Structural crack grouting and plugging device for water disaster prevention and control of coal mine and punching and grouting process
By designing a coal mine water damage prevention and grouting sealing device that includes control components, caulking components and dust collectors, the problems of rugged crack surface shape and dust pollution are solved, and efficient structural repair and safe construction process are achieved, ensuring that Grouting material fills cracks and improves repair.
Patent Information
- Application Number
- CN202411144708.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-11-26
AI Technical Summary
The existing crack grouting and sealing methods for coal mine water damage prevention and control structures have rugged surface shape and insufficient filling of casting materials, which can easily cause water or other substances to enter the structure through the cracks, and dust pollution is generated during the treatment process, which poses safety hazards.
A grouting sealing device and drilling grouting process including carrier frame, control assembly, drill seat, replacement head, drill bit, caulking assembly, protective cover, dust collector, material processing assembly, roller, lifting cylinder, and drilling grouting process are designed, through control The assembly controls the drilling and grouting paths, uses the caulking assembly to ensure that the grouting material fills the crack space, and combines the dust collector to reduce dust spillage.
Effectively isolate dust spillage, improve the connectivity between grouting materials and structural cracks, reduce environmental pollution and construction safety hazards, ensure the durability and tightness of structural repair, and avoid the occurrence of water damage.
Smart Images

Figure CN119021715A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of grouting and plugging devices, and in particular to a structural crack grouting and plugging device and a drilling grouting process for preventing and controlling water hazards in coal mines. Background Art
[0002] Natural erosion of coal mine walls, thermal expansion and contraction due to seasonal changes, etc. can easily induce structural cracks, which can easily lead to water or other substances entering the structure through the cracks, causing water damage or further damage. Therefore, when structural cracks appear, grouting sealing devices are needed to repair the structural cracks.
[0003] However, the existing method of grouting and sealing structural cracks for water hazard prevention and control in coal mines is to simply clean the area around the structural cracks and inject materials into the structural gaps. After the materials are solidified, they form water-resistant and pressure-resistant sealing materials to seal the structural cracks. However, this method has the following disadvantages: first, the surface shape of the cracks is rugged and there are many branch cracks. It is difficult to fully fill them with simple pouring. The connectivity between the pouring materials and the structural gaps is poor and they are easy to fall off. Secondly, during construction, mixing materials, repairing structural cracks, and pouring will generate a lot of dust, which will pollute the surrounding environment and pose a great safety hazard to coal mine construction. Summary of the invention
[0004] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a structural crack grouting and plugging device and a drilling and grouting process for preventing and controlling water damage in coal mines. The grouting and plugging device and the drilling and grouting process are intended to solve the technical problems of the uneven surface shape of cracks in the prior art and insufficient filling of casting materials, which easily lead to water or other substances entering the interior of the structure through the cracks, thereby causing water damage or further damage. At the same time, when processing structural cracks, multiple steps will generate dust pollution.
[0005] The technical solution of the present invention is: a structural crack grouting and plugging device for preventing and controlling water hazards in coal mines, comprising a bearing frame, a control component, a drill seat, a replacement head, a drill bit, a caulking component, a protective cover, a dust collector, a material handling component, a roller, and a lifting cylinder; a control component for controlling the drilling and grouting path of the device is installed on the inner side of the bearing frame; a drill seat for driving the lower end component to rotate is installed at the front end of the control component; a replacement head is installed at the lower end of the drill seat output shaft; a drill bit for drilling holes in structural cracks is installed at the lower end of the replacement head; a protective cover for preventing dust from overflowing during drilling and grouting is fixedly connected to the upper end of the bearing frame; dust collectors for quickly absorbing dust are installed at both ends of the protective cover; a material handling component for feeding and mixing grouting materials is fixedly connected to the middle position of the upper end of the protective cover; the grouting material output pipe end of the material handling component is connected to the side of the control component; and a roller is installed at the outer edge of the bearing frame.
