Construction method and device of underground chamber, terminal equipment and storage medium
By considering the tensile strength of the rock mass, the buried depth of the underground chamber is accurately calculated, and the problem of large buried depth in the existing technology is solved, and a more economical and efficient construction of underground compressed air energy storage power station chambers is achieved.
Patent Information
- Application Number
- CN202411184053.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-26
AI Technical Summary
When designing the chambers of underground compressed air energy storage power stations, the existing technology failed to effectively consider the tensile strength of the rock mass, resulting in a large burial depth, which increased the construction cost and construction cycle, and affected the economics of the project.
By obtaining the tensile strength data of the rock mass and combining the design requirements of the underground chamber, a variety of experimental methods and empirical methods are used to determine the tensile strength of the rock mass, and based on the tensile strength, internal pressure, mass mass weight and fracture surface angle, it is used to determine the tensile strength, and the weight of the rock mass and the angle of the fracture surface. Calculate a more accurate buried depth, reducing the construction cost of the chamber.
It improves the accuracy of underground chamber design, reduces unnecessary construction depth, saves project investment and construction period, and achieves more economical and efficient underground chamber construction.
Smart Images

Figure CN119026221A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of civil engineering, and in particular to a construction method, device, terminal equipment and storage medium of an underground chamber. Background Art
[0002] Energy storage is an important component of building a new power system. Compressed air energy storage has the advantages of large capacity, long working time, good economic performance, and multiple charge and discharge cycles. It can make up for the high requirements for site selection of pumped storage and will be an important choice to effectively solve my country's large-scale energy storage problem.
[0003] Large-capacity compressed air energy storage power stations need to set up underground chambers as gas storage reservoirs hundreds or even hundreds of meters below the ground. Under working conditions, they withstand internal pressures of up to 10 to 18 MPa, and the surrounding rock is subjected to complex forces. Under the action of high internal pressure of gas, the underground chamber needs to be covered with a certain thickness of hard rock to ensure that the underground rock is not damaged by high pressure and does not affect the ground. How to ensure the stability of the underground cavern of compressed air energy storage rock, especially the anti-uplift stability, has become one of the problems that designers must solve, that is, it is necessary to calculate and determine the burial depth of the underground chamber: if the burial depth of the underground chamber is too shallow, the thickness of the hard rock above the chamber is not enough, which will affect the safety of the underground chamber; if the burial depth is too deep, the design is too conservative, which will affect the economic efficiency of the compressed air energy storage project. Since there is no built case of compressed air energy storage artificial chambers, there are not many design studies on it, and it mainly refers to the design experience of hydraulic tunnels.
[0004] The design method of hydraulic tunnels only considers the weight of the rock mass to resist the tunnel pressure, ignoring the strength of the rock mass itself. The rock mass cover thickness calculated by this method will be too large, and this method will be too conservative when directly applied to the design of shallow buried compressed air energy storage power station chambers. Taking the underground chamber of the compressed air energy storage power station as an example, the underground chamber needs to withstand a pressure of 18Mpa. The thickness of the rock mass covering the underground chamber designed by this technology needs to be more than 800 meters. Considering that there will be some non-rock covering layers under the ground, the burial depth of the underground chamber will be close to or exceed 900 meters. Excessive burial depth makes the construction of underground chambers difficult, the construction workload of underground chambers will also be large, and the construction period will be long, which will affect the economic feasibility of the compressed air energy storage project. Summary of the invention
[0005] The present invention provides a construction method, device, terminal equipment and storage medium for an underground chamber to solve the above-mentioned technical problems and effectively save the construction cost of the underground chamber.
[0006] In order to solve the above technical problems, the present invention provides a method for constructing an underground chamber, comprising:
[0007] Determine the construction location range and diameter of the underground chamber, and obtain rock mass data and chamber data of the underground chamber; wherein the rock mass data includes the tensile strength of the rock mass;
[0008] Obtaining the buried depth of the underground chamber based on the rock mass data of the underground chamber and the chamber data of the underground chamber;
[0009] A construction plan for the underground chamber is obtained based on the construction location range, diameter and burial depth of the underground chamber, and the underground chamber is constructed based on the construction plan.
