Rapid detection mechanism for stability of surrounding rock of waste tailings pond
By using adjustment support frames and multiple sets of components in the surrounding rock detection device of waste tailings ponds, the dust and rock crushing problems during openings are solved, and higher detection accuracy and efficiency are achieved, ensuring hole cleaning and water source recovery. The problem of detection accuracy and inefficiency in the prior art has been solved.
Patent Information
- Application Number
- CN202411434451.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-15
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing surrounding rock detection device of waste tailings pond produces a large amount of dust and crushed rock during the opening process, resulting in reduced detection accuracy and wear of the device. It is difficult for a single pushing mechanism to effectively clean up the substances in the hole, which affects the accuracy of the detection results and efficiency.
Adopt the adjustment support frame and multiple sets of components, including blower vacuuming components, boost sealing components and return water detection components. The dust and rock crushing are treated separately through blower vacuuming, boost sealing and multiple sets of return water detection. and water sources to ensure clean holes and water sources, and improve detection accuracy and efficiency.
It effectively reduces dust and crushed rocks in the holes, prevents water absorption, improves the accuracy of detection results and the service life of the device, and improves the accuracy and efficiency of surrounding rock permeability detection.
Smart Images

Figure CN119023537A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of surrounding rock detection, and in particular to a rapid stability detection mechanism for surrounding rocks of a waste tailings pond. Background Art
[0002] Waste tailings ponds refer to the large amount of waste slag produced by mining enterprises after useful minerals are separated from gangue, surrounding rock, etc. through processes such as ore dressing during the process of mining metal, non-metal, coal and other mineral resources. These waste slags are usually stored in tailings ponds near the mines.
[0003] In rock underground engineering, the surrounding rock mass whose stress state changes due to the influence of excavation is called surrounding rock. In the fields of mining, tunnel engineering, etc., the nature and stability of surrounding rock have a crucial impact on the safety and construction difficulty of the project.
[0004] The existing patent with authorization publication number CN 113433052A discloses a rapid detection device for the stability of the surrounding rock of a waste tailings pond. This patent achieves the effect of automatic cleaning by setting a feeding mechanism to push the rock and soil generated when opening a hole. At the same time, it utilizes the relationship between gear transmission to flexibly adjust the relative spacing between the two opening pipes, thereby significantly improving the efficiency of multiple groups of surrounding rock leakage detection operations.
[0005] However, when drilling holes in the surrounding rock, this patent will generate a large amount of dust and broken rocks, which cannot be discharged from the hole by a single jacking, and continuous pushing will gradually compact them, causing wear on the propulsion device. At the same time, the test water source will also be absorbed by a large amount of dust after input, resulting in the test water penetrating into the dust during detection. A large amount of dust will affect the device and affect the accuracy of the detection.
[0006] In addition, the jacking mechanism will cause accumulation and gradual compaction as it advances, and the internal structure of the surrounding rock is difficult to view. Relying on only a single detection device to detect the wetness inside the hole, due to the different internal structures of the surrounding rock, the seepage water may not be recovered or the recovery amount may be inaccurate, resulting in deviations in the test results and low detection efficiency.
[0007] Therefore, the present application provides a mechanism for rapid stability detection of the surrounding rock of a waste tailings pond to meet the demand. Summary of the invention
[0008] The technical problem to be solved by the present invention is to provide a rapid detection mechanism for the stability of the surrounding rock of a waste tailings pond to solve the problem that when the existing surrounding rock is opened, a large amount of dust and broken rocks will be generated, which cannot be discharged from the inside of the hole by a single jacking, and continuous pushing will gradually compact them, causing wear on the propulsion device. At the same time, the detection water source will also be absorbed by a large amount of dust after input, resulting in the detection water penetrating into the dust during detection. A large amount of dust will affect the device and affect the accuracy of the detection; and the jacking mechanism will cause accumulation and gradual compaction with the advancement, and the internal structure of the surrounding rock is difficult to view. Only relying on a single detection device to detect the wetness inside the hole, due to the different internal structures of the surrounding rock, it may cause the infiltrated water to not be recovered or the recovered amount to be inaccurate, resulting in deviations in the detection results and low detection efficiency.
