Control system and control equipment for generator test

By designing a generator test control system, the problem of difficulty in monitoring generator voltage and current in ground tests is solved, and the generator is effectively started and power management is realized, ensuring the safety and controllability of the test process.

CN119024163APending Publication Date: 2024-11-26CAIHONG DRONE TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411192038.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the ground test of the drone electrical system, the starter generator lacks control equipment and cannot monitor the generator voltage and current.

Method used

A control system for generator testing is designed, including a start-up controller, a signal transmission unit, a power supply component and a control switch assembly. The start-up controller sends a power generation or stops the power generation signal to the start-up controller through the signal transmission unit, and the start-up controller receives it. The signal is sent to the generator, and the voltage and current of the generator are displayed using the first voltage display table and the current display table.

Benefits of technology

The generator voltage and current is monitored, and the generator is started on the ground through the switch button to ensure power management and fault handling during the test.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119024163A_ABST
    Figure CN119024163A_ABST
Patent Text Reader

Abstract

The invention provides a control system and control equipment for a generator test, and relates to the technical field of electrics, and the control system comprises a starting controller which is connected with a generator; the signal transmission unit is connected with the starting controller; the power supply assembly is connected with the signal transmission unit; the two ends of the control switch assembly are connected with the signal transmission unit and the power supply assembly respectively, and the control switch assembly can send a power generation signal or a power generation stopping signal to the starting controller through the signal transmission unit. The starting controller is used for receiving the power generation signal or the power generation stopping signal and sending a power generation or power generation stopping instruction to the power generator; when the generator starts to generate power, the voltage and current of the generator collected by the generator controller can be seen on the first voltage display meter and the current display meter, and the purpose of monitoring the voltage and current of the generator can be achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of electrical technology, in particular to the field of unmanned aerial vehicle avionics technology, and more specifically, to a control system and control equipment for generator testing. Background Art

[0002] In the ground test of the UAV electrical system, it is necessary to start and generate electricity on the ground test platform, and use the load on the electronic load simulator to consume the electrical energy generated by the starter generator. Due to the lack of a host computer on the ground test platform, the starter generator lacks control equipment on the ground test platform, and the voltage and current of the generator cannot be monitored. Summary of the invention

[0003] The purpose of the present invention is to provide a control system and control equipment for generator testing in view of the deficiencies in the existing technology, so as to solve the problem mentioned in the background technology that when the starter generator is tested on a ground test platform, there is a lack of control equipment and the voltage and current of the generator cannot be monitored.

[0004] In order to achieve the above object, the present invention provides a control system for generator testing, the control system comprising:

[0005] A starting controller connected to the generator;

[0006] A signal transmission unit, the signal transmission unit is connected to the starting controller;

[0007] a power supply component, the power supply component being connected to the signal transmission unit;

[0008] A control switch assembly, wherein two ends of the control switch assembly are respectively connected to the signal transmission unit and the power supply assembly, and the control switch assembly can send a power generation signal or a stop power generation signal to the starting controller through the signal transmission unit, and the starting controller is used to receive the power generation signal or the stop power generation signal and send a power generation or stop power generation instruction to the generator;

[0009] A first voltage display meter and a current display meter, wherein the first voltage display meter and the current display meter are connected to the signal transmission unit, the first voltage display meter is used to display the voltage of the generator collected by the starting controller, and the current display meter is used to display the current of the generator collected by the starting controller.

[0010] Preferably, the control system for the generator test further comprises:

[0011] a storage battery connected to the generator;

[0012] A protection switch, wherein two ends of the protection switch are respectively connected to the signal transmission unit and the power supply component;

[0013] A protection contactor is connected to a wiring harness between the battery and the generator, the signal transmission unit is connected to the protection contactor, and the protection switch can send a closing signal to the protection contactor through the signal transmission unit to close the protection contactor.

[0014] Preferably, the power supply assembly comprises:

[0015] An AC power input socket, the AC power input socket being connected to an external power supply;

[0016] A power switch connected to the AC power input socket;

[0017] an AC-to-DC module, the AC-to-DC module being connected to the output end of the AC power input socket, and the AC-to-DC module being capable of converting the AC power transmitted by the external power supply into DC power;

[0018] A power indicator light, wherein the power indicator light is connected to the line speed between the AC to DC module and the signal transmission unit, and the power indicator light can light up when the power switch is in the on state.