[0006] Preferably, the control component includes a translation frame, a driving motor, a threaded rod, a movable seat, a lifting frame, a control cylinder, an equipment fixing frame and a pushing cylinder group; a driving motor is installed on the right side of the inner side of the translation frame; a threaded rod is installed on the left end of the output shaft of the driving motor; a movable seat with a threaded sleeve is connected to the outer side of the threaded rod for transmission; when the control component is running, the pushing cylinder group pushes the translation frame to move smoothly back and forth on the inner side of the carrier frame, and at the same time, the driving motor drives the threaded rod to drive the outer movable seat to move left and right, and the control cylinder on the inner side of the lifting frame drives the drill bit to move up and down to trim the structural cracks.
[0007] Preferably, a lifting frame is fixedly connected to the front end of the movable seat; a control cylinder is installed on the upper end of the inner side of the lifting frame; an equipment fixing frame is arranged at the lower end of the piston rod of the control cylinder; the translation frame and the supporting frame are slidingly connected by means of a slide groove and a slider; a pushing cylinder group for controlling the forward and backward translation of the translation frame is installed at the rear end of the supporting frame; this design allows the drill bit to cover a larger working area, can comprehensively inspect and trim cracks in the structure, and ensure the efficiency and accuracy of structural gap trimming.
[0008] Preferably, a caulking assembly is installed at the lower end of the replacement head for fully filling the grouting into the corners of the structural cracks; the caulking assembly includes a mounting head, an adjustment plate, positioning holes and a caulking rod; a front-and-rear symmetrical adjustment plate is fixedly connected to the lower end of the mounting head; a caulking rod is installed at the lower end of the adjustment plate; the caulking rod and the upper end of the adjustment plate are provided with positioning holes with the same hole spacing; the positioning hole and another positioning hole are installed and connected by fixing bolts; the spacing of the caulking rods at the lower end of the caulking assembly can be adjusted accordingly according to the spacing of the structural gaps. When adjusting, align the positioning holes of the caulking rod with the matching positioning holes of the adjustment plate and lock them with fixing bolts. When grouting, slowly rotate the two caulking rods to ensure that the grouting material can fill the entire crack space, improve the connectivity between the grouting material and the structural cracks, remove bubbles in the grouting material, and improve the durability and tightness of the structure after repair.
[0009] Preferably, the material handling component includes a feeding channel, an electric auger, a pretreatment bucket, a telescopic distribution plate, a mixing box and an electric agitator, and an inner wall scraper; an electric auger is installed on the inner side of the feeding channel; according to the requirements for repairing structural cracks, suitable grouting materials are selected, and the weighed materials are put into the feeding channel of the material handling component, and the materials are input into the pretreatment bucket along with the electric auger.
[0010] Preferably, the front end of the feeding channel is connected to a pretreatment bucket; a telescopic distribution plate is installed on the right end inside the pretreatment bucket for evenly distributing the grouting material; the lower end of the pretreatment bucket is connected to a mixing box; an electric stirrer is installed inside the mixing box for evenly mixing the grouting materials with good proportions; an inner wall scraper for scraping off the grouting material sticking to the inner wall of the mixing box is fixedly connected to the outer side of the rotating shaft of the electric stirrer, and the telescopic distribution plate evenly distributes the grouting material into the mixing box, and the material is evenly mixed and stirred by the electric stirrer and the inner wall scraper.
[0011] Preferably, a lifting cylinder positioned on the connecting plate for controlling the lifting and lowering of the roller is installed at the upper end of the roller.
