Regional power grid new energy maximum acceptance capability assessment method considering multiple scenes

Through the hybrid integer linear planning model established through scenario analysis method and linearization processing, the maximum acceptance capacity of new energy in regional power grids was evaluated, the problems of uncertain new energy installed capacity and grid matching in multiple scenarios were solved, and new energy consumption was improved Capacity and resource utilization reduce power abandonment.

CN119026447AInactive Publication Date: 2024-11-26STATE GRID ZHEJIANG ELECTRIC POWER CO LTD NINGBO POWER SUPPLY CO
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410922394.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology has failed to effectively evaluate the maximum new energy acceptance capacity of regional power grids, especially in the uncertain new energy installed capacity and multiple scenarios, which makes the power grid operation difficult to match the output of new energy, resulting in the occurrence of "wind" and "discarded wind" and "discarded" Light' phenomenon affects resource allocation and return on investment.

Method used

Using a scenario analysis method, a mixed integer linear planning model is established through the clustering and linearization of seasonal historical sampling data, combined with a commercial solver to solve the upper limit of new energy installed capacity and annual power acceptance expectations, considering grid safety and new Energy storage configuration.

Benefits of technology

The new energy acceptance capacity assessment in multiple scenarios has been achieved, providing a basis for guiding grid planning and scheduling, improving the new energy consumption capacity and resource utilization rate, reducing the power waste rate, and optimizing the grid operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026447A_ABST
    Figure CN119026447A_ABST
Patent Text Reader

Abstract

The invention discloses a regional power grid new energy maximum acceptance capability assessment method considering multiple scenes, and the method comprises the steps: dividing the historical sampling data of the new energy output of the regional power grid new energy based on seasonal characteristics, and determining a plurality of seasonal historical sampling data; clustering reduction is carried out on the multiple pieces of seasonal historical sampling data, a typical scene set of each piece of seasonal historical sampling data is determined, a constraint condition and an objective function are constructed, and a regional power grid new energy maximum admitting ability evaluation model based on a scene analysis method is established; linear processing is carried out on nonlinear constraints of the regional power grid new energy maximum acceptance capability evaluation model, and the regional power grid new energy maximum acceptance capability evaluation model is converted into a mixed integer linear programming model; and solving the mixed integer linear programming model through a commercial solver, and obtaining the new energy installed capacity upper limit and the annual accepted electric quantity expectation under the maximum new energy accepting state of the regional power grid.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of new energy acceptance capacity assessment, and more specifically, to a method for assessing the maximum new energy acceptance capacity of a regional power grid taking multiple scenarios into consideration. Background Art

[0002] China's renewable energy installed capacity continues to grow at a high speed. However, unlike traditional fossil energy, renewable energy is unstable and intermittent. For example, solar power generation is affected by weather conditions, while wind power generation is affected by changes in wind speed. This makes the power output of renewable energy fluctuate and is not easy to match well with the load demand of the power system. In addition, the increase in the proportion of renewable energy access will lead to a gradual reduction in the power generation of traditional thermal power units, which makes the operating environment of the power system more complex, and the uncertainty and low inertia characteristics of the regional power grid will be further aggravated. Therefore, the real-time balance adjustment of the power grid is more difficult than before, and the demand for flexible resources in the power system has greatly increased. When the power grid cannot effectively absorb new energy, new energy power generation equipment will be forced to shut down or reduce production, resulting in "wind abandonment" and "light abandonment", which will affect the return on investment and lead to waste of resource allocation. Therefore, in the face of the increasingly severe situation of new energy consumption, combined with the existing flexible resources of the power grid and the flexible resources that can be called in the future, accurately evaluating the maximum scale of new energy that the system can carry will help to judge the scale limit and reasonable growth rate of new energy development, and it has important practical significance for guiding the reasonable planning of regional wind power, photovoltaic and other new energy power stations and coordinating the sustainable development of power grids.

[0003] At present, the definition of new energy absorption capacity has not been clearly defined, and the evaluation method has not been unified. Although researchers have made many progresses in this field, they are basically based on the existing installed capacity of new energy, and the acceptance capacity is evaluated at the dispatching level. They do not consider the development potential of new energy in the future or the acceptance capacity of new energy under the condition of uncertain installed capacity. Specifically, the installed capacity of new energy and the location of access to the power grid are different, and the absorption capacity of new energy will also be different. Therefore, in order to obtain the upper limit of the new energy absorption capacity based on the carrying capacity of the regional power grid itself, it is necessary to comprehensively consider the possible installed capacity of new energy in the future and different access nodes to carry out the evaluation method of the maximum absorption capacity of new energy in the regional power grid. How to achieve this has become a technical problem that needs to be solved urgently. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a method for evaluating the maximum acceptance capacity of new energy in a regional power grid taking into account multiple scenarios.

[0005] According to one aspect of the present invention, a method for evaluating the maximum acceptance capacity of new energy in a regional power grid considering multiple scenarios is provided, comprising:

[0006] Based on seasonal characteristics, the historical sampling data of the new energy output of the regional power grid is divided to determine a plurality of seasonal historical sampling data;

[0007] A preset clustering algorithm is used to cluster and reduce multiple seasonal historical sampling data respectively, and a typical scene set of each seasonal historical sampling data is determined;

[0008] According to the typical scenario set of each seasonal historical sampling data, the constraints and objective functions are constructed, and based on the constraints and objective functions, a regional power grid new energy maximum acceptance capacity assessment model based on scenario analysis method is established;

[0009] The AC power flow linearization method and the cyclic linearization method are used to linearize the nonlinear constraints of the regional power grid's maximum new energy acceptance capacity assessment model, and the regional power grid's maximum new energy acceptance capacity assessment model is transformed into a mixed integer linear programming model.

[0010] The mixed integer linear programming model is solved by a commercial solver to obtain the upper limit of renewable energy installed capacity and the expected annual power consumption under the maximum renewable energy acceptance state of the regional power grid.

[0011] Optionally, a preset clustering algorithm is used to perform clustering reduction on a plurality of seasonal historical sampling data respectively, and a typical scene set of each seasonal historical sampling data is determined, including:

[0012] Randomly select K initial cluster centers C within the distribution range of seasonal historical sampling data i , 1≤i≤K;

[0013] The function expression defining the distance between seasonal historical sampling data samples is: p and q are the vectors whose distances need to be calculated. i ,q i are the i-th elements in vectors p and q respectively;

[0014] Calculate the remaining data objects in the seasonal historical sampling data to the cluster center C respectively i The distance between each data object and itself is divided into the cluster corresponding to the cluster center closest to it;

[0015] For each cluster, each point in the cluster is used as the new center point, and the total loss cost is calculated to determine the new center point of each cluster;

[0016] It is determined whether the preset end condition is met, and when the end condition is met, the clustering result of the seasonal historical sampling data is obtained as a typical scenario set.

