Electric power data large model construction system and method applied to low-carbon power grid

By analyzing historical operation and early warning data in the low-carbon power grid power data management platform, identifying abnormal control structures, and generating early warning databases, the complexity and lag problems of early warning data processing in the power grid are solved, intelligent early warning and timely processing are realized, and the Manage burdens and potential losses.

CN119026815AActive Publication Date: 2024-11-26NANJING ANCIENT NETWORK TECH CO LTD

Patent Information

Application Number
CN202411496756.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2024-11-26
Estimated Expiration
2044-10-25

AI Technical Summary

Technical Problem

The existing low-carbon power data management platform has complexity and lag problems when processing early warning data, resulting in complexity in the power grid management process and increasing management burden and potential losses.

Method used

By building a power data management platform, we can receive and analyze early warning data in real time, sort out historical operation records, calculate characteristic operation indexes, identify abnormal control structures, generate early warning databases, and provide intelligent early warning prompts to process lagging data in a timely manner.

Benefits of technology

Effectively identify and process complex early warning data caused by lagging management and control adjustments, reduce grid losses, reduce management burden, and achieve intelligent early warning and control of the target power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026815A_ABST
    Figure CN119026815A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of electric power data management, in particular to an electric power data large model construction system and method applied to a low-carbon power grid, and the method comprises the steps: carrying out the recognition and extraction of an electric power management and control structure, actually generated in an electric power data management platform, of a corresponding authority management account; the method comprises the following steps: calculating and evaluating a feature operation index for each electric power management and control structure, and measuring the management and control operation influence of feature early warning information in the corresponding electric power management and control structure on a target power grid; the method comprises the following steps of: screening out an electric power management and control structure which has a lag processing phenomenon aiming at at least one historical early warning data receiving record, and identifying and extracting characteristic early warning information which can cause condition complexity and process complexity of a corresponding processing condition due to lag of management and control adjustment; the method and the device are used for realizing intelligent early warning prompt aiming at target power grid management and control for a management terminal.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power data management, and in particular to a system and method for constructing a large power data model applied to a low-carbon power grid. Background Art

[0002] At present, the power data management platform built for low-carbon power grids often has the ability to remotely analyze the alarm data of substation equipment collected by the power grid, as well as remotely control the power grid to complete relevant power hidden danger inspections. This makes it more convenient to implement corresponding power management and control processes for the power grid while realizing remote monitoring of the power grid status. In this process, the power management process data can also be directly processed and analyzed.

[0003] As a system capable of remote control and management, the necessity of timely processing some early warning data that may complicate the situation and the corresponding process of handling the situation lies in ensuring the effectiveness and practicality of most of the early warning data, minimizing the losses to the power grid and the management burden on the corresponding authorized users. Summary of the invention

[0004] The purpose of the present invention is to provide a system and method for constructing a large power data model applied to a low-carbon power grid, so as to solve the problems raised in the above-mentioned background technology.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a method for constructing a large power data model applied to a low-carbon power grid, the method comprising: Step S1: construct a power data management platform including several power control models, establish a remote communication connection between the power data management platform and the target power grid, and remotely receive the early warning data transmitted by the target power grid in real time; the authority management account realizes remote control of the target power grid through the power data management platform based on the early warning data; Step S2: Periodically extract historical warning data reception records and all historical operation records generated by the corresponding authority management account in the power data management platform from the historical operation log of the power data management platform; Step S3: sort out the historical operation process data generated by the authority management account to achieve control over the target power grid through the power data management platform, and the time characteristic distribution presented between the historical warning data received by the power data management platform, judge and identify the historical warning data reception records and historical operation records that have corresponding connection relationships, and construct and extract the power control structure; Step S4: Sort out the characteristic distribution presented by the corresponding historical operation records in each power control structure, and calculate the evaluation characteristic operation index for each power control structure; classify each power control structure according to the quantity distribution presented by the corresponding historical warning data reception records in each power control structure. Step S5: Evaluate and calculate the theoretical characteristic operation index for the corresponding power control structure, and screen out abnormal control structures according to the deviation between the characteristic operation index and the theoretical characteristic operation index of the corresponding power control structure. Step S6: From the abnormal control structures, identify and extract the warning data that will cause control complexity due to the lag of control adjustment operations, construct and generate a power data processing warning library, and judge whether to send a warning prompt for timely processing to the management terminal based on the power data processing warning library for the newly added warning data reception record.