[0009] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0010] A rapid detection mechanism for the stability of the surrounding rock of a waste tailings pond comprises an adjusting support frame, a control center is installed at the bottom of the adjusting support frame, a sliding frame plate is installed at the top of the adjusting support frame, a servo motor is installed at one end of the sliding frame plate, two groups of rotating sleeves are plugged into one side of the sliding frame plate, two groups of jacking pipes are sleeved inside the two groups of rotating sleeves, a water storage tank is installed on the top right side of the adjusting support frame, a water pump is installed at one end of the water storage tank, a cylinder is installed at the bottom of the middle end of the adjusting support frame, the output end of the cylinder is connected to the bottom of the sliding frame plate, the bottoms of the two groups of jacking pipes are meshed and installed at the output end of the motor through a gear set, the bottom of the motor is slidably connected to the top of the adjusting support frame, a positioning connecting plate is installed on the outer surface of the rotating sleeve, a permeability meter is installed at the top of the bottom of the two groups of jacking pipes, and the right side of the jacking pipe A blower is provided; an air blast and dust suction assembly, one end of the jacking tube is equipped with an air blast and dust suction assembly, and the air blast and dust suction assembly is used to collect debris and dust inside the surrounding rock; a booster sealing assembly, one end of the jacking tube is equipped with an booster sealing assembly, and the booster sealing assembly is used to push the broken rock in the slotted hole and seal the hole; a backwater detection assembly, a plurality of groups of backwater detection assemblies are installed on the top of one end of the jacking tube, and the backwater detection assembly recovers and detects the water delivered by the water pump; the number of the air blast and dust suction assemblies is set to two groups, and the two groups of the air blast and dust suction assemblies are respectively installed at the ends of the jacking tube; the rotating sleeve is installed at the end of the top jacking tube in the two groups of the jacking tubes; the booster sealing assembly is installed at the end of the bottom jacking tube in the two groups of the jacking tubes, and the backwater detection assembly is sleeved on the end of the bottom jacking tube in the two groups of the jacking tubes.
[0011] Optionally, two groups of rotating sleeves are placed at the upper and lower ends of the sliding frame, and the front end of the lower rotating sleeve is longer than the upper rotating sleeve.
[0012] Optionally, the air blowing and dust suction assembly includes a fixed sleeve, which is installed at one end of the push tube, and a polyurethane suction barrel is installed at one end of the fixed sleeve. The polyurethane suction barrel can be folded, and a spring is installed on the surface of the polyurethane suction barrel. An exhaust valve is installed at one end of the polyurethane suction barrel, and the maximum pressure of the exhaust valve is less than the pressure of the spring on the surface of the polyurethane suction barrel.
[0013] Optionally, a dust collecting bin is installed at the bottom of the polyurethane suction barrel, and the dust collecting bin is folded synchronously with the polyurethane suction barrel. A single-closed valve is provided at one end of the fixed sleeve, and the single-closed valve is composed of two groups of plate covers, one group of plate covers is hollow, and the other group is solid plate covers, and an axial gear is provided between the two groups of plate covers of the single-closed valve.
[0014] Optionally, a connecting rod is meshedly connected to one side of the one-way closing valve, a one-way valve is arranged on one side of the top of the one-way closing valve, a clamping block seat is arranged above the one-way valve, and a wrench is rotatably connected to the inside of the clamping block seat.
[0015] Optionally, the booster sealing assembly includes a sealing plate, which is installed at one end of the push tube. There are two groups of sealing plates connected by a hollow tube. A rubber ring is provided at one end of the sealing plate, and the expansion size of the rubber ring is the same as the inner diameter of the rotating sleeve.
[0016] Optionally, a buffer pad is installed on the surface of the cavity sealing plate, and a pusher head is provided at one end of the cavity sealing plate, and the size of the pusher head is the same as the diameter of the cavity sealing plate.
[0017] Optionally, the backwater detection assembly includes a positioning rack, which is installed on the inner wall of the top of the rotating sleeve, the surface of the positioning rack is meshed with a gear, a bevel gear 1 is installed at the bottom of the gear, one end of the bevel gear 1 is meshed with bevel gear 2, and one end of the bevel gear 2 is installed with a cylindrical gear.
[0018] Optionally, one end of the cylindrical gear is meshingly connected with a flip rod, a rack is provided at the front end of the flip rod, and the flip rod is inclined 90 degrees, a limit plate is installed on the top of the flip rod, a rotating shaft is provided on one side of the limit plate, and a double-opening folding plate is installed on the top of the limit plate. Optionally, a funnel bin is provided at one end of the limit plate, and the funnel bin is provided in multiple groups, and the top opening size of the multiple groups of funnel bins is consistent with the size of the opening on the surface of the rotating sleeve, an infusion tube is installed at the bottom of the funnel bin, a filter cloth box is installed at one end of the infusion tube, and one end of the filter cloth box is installed at the bottom of the permeability meter.
[0019] Compared with the prior art, the present invention has at least the following beneficial effects:
[0020] In the above scheme, by setting a blast dust suction component, when a large amount of dust is generated while the device is drilling through a motor, a large amount of suction is generated by starting the blower through the multiple groups of openings at the front end of the push tube. The suction pipe absorbs the dust and lighter particles into the polyurethane suction barrel under the suction force, causing it to expand and bulge. The larger particles settle in the dust collecting bin under the action of gravity. After the suction is completed, the wrench is adjusted to rotate the single-closed valve to open the outlet pipe and close the inlet pipe. The gas in the polyurethane suction barrel generates a blowing force on the outlet pipe through the pressure of the spring and blows it into the hole. After the dust is blown up again, the single-closed valve is adjusted again, and the suction pipe absorbs it again. The collected garbage is discharged outside the device through the opening of the collection bin. By absorbing and blowing the dust in the excavated tunnel, the amount of dust inside the hole is reduced, avoiding the absorption of the detection water source and affecting the effect of surrounding rock penetration. At the same time, the smaller impurities in the hole are absorbed and processed, which provides convenience for the device detection work, increases the accuracy of the detection results, and facilitates subsequent operations.