[0017] Optionally, the objective function of the regional power grid's maximum renewable energy acceptance capacity assessment model is to maximize the amount of renewable energy accepted during the dispatch cycle:

[0018]

[0019] In the formula, E N (U, R) is the expected amount of electricity received by renewable energy during the dispatch period; D is the total number of scenarios in the typical scenario set; π s is the occurrence probability of scenario s; N T is the number of scheduling days per year; T is the number of scheduling periods; t is the index number of the scheduling period; is the output power of wind farm i in scheduling period t under scenario s; is the output power of wind farm j in scheduling period t under scenario s; Δt represents the duration of a single scheduling period; N W is the number of wind farms; N S is the number of photovoltaic power stations;

[0020] The constraints of the regional power grid's maximum renewable energy acceptance capacity assessment model include: power flow equation and power balance constraints, power grid security constraints, renewable energy-related constraints, thermal power unit-related constraints, and energy storage-related constraints.

[0021] The power flow equations and power balance constraints include:

[0022]

[0023] In the formula, and are respectively the active and reactive outputs of thermal power unit k in period t under scenario s; They are the active outputs of the wind power station, photovoltaic power plant, and energy storage device connected to node i during period t under scenario s; and are respectively the active and reactive loads of node i in period t under scenario s; P ij,t,s and Q ij,t,s are the active and reactive power transmitted by the transmission line ij in period t under scenario s, respectively; and are the reactive outputs of the wind farm and reactive compensation device connected to node i during period t under scenario s; is the set of thermal power units connected to node i; Ω line is the set of transmission lines; U i,t,s is the voltage amplitude of node i in time period t under scenario s; g ij is the conductance of the transmission line ij; b ij is the susceptance of the transmission line ij; θ ij,t,s is the voltage phase angle difference between node i and node j during period t under scenario s;

[0024] Grid security constraints include:

[0025]

[0026] U min ≤U i,t,s ≤U max

[0027]

[0028]

[0029] In the formula, S ij,max is the capacity of the transmission line on the transmission line ij; U max and U min are the upper and lower limits of the node voltage amplitude respectively; u k,t,s Indicates the start / stop status of thermal power unit k in period t under scenario s, which is a 0-1 variable; N G 、N E 、N L are the number of thermal power units, energy storage, and load nodes respectively; and The upper and lower limits of active output of thermal power unit k; and are respectively the charging and discharging power of energy storage i in period t under scenario s; is the upper limit of the charging and discharging power of energy storage i; β L , β w , β s are the volatility of load, wind power and photovoltaic power respectively;

[0030] New energy-related constraints include:

[0031]

[0032] In the formula, and are the installed capacities of the wind farm and photovoltaic power station connected to node i respectively; and are the predicted output coefficients of the wind farm and photovoltaic power station connected to node i at time t under scenario s; α w and α s They are the minimum utilization rates of wind and solar power respectively;

[0033] Relevant constraints for thermal power units include:

[0034]

[0035]

[0036] In the formula, and are the upper and lower limits of reactive power output of thermal power unit k respectively; and are the maximum rising and falling climbing rates of thermal power unit k respectively; and They represent the startup and shutdown time of thermal power unit k at time t-1 under scenario s respectively; and They represent the minimum start-up and shutdown time of thermal power unit k respectively;

[0037] Energy storage related constraints include:

[0038]

[0039] In the formula, is the energy storage capacity connected to node i; γ is the energy storage ratio; and They are respectively the charge and discharge status signs of energy storage i at time t in scenario s; and They are respectively the charge and discharge status signs of energy storage i at time t in scenario s; is the charge of energy storage i at time t in scenario s; and are the lowest and highest charges of energy storage i respectively; η ch and η dis They are the charging and discharging efficiency of energy storage respectively;

[0040] Optionally, an AC power flow linearization method and a cyclic linearization method are used to linearize the nonlinear constraints of the regional power grid new energy maximum acceptance capacity evaluation model, and the regional power grid new energy maximum acceptance capacity evaluation model is converted into a mixed integer linear programming model, including:

[0041] The AC power flow linearization method is used to linearize the power flow equation and power balance constraints in the regional power grid's maximum new energy acceptance capacity assessment model, and the linearized power flow equation and power balance constraints are determined;

[0042] The cyclic linearization method is used to linearize the line capacity constraint in the power grid security constraint in the regional power grid maximum acceptance capacity assessment model, and the linearized line capacity constraint is determined.

[0043] The linearized power flow equation, power balance constraint and line capacity constraint are used to replace the power flow equation, power balance constraint and line capacity constraint, and a mixed integer linear programming model is determined.

[0044] Optionally, the linearized power flow equation and power balance constraint are expressed as:

[0045] P ij,t,s =gij -g ij cos * θ ij,t,s -b ij (θ i,t,s -θ j,t,s )

[0046] Q ij,t,s =-b ij -g ij (θ i,t,s -θ j,t,s )+b ij cos * θ ij,t,s -b ij (δ i,t,s -δ j,t,s )

[0047]

[0048] In the formula, cos * θ ij,t,s is used to approximate cosθ ij,t,s Approximate variables of Phase angle range for setting 2h is the number of tangents of the cosine function approximating the polyhedron; d is the interval of tangent points; v is the auxiliary variable;

[0049] The linearized line capacity constraint is expressed as:

[0050] -S ij,max ≤P ij,t,s ≤S ij,max

[0051] -S ij,max ≤Q ij,t,s ≤S ij,max

[0052]

[0053] According to another aspect of the present invention, a device for evaluating the maximum acceptance capacity of new energy in a regional power grid considering multiple scenarios is provided, comprising:

[0054] A division module, for dividing the historical sampling data of the new energy output of the regional power grid new energy based on seasonal characteristics, and determining a plurality of seasonal historical sampling data;

[0055] A clustering module, used for clustering and reducing a plurality of seasonal historical sampling data respectively by using a preset clustering algorithm, and determining a typical scene set of each seasonal historical sampling data;

[0056] Establish a module for constructing constraints and objective functions based on a typical scenario set of each seasonal historical sampling data, and establish a regional power grid new energy maximum acceptance capacity assessment model based on scenario analysis method based on the constraints and objective functions;

[0057] A linearization module is used to linearize the nonlinear constraints of the regional power grid's maximum new energy acceptance capacity assessment model using an AC power flow linearization method and a cyclic linearization method, respectively, and transform the regional power grid's maximum new energy acceptance capacity assessment model into a mixed integer linear programming model;

[0058] The solution module is used to solve the mixed integer linear programming model through a commercial solver to obtain the upper limit of the installed capacity of new energy and the expected annual power acceptance under the maximum acceptance state of new energy in the regional power grid.

[0059] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the storage medium stores a computer program, and the computer program is used to execute the method described in any one of the above aspects of the present invention.

[0060] According to another aspect of the present invention, an electronic device is provided, comprising: a processor; a memory for storing instructions executable by the processor; the processor is configured to read the executable instructions from the memory and execute the instructions to implement the method described in any one of the above aspects of the present invention.