[0010] The beneficial effects of the present invention are:
[0011] In the prior art, the design experience of hydraulic tunnels is mainly used to determine the burial depth of underground chambers. However, the design method of hydraulic tunnels only considers the weight of the rock mass to resist the tunnel pressure, ignoring the strength of the rock mass itself, resulting in a larger burial depth for the construction of underground chambers. Directly applying this method to the construction design of underground chambers of shallow-buried compressed gas energy storage power stations will be too conservative, with large errors and unnecessary increase in construction costs. Compared with the prior art, the present invention takes into account the tensile strength of the rock mass when obtaining the burial depth of the underground chamber, so that the construction plan can be more in line with the actual stress conditions of the underground chamber and the rock mass, and effectively improves the design accuracy of the burial depth of the underground chamber. Furthermore, the improvement of the design accuracy can avoid the construction of the underground chamber at a larger burial depth, saving the construction period and economic cost of the underground chamber, and has very beneficial application significance and application prospects.
[0012] As a preferred solution, the step of obtaining rock mass data of the underground chamber and chamber data of the underground chamber includes:
[0013] Determine the maximum internal pressure of the underground chamber according to the operation requirements of the underground chamber;
[0014] Determine the tensile strength of rock mass;
[0015] The thickness of the non-rock covering layer, the bulk density of the rock mass and the first angle are obtained; the first angle is the angle of the fracture surface caused by the upward shearing of the pressure in the underground chamber.
[0016] As a preferred solution, the determining of the tensile strength of the rock mass includes:
[0017] A first initial tensile strength is obtained by direct tensile testing;
[0018] The second initial tensile strength was obtained by Brazilian disc tensile test;
[0019] The third initial tensile strength is obtained by empirical method;
[0020] The tensile strength of the rock mass is determined based on the first initial tensile strength, the second initial tensile strength, and the third initial tensile strength.
[0021] This preferred solution combines a variety of rock tensile strength test methods and empirical methods to obtain the tensile strength of the rock mass, taking all factors into consideration so that the construction plan can better fit the actual situation of the underground chamber.
[0022] As a preferred solution, the burial depth of the underground chamber is obtained by the following first formula:
[0023]
[0024] In the above formula, H is the burial depth of the underground chamber; Hs is the thickness of the non-rock cover layer; p u is the maximum internal pressure of the underground chamber; d is the diameter of the underground chamber; γ is the bulk density of the rock mass; f t is the tensile strength of the rock mass; θ is the angle of the fracture surface caused by the upward shearing of the rock mass by the pressure in the underground chamber; F is the safety factor.
[0025] Accordingly, in order to solve the above technical problems, the present invention also provides an underground chamber construction device, comprising: a data acquisition module, a burial depth acquisition module and a chamber construction module;
[0026] The data acquisition module is used to determine the construction location range and diameter of the underground chamber, and to acquire the rock mass data of the underground chamber and the chamber data of the underground chamber; wherein the rock mass data includes the tensile strength of the rock mass;
[0027] The burial depth acquisition module is used to acquire the burial depth of the underground chamber based on the rock mass data of the underground chamber and the chamber data of the underground chamber;
[0028] The chamber construction module is used to obtain a construction plan for the underground chamber based on the construction location range, diameter and burial depth of the underground chamber, and to construct the underground chamber based on the construction plan.
[0029] As a preferred solution, the data acquisition module includes: a first acquisition unit and a second acquisition unit;
[0030] Wherein, the first acquisition unit is used to determine the maximum internal pressure of the underground chamber according to the operation requirements of the underground chamber;
[0031] The second acquisition unit is used to determine the tensile strength of the rock mass; obtain the thickness of the non-rock covering layer, the bulk density of the rock mass and the first angle; the first angle is the angle of the fracture surface caused by the upward shearing of the pressure in the underground chamber.