[0012] A structural crack drilling and grouting process for preventing water damage in coal mines, comprising the structural crack grouting and plugging device for preventing water damage in coal mines as described above, and the steps are as follows:
[0013] Step 1: Use a tractor to move the grouting plugging device to the upper end of the coal mine structure crack, start the lifting cylinders at the four corners outside the device to retract the rollers, and the support frame contacts the ground to stably support the device and cover the area to be repaired;
[0014] Step 2: Before grouting, the dust, debris and loose structure inside the structural cracks need to be pre-processed. The staff opens the inspection door at the front end of the protective cover, installs the drill bit on the replacement head at the lower end of the drill seat, closes the inspection door, turns on the dust collector, and when the control component is running, pushes the cylinder group to push the translation frame to move smoothly back and forth inside the carrier frame. At the same time, the drive motor drives the threaded rod to drive the outer moving seat to move left and right, and the control cylinder inside the lifting frame drives the drill bit to move up and down to trim the structural cracks;
[0015] Step 3: According to the requirements for repairing structural cracks, select suitable grouting materials, put these weighed materials into the feeding channel of the material handling component, and the materials are input into the pre-treatment bucket along with the electric auger. The telescopic distribution plate evenly distributes the input grouting materials and drops them into the mixing box, where they are evenly mixed and stirred by the electric stirrer and the inner wall scraper;
[0016] Step 4: The staff opens the inspection door and replaces the caulking assembly to the lower end of the drill seat. The spacing of the caulking rods at the lower end of the caulking assembly can be adjusted accordingly according to the spacing of the structural gaps. When adjusting, align the positioning holes of the caulking rods with the matching positioning holes of the adjustment plate and lock them with fixing bolts. At the same time, confirm whether the output port of the material handling assembly is stably connected to the side of the control assembly, and close the inspection door;
[0017] Step 5: The control component links the output port of the material handling component to inject the grouting material into the crack and slowly rotates the two caulking rods to ensure that the grouting material can fill the entire crack space and seal the crack. This can prevent water or other substances from entering the structure through the crack, causing water damage or further damage.
[0018] Beneficial effects of the present invention:
[0019] Compared with the traditional method of simply cleaning the cracks and injecting materials into the structural gaps, the present invention uses a carrier frame and a protective cover to cover the area to be repaired, and the mixing of materials, repairing of structural cracks, and pouring are all completed internally. When used in conjunction with a dust collector, it can effectively isolate dust spillage, reduce pollution to the surrounding environment and safety hazards in coal mine construction, and control the drilling and grouting paths of the control component control device. During the drilling operation, a larger working area can be covered, and the cracks in the structure can be comprehensively inspected and repaired to ensure the efficiency and accuracy of the structural gap repair. In addition, in the subsequent grouting operation, the grouting output pipe can be driven to move, and the rotating caulking rod can be used to ensure that the grouting material can fill the entire crack space, improve the connectivity between the grouting material and the structural cracks, remove bubbles in the grouting material, and improve the durability and tightness of the structure after repair. After sealing, water or other substances can be prevented from entering the structure through the cracks, thereby causing water damage or further damage. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 What is shown is a schematic diagram of the three-dimensional structure of the grouting and plugging device of the present invention;
[0021] Figure 2 Another schematic diagram of the three-dimensional structure of the grouting plugging device of the present invention is shown;
[0022] Figure 3 Shown is a schematic diagram of the control component structure of the grouting plugging device of the present invention;
[0023] Figure 4 Shown is a schematic diagram of the three-dimensional structure of the caulking assembly of the grouting and plugging device of the present invention;
[0024] Figure 5 Shown is a schematic cross-sectional structure diagram of a material processing assembly of a grouting plugging device of the present invention;
[0025] Figure 6 Shown is a schematic diagram of the structure of the grouting and plugging device of the present invention when in motion.
