Self-adaptive optimization scheduling system and method based on artificial intelligence
By using an AI-based adaptive optimization scheduling system to analyze production data and optimize the equipment set on the production line, the problems of substandard quality control and slow production speed in the production of machinery have been solved. This has enabled efficient allocation of production line equipment and risk assessment, thereby improving production efficiency and stability.
Patent Information
- Application Number
- CN202411046649.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-26
AI Technical Summary
In the process of manufacturing medical devices, there are problems such as substandard quality control and slow production speed, which lead to production delays and make it impossible to effectively schedule the production line.
An AI-based adaptive optimization scheduling system is adopted to optimize the allocation and adjustment of production line equipment by analyzing historical production data. Combined with production qualification rate and production rate, it achieves reasonable production line equipment allocation and risk assessment.
It improved the efficiency of machinery production, avoided production anomalies, ensured the rationality of production line equipment adjustments, and improved the stability and efficiency of the production line.
Smart Images

Figure CN119026839A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of production scheduling, and in particular to an artificial intelligence-based adaptive optimization scheduling system and method. Background Art
[0002] Device production refers to the process of designing, processing, assembling and testing various devices and equipment in industry and manufacturing; this process covers the entire process from the selection of raw materials to the completion of the final product, involving multiple links and processes.
[0003] In the production process of medical devices, the quality of the medical devices is of vital importance. There are multiple links on a production line to confirm the quality of the medical devices. However, in the actual production process, there will be problems such as unqualified quality control and various defects in the production process, which will affect the quality of the product. At the same time, there will also be problems such as slow production speed in the production process, leading to production delays. These are all caused by the inability to reasonably schedule the production line of the medical devices. Summary of the invention
[0004] The purpose of the present invention is to provide an adaptive optimization scheduling system and method based on artificial intelligence to solve the problems raised in the above background technology.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: an adaptive optimization scheduling method based on artificial intelligence, the scheduling method comprises the following steps:
[0006] Step S100: Obtain the historical equipment production log of any equipment in the production data management platform, extract the production records in the historical equipment production log, and determine the production line equipment set corresponding to the historical equipment production log; analyze the equipment production data stored in each production record to obtain the comprehensive production qualification rate of the historical equipment production log and the production rate of each production record; the production data management platform stores the data generated in the process of producing equipment, and a production record is the data generated in one link of the production process, that is, a production record corresponds to one link, and an equipment production log is a complete process of producing an equipment once;
[0007] Step S200: obtaining the target device currently in demand, and generating a device production log of the target device on the production data management platform; determining a number of production line equipment sets presented by the target device in each historical device production log, and allocating production line equipment sets to the target device according to the production conditions of the number of production line equipment sets in the historical device production log;
[0008] Step S300: if a new production record is added to a certain device production log, a new device production log is generated on the production data management platform, the production status of each production line equipment between the certain device production log and the new device production log is analyzed; the adjustment status of the production line equipment between the two device production logs is analyzed, and the production line equipment sets of the two device production logs are reallocated;
[0009] Capture S400: When several production line equipment in the production line equipment set of the certain device production log are allocated to the new device production log, the production situation of the several production line equipment after reallocation and adjustment is analyzed; the comprehensive production qualification rate of the new device production log is calculated, and the risk assessment of the new device production log is performed.
[0010] Furthermore, step S100 includes the following steps:
[0011] Step S101: selecting a certain historical equipment production log of the i-th equipment on the production data management platform, extracting the production line equipment information contained in each production record in the certain historical equipment production log, and obtaining the production line equipment set of the certain historical equipment production log, wherein the production line equipment set corresponds to a production line of the i-th equipment;
[0012] Step S102: Obtain the production qualification rate H of the kth production record in the historical equipment production log k , according to the formula: Wherein, a is the number of production records in the production log of a certain historical device; the comprehensive production qualification rate P of the production log of a certain historical device is calculated;
[0013] Step S103: Set the equipment corresponding to the k-th production record as the k-th production line equipment, sort all the historical equipment production logs on the production data management platform according to the generation time, obtain the production line equipment set of the previous historical equipment production log of the said historical equipment production log, if the production line equipment set contains the k-th production line equipment, obtain the production qualification rate H of the corresponding production record of the k-th production line equipment in the previous historical equipment production log k ′, the production loss caused by the continuous use of the k-th production line equipment in two consecutively generated equipment production logs is calculated to be When a piece of production equipment is used by multiple production lines for many consecutive times during the production process, it will lead to overuse of the production equipment without relief, which will affect the production qualification rate of the production equipment during production; analyzing the production loss will help to make the subsequent calculation of the actual production qualification rate more accurate;
[0014] Step S104: Obtain the interval between any two adjacent records in the historical equipment production log, and set the interval between the k-1th production record and the kth production record to Δt k-1,k , get the number of devices produced stored in the k-th production record as n k , the production rate of the kth production record is v k =n k / Δt k-1,k ; Calculating the production rate is helpful in providing reference data for subsequent analysis processes.