[0021] By setting up the booster sealing component, during the drilling process of the device, when the broken rocks are piled up, they are acted upon by the pusher head to continue rolling toward the depth, thereby avoiding the generation and compaction of the accumulation affecting the detection of the device, improving the drilling efficiency of the device, and saving the detection time. At the same time, when the drilling is stopped, the sealing plate will seal the front end of the rotating casing, and the rubber pad will expand due to the air to seal the opening, thereby avoiding the water source from flowing into the broken rocks generated during the drilling. The water source flows through the opening on the rotating casing, thereby ensuring the directional flow of the water source, maintaining the integrity of the water volume, and increasing the permeability of the surrounding rock.
[0022] By setting up multiple sets of backwater detection components, using positioning racks, gears, flip rods, funnel bins, split folding plates, infusion pipes and filter cloth boxes, water sources that penetrate from above can be received at the same time. The use of split folding plates avoids the invasion of dust and rock and soil debris, which may damage the device, pollute the internal environment of the detection mechanism, and affect the detection accuracy. At the same time, the gear is thrust by the top push pipe and contacts the positioning rack on the inner wall of the rotating sleeve, causing rotation to open the split folding plate. Water sources that penetrate the surrounding rock flow into the funnel bin and into the infusion pipe below. Under suction, the liquid is continuously input into the filter cloth box and, after filtration, flows to the permeability meter to monitor data. The use of multiple recovery bins allows water at different positions to be recovered and detected, avoiding the internal cavities or fragmentation of the surrounding rock, which may cause the loss of water sources to affect the detection mechanism. At the same time, it reduces time loss, improves recovery efficiency, and lays a foundation for the accuracy of the detection structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The accompanying drawings, which are incorporated herein and constitute a part of the specification, illustrate embodiments of the invention and, together with the description, further serve to explain the principles of the invention and to enable those skilled in the relevant art to make and use the invention.
[0024] Figure 1 This is a schematic diagram of the main stereoscopic structure of the rapid detection mechanism for the stability of the surrounding rock of the waste tailings pond.
[0025] Figure 2 It is a schematic diagram of the front plan structure of the rapid detection mechanism for the stability of the surrounding rock of the waste tailings pond.
[0026] Figure 3 This is a schematic diagram of the three-dimensional structure from another perspective of the rapid detection mechanism for the stability of the surrounding rock of the waste tailings pond.
[0027] Figure 4 It is a schematic diagram of the three-dimensional structure of the top mechanism of the adjusting support frame.
[0028] Figure 5 It is a three-dimensional structural schematic diagram of the position relationship of two sets of rotating sleeves.
[0029] Figure 6 It is a schematic diagram of the front view of the interior of the push tube.
[0030] Figure 7 It is a schematic diagram of the three-dimensional structure of the air blast dust collection component.
[0031] Figure 8 for Figure 7 Enlarged view of point A in the middle.
[0032] Fig. 9 It is a three-dimensional structural schematic diagram of the position relationship between the booster sealing chamber assembly and the booster tube.
[0033] Fig.10 for Fig. 9 Enlarged view of point B in the middle.
[0034] Fig.11 It is a three-dimensional structural schematic diagram of the position relationship between the split folding plate and the rotating sleeve.
[0035] Fig.12 It is a schematic diagram of the three-dimensional structure of the backwater detection component.
[0036] Fig.13 It is a system diagram of the present invention.
[0037] Reference numerals:
[0038] 1. Adjust the support frame; 2. Control center; 3. Servo motor; 4. Sliding frame; 5. Rotating sleeve; 6. Blower dust suction assembly; 61. Fixed sleeve; 62. Polyurethane suction barrel; 63. Exhaust valve; 64. Dust collection bin; 65. Single-close valve; 66. Connecting rod; 67. One-way valve; 68. Block seat; 69. Wrench; 7. Boosting sealing chamber assembly; 71. Sealing chamber plate; 72. Rubber ring; 73. Buffer pad; 74. Push head; 8 , backwater detection assembly; 81, positioning rack; 82, gear; 83, flip rod; 84, limit plate; 85, funnel bin; 86, double folding plate; 87, infusion tube; 88, filter cloth box; 89, bevel gear one; 810, bevel gear two; 811, cylindrical gear; 9, push pipe; 10, water storage tank; 11, water pump; 12, cylinder; 13, motor; 14, positioning connecting plate; 15, permeability meter; 16, blower.