[0019] Preferably, the control system for the generator test further comprises:

[0020] a second voltmeter, the second voltmeter being connected to a wiring harness between the AC power input socket and the AC-DC converter, and the second voltmeter being used to display an input voltage of the AC-DC converter;

[0021] A third voltmeter is connected to the wiring harness between the AC-DC module and the signal transmission unit, and the second voltmeter is used to display the output voltage of the AC-DC module.

[0022] Preferably, the control switch assembly includes a power generation switch and a power off switch.

[0023] Preferably, the control system for the generator test further comprises:

[0024] A starting switch, wherein two ends of the starting switch are respectively connected to the signal transmission unit and the power supply assembly, and the starting switch can control the signal transmission unit to send a starting signal to the starting controller, and the starting controller is used to receive the starting signal and send a starting instruction to the generator;

[0025] A switch-on switch, two ends of which are connected to the signal transmission unit and the power supply assembly respectively, and the switch-on switch can send a switch-on signal to the starting controller through the signal transmission unit, and the starting controller is used to receive the switch-on signal and send an instruction to connect the battery;

[0026] An overvoltage switch, wherein two ends of the overvoltage switch are respectively connected to the signal transmission unit and the power supply assembly, and the overvoltage switch can send an overvoltage signal to the starting controller through the signal transmission unit, and the starting controller is used to receive the overvoltage signal and send a shutdown command to the generator;

[0027] A short-circuit switch, wherein two ends of the short-circuit switch are respectively connected to the signal transmission unit and the power supply assembly, and the short-circuit switch can send a short-circuit signal to the starting controller through the signal transmission unit, and the starting controller is used to receive the short-circuit signal and send a shutdown command to the generator;

[0028] A reset switch is connected to the line speed between the power supply assembly and the signal transmission unit. After the generator fails to start, the reset switch can send a reset signal to the starting controller through the signal transmission unit. The starting controller is used to receive the reset signal and send a reset instruction to the generator.

[0029] Preferably, the control system for the generator test further comprises:

[0030] A battery presence indicator light is connected to the signal transmission unit, and the battery presence indicator light can light up when the switch is in the on state.

[0031] A start failure indicator light and a power generation indicator light, wherein the start failure indicator light and the power generation indicator light are both connected to the signal transmission unit, and when the start switch is in the on state, the generator starts successfully and is in the power generation state and the power generation indicator light can be on, or the generator fails to start and the start failure indicator light can be on.

[0032] A control device for generator testing, comprising:

[0033] Control box;

[0034] The control equipment for generator testing is used to be set in the control box.

[0035] Preferably, the control box comprises:

[0036] shell;

[0037] A bottom plate connected to the bottom of the housing;

[0038] A cover body, the cover body being hingedly connected to the top of the shell;

[0039] A panel is arranged in the housing, a mounting cavity is formed between the panel and the bottom plate, and a mounting surface is formed on the top of the panel.

[0040] Preferably, the control box further comprises four corner brackets, the four corner brackets are respectively connected to four corner ends of the shell, and the panel is connected to the four corner brackets.

[0041] The present invention provides a control system and control equipment for generator testing, which have the beneficial effects that: during the generator test, the control switch assembly of the control system can send a power generation signal or a power generation stop signal to a starting controller through a signal transmission unit, and the starting controller is used to receive the power generation signal or the power generation stop signal and send a power generation or power generation stop instruction to the generator. The purpose of ground starting the generator can be achieved by a switch-shaped button. When the generator starts to generate electricity, the voltage and current of the starting generator collected by the starting controller can be seen on a first voltage display meter and a current display meter, thereby achieving the purpose of monitoring the voltage and current of the generator.

[0042] Other features and advantages of the present invention will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] The above and other objects, features and advantages of the present invention will become more apparent through a more detailed description of exemplary embodiments of the present invention in conjunction with the accompanying drawings, wherein like reference numerals generally represent like components throughout the exemplary embodiments of the present invention.

[0044] Figure 1 A connection diagram of a control system for a generator test according to an embodiment of the present invention is shown. Figure 1 ;

[0045] Figure 2 A connection diagram of a control system for a generator test according to an embodiment of the present invention is shown. Figure 2 ;

[0046] Figure 3 A schematic diagram showing the internal structure of a housing of a control device for a generator test according to an embodiment of the present invention Figure 1 ;

[0047] Figure 4 A schematic diagram showing the internal structure of a housing of a control device for a generator test according to an embodiment of the present invention Figure 2 .