[0026] Explanation of the reference numerals in the accompanying drawings: 1. Carrying frame; 2. Control assembly; 201. Translation frame; 202. Driving motor; 203. Threaded rod; 204. Moving seat; 205. Lifting frame; 206. Control cylinder; 207. Equipment fixing frame; 208. Pushing cylinder group; 3. Drill seat; 4. Replacement head; 5. Drill bit; 6. Caulking assembly; 601. Mounting head; 602. Adjustment plate; 603. Positioning hole; 604. Caulking rod; 7. Protective cover; 8. Dust collector; 9. Material handling assembly; 901. Feeding channel; 902. Electric auger blade; 903. Pre-treatment bucket; 905. Telescopic distribution plate; 906. Mixing box; 907. Electric agitator; 908. Inner wall scraper; 10. Roller; 11. Lifting cylinder. DETAILED DESCRIPTION
[0027] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0028] See also Figure 1 , 2 6. The present invention provides an embodiment: a structural crack grouting and plugging device for preventing and controlling water hazards in coal mines, comprising a support frame 1, a control component 2, a drill seat 3, a replacement head 4, a drill bit 5, a caulking component 6, a protective cover 7, a dust collector 8, a material handling component 9, a roller 10, and a lifting cylinder 11; a control component 2 for controlling the drilling and grouting path of the device is installed on the inner side of the support frame 1; a drill seat 3 for driving the lower end component to rotate is installed at the front end of the control component 2; a replacement head 4 is installed at the lower end of the output shaft of the drill seat 3; a material handling component 4 is installed at the lower end of the replacement head 4 for drilling structural cracks A drill bit 5 for drilling holes; a protective cover 7 is fixedly connected to the upper end of the carrier 1 for preventing dust from escaping during drilling and grouting; dust collectors 8 for quickly absorbing dust are installed at both ends of the left and right ends of the protective cover 7; a material processing component 9 for loading and mixing grouting materials is fixedly connected to the middle position of the upper end of the protective cover 7; the end of the grouting material output pipe of the material processing component 9 is connected to the side of the control component 2; a roller 10 is installed at the outer edge of the carrier 1; a lifting cylinder 11 positioned on the connecting plate to control the lifting and lowering of the roller 10 is installed on the upper end of the roller 10.
[0029] See also Figure 3In this embodiment, the control component 2 includes a translation frame 201, a driving motor 202, a threaded rod 203, a moving seat 204, a lifting frame 205, a control cylinder 206, an equipment fixing frame 207 and a pushing cylinder group 208; the driving motor 202 is installed on the right side of the inner side of the translation frame 201; the threaded rod 203 is installed on the left end of the output shaft of the driving motor 202; the outer side of the threaded rod 203 is connected to the moving seat 204 with a threaded sleeve; when the control component 2 is running, the pushing cylinder group 208 pushes the translation frame 201 to move smoothly back and forth on the inner side of the carrier 1, and at the same time, the driving motor 202 drives the threaded rod 203 to drive the outer moving seat 204 to move left and right Move right, the control cylinder 206 inside the lifting frame 205 drives the drill bit 5 to move up and down to trim the structural cracks, and the front end of the moving seat 204 is fixedly connected to the lifting frame 205; the control cylinder 206 is installed on the upper end of the inner side of the lifting frame 205; the lower end of the piston rod of the control cylinder 206 is provided with an equipment fixing frame 207; the translation frame 201 and the supporting frame 1 are connected by sliding grooves and sliders; the rear end of the supporting frame 1 is installed with a pushing cylinder group 208 for controlling the forward and backward translation of the translation frame 201; this design allows the drill bit 5 to cover a larger working area, can comprehensively inspect and trim the cracks in the structure, and ensure the efficiency and accuracy of the structural gap trimming.
[0030] See also Figure 4 In this embodiment, a caulking assembly 6 for fully filling the cracks of the structure with grout is installed at the lower end of the replacement head 4; the caulking assembly 6 includes a mounting head 601, an adjustment plate 602, a positioning hole 603 and a caulking rod 604; a front-to-back symmetrical adjustment plate 602 is fixedly connected to the lower end of the mounting head 601; a caulking rod 604 is installed at the lower end of the adjustment plate 602; positioning holes 603 with the same hole pitch are opened at the upper ends of the caulking rod 604 and the adjustment plate 602; a positioning hole 603 is connected to another positioning hole 603 by a The connection is installed with fixing bolts; the spacing of the caulking rods 604 at the lower end of the caulking assembly 6 can be adjusted accordingly according to the spacing of the structural gaps. When adjusting, align the positioning holes 603 of the caulking rods 604 with the positioning holes 603 matching the adjustment plate 602, and lock them with fixing bolts. When grouting, slowly rotate the two caulking rods 604 to ensure that the grouting material can fill the entire crack space, improve the connectivity between the grouting material and the structural cracks, remove bubbles in the grouting material, and improve the durability and tightness of the structure after repair.
