Informatization research and development project tester work evaluation alarm method and device
By receiving alarm requests in information technology research and development projects, determining the work information of the target staff and applying statistical strategies and prediction models to generate improvement measures, the problem of low accuracy of testers' work evaluation is solved, and the accuracy and work of alarm prompts are improved. The degree of completion has improved the efficiency and quality of the project.
Patent Information
- Application Number
- CN202411480539.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-23
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The accuracy of the tester work evaluation in the information technology research and development projects is low, which affects product quality.
By receiving alarm requests, determine the work information of the target staff, apply statistical strategies and prediction models to generate improvement measures, improve work completion, and send alarm information to the project management platform.
It improves the accuracy of alarm prompts, ensures that the work content is accurately reflected and the targeted improvement measures are targeted, and improves the efficiency and quality of information research and development projects.
Smart Images

Figure CN119025433A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data processing technology, and in particular to a method and device for warning test personnel of an information technology research and development project. Background Art
[0002] In information technology R&D projects, testers are responsible for discovering defects in products and improving product quality. Specifically, the work of testers includes but is not limited to at least one of the following: writing test plans, analyzing test points according to requirements, designing test cases, executing tests, recording test results and tracking defects, etc.
[0003] In actual applications, when testers perform testing work, errors may occur, which may affect the accuracy of the test and further affect the quality of the product. In related technologies, errors in the test are determined by evaluating the work information of the testers.
[0004] However, this evaluation method suffers from low accuracy. Summary of the invention
[0005] The present application provides a method and device for warning the work evaluation of test personnel in an information technology research and development project, so as to improve the accuracy of warning prompts.
[0006] In a first aspect, the present application provides a test personnel work evaluation alarm method for an information technology research and development project, which is applied to a server and includes: receiving an alarm request, the alarm request including multiple target staff member identifiers; determining multiple target work information corresponding to the multiple target staff member identifiers through a database management system according to the alarm request; determining multiple target statistical strategies, and statistically processing the multiple target work information through the multiple target statistical strategies to obtain multiple initial statistical information, wherein the initial statistical information is used to indicate the degree of work completion; determining multiple upstream staff member identifiers corresponding to the multiple target staff member identifiers according to a project pipeline, and determining multiple upstream statistical information corresponding to the multiple upstream staff member identifiers; correcting the multiple initial statistical information through the multiple upstream statistical information to obtain multiple target statistical information, inputting the multiple target statistical information into a prediction model to obtain multiple target improvement measures, and generating alarm information based on the multiple target statistical information and the multiple target improvement measures, wherein the target improvement measures are used to improve the degree of work completion; sending the alarm information to a project management platform so that the project management platform completes the alarm prompt for the target staff member.
[0007] In a possible implementation, determining multiple target work information corresponding to the multiple target staff identifiers includes: determining an instruction template, the instruction template being used to generate a query instruction; generating multiple target query instructions based on the multiple target staff identifiers and the instruction template; and executing the multiple target query instructions respectively through the query function of the database management system to obtain the multiple target work information.
[0008] In a possible implementation, the alarm request also includes a preset time period; based on the multiple target staff identifiers and the instruction template, multiple target query instructions are generated, including: filling each target staff identifier and the preset time period into the instruction template respectively to obtain the multiple target query instructions.
[0009] In a possible implementation, the multiple target work information are statistically processed through the multiple target statistical strategies to obtain multiple initial statistical information, including: determining multiple evaluation indicators; calculating and processing the multiple target work information according to the multiple evaluation indicators to obtain multiple indicator values, wherein each indicator value corresponds to an evaluation indicator; and statistically processing the multiple indicator values through the multiple target statistical strategies to obtain the multiple initial statistical information.
[0010] In a possible implementation, multiple upstream staff identifiers corresponding to the multiple target staff identifiers are determined according to the project pipeline, including: for any target staff identifier, determining the target node identifier of the target staff identifier in the project pipeline; querying the target node identifier and the project pipeline through the query function of the database management system to obtain multiple upper-level node identifiers of the target node; and determining the staff identifiers corresponding to the multiple upper-level node identifiers as the upstream staff identifiers.
[0011] In a possible implementation, for any initial statistical information; the initial statistical information is corrected by the upstream statistical information to obtain target statistical information, including: determining corresponding task information according to the upstream statistical information corresponding to the initial statistical information, the task information including at least one of the following: task difficulty, task complexity, task accuracy, or task workload; determining a correction value according to the task information; and correcting the initial statistical information according to the correction value to obtain the target statistical information.
[0012] In a possible implementation, the method further includes: determining sample data, the sample data including multiple sample statistical information and corresponding multiple sample improvement measures; performing model training through the sample data to obtain the prediction model, and the prediction model is used to generate corresponding target improvement measures based on the target statistical information.
[0013] In a second aspect, the present application provides a tester work evaluation alarm device for an information-based R&D project, which is applied to a server and includes: a receiving module for receiving an alarm request, wherein the alarm request includes multiple target staff identifiers; a determining module for determining, according to the alarm request, multiple target work information corresponding to the multiple target staff identifiers through a database management system; a statistical module for determining multiple target statistical strategies, and performing statistical processing on the multiple target work information through the multiple target statistical strategies to obtain multiple initial statistical information, wherein the initial statistical information is used to indicate the degree of work completion; a search module for determining, according to a project pipeline, multiple upstream staff identifiers corresponding to the multiple target staff identifiers, and determining multiple upstream statistical information corresponding to the multiple upstream staff identifiers; a correction module for performing correction processing on the multiple initial statistical information through the multiple upstream statistical information to obtain multiple target statistical information, inputting the multiple target statistical information into a prediction model to obtain multiple target improvement measures, and generating alarm information according to the multiple target statistical information and the multiple target improvement measures, wherein the target improvement measures are used to improve the degree of work completion; a sending module for sending the alarm information to a project management platform so that the project management platform completes the alarm prompt for the target staff.