[0039] As shown in the figure, in order to clearly implement the structure of the embodiment of the present invention, specific structures and devices are marked in the figure, but this is only for illustrative purposes and is not intended to limit the present invention to the specific structure, device and environment. According to specific needs, ordinary technicians in this field can adjust or modify these devices and environments. DETAILED DESCRIPTION
[0040] The following is a detailed description of a rapid detection mechanism for the stability of the surrounding rock of a waste tailings pond provided by the present invention in conjunction with the accompanying drawings and specific embodiments. At the same time, it is explained here that in order to make the embodiments more detailed, the following embodiments are the best and preferred embodiments, and those skilled in the art may also adopt other alternative methods to implement some known technologies; and the accompanying drawings are only for a more specific description of the embodiments, and are not intended to specifically limit the present invention.
[0041] It should be noted that the references to "one embodiment", "an embodiment", "an exemplary embodiment", "some embodiments" and the like in the specification indicate that the embodiments described may include specific features, structures or characteristics, but not every embodiment may include the specific features, structures or characteristics. In addition, when a specific feature, structure or characteristic is described in conjunction with an embodiment, it should be within the knowledge of a person skilled in the art to implement such feature, structure or characteristic in conjunction with other embodiments (whether or not explicitly described).
[0042] In general, a term can be understood, at least in part, from its use in context. For example, depending, at least in part, on the context, the term "one or more" as used herein can be used to describe any feature, structure, or characteristic in the singular sense, or can be used to describe a combination of features, structures, or characteristics in the plural sense. Additionally, the term "based on" can be understood as not necessarily intended to convey an exclusive set of factors, but can instead, depending, at least in part, on the context, allow for the presence of other factors that are not necessarily explicitly described.
[0043] It will be understood that the meanings of “on,” “over,” and “above” in the present invention should be interpreted in the broadest manner, so that “on” not only means “directly on” something, but also includes the meaning of being “on” something with intervening features or layers therebetween, and “on” or “over” not only means “on” or “above” something, but also includes the meaning of being “on” or “above” something with no intervening features or layers therebetween.
[0044] Additionally, spatially relative terms such as "under," "beneath," "lower," "above," "upper," and the like may be used herein for descriptive convenience to describe the relationship of one element or feature to another element or features, as shown in the accompanying drawings. Spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the accompanying drawings. The device may be oriented in other ways, and the spatially relative descriptors used herein may be similarly interpreted accordingly.
[0045] like Figures 1 to 13As shown, an embodiment of the present invention provides a rapid detection mechanism for the stability of the surrounding rock of a waste tailings pond, comprising an adjustable support frame 1, a control center 2 is installed at the bottom of the adjustable support frame 1, a sliding frame plate 4 is installed at the top of the adjustable support frame 1, a servo motor 3 is installed at one end of the sliding frame plate 4, two groups of rotating sleeves 5 are plugged into one side of the sliding frame plate 4, two groups of jacking pipes 9 are sleeved inside the two groups of rotating sleeves 5, a water storage tank 10 is installed on the right side of the top of the adjustable support frame 1, a water pump 11 is installed at one end of the water storage tank 10, a cylinder 12 is installed at the bottom of the middle end of the adjustable support frame 1, the output end of the cylinder 12 is connected to the bottom of the sliding frame plate 4, the bottoms of the two groups of jacking pipes 9 are meshed and installed at the output end of the motor 13 through a gear set, the bottom of the motor 13 is slidably connected to the top of the adjustable support frame 1, a positioning connecting plate 14 is installed on the outer surface of the rotating sleeve 5, and a seepage Permeability measuring device 15, a blower 16 is arranged on the right side of the jacking pipe 9; a blast dust suction assembly 6, a blast dust suction assembly 6 is installed at one end of the jacking pipe 9, and the blast dust suction assembly 6 is used to collect debris and dust inside the surrounding rock; a booster sealing assembly 7, a booster sealing assembly 7 is installed at one end of the jacking pipe 9, and the booster sealing assembly 7 is used to push the broken rock in the slotted hole and seal the cavity; a backwater detection assembly 8, a plurality of groups of backwater detection assemblies 8 are installed on the top of one end of the jacking pipe 9, and the backwater detection assembly 8 recovers and detects the water transported by the water pump 11; the number of blast dust suction assemblies 6 is set to two groups, and the two groups of blast dust suction assemblies 6 are respectively installed at the ends of the jacking pipe 9; the rotating sleeve 5 is installed at the end of the top jacking pipe 9 in the two groups of jacking pipes 9; the booster sealing assembly 7 is installed at the end of the bottom jacking pipe 9 in the two groups of jacking pipes 9, and the backwater detection assembly 8 is sleeved on the end of the bottom jacking pipe 9 in the two groups of jacking pipes 9.