[0048] Description of reference numerals:

[0049] 1. Shell; 2. Power switch; 3. Signal transmission unit; 4. AC input socket; 5. Angle bracket; 6. Bottom plate; 7. AC to DC module; 8. Panel; 9. First voltage display meter; 10. Second voltage meter; 11. Start switch; 12. Reset switch; 13. Power generation switch; 14. Power off switch; 15. Connect switch; 16. Protection switch; 17. Short circuit switch; 18. Third voltage meter; 19. Overvoltage switch; 20. Start failure indicator light; 21. Power generation indicator light; 22. Power indicator light; 23. Battery in place indicator light; 24. Current display meter; 25. Start controller; 26. Generator; 27. Battery; 28. Protection contactor; 29. ​​Control box. DETAILED DESCRIPTION

[0050] The preferred embodiments of the present invention will be described in more detail below. Although the preferred embodiments of the present invention are described below, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to make the present invention more thorough and complete, and to fully convey the scope of the present invention to those skilled in the art.

[0051] like Figure 1 and Figure 2 As shown, the present invention provides a control system for generator testing, the control system comprising:

[0052] A starting controller 25, the starting controller 25 is connected to a generator 26;

[0053] A signal transmission unit 3, the signal transmission unit 3 is connected to the starting controller 25;

[0054] A power supply component, the power supply component is connected to the signal transmission unit 3;

[0055] A control switch assembly, wherein both ends of the control switch assembly are connected to the signal transmission unit 3 and the power supply assembly respectively. The control switch assembly can send a power generation signal or a power generation stop signal to the starting controller 25 through the signal transmission unit 3. The starting controller 25 is used to receive the power generation signal or the power generation stop signal and send a power generation or power generation stop instruction to the generator 26;

[0056] The first voltage display meter 9 and the current display meter 24 are connected to the signal transmission unit 3 , the first voltage display meter 9 is used to display the voltage of the generator 26 collected by the starting controller 25 , and the current display meter 24 is used to display the current of the generator 26 collected by the starting controller 25 .

[0057] Specifically, in order to solve the problem that when the starter generator is tested on a ground test platform, there is a lack of control equipment and the voltage and current of the generator cannot be monitored, the present invention provides a control system and control equipment for generator testing. The generator 26 can be a starter generator, and the signal transmission unit 3 can be a signal output socket. During the test of the generator 26, the control switch assembly of the control system can send a power generation signal or a stop power generation signal to the starting controller 25 through the signal transmission unit 3. The starting controller 25 is used to receive the power generation signal or the stop power generation signal and send a power generation or stop power generation instruction to the generator 26. The purpose of starting the generator 26 on the ground can be achieved by a switch-shaped button. When the generator 26 starts to generate electricity, the voltage and current of the starter generator 26 collected by the starting controller 25 can be seen on the first voltage display meter 9 and the current display meter 24, so the purpose of monitoring the voltage and current of the generator 26 can be achieved.

[0058] Preferably, the control system for the generator test further comprises:

[0059] A battery 27 connected to the generator 26;

[0060] A protection switch 16, two ends of which are connected to the signal transmission unit 3 and the power supply component respectively;

[0061] The protection contactor 28 is connected to the wiring harness between the battery 27 and the generator 26 . The signal transmission unit 3 is connected to the protection contactor 28 . The protection switch 16 can send a closing signal to the protection contactor 28 through the signal transmission unit 3 to close the protection contactor 28 .

[0062] Specifically, the protection switch 16 is used to control the protection contactor 28 on the ground test platform to ensure that the test is terminated when an abnormal situation occurs during the test process.

[0063] Preferably, the power supply assembly comprises:

[0064] An AC power input socket 4, the AC power input socket 4 is connected to an external power supply;

[0065] A power switch 2, the power switch 2 is connected to an AC power input socket 4;

[0066] The AC-DC module 7 is connected to the output end of the AC power input socket 4, and the AC-DC module 7 can convert the AC power transmitted by the external power supply into DC power;

[0067] The power indicator light 22 is connected to the line speed between the AC to DC module 7 and the signal transmission unit 3. When the power switch 2 is in the on state, the power indicator light 22 can light up.

[0068] Specifically, the AC to DC module 7 is used to rectify three-phase AC power into DC power. After the power switch 2 is turned on, the power indicator light 22 will light up, indicating that the control system has been powered on and can work normally.