[0032] As a preferred solution, the second acquisition unit includes: a first acquisition subunit and a second acquisition subunit;
[0033] Wherein, the first acquisition subunit is used to obtain a first initial tensile strength through a direct tensile test; obtain a second initial tensile strength through a Brazilian disc tensile test; and obtain a third initial tensile strength through an empirical method;
[0034] The second acquisition subunit is used to determine the tensile strength of the rock mass based on the first initial tensile strength, the second initial tensile strength and the third initial tensile strength.
[0035] As a preferred solution, the burial depth of the underground chamber is obtained by the following first formula:
[0036]
[0037] In the above formula, H is the burial depth of the underground chamber; Hs is the thickness of the non-rock cover layer; p u is the maximum internal pressure of the underground chamber; d is the diameter of the underground chamber; γ is the bulk density of the rock mass; f t is the tensile strength of the rock mass; θ is the angle of the fracture surface caused by the upward shearing of the rock mass by the pressure in the underground chamber; F is the safety factor.
[0038] The present invention also provides a terminal device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the steps of the method for constructing an underground chamber as described in any one of the above items are implemented.
[0039] The present invention also provides a storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the steps of the method for constructing an underground chamber as described in any one of the above items are implemented. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 : A schematic flow chart of an embodiment of a method for constructing an underground chamber provided by the present invention;
[0041] Figure 2 : A schematic diagram of the empirical relationship between the tensile strength, shear strength, bending strength and compressive strength of rocks provided in an embodiment of the present invention;
[0042] Figure 3 : A schematic diagram of empirical data of rock mechanical property indicators provided by an embodiment of the present invention;
[0043] Figure 4 : A force analysis diagram of an underground chamber provided in an embodiment of the present invention;
[0044] Figure 5 : A force analysis diagram of an underground chamber provided in an embodiment of the present invention;
[0045] Figure 6 : Finite element verification analysis diagram provided for the embodiment of the present invention;
[0046] Figure 7 : A schematic structural diagram of an embodiment of a construction device for an underground chamber provided by the present invention;
[0047] Figure 8 : A structural diagram of an embodiment of the data acquisition module provided by the present invention. DETAILED DESCRIPTION
[0048] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0049] At present, the design of underground chambers for compressed gas energy storage is mainly based on the design experience of hydraulic tunnels.
[0050] The design method of hydraulic tunnels is the Norwegian criterion (also known as the minimum thickness criterion or the uplift criterion). Its principle is to require that the weight of the overburden of the pressure tunnel body should not be less than the vertical uplift pressure acting on the surrounding rock area of the tunnel body. Its discriminant formula is:
[0051]
[0052] In the above formula, L is the minimum cover thickness of the rock mass, excluding the full-strength weathering thickness, m; H is the water head height, m; α is the inclination angle of the surface rock mass, and when α>60°, α=60°; γ w is the water specific gravity, N / m 3 ; γ R is the rock bulk density, N / m 3 ; F is the safety factor, generally 1.3~1.5.
[0053] However, the design method of hydraulic tunnels only considers the weight of the rock mass to resist the tunnel pressure, ignoring the strength of the rock mass itself. The rock mass cover thickness calculated by this method will be too large. This method will be too conservative when directly applied to the design of the shallow buried compressed air energy storage power station chamber, affecting the economic efficiency of the compressed air energy storage project. Taking the underground chamber of the compressed air energy storage power station as an example, the underground chamber needs to withstand a pressure of 18Mpa. The thickness of the rock mass covering the underground chamber designed by this technology needs to be more than 800 meters. Considering that there will be some non-rock covering layers under the ground, the burial depth of the underground chamber will be close to or exceed 900 meters. Excessive burial depth makes the construction of underground chambers difficult, the construction workload of underground chambers will also be large, and the construction period will be long, which will affect the economic efficiency of compressed air energy storage projects.