[0014] In a possible implementation, the determination module is specifically used to determine an instruction template, and the instruction template is used to generate a query instruction; the determination module is also specifically used to generate a plurality of target query instructions based on the plurality of target staff identifiers and the instruction template; the determination module is also specifically used to respectively execute the plurality of target query instructions through the query function of the database management system to obtain the plurality of target work information.
[0015] In a possible implementation, the alarm request further includes a preset time period; the determination module is specifically configured to fill each target staff member identifier and the preset time period into the instruction template respectively to obtain the multiple target query instructions.
[0016] In a possible implementation, the device also includes: an execution module, used to determine multiple evaluation indicators; the execution module is also used to calculate and process the multiple target work information according to the multiple evaluation indicators to obtain multiple indicator values, wherein each indicator value corresponds to an evaluation indicator; the execution module is also used to perform statistical processing on the multiple indicator values through the multiple target statistical strategies to obtain the multiple initial statistical information.
[0017] In a possible implementation, the device also includes: a query module, used to determine, for any target staff member identifier, a target node identifier of the target staff member identifier in the project pipeline; the query module is also used to query the target node identifier and the project pipeline through the query function of the database management system to obtain multiple upper-level node identifiers of the target node; the query module is also used to determine the staff identifier corresponding to the multiple upper-level node identifiers as the upstream staff identifier.
[0018] In one possible implementation, for any initial statistical information, the device also includes: a calculation module, used to determine the corresponding task information based on the upstream statistical information corresponding to the initial statistical information, and the task information includes at least one of the following: task difficulty, task complexity, task accuracy, or task workload; the calculation module is also used to determine the correction value based on the task information; the calculation module is also used to correct the initial statistical information according to the correction value to obtain the target statistical information.
[0019] In a possible implementation, the device also includes: a training module for determining sample data, the sample data including multiple sample statistical information and corresponding multiple sample improvement measures; the training module is also used to perform model training through the sample data to obtain the prediction model, and the prediction model is used to generate corresponding target improvement measures based on the target statistical information.
[0020] In a third aspect, the present application provides an electronic device comprising: a processor, and a memory communicatively connected to the processor; the memory stores computer-executable instructions; the processor executes the computer-executable instructions stored in the memory to implement any method described in the first aspect.
[0021] In a fourth aspect, the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores computer-executable instructions, and the computer-executable instructions are executed by a processor as described in any one of the methods in the first aspect.
[0022] In a fifth aspect, the present application provides a computer program product, comprising a computer program, wherein the computer program is executed by a processor as in any one of the methods in the first aspect.
[0023] The present application provides a tester work evaluation alarm method and device for an information-based R&D project, which is applied to a server, and the method includes: receiving an alarm request, the alarm request including multiple target staff identifiers; determining multiple target work information corresponding to the multiple target staff identifiers through a database management system according to the alarm request; determining multiple target statistical strategies, and statistically processing the multiple target work information through the multiple target statistical strategies to obtain multiple initial statistical information, wherein the initial statistical information is used to indicate the degree of work completion; determining multiple upstream staff identifiers corresponding to the multiple target staff identifiers according to the project pipeline, and determining multiple upstream statistical information corresponding to the multiple upstream staff identifiers; correcting the multiple initial statistical information through the multiple upstream statistical information to obtain multiple target statistical information, inputting the multiple target statistical information into a prediction model to obtain multiple target improvement measures, and generating alarm information according to the multiple target statistical information and the multiple target improvement measures, wherein the target improvement measures are used to improve the degree of work completion; sending the alarm information to a project management platform so that the project management platform completes the alarm prompt for the target staff. In the above scheme, the target statistical information obtained by correcting the upstream statistical information can accurately reflect the work content of the target staff, and the alarm prompt based on the target statistical information can improve the accuracy of the alarm prompt. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.
[0025] Figure 1 A schematic diagram of an application scenario of a tester work evaluation alarm method for an information-based R&D project provided in an embodiment of the present application;
[0026] Figure 2 A flowchart of a tester work evaluation alarm method for an information-based R&D project provided in an embodiment of the present application;
[0027] Figure 3 A flowchart of a tester work evaluation alarm method for an information-based R&D project provided in an embodiment of the present application;
[0028] Figure 4 A schematic diagram of obtaining target work information provided in an embodiment of the present application;
[0029] Figure 5A schematic diagram of determining an upstream staff member identification provided in an embodiment of the present application;
[0030] Figure 6 A schematic diagram of the correction process provided in an embodiment of the present application;
[0031] Figure 7 A schematic diagram of a structure of a tester work evaluation alarm device for an information-based R&D project provided in an embodiment of the present application;
[0032] Figure 8 A schematic diagram of a structure of a tester work evaluation alarm device for an information-based R&D project provided in an embodiment of the present application;
[0033] Fig. 9 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application.
[0034] The above drawings have shown clear embodiments of the present application, which will be described in more detail later. These drawings and text descriptions are not intended to limit the scope of the present application in any way, but to illustrate the concept of the present application to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION
[0035] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The implementations described in the following exemplary embodiments do not represent all implementations consistent with the present application. Instead, they are merely examples of devices and methods consistent with some aspects of the present application as detailed in the appended claims.
[0036] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use, processing, transmission, provision, disclosure and application of the relevant data comply with the relevant laws, regulations and standards of the relevant countries and regions, take necessary confidentiality measures, do not violate public order and good customs, and provide corresponding operation entrances for users to choose to authorize or refuse.