[0069] Preferably, the control system for the generator test further comprises:

[0070] A second voltmeter 10, which is connected to the wiring harness between the AC input socket 4 and the AC-DC module 7, and is used to display the input voltage of the AC-DC module 7;

[0071] The third voltmeter 18 is connected to the wiring harness between the AC to DC module 7 and the signal transmission unit 3 . The second voltmeter 18 is used to display the output voltage of the AC to DC module 7 .

[0072] Specifically, the second voltmeter 10 is used to collect the input voltage of the AC-DC converter 7 , and the third voltmeter 18 is used to collect the output voltage of the AC-DC converter 7 .

[0073] Preferably, the control switch assembly includes a power generation switch 13 and a power off switch 14 .

[0074] Specifically, the power generation switch 13 and the power off switch 14 are used to control the generator 26 to generate power or stop generating power after the generator 26 completes the starting process.

[0075] Preferably, the control system for the generator test further comprises:

[0076] A start switch 11, two ends of which are connected to the signal transmission unit 3 and the power supply assembly respectively. The start switch 11 can control the signal transmission unit 3 to send a start signal to the start controller 25, and the start controller 25 is used to receive the start signal and send a start command to the generator 26;

[0077] A switch 15, wherein both ends of the switch 15 are connected to the signal transmission unit 3 and the power supply assembly respectively, and the switch 15 can send a switch-on signal to the starting controller 25 through the signal transmission unit 3, and the starting controller 25 is used to receive the switch-on signal and send an instruction to connect the battery 27;

[0078] An overvoltage switch 19, where both ends of the overvoltage switch 19 are connected to the signal transmission unit 3 and the power supply assembly respectively. The overvoltage switch 19 can send an overvoltage signal to the starting controller 25 through the signal transmission unit 3. The starting controller 25 is used to receive the overvoltage signal and send a shutdown command to the generator 26;

[0079] A short-circuit switch 17, where both ends of the short-circuit switch 17 are connected to the signal transmission unit 3 and the power supply assembly respectively. The short-circuit switch 17 can send a short-circuit signal to the starting controller 25 through the signal transmission unit 3. The starting controller 25 is used to receive the short-circuit signal and send a shutdown command to the generator 26;

[0080] Reset switch 12, the reset switch 12 is connected to the line speed between the power supply component and the signal transmission unit 3. After the generator 26 fails to start, the reset switch 12 can send a reset signal to the starting controller 25 through the signal transmission unit 3. The starting controller 25 is used to receive the reset signal and send a reset instruction to the generator 26.

[0081] Specifically, after the overvoltage switch 19 or the short-circuit switch 17 is turned on, the signal transmission unit 3 will send an overvoltage or short-circuit signal to the starting controller 25. After the starting controller 25 receives the overvoltage or short-circuit signal, the generator 26 will stop working;

[0082] The start switch 11 is used to make the signal transmission unit 3 send a start signal for starting the generator 26;

[0083] The switch 15 is used to connect the storage battery 27 on the ground to start the generator 26 and supply power;

[0084] The reset switch 12 is a reset rebound switch. The reset switch 12 is a switch for resetting the generator 26 and is used to reset the generator 26 after a fault occurs in the generator 26 .

[0085] Preferably, the control system for the generator test further comprises:

[0086] The battery presence indicator light 23 is connected to the signal transmission unit 3, and when the switch 15 is in the on state, the battery presence indicator light 23 can light up.

[0087] The start failure indicator light 20 and the power generation indicator light 21 are both connected to the signal transmission unit 3. When the start switch 11 is in the on state, the generator 26 starts successfully and is in the power generation state and the power generation indicator light 21 can light up, or the generator 26 fails to start and the start failure indicator light 20 can light up.

[0088] Specifically, the battery presence indicator light 23 will light up after the switch 15 is turned on, indicating that the ground battery 27 has been connected;

[0089] During the starting process of the generator 26, if the starting fails, the starting failure indicator light 20 will light up, and if the starting is successful and turns to the power generation state, the power generation indicator light 21 will light up.

[0090] like Figure 3 and Figure 4As shown, a control device for generator testing includes:

[0091] Control box 29;

[0092] The control equipment for the generator test is arranged in the control box 29.

[0093] Preferably, the control box 29 comprises:

[0094] Shell 1;

[0095] A bottom plate 6 connected to the bottom of the housing 1;

[0096] A cover body, which is hingedly connected to the top of the housing 1;

[0097] The panel 8 is disposed in the housing 1 , a mounting cavity is formed between the panel 8 and the bottom plate 6 , and a mounting surface is formed on the top of the panel 8 .