[0054] Embodiment 1
[0055] In order to solve the above technical problems, the present invention provides a construction method, device, terminal equipment and storage medium for an underground chamber, so as to solve the above technical problems and effectively save the construction cost of the underground chamber.
[0056] Please refer to Figure 1 , is a flow chart of an embodiment of a method for constructing an underground chamber provided by an embodiment of the present invention. Figure 1 As shown, the construction method of the underground chamber includes steps 101 to 103, specifically:
[0057] Step 101: Determine the construction location range and diameter of the underground chamber, and obtain rock mass data and chamber data of the underground chamber; wherein the rock mass data includes the tensile strength of the rock mass;
[0058] Step 102: Obtaining the buried depth of the underground chamber based on the rock mass data of the underground chamber and the chamber data of the underground chamber;
[0059] Step 103: Obtain a construction plan for the underground chamber based on the construction location range, diameter, and burial depth of the underground chamber, and construct the underground chamber based on the construction plan.
[0060] In the prior art, the design experience of hydraulic tunnels is mainly used to determine the burial depth of underground chambers. However, the design method of hydraulic tunnels only considers the weight of the rock mass to resist the tunnel pressure, ignoring the strength of the rock mass itself, resulting in a larger burial depth for the construction of underground chambers. Directly applying this method to the construction design of underground chambers of shallow-buried compressed gas energy storage power stations will be too conservative, with large errors and unnecessary increase in construction costs. Compared with the prior art, the present invention takes into account the tensile strength of the rock mass when obtaining the burial depth of the underground chamber, so that the construction plan can be more in line with the actual stress conditions of the underground chamber and the rock mass, and effectively improves the design accuracy of the burial depth of the underground chamber. Furthermore, the improvement of the design accuracy can avoid the construction of the underground chamber at a larger burial depth, saving the construction period and economic cost of the underground chamber, and has very beneficial application significance and application prospects.
[0061] Further, in step 101, the obtaining of rock mass data of the underground chamber and chamber data of the underground chamber includes:
[0062] Determine the maximum internal pressure of the underground chamber according to the operation requirements of the underground chamber;
[0063] Determine the tensile strength of rock mass;
[0064] The thickness of the non-rock covering layer, the bulk density of the rock mass and the first angle are obtained; the first angle is the angle of the fracture surface caused by the upward shearing of the pressure in the underground chamber.
[0065] In the present invention, it is necessary to conduct geological exploration of the compressed air energy storage underground chamber and test the rock samples to obtain the relevant parameters required for calculating the burial depth of the underground chamber, among which the thickness of the non-rock covering layer can be obtained through geological drilling; the bulk density of the rock mass can be obtained by on-site drilling sampling and indoor testing.
[0066] Further, the determining the tensile strength of the rock mass includes:
[0067] A first initial tensile strength is obtained by direct tensile testing;
[0068] The second initial tensile strength was obtained by Brazilian disc tensile test;
[0069] The third initial tensile strength is obtained by empirical method;
[0070] The tensile strength of the rock mass is determined based on the first initial tensile strength, the second initial tensile strength, and the third initial tensile strength.
[0071] In this embodiment, the tensile strength of the rock mass is determined specifically by the following formula:
[0072] f t =min{f t1,f t2 ,f t3};
[0073] In the above formula, f t is the tensile strength of the rock mass; f t1 is the first initial tensile strength obtained by direct tensile test; f t2 is the second initial tensile strength obtained by the Brazilian disc tensile test; f t3 is the third initial tensile strength obtained by empirical method.
[0074] Figure 2 A schematic diagram of the empirical relationship between the tensile strength, shear strength, flexural strength and compressive strength of rock provided in an embodiment of the present invention. Figure 3 A schematic diagram of empirical data of rock mechanical property indicators provided by an embodiment of the present invention. Figure 2 and Figure 3 All are derived from the Handbook of Engineering Geology (Fifth Edition).
