Sewage discharge early warning analysis method based on metal processing monitoring

By generating sewage discharge warning rules in the metal processing monitoring system and using anti-rule interference observer to correct monitoring strategies, the problem of insufficient real-time monitoring and early warning capabilities of sewage discharge in the existing technology is solved, and effective sewage discharge in the metal processing process is achieved Early warning and environmental protection.

CN119026820AActive Publication Date: 2024-11-26KUNSHAN STAR CUBE PRECISION MASCH TECH CO LTD

Patent Information

Application Number
CN202411520620.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-29
Publication Date
2024-11-26
Estimated Expiration
2044-10-29

AI Technical Summary

Technical Problem

The existing metal processing monitoring system lacks real-time monitoring and early warning capabilities for sewage discharge, and cannot provide effective early warning information before sewage discharge occurs, making it difficult to control and solve environmental pollution problems in a timely manner.

Method used

Through the sewage discharge warning analysis method based on metal processing monitoring, sewage discharge warning rules are generated and monitoring data is input into the metal processing process model as system variables. The monitoring strategy is corrected using anti-rule interference observers to predict potential conflicts and adjust the strategy to reduce sewage discharge Impact on the environment.

Benefits of technology

Real-time monitoring and early warning of sewage discharge during metal processing has been achieved, the accuracy and timeliness of early warning have been improved, the risk of environmental pollution has been reduced, and the environmental protection and sustainability of the metal processing industry has been promoted.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026820A_ABST
    Figure CN119026820A_ABST
Patent Text Reader

Abstract

The invention provides a sewage discharge early warning analysis method based on metal processing monitoring, and the method comprises the steps: generating early warning rules through monitoring data, and inputting monitoring variables generated by the rules and a communication topology matrix into a metal processing process model. An early warning rule is improved to generate a sewage discharge rule, and monitoring variable change and communication topology generated by the rule are used as a disturbance input model. By judging whether system variables and disturbance cause conflicts or not, correcting a monitoring strategy by using an anti-rule interference observer when the conflicts occur, and feeding back the corrected strategy to a model and an early warning rule, effective early warning and control of sewage discharge in the metal processing process can be realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the fields of environmental monitoring and industrial automation, and more specifically, to a sewage discharge early warning analysis method based on metal processing monitoring. Background Art

[0002] In the metal processing industry, wastewater discharge is an important environmental issue. Traditional metal processing processes are often accompanied by the generation of large amounts of wastewater and pollutants. If these wastewaters are not effectively treated and monitored and directly discharged into the environment, they will cause serious damage to water bodies and ecosystems. Existing metal processing monitoring technologies mainly focus on processing efficiency and product quality, but pay insufficient attention to the problem of wastewater discharge generated during the processing process. Although there are some monitoring systems that can collect and analyze data during the processing process, they usually lack the ability to warn and analyze wastewater discharge, and cannot provide effective warning information before wastewater discharge occurs.

[0003] Existing technologies often rely on post-processing when dealing with wastewater discharge, that is, treating wastewater after it has been generated and discharged, which not only increases treatment costs but also makes it difficult to avoid damage to the environment. In addition, existing monitoring systems have limitations in data collection and analysis, and cannot accurately reflect the wastewater discharge in the metal processing process in real time, resulting in a slow response speed of the early warning system and low accuracy of early warning.

[0004] In the process of implementing the embodiments of the present invention, the inventors found that there are at least the following problems or defects in the prior art: the existing metal processing monitoring system lacks the real-time monitoring and early warning capabilities for sewage discharge, and cannot provide effective early warning information before sewage discharge occurs, resulting in environmental pollution problems that are difficult to control and solve in a timely manner. In addition, the existing monitoring strategies and early warning rules are often too simple and cannot adapt to the complex and changeable metal processing environment. A more intelligent and flexible early warning analysis method is needed to improve the accuracy and timeliness of the early warning. Summary of the invention

[0005] The invention provides a sewage discharge early warning analysis method and device based on metal processing monitoring.

[0006] In a first aspect of the present invention, a wastewater discharge early warning analysis method based on metal processing monitoring is provided, comprising: Generate a sewage discharge warning rule based on monitoring data of the metal processing process, and input a first relative state variable to be monitored in the metal processing process and a first communication topology matrix generated by the sewage discharge warning rule as system variables into a metal processing process model, wherein the sewage discharge warning rule includes a metal processing process monitoring strategy; By improving the sewage discharge warning rule, a sewage discharge rule is generated, and the second relative state change to be monitored in the metal processing process and the second communication topology generated by the sewage discharge rule are input as disturbances into the metal processing process model; Determine whether the system variables and the disturbance in the metal processing process model will cause conflict; and when the conflict occurs, use the anti-rule interference observer to correct the metal processing process monitoring strategy and feed back the corrected metal processing process monitoring strategy to the metal processing process model and the sewage discharge warning rule.