[0015] Further, step S200 includes the following steps:
[0016] Step S201: Set the target device of the current demand as the i-th device, generate a new device production log of the i-th device on the production data management platform; obtain the production line equipment information contained in each historical device production log of the i-th device, and obtain several production line equipment sets; use the several production line equipment sets as several production lines to be allocated for the new device production log;
[0017] Step S202: arbitrarily select the k-th type of production line equipment in the j-th production line equipment set, extract x historical equipment production logs that are generated continuously and have the shortest time interval from the current moment from the production data management platform, and count the number of times the k-th type of equipment is used in the x historical equipment production logs.
[0018] Step S203: Obtain the j-th production line equipment set in the corresponding historical equipment production log, and the production qualification rate of the k-th production record is H k ; According to the formula:
[0019]
[0020] in, is the comprehensive production qualification rate of the jth production line equipment set in the historical equipment production log of the i-th type of equipment, a is the number of production records in the historical equipment production log using the jth production line equipment set, θ k is the production loss caused by the continuous use of the k-th production line equipment in two consecutively generated equipment production logs; the actual comprehensive production qualification rate of the current new equipment production log is calculated
[0021] Step S204: Obtain the j-th production line equipment set in the corresponding historical equipment production log, and the production rate of the k-th production record is v k ; According to the formula: Get the comprehensive production rate of the i-th type of equipment produced by the j-th production line equipment set Set the target production quantity of the current demand for the i-th type of device to be (S now ) i , the expected production time of the current j-th production line equipment set to produce the i-th type of device is calculated to be
[0022] Step S205: Obtain the actual comprehensive production qualification rate and expected production time of each production line equipment set of the i-th type of equipment according to the formula: Calculate the selection priority value of the i-th category device for the j-th production line equipment set; assign the production line equipment set with the largest selection priority value to the current i-th category device;
[0023] By analyzing the actual comprehensive production qualification rate and expected production time of each production line equipment set, the production situation of each production line equipment set can be determined, and the most efficient production line selection can be given for the device production process.
[0024] Further, step S300 includes the following steps:
[0025] Step S301: If a new production record is added to the equipment production log of the current i-th category equipment, a new equipment production log is generated on the production data management platform; the target equipment of the new equipment production log is set to be the i′th category equipment, and several production line equipment sets recorded in the historical equipment production log of the i′th category equipment are obtained; the current i-th category equipment is set to select the j-th production line equipment set for production, and the production line equipment of the j-th production line equipment set is compared with the several production line equipment sets of the i′th category equipment; among the several production line equipment sets of the i′th category equipment, the j′th production line equipment set and the j-th production line equipment set contain the same production line equipment, and a common production line equipment set of the j′th production line equipment set and the j-th production line equipment set is generated; the same production line equipment between the two production line equipment sets is analyzed, which can be beneficial to the allocation selection when the production line equipment is subsequently reallocated;
[0026] Step S302: Obtain the production line equipment information contained in each production record in the equipment production log of the current i-th type of equipment, compare the production line equipment with the j-th production line equipment set, and obtain a number of remaining production line equipment that are not in production; sort the corresponding identical production line equipment in the public production line equipment set according to the order of use of the remaining production line equipment in the j-th production line equipment set;
[0027] Step S303: Obtain the generation time of the equipment production log of the current i-th type of equipment Assume that the expected production time of the i-th type of device produced by the j-th production line equipment set is Get the remaining production time of the current i-th type of equipment The expected production time of the i′th type of device using the j′th production line equipment set is obtained as When the first public production line equipment in the public production line equipment set is removed from the j-th production line equipment set, according to the formula:
[0028]
[0029] Among them, (S now ) i is the target production quantity for class i devices currently in demand, is the comprehensive production rate of the i-th type of device produced by the j-th production line equipment set, u is an integer, and u∈(1,b), b is the number of equipment in the j-th production line equipment set, starting from the removed common production line equipment to the last production line equipment in the j-th production line equipment set, v u is the production rate of the uth device from the removed common production line device to the last production line device in the jth production line device set; the estimated waiting time of the i-th type of device is obtained like All production line equipment in the public production line equipment set are assigned to the j′th production line equipment set of the i′th category of equipment;
[0030] Analyze the impact of the reallocated production line equipment on the original production line after it is removed from the original production line, and its usage in the new production line. Analyze the production time required for the two production line sets due to the changes in production line equipment, determine the final allocation of production line equipment, and reasonably allocate production lines for various types of equipment to achieve the most efficient production of various types of equipment.