[0006] Preferably, Step S3 includes: Step S3-1: Sort all historical warning data reception records in the order of record generation time to obtain a reception record sequence; in the reception record sequence, successively extract the record generation times T1 and T2 for each adjacent pair of historical warning data reception records, where T1 < T2, to obtain a number of characteristic periods [T1, T2]. Step S3-2: Traverse the record generation times of each historical operation record, and respectively collect the historical operation records within each characteristic period to obtain an operation record set corresponding to each characteristic period; successively traverse the total number of historical operation records included in the operation record sets of each characteristic period, and set the operation record sets with the total number of included historical operation records greater than or equal to 1 as target operation record sets; number the target operation record sets in order; here, the order refers to the position order of the historical warning data reception records for extracting the corresponding target operation record sets in the above reception record sequence. Step S3-3: When the operation record set corresponding to the characteristic period between the jth historical warning data reception record and the (j + 1)th historical warning data reception record is a target operation record set, judge that there is a division node between the jth historical warning data reception record and the (j + 1)th historical warning data reception record in the reception record sequence. Step S3-4: Identify all the division nodes existing in the reception record sequence, divide the reception record sequence into several target subsequences based on each division node; number the several target subsequences in order; here, the order refers to the position order of each reception record subsequence in the original above reception record sequence, and establish a corresponding connection relationship between the target subsequences with the same number and the target operation record sets to construct and generate several power control structures {target subsequence, target operation record set}.

[0007] Preferably, step S4 comprises: Step S4-1: Extract the target operation record sets in the corresponding power management and control structures respectively, obtain the total number M of historical operation records contained in each target operation record set, capture the total number K of permission management accounts that operate M historical operation records, and capture the highest permission level C among the K permission management accounts. max and minimum clearance level C min , calculate the level span P=|C of the corresponding permission management account in each target operation record set max -C min |, calculate the characteristic operation index β=(M×K) for the target operation record set in each power control structure P , where M≥1, K≥1, P≥0; Step S4-2: Traverse the total number N of historical warning data reception records contained in the corresponding target subsequence in each power management and control structure; set the power management and control structure with the corresponding total number N=1 as the first characteristic power management and control structure, and set the power management and control structure with the corresponding total number N≥2 as the second characteristic power management and control structure.

[0008] Preferably, step S5 comprises: Step S5-1: extract the warning data received by the power data management platform in each historical warning data reception record, perform feature extraction on the warning data, and obtain a feature warning information set corresponding to each historical warning data reception record; traverse the feature operation index of the corresponding target operation record set in each power management and control structure and the feature warning information set corresponding to each historical warning data reception record in the corresponding target subsequence; wherein the number of feature warning information sets extracted for each first feature power management and control structure is 1, and the number of feature warning information sets extracted for each second feature power management and control structure is greater than 1; Step S5-2: Assume that in a second characteristic power control structure, the characteristic operation index of the corresponding target operation record set is F, and the corresponding target subsequence is D; collect the characteristic warning information sets extracted from all the first characteristic power control structures to obtain a set W; in the set W, capture the characteristic warning information sets that meet the highest similarity with the characteristic warning information sets corresponding to each historical warning data reception record in the target subsequence D, and identify the first characteristic power control structure corresponding to the characteristic warning information set with the highest similarity; Step S5-3: Assume that the characteristic warning information set d corresponding to the i-th historical warning data reception record in the target subsequence D is captured in the set W iThe feature warning information set that meets the highest similarity is g, and the feature warning information set g and the feature warning information set d i The similarity between them is β, and the characteristic operation index of the first characteristic power control structure corresponding to the characteristic warning information set g is Y g , where 0≦β≦1; Step S5-4: Evaluate the characteristic operation value f contributed by the i-th historical warning data reception record in the target subsequence D to a second characteristic power control structure i =β×Y g , accumulate the characteristic operation values ​​contributed by all historical warning data reception records in the target subsequence D to a second characteristic power control structure, and obtain the theoretical characteristic operation index F'. When F'-F>η, the second characteristic power control structure is judged to be an abnormal control structure, where η is the threshold value, and η>0; Normally, every time the target power grid transmits warning data, it is necessary to make corresponding control adjustments to the target power grid through the power data management platform in a timely manner for some warning data that may complicate the situation and the corresponding process of handling the situation; and in each second characteristic power control structure, the number of historical warning data reception records is greater than or equal to 2, which means that there is a lag in control adjustment for at least one historical warning data reception record. When a second characteristic power control structure satisfies F'-F>η, it means that in the characteristic warning information set corresponding to the second characteristic power control structure, there is characteristic warning information that will complicate the situation and the corresponding process of handling the situation due to the lag in control adjustment.