[0046] As an implementation method in this embodiment, Figures 5 to 8As shown, the two groups of rotating sleeves 5 are placed at the upper and lower ends of the sliding frame 4, and the front end of the lower rotating sleeve 5 is longer than the upper rotating sleeve 5. The control center 2 is connected to the servo motor 3, the water pump 11, the cylinder 12, the motor 13, the permeability meter 15 and the blower 16. The blast dust suction component 6 includes a fixed sleeve 61, which is installed at one end of the push tube 9. A polyurethane suction barrel 62 is installed at one end of the fixed sleeve 61. The polyurethane suction barrel 62 can be folded, and a spring is installed on the surface of the polyurethane suction barrel 62. An exhaust valve 63 is installed at one end of the polyurethane suction barrel 62. The maximum pressure of the exhaust valve 63 is less than that of the polyurethane suction barrel 62. The pressure of the spring on the surface of the suction barrel 62, a dust collecting bin 64 is installed at the bottom of the polyurethane suction barrel 62, and the dust collecting bin 64 is folded synchronously with the polyurethane suction barrel 62. A single-closed valve 65 is arranged at one end of the fixed sleeve 61. The single-closed valve 65 is composed of two sets of plate covers, one set of plate covers is hollow, and the other set is solid. A shaft gear is arranged between the two sets of plate covers of the single-closed valve 65, one side of the single-closed valve 65 is meshedly connected with a connecting rod 66, and a one-way valve 67 is arranged on one side of the top of the single-closed valve 65. A block seat 68 is arranged above the one-way valve 67, and a wrench 69 is connected to the internal rotation of the block seat 68. When the blower 16 is started, a The suction force generates dust and light particles in the hole, which are absorbed by the multiple groups of openings at the front end of the push tube 9, and are transported to the polyurethane suction barrel 62 through the fixed sleeve 61 connected to the suction pipe. At the same time, the exhaust valve 63 transports excess gas to the outside of the polyurethane suction barrel 62 to ensure the stability of the inside of the polyurethane suction barrel 62. At the same time, when too much dust and particles accumulate in the polyurethane suction barrel 62, they flow along the inclined inner wall of the polyurethane suction barrel 62 to the dust collecting bin 64, and then are discharged through the opening at the bottom of the dust collecting bin 64. When the conveying in the suction pipe stops, pull up the wrench 69 to make it snap onto the block seat 68, and at the same time, the connecting rod 66 is moved forward. The one-way valve 65 is moved to start rotating 180 degrees, and the lower opening of the one-way valve 65 is aligned with the tail of the one-way valve 67. The polyurethane suction barrel 62, which is subjected to the tension of multiple sets of springs, contracts, and the internal gas is quickly transported to the inside of the slotted hole on the surrounding rock through the air supply pipe connected to the one-way valve 67, so that the dust remaining in the hole of the surrounding rock during the slotting continues to diffuse. After the gas is completely transported, the wrench 69 is lowered from the block seat 68, and the one-way valve 65 continues to rotate 180 degrees, and the opening is realigned with the suction pipe. The blower 16 continues to operate to absorb the dust and particles inside the hole into the polyurethane suction barrel 62.
[0047] As an implementation method in this embodiment, Figures 9 and 10As shown, the booster sealing assembly 7 includes a sealing plate 71, which is mounted at one end of the jacking tube 9. There are two groups of sealing plates 71 connected by hollow tubes. A rubber ring 72 is provided at one end of the sealing plate 71. The expansion size of the rubber ring 72 is the same as the inner diameter of the rotating sleeve 5. A buffer pad 73 is installed on the surface of the sealing plate 71. A pusher head 74 is provided at one end of the sealing plate 71. The size of the pusher head 74 is the same as the diameter of the sealing plate 71. When the pusher head 74 rotates and pushes forward, the surrounding rock under the rotating sleeve 5 is broken up and pushed to both sides of the forward direction to prevent the generated impurities from accumulating on the main line. At the same time, the rotating sleeve 5 stops drilling after drilling to the maximum depth, the sealing plate 71 is fitted with the inner wall of the rotating sleeve 5, and the buffer pad 73 pushes the internal gravel forward to maintain a certain distance, and inflates the rubber ring 72. After the rubber ring 72 expands, the inner wall gap is sealed again.