[0031] See also Figure 5In this embodiment, the material processing component 9 includes a feeding channel 901, an electric auger piece 902, a pre-treatment bucket 903, a telescopic distribution plate 905, a mixing box 906, an electric stirrer 907, and an inner wall scraper 908; an electric auger piece 902 is installed inside the feeding channel 901; according to the requirements for repairing structural cracks, suitable grouting materials are selected, and these weighed materials are put into the feeding channel 901 of the material processing component 9, and the materials are input into the pre-treatment bucket 903 along with the electric auger piece 902. The front end of the feeding channel 901 is connected to the pre-treatment bucket 903; the pre-treatment bucket 90 A telescopic distribution plate 905 for evenly distributing the input grouting materials is installed on the right end of the inner side; the lower end of the pretreatment bucket 903 is connected to a mixing box 906; an electric stirrer 907 for evenly mixing the grouting materials with a good ratio is installed on the inner side of the mixing box 906; an inner wall scraper 908 for scraping off the grouting materials sticking to the inner wall of the mixing box 906 is fixedly connected to the outer side of the rotating shaft of the electric stirrer 907, and the telescopic distribution plate 905 evenly distributes the input grouting materials and drops them into the mixing box 906, and the electric stirrer 907 and the inner wall scraper 908 are evenly mixed and stirred.
[0032] The specific steps of a structural crack drilling and grouting process for preventing and controlling water damage in coal mines are as follows:
[0033] Step 1: Move the grouting plugging device to the upper end of the coal mine structure crack by a tractor, start the lifting cylinders 11 at the four corners outside the device to retract the roller 10, and the support frame 1 contacts the ground to stably support the device and cover the area to be repaired.
[0034] Step 2: Before grouting, the dust, debris and loose structure inside the structural cracks need to be pre-processed. The staff opens the inspection door at the front end of the protective cover 7, installs the drill bit 5 on the replacement head 4 at the lower end of the drill seat 3, closes the inspection door, and opens the dust collector 8. When the control component 2 is running, the cylinder group 208 is pushed to push the translation frame 201 to move smoothly back and forth on the inside of the carrier frame 1. At the same time, the drive motor 202 drives the threaded rod 203 to drive the outer moving seat 204 to move left and right, and the control cylinder 206 inside the lifting frame 205 drives the drill bit 5 to move up and down to trim the structural cracks.
[0035] Step 3: According to the requirements for repairing structural cracks, select suitable grouting materials, and put the weighed materials into the feeding channel 901 of the material processing component 9. The materials are input into the pre-treatment bucket 903 along the electric auger 902. The telescopic distribution plate 905 evenly distributes the input grouting materials and drops them into the mixing box 906, where they are evenly mixed and stirred by the electric agitator 907 and the inner wall scraper 908.
[0036] Step 4: The staff opens the inspection door and replaces the caulking assembly 6 to the lower end of the drill seat 3. The spacing of the caulking rod 604 at the lower end of the caulking assembly 6 can be adjusted accordingly according to the spacing of the structural gap. When adjusting, align the positioning hole 603 of the caulking rod 604 with the matching positioning hole 603 of the adjustment plate 602, and lock it with the fixing bolt. At the same time, confirm whether the output port of the material handling assembly 9 is stably connected to the side of the control assembly 2, and close the inspection door.
[0037] Step 5: Control component 2 links the output port of material processing component 9 to inject grouting material into the crack and slowly rotate the two caulking rods 604 to ensure that the grouting material can fill the entire crack space and seal the crack. This can prevent water or other substances from entering the structure through the crack, thereby causing water damage or further damage.