[0009] Preferably, step S6 comprises: Step S6-1: For each abnormal control structure, the warning data received by the power data management platform in each historical warning data reception record contained in the corresponding target subsequence is collected to obtain a warning data set S; feature extraction is performed on the warning data set S to obtain a feature warning information set R corresponding to each abnormal control structure; Step S6-2: extract the characteristic warning information set corresponding to each historical warning data reception record in the target subsequence. When the characteristic warning information set S corresponding to a certain historical warning data reception record satisfies the following condition with the characteristic warning information set R: SS∩R=U≠∅, extract the characteristic warning information contained in the set U as the target characteristic warning information; Step S6-3: Gather all target feature warning information extracted from each abnormal control structure to build a power data processing warning library; whenever a new warning data reception record is monitored on the power data management platform, and after feature extraction of the newly received warning data in the current power data management platform, capture the feature warning information that exists in the power data processing warning library, and send a warning prompt for timely processing to the management terminal.

[0010] In order to better implement the above method, a power data big model construction system is also proposed, which includes a power data management platform construction module, a historical data management module, a power control structure construction management module, a power control structure data management module, an abnormal control structure screening module, and an early warning prompt management module; The power data management platform construction module is used to build a power data management platform containing several power management and control models, establish a remote communication connection between the power data management platform and the target power grid, remotely receive the early warning data transmitted by the target power grid in real time, and the authority management account realizes remote management and control of the target power grid through the power data management platform based on the early warning data; The historical data management module is used to periodically extract historical warning data reception records and all historical operation records generated by the corresponding authority management account in the power data management platform from the historical operation log of the power data management platform; The power control structure construction management module is used to sort out the historical operation process data generated by the authority management account to achieve control over the target power grid through the power data management platform, and the time characteristic distribution between the historical warning data received by the power data management platform, and to identify the historical warning data reception records and historical operation records with corresponding connection relationships, and to construct and extract the power control structure; The power control structure data management module is used to sort out the characteristic distribution of the corresponding historical operation records in each power control structure, calculate and evaluate the characteristic operation index of each power control structure; classify each power control structure according to the quantity distribution of the corresponding historical warning data reception records in each power control structure; The abnormal control structure screening module is used to evaluate and calculate the theoretical characteristic operation index of the corresponding power control structure, and screen out the abnormal control structure according to the deviation between the characteristic operation index of the corresponding power control structure and the theoretical characteristic operation index; The early warning management module is used to identify and extract early warning data from abnormal control structures that may complicate management due to delayed control adjustment operations, build and generate an electric power data processing early warning library, determine whether to receive records of newly added early warning data based on the electric power data processing early warning library, and send early warning prompts for timely processing to the management terminal.

[0011] Preferably, the power control structure construction management module includes a data distribution combing unit and a structure construction management unit; A data distribution combing unit is used to comb the historical operation process data generated by the authority management account to achieve control over the target power grid through the power data management platform, and the time characteristic distribution presented between the historical warning data received by the power data management platform; The structure construction management unit is used to judge and identify the historical warning data reception records and historical operation records that have corresponding connection relationships, and construct and extract the power management and control structure.

[0012] Preferably, the power control structure data management module includes a characteristic operation index evaluation calculation unit and a classification management unit; A characteristic operation index evaluation and calculation unit is used to sort out the characteristic distribution presented by the corresponding historical operation records in each power control structure, and calculate and evaluate the characteristic operation index of each power control structure; The classification management unit is used to classify each power management and control structure according to the quantity distribution presented by the corresponding historical warning data reception records in each power management and control structure.