[0007] Furthermore, using the rule-resistant interference observer to correct the metal processing process monitoring strategy further includes: inputting the wastewater discharge output result and the machine decision output result into the rule-resistant interference observer; The rule-resistant disturbance observer simulates the change item of the metal machining process model after receiving the disturbance; and uses the change item to assist in correcting the metal machining process monitoring strategy to offset the influence of the disturbance on the metal machining process model.

[0008] Furthermore, the anti-regular interference observer z is expressed by the following formula:

[0009] in, The metal processing process monitoring strategy for the wastewater discharge warning rule is Metalworking process monitoring strategies for the wastewater discharge regulations, is the time delay between two adjacent sampling times Within the monitoring strategy threshold, for and The error, and is a sign function.

[0010] Furthermore, it further includes: when the conflict is not caused, improving the metal processing process monitoring strategy using the wastewater discharge output result; and feeding back the improved metal processing process monitoring strategy to the metal processing process model and the wastewater discharge warning rule.

[0011] Further, the monitoring strategy threshold is determined by the following formula: :

[0012] in, and are the time of the kth sampling point The time of the k+1th sampling point The monitoring strategy threshold at .

[0013] Further, the monitoring data of the metal processing process is , Where x is the relative state variable , where r is the relative distance in the metal processing process, It is the sight angle. is the relative speed along the line of sight during metal processing, It is the relative speed perpendicular to the line of sight during metal processing; is the communication topology matrix ,in, is the i-th row and j-th column element of the communication topology matrix A; and For monitoring strategy ,in, is the component of the acceleration in the metal processing process along the metal processing line, and It is the component of acceleration in the metal processing process that is perpendicular to the direction of the metal processing line.

[0014] Furthermore, the metal processing process model further includes: a metal processing process dynamics model, a metal processing process kinematics model and a metal processing process communication topology matrix.

[0015] Furthermore, the metal processing process model is , the state variable threshold σF within the time delay Δt between each two adjacent sampling times is limited by the following formula:

[0016] in, is the relative state variable ,in, is the relative distance in the metal processing process, It is the sight angle. is the relative speed along the line of sight during metal processing, It is the relative speed perpendicular to the line of sight during metal processing; is the communication topology matrix ,in, is the communication topology matrix The i-th row, j-th column element of For monitoring strategy ,in, is the component of the acceleration in the metal processing process along the metal processing line, and It is the component of acceleration in the metal processing process that is perpendicular to the direction of the metal processing line.

[0017] In a second aspect of the present invention, a sewage discharge early warning analysis device based on metal processing monitoring is provided, comprising: A consistency protocol module for generating monitoring data for metalworking processes; A machine decision rule and system variable generation module, used to generate a machine decision rule based on a consistency protocol, and use a first relative state variable to be monitored in a metal processing process generated by the machine decision rule and a first communication topology matrix as system variables, wherein the machine decision rule includes a metal processing process monitoring strategy; A sewage discharge rule and disturbance generation module, used for receiving the machine decision rule and generating a sewage discharge rule by improving the machine decision rule, and using the second relative state change and the second communication topology generated by the sewage discharge rule to be monitored in the metal processing process as a disturbance; a metal processing process model module, for receiving the system variables and the disturbance and inputting them into the metal processing process model; A conflict judgment module is used to judge whether the system variables and the disturbance in the metal processing process model will cause a conflict; and an anti-rule interference observer is used to correct the metal processing process monitoring strategy when the conflict occurs and feed back the corrected metal processing process monitoring strategy to the metal processing process model module and the consistency protocol module.

[0018] Further, it includes: a sewage discharge output module and a machine decision output module, wherein the sewage discharge output module is connected to the conflict judgment module and provides the sewage discharge output result to the anti-rule interference observer; The machine decision output module is connected to the conflict judgment module and provides the machine decision output result to the anti-rule interference observer; and the anti-rule interference observer simulates the change item of the metal processing process model after receiving the disturbance, and uses the change item to assist in correcting the metal processing process monitoring strategy to offset the influence of the disturbance on the metal processing process model.

[0019] According to the above-mentioned embodiments of the present invention, at least the following beneficial effects are achieved: the wastewater discharge early warning analysis method based on metal processing monitoring provided by the present invention can effectively monitor the wastewater discharge during the metal processing process and generate early warning rules through real-time data analysis. This method can predict potential conflicts and adjust the monitoring strategy in a timely manner through improved wastewater discharge rules and disturbance inputs, thereby reducing or avoiding the impact of wastewater discharge on the environment. In addition, through the application of anti-rule interference observers, the accuracy and response speed of the monitoring strategy can be further improved to ensure the environmental friendliness and sustainability of the metal processing process.