[0048] As an implementation method in this embodiment, Figure 11 to Figure 12 As shown, the backwater detection assembly 8 includes a positioning rack 81, which is mounted on the inner wall of the top of the rotating sleeve 5, and the surface of the positioning rack 81 is meshed with a gear 82, and a bevel gear 89 is mounted on the bottom of the gear 82, and one end of the bevel gear 89 is meshed with a bevel gear 810, and one end of the bevel gear 810 is mounted with a cylindrical gear 811, and one end of the cylindrical gear 811 is meshed with a flip rod 83, and a rack is arranged at the front end of the flip rod 83, and the flip rod 8 3 is tilted 90 degrees, a limit plate 84 is installed on the top of the turning rod 83, a rotating shaft is set on one side of the limit plate 84, a double-opening folding plate 86 is installed on the top of the limit plate 84, a funnel bin 85 is set at one end of the limit plate 84, and the funnel bin 85 is provided with multiple groups, and the top opening size of the multiple groups of funnel bins 85 is consistent with the size of the opening on the surface of the rotating sleeve 5, and an infusion tube 87 is installed at the bottom of the funnel bin 85, and a filter cloth box 88 is installed at one end of the infusion tube 87, and one end of the filter cloth box 88 is installed at the seepage At the bottom of the transmittance measuring device 15, when the gear 82 meshes with the positioning rack 81 on the inner wall of the rotating sleeve 5 and rotates, the bevel gear 1 89 installed at the bottom of the gear 82 starts to rotate. When the bevel gear 1 89 rotates, the bevel gear 2 810 meshed and connected at one end of the bevel gear 1 89 starts to rotate. When the bevel gear 2 810 rotates, the cylindrical gear 811 installed at one end of the bevel gear 2 810 starts to rotate. The rotation of the cylindrical gear 811 drives the flip rod 83 to move in the opposite direction and rotate 90 degrees. At the same time, the limit plate 84 rotates around the surface of one side of the rotating shaft. When the limit plate 84 rotates, at the opening of the rotating sleeve 5 below, the corresponding size of the split folding plate 86 begins to fold towards each other from a closed state and open. When the split folding plate 86 is opened, the funnel bin 85 collects the seepage water from the surrounding rock above. The collected seepage water will be transported to the filter cloth box 88 through the infusion tube 87. The filter cloth box 88 is divided into an upper and lower layer, which can be manually replaced to ensure the accuracy of the detection.
[0049] The working principle provided by the technical solution of the present invention is:
[0050] First, move the device to the detection position, adjust the height of the legs of the support frame 1 to make it vertical to the surrounding rock body, start power, start the servo motor 3 through the control center 2, adjust the spacing between the two groups of rotating sleeves 5 on the sliding frame 4, and fix the two groups of rotating sleeves 5 through the positioning connecting plate 14, then align the rotating sleeve 5 with the surrounding rock body, start the cylinder 12, and the started cylinder 12 drives the sliding frame 4 to move forward, and at the same time, the rotating sleeve 5 is aligned with the surrounding rock to groove, and at the same time, the motor 13 is started, and the motor 13 drives the jacking pipe 9 to rotate inside the rotating sleeve 5, and then the water pump 11 is turned on, and the water pump 11 first transports water from the water tank 10 to the surface of the rotating sleeve 5, cools down its rotor, avoids damage caused by high-temperature rotation, and improves its service life.
[0051] When the jacking pipe 9 is in operation, the blowing and dust collection assembly 6 is in operation synchronously. The suction force generated by the blower 16 is started, and the dust and light particles generated in the surrounding rock holes are passed through the multiple groups of openings at the front end of the jacking pipe 9, and are absorbed and transported to the polyurethane suction barrel 62 through the suction pipe through the fixed sleeve 61. At the same time, the excess gas will be transported to the outside of the polyurethane suction barrel 62 through the exhaust valve 63 to ensure the stability of the polyurethane suction barrel 62. At the same time, when too much dust and particles accumulate in the polyurethane suction barrel 62, they flow along the inclined inner wall of the polyurethane suction barrel 62 to the dust collecting bin 64, and then are discharged in an orderly manner through the opening at the bottom. When the conveying in the suction pipe stops, pull up the wrench 69 to make it snap onto the block seat 68, and at the same time, the connecting rod 66 moves to make the single closing valve 65 Start to rotate 180 degrees, align the lower end opening of the one-way valve 65 with the tail of the one-way valve 67, and the polyurethane suction barrel 62, which is subjected to the tension of multiple groups of springs, shrinks. The internal gas is quickly transported to the inside of the slotted hole on the surrounding rock through the air supply pipe connected to the one-way valve 67, so that the dust remaining in the hole of the surrounding rock during the slotting continues to diffuse. After all the gas is transported, the wrench 69 is lowered from the block seat 68, and the one-way valve 65 continues to rotate 180 degrees, and the opening is realigned with the suction pipe. The blower 16 continues to operate to absorb the dust and particles inside the hole into the polyurethane suction barrel 62 for cleaning again. After repeated several times, stop, so that the amount of dust inside the hole is reduced, to avoid the subsequent detection of water source being excessively absorbed by dust and rock and soil, which affects the effect of surrounding rock penetration.
[0052] At the same time, smaller impurities in the hole are collected and discharged through the dust collecting bin 64, which provides convenience for the subsequent detection work of the device and increases the accuracy of the detection results. At the same time, in conjunction with the booster sealing chamber assembly 7, the push head 74 rotates and pushes forward, breaking up the surrounding rock under the rotating sleeve 5 and pushing it on both sides of the forward direction to prevent the impurities generated during the drilling process from slowly accumulating on the main line, resulting in the gradual increase and compaction of impurities, causing resistance to the drilling device, increasing the friction reaction and causing the device to lose, reducing its service life. At the same time, the rotating sleeve 5 stops drilling after drilling to the maximum depth, and the sealing chamber plate 71 fits with the inner wall of the rotating sleeve 5. At the same time, the buffer pad 73 pushes the internal gravel forward, maintains a certain distance, and inflates the rubber ring 72. After the rubber ring 72 expands, the inner wall gap is closed again, so that the water source flows through the opening on the rotating sleeve 5, ensuring the directional flow of the water source and maintaining the integrity of the water volume.
[0053] When the water source starts to flow directionally through the hole at the front end of the rotating sleeve 5, the return water detection component 8 in the rotating sleeve 5 below starts to operate, and the push tube 9 pushes the gear 82 to move into the drilled hole, meshing and rotating with the positioning rack 81 on the inner wall of the rotating sleeve 5 on the running track. When the gear 82 rotates, the bevel gear 1 89 installed at the bottom starts to rotate. When the bevel gear 1 89 rotates, the bevel gear 2 810 meshing and connected at one end of the bevel gear 1 89 starts to rotate. When the bevel gear 2 810 rotates, the cylindrical gear 811 installed at one end of the bevel gear 2 810 starts to rotate. The rotation of the cylindrical gear 811 drives the opposite flip rod 83 to move and rotate 90 degrees. When the flip rod 83 While rotating, the limit plate 84 rotates around the surface of one side of the rotating shaft. When the limit plate 84 rotates, the corresponding size of the double-opening folding plate 86 at the opening of the rotating sleeve 5 below begins to flip and open from a closed state. When the double-opening folding plate 86 is opened, the funnel bin 85 collects the seepage water from the surrounding rock above. At the same time, the collected seepage water will be transported to the filter cloth box 88 through the infusion tube 87. After being filtered by the filter cloth box 88, the seepage water flows to the permeability meter 15 for detection, and the data is fed back through the display. The permeability meter 15 monitors the data. The permeability meter 15 is a water volume monitor that detects the stability of the surrounding rock by detecting the amount of recovered water.
[0054] The present invention covers any substitution, modification, equivalent method and scheme made on the essence and scope of the present invention. In order to make the public have a thorough understanding of the present invention, specific details are described in detail in the following preferred embodiments of the present invention, but those skilled in the art can fully understand the present invention without the description of these details. In addition, in order to avoid unnecessary confusion about the essence of the present invention, well-known methods, processes, procedures, components and circuits are not described in detail.
[0055] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A rapid detection mechanism for the stability of the surrounding rock of a waste tailings pond, characterized in that: The invention comprises an adjustable support frame (1), a control center (2) is installed at the bottom of the adjustable support frame (1), a sliding frame plate (4) is installed at the top of the adjustable support frame (1), a servo motor (3) is installed at one end of the sliding frame plate (4), two groups of rotating sleeves (5) are inserted at one side of the sliding frame plate (4), two groups of push pipes (9) are sleeved inside the two groups of rotating sleeves (5), a water tank (10) is installed at the right side of the top of the adjustable support frame (1), a water pump (11) is installed at one end of the water tank (10), and the adjustable support frame (10) is provided with a plurality of rotating sleeves (5) connected to the rotating sleeves (5). 1) is provided with a cylinder (12) at the bottom of the middle end, the output end of the cylinder (12) is connected to the bottom of the sliding frame plate (4), the bottoms of the two groups of push tubes (9) are meshed and installed on the output end of the motor (13) through a gear set, the bottom of the motor (13) is slidably connected to the top of the adjustment support frame (1), the outer surface of the rotating sleeve (5) is provided with a positioning connecting plate (14), the top of the push tube (9) at the bottom of the two groups of push tubes (9) is provided with a permeability meter (15), and a blower (16) is provided on the right side of the push tube (9); An air blast and dust suction component (6), one end of the jacking tube (9) is equipped with an air blast and dust suction component (6), and the air blast and dust suction component (6) is used to collect debris and dust inside the surrounding rock; A boosting and sealing cavity component (7), one end of the pushing tube (9) is equipped with the boosting and sealing cavity component (7), and the boosting and sealing cavity component (7) is used to push the crushed rock in the slotted hole and seal the cavity; A water return detection assembly (8), wherein a plurality of water return detection assemblies (8) are installed on the top of one end of the push pipe (9), and the water return detection assembly (8) recovers and detects the water delivered by the water pump (11); The number of the air blowing and dust suction components (6) is set to two groups, and the two groups of the air blowing and dust suction components (6) are respectively installed at the ends of the push tube (9); The rotating sleeve (5) is installed at the end of the top push tube (9) in the two groups of push tubes (9); The boosting and sealing chamber assembly (7) is installed at the end of the bottom pushing tube (9) in the two groups of pushing tubes (9), and the return water detection assembly (8) is sleeved on the end of the bottom pushing tube (9) in the two groups of pushing tubes (9).