[0038] Through the above steps, by covering the area to be repaired with the support frame 1 and the protective cover 7, the mixing of materials, repairing of structural cracks, and pouring are all completed inside, and used together with the dust collector 8, it can effectively isolate dust from spilling out, reduce pollution to the surrounding environment and safety hazards in coal mine construction, and control the drilling and grouting paths of the device through the control component 2. During the drilling operation, a larger working area can be covered, and the cracks in the structure can be comprehensively inspected and repaired to ensure the efficiency and accuracy of the structural gap repair. In addition, in the subsequent grouting operation, the grouting output pipe can be driven to move, and cooperate with the rotating caulking rod 604, so that it can be ensured that the grouting material can fill the entire crack space, improve the connectivity between the grouting material and the structural crack, remove bubbles in the grouting material, and improve the durability and tightness of the structure after repair. After sealing, water or other substances can be prevented from entering the structure through the cracks, thereby causing water damage or further damage.
[0039] The embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of those skilled in the art without departing from the spirit of the present invention.
Claims
1. A structural crack grouting and plugging device for preventing and controlling water damage in coal mines, comprising a bearing frame (1); characterized in that: The invention also comprises a control component (2), a drill seat (3), a replacement head (4), a drill bit (5), a caulking component (6), a protective cover (7), a dust collector (8), a material handling component (9), a roller (10), and a lifting cylinder (11); a control component (2) for controlling the drilling and grouting paths of the device is installed on the inner side of the carrier frame (1); a drill seat (3) for driving the lower end component to rotate is installed at the front end of the control component (2); a replacement head (4) is installed at the lower end of the output shaft of the drill seat (3); and a replacement head (4) is installed at the lower end of the replacement head (4) for adjusting the joint. A drill bit (5) for drilling holes in structural cracks; a protective cover (7) for preventing dust from escaping during drilling and grouting is fixedly connected to the upper end of the carrier (1); dust collectors (8) for quickly absorbing dust are installed at both left and right ends of the protective cover (7); a material processing component (9) for feeding and mixing grouting materials is fixedly connected to the middle position of the upper end of the protective cover (7); the grouting material output pipe end of the material processing component (9) is connected to the side of the control component (2); and a roller (10) is installed at the outer edge of the carrier (1).
2. A structural crack grouting and plugging device for preventing and controlling water damage in coal mines according to claim 1, characterized in that: The control assembly (2) comprises a translation frame (201), a driving motor (202), a threaded rod (203), a moving seat (204), a lifting frame (205), a control cylinder (206), an equipment fixing frame (207) and a pushing cylinder group (208); the driving motor (202) is installed on the right side of the inner side of the translation frame (201); the threaded rod (203) is installed on the left end of the output shaft of the driving motor (202); and the moving seat (204) with a threaded sleeve is drivingly connected to the outer side of the threaded rod (203).
3. A structural crack grouting and plugging device for preventing and controlling water damage in coal mines according to claim 2, characterized in that: The front end of the movable seat (204) is fixedly connected to a lifting frame (205); a control cylinder (206) is installed at the upper end of the inner side of the lifting frame (205); a device fixing frame (207) is arranged at the lower end of the piston rod of the control cylinder (206); the translation frame (201) and the supporting frame (1) are connected in a limited sliding manner through a sliding groove and a slider; and a pushing cylinder group (208) for controlling the translation frame (201) to move forward, backward and translationally is installed at the rear end of the supporting frame (1).
4. A structural crack grouting and plugging device for preventing and controlling water damage in coal mines according to claim 1, characterized in that: A caulking assembly (6) for fully filling grouting into the corners of structural cracks is installed at the lower end of the replacement head (4); the caulking assembly (6) comprises a mounting head (601), an adjustment plate (602), a positioning hole (603) and a caulking rod (604); the lower end of the mounting head (601) is fixedly connected to a front-to-back symmetrical adjustment plate (602); the lower end of the adjustment plate (602) is installed with a caulking rod (604); the upper ends of the caulking rod (604) and the adjustment plate (602) are both provided with positioning holes (603) with the same hole spacing; and the positioning hole (603) is connected to another positioning hole (603) by means of fixing bolts.