[0075] In this embodiment, the empirical method is specifically based on Figure 2 and Figure 3 The third initial tensile strength was obtained based on the relevant empirical data in the "Engineering Geology Handbook" (Fifth Edition).
[0076] The effective test method of the tensile strength of rock mass is still a hot topic in the field of rock mechanics. Scholars have doubts about the accuracy of the tensile strength of rock, and the tensile strength of rock is one of the most important parameters of the calculation method of the present invention. The present invention combines a variety of rock tensile strength test methods and empirical methods recognized at home and abroad to obtain the tensile strength of the rock mass, taking comprehensive considerations so that the construction plan can be more in line with the actual situation of the underground chamber, and taking the minimum value reflects the safety principle of calculating the burial depth of the underground chamber, ensuring the safety of the underground chamber.
[0077] Furthermore, in step 102, the buried depth of the underground chamber is obtained by the following first formula:
[0078]
[0079] In the above formula, H is the burial depth of the underground chamber; Hs is the thickness of the non-rock cover layer; p u is the maximum internal pressure of the underground chamber; d is the diameter of the underground chamber; γ is the bulk density of the rock mass; f t is the tensile strength of the rock mass; θ is the angle of the fracture surface caused by the upward shearing of the rock mass by the pressure in the underground chamber; F is the safety factor.
[0080] Figure 4 A force analysis diagram of an underground chamber provided in an embodiment of the present invention; Figure 5A force analysis diagram of an underground chamber provided in an embodiment of the present invention.
[0081] Combine the following Figure 4 and Figure 5 The steps for obtaining the first formula are described below.
[0082] like Figure 4 As shown in Figure 1, the buried depth H of the underground chamber consists of two parts, one of which is the thickness of the rock layer Hr, and the other is the thickness of the non-rock cover layer Hs; therefore, the buried depth is:
[0083] H=Hs+Hr (1)
[0084] The rock layer consists of hard rocks above the underground chamber, and generally only medium-weathered and above hardness rocks are considered, because only hard rocks have sufficient bearing capacity to resist the high pressure of the compressed air energy storage underground chamber.
[0085] like Figure 5 As shown in the figure, the rock layer resists the internal pressure of this underground chamber by two parts of resistance, the rock gravity W and the rock shear resistance T, thus, we get:
[0086] p u d=W+T (2)
[0087] In the above formula, p u is the maximum internal pressure of the underground chamber; d is the diameter of the underground chamber; W is the gravity of the rock; T is the shear resistance of the rock.
[0088] The gravity W of the rock is expressed by the following formula:
[0089] W=γdHr (3)
[0090] In the above formula, γ is the bulk density of the rock mass; d is the diameter of the underground chamber; Hr is the thickness of the rock layer.
[0091] For rock shear resistance T, Figure 5 As shown in the figure, the two oblique sides are the section lines of the inclined surface of the rock shearing failure cone. The length of the oblique side is: Hctgθ, θ is the angle of the fracture surface caused by the upward shearing of the pressure in the underground chamber. When the rock is destroyed along the shearing fracture line, the rock and soil strength takes the tensile strength. When the rock mass above the underground chamber is subjected to the pressure of compressed air, it will be destroyed along the fracture surface where the rock mass has the weakest bearing capacity.
[0092] Tensile strength is an important parameter to measure the ability of rock to resist destruction. In underground rock engineering problems, since the tensile strength of rock is much smaller than the compressive strength, under the high pressure conditions of the compressed air energy storage underground chamber, brittle failure dominated by tensile microfractures will occur first. Since the compressed air energy storage underground chamber has very high requirements for airtightness, if the surrounding rock mass has brittle failure of microfractures, it will have a certain impact on the airtightness of the chamber. Therefore, the present invention adopts tensile strength dominated by tensile microfractures.