[0013] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention identifies and extracts the power control structure actually generated by the corresponding authority management account in the power data management platform by sorting out the historical operation process data generated by the authority management account to realize the control of the target power grid based on the power data management platform, and the time characteristic distribution between the historical warning data received by the power data management platform; by calculating and evaluating the characteristic operation index of each power control structure, the control operation impact of the characteristic warning information in the corresponding power control structure on the target power grid is measured, and by sorting out the changes in the characteristic operation index, the power control structure with a delayed processing phenomenon for at least one historical warning data reception record is screened out, and at the same time, the characteristic warning information that may complicate the situation and the corresponding processing process due to the lag in the control adjustment is identified and extracted, so as to realize intelligent early warning prompts for the management terminal for the control of the target power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings: Figure 1 It is a flow chart of a method for constructing a large power data model applied to a low-carbon power grid according to the present invention; Figure 2 It is a structural schematic diagram of a system for building a large power data model for a low-carbon power grid according to the present invention. Detailed implementation manners

[0015] Next, the technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present invention without creative efforts shall fall within the protection scope of the present invention.

[0016] Please refer to Figure 1-Figure 2 , the present invention provides a technical solution: a method for constructing a large power data model applied to a low-carbon power grid, the method including: Step S1: Construct a power data management platform including a number of power control models, establish a remote communication connection between the power data management platform and the target power grid, and remotely receive the early warning data transmitted by the target power grid in real time; the permission management account remotely controls the target power grid through the power data management platform based on the early warning data; Step S2: Regularly extract the historical early warning data reception records from the historical operation logs of the power data management platform and all historical operation records generated by the corresponding permission management account in the power data management platform; Step S3: Sort out the time characteristic distribution between the historical operation process data generated by the permission management account to remotely control the target power grid through the power data management platform and the historical early warning data received by the power data management platform, judge and identify the historical early warning data reception records and historical operation records with corresponding connection relationships, and construct and extract a power control structure; Among them, step S3 includes: Step S3-1: Sort all the historical early warning data reception records in the order of the record generation time, and obtain a reception record sequence; in the reception record sequence, for each adjacent pair of historical early warning data reception records in turn, extract the record generation times T1 and T2, where T1 < T2, and obtain a number of characteristic periods [T1, T2]; Step S3-2: Traverse the record generation times of each historical operation record, respectively gather the historical operation records within each characteristic period, and obtain an operation record set corresponding to each characteristic period; traverse in turn the total number of historical operation records included in the operation record sets in each characteristic period, and set the operation record sets with the total number of historical operation records included greater than or equal to 1 as target operation record sets; number the target operation record sets in order; Step S3-3: when the operation record set corresponding to the characteristic period between the jth historical warning data reception record and the j+1th historical warning data reception record is the target operation record set, it is determined that there is a partition node between the jth historical warning data reception record and the j+1th historical warning data reception record in the reception record sequence; Step S3-4: Identify all the division nodes existing in the received record sequence, divide the received record sequence into a number of target subsequences based on each division node; number the target subsequences in sequence; establish a corresponding connection relationship between the target subsequences with the same corresponding numbers and the target operation record set, and construct and generate a number of power management and control structures {target subsequence, target operation record set}; Step S4: sorting out the characteristic distribution of the corresponding historical operation records in each power control structure, and calculating and evaluating the characteristic operation index of each power control structure; classifying each power control structure according to the quantity distribution of the corresponding historical warning data reception records in each power control structure; Wherein, step S4 comprises: Step S4-1: Extract the target operation record sets in the corresponding power management and control structures respectively, obtain the total number M of historical operation records contained in each target operation record set, capture the total number K of permission management accounts that operate M historical operation records, and capture the highest permission level C among the K permission management accounts. max and minimum clearance level C min , calculate the level span P=|C of the corresponding permission management account in each target operation record set max -C min |, calculate the characteristic operation index β=(M×K) for the target operation record set in each power control structure P , where M≥1, K≥1, P≥0; For example, the total number of historical operation records contained in a certain target operation record set is M=10, and the total number of permission management accounts that have captured the operations of the above 10 historical operation records is K=4; The permission levels of the four permission management accounts are: permission management account 1 is permission level 3, permission management account 2 is permission level 2, permission management account 3 is permission level 3, and permission management account 4 is permission level 1. The higher the permission level value, the greater the specific operation permission of the corresponding permission management account. Among the above four permission management accounts, the highest permission level C max =3 and minimum clearance level C min =1, then the level span of the permission management account is P=3-1=2; if the permission level value is higher, it means that the specific operation authority of the corresponding permission management account is smaller, then among the above 4 permission management accounts, the highest permission level Cmax =1 and minimum clearance level C min =3, then the level span of the permission management account P=3-1=2.