[0031] Furthermore, step S400 includes the following steps:
[0032] Step S401: If several production line devices in the jth production line device set of the current i-th category equipment are allocated to the j′th production line device set of the i′th category equipment, the number of production line devices in the j′th production line device set is obtained as u j′ ;
[0033] Step S402: Obtain the production loss θ caused by the continuous use of the k-th production line equipment in two consecutively generated equipment production logs k , the actual production loss of the k-th type of production line equipment in the j′th production line equipment set is H′ k =Hk ×(1-θ k ); According to the formula:
[0034]
[0035] Among them, IF() is a judgment function. When H k =H′ k When IF(H k =H′ ′ )=1, otherwise, IF(H k =H′ k )=0; when H k ≠H′ k When IF(H k ≠H′ k )=1, otherwise, IF(H k ≠H′ k )=0; the actual comprehensive production qualification rate of the current i′th type of equipment produced by the j′th production line equipment set is calculated as Set the production qualification rate threshold τ, if Then a risk warning will be issued for the device production log of the current Class i′ device.
[0036] In order to better implement the above method, an adaptive optimization scheduling system based on artificial intelligence is also proposed. The scheduling system includes a production line data analysis module, a demand analysis module, a demand addition analysis module and a production evaluation module;
[0037] The production line data analysis module is used to obtain the historical equipment production log of any equipment in the production data management platform, extract the production records in the historical equipment production log, and determine the production line equipment set corresponding to the historical equipment production log; analyze the equipment production data stored in each production record to obtain the comprehensive production qualification rate of the historical equipment production log and the production rate of each production record;
[0038] The demand analysis module is used to obtain the target device of the current demand and generate the device production log of the target device on the production data management platform; determine the several production line equipment sets presented by the target device in each historical device production log, and allocate the production line equipment sets to the target device according to the production conditions of the several production line equipment sets in the historical device production log;
[0039] The demand addition analysis module is used to generate a new equipment production log on the production data management platform when a new production record is added to a certain equipment production log, analyze the production status of each production line equipment between the certain equipment production log and the new equipment production log; analyze the adjustment status of the production line equipment between the two equipment production logs, and reallocate the production line equipment sets of the two equipment production logs;
[0040] The production assessment module is used to analyze the production situation after the reallocation and adjustment of several production line equipment in the production line equipment set of the certain device production log when the several production line equipment in the production line equipment set of the certain device production log is allocated to the new device production log; calculate the comprehensive production qualification rate of the new device production log, and perform risk assessment on the new device production log.
[0041] Further, the production line data analysis module includes a production line equipment extraction unit and a production data calculation unit;
[0042] The production line equipment extraction unit is used to obtain the historical equipment production log of any equipment in the production data management platform, extract the production records in the historical equipment production log, and determine the production line equipment set corresponding to the historical equipment production log; the production data calculation unit is used to analyze the equipment production data stored in each production record to obtain the comprehensive production qualification rate of the historical equipment production log and the production rate of each production record.
[0043] Further, the demand analysis module includes a production situation analysis unit and a production line equipment allocation unit;
[0044] The production situation analysis unit is used to generate a new equipment production log on the production data management platform when a new production record is added to a certain equipment production log, and analyze the production situation of each production line equipment between the certain equipment production log and the new equipment production log; the production line equipment allocation unit is used to analyze the adjustment of the production line equipment between the two equipment production logs and reallocate the production line equipment sets of the two equipment production logs.