[0093] Assume T 1 and T 2 are the shear resistances on the left and right sides of the rock, respectively, then:
[0094] T=T 1 +T 2 (4)
[0095] Among them, because the diameter of the high-pressure chamber is generally about 8 to 12 meters, the rocks on the left and right sides of the high-pressure chamber are generally the same, and the underground chamber is symmetrical, so there are:
[0096] T 1 =T 2 (5)
[0097] Therefore, for the rock's shear resistance, we have:
[0098] T 1 =T 2 =f t (Hrctgθ) (6)
[0099] From formulas (1)-(6), we can get:
[0100] p u d=γHr+2f t (Hrctgθ) (7)
[0101] From formula (7), we can get:
[0102]
[0103] Since safety reserve needs to be considered in the design, the safety factor is introduced into formula (7) to obtain:
[0104]
[0105] In the above formula, F is the safety factor, which is 2.0-3.0. Since the strength of the rock is taken into consideration, the safety factor here is higher than the Norwegian formula value of 1.3-1.5.
[0106] From formulas (1)-(9), we can get the first formula:
[0107]
[0108] Therefore, the present invention calculates the anti-shear bearing capacity of the rock mass according to the stress characteristics of the compressed air energy storage underground chamber and the rock mechanics theory, and adopts the tensile strength of the rock to calculate the burial depth of the underground chamber scientifically and reasonably.
[0109] When there are multiple types of rock mass, formula (10) can be used to obtain:
[0110]
[0111] In the above formula, n is the number of rock mass types.
[0112] In this embodiment, the fracture angle of the rock mass caused by the upward shearing of the pressure in the underground chamber requires testing and analysis to obtain an accurate value. When there is no accurate basis, a conservative method can be used, and θ is taken as 0 degrees. At this time, formula (11) can be simplified to:
[0113]
[0114] The construction method of the underground chamber in the present invention is further illustrated by an implementation case.
[0115] Assume that a compressed air energy storage power station is built in a certain place. The underground chamber needs to withstand a pressure of 18Mpa. The diameter of the underground chamber is d = 10m. The thickness of the non-rock cover layer Hs is 10m. The underground is a granite body with a bulk density of γ = 2.63g / cm 3 , f t =2.1Mpa (the numerical value of the tensile strength of the rock mass is the empirical data of rock mechanical properties indicators in Table 3-1-45 of the "Engineering Geology Handbook" (Fifth Edition), and the lower value is taken).
[0116] Among them, when the Norwegian standard formula is used to calculate the burial depth of the underground chamber, the safety factor F is taken as 1.3. Therefore, the safe burial depth H of the underground chamber is calculated. 1 =900m.
[0117] When the method of the present invention is used to calculate the buried depth of the underground chamber, the safety factor F is taken as 3.0, and the fracture surface angle θ generated by the upward shearing of the pressure inside the underground chamber is conservatively taken as 0 degrees. Thus, the safe buried depth H of the underground chamber is calculated. 2 =90m.
[0118] It can be seen that by adopting the method of the present invention, the burial depth of the underground chamber is 90m, which is greatly optimized compared with the burial depth of 900m obtained by adopting the Norwegian formula.
[0119] Furthermore, finite element modeling was performed to verify the construction method of the underground chamber of the present invention. Specifically, FLAC3D finite element software was used to verify the implementation case. Figure 6 This is a finite element verification analysis diagram provided for an embodiment of the present invention.
[0120] According to the parameters of the implementation case, the rock mass thickness is taken as 80m, and the non-rock cover layer thickness Hs is taken as 10m, and the stress condition of the rock mass is obtained. Figure 6 It can be seen that the safe burial depth H 2 , the rock mass is safe.
[0121] Through the above implementation cases, the design scheme using the method of the present invention can save about 17 million yuan in engineering investment and 150 days of construction time compared with the scheme using the Norwegian standard formula.
[0122] Accordingly, in order to solve the above technical problems, the present invention also provides a construction device for an underground chamber. Figure 7 , which is a structural schematic diagram of an embodiment of a construction device for an underground chamber provided by the present invention.
[0123] like Figure 7 As shown, the underground chamber construction device 20 includes: a data acquisition module 201, a buried depth acquisition module 202 and a chamber construction module 203;
[0124] The data acquisition module 201 is used to determine the construction location range and diameter of the underground chamber, and to acquire the rock mass data of the underground chamber and the chamber data of the underground chamber; wherein the rock mass data includes the tensile strength of the rock mass;
[0125] The burial depth acquisition module 202 is used to acquire the burial depth of the underground chamber based on the rock mass data of the underground chamber and the chamber data of the underground chamber;
[0126] The chamber construction module 203 is used to obtain a construction plan of the underground chamber based on the construction position range, diameter and burial depth of the underground chamber, and to construct the underground chamber based on the construction plan.
[0127] Figure 8 A schematic structural diagram of an embodiment of a data acquisition module provided by the present invention.
[0128] Furthermore, if Figure 8 As shown, the data acquisition module 201 includes: a first acquisition unit 2011 and a second acquisition unit 2012;
[0129] Wherein, the first acquisition unit 2011 is used to determine the maximum internal pressure of the underground chamber according to the operation requirements of the underground chamber;
[0130] The second acquisition unit 2012 is used to determine the tensile strength of the rock mass; obtain the thickness of the non-rock covering layer, the bulk density of the rock mass and the first angle; the first angle is the angle of the fracture surface caused by the upward shearing of the pressure in the underground chamber.
[0131] Furthermore, if Figure 8 As shown, the second acquisition unit 2012 includes: a first acquisition subunit and a second acquisition subunit;
[0132] Wherein, the first acquisition subunit is used to obtain a first initial tensile strength through a direct tensile test; obtain a second initial tensile strength through a Brazilian disc tensile test; and obtain a third initial tensile strength through an empirical method;
[0133] The second acquisition subunit is used to determine the tensile strength of the rock mass based on the first initial tensile strength, the second initial tensile strength and the third initial tensile strength.
[0134] Furthermore, the burial depth of the underground chamber is obtained by the following first formula:
[0135]
[0136] In the above formula, H is the burial depth of the underground chamber; Hs is the thickness of the non-rock cover layer; p u is the maximum internal pressure of the underground chamber; d is the diameter of the underground chamber; γ is the bulk density of the rock mass; f t is the tensile strength of the rock mass; θ is the angle of the fracture surface caused by the upward shearing of the rock mass by the pressure in the underground chamber; F is the safety factor.
[0137] The present invention also provides a terminal device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the steps of the method for constructing an underground chamber as described in any one of the above items are implemented.
[0138] The present invention also provides a storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the steps of the method for constructing an underground chamber as described in any one of the above items are implemented.
[0139] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:
[0140] 1. Compared with the existing Norwegian standard calculation method, the calculation method of the present invention is more in line with the actual stress conditions of the compressed air energy storage underground chamber and the rock mass.
[0141] 2. The burial depth of the underground chamber determined by the calculation method of the present invention will be shallower than the burial depth calculated by the prior art while ensuring safety. A shallower burial depth can save engineering costs and the construction period of the underground chamber, and has very beneficial application significance and application prospects.
[0142] 3. The calculation method formula of the underground chamber burial depth of the present invention is simple and suitable for engineering design.
[0143] The specific embodiments described above further illustrate the purpose, technical solutions and beneficial effects of the present invention. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the scope of protection of the present invention. It is particularly pointed out that for those skilled in the art, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for constructing an underground chamber, characterized in that: include: Determine the construction location range and diameter of the underground chamber, and obtain rock mass data and chamber data of the underground chamber; wherein the rock mass data includes the tensile strength of the rock mass; Obtaining the buried depth of the underground chamber based on the rock mass data of the underground chamber and the chamber data of the underground chamber; A construction plan for the underground chamber is obtained based on the construction location range, diameter and burial depth of the underground chamber, and the underground chamber is constructed based on the construction plan.