[0061] Therefore, the present invention takes into account the uncertainty of new energy output under multiple scenarios, and solves the problem that the traditional new energy acceptance capacity assessment model is only applicable to day-ahead scheduling research through the method of multi-scenario joint scheduling solution, which is more in line with planning needs. On this basis, the acceptance capacity is defined as the amount of electricity consumed by new energy, and combined with the development potential of future new energy, the new energy acceptance capacity assessment model of the regional power grid is established under the condition of uncertainty of installed capacity, taking into account the constraints of power grid safety operation, thermal power unit operation constraints, rotating reserve constraints and other constraints, and using the AC power flow linear model and the cyclic linearization method to linearize the power flow equation and line capacity constraints respectively, and convert the model into a mixed integer linear programming model, which can be directly solved using a commercial solver. At the same time, the model analyzes the new energy acceptance capacity of the regional power grid based on the new energy storage configuration ratio and the new energy abandonment rate constraints, and realizes the evaluation of the regional power grid acceptance capacity under the coordinated operation of source, grid, load and storage. The solution results are of guiding significance to both planning and scheduling levels. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] A more complete understanding of exemplary embodiments of the present invention may be obtained by referring to the following drawings:

[0063] Figure 1It is a flow chart of a method for evaluating the maximum acceptance capacity of new energy in a regional power grid considering multiple scenarios provided by an exemplary embodiment of the present invention;

[0064] Figure 2 is a schematic diagram of a power transmission network topology provided by an exemplary embodiment of the present invention;

[0065] Figure 3 It is a structural schematic diagram of a device for evaluating the maximum acceptance capacity of new energy in a regional power grid considering multiple scenarios provided by an exemplary embodiment of the present invention;

[0066] Figure 4 This is a structure of an electronic device provided by an exemplary embodiment of the present invention. DETAILED DESCRIPTION

[0067] Below, the exemplary embodiments according to the present invention will be described in detail with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments of the present invention, and it should be understood that the present invention is not limited to the exemplary embodiments described here.

[0068] It should be noted that the relative arrangement of components and steps, numerical expressions and numerical values ​​set forth in these embodiments do not limit the scope of the present invention unless specifically stated otherwise.

[0069] Those skilled in the art can understand that the terms "first" and "second" in the embodiments of the present invention are only used to distinguish different steps, devices or modules, etc., and neither represent any specific technical meaning nor indicate the necessary logical order between them.

[0070] It should also be understood that, in the embodiments of the present invention, “plurality” may refer to two or more than two, and “at least one” may refer to one, two or more than two.

[0071] It should also be understood that any component, data or structure mentioned in the embodiments of the present invention can generally be understood as one or more, unless explicitly limited or otherwise indicated in the context.

[0072] In addition, the term "and / or" in the present invention is only a description of the association relationship of the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in the present invention generally indicates that the associated objects before and after are in an "or" relationship.

[0073] It should also be understood that the description of the various embodiments of the present invention focuses on the differences between the various embodiments, and the same or similar aspects thereof can be referenced to each other, and for the sake of brevity, they will not be described one by one.

[0074] At the same time, it should be understood that for the convenience of description, the sizes of the various parts shown in the drawings are not drawn according to the actual proportional relationship.

[0075] The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application, or uses.

[0076] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered part of the specification.

[0077] It should be noted that like reference numerals and letters refer to similar items in the following figures, and therefore, once an item is defined in one figure, it need not be further discussed in subsequent figures.

[0078] Embodiments of the present invention can be applied to electronic devices such as terminal devices, computer systems, servers, etc., which can operate with many other general or special computing system environments or configurations. Examples of well-known terminal devices, computing systems, environments and / or configurations suitable for use with electronic devices such as terminal devices, computer systems, servers, etc. include, but are not limited to: personal computer systems, server computer systems, thin clients, thick clients, handheld or laptop devices, microprocessor-based systems, set-top boxes, programmable consumer electronics, network personal computers, small computer systems, large computer systems, and distributed cloud computing technology environments including any of the above systems, etc.

[0079] Electronic devices such as terminal devices, computer systems, servers, etc. can be described in the general context of computer system executable instructions (such as program modules) executed by computer systems. Generally, program modules can include routines, programs, object programs, components, logic, data structures, etc., which perform specific tasks or implement specific abstract data types. Computer systems / servers can be implemented in a distributed cloud computing environment, where tasks are performed by remote processing devices linked through a communication network. In a distributed cloud computing environment, program modules can be located on local or remote computing system storage media including storage devices.

[0080] Exemplary Methods

[0081] Figure 1 1 is a flow chart of a method for evaluating the maximum acceptance capacity of a regional power grid for new energy considering multiple scenarios provided by an exemplary embodiment of the present invention. This embodiment can be applied to electronic devices, such as Figure 1 As shown, the method 100 for evaluating the maximum acceptance capacity of new energy in a regional power grid considering multiple scenarios includes the following steps:

[0082] Step 101, dividing the historical sampling data of the new energy output of the regional power grid new energy based on seasonal characteristics, and determining a plurality of seasonal historical sampling data;

[0083] Step 102, using a preset clustering algorithm to perform clustering reduction on multiple seasonal historical sampling data respectively, and determine a typical scene set of each seasonal historical sampling data;

[0084] Step 103, constructing constraint conditions and objective functions according to a typical scenario set of each seasonal historical sampling data, and establishing a regional power grid new energy maximum acceptance capacity assessment model based on scenario analysis method based on the constraint conditions and objective function;

[0085] Step 104, using an AC power flow linearization method and a cyclic linearization method to linearize the nonlinear constraints of the regional power grid's maximum new energy acceptance capacity assessment model, and converting the regional power grid's maximum new energy acceptance capacity assessment model into a mixed integer linear programming model;

[0086] Step 105, solving the mixed integer linear programming model by a commercial solver to obtain the upper limit of the installed capacity of new energy and the expected annual power acceptance under the maximum acceptance state of new energy in the regional power grid.

[0087] Specifically, the invented method for evaluating the maximum acceptance capacity of new energy in a regional power grid considering multiple scenarios includes the following:

[0088] S1. The historical sampling data of new energy is divided based on seasonal characteristics, and the K-medoids clustering algorithm is used to reduce the scene set. Then, a typical scene set is established based on the clustering results to provide data support for the evaluation of new energy acceptance capacity.

[0089] S2. Taking the maximum amount of renewable energy accepted within the daily dispatch cycle of multiple scenarios as the objective function, the installed capacity of renewable energy and the dispatch scheme as decision variables, a regional power grid maximum renewable energy acceptance capacity assessment model based on scenario analysis method is established by comprehensively considering the coordinated operation constraints of source, grid, load and storage.

[0090] S3. According to the AC power flow linearization method and the cyclic linearization method, the nonlinear constraints are linearized respectively, and the model is converted into a mixed integer linear programming model. The reasonable upper limit of the installed capacity of new energy and the expected annual power acceptance under the maximum acceptance state of new energy in the regional power grid can be efficiently solved by a commercial solver.

[0091] In one embodiment, in S1, the specific calculation steps of the K-medoids clustering algorithm are:

[0092] (1) Randomly select K initial cluster centers C within the distribution range of the data set i(1≤i≤K), it should be noted that the cluster center C i It needs to be real sample data and cannot be randomly generated;

[0093] (2) The function expression defining the distance between samples is:

[0094]

[0095] In the formula, p and q are the vectors whose distance needs to be calculated. i ,q i are the i-th elements in vectors p and q respectively.

[0096] Calculate the remaining data objects to the cluster center C separately i The distance between each data object and itself is divided into the cluster corresponding to the cluster center closest to it;

[0097] (3) For each cluster, a new center point is selected to minimize the cost by trying each point in the cluster as the new center point and calculating the total loss cost;

[0098] (4) Determine whether the termination condition is met. Usually, the cluster center no longer changes as the convergence condition. The calculation ends when the result converges or the maximum number of iterations is reached. Otherwise, proceed to the next iteration.

[0099] There are two problems with K-medoids: the selection of the number of clusters and the sensitivity to the initial value. The following are the solutions to these two problems:

[0100] (1) Determination of the optimal number of clusters

[0101] The determination of the optimal number of clusters in the K-medoids algorithm usually requires the use of some methods to evaluate the effectiveness of clustering. Commonly used methods include the elbow rule, silhouette coefficient, and Davidson-Bouldin Index (DBI). The present invention selects the Davidson-Bouldin Index as an evaluation index of clustering effectiveness. The Davidson-Bouldin Index, also known as the classification accuracy index, represents the average value of the ratio of cohesion to separation, and its expression is:

[0102]

[0103] In the formula, I DBI is the Davidson-Boting index; N is the number of clusters; S i is the average distance from the data within the class to the centroid of cluster i; w iis the i-th cluster center. The more the clustering results generated by the algorithm change towards the minimum intra-class distance (maximum intra-class similarity) and the maximum inter-class distance (minimum inter-class similarity), the smaller the Davidson-Borgin index will be. Therefore, the lower the DBI value, the better the clustering effect, which means that the points within the cluster are closer and the points between clusters are more dispersed.

[0104] (2) Improvement of initial value sensitivity

[0105] By selecting K cluster centers one by one and following the principle that the sample points farther away from other cluster centers are more likely to be selected as the next cluster center, it is ensured that many cluster centers will not be initialized to the same cluster and fall into the local optimal solution. The specific steps are as follows:

[0106] ① Assume that a sample has been randomly selected from the data set as the i-th initial cluster center C i ;

[0107] ② Calculate the shortest distance between each sample and the current cluster center, recorded as D(x), and then select the sample corresponding to the largest distance D(x) as the next initial cluster center;

[0108] ③ Repeat ② until K initial cluster centers are selected.

[0109] After obtaining the clustering results, the typical scenarios of renewable energy output are further divided into three categories: scenario I, scenario II and scenario III. Scenario I is the situation where both wind and solar power have high output, scenario II is the situation where both wind and solar power have normal output or one of them has high output and the other has weak output, and scenario III is the situation where the output levels of both are low and the output of renewable energy is weak.

[0110] In one embodiment, in S2, the established regional power grid new energy acceptance capacity assessment model is specifically:

[0111] This model is optimized with the goal of maximizing the amount of renewable energy power generation within the scheduling period. Since wind power and photovoltaic power account for the vast majority of renewable energy power generation, this paper only considers wind power and photovoltaic power, and establishes a decision plan (U, R). The decision variable U represents the renewable energy installed capacity of each node, and R represents the scheduling decision. Within the time scale of interest, it is assumed that each node has the motivation and ability to build a renewable energy power station, that is, each node is allowed to connect to a new renewable energy power station, and the scheduling target is set to maximize the amount of renewable energy accepted during the scheduling period:

[0112]

[0113] In the formula, E N (U, R) is the expected amount of electricity received by renewable energy during the dispatch period; D is the total number of scenarios in the typical scenario set; π sis the occurrence probability of scenario s; N T is the number of scheduling days per year; T is the number of scheduling periods; t is the index number of the scheduling period; is the output power of wind farm i in scheduling period t under scenario s; is the output power of wind farm j in scheduling period t under scenario s; Δt represents the duration of a single scheduling period; N W is the number of wind farms; N S is the number of photovoltaic power stations.

[0114] In view of the research on the evaluation method of the maximum acceptance capacity of regional power grid new energy, considering the conditions that need to be met by the grid operation and dispatching and the operating characteristics of various internal resources, the constraints are established as follows:

[0115] (1) The power balance constraint can be decomposed into reactive power balance and active power balance, as follows:

[0116]

[0117] In the formula, and are respectively the active and reactive outputs of thermal power unit k in period t under scenario s; They are the active outputs of the wind power station, photovoltaic power plant, and energy storage device connected to node i during period t under scenario s; and are respectively the active and reactive loads of node i in period t under scenario s; P ij,t,s and Q ij,t,s are the active and reactive power transmitted by the transmission line ij in period t under scenario s, respectively; and are the reactive outputs of the wind farm and reactive compensation device connected to node i during period t under scenario s; is the set of thermal power units connected to node i; Ω line A collection of transmission lines.

[0118] For any branch (i,j)∈Ω line , the magnitude of the tidal current is given by:

[0119]

[0120] Where U i,t,s is the voltage amplitude of node i in time period t under scenario s; g ij is the conductance of the transmission line ij; b ij is the susceptance of the transmission line ij; θ ij,t,s is the voltage phase angle difference between node i and node j in period t under scenario s.

[0121] (2) To ensure the safe and reliable operation of the regional power grid, the present invention takes into account the branch flow, node voltage, and system reserve constraints. Formula (8) indicates that the size of the branch flow is constrained by the capacity of the transmission line; Formula (9) gives the steady-state range limit of the node voltage amplitude; Formulas (10) and (11) are the upper and lower limit constraints of the system reserve, respectively. The up and down capacity of conventional units should be greater than the fluctuation of load and new energy output.

[0122]

[0123] U min ≤U i,t,s ≤U max (9)

[0124]

[0125] In the formula, S ij,max is the capacity of the transmission line on the transmission line ij; U min and U max are the upper and lower limits of the node voltage amplitude respectively; u k,t,s Indicates the start / stop status of thermal power unit k in period t under scenario s, which is a 0-1 variable; N G 、N E 、N L are the number of thermal power units, energy storage, and load nodes respectively; and The upper and lower limits of active output of thermal power unit k; and are respectively the charging and discharging power of energy storage i in period t under scenario s; is the upper limit of the charging and discharging power of energy storage i; β L , β w , β s are the fluctuation rates of load, wind power and photovoltaic power respectively.

[0126] (3) Since the output of wind power and photovoltaic power is limited by wind and solar resources and has an upper limit, equations (12) and (13) indicate that when power abandonment is allowed, the actual output should be less than the rated output when power abandonment is not allowed. Considering the economic efficiency during operation, equations (14) and (15) give the utilization rate constraints of wind power and photovoltaic power, indicating that during the dispatch period, the proportion of the actual utilization of renewable energy to the output of renewable energy should be greater than the specified value.

[0127]

[0128]

[0129] In the formula, and are the installed capacities of the wind farm and photovoltaic power station connected to node i respectively; and are the predicted output coefficients of the wind farm and photovoltaic power station connected to node i at time t under scenario s; α w and α s are the minimum utilization rates of wind and solar power respectively.

[0130] (4) Considering the operating characteristics of thermal power units, their output is modeled. Equations (16) and (17) are the power output limits of conventional units, respectively; Equation (18) is the ramp constraint; Equations (19) and (20) are the constraints on the minimum start-up and shutdown time.