[0045] Further, the demand addition analysis module includes a new demand analysis unit and a production line equipment adjustment unit;
[0046] A new demand analysis unit is used to generate a new equipment production log on the production data management platform when a new production record is added to a certain equipment production log, and analyze the production status of each production line equipment between the certain equipment production log and the new equipment production log; a production line equipment adjustment unit is used to analyze the adjustment status of the production line equipment between two equipment production logs and reallocate the production line equipment sets of the two equipment production logs.
[0047] Further, the production assessment module includes an adjustment data analysis unit and a risk assessment unit;
[0048] An adjustment data analysis unit is used to analyze the production situation of several production line equipment after reallocation and adjustment when several production line equipment in the production line equipment set of the certain device production log is allocated to the new device production log; a risk assessment unit is used to calculate the comprehensive production qualification rate of the new device production log and perform risk assessment on the new device production log.
[0049] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: (1) The present invention ensures that the production of equipment can be carried out in a more efficient manner by reasonably allocating and adjusting the production line in the equipment production process, thereby improving the efficiency of equipment production and saving a lot of time; (2) The present invention can scientifically analyze the adjusted production line and the changes in production after the adjustment, and can promptly discover possible abnormalities to avoid abnormalities in the production line that lead to stagnation of the production process and affect efficiency; (3) In the process of adjusting the production line equipment, the present invention takes into account the different roles of the production line equipment in different production lines, which will cause a certain impact on the qualified rate of the product; the present invention further avoids this situation, making the adjustment of the production line equipment more reasonable. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0051] Figure 1 It is a schematic diagram of the steps of an adaptive optimization scheduling method based on artificial intelligence;
[0052] Figure 2 It is a structural diagram of an adaptive optimization scheduling system based on artificial intelligence. DETAILED DESCRIPTION
[0053] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0054] See also Figure 1 to Figure 2 The present invention provides a technical solution: an adaptive optimization scheduling method based on artificial intelligence, the scheduling method comprises the following steps:
[0055] Step S100: Obtain the historical equipment production log of any equipment in the production data management platform, extract the production records in the historical equipment production log, and determine the production line equipment set corresponding to the historical equipment production log; analyze the equipment production data stored in each production record to obtain the comprehensive production qualification rate of the historical equipment production log and the production rate of each production record;
[0056] Wherein, step S100 includes the following steps:
[0057] Step S101: selecting a certain historical equipment production log of the i-th equipment on the production data management platform, extracting the production line equipment information contained in each production record in the certain historical equipment production log, and obtaining the production line equipment set of the certain historical equipment production log, wherein the production line equipment set corresponds to a production line of the i-th equipment;
[0058] Step S102: Obtain the production qualification rate H of the kth production record in the historical equipment production log k , according to the formula: Wherein, a is the number of production records in the production log of a certain historical device; the comprehensive production qualification rate P of the production log of a certain historical device is calculated;
[0059] Step S103: Set the equipment corresponding to the k-th production record as the k-th production line equipment, sort all the historical equipment production logs on the production data management platform according to the generation time, obtain the production line equipment set of the previous historical equipment production log of the said historical equipment production log, if the production line equipment set contains the k-th production line equipment, obtain the production qualification rate H of the corresponding production record of the k-th production line equipment in the previous historical equipment production log k ′, the production loss caused by the continuous use of the k-th production line equipment in two consecutively generated equipment production logs is calculated to be
[0060] Step S104: Obtain the interval between any two adjacent records in the historical equipment production log, and set the interval between the k-1th production record and the kth production record to Δt k-1,k , get the number of devices produced stored in the k-th production record as n k , the production rate of the kth production record is v k =n k / Δt k-1,k ; A production record corresponds to a link, so the production rate of a production record is also the production rate of the corresponding production line equipment in a link.