2. The rapid detection mechanism for the stability of the surrounding rock of the waste tailings pond according to claim 1 is characterized in that: The two groups of rotating sleeves (5) are placed at the upper and lower ends of the sliding frame plate (4), and the front end of the lower rotating sleeve (5) is longer than the upper rotating sleeve (5).
3. The rapid detection mechanism for the stability of the surrounding rock of the waste tailings pond according to claim 2 is characterized in that: The air blowing and dust suction component (6) comprises a fixed sleeve (61), wherein the fixed sleeve (61) is installed at one end of the push tube (9), a polyurethane suction barrel (62) is installed at one end of the fixed sleeve (61), the polyurethane suction barrel (62) is foldable, and a spring is installed on the surface of the polyurethane suction barrel (62), an exhaust valve (63) is installed at one end of the polyurethane suction barrel (62), and the maximum pressure of the exhaust valve (63) is less than the pressure of the spring on the surface of the polyurethane suction barrel (62).
4. The rapid detection mechanism for the stability of the surrounding rock of the waste tailings pond according to claim 3 is characterized in that: A dust collecting bin (64) is installed at the bottom of the polyurethane suction barrel (62), and the dust collecting bin (64) is folded synchronously with the polyurethane suction barrel (62). A single closing valve (65) is arranged at one end of the fixed sleeve (61), and the single closing valve (65) is composed of two groups of plate covers, one group of plate covers is hollow, and the other group is solid, and an axial gear is arranged between the two groups of plate covers of the single closing valve (65).
5. The rapid detection mechanism for the stability of the surrounding rock of the waste tailings pond according to claim 4 is characterized in that: A connecting rod (66) is meshedly connected to one side of the one-way closing valve (65), a one-way valve (67) is arranged on one side of the top of the one-way closing valve (65), a clamping block seat (68) is arranged above the one-way valve (67), and a wrench (69) is rotatably connected inside the clamping block seat (68).
6. The rapid detection mechanism for the stability of the surrounding rock of the waste tailings pond according to claim 5 is characterized in that: The booster sealing chamber assembly (7) comprises a sealing chamber plate (71), the sealing chamber plate (71) being mounted on one end of the push tube (9), the sealing chamber plates (71) comprising two groups connected by a hollow tube, a rubber ring (72) being arranged at one end of the sealing chamber plate (71), the expansion dimension of the rubber ring (72) being the same as the inner diameter dimension of the rotating sleeve (5).
7. The rapid detection mechanism for the stability of the surrounding rock of the waste tailings pond according to claim 6 is characterized in that: A buffer pad (73) is installed on the surface of the cavity sealing plate (71), and a push head (74) is provided at one end of the cavity sealing plate (71), and the size of the push head (74) is the same as the diameter of the cavity sealing plate (71).
8. The rapid detection mechanism for the stability of the surrounding rock of the waste tailings pond according to claim 7 is characterized in that: The backwater detection assembly (8) comprises a positioning rack (81), the positioning rack (81) being mounted on the inner wall of the top of the rotating sleeve (5), the surface of the positioning rack (81) being meshedly connected with a gear (82), the bottom of the gear (82) being mounted with a bevel gear 1 (89), one end of the bevel gear 1 (89) being meshedly connected with a bevel gear 2 (810), and one end of the bevel gear 2 (810) being mounted with a cylindrical gear (811).
9. The rapid detection mechanism for the stability of the surrounding rock of the waste tailings pond according to claim 8 is characterized in that: One end of the cylindrical gear (811) is meshedly connected with a flip rod (83), a rack is provided at the front end of the flip rod (83), and the flip rod (83) is inclined at 90 degrees. A limit plate (84) is installed on the top of the flip rod (83), a rotating shaft is provided on one side of the limit plate (84), and a split folding plate (86) is installed on the top of the limit plate (84).
10. The rapid detection mechanism for the stability of the surrounding rock of the waste tailings pond according to claim 9, characterized in that: A funnel bin (85) is provided at one end of the limiting plate (84), and the funnel bins (85) are provided in multiple groups, and the top opening sizes of the multiple groups of the funnel bins (85) are consistent with the size of the openings on the surface of the rotating sleeve (5). An infusion tube (87) is installed at the bottom of the funnel bin (85), and a filter cloth box (88) is installed at one end of the infusion tube (87), and one end of the filter cloth box (88) is installed at the bottom of the permeability meter (15).