[0037] In addition, this application involves conducting big data analysis of user information (including but not limited to personal biometrics, identity data, consumption data, asset data, electronic terminal operation data, etc.), and using artificial intelligence technology to make automated decisions, and making technical solutions that have a significant impact on personal rights and interests based on the results of automated decisions. The application provides users with corresponding operation entrances for them to choose to agree or reject the results of automated decisions; if the user chooses to reject, the expert decision-making process will be entered.
[0038] It should be noted that the test personnel work evaluation alarm method and device of the information technology research and development project of the present application can be used in the field of data processing technology, and can also be used in any field except data processing. The application field of the test personnel work evaluation alarm method and device of the information technology research and development project of the present application is not limited.
[0039] Figure 1 A schematic diagram of an application scenario of a method for evaluating and warning test personnel in an information technology research and development project provided in an embodiment of the present application is used as an example in combination with the scenario shown in the diagram: the tester receives an initial product, specifies a test task based on the initial product, executes the test task to obtain a test result, and achieves product optimization through the test results.
[0040] In related technologies, testers may encounter problems when performing their work. Generating alarm prompts based on the testers' work information can optimize the existing problems, thereby improving the efficiency and quality of information technology research and development projects.
[0041] In the related art, alarm prompts are issued only based on the work information of testers. However, the work of testers is affected by the quality of the initial product, which is developed by developers. The work information of developers affects the quality of the initial product, which in turn affects the work information of testers. Therefore, the alarm prompts issued only based on the work information of testers are incomplete, which affects the accuracy of alarm enhancement.
[0042] The method for tester work evaluation alarm of an information technology research and development project provided in this application is intended to solve the above technical problems of the prior art.
[0043] The technical solution of the present application and how the technical solution of the present application solves the above-mentioned technical problems are described in detail below with specific embodiments. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments. The embodiments of the present application will be described below in conjunction with the accompanying drawings.
[0044] Figure 2 A flowchart of a tester work evaluation alarm method for an information-based R&D project provided in an embodiment of the present application, the method comprising the following steps:
[0045] S201. Receive an alarm request, where the alarm request includes multiple target staff members' identifiers.
[0046] The server responds to the alarm request and issues an alarm prompt to the staff members corresponding to the multiple target staff member identifiers.
[0047] Exemplarily, the target staff member identifier is a unique identifier, and the corresponding staff member can be accurately identified through the target staff member identifier.
[0048] S202. According to the alarm request, a database management system is used to determine multiple target work information corresponding to multiple target staff member identifiers.
[0049] Among them, the database management system is used to manage the data in the database.
[0050] Exemplarily, the work information of each staff member is stored in a database.
[0051] Optionally, the database management system obtains work information from the work record of each staff member in real time and stores the work information in a database.
[0052] Optionally, the target work information may include: the number of test cases created and maintained by the staff, the number of test executions, test defects, regression test pass rate, i.e. the proportion of repaired code that passes when tested again, test document quality, test execution speed, defect repair cycle, tools used for testing, or feedback information from the tools, etc.
[0053] Combined with the scenario example, it can be determined whether there is a problem with the worker's work by calculating and / or analyzing the target work information.
[0054] S203, determining a plurality of target statistical strategies, and performing statistical processing on a plurality of target work information by using the plurality of target statistical strategies to obtain a plurality of initial statistical information.
[0055] Among them, initial statistics are used to indicate the degree of work completion.
[0056] For example, the degree of work completion is used to evaluate whether the work tasks are completed on time, with quality and quantity guaranteed.
[0057] In the related art, the degree of work completion is determined manually based on work information. However, the manual method has the problem of low efficiency.
[0058] Exemplarily, the multiple initial statistical information includes statistical information of multiple evaluation indicators. The multiple evaluation indicators are used to reflect the degree of work completion. Corresponding improvement measures are determined respectively through the multiple evaluation indicators, which can improve the pertinence of the improvement measures.
[0059] Exemplarily, multiple evaluation indicators include but are not limited to at least one of the following: weighted number of test defects, test omission defect rate, defect verification timeliness, average use case design time, average use case execution time, proportion of backlog unverified defects, proportion of test case design, proportion of test case execution, tester workload, weighted number of test tasks, or test working hours, etc.
[0060] Combined with the scenario example, the weighted number of test defects is obtained by weighted summing of all defects found by the staff according to the weight of each defect. Optionally, the weight can be determined according to the defect introduction stage, defect severity, or defect root cause. For example, the defect introduction stage includes but is not limited to: requirement stage, design stage, or coding stage, etc., and each defect introduction stage corresponds to a weight. The severity of the defect can be divided into levels, with level 1 being the most severe and level 4 being the least severe, and each defect severity level corresponds to a weight. The root causes of defects include but are not limited to: requirements analysis errors, requirements analysis omissions, design errors, design omissions, coding errors, or coding omissions, etc., and each defect root source type corresponds to a weight. If the weighted number of test defects is low, it means that there is a problem with the staff's testing strategy, and the corresponding improvement measures can be to optimize the testing strategy.
[0061] The test missed defect rate reflects the proportion of missed defects. If the test missed defect rate is high, it means that the test cases are not comprehensive. The corresponding improvement measures can be to enhance the design and review of test cases to ensure that the test cases fully cover all functions of the product and conduct regular review and updates.
[0062] If the result of defect verification timeliness is untimely verification, that is, the average verification time is long, it may indicate that there are insufficient test resources. The corresponding improvement measure can be to increase test resources.
[0063] If the average use case design time is too long, it means that the efficiency of task execution is low, which will affect the progress of the information technology R&D project. The corresponding improvement measures can be to design test case templates or introduce automated testing tools.