[0061] Step S200: obtaining the target device currently in demand, and generating a device production log of the target device on the production data management platform; determining a number of production line equipment sets presented by the target device in each historical device production log, and allocating production line equipment sets to the target device according to the production conditions of the number of production line equipment sets in the historical device production log;
[0062] Wherein, step S200 includes the following steps:
[0063] Step S201: Set the target device of the current demand as the i-th device, generate a new device production log of the i-th device on the production data management platform; obtain the production line equipment information contained in each historical device production log of the i-th device, and obtain several production line equipment sets; use the several production line equipment sets as several production lines to be allocated for the new device production log;
[0064] Step S202: arbitrarily select the k-th type of production line equipment in the j-th production line equipment set, extract x historical equipment production logs that are generated continuously and have the shortest time interval from the current moment from the production data management platform, and count the number of times the k-th type of equipment is used in the x historical equipment production logs.
[0065] Step S203: Obtain the j-th production line equipment set in the corresponding historical equipment production log, and the production qualification rate of the k-th production record is H k ; According to the formula:
[0066]
[0067] in, is the comprehensive production qualification rate of the jth production line equipment set in the historical equipment production log of the i-th type of equipment, a is the number of production records in the historical equipment production log using the jth production line equipment set, θ kis the production loss caused by the continuous use of the k-th production line equipment in two consecutively generated equipment production logs; the actual comprehensive production qualification rate of the current new equipment production log is calculated
[0068] Step S204: Obtain the j-th production line equipment set in the corresponding historical equipment production log, and the production rate of the k-th production record is v k ; According to the formula: Get the comprehensive production rate of the i-th type of equipment produced by the j-th production line equipment set Set the target production quantity of the current demand for the i-th type of device to be (S now ) i , the expected production time of the current j-th production line equipment set to produce the i-th type of device is calculated to be
[0069] Step S205: Obtain the actual comprehensive production qualification rate and expected production time of each production line equipment set of the i-th type of equipment according to the formula: Calculate the selection priority value of the i-th category device for selecting the j-th production line equipment set; and assign the production line equipment set with the largest selection priority value to the current i-th category device.
[0070] Step S300: if a new production record is added to a certain device production log, a new device production log is generated on the production data management platform, the production status of each production line equipment between the certain device production log and the new device production log is analyzed; the adjustment status of the production line equipment between the two device production logs is analyzed, and the production line equipment sets of the two device production logs are reallocated;
[0071] Wherein, step S300 includes the following steps:
[0072] Step S301: If a new production record is added to the equipment production log of the current i-th category equipment, a new equipment production log is generated on the production data management platform; the target equipment of the new equipment production log is set to be the i′th category equipment, and several production line equipment sets recorded in the historical equipment production log of the i′th category equipment are obtained; the current i-th category equipment is set to select the j-th production line equipment set for production, and the production line equipment of the j-th production line equipment set is compared with the several production line equipment sets of the i′th category equipment; among the several production line equipment sets of the i′th category equipment, the j′th production line equipment set and the j-th production line equipment set contain the same production line equipment, and a common production line equipment set of the j′th production line equipment set and the j-th production line equipment set is generated;
[0073] Step S302: Obtain the production line equipment information contained in each production record in the equipment production log of the current i-th type of equipment, compare the production line equipment with the j-th production line equipment set, and obtain a number of remaining production line equipment that are not in production; sort the corresponding identical production line equipment in the public production line equipment set according to the order of use of the remaining production line equipment in the j-th production line equipment set;
[0074] Step S303: Obtain the generation time of the equipment production log of the current i-th type of equipment Assume that the expected production time of the i-th type of device produced by the j-th production line equipment set is Get the remaining production time of the current i-th type of equipment The expected production time of the i′th type of device using the j′th production line equipment set is obtained as When the first public production line equipment in the public production line equipment set is removed from the j-th production line equipment set, according to the formula:
[0075]
[0076] Among them, (S now ) i is the target production quantity for class i devices currently in demand, is the comprehensive production rate of the i-th type of device produced by the j-th production line equipment set, u is an integer, and u∈(1,b), b is the number of equipment in the j-th production line equipment set, starting from the removed common production line equipment to the last production line equipment in the j-th production line equipment set, v u is the production rate of the uth device from the removed common production line device to the last production line device in the jth production line device set; the estimated waiting time of the i-th type of device is obtained like All the production line equipment in the public production line equipment set are allocated to the j′th production line equipment set of the i′th category of equipment.