[0017] Step S4-2: Traverse the total number N of historical warning data reception records contained in the corresponding target subsequence in each power control structure; set the power control structure with the corresponding total number N=1 as the first characteristic power control structure, and set the power control structure with the corresponding total number N≥2 as the second characteristic power control structure; Step S5: evaluating and calculating the theoretical characteristic operation index of the corresponding power control structure, and screening out abnormal control structures according to the deviation between the characteristic operation index of the corresponding power control structure and the theoretical characteristic operation index; Wherein, step S5 comprises: Step S5-1: extract the warning data received by the power data management platform in each historical warning data reception record, perform feature extraction on the warning data, and obtain a feature warning information set corresponding to each historical warning data reception record; traverse the feature operation index of the corresponding target operation record set in each power management and control structure and the feature warning information set corresponding to each historical warning data reception record in the corresponding target subsequence; Step S5-2: Assume that in a second characteristic power control structure, the characteristic operation index of the corresponding target operation record set is F, and the corresponding target subsequence is D; collect the characteristic warning information sets extracted from all the first characteristic power control structures to obtain a set W; in the set W, capture the characteristic warning information sets that meet the highest similarity with the characteristic warning information sets corresponding to each historical warning data reception record in the target subsequence D, and identify the first characteristic power control structure corresponding to the characteristic warning information set with the highest similarity; Step S5-3: Assume that the characteristic warning information set d corresponding to the i-th historical warning data reception record in the target subsequence D is captured in the set W i The feature warning information set that meets the highest similarity is g, and the feature warning information set g and the feature warning information set d i The similarity between them is β, and the characteristic operation index of the first characteristic power control structure corresponding to the characteristic warning information set g is Y g , where 0≦β≦1; Step S5-4: Evaluate the characteristic operation value f contributed by the i-th historical warning data reception record in the target subsequence D to a second characteristic power control structure i =β×Y g, accumulate the characteristic operation values ​​contributed by all historical warning data reception records in the target subsequence D to a second characteristic power control structure, and obtain the theoretical characteristic operation index F'. When F'-F>η, the second characteristic power control structure is judged to be an abnormal control structure, where η is the threshold value, and η>0; Step S6: from the abnormal control structure, identify and extract the early warning data that will cause the control to be complicated due to the lag of the control adjustment operation, build and generate a power data processing early warning library, determine whether to receive and record the newly added early warning data based on the power data processing early warning library, and send an early warning prompt for timely processing to the management terminal; Wherein, step S6 comprises: Step S6-1: For each abnormal control structure, the warning data received by the power data management platform in each historical warning data reception record contained in the corresponding target subsequence is collected to obtain a warning data set S; feature extraction is performed on the warning data set S to obtain a feature warning information set R corresponding to each abnormal control structure; Step S6-2: extract the characteristic warning information set corresponding to each historical warning data reception record in the target subsequence. When the characteristic warning information set S corresponding to a certain historical warning data reception record satisfies the following condition with the characteristic warning information set R: SS∩R=U≠∅, extract the characteristic warning information contained in the set U as the target characteristic warning information; Step S6-3: Gather all target feature warning information extracted from each abnormal control structure to build a power data processing warning library; whenever a new warning data reception record is monitored on the power data management platform, and after feature extraction of the newly received warning data in the current power data management platform, capture the feature warning information that exists in the power data processing warning library, and send a warning prompt for timely processing to the management terminal.