2. A method for constructing an underground chamber as claimed in claim 1, characterized in that: The step of obtaining rock mass data of the underground chamber and chamber data of the underground chamber includes: Determine the maximum internal pressure of the underground chamber according to the operation requirements of the underground chamber; Determine the tensile strength of rock mass; The thickness of the non-rock covering layer, the bulk density of the rock mass and the first angle are obtained; the first angle is the angle of the fracture surface caused by the upward shearing of the pressure in the underground chamber.
3. A method for constructing an underground chamber as claimed in claim 2, characterized in that: Determining the tensile strength of the rock mass comprises: A first initial tensile strength is obtained by direct tensile testing; The second initial tensile strength was obtained by Brazilian disc tensile test; The third initial tensile strength is obtained by empirical method; The tensile strength of the rock mass is determined based on the first initial tensile strength, the second initial tensile strength, and the third initial tensile strength.
4. A method for constructing an underground chamber as claimed in claim 2, characterized in that: The buried depth of the underground chamber is obtained by the following first formula: In the above formula, H is the burial depth of the underground chamber; Hs is the thickness of the non-rock cover layer; p u is the maximum internal pressure of the underground chamber; d is the diameter of the underground chamber; γ is the bulk density of the rock mass; f t is the tensile strength of the rock mass; θ is the angle of the fracture surface caused by the upward shearing of the rock mass by the pressure in the underground chamber; F is the safety factor.
5. A construction device for an underground chamber, characterized in that: include: Data acquisition module, burial depth acquisition module and chamber construction module; The data acquisition module is used to determine the construction location range and diameter of the underground chamber, and to acquire the rock mass data of the underground chamber and the chamber data of the underground chamber; wherein the rock mass data includes the tensile strength of the rock mass; The burial depth acquisition module is used to acquire the burial depth of the underground chamber based on the rock mass data of the underground chamber and the chamber data of the underground chamber; The chamber construction module is used to obtain a construction plan for the underground chamber based on the construction location range, diameter and burial depth of the underground chamber, and to construct the underground chamber based on the construction plan.
6. The construction device for an underground chamber as claimed in claim 5, characterized in that: The data acquisition module includes: a first acquisition unit and a second acquisition unit; Wherein, the first acquisition unit is used to determine the maximum internal pressure of the underground chamber according to the operation requirements of the underground chamber; The second acquisition unit is used to determine the tensile strength of the rock mass; obtain the thickness of the non-rock covering layer, the bulk density of the rock mass and the first angle; the first angle is the angle of the fracture surface caused by the upward shearing of the pressure in the underground chamber.
7. The construction device for an underground chamber according to claim 6, characterized in that: The second acquisition unit includes: a first acquisition subunit and a second acquisition subunit; Wherein, the first acquisition subunit is used to obtain a first initial tensile strength through a direct tensile test; obtain a second initial tensile strength through a Brazilian disc tensile test; and obtain a third initial tensile strength through an empirical method; The second acquisition subunit is used to determine the tensile strength of the rock mass based on the first initial tensile strength, the second initial tensile strength and the third initial tensile strength.
8. The construction device for an underground chamber according to claim 6, characterized in that: The buried depth of the underground chamber is obtained by the following first formula: In the above formula, H is the burial depth of the underground chamber; Hs is the thickness of the non-rock cover layer; p u is the maximum internal pressure of the underground chamber; d is the diameter of the underground chamber; γ is the bulk density of the rock mass; f t is the tensile strength of the rock mass; θ is the angle of the fracture surface caused by the upward shearing of the rock mass by the pressure in the underground chamber; F is the safety factor.
9. A terminal device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the steps of the method for constructing an underground chamber as described in any one of claims 1 to 4 are implemented.
10. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method for constructing an underground chamber as claimed in any one of claims 1 to 4 are implemented.