[0020] In addition, the present invention also provides a sewage discharge early warning analysis device based on metal processing monitoring, which can realize all the functions of the above method, including a consistency protocol module, a machine decision rule and system variable generation module, a sewage discharge rule and disturbance generation module, a metal processing process model module, a conflict judgment module, and an anti-rule interference observer. The application of this device can improve the environmental monitoring capabilities of the metal processing industry, reduce environmental pollution risks, and improve production efficiency and product quality. Through real-time monitoring and early warning, the device helps enterprises achieve a more environmentally friendly and sustainable production method, which meets the current social demand for green manufacturing and clean production. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The above and other objects, features and advantages of the exemplary embodiments of the present invention will become readily understood by reading the detailed description below with reference to the accompanying drawings. In the accompanying drawings, several embodiments of the present invention are shown in an exemplary and non-limiting manner, in which: Figure 1 A schematic flow chart of a wastewater discharge early warning analysis method based on metal processing monitoring provided by an embodiment of the present invention; Figure 2 A schematic diagram of the structure of a sewage discharge early warning and analysis device based on metal processing monitoring provided by an embodiment of the present invention; Figure 3 The schematic diagram schematically shows the structure of an electronic device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0022] The principles and spirit of the present invention will be described below with reference to several exemplary embodiments. It should be understood that these embodiments are provided only to enable those skilled in the art to better understand and implement the present invention, and are not intended to limit the scope of the present invention in any way. On the contrary, these embodiments are provided to make the present invention more thorough and complete, and to fully convey the scope of the present invention to those skilled in the art.

[0023] Those skilled in the art know that the embodiments of the present invention can be implemented as a system, device, apparatus, method or computer program product. Therefore, the present invention can be specifically implemented in the following forms, namely: complete hardware, complete software (including firmware, resident software, microcode, etc.), or a combination of hardware and software.

[0024] It should be noted that any number of elements in the drawings is for illustration rather than limitation, and any naming is only for distinction and does not have any limiting meaning.

[0025] Reference below Figure 1 , Figure 1The following is a flow chart of a wastewater discharge early warning analysis method based on metal processing monitoring provided by an embodiment of the present invention. Figure 1 As shown, a wastewater discharge early warning analysis method 100 based on metal processing monitoring includes: Step 101, generating a sewage discharge warning rule based on monitoring data of a metal processing process, and inputting a first relative state variable to be monitored in the metal processing process generated by the sewage discharge warning rule and a first communication topology matrix as system variables into a metal processing process model, wherein the sewage discharge warning rule includes a metal processing process monitoring strategy; Step 102, improving the sewage discharge warning rule to generate a sewage discharge rule, and inputting the second relative state change to be monitored in the metal processing process and the second communication topology generated by the sewage discharge rule as disturbances into the metal processing process model; Step 103, determining whether the system variables and the disturbance in the metal processing process model will cause a conflict; and when the conflict occurs, using an anti-rule interference observer to correct the metal processing process monitoring strategy and feed back the corrected metal processing process monitoring strategy to the metal processing process model and the wastewater discharge warning rule.

[0026] It should be noted that the wastewater discharge warning rules are first generated based on the monitoring data of the metal processing process. This step is to ensure that risk factors that may lead to wastewater discharge can be discovered in a timely manner during the metal processing process. To this end, the monitoring data will be used to create a set of warning rules that will guide how to monitor the metal processing process and determine which parameters need special attention.

[0027] Specifically, these monitoring data include parameters such as relative distance, line of sight, relative speed, etc. during metal processing, as well as the communication topology matrix, which describes the communication relationship between various parts during the processing. The warning rules will set thresholds based on these parameters, and when the monitored parameter values ​​exceed these thresholds, the system will trigger a warning. For example, if the relative speed exceeds the preset safety range, the system will issue a warning signal.

[0028] Preferably, these early warning rules may also include monitoring of acceleration components during the metal processing process, namely, the component along the direction of the metal processing process line and the component perpendicular to the direction. In this way, the risk of sewage discharge can be predicted more accurately.

[0029] Furthermore, the generation of early warning rules can also combine historical data and machine learning algorithms to improve the accuracy and adaptability of early warnings. In practical applications, the parameter settings in the early warning rules can be adjusted according to the specific metal processing environment and requirements to achieve the best monitoring effect.

[0030] In some embodiments, correcting the metal processing process monitoring strategy using the rule-resistant interference observer further comprises: inputting the wastewater discharge output result and the machine decision output result into the rule-resistant interference observer; The rule-resistant disturbance observer simulates the change item of the metal machining process model after receiving the disturbance; and uses the change item to assist in correcting the metal machining process monitoring strategy to offset the influence of the disturbance on the metal machining process model.

[0031] It should be noted that the implementation of the method involves using a rule-resistant disturbance observer to calibrate the metal processing process monitoring strategy. This step is to be able to adjust the strategy in time to maintain the stability and efficiency of the metal processing process when the monitoring strategy is affected by disturbances. The rule-resistant disturbance observer is an advanced control strategy that can simulate and predict the behavior of the system when it is disturbed and adjust the control strategy accordingly.

[0032] Specifically, the rule-resistant observer takes as input the wastewater discharge output and the machine decision output. These outputs reflect the current state of the metalworking process and potential problems. The observer compares this information with a preset model to determine whether there is a disturbance and the nature of the disturbance. For example, if the wastewater discharge suddenly increases, the observer will identify this change and analyze its impact on the metalworking process.

[0033] Preferably, the implementation of the rule-resistant observer may include setting specific monitoring strategy thresholds. These thresholds may be set based on the specific requirements and historical data of the metalworking process. For example, a wastewater discharge threshold based on historical data may be set, and when the actual discharge exceeds this threshold, the observer will trigger a correction mechanism.

[0034] Furthermore, the correction mechanism of the observer can adopt a variety of algorithms, such as PID control, fuzzy logic control or adaptive control, to adapt to different processing environments and requirements. In the implementation process, it is also possible to consider introducing self-learning capabilities so that the observer can continuously optimize the correction strategy based on new data.

[0035] In some embodiments, the anti-regular interference observer z is expressed by the following formula:

[0036] in, The metal processing process monitoring strategy for the wastewater discharge warning rule is Metalworking process monitoring strategies for the wastewater discharge regulations, is the time delay between two adjacent sampling times Within the monitoring strategy threshold, for and The error, and is a sign function.

[0037] Specifically, the calculation formula of the rule-resistant interference observer involves several key parameters: the metal processing process monitoring strategy of the sewage discharge warning rule, the metal processing process monitoring strategy of the sewage discharge rule, the monitoring strategy threshold and the error.

[0038] More specifically, these parameters jointly determine how the observer simulates the changes in the metalworking process model after receiving disturbances and corrects the monitoring strategy accordingly. For example, the monitoring strategy threshold can be set as a dynamically adjusted parameter, which is adjusted according to the changing trends of real-time monitoring data and historical data.

[0039] Preferably, the calculation formula of the anti-regular interference observer can be further refined. For example, the error calculation can adopt a variety of methods, such as absolute error, square error or weighted error, etc., to meet different monitoring accuracy requirements.

[0040] Furthermore, the choice of symbolic function can also be adjusted according to the actual application scenario to ensure that the observer can accurately simulate and predict the behavior of the system when it is disturbed. In practical applications, it is also possible to consider introducing an adaptive mechanism so that the observer can continuously optimize the parameter settings in its calculation formula based on new data to improve the adaptability and accuracy of the correction strategy.

[0041] In some embodiments, it further includes: when the conflict is not caused, improving the metal processing process monitoring strategy using the wastewater discharge output result; and feeding back the improved metal processing process monitoring strategy to the metal processing process model and the wastewater discharge warning rule.

[0042] It should be noted that the implementation of this method includes using the wastewater discharge output results to improve the metalworking process monitoring strategy when no conflict is caused. This means that when the system variables and disturbance inputs do not cause conflicts, the system will use a feedback mechanism to optimize the monitoring strategy by analyzing the actual output results of the wastewater discharge.

[0043] Specifically, this approach will involve the collection and analysis of wastewater discharge output results, which may include key parameters such as the chemical composition of the wastewater, discharge volume, and discharge frequency.

[0044] More specifically, this data can be used to evaluate the effectiveness of current monitoring strategies and identify areas for improvement. For example, if emissions of a chemical are found to exceed a preset safety threshold, the monitoring strategy may need to be adjusted to more closely monitor the generation and emission of that chemical.

[0045] Preferably, the improved monitoring strategy can include resetting the monitoring parameters, such as adjusting the monitoring frequency, adding new monitoring points, or using more sensitive monitoring equipment. In addition, it is also possible to consider introducing machine learning algorithms to analyze sewage discharge data, so as to automatically adjust the monitoring strategy to make it more intelligent and adaptive.

[0046] Furthermore, historical sewage discharge data can be used to train a prediction model that can predict future discharge trends and adjust monitoring strategies in advance. This approach can not only improve the efficiency of monitoring, but also take preventive measures before potential environmental risks occur.

[0047] In some embodiments, the monitoring strategy threshold σg is determined by the following formula:

[0048] in, and are the time of the kth sampling point The time of the k+1th sampling point The monitoring strategy threshold at .

[0049] It should be noted that the implementation method of this method is to determine the monitoring strategy threshold To optimize the monitoring strategy. The monitoring strategy threshold is a key parameter that defines the range of changes in the monitoring strategy between consecutive sampling points.

[0050] Specifically, the monitoring strategy threshold It is determined by comparing the monitoring strategy values ​​of two consecutive sampling points. For example, if the absolute difference between the monitoring strategy value of the kth sampling point and the monitoring strategy value of the k+1th sampling point does not exceed the preset threshold , then the monitoring strategy can be considered stable between these two sampling points. This comparison can be applied to various monitoring parameters, such as relative distance, line of sight angle, relative speed, etc. during metal processing. The parameter settings can be adjusted according to the actual processing environment and needs to ensure that the monitoring strategy is both sensitive and stable.

[0051] Preferably, the monitoring strategy threshold There are many ways to determine , including statistical analysis, empirical setting, or model-based optimization. For example, it can be determined by analyzing historical data The appropriate range can be determined, or an initial value can be set based on expert experience, and then adjusted based on actual performance.

[0052] Furthermore, we can also consider introducing an adaptive mechanism to make It can dynamically adjust according to real-time data to adapt to changes in the processing process. This dynamic adjustment can be based on machine learning algorithms to optimize the monitoring strategy threshold by continuously learning the dynamic characteristics of the processing process, thereby improving the adaptability and accuracy of the monitoring strategy.

[0053] The monitoring data of the metal processing process is , Where x is the relative state variable ,in, is the relative distance in the metal processing process, It is the sight angle. is the relative speed along the line of sight during metal processing, It is the relative speed perpendicular to the line of sight during metal processing; is the communication topology matrix ,in, is the i-th row and j-th column element of the communication topology matrix A; and For monitoring strategy ,in, is the component of the acceleration in the metal processing process along the metal processing line, and It is the component of acceleration in the metal processing process that is perpendicular to the direction of the metal processing line.

[0054] It should be noted that the implementation of this method involves the use of specific monitoring data to generate wastewater discharge warning rules. These monitoring data include relative state variables and communication topology matrices in the metal processing process, which are the basis for assessing wastewater discharge risks and formulating warning rules.

[0055] Specifically, the monitoring data includes relative distance , sight angle , relative speed along the line of sight and the relative velocity perpendicular to the line of sight These parameters can provide dynamic information on the metalworking process and help identify abnormal conditions that may lead to wastewater discharge.

[0056] More specifically, the communication topology matrix It describes the communication relationship between various parts in the processing process, which is crucial for understanding the dynamic behavior of the entire system and formulating effective early warning rules. Includes the component of acceleration along the metal processing process line and the component perpendicular to that direction ,These parameters help to evaluate the dynamic changes during machining.

[0057] Preferably, the collection and processing of monitoring data can adopt advanced sensor technology and data analysis methods. For example, high-precision laser sensors can be used to measure relative distance and speed, and high-speed cameras can be used to capture changes in line of sight angles. The construction of the communication topology matrix can be based on the actual processing equipment layout and communication protocol.

[0058] Furthermore, the development of monitoring strategies can combine expert knowledge and historical data to ensure the accuracy and practicality of early warning rules. During implementation, it is also possible to consider introducing machine learning algorithms to analyze monitoring data, thereby automatically adjusting early warning rules to make them more intelligent and adaptive. This approach can not only improve the efficiency of monitoring, but also take preventive measures before potential environmental risks occur.

[0059] In some embodiments, the metal machining process model further includes: a metal machining process dynamics model, a metal machining process kinematics model, and a metal machining process communication topology matrix.

[0060] It should be noted that the implementation of this method covers multiple aspects of the metal processing process model, including dynamics model, kinematics model and communication topology matrix. These models together form a comprehensive framework for simulating and analyzing possible wastewater discharge situations in metal processing processes.

[0061] Specifically, the dynamics model of the metal machining process focuses on the conversion of force and energy during the machining process, the kinematic model describes the motion trajectory and speed of the machining parts, and the communication topology matrix defines the way information is exchanged between various components during the machining process.

[0062] More specifically, the parameter settings of these models need to be determined based on the actual processing equipment and process requirements. For example, the dynamic model may need to consider parameters such as cutting force and torque, the kinematic model may need to consider parameters such as speed and acceleration, and the communication topology matrix needs to be constructed based on the actual network layout and communication protocol.

[0063] Preferably, the implementation of these models can adopt advanced simulation technology and real-time data processing methods. For example, computer-aided engineering CAE software can be used to build and simulate dynamics and kinematics models, while real-time data acquisition systems can be used to monitor actual parameters during the processing.

[0064] Furthermore, the construction of the communication topology matrix can be based on modern industrial Internet of Things (IIoT) technology to achieve efficient data exchange and processing. During the implementation process, it is also possible to consider introducing an adaptive control strategy so that the model can be dynamically adjusted according to real-time data to adapt to changes in the processing process. This approach can not only improve the accuracy of monitoring, but also take preventive measures before potential environmental risks occur.

[0065] In some embodiments, the metal machining process model is , the state variable threshold within the delay Δt between each two adjacent sampling times is limited by the following formula :

[0066] in, is the relative state variable ,in, is the relative distance in the metal processing process, It is the sight angle. is the relative speed along the line of sight during metal processing, It is the relative speed perpendicular to the line of sight during metal processing; is the communication topology matrix ,in, is the communication topology matrix The i-th row, j-th column element of For monitoring strategy ,in, is the component of the acceleration in the metal processing process along the metal processing line, and It is the component of acceleration in the metal processing process that is perpendicular to the direction of the metal processing line.

[0067] It should be noted that the implementation method of this method is to limit the state variable threshold within the time delay Δt between each two adjacent sampling times. To ensure the stability of the metal processing process and the accuracy of early warning analysis. This method uses state variable thresholds to monitor and evaluate changes in the metal processing process, thereby promptly identifying risks that may lead to wastewater discharge.

[0068] Specifically, the state variable threshold Is based on the relative distance during metal processing , sight angle , relative speed along the line of sight and the relative velocity perpendicular to the line of sight These parameters together describe the dynamic state of the metal processing process, and the state variable threshold This defines the acceptable range of variation of these parameters between consecutive sampling points. For example, if the relative speed If the change between two consecutive samples exceeds the preset threshold, the system will consider there to be a potential risk and may trigger an early warning mechanism.

[0069] Preferably, the state variable threshold There are many ways to set the threshold, including historical data analysis based on statistical analysis, expert experience, or machine learning algorithms. For example, the normal fluctuation range of each parameter can be determined by analyzing historical data, and the threshold can be set accordingly.

[0070] Furthermore, it is also possible to consider introducing a real-time feedback mechanism so that the threshold can be dynamically adjusted according to the current processing conditions and environmental changes. For example, if the temperature or humidity of the processing environment is monitored to have significant changes, the system can automatically adjust the threshold to adapt to these changes, thereby improving the adaptability and accuracy of the early warning system. This approach can not only improve the real-time nature of monitoring, but also take preventive measures before potential environmental risks occur.

[0071] The above-mentioned embodiments of the present invention have the following beneficial effects: The sewage discharge early warning analysis method based on metal processing monitoring of the present invention can provide a comprehensive monitoring and early warning mechanism to monitor and analyze the sewage discharge in the metal processing process in real time. This method can effectively predict and analyze the possibility of sewage discharge by generating sewage discharge early warning rules and inputting the monitoring data as system variables into the metal processing process model. In addition, by improving the sewage discharge early warning rules, generating sewage discharge rules, and using the relative state changes and communication topologies generated by these rules as disturbance input models, the accuracy and adaptability of the early warning system can be further enhanced. This method also includes judging whether the system variables and disturbances will cause conflicts, and using the anti-rule interference observer to correct the monitoring strategy when a conflict occurs, so as to ensure the stability and environmental protection of the metal processing process.

[0072] This method can monitor and warn wastewater discharge in the metal processing process in real time, thereby reducing environmental pollution. It can simulate the changes in the metal processing process model after receiving the disturbance, and use these changes to assist in correcting the monitoring strategy to offset the impact of the disturbance on the model. This can not only improve the effectiveness of the monitoring strategy, but also reduce the environmental risks caused by wastewater discharge. In addition, the method also includes using the output results of wastewater discharge to improve the monitoring strategy when there is no conflict, and feeding the improved strategy back to the model and warning rules, so that the monitoring strategy can be continuously optimized and the accuracy and practicality of the warning analysis can be improved.

[0073] like Figure 2 As shown, in some embodiments, a wastewater discharge early warning analysis device 200 based on metal processing monitoring includes: A consistency protocol module 201, for generating monitoring data of a metal processing process; A machine decision rule and system variable generation module 202 is used to generate a machine decision rule based on a consistency protocol, and use a first relative state variable to be monitored in a metal processing process generated by the machine decision rule and a first communication topology matrix as system variables, wherein the machine decision rule includes a metal processing process monitoring strategy; A sewage discharge rule and disturbance generation module 203 is used to receive the machine decision rule and generate a sewage discharge rule by improving the machine decision rule, and use the second relative state change and the second communication topology generated by the sewage discharge rule to be monitored in the metal processing process as a disturbance; A metal processing process model module 204, for receiving the system variables and the disturbance and inputting them into the metal processing process model; The conflict judgment module 205 is used to judge whether the system variables and the disturbance in the metal processing process model will cause a conflict; and the anti-rule interference observer is used to correct the metal processing process monitoring strategy when the conflict occurs and feed back the corrected metal processing process monitoring strategy to the metal processing process model module and the consistency protocol module.

[0074] It can be understood that the modules recorded in the wastewater discharge early warning analysis device 200 based on metal processing monitoring are similar to those in the reference Figure 1 The steps in the wastewater discharge early warning analysis method based on metal processing monitoring described above correspond to each other. Therefore, the operations, features and beneficial effects described above for the wastewater discharge early warning analysis method based on metal processing monitoring are also applicable to the wastewater discharge early warning analysis device 200 based on metal processing monitoring and the modules contained therein, and will not be repeated here.

[0075] In some embodiments, it further comprises: a sewage discharge output module and a machine decision output module, wherein the sewage discharge output module is connected to the conflict judgment module and provides the sewage discharge output result to the anti-rule interference observer; The machine decision output module is connected to the conflict judgment module and provides the machine decision output result to the anti-rule interference observer; and the anti-rule interference observer simulates the change item of the metal processing process model after receiving the disturbance, and uses the change item to assist in correcting the metal processing process monitoring strategy to offset the influence of the disturbance on the metal processing process model.

[0076] It should be noted that the implementation of this device includes multiple modules that work together to achieve early warning analysis of wastewater discharge during metal processing. Specifically, the consistency protocol module is responsible for generating monitoring data, the machine decision rule and system variable generation module generates machine decision rules based on these data, and the wastewater discharge rule and disturbance generation module improves these rules to generate wastewater discharge rules.

[0077] Specifically, the consistency protocol module can be a network-based communication protocol to ensure the accuracy and real-time nature of the data. The machine decision rule and system variable generation module will use this data to generate an initial monitoring strategy, including which parameters to monitor and how to monitor.

[0078] More specifically, the wastewater discharge rule and disturbance generation modules further analyze these strategies, generate more sophisticated wastewater discharge rules, and identify possible disturbance factors. The parameter settings of these modules need to be adjusted according to the actual metal processing process to ensure that they can effectively monitor and warn of wastewater discharge.

[0079] Preferably, the embodiment of the device may further include a sewage discharge output module and a machine decision output module, which are connected to the conflict judgment module and provide necessary output results to the anti-rule interference observer. These modules may use advanced data processing algorithms to ensure the accuracy of the output results. For example, data fusion technology may be used to integrate data from multiple sensors, or pattern recognition algorithms may be used to identify potential sewage discharge patterns.

[0080] Furthermore, the anti-regular disturbance observer can adopt advanced control algorithms, such as adaptive control or robust control, to improve the system's resistance to disturbances. In practical applications, it is also possible to consider introducing artificial intelligence technologies, such as deep learning, to further improve the early warning capability and adaptability of the device. This approach can not only improve the accuracy of monitoring, but also take preventive measures before potential environmental risks occur.

[0081] Reference below Figure 3 , which shows a schematic diagram of the structure of an electronic device 300 suitable for implementing some embodiments of the present invention. The electronic devices in some embodiments of the present invention may include but are not limited to mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Figure 3 The terminal device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.

[0082] like Figure 3 As shown, the electronic device 300 may include a processing device (e.g., a central processing unit, a graphics processing unit, etc.) 301, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 302 or a program loaded from a storage device 308 to a random access memory (RAM) 303. In the RAM 303, various programs and data required for the operation of the electronic device 300 are also stored. The processing device 301, the ROM 302, and the RAM 303 are connected to each other via a bus 304. An input / output (I / O) interface 305 is also connected to the bus 304.

[0083] Typically, the following devices may be connected to the I / O interface 305: an input device 306 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; an output device 307 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; a storage device 308 including, for example, a magnetic tape, a hard disk, etc.; and a communication device 309. The communication device 309 may allow the electronic device 300 to communicate with other devices wirelessly or by wire to exchange data. Figure 3 The electronic device 300 is shown with various devices, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead. Figure 3 Each block shown in the figure may represent one device, or may represent multiple devices as required.

[0084] Furthermore, the storage medium of the embodiment of the present application stores program instructions that can implement all the above methods, wherein the program instructions can be stored in the above storage medium in the form of a software product, including several instructions for enabling a computer device (which can be a personal computer, server, or network device, etc.) or a processor to execute all or part of the steps of the methods described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, or terminal devices such as a computer, a server, a mobile phone, and a tablet.

[0085] The above descriptions are only some preferred embodiments of the present invention and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the embodiments of the present invention is not limited to the technical solutions formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above inventive concept. For example, the above features are replaced with (but not limited to) technical features with similar functions disclosed in the embodiments of the present invention.

Claims

1. A wastewater discharge early warning analysis method based on metal processing monitoring, characterized in that: include: Generate a sewage discharge warning rule based on monitoring data of the metal processing process, and input a first relative state variable to be monitored in the metal processing process and a first communication topology matrix generated by the sewage discharge warning rule as system variables into a metal processing process model, wherein the sewage discharge warning rule includes a metal processing process monitoring strategy; By improving the sewage discharge warning rule, a sewage discharge rule is generated, and the second relative state change to be monitored in the metal processing process and the second communication topology generated by the sewage discharge rule are input as disturbances into the metal processing process model; Determine whether the system variables and the disturbance in the metal processing process model will cause conflict; and when the conflict occurs, use the anti-rule interference observer to correct the metal processing process monitoring strategy and feed back the corrected metal processing process monitoring strategy to the metal processing process model and the sewage discharge warning rule.

2. The wastewater discharge early warning analysis method based on metal processing monitoring according to claim 1 is characterized in that: Correcting the metal processing process monitoring strategy using the rule-resistant interference observer further includes: inputting the wastewater discharge output result and the machine decision output result into the rule-resistant interference observer; The rule-resistant disturbance observer simulates the change item of the metal machining process model after receiving the disturbance; and uses the change item to assist in correcting the metal machining process monitoring strategy to offset the influence of the disturbance on the metal machining process model.

3. The wastewater discharge early warning analysis method based on metal processing monitoring according to claim 2 is characterized in that: The anti-regular disturbance observer z is expressed by the following formula: in, The metal processing process monitoring strategy for the wastewater discharge warning rule is is the time delay between two adjacent sampling times Within the monitoring strategy threshold, for and The error, Metalworking process monitoring strategies for the wastewater discharge regulations, and is a sign function.

4. The wastewater discharge early warning analysis method based on metal processing monitoring according to claim 1 is characterized in that: Further including: When said conflicts are not caused, improving metalworking process monitoring strategies using wastewater discharge output results; And feeding back the improved metal processing process monitoring strategy to the metal processing process model and the wastewater discharge early warning rules.

5. The wastewater discharge early warning analysis method based on metal processing monitoring according to claim 3 is characterized in that: The monitoring strategy threshold σg is determined by the following formula: in, and are the time of the kth sampling point The time of the k+1th sampling point The monitoring strategy threshold at .

6. The wastewater discharge early warning analysis method based on metal processing monitoring according to claim 1 is characterized in that: The monitoring data of the metal processing process is , Where x is the relative state variable , where r is the relative distance in the metal processing process, It is the sight angle. is the relative speed along the line of sight during metal processing, It is the relative speed perpendicular to the line of sight during metal processing; is the communication topology matrix ,in, is the i-th row and j-th column element of the communication topology matrix A; and For monitoring strategy ,in, is the component of the acceleration in the metal processing process along the metal processing line, and It is the component of acceleration in the metal processing process that is perpendicular to the direction of the metal processing line.

7. The wastewater discharge early warning analysis method based on metal processing monitoring according to claim 1 is characterized in that: The metal processing process model further includes: a metal processing process dynamics model, a metal processing process kinematics model and a metal processing process communication topology matrix.

8. The wastewater discharge early warning analysis method based on metal processing monitoring according to claim 2 is characterized in that: The metal processing process model is , the state variable threshold within the delay Δt between each two adjacent sampling times is limited by the following formula : in, is the relative state variable ,in, is the relative distance in the metal processing process, It is the sight angle. is the relative speed along the line of sight during metal processing, It is the relative speed perpendicular to the line of sight during metal processing; is the communication topology matrix ,in, is the communication topology matrix The i-th row, j-th column element of For monitoring strategy ,in, is the component of the acceleration in the metal processing process along the metal processing line, and It is the component of acceleration in the metal processing process that is perpendicular to the direction of the metal processing line.

9. A sewage discharge early warning analysis device based on metal processing monitoring, characterized in that: include: A consistency protocol module for generating monitoring data for metalworking processes; A machine decision rule and system variable generation module, used to generate a machine decision rule based on a consistency protocol, and use a first relative state variable to be monitored in a metal processing process generated by the machine decision rule and a first communication topology matrix as system variables, wherein the machine decision rule includes a metal processing process monitoring strategy; A sewage discharge rule and disturbance generation module, used for receiving the machine decision rule and generating a sewage discharge rule by improving the machine decision rule, and using the second relative state change and the second communication topology generated by the sewage discharge rule to be monitored in the metal processing process as a disturbance; a metal processing process model module, for receiving the system variables and the disturbance and inputting them into the metal processing process model; A conflict judgment module is used to judge whether the system variables and the disturbance in the metal processing process model will cause a conflict; and an anti-rule interference observer is used to correct the metal processing process monitoring strategy when the conflict occurs and feed back the corrected metal processing process monitoring strategy to the metal processing process model module and the consistency protocol module.

10. The sewage discharge early warning and analysis device based on metal processing monitoring according to claim 9 is characterized in that: Further comprising: a sewage discharge output module and a machine decision output module, wherein the sewage discharge output module is connected to the conflict judgment module and provides a sewage discharge output result to the anti-rule interference observer; The machine decision output module is connected to the conflict judgment module and provides the machine decision output result to the anti-rule interference observer; and the anti-rule interference observer simulates the change item of the metal processing process model after receiving the disturbance, and uses the change item to assist in correcting the metal processing process monitoring strategy to offset the influence of the disturbance on the metal processing process model.

Citation Information

Patent Citations

  • Treatment method for metal processing wastewater

    CN109502798A

  • Sewage monitoring data intelligent processing method and system

    CN118761326A

Cited By

  • Edge computing gateway device for multi-mode energy carbon emission comprehensive monitoring

    CN120281607A

  • Edge computing gateway device for comprehensive monitoring of multimodal energy and carbon emissions

    CN120281607B