[0018] In order to better implement the above method, a power data big model construction system is also proposed, which includes a power data management platform construction module, a historical data management module, a power control structure construction management module, a power control structure data management module, an abnormal control structure screening module, and an early warning prompt management module; The power data management platform construction module is used to build a power data management platform containing several power management and control models, establish a remote communication connection between the power data management platform and the target power grid, remotely receive the early warning data transmitted by the target power grid in real time, and the authority management account realizes remote management and control of the target power grid through the power data management platform based on the early warning data; The historical data management module is used to periodically extract historical warning data reception records and all historical operation records generated by the corresponding authority management account in the power data management platform from the historical operation log of the power data management platform; The power control structure construction management module is used to sort out the historical operation process data generated by the authority management account to achieve control over the target power grid through the power data management platform, and the time characteristic distribution between the historical warning data received by the power data management platform, and to identify the historical warning data reception records and historical operation records with corresponding connection relationships, and to construct and extract the power control structure; Among them, the power control structure construction management module includes a data distribution combing unit and a structure construction management unit; A data distribution combing unit is used to comb the historical operation process data generated by the authority management account to achieve control over the target power grid through the power data management platform, and the time characteristic distribution presented between the historical warning data received by the power data management platform; A structure construction management unit is used to judge and identify the historical warning data reception records and historical operation records that have corresponding connection relationships, and to construct and extract the power control structure; The power control structure data management module is used to sort out the characteristic distribution of the corresponding historical operation records in each power control structure, calculate and evaluate the characteristic operation index of each power control structure; classify each power control structure according to the quantity distribution of the corresponding historical warning data reception records in each power control structure; Among them, the power control structure data management module includes a characteristic operation index evaluation calculation unit and a classification management unit; A characteristic operation index evaluation and calculation unit is used to sort out the characteristic distribution presented by the corresponding historical operation records in each power control structure, and calculate and evaluate the characteristic operation index of each power control structure; A classification management unit, used to classify each power management and control structure according to the quantity distribution presented by the corresponding historical warning data reception records in each power management and control structure; The abnormal control structure screening module is used to evaluate and calculate the theoretical characteristic operation index of the corresponding power control structure, and screen out the abnormal control structure according to the deviation between the characteristic operation index of the corresponding power control structure and the theoretical characteristic operation index; The early warning management module is used to identify and extract early warning data from abnormal control structures that may complicate management due to delayed control adjustment operations, build and generate an electric power data processing early warning library, determine whether to receive records of newly added early warning data based on the electric power data processing early warning library, and send early warning prompts for timely processing to the management terminal.

[0019] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0020] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for constructing a large power data model for a low-carbon power grid, characterized in that: The method includes: Step S1: Construct a power data management platform containing a number of power control models, establish a remote communication connection between the power data management platform and the target power grid, and remotely receive the early warning data transmitted by the target power grid in real time; Based on the early warning data, the permission management account realizes remote control of the target power grid through the power data management platform; Step S2: Regularly extract the historical early warning data reception records from the historical operation logs of the power data management platform and all historical operation records generated by the corresponding permission management account in the power data management platform; Step S3: Sort out the time feature distribution between the historical operation process data generated by the permission management account to control the target power grid through the power data management platform and the historical early warning data received by the power data management platform, judge and identify the historical early warning data reception records and historical operation records with corresponding connection relationships, and construct and extract the power control structure; Step S4: Sort out the feature distribution of the corresponding historical operation records in each power control structure, and calculate and evaluate the characteristic operation index for each power control structure; Classify each power control structure according to the quantity distribution of the corresponding historical early warning data reception records in each power control structure; Step S5: Evaluate and calculate the theoretical characteristic operation index for the corresponding power control structure, and screen out the abnormal control structures according to the deviation between the characteristic operation index and the theoretical characteristic operation index of the corresponding power control structure; Step S6: From the abnormal control structures, identify and extract the early warning data that will cause control complexity due to the lag of control adjustment operations, construct and generate a power data processing early warning library, and judge whether to send an early warning prompt for timely processing to the management terminal based on the power data processing early warning library for the newly added early warning data reception records.

2. The method for constructing a large power data model for a low-carbon power grid according to claim 1, characterized in that: The said Step S3 includes: Step S3-1: Sort all the historical early warning data reception records in the order of the record generation time, and obtain a reception record sequence; In the reception record sequence, for each adjacent pair of historical early warning data reception records in turn, extract the record generation times T1 and T2, where T1 < T2, and obtain a number of characteristic periods [T1, T2]; Step S3-2: Traverse the record generation times of each historical operation record, respectively gather the historical operation records within each characteristic period, and obtain an operation record set corresponding to each characteristic period; Traverse the total number of historical operation records included in the operation record set of each characteristic period in turn, and set the operation record set with the total number of historical operation records included greater than or equal to 1 as the target operation record set; Number each target operation record set in order; Step S3-3: When the operation record set corresponding to the characteristic period between the jth historical early warning data reception record and the (j + 1)th historical early warning data reception record is the target operation record set, judge that there is a division node between the jth historical early warning data reception record and the (j + 1)th historical early warning data reception record in the reception record sequence; Step S3-4: Identify all division nodes existing in the received record sequence, and divide the received record sequence into several target subsequences based on each division node; number the several target subsequences in sequence; establish a corresponding connection relationship between the target subsequences and the target operation record sets with the same corresponding numbers, and construct and generate several power management and control structures {target subsequence, target operation record set}.

3. The method for constructing a large power data model for a low-carbon power grid according to claim 2, characterized in that: The step S4 comprises: Step S4-1: Extract the target operation record sets in the corresponding power management and control structures respectively, obtain the total number M of historical operation records contained in each target operation record set, capture the total number K of permission management accounts that operate M historical operation records, and capture the highest permission level C among the K permission management accounts. max and minimum clearance level C min , calculate the level span P=|C of the corresponding permission management account in each target operation record set max -C min |, calculate the characteristic operation index β=(M×K) for the target operation record set in each power control structure P , where M≥1, K≥1, P≥0; Step S4-2: Traverse the total number N of historical warning data reception records contained in the corresponding target subsequence in each power management and control structure; set the power management and control structure with the corresponding total number N=1 as the first characteristic power management and control structure, and set the power management and control structure with the corresponding total number N≥2 as the second characteristic power management and control structure.

4. The method for constructing a large power data model for a low-carbon power grid according to claim 3 is characterized in that: The step S5 comprises: Step S5-1: extract the warning data received by the power data management platform in each historical warning data reception record, perform feature extraction on the warning data, and obtain a feature warning information set corresponding to each historical warning data reception record; traverse the feature operation index of the corresponding target operation record set in each power management and control structure and the feature warning information set corresponding to each historical warning data reception record in the corresponding target subsequence; Step S5-2: Assume that in a second characteristic power control structure, the characteristic operation index of the corresponding target operation record set is F, and the corresponding target subsequence is D; collect the characteristic warning information sets extracted from all the first characteristic power control structures to obtain a set W; in the set W, capture the characteristic warning information sets that meet the highest similarity with the characteristic warning information sets corresponding to each historical warning data reception record in the target subsequence D, and identify the first characteristic power control structure corresponding to the characteristic warning information set with the highest similarity; Step S5-3: Assume that the characteristic warning information set d corresponding to the i-th historical warning data reception record in the target subsequence D is captured in the set W i The feature warning information set that meets the highest similarity is g, and the feature warning information set g and the feature warning information set d i The similarity between them is β, and the characteristic operation index of the first characteristic power control structure corresponding to the characteristic warning information set g is Y g , where 0≦β≦1; Step S5-4: Evaluate the characteristic operation value f contributed by the i-th historical warning data reception record in the target subsequence D to the second characteristic power control structure i =β×Y g , accumulate the characteristic operation values ​​contributed by all historical warning data reception records in the target subsequence D to the second characteristic power control structure, and obtain the theoretical characteristic operation index F'. When F'-F>η, the second characteristic power control structure is judged to be an abnormal control structure, where η is the threshold value, and η>0.