[0077] Capture S400: when a number of production line devices in the production line device set of the certain device production log are allocated to the new device production log, analyze the production situation of the number of production line devices after reallocation and adjustment; calculate the comprehensive production qualification rate of the new device production log, and perform risk assessment on the new device production log;
[0078] Wherein, step S400 includes the following steps:
[0079] Step S401: If several production line devices in the jth production line device set of the current i-th category equipment are allocated to the j′th production line device set of the i′th category equipment, the number of production line devices in the j′th production line device set is obtained as u j′ ;
[0080] Step S402: Obtain the production loss θ caused by the continuous use of the k-th production line equipment in two consecutively generated equipment production logs k , the actual production loss of the k-th type of production line equipment in the j′th production line equipment set is H′ k =H k ×(1-θ k ); According to the formula:
[0081]
[0082] Among them, IF() is a judgment function. When H k =H′ k When IF(H k =H′ k )=1, otherwise, IF(H k =H′ k )=0; when H k ≠H′ k When IF(H k ≠H′ k )=1, otherwise, IF(H k ≠H′ k )=0; the actual comprehensive production qualification rate of the current i′th type of equipment produced by the j′th production line equipment set is calculated as Set the production qualification rate threshold τ, if Then a risk warning will be issued for the device production log of the current Class i′ device.
[0083] An adaptive optimization scheduling system based on artificial intelligence, the scheduling system includes a production line data analysis module, a demand analysis module, a demand addition analysis module and a production evaluation module;
[0084] The production line data analysis module is used to obtain the historical equipment production log of any equipment in the production data management platform, extract the production records in the historical equipment production log, and determine the production line equipment set corresponding to the historical equipment production log; analyze the equipment production data stored in each production record to obtain the comprehensive production qualification rate of the historical equipment production log and the production rate of each production record;
[0085] The demand analysis module is used to obtain the target device of the current demand and generate the device production log of the target device on the production data management platform; determine the several production line equipment sets presented by the target device in each historical device production log, and allocate the production line equipment sets to the target device according to the production conditions of the several production line equipment sets in the historical device production log;
[0086] The demand addition analysis module is used to generate a new equipment production log on the production data management platform when a new production record is added to a certain equipment production log, analyze the production status of each production line equipment between the certain equipment production log and the new equipment production log; analyze the adjustment status of the production line equipment between the two equipment production logs, and reallocate the production line equipment sets of the two equipment production logs;
[0087] The production assessment module is used to analyze the production situation after the reallocation and adjustment of several production line equipment in the production line equipment set of the certain device production log when the several production line equipment in the production line equipment set of the certain device production log is allocated to the new device production log; calculate the comprehensive production qualification rate of the new device production log, and perform risk assessment on the new device production log.
[0088] Among them, the production line data analysis module includes a production line equipment extraction unit and a production data calculation unit;
[0089] The production line equipment extraction unit is used to obtain the historical equipment production log of any equipment in the production data management platform, extract the production records in the historical equipment production log, and determine the production line equipment set corresponding to the historical equipment production log; the production data calculation unit is used to analyze the equipment production data stored in each production record to obtain the comprehensive production qualification rate of the historical equipment production log and the production rate of each production record.
[0090] Among them, the demand analysis module includes a production situation analysis unit and a production line equipment allocation unit;
[0091] The production situation analysis unit is used to generate a new equipment production log on the production data management platform when a new production record is added to a certain equipment production log, and analyze the production situation of each production line equipment between the certain equipment production log and the new equipment production log; the production line equipment allocation unit is used to analyze the adjustment of the production line equipment between the two equipment production logs and reallocate the production line equipment sets of the two equipment production logs.
[0092] Among them, the demand addition analysis module includes a new demand analysis unit and a production line equipment adjustment unit;
[0093] A new demand analysis unit is used to generate a new equipment production log on the production data management platform when a new production record is added to a certain equipment production log, and analyze the production status of each production line equipment between the certain equipment production log and the new equipment production log; a production line equipment adjustment unit is used to analyze the adjustment status of the production line equipment between two equipment production logs and reallocate the production line equipment sets of the two equipment production logs.
[0094] Among them, the production assessment module includes an adjustment data analysis unit and a risk assessment unit;
[0095] An adjustment data analysis unit is used to analyze the production situation of several production line equipment after reallocation and adjustