
2. The reliability optimization and improvement design method of a soluble bridge plug for staged fracturing according to claim 1 is characterized in that: The specific method for selecting the soluble bridge plug for well condition and process adaptation is as follows: by coupling analysis of the specific service conditions of the soluble bridge plug, such as the working temperature, mineralization, pressure bearing strength, effective sealing time, and post-pressure dissolution cycle, the combined sealing mode, temperature resistance range, strength index, and dissolution rate of the bridge plug are optimized and selected. On the basis of understanding the service conditions of the bridge plug before fracturing, the soluble bridge plug is customized and designed, thereby improving the comprehensive performance of the soluble bridge plug in terms of effective temperature resistance, sealing pressure bearing, and post-pressure dissolution.
3. The reliability optimization and improvement design method of a soluble bridge plug for staged fracturing according to claim 1 is characterized in that: The specific method for identifying the effectiveness of the soluble bridge plug setting is as follows: by optimizing the existing setting tool so that the displacement and release load parameters of the setting can be obtained during the setting of the bridge plug, and the deviation between the bridge plug setting displacement and the release load and the design values is determined in combination with the specific position of the bridge plug setting, the inner diameter of the casing, and the key dimension data of the length and maximum outer diameter of the bridge plug body. If the deviation value is greater than 10%, it is preliminarily determined that the bridge plug setting has failed, and it is recommended to re-insert the soluble bridge plug. If the deviation value is within 10%, a pressure test is started by pumping soluble balls or releasing the soluble balls that come with the bridge plug. When the bridge plug reaches the design pressure index, fracturing construction is started. If the design pressure index is not reached, the soluble bridge plug is re-inserted.
4. The reliability optimization and improvement design method of a soluble bridge plug for staged fracturing according to claim 1 is characterized in that: The specific method for real-time monitoring and early warning of the service status of the soluble bridge plug fracturing is as follows: combined with the key device for optimizing and improving the reliability of the soluble bridge plug for staged fracturing, the key device for optimizing and improving the reliability of the soluble bridge plug for staged fracturing monitors the service status of the bridge plug in real time during the service of the soluble bridge plug fracturing, and at the same time obtains the fracturing curves of the adjacent wells and the same layer of the fracturing well before the fracturing construction, which are used as an important basis for judging and identifying the sudden changes in the fracturing curve during the whole process; by monitoring whether there is a one-way flow of fracturing at the bottom of the bridge plug through the key device for optimizing and improving the reliability of the soluble bridge plug for staged fracturing, combined with judging whether the possibility of bridge plug slippage and leakage that causes the sudden change of the bridge plug fracturing curve is greater than 60%, the service status of the bridge plug is monitored and early warned from these two aspects, and the early warning is divided into no monitoring early warning, general monitoring early warning and fracturing monitoring early warning according to the service status of the bridge plug, and corresponding work prompts are given according to different states to ensure the effective service of the bridge plug.
5. A key device for optimizing the reliability of soluble bridge plugs for staged fracturing, characterized in that: include: A soluble bridge plug (3) is arranged in a wellbore casing (4); the wellbore casing (4) also includes a bottom hole real-time monitoring device (1), a bottom hole signal transmitting device (2), a signal receiving relay (5), a signal receiving and transmitting relay (6), and a wellhead signal receiving device (7) which are arranged in sequence on the wellbore casing (4); the wellhead signal receiving device (7) is connected to a signal analysis and processing system (8) for communication, and the signal analysis and processing system (8) is also connected to a bridge plug status display and warning terminal (9) and a fracturing construction command system (10) in sequence; The bottom hole real-time monitoring device (1) is designed at the lower part of the sealing position of the soluble bridge plug (3) and is provided with temperature, flow rate, vibration and other parameter sensors. During the staged fracturing operation, the soluble bridge plug is monitored in real time to see if leakage, slippage or displacement occurs. The bottom hole real-time monitoring device (1) and the bottom hole signal transmitting device (2), signal receiving and transmitting relay (6), wellhead signal receiving device (7), signal analysis and processing system (8), and bridge plug status display and early warning terminal (9) constitute a complete system for sending, transmitting, receiving and analyzing bottom hole monitoring information, and finally transmit the early warning information to the fracturing operation command system (10).