5. The structural crack grouting and plugging device for preventing and controlling water damage in coal mines according to claim 1, characterized in that: The material processing assembly (9) includes a feeding channel (901), an electric auger blade (902), a pre-processing bucket (903), a telescopic distribution plate (905), a mixing box (906), an electric stirrer (907), and an inner wall scraper (908); the electric auger blade (902) is installed on the inner side of the feeding channel (901).
6. A structural crack grouting and plugging device for preventing and controlling water damage in coal mines according to claim 5, characterized in that: The front end of the feeding channel (901) is connected to a pre-treatment bucket (903); a telescopic distribution plate (905) is installed on the right end inside the pre-treatment bucket (903) for evenly distributing the input grouting material; the lower end of the pre-treatment bucket (903) is connected to a mixing box (906); an electric stirrer (907) is installed inside the mixing box (906) for evenly mixing the grouting materials with a good ratio; an inner wall scraper (908) is fixedly connected to the outer side of the rotating shaft of the electric stirrer (907) for scraping off the grouting material sticking to the inner wall of the mixing box (906).
7. The structural crack grouting and plugging device for preventing and controlling water damage in coal mines according to claim 1, characterized in that: A lifting cylinder (11) is installed on the upper end of the roller (10) and is positioned on the connecting plate to control the lifting and lowering of the roller (10).
8. A structural crack drilling and grouting process for preventing water damage in coal mines, characterized in that The invention comprises a structural crack grouting and plugging device for preventing and controlling water damage in coal mines according to claims 1 to 7, and the steps are as follows: Step 1: Move the grouting plugging device to the upper end of the coal mine structure crack by a tractor, start the lifting cylinders (11) at the four corners outside the device to retract the rollers (10), and the support frame (1) contacts the ground to stably support the device and cover the area to be repaired; Step 2: Before grouting, the dust, debris and loose structure inside the structural crack need to be pre-processed. The staff opens the inspection door at the front end of the protective cover (7), installs the drill bit (5) on the replacement head (4) at the lower end of the drill seat (3), closes the inspection door, opens the dust collector (8), and when the control component (2) is running, the cylinder group (208) is pushed to push the translation frame (201) to move smoothly back and forth inside the carrier frame (1). At the same time, the drive motor (202) drives the threaded rod (203) to drive the outer moving seat (204) to move left and right, and the control cylinder (206) inside the lifting frame (205) drives the drill bit (5) to move up and down to repair the structural cracks; Step 3: According to the requirements for repairing the structural cracks, suitable grouting materials are selected, and the weighed materials are put into the feeding channel (901) of the material processing component (9). The materials are input into the pre-processing bucket (903) along with the electric auger (902), and the telescopic distribution plate (905) evenly distributes the input grouting materials and drops them into the mixing box (906), where they are evenly mixed and stirred by the electric stirrer (907) and the inner wall scraper (908); Step 4: The staff opens the inspection door and moves the caulking assembly (6) to the lower end of the drill seat (3). The spacing of the caulking rods (604) at the lower end of the caulking assembly (6) can be adjusted accordingly according to the spacing of the structural gaps. When adjusting, align the positioning holes (603) of the caulking rods (604) with the matching positioning holes (603) of the adjustment plate (602), and tighten them with fixing bolts. At the same time, check whether the output port of the material handling assembly (9) is stably connected to the side of the control assembly (2), and close the inspection door. Step 5: The control component (2) links the output port of the material processing component (9) to inject the grouting material into the crack and slowly rotates the two caulking rods (604) to ensure that the grouting material can fill the entire crack space and seal the crack. After sealing, water or other substances can be prevented from entering the structure through the crack, thereby causing water damage or further damage.