5. The method for constructing a large power data model for a low-carbon power grid according to claim 4, characterized in that: The step S6 comprises: Step S6-1: For each abnormal control structure, respectively, the warning data received by the power data management platform in each historical warning data reception record contained in the corresponding target subsequence is collected to obtain a warning data set S; feature extraction is performed on the warning data set S to obtain a feature warning information set R corresponding to each abnormal control structure; Step S6-2: extract the characteristic warning information set corresponding to each historical warning data reception record in the target subsequence. When the characteristic warning information set S corresponding to a certain historical warning data reception record satisfies the following condition with the characteristic warning information set R: SS∩R=U≠∅, extract the characteristic warning information contained in the set U as the target characteristic warning information; Step S6-3: Gather all target feature warning information extracted from each abnormal control structure to build a power data processing warning library; whenever a new warning data reception record is monitored on the power data management platform, and after feature extraction of the newly received warning data in the current power data management platform, capture the feature warning information that exists in the power data processing warning library, and send a warning prompt for timely processing to the management terminal.

6. A power data big model construction system, used to execute the power data big model construction method applied to a low-carbon power grid as described in any one of claims 1-5, characterized in that: The system includes a power data management platform construction module, a historical data management module, a power control structure construction management module, a power control structure data management module, an abnormal control structure screening module, and an early warning prompt management module; The power data management platform construction module is used to construct a power data management platform including several power management and control models, establish a remote communication connection between the power data management platform and the target power grid, remotely receive the early warning data transmitted by the target power grid in real time, and the authority management account realizes remote management and control of the target power grid through the power data management platform based on the early warning data; The historical data management module is used to periodically extract historical warning data reception records and all historical operation records generated by the corresponding authority management account in the power data management platform from the historical operation log of the power data management platform; The power control structure construction management module is used to sort out the historical operation process data generated by the authority management account to achieve control over the target power grid through the power data management platform, and the time characteristic distribution presented between the historical warning data received by the power data management platform, judge and identify the historical warning data reception records and historical operation records that have corresponding connection relationships, and construct and extract the power control structure; The power control structure data management module is used to sort out the characteristic distribution of the corresponding historical operation records in each power control structure, and calculate and evaluate the characteristic operation index of each power control structure; Classify each power control structure according to the quantity distribution presented by the corresponding historical warning data reception records in each power control structure; The abnormal control structure screening module is used to evaluate and calculate the theoretical characteristic operation index of the corresponding power control structure, and screen out the abnormal control structure according to the deviation between the characteristic operation index of the corresponding power control structure and the theoretical characteristic operation index; The early warning management module is used to identify and extract early warning data that may complicate management and control due to delayed management and control adjustment operations from the abnormal management and control structure, build and generate an electric power data processing early warning library, determine whether to receive records of newly added early warning data based on the electric power data processing early warning library, and send early warning prompts for timely processing to the management terminal.

7. A power data big model construction system according to claim 6, characterized in that: The power control structure construction management module includes a data distribution combing unit and a structure construction management unit; The data distribution combing unit is used to comb the historical operation process data generated by the authority management account to achieve control over the target power grid through the power data management platform, and the time characteristic distribution presented between the historical warning data received by the power data management platform; The structure construction management unit is used to judge and identify the historical warning data reception records and historical operation records that have corresponding connection relationships, and construct and extract the power management and control structure.

8. A power data big model construction system according to claim 6, characterized in that: The power control structure data management module includes a characteristic operation index evaluation calculation unit and a classification management unit; The characteristic operation index evaluation and calculation unit is used to sort out the characteristic distribution presented by the corresponding historical operation records in each power management and control structure, and calculate and evaluate the characteristic operation index of each power management and control structure; The classification management unit is used to classify each power management and control structure according to the quantity distribution presented by the corresponding historical warning data reception records in each power management and control structure.

Citation Information

Patent Citations

  • Integrated platform system for remote management and control of wind power field cluster

    CN102736593A

  • Smart grid secondary equipment remote control method

    CN107168197A

  • Monitoring and early warning method for power operation and maintenance network security

    CN112766517A

Cited By

  • Model optimization data management system based on interactive feedback field experience and application thereof

    CN119227912A

  • Model optimization data management system based on interactive feedback domain experience and its application

    CN119227912B