[0064] If the average test case execution time is long, it means that the efficiency of executing test cases is low, which will affect the progress of the information technology R&D project. The possible reason is that there are problems with the test environment. The corresponding improvement measures can be to optimize the test environment, such as upgrading the hardware configuration.
[0065] If the backlog of unverified defects accounts for a high proportion, it will affect the progress of the information technology R&D project. The corresponding improvement measures can be real-time monitoring of defects and prompting of defects according to the preset deadline.
[0066] If the proportion of test case design is low, it may mean that the staff members are involved in fewer design tasks, or the quality of the test cases they are involved in designing is not high. The corresponding improvement measures can be to optimize the work task arrangement.
[0067] If the execution ratio of test cases is low, it may mean that the staff is involved in fewer tasks. The corresponding improvement measure can be to optimize the work task arrangement.
[0068] If the workload of testers is high, which may affect the execution quality, the corresponding improvement measures can be to optimize the work task arrangement.
[0069] The weighted number of test tasks can be obtained by determining the weight according to the importance of the test tasks and performing weighted summation. If the weighted number of test tasks is high, it means that the importance of the tasks is high, and the corresponding improvement measures can be to optimize resource allocation to improve the test quality of important tasks.
[0070] If the testing hours are long, the corresponding improvement measures can be to improve the skills of the staff to improve work efficiency.
[0071] S204. Determine multiple upstream staff identifiers corresponding to multiple target staff identifiers according to the project pipeline, and determine multiple upstream statistical information corresponding to the multiple upstream staff identifiers.
[0072] Among them, the upstream statistical information is the information corresponding to the work of the upstream staff.
[0073] Exemplarily, the upstream staff member corresponding to the upstream staff member identifier has a work association with the target staff member. For example, the target staff member's task is to test the product, and the tested product is the product developed by the corresponding upstream staff member. If the product itself has a small number of defects, the target staff member's task volume is small. If the product itself does not have serious defects, the target staff member's task difficulty is relatively small.
[0074] S205. Correct the multiple initial statistical information through multiple upstream statistical information to obtain multiple target statistical information, input the multiple target statistical information into the prediction model to obtain multiple target improvement measures, and generate alarm information according to the multiple target statistical information and the multiple target improvement measures.
[0075] Among them, target improvement measures are used to improve the degree of work completion.
[0076] Exemplarily, the target statistical information obtained through the correction process can better reflect the work actually handled by the target staff than the initial statistical information. The accuracy of the alarm prompt can be improved based on the target statistical information.
[0077] Exemplarily, the prediction model identifies features of the target statistical information and determines the target statistical information corresponding thereto based on the features.
[0078] Exemplarily, the statistical information corresponds to the improvement measures, and the target improvement measures are improvement measures for the target statistical information, which are used to specifically address the problems corresponding to the target statistical information.
[0079] S206: Send the warning information to the project management platform so that the project management platform can complete the warning prompt to the target staff.
[0080] Exemplarily, the project management platform establishes a communication connection with each work team and issues an alarm prompt based on the communication connection.
[0081] Optionally, the project management platform establishes a correspondence between each work team and the communication connection, and issues an alarm prompt based on the correspondence.
[0082] Combined with the scenario example, when the project management platform receives alarm information, it immediately and automatically determines the corresponding communication connection according to the work team corresponding to the alarm information, and sends the alarm information to the corresponding work team through the communication connection, so that the work team can optimize the work in time according to the alarm information and improve the efficiency of the alarm prompt.
[0083] The tester work evaluation alarm method of the information technology research and development project provided by the embodiment of the present application includes: receiving an alarm request, the alarm request includes multiple target staff identifications; according to the alarm request, determining multiple target work information corresponding to the multiple target staff identifications through a database management system; determining multiple target statistical strategies, and statistically processing the multiple target work information through multiple target statistical strategies to obtain multiple initial statistical information, wherein the initial statistical information is used to indicate the degree of work completion; determining multiple upstream staff identifications corresponding to the multiple target staff identifications according to the project pipeline, and determining multiple upstream statistical information corresponding to the multiple upstream staff identifications; correcting the multiple initial statistical information through multiple upstream statistical information to obtain multiple target statistical information, inputting the multiple target statistical information into the prediction model to obtain multiple target improvement measures, and generating alarm information according to the multiple target statistical information and the multiple target improvement measures, wherein the target improvement measures are used to improve the degree of work completion; sending the alarm information to the project management platform, so that the project management platform completes the alarm prompt for the target staff. In the above scheme, the target statistical information obtained by correcting the upstream statistical information can accurately reflect the work content of the staff, and the alarm prompt according to the target statistical information can improve the accuracy of the alarm prompt.
[0084] Based on any of the above embodiments, Figure 3, explains the detailed process of tester work evaluation alarm for information technology R&D projects.
[0085] Figure 3 A flowchart of a method for providing an alarm for test personnel's work evaluation in an information technology R&D project provided by an embodiment of the present application. Figure 3 As shown, the method includes:
[0086] S301. Receive an alarm request, where the alarm request includes multiple target staff members' identifiers.
[0087] It should be noted that the execution process of S301 refers to S201 and will not be repeated here.
[0088] S302: Determine an instruction template, where the instruction template is used to generate a query instruction.
[0089] Optionally, the instruction template includes fixed formats or placeholders, and specific values can be inserted in these locations to perform the doctor's query command.
[0090] Optionally, multiple instruction templates are pre-configured, and the multiple instruction templates correspond to different query functions. The corresponding instruction template is determined according to the query requirements.
[0091] S303: Generate multiple target query instructions according to multiple target staff member identifiers and instruction templates.
[0092] Exemplarily, the target staff member identifier is inserted into the instruction template to obtain the target query instruction.
[0093] It can be understood that the instruction template includes common content, which does not need to be input or modified, and the common content and the target staff member identifier together constitute the target query instruction. Compared with writing query instructions according to the target staff member identifier, the efficiency of generating query instructions can be effectively improved by using the instruction template method.
[0094] In a feasible implementation, the alarm request also includes a preset time period, and the target query instruction can be generated by the following method: each target staff member identifier and the preset time period are respectively filled into the instruction template to obtain multiple target query instructions.
[0095] Combined with the scenario example, the database stores the full amount of work information corresponding to each staff member. The work information that is far away from the current moment in the full amount of work information has a lower reference value. The alarm prompt is only needed for work information of a certain period of time, and the duration is controlled by the preset time period.
[0096] In this feasible implementation, by generating a target query instruction in a preset time period, the scope of the query can be accurately determined, thereby improving the accuracy of alarm generation.
[0097] S304. Execute multiple target query instructions respectively through the query function of the database management system to obtain multiple target work information.
[0098] Next, combine Figure 4 Describe how to obtain target work information.
[0099] Figure 4 This is a schematic diagram of obtaining target work information provided by an embodiment of the present application. Figure 4 As shown, the target staff member identifier is inserted into the instruction template to obtain a target query instruction, and the target query instruction is executed through the database management system to obtain the target work information.
[0100] Exemplarily, for any target query instruction, the target query instruction is executed to obtain a query result, the query result is data related to the target query instruction in the database, and the target work information is extracted from the query result.
[0101] Optionally, the extraction process includes but is not limited to at least one of the following: sorting, filtering or aggregation.
[0102] S305: Determine multiple evaluation indicators.
[0103] It should be noted that the evaluation indicators refer to S202 and will not be described in detail here.
[0104] S306. Calculate and process multiple target work information according to multiple evaluation indicators to obtain multiple indicator values, wherein each indicator value corresponds to an evaluation indicator.
[0105] Combined with the scenario examples, different evaluation indicators correspond to different indicator value calculation methods, for example:
[0106] The calculation method of the test defect weighted index value may be the sum of the weighted values of the effective defects found, wherein the weighted value of each defect may be determined according to the severity of the defect.
[0107] The calculation method of the test missed defect rate index value may be the ratio of the weighted value of missed defects to the weighted value of found defects.
[0108] The defect verification timeliness index value may be calculated as the ratio of the sum of the resolution time for each permission to the number of defects. The resolution time for each permission may be the time between the time when each defect is closed and the time when the defect is resolved.
[0109] The calculation method of the average use case design time index value can be the ratio of the total test case design time to the number of third-level requirements attached to the tester's use case.
[0110] The average test case execution time indicator value may be calculated as the ratio of the total time the tester takes to execute the test cases to the total number of test cases executed by the tester.
[0111] The calculation method for the backlog of unverified defects ratio indicator value may be the ratio of the number of extra-long defects among closed defects to the total number of closed defects, where an extra-long defect may be a defect in which the time between the time when the defect status is changed to closed and the time when the defect status is changed to resolved is greater than the preset time.
[0112] The calculation method for the test case design ratio indicator value can be the total number of test cases designed by the tester.
[0113] The test case execution ratio indicator value may be calculated by the total number of test cases executed by the tester.
[0114] The calculation method of the tester workload index value can be the ratio of the tester's actual workload to the standard workload.
[0115] The calculation method of the weighted number indicator value of the test task can be the weighted total number of use case design class, integration test class, system test class, and automation test class tasks.
[0116] The calculation method for the test time indicator value can be the completed time for static testing, integration testing, system testing, release testing, regression testing and automated testing tasks.
[0117] Based on the above implementation modes, by respectively calculating the indicator value corresponding to each evaluation indicator, each evaluation indicator can be quantified respectively, so as to accurately issue an alarm prompt.
[0118] S307: Perform statistical processing on multiple indicator values through multiple target statistical strategies to obtain multiple initial statistical information.
[0119] Each statistical strategy corresponds to an evaluation indicator, and each statistical strategy performs statistical processing on the indicator value corresponding to the corresponding evaluation indicator.
[0120] Combined with the scenario example, taking the evaluation indicator of the number of defects found as an example, the calculation formula for calculating the initial statistical information of the target work team can be:
[0121]
[0122] Among them, T represents statistical information, A represents the standard score, which corresponds to the evaluation index, B represents the index value of the target work team, C represents the minimum value among the index values of multiple work teams, D represents the maximum value among the index values of multiple work teams, γ1 is the first coefficient, γ2 is the second coefficient, the first coefficient and the second coefficient correspond to the indicator type respectively, and the sum of the first coefficient and the second coefficient is 1.
[0123] Taking the test work hours as an example, the calculation formula for calculating the initial statistical information of the target work team can be:
[0124]
[0125] Among them, T represents statistical information, A represents standard score, which corresponds to the evaluation index, E represents the index value of the target work team, that is, the actual working hours, and F represents standard working hours, which can be the average or median of multiple working hours of multiple work teams, or the maximum value of the remaining working hours after removing a preset proportion of working hours that rank high.
[0126] It should be noted that this application does not limit the specific implementation method of the statistical strategy.
[0127] S308. For any target worker identifier, determine the target node identifier of the target worker identifier in the project pipeline.
[0128] Among them, the project pipeline refers to a series of stages or steps arranged in a certain order during the project management and execution process. These stages or steps constitute the entire life cycle from project initiation to completion. Each stage or step corresponds to a node, and each node corresponds to a staff member ID.
[0129] For example, the execution sequence relationship between each stage or step can be determined through the project pipeline, so that the task can be traced according to the execution sequence relationship.
[0130] S309: query the target node identifier and the project pipeline through the query function of the database management system to obtain multiple upper-level node identifiers of the target node.