[0131]

[0132] In the formula, and are the upper and lower limits of reactive power output of thermal power unit k respectively; and are the maximum rising and falling climbing rates of thermal power unit k respectively; and They represent the startup and shutdown time of thermal power unit k at time t-1 under scenario s respectively; and They represent the minimum startup and shutdown time of thermal power unit k respectively.

[0133] (5) Energy storage capacity is configured according to the installed capacity of new energy:

[0134]

[0135] In the formula, is the energy storage capacity connected to node i; γ is the energy storage ratio.

[0136] The state constraints of the energy storage device are as follows:

[0137]

[0138]

[0139] In the formula, and They are respectively the charge and discharge status signs of energy storage i at time t in scenario s; is the charge of energy storage i at time t in scenario s; and are the lowest and highest charges of energy storage i respectively; η ch and η dis are the charging and discharging efficiencies of energy storage, respectively.

[0140] In one embodiment, in S3, the proposed method for evaluating the regional power grid's new energy acceptance capacity is specifically as follows:

[0141] Firstly, based on mathematical theory, the nonlinear terms in the acceptance capacity assessment model are linearized and the model is converted into a mixed integer linear programming model. The reasonable upper limit of the installed capacity of new energy and the expected annual acceptance power under the maximum acceptance state of new energy in the regional power grid can be obtained by a commercial solver.

[0142] Equations (6) and (7) are nonlinear power flow equation constraints and need to be linearized to improve solution efficiency. Since the voltage difference between nodes in the transmission network is very small, it is reasonable to assume that the voltage of node i after normalization is U i,t,s =1+δ i,t,s , δ i,t,s is the voltage deviation value, which can be considered as a small quantity, and the phase angle difference between the nodes is θ ij Usually it is also very small, and can be approximated as sinθ ij =θ ij , based on these assumptions, the cosine function is relaxed by the hyperplane tangent set, and the remaining nonlinear terms are processed by Taylor expansion. Then the nonlinear power flow equation can be transformed into the following linear equation:

[0143] P ij,t,s =g ij -g ij cos * θ ij,t,s -b ij (θ i,t,s -θ j,t,s ) (27)

[0144] Q ij,t,s =-b ij -g ij (θ i,t,s -θ j,t,s )+b ij cos * θ ij,t,s -b ij (δ i,t,s -δ j,t,s )(28)

[0145]

[0146]

[0147] In the formula, cos * θ ij,t,s is used to approximate cosθ ij,t,s Approximate variables of Phase angle range for setting 2h is the number of tangents of the cosine function approximating the polyhedron; d is the interval of tangent points; v is the auxiliary variable.

[0148] Formula (8) is a line capacity constraint containing quadratic terms, which is linearized using the cyclic linearization method.

[0149] -S ij,max ≤P ij,t,s ≤S ij,max (32)

[0150] -S ij,max ≤Q ij,t,s ≤S ij,max (33)

[0151]

[0152] At this point, the mixed integer nonlinear optimization model is transformed into a mixed integer linear optimization model, which can be efficiently solved by commercial solvers.

[0153] In order to verify the effectiveness of the proposed evaluation method, we use Figure 2 The transmission network topology shown in the figure was tested. The system voltage was 138kV and 230kV, including 24 load / generator buses and 38 transmission lines. There were 32 conventional units with a total installed capacity of 3405MW. The unit parameters are shown in Table 1.

[0154] Table 1 Thermal power unit parameters

[0155]

[0156] Table 2 shows the occurrence probability of each scenario, Table 3 shows the optimization results of renewable energy installed capacity, and Table 4 shows the amount of renewable energy received. Figure 3 The daily scheduling results for January, April, July, and November are shown.

[0157] As can be seen from Tables 2, 3 and 4, the method in this paper selects to configure a total of 2059.0MW of wind power installed capacity at nodes 5, 11, 20 and 21, and a photovoltaic installed capacity of 1672.7MW at node 20. The new energy power station is configured in the power consumption area, and it can meet the power load demand and grid security constraints in cooperation with the thermal power units. July is the month with the largest output of new energy, and the monthly new energy acceptance power expectation has reached 468.13GWh. The new energy acceptance power expectation in November is the smallest, at 239.62GWh. The reason is that the scenarios with weak new energy output in November account for 68.49%, and the probability of sufficient output accounts for only 2.49%. This makes the daily acceptance power of new energy in various scenarios in November similar to that of other months, but the monthly acceptance power expectation is significantly lower than that of other months.

[0158] As can be seen from Tables 4 and 5, the method in this paper shows that increasing the proportion of renewable energy storage and the limit of renewable energy power abandonment rate can effectively improve the renewable energy acceptance capacity of the regional power grid. Energy storage can be charged during the peak period of renewable energy output and discharged during the period of renewable energy output shortage, which plays a role in peak load shifting and valley filling. In the same grid topology, the higher the proportion of renewable energy storage, the greater the maximum renewable energy installed capacity and annual power acceptance allowed to be connected while meeting the constraints of safe operation of the power grid. Releasing the upper limit of wind and solar abandonment rate can also improve the renewable energy acceptance capacity of the regional power grid: increasing the upper limit of the power abandonment rate from 5% to 15%, the maximum renewable energy installed capacity increased from 3730.7MW to 4128.0MW, an increase of 10.6%; the maximum renewable energy annual power acceptance increased from 4520.82GWh to 5168.59GWh, an increase of 12.5%. In addition, the lower the power abandonment rate does not mean that the "cost-effectiveness" of new energy installed capacity is higher. As can be seen from the table, the ratio of annual new energy consumption to new energy installed capacity is highest when the power abandonment rate is 10%, and lowest when the power abandonment rate is 5%. This shows that setting too low an upper limit on the power abandonment rate is not conducive to the consumption of new energy, let alone the further development of new energy. On the contrary, there is a most reasonable utilization rate for new energy, and at this utilization rate, the consumption of new energy has the highest cost-effectiveness.

[0159] Table 2 Probability of new energy output scenarios

[0160]

[0161] Table 3 Optimization results of maximum installed capacity of new energy

[0162]

[0163] Table 4 New energy consumption

[0164]

[0165] Table 5 Regional grid acceptance capacity under different energy storage ratios of new energy

[0166]

[0167] Table 6 Regional grid acceptance capacity under different wind and solar curtailment rates

[0168]

[0169] Therefore, the method for evaluating the maximum acceptance capacity of new energy in regional power grids considering multiple scenarios proposed in this application aims at the problem of new energy consumption in regional power grids with large-scale access to new energy. The maximum amount of new energy accepted in the daily dispatch cycle of multiple scenarios is taken as the objective function, and the installed capacity of new energy and the dispatching scheme are taken as decision variables. The constraint of coordinated operation of source, grid, load and storage is considered comprehensively to establish a model for evaluating the maximum acceptance capacity of new energy in regional power grids based on scenario analysis. Then, the nonlinear constraints are linearized based on the AC power flow linearization method and the cyclic linearization method, and the model is converted into a mixed integer linear programming model to solve the reasonable upper limit of the installed capacity of new energy and the expected annual acceptance capacity of new energy under the maximum acceptance state of new energy in the regional power grid. In the proposed method, the development potential of future new energy is taken into account. When the installed capacity is uncertain, the new energy acceptance capacity of the regional power grid is evaluated, and a new energy acceptance scheme close to the upper limit of the carrying capacity of the regional power grid can be obtained. Therefore, the solution result has guiding significance for both power system planning and dispatching.

[0170] Exemplary Devices

[0171] Figure 3 1 is a schematic diagram of a structure of a device for evaluating the maximum acceptance capacity of a regional power grid for new energy considering multiple scenarios provided by an exemplary embodiment of the present invention. Figure 3 As shown, the device 300 includes:

[0172] A division module 310 is used to divide the historical sampling data of the new energy output of the regional power grid new energy based on seasonal characteristics to determine a plurality of seasonal historical sampling data;

[0173] A clustering module 320 is used to perform clustering reduction on the multiple seasonal historical sampling data respectively by using a preset clustering algorithm to determine a typical scene set of each seasonal historical sampling data;

[0174] Establishing module 330, for constructing constraint conditions and objective functions according to a typical scenario set of each seasonal historical sampling data, and establishing a regional power grid new energy maximum acceptance capacity assessment model based on scenario analysis method based on the constraint conditions and objective function;

[0175] The linearization module 340 is used to linearize the nonlinear constraints of the regional power grid new energy maximum acceptance capacity evaluation model by using an AC power flow linearization method and a cyclic linearization method, and convert the regional power grid new energy maximum acceptance capacity evaluation model into a mixed integer linear programming model;

[0176] The solution module 350 is used to solve the mixed integer linear programming model through a commercial solver to obtain the upper limit of the installed capacity of new energy and the annual power acceptance expectation under the maximum acceptance state of new energy in the regional power grid.

[0177] Optionally, the clustering module 320 includes:

[0178] Randomly select K initial cluster centers C within the distribution range of seasonal historical sampling data i , 1≤i≤K;

[0179] The function expression defining the distance between seasonal historical sampling data samples is: p and q are the vectors whose distances need to be calculated. i ,q i are the i-th elements in vectors p and q respectively;

[0180] Calculate the remaining data objects in the seasonal historical sampling data to the cluster center C respectively i The distance between each data object and itself is divided into the cluster corresponding to the cluster center closest to it;

[0181] For each cluster, each point in the cluster is used as the new center point, and the total loss cost is calculated to determine the new center point of each cluster;

[0182] It is determined whether the preset end condition is met, and when the end condition is met, the clustering result of the seasonal historical sampling data is obtained as a typical scenario set.

[0183] Optionally, the objective function of the regional power grid's maximum renewable energy acceptance capacity assessment model is to maximize the amount of renewable energy accepted during the dispatch cycle:

[0184]

[0185] In the formula, E N (U, R) is the expected amount of electricity received by renewable energy during the dispatch period; D is the total number of scenarios in the typical scenario set; π s is the occurrence probability of scenario s; N T is the number of scheduling days per year; T is the number of scheduling periods; t is the index number of the scheduling period; is the output power of wind farm i in scheduling period t under scenario s; is the output power of wind farm j in scheduling period t under scenario s; Δt represents the duration of a single scheduling period; N W is the number of wind farms; N S is the number of photovoltaic power stations;

[0186] The constraints of the regional power grid's maximum renewable energy acceptance capacity assessment model include: power flow equation and power balance constraints, power grid security constraints, renewable energy-related constraints, thermal power unit-related constraints, and energy storage-related constraints.

[0187] The power flow equations and power balance constraints include:

[0188]

[0189] In the formula, and are respectively the active and reactive outputs of thermal power unit k in period t under scenario s; They are the active outputs of the wind power station, photovoltaic power plant, and energy storage device connected to node i during period t under scenario s; and are respectively the active and reactive loads of node i in period t under scenario s; P ij,t,s and Q ij,t,s are the active and reactive power transmitted by the transmission line ij in period t under scenario s, respectively; and are the reactive outputs of the wind farm and reactive compensation device connected to node i during period t under scenario s; is the set of thermal power units connected to node i; Ω line is the set of transmission lines; U i,t,s is the voltage amplitude of node i in time period t under scenario s; g ij is the conductance of the transmission line ij; b ij is the susceptance of the transmission line ij; θ ij,t,s is the voltage phase angle difference between node i and node j during period t under scenario s;

[0190] Grid security constraints include:

[0191]

[0192] U min ≤U i,t,s ≤U max

[0193]

[0194] In the formula, S ij,max is the capacity of the transmission line on the transmission line ij; U max and U min are the upper and lower limits of the node voltage amplitude respectively; u k,t,s Indicates the start / stop status of thermal power unit k in period t under scenario s, which is a 0-1 variable; N G 、N E 、N L are the number of thermal power units, energy storage, and load nodes respectively; and The upper and lower limits of active output of thermal power unit k; and are respectively the charging and discharging power of energy storage i in period t under scenario s; is the upper limit of the charging and discharging power of energy storage i; β L , βw , β s are the volatility of load, wind power and photovoltaic power respectively;

[0195] New energy-related constraints include:

[0196]

[0197] In the formula, and are the installed capacities of the wind farm and photovoltaic power station connected to node i respectively; and are the predicted output coefficients of the wind farm and photovoltaic power station connected to node i at time t under scenario s; α w and α s They are the minimum utilization rates of wind and solar power respectively;

[0198] Relevant constraints for thermal power units include:

[0199]

[0200] In the formula, and are the upper and lower limits of reactive power output of thermal power unit k respectively; and are the maximum rising and falling climbing rates of thermal power unit k respectively; and They represent the startup and shutdown time of thermal power unit k at time t-1 under scenario s respectively; and They represent the minimum start-up and shutdown time of thermal power unit k respectively;

[0201] Energy storage related constraints include:

[0202]

[0203]

[0204] In the formula, is the energy storage capacity connected to node i; γ is the energy storage ratio; and They are respectively the charge and discharge status signs of energy storage i at time t in scenario s; and They are respectively the charge and discharge status signs of energy storage i at time t in scenario s; is the charge of energy storage i at time t in scenario s; and are the lowest and highest charges of energy storage i respectively; η ch and η dis are the charging and discharging efficiencies of energy storage, respectively.

[0205] Optionally, the linearization module 340 includes:

[0206] The first linearization submodule is used to linearize the power flow equation and power balance constraint in the regional power grid new energy maximum acceptance capacity assessment model by using the AC power flow linearization method, and determine the linearized power flow equation and power balance constraint;

[0207] The second linearization submodule is used to linearize the line capacity constraint in the power grid security constraint in the regional power grid new energy maximum acceptance capacity assessment model by using a cyclic linearization method, and determine the linearized line capacity constraint;

[0208] A submodule is determined, which is used to replace the power flow equation, the power balance constraint and the line capacity constraint with the linearized power flow equation, the power balance constraint and the linearized line capacity constraint to determine the mixed integer linear programming model.

[0209] Optionally, the linearized power flow equation and power balance constraint are expressed as:

[0210] P ij,t,s =g ij -g ij cos * θ ij,t,s -b ij (θ i,t,s -θ j,t,s )

[0211] Q ij,t,s =-b ij -g ij (θ i,t,s -θ j,t,s )+b ij cos * θ ij,t,s -b ij (δ i,t,s -δ j,t,s )

[0212]

[0213] In the formula, cos * θ ij,t,s is used to approximate cosθ ij,t,s Approximate variables of Phase angle range for setting 2h is the number of tangents of the cosine function approximating the polyhedron; d is the interval of tangent points; v is the auxiliary variable.

[0214] The linearized line capacity constraint is expressed as:

[0215] -S ij,max ≤P ij,t,s ≤Sij,max

[0216] -S ij,max ≤Q ij,t,s ≤S ij,max

[0217]

[0218] Exemplary Electronic Devices

[0219] Figure 4 This is a structure of an electronic device provided by an exemplary embodiment of the present invention. Figure 4 As shown, the electronic device 40 includes one or more processors 41 and a memory 42 .

[0220] The processor 41 may be a central processing unit (CPU) or other forms of processing units having data processing capabilities and / or instruction execution capabilities, and may control other components in the electronic device to perform desired functions.

[0221] The memory 42 may include one or more computer program products, which may include various forms of computer-readable storage media, such as volatile memory and / or non-volatile memory. The volatile memory may include, for example, random access memory (RAM) and / or cache memory (cache), etc. The non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc. One or more computer program instructions may be stored on the computer-readable storage medium, and the processor 41 may run the program instructions to implement the methods of the software programs of the various embodiments of the present invention described above and / or other desired functions. In one example, the electronic device may also include: an input device 43 and an output device 44, which are interconnected via a bus system and / or other forms of connection mechanisms (not shown).

[0222] In addition, the input device 43 may also include, for example, a keyboard, a mouse, etc.

[0223] The output device 44 can output various information to the outside, and can include, for example, a display, a speaker, a printer, a communication network and a remote output device connected thereto.

[0224] Of course, to simplify, Figure 4 Only some of the components related to the present invention in the electronic device are shown, and components such as a bus, an input / output interface, etc. are omitted. In addition, the electronic device may further include any other appropriate components according to specific application conditions.

[0225] Exemplary computer program products and computer-readable storage media

[0226] In addition to the above-mentioned methods and devices, an embodiment of the present invention may also be a computer program product, which includes computer program instructions, which, when executed by a processor, enable the processor to execute the steps of the method according to various embodiments of the present invention described in the above-mentioned "Exemplary Method" section of this specification.

[0227] The computer program product may be written in any combination of one or more programming languages ​​to write program code for performing the operations of the embodiments of the present invention, including object-oriented programming languages ​​such as Java, C++, etc., and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user computing device, partially on the user device, as a separate software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server.

[0228] In addition, an embodiment of the present invention may also be a computer-readable storage medium having computer program instructions stored thereon, which, when executed by a processor, enable the processor to execute the steps of the method according to various embodiments of the present invention described in the above “Exemplary Method” section of this specification.

[0229] The computer readable storage medium can adopt any combination of one or more readable media. The readable medium can be a readable signal medium or a readable storage medium. The readable storage medium can include, for example, but is not limited to, a system, system or device of electricity, magnetism, light, electromagnetic, infrared, or semiconductor, or any combination of the above. More specific examples (non-exhaustive list) of readable storage media include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.

[0230] The basic principle of the present invention is described above in conjunction with specific embodiments. However, it should be pointed out that the advantages, strengths, effects, etc. mentioned in the present invention are only examples and not limitations, and it cannot be considered that these advantages, strengths, effects, etc. must be possessed by each embodiment of the present invention. In addition, the specific details disclosed above are only for the purpose of illustration and facilitation of understanding, rather than limitation, and the above details do not limit the present invention to being implemented by adopting the above specific details.

[0231] Each embodiment in this specification is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the system embodiment, since it basically corresponds to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0232] The block diagrams of the devices, systems, equipment, and systems involved in the present invention are only illustrative examples and are not intended to require or imply that they must be connected, arranged, and configured in the manner shown in the block diagram. As will be appreciated by those skilled in the art, these devices, systems, equipment, and systems can be connected, arranged, and configured in any manner. Words such as "including", "comprising", "having", etc. are open words, referring to "including but not limited to", and can be used interchangeably with them. The words "or" and "and" used here refer to the words "and / or" and can be used interchangeably with them, unless the context clearly indicates otherwise. The word "such as" used here refers to the phrase "such as but not limited to", and can be used interchangeably with it.

[0233] The method and system of the present invention may be implemented in many ways. For example, the method and system of the present invention may be implemented by software, hardware, firmware or any combination of software, hardware, firmware. The above order of steps for the method is only for illustration, and the steps of the method of the present invention are not limited to the order specifically described above, unless otherwise specifically stated. In addition, in some embodiments, the present invention may also be implemented as a program recorded in a recording medium, which includes machine-readable instructions for implementing the method according to the present invention. Thus, the present invention also covers a recording medium storing a program for executing the method according to the present invention.

[0234] It should also be noted that in the system, device and method of the present invention, each component or each step can be decomposed and / or recombined. These decompositions and / or recombinations should be regarded as equivalent schemes of the present invention. The above description of the disclosed aspects is provided to enable any technician in the field to make or use the present invention. Various modifications to these aspects are very obvious to those skilled in the art, and the general principles defined here can be applied to other aspects without departing from the scope of the present invention. Therefore, the present invention is not intended to be limited to the aspects shown here, but in accordance with the widest range consistent with the principles and novel features disclosed here.

[0235] The above description has been given for the purpose of illustration and description. In addition, this description is not intended to limit the embodiments of the present invention to the forms disclosed herein. Although a number of example aspects and embodiments have been discussed above, those skilled in the art will recognize certain variations, modifications, changes, additions and sub-combinations thereof.

Claims

1. A method for evaluating the maximum capacity of regional power grid to accept new energy considering multiple scenarios. It is characterized in that include: Based on seasonal characteristics, the historical sampling data of the new energy output of the regional power grid is divided to determine a plurality of seasonal historical sampling data; Using a preset clustering algorithm to cluster and reduce the plurality of seasonal historical sampling data respectively, and determining a typical scene set of each seasonal historical sampling data; Constructing constraint conditions and objective functions according to the typical scenario set of each seasonal historical sampling data, and establishing a regional power grid new energy maximum acceptance capacity assessment model based on scenario analysis method based on the constraint conditions and the objective function; The nonlinear constraints of the regional power grid new energy maximum acceptance capacity assessment model are linearized by using an AC power flow linearization method and a cyclic linearization method, respectively, and the regional power grid new energy maximum acceptance capacity assessment model is converted into a mixed integer linear programming model; The mixed integer linear programming model is solved by a commercial solver to obtain the upper limit of the installed capacity of new energy and the expected annual power acceptance under the maximum new energy acceptance state of the regional power grid.

2. The method according to claim 1, It is characterized in that A preset clustering algorithm is used to cluster and reduce the plurality of seasonal historical sampling data respectively, and a typical scene set of each seasonal historical sampling data is determined, including: Randomly select K initial cluster centers C within the distribution range of the seasonal historical sampling data i , 1≤i≤K; The function expression defining the distance between the seasonal historical sampling data samples is: p and q are the vectors whose distances need to be calculated. i ,q i are the i-th elements in vectors p and q respectively; Calculate the remaining data objects in the seasonal historical sampling data to the cluster center C respectively i The distance between each data object and itself is divided into the cluster corresponding to the cluster center closest to it; For each cluster, each point in the cluster is used as the new center point, and the total loss cost is calculated to determine the new center point of each cluster; It is determined whether a preset end condition is met, and when the end condition is met, a clustering result of the seasonal historical sampling data is obtained as the typical scene set.

3. The method according to claim 1, It is characterized in that The objective function of the regional power grid new energy maximum acceptance capacity evaluation model is to maximize the amount of new energy accepted within the dispatch period: In the formula, E N (U, R) is the expected amount of electricity received by renewable energy during the dispatch period; D is the total number of scenarios in the typical scenario set; π s is the occurrence probability of scenario s; N T is the number of scheduling days per year; T is the number of scheduling periods; t is the scheduling period index number; is the output power of wind farm i in scheduling period t under scenario s; is the output power of wind farm j in scheduling period t under scenario s; Δt represents the duration of a single scheduling period; N W is the number of wind farms; N S is the number of photovoltaic power stations; The constraints of the regional power grid's maximum new energy acceptance capacity assessment model include: power flow equation and power balance constraints, power grid security constraints, new energy related constraints, thermal power unit related constraints and energy storage related constraints, among which The power flow equation and power balance constraints include: In the formula, and are respectively the active and reactive outputs of thermal power unit k in period t under scenario s; They are the active outputs of the wind power station, photovoltaic power plant, and energy storage device connected to node i during period t under scenario s; and are respectively the active and reactive loads of node i in period t under scenario s; P ij,t,s and Q ij,t,s are the active and reactive power transmitted by the transmission line ij in period t under scenario s, respectively; and are the reactive outputs of the wind farm and reactive compensation device connected to node i during period t under scenario s; is the set of thermal power units connected to node i; Ω line is the set of transmission lines; U i,t,s is the voltage amplitude of node i in time period t under scenario s; g ij is the conductance of the transmission line ij; b ij is the susceptance of the transmission line ij; θ ij,t,s is the voltage phase angle difference between node i and node j during period t under scenario s; The grid security constraints include: IN min ≤U i,t,s ≤U max In the formula, S ij,max is the capacity of the transmission line on the transmission line ij; U max and U min are the upper and lower limits of the node voltage amplitude respectively; u k,t,s Indicates the start / stop status of thermal power unit k in period t under scenario s, which is a 0-1 variable; N G 、N E 、N L are the number of thermal power units, energy storage, and load nodes respectively; and The upper and lower limits of active output of thermal power unit k; and are respectively the charging and discharging power of energy storage i in period t under scenario s; is the upper limit of the charging and discharging power of energy storage i; β L , β w , β s are the volatility of load, wind power and photovoltaic power respectively; The new energy related constraints include: In the formula, S i WT and S i PV are the installed capacities of the wind farm and photovoltaic power station connected to node i respectively; and are the predicted output coefficients of the wind farm and photovoltaic power station connected to node i at time t under scenario s; α w and α s They are the minimum utilization rates of wind and solar power respectively; The constraints related to the thermal power units include: In the formula, and are the upper and lower limits of reactive power output of thermal power unit k respectively; and are the maximum rising and falling climbing rates of thermal power unit k respectively; and They represent the startup and shutdown time of thermal power unit k at time t-1 under scenario s respectively; and They represent the minimum start-up and shutdown time of thermal power unit k respectively; The energy storage related constraints include: In the formula, is the energy storage capacity connected to node i; γ is the energy storage ratio; and They are respectively the charge and discharge status signs of energy storage i at time t in scenario s; and They are respectively the charge and discharge status signs of energy storage i at time t in scenario s; is the charge of energy storage i at time t in scenario s; and are the lowest and highest charges of energy storage i respectively; η ch and η dis are the charging and discharging efficiencies of energy storage, respectively.

4. The method according to claim 3, It is characterized in that The nonlinear constraints of the regional power grid new energy maximum acceptance capacity evaluation model are linearized by using an AC power flow linearization method and a cyclic linearization method, respectively, and the regional power grid new energy maximum acceptance capacity evaluation model is converted into a mixed integer linear programming model, including: The AC power flow linearization method is used to linearize the power flow equation and power balance constraint in the regional power grid new energy maximum acceptance capacity assessment model, and the linearized power flow equation and power balance constraint are determined; A cyclic linearization method is used to linearize the line capacity constraint in the power grid security constraint in the regional power grid new energy maximum acceptance capacity assessment model, and a linearized line capacity constraint is determined; The linearized power flow equation and power balance constraint and the linearized line capacity constraint are used to replace the power flow equation and the power balance constraint and the line capacity constraint to determine the mixed integer linear programming model.

5. The method according to claim 4, It is characterized in that The linearized power flow equation and power balance constraint are expressed as: P ij,t,s =g ij -g ij cos * i ij,t,s -b ij (i i,t,s -θ j,t,s ) Q ij,t,s =-b ij -g ij (i i,t,s -θ j,t,s )+b ij cos * i ij,t,s -b ij (d i,t,s -d j,t,s ) In the formula, cos * θ ij,t,s is used to approximate cosθ ij,t,s Approximate variables of Phase angle range for setting 2h is the number of tangents of the cosine function approximating the polyhedron; d is the interval of tangent points; v is the auxiliary variable; The linearized line capacity constraint is expressed as: -S ij,max ≤Q ij,t,s ≤S ij,max 6. A device for evaluating the maximum acceptance capacity of new energy in regional power grids considering multiple scenarios. It is characterized in that include: A division module, for dividing the historical sampling data of the new energy output of the regional power grid new energy based on seasonal characteristics, and determining a plurality of seasonal historical sampling data; A clustering module, used to perform clustering reduction on the plurality of seasonal historical sampling data respectively by using a preset clustering algorithm, and determine a typical scene set of each seasonal historical sampling data; Establish a module for constructing constraint conditions and objective functions according to the typical scenario set of each seasonal historical sampling data, and establishing a regional power grid new energy maximum acceptance capacity assessment model based on scenario analysis method based on the constraint conditions and the objective function; A linearization module is used to linearize the nonlinear constraints of the regional power grid's maximum new energy acceptance capacity assessment model using an AC power flow linearization method and a cyclic linearization method, respectively, and convert the regional power grid's maximum new energy acceptance capacity assessment model into a mixed integer linear programming model; A solution module is used to solve the mixed integer linear programming model through a commercial solver to obtain the upper limit of the installed capacity of new energy and the annual power acceptance expectation under the maximum acceptance state of new energy of the regional power grid.

7. A computer-readable storage medium, It is characterized in that The storage medium stores a computer program, and the computer program is used to execute the method according to any one of claims 1 to 5.

8. An electronic device, It is characterized in that The electronic device comprises: processor; a memory for storing instructions executable by the processor; The processor is used to read the executable instructions from the memory and execute the instructions to implement the method described in any one of claims 1 to 5.

Citation Information

Cited By

  • Power system scheduling method, device and equipment based on line transmission quota grading switching and medium

    CN122092250A