[0098] Specifically, the housing 1 is an integrated structure, a hinge is provided between the cover body and the housing 1, and the housing 1 can be opened and closed by flipping the cover body;

[0099] A first rectangular hole with a size of 28 mm×47 mm is provided on one side of the housing 1, and two screw holes with a diameter of 3.2 mm are provided for mounting the AC input socket 4;

[0100] A second rectangular hole of 20 mm×10 mm is also provided on one side of the housing 1 for mounting the power switch 2;

[0101] A first circular hole with a diameter of 17 mm is provided on the rear side of the housing 1, and four second circular holes with a diameter of 3.2 mm are symmetrically distributed around the center of the first circular hole for mounting a signal output socket;

[0102] The bottom of the housing 1 is provided with four third circular holes with a distance of 350 mm×250 mm and a diameter of 5 mm, for mounting the bottom plate 6;

[0103] The bottom plate 6 is provided with four fourth circular holes with a distance of 149 mm×49 mm and a diameter of 4.2 mm, which are used to install the AC-DC module 7. The AC-DC module 7 is arranged in the installation cavity.

[0104] Preferably, the control box further includes four corner brackets 5 , which are respectively connected to four corner ends of the housing 1 , and the panel 8 is connected to the four corner brackets 5 .

[0105] Two through holes with a diameter of 5.2 mm are symmetrically installed on each of the four sides of the housing 1, and the two through holes on both sides of each corner end are used to install the corner bracket 5;

[0106] There are four corner brackets 5 in the housing 1, each of which has three mutually perpendicular faces, each of which has a fifth circular hole with a diameter of 5.2 mm, two of which are used to install the corner bracket 5 on the side of the housing 1, and the other is used to install the panel 8;

[0107] The panel 8 is provided with four third rectangular holes of 92 mm×45 mm for mounting the first voltage display meter 9, the second voltage display meter 10, the third voltage display meter 18, and the current display meter 24;

[0108] The panel 8 is also provided with four fifth round holes with a diameter of 14.2 mm, which are used to install the power indicator light 22, the battery in place indicator light 23, the start failure indicator light 20 and the power generation indicator light 21;

[0109] The panel 8 is also provided with seven fourth rectangular holes of 12 mm×30 mm for installing the starting switch 11, the generating switch 13, the power-off switch 14, the connecting switch 15, the protection switch 16, the short-circuit switch 17 and the overvoltage switch 19;

[0110] The panel 8 is also provided with a sixth circular hole with a diameter of 19 mm for mounting a reset switch 12 .

[0111] In summary, during the normal test on the ground using the control system for the generator test, turn on the power switch 2 and the protection switch 16, the control system will close the protection contactor 28 through the signal output socket, and the battery in place indicator light 23 will light up. At this time, turn on the start switch 11, and send a start signal to the start controller 25 through the signal output socket, and the generator 26 will start. If the start fails, the start controller 25 will control the start failure indicator light 20 to light up. At this time, the generator 26 can be restored to its initial state by resetting the rebound switch. If it starts successfully, at this time, turn on the generator switch. 13, the power generation indicator light 21 will light up, the generator 26 starts to generate electricity, and the voltage and current of the starting generator 26 collected by the starting controller 25 can be seen on the first voltage display meter 9 and the current display meter 24; when overvoltage or short circuit occurs, open the overvoltage switch 19 or the short circuit switch 17, and an overvoltage signal or a short circuit signal will be sent to the starting controller 25, and the generator 26 will stop working; during the test, the second voltmeter 10 is used to collect the input voltage of the AC to DC module 7, and the third voltmeter 18 is used to collect the output voltage of the AC to DC module 7 to ensure the normal operation of the control system.

[0112] The embodiments of the present invention have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those skilled in the art without departing from the scope and spirit of the described embodiments.

Claims

1. A control system for generator testing, It is characterized in that The control system includes: A starting controller connected to the generator; A signal transmission unit, the signal transmission unit is connected to the starting controller; a power supply component, the power supply component being connected to the signal transmission unit; A control switch assembly, wherein two ends of the control switch assembly are respectively connected to the signal transmission unit and the power supply assembly, and the control switch assembly can send a power generation signal or a stop power generation signal to the starting controller through the signal transmission unit, and the starting controller is used to receive the power generation signal or the stop power generation signal and send a power generation or stop power generation instruction to the generator; A first voltage display meter and a current display meter, wherein the first voltage display meter and the current display meter are connected to the signal transmission unit, the first voltage display meter is used to display the voltage of the generator collected by the starting controller, and the current display meter is used to display the current of the generator collected by the starting controller.

2. A control system for generator testing according to claim 1, It is characterized in that The control system of the generator test also includes: a battery connected to the generator; A protection switch, wherein two ends of the protection switch are respectively connected to the signal transmission unit and the power supply component; A protection contactor is connected to a wiring harness between the battery and the generator, the signal transmission unit is connected to the protection contactor, and the protection switch can send a closing signal to the protection contactor through the signal transmission unit to close the protection contactor.

3. A control system for generator testing according to claim 1, It is characterized in that The power supply assembly comprises: An AC power input socket, the AC power input socket being connected to an external power supply; A power switch connected to the AC power input socket; an AC-to-DC module, the AC-to-DC module being connected to the output end of the AC power input socket, and the AC-to-DC module being capable of converting the AC power transmitted by the external power supply into DC power; A power indicator light, wherein the power indicator light is connected to the line speed between the AC to DC module and the signal transmission unit, and the power indicator light can light up when the power switch is in the on state.

4. A control system for generator testing according to claim 3, It is characterized in that The control system of the generator test also includes: a second voltmeter, the second voltmeter being connected to a wiring harness between the AC power input socket and the AC-DC converter, and the second voltmeter being used to display an input voltage of the AC-DC converter; A third voltmeter is connected to the wiring harness between the AC-DC module and the signal transmission unit, and the second voltmeter is used to display the output voltage of the AC-DC module.

5. A control system for generator testing according to claim 1, It is characterized in that The control switch assembly includes a power generation switch and a power off switch.

6. A control system for generator testing according to claim 2, It is characterized in that The control system of the generator test also includes: A starting switch, wherein two ends of the starting switch are respectively connected to the signal transmission unit and the power supply assembly, and the starting switch can control the signal transmission unit to send a starting signal to the starting controller, and the starting controller is used to receive the starting signal and send a starting instruction to the generator; A switch-on switch, two ends of which are connected to the signal transmission unit and the power supply assembly respectively, and the switch-on switch can send a switch-on signal to the starting controller through the signal transmission unit, and the starting controller is used to receive the switch-on signal and send an instruction to connect the battery; An overvoltage switch, wherein two ends of the overvoltage switch are respectively connected to the signal transmission unit and the power supply assembly, and the overvoltage switch can send an overvoltage signal to the starting controller through the signal transmission unit, and the starting controller is used to receive the overvoltage signal and send a shutdown command to the generator; A short-circuit switch, wherein two ends of the short-circuit switch are respectively connected to the signal transmission unit and the power supply assembly, and the short-circuit switch can send a short-circuit signal to the starting controller through the signal transmission unit, and the starting controller is used to receive the short-circuit signal and send a shutdown command to the generator; A reset switch is connected to the line speed between the power supply assembly and the signal transmission unit. After the generator fails to start, the reset switch can send a reset signal to the starting controller through the signal transmission unit. The starting controller is used to receive the reset signal and send a reset instruction to the generator.

7. A control system for generator testing according to claim 6, It is characterized in that The control system of the generator test also includes: A battery presence indicator light is connected to the signal transmission unit, and the battery presence indicator light can light up when the switch is in the on state. A start failure indicator light and a power generation indicator light, wherein the start failure indicator light and the power generation indicator light are both connected to the signal transmission unit, and when the start switch is in the on state, the generator starts successfully and is in the power generation state and the power generation indicator light can be on, or the generator fails to start and the start failure indicator light can be on.

8. A control device for generator testing, It is characterized in that include: Control box; A generator test control device according to any one of claims 1 to 7, which is used to be arranged in a control box.

9. A control device for generator testing according to claim 8, It is characterized in that The control box comprises: shell; A bottom plate connected to the bottom of the housing; A cover body, the cover body being hingedly connected to the top of the shell; A panel is arranged in the housing, a mounting cavity is formed between the panel and the bottom plate, and a mounting surface is formed on the top of the panel.

10. A control device for generator testing according to claim 8, It is characterized in that The control box also includes four corner brackets, which are respectively connected to the four corner ends of the shell, and the panel is connected to the four corner brackets.