[0131] Exemplarily, the sequential relationship between multiple nodes in the project pipeline is stored in a database.
[0132] Combined with the scenario example, for complex project pipelines, if the previous node identifier is queried manually, there may be problems such as missing queries or query errors. This application can accurately query multiple previous node identifiers through database query, thereby improving the accuracy of alarm prompts.
[0133] S310. Determine the staff identifiers corresponding to the multiple upper-level node identifiers as upstream staff identifiers.
[0134] Optionally, multiple upper-level node identifiers may correspond to multiple different work contents, among which the work content corresponding to only one node identifier is related to the target work information corresponding to the target staff identifier, and the work content corresponding to the upstream staff identifier screened from multiple upper-level node identifiers is related to the target work information.
[0135] Next, combine Figure 5 Explain how to identify upstream staff members.
[0136] Figure 5 A schematic diagram of determining the upstream staff identification provided in an embodiment of the present application. Figure 5 As shown, the corresponding target node identifier is determined from the project pipeline according to the target staff identifier. The target node identifier is queried through the database management system to obtain the query result. The upper node identifier of the target node identifier is determined from the query result. The upstream staff identifier corresponding to the upper node identifier is determined.
[0137] S311. Correct multiple initial statistical information through multiple upstream statistical information to obtain multiple target statistical information, input the multiple target statistical information into the prediction model to obtain multiple target improvement measures, and generate alarm information based on the multiple target statistical information and the multiple target improvement measures.
[0138] Among them, target improvement measures are used to improve the degree of work completion.
[0139] A feasible implementation method can perform correction processing through the following method: determine the corresponding task information based on the upstream statistical information corresponding to the initial statistical information, and the task information includes at least one of the following: task difficulty, task complexity, task accuracy, or task workload; determine the correction value based on the task information; and correct the initial statistical information based on the correction value to obtain the target statistical information.
[0140] Optionally, the correction value corresponding to the task information is determined according to a preset corresponding relationship.
[0141] Next, combine Figure 6 The correction process will be described.
[0142] Figure 6 This is a schematic diagram of the correction process provided in the embodiment of the present application. Figure 6 As shown, the upstream statistical information corresponding to the initial statistical information is determined, the task information is determined from the upstream statistical information, the task information is used to evaluate the work content of the upstream staff, the correction value is determined according to the task information, and the initial statistical information is corrected by the correction value to obtain the target statistical information.
[0143] In this feasible implementation, the target statistical information obtained by correcting the upstream statistical information can accurately reflect the work content of the target staff, thereby improving the accuracy of the alarm prompt.
[0144] A feasible implementation method is that the prediction model is obtained through model training, and the model training can be performed by the following method: determining sample data, the sample data includes multiple sample statistical information and corresponding multiple sample improvement measures; performing model training through the sample data to obtain the prediction model, and the prediction model is used to generate corresponding target improvement measures according to the target statistical information.
[0145] Optionally, sample statistical information is obtained from historical data, and corresponding sample improvement measures are determined manually.
[0146] For example, the sample improvement measures are used as labels for model training. The prediction model obtained through model training can learn the correlation between statistical information and improvement measures, and the prediction model predicts through the correlation to obtain the target improvement measures.
[0147] In this feasible implementation, the model obtained through model training can accurately predict target improvement measures based on target statistical information, thereby improving the accuracy of alarm prompts.
[0148] S312: Send the warning information to the project management platform so that the project management platform can complete the warning prompt to the target staff.
[0149] It should be noted that the execution process of S312 refers to S206 and will not be repeated here.
[0150] Figure 7 A schematic diagram of a tester work evaluation alarm device for an information technology R&D project provided in an embodiment of the present application. Figure 7 As shown, the tester work evaluation alarm device 70 of the information technology R&D project may include: a receiving module 71, a determining module 72, a statistical module 73, a searching module 74, a correcting module 75, and a sending module 76, wherein:
[0151] The receiving module 71 is used to receive an alarm request, where the alarm request includes multiple target staff members' identifiers.
[0152] The determination module 72 is used to determine multiple target work information corresponding to multiple target staff identifications through a database management system according to the alarm request.
[0153] The statistical module 73 is used to determine multiple target statistical strategies, and perform statistical processing on multiple target work information through the multiple target statistical strategies to obtain multiple initial statistical information, wherein the initial statistical information is used to indicate the degree of work completion.
[0154] The search module 74 is used to determine multiple upstream staff identifiers corresponding to multiple target staff identifiers according to the project pipeline, and determine multiple upstream statistical information corresponding to the multiple upstream staff identifiers.
[0155] The correction module 75 is used to correct the multiple initial statistical information through multiple upstream statistical information to obtain multiple target statistical information, input the multiple target statistical information into the prediction model to obtain multiple target improvement measures, and generate alarm information based on the multiple target statistical information and the multiple target improvement measures, wherein the target improvement measures are used to improve the degree of work completion.
[0156] The sending module 76 is used to send the alarm information to the project management platform so that the project management platform can complete the alarm prompt to the target staff.
[0157] Optionally, the receiving module 71 may execute Figure 2 S201 in the embodiment.
[0158] Optionally, the determination module 72 may execute Figure 2 S202 in the embodiment.
[0159] Optionally, the statistics module 73 may execute Figure 2 S203 in the embodiment.
[0160] Optionally, the search module 74 may execute Figure 2 S204 in the embodiment.
[0161] Optionally, the correction module 75 may execute Figure 2 S205 in the embodiment.
[0162] Optionally, the sending module 76 may execute Figure 2 S206 in the embodiment.
[0163] It should be noted that the test personnel work evaluation alarm device for the information technology R&D project shown in the embodiment of the present application can execute the technical solution shown in the above method embodiment, and its implementation principle and beneficial effects are similar, which will not be repeated here.
[0164] In one possible implementation, the determination module 72 is specifically used to: determine an instruction template, the instruction template is used to generate a query instruction; generate multiple target query instructions based on multiple target staff identifiers and the instruction template; and execute the multiple target query instructions separately through the query function of the database management system to obtain multiple target work information.
[0165] In a possible implementation, the alarm request further includes a preset time period; the determination module 72 is specifically configured to: fill each target staff member identifier and the preset time period into the instruction template respectively to obtain a plurality of target query instructions.
[0166] Figure 8 A schematic diagram of a tester work evaluation alarm device for an information technology R&D project provided in an embodiment of the present application. Figure 7 Based on the embodiment shown, Figure 8 As shown, the tester work evaluation alarm device 80 of the information technology R&D project also includes: an execution module 77, a query module 78, a calculation module 79, and a training module 710, wherein:
[0167] The execution module 77 is used to: determine multiple evaluation indicators; calculate and process multiple target work information according to the multiple evaluation indicators to obtain multiple indicator values, wherein each indicator value corresponds to an evaluation indicator; perform statistical processing on the multiple indicator values through multiple target statistical strategies to obtain multiple initial statistical information.
[0168] The query module 78 is used to: determine the target node identifier of the target staff identifier in the project pipeline for any target staff identifier; query and process the target node identifier and the project pipeline through the query function of the database management system to obtain multiple upper-level node identifiers of the target node; and determine the staff identifiers corresponding to the multiple upper-level node identifiers as upstream staff identifiers.
[0169] For any initial statistical information; the calculation module 79 is used to: determine the corresponding task information based on the upstream statistical information corresponding to the initial statistical information, and the task information includes at least one of the following: task difficulty, task complexity, task accuracy, or task workload; determine the correction value based on the task information; correct the initial statistical information according to the correction value to obtain the target statistical information.
[0170] The training module 710 is used to: determine sample data, the sample data includes multiple sample statistical information and corresponding multiple sample improvement measures; perform model training through the sample data to obtain a prediction model, and the prediction model is used to generate corresponding target improvement measures according to the target statistical information.
[0171] Fig. 9 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application is shown in FIG. Fig. 9 As shown, the electronic device includes:
[0172] The electronic device includes a processor 291 and a memory 292; it may also include a communication interface 293 and a bus 294. The processor 291, the memory 292, and the communication interface 293 may communicate with each other through the bus 294. The communication interface 293 may be used for information transmission. The processor 291 may call the logic instructions in the memory 292 to execute the method of the above embodiment.
[0173] In addition, the logic instructions in the above-mentioned memory 292 can be implemented in the form of software functional units and can be stored in a computer-readable storage medium when sold or used as an independent product.
[0174] The memory 292 is a computer-readable storage medium that can be used to store software programs and computer executable programs, such as program instructions / modules corresponding to the methods in the embodiments of the present application. The processor 291 executes functional applications and data processing by running the software programs, instructions, and modules stored in the memory 292, that is, implementing the methods in the above method embodiments.
[0175] The memory 292 may include a program storage area and a data storage area, wherein the program storage area may store an operating system and an application required for at least one function; the data storage area may store data created according to the use of the terminal device, etc. In addition, the memory 292 may include a high-speed random access memory and may also include a non-volatile memory.
[0176] An embodiment of the present application provides a non-temporary computer-readable storage medium, in which computer-executable instructions are stored. When the computer-executable instructions are executed by a processor, they are used to implement the method as described in the above embodiment.
[0177] An embodiment of the present application provides a computer program product, including a computer program, which implements the method of the above embodiment when the computer program is executed by a processor.
[0178] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all optional embodiments, and the actions and modules involved are not necessarily required by the present application.
[0179] It should be further noted that, although the various steps in the flow chart are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a portion of the steps in the flow chart may include multiple sub-steps or multiple stages, and these sub-steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these sub-steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a portion of the sub-steps or stages of other steps.
[0180] It should be understood that the above-mentioned device embodiments are only illustrative, and the device of the present application can also be implemented in other ways. For example, the division of units / modules in the above-mentioned embodiments is only a logical function division, and there may be other division methods in actual implementation. For example, multiple units, modules or components can be combined, or can be integrated into another system, or some features can be ignored or not executed.
[0181] In addition, unless otherwise specified, each functional unit / module in each embodiment of the present application may be integrated into one unit / module, each unit / module may exist physically separately, or two or more units / modules may be integrated together. The above-mentioned integrated unit / module may be implemented in the form of hardware or in the form of a software program module.
[0182] If the integrated unit / module is implemented in the form of hardware, the hardware may be a digital circuit, an analog circuit, etc. The physical implementation of the hardware structure includes but is not limited to transistors, memristors, etc. The processor may be any appropriate hardware processor, such as CPU, GPU, FPGA, DSP, and ASIC, etc. The storage unit may be any appropriate magnetic storage medium or magneto-optical storage medium, such as Resistive Random Access Memory (RRAM), Dynamic Random Access Memory (DRAM), Static Random Access Memory (SRAM), Enhanced Dynamic Random Access Memory (EDRAM), High-Bandwidth Memory (HBM), Hybrid Memory Cube (HMC), etc.
[0183] If the integrated unit / module is implemented in the form of a software program module and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a memory, including a number of instructions to enable a computer device (which can be a personal computer, server or network device, etc.) to execute all or part of the steps of the various embodiments of the present application. The aforementioned memory includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, disk or optical disk and other media that can store program codes.
[0184] In the above embodiments, the description of each embodiment has its own emphasis. For the part not described in detail in a certain embodiment, please refer to the relevant description of other embodiments. The technical features of the above embodiments can be combined arbitrarily. In order to make the description concise, all possible combinations of the technical features in the above embodiments are not described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0185] Those skilled in the art will readily appreciate other embodiments of the present application after considering the specification and practicing the invention disclosed herein. The present application is intended to cover any modification, use or adaptation of the present application, which follows the general principles of the present application and includes common knowledge or customary techniques in the art that are not disclosed in the present application. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present application are indicated by the following claims.
[0186] It should be understood that the present application is not limited to the precise structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present application is limited only by the appended claims.
Claims
1. A tester work evaluation alarm method for an information technology R&D project, characterized in that: Applicable to servers, including: receiving an alarm request, wherein the alarm request includes multiple target staff members' identifiers; According to the alarm request, determining, through a database management system, a plurality of target work information corresponding to the plurality of target staff identifiers; Determine a plurality of target statistical strategies, and perform statistical processing on the plurality of target work information by using the plurality of target statistical strategies to obtain a plurality of initial statistical information, wherein the initial statistical information is used to indicate the degree of work completion; Determine multiple upstream staff identifiers corresponding to the multiple target staff identifiers according to the project pipeline, and determine multiple upstream statistical information corresponding to the multiple upstream staff identifiers; Correcting the multiple initial statistical information by using the multiple upstream statistical information to obtain multiple target statistical information, inputting the multiple target statistical information into a prediction model to obtain multiple target improvement measures, and generating alarm information according to the multiple target statistical information and the multiple target improvement measures, wherein the target improvement measures are used to improve the degree of work completion; The warning information is sent to the project management platform so that the project management platform can complete the warning prompt to the target staff member.
2. The method according to claim 1, characterized in that Determining multiple target work information corresponding to the multiple target worker identifiers includes: Determine an instruction template, wherein the instruction template is used to generate a query instruction; Generate multiple target query instructions according to the multiple target staff member identifiers and the instruction template; The plurality of target query instructions are respectively executed through the query function of the database management system to obtain the plurality of target work information.
3. The method according to claim 2, characterized in that The alarm request also includes a preset time period; and generating multiple target query instructions according to the multiple target staff identifiers and the instruction template, including: Each target staff member identifier and the preset time period are respectively filled into the instruction template to obtain the multiple target query instructions.
4. The method according to any one of claims 1 to 3, characterized in that The multiple target work information is statistically processed by the multiple target statistical strategies to obtain multiple initial statistical information, including: Identify multiple evaluation indicators; Calculating and processing the plurality of target work information according to the plurality of evaluation indicators to obtain a plurality of indicator values, wherein each indicator value corresponds to an evaluation indicator; The multiple indicator values are statistically processed using the multiple target statistical strategies to obtain the multiple initial statistical information.
5. The method according to claim 1, characterized in that Determining multiple upstream staff identifiers corresponding to the multiple target staff identifiers according to the project pipeline includes: For any target worker identifier, determine a target node identifier of the target worker identifier in the project pipeline; Perform query processing on the target node identifier and the project pipeline through the query function of the database management system to obtain multiple upper-level node identifiers of the target node; The staff identifiers corresponding to the multiple upper-level node identifiers are determined as the upstream staff identifiers.
6. The method according to claim 1, characterized in that For any initial statistical information, the initial statistical information is corrected by the upstream statistical information to obtain target statistical information, including: Determine corresponding task information according to the upstream statistical information corresponding to the initial statistical information, wherein the task information includes at least one of the following: task difficulty, task complexity, task accuracy, or task workload; determining a correction value according to the task information; The initial statistical information is corrected according to the correction value to obtain the target statistical information.
7. The method according to claim 6, characterized in that The method further comprises: Determine sample data, where the sample data includes a plurality of sample statistical information and a corresponding plurality of sample improvement measures; The prediction model is obtained by performing model training through the sample data, and the prediction model is used to generate corresponding target improvement measures according to the target statistical information.
8. A work evaluation alarm device for testers of an information technology R&D project, characterized in that: Applicable to servers, including: A receiving module, configured to receive an alarm request, wherein the alarm request includes multiple target staff members' identifiers; A determination module, configured to determine, according to the alarm request, a plurality of target work information corresponding to the plurality of target staff member identifiers through a database management system; A statistical module, used for determining a plurality of target statistical strategies, and performing statistical processing on the plurality of target work information by using the plurality of target statistical strategies to obtain a plurality of initial statistical information, wherein the initial statistical information is used for indicating the degree of work completion; A search module, used to determine multiple upstream staff identifiers corresponding to the multiple target staff identifiers according to the project pipeline, and determine multiple upstream statistical information corresponding to the multiple upstream staff identifiers; A correction module, configured to correct the plurality of initial statistical information by using the plurality of upstream statistical information to obtain a plurality of target statistical information, input the plurality of target statistical information into a prediction model to obtain a plurality of target improvement measures, and generate warning information according to the plurality of target statistical information and the plurality of target improvement measures, wherein the target improvement measures are used to improve the degree of work completion; The sending module is used to send the alarm information to the project management platform so that the project management platform can complete the alarm prompt to the target staff member.
9. An electronic device, characterized in that: include: A processor, and a memory communicatively connected to the processor; The memory stores computer-executable instructions; The processor executes the computer-executable instructions stored in the memory to implement the method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-executable instructions, which are used to implement the method according to any one of claims 1 to 7 when executed by a processor.
Citation Information
Patent Citations
Information system engineering supervision project risk dynamic analysis method
CN114037314A
Automatic project management system and method based on WBS
CN115545664A
Visual monitoring method, device and equipment for research and development quality and readable storage medium
CN116384680A
Informatization software project measurement whole process management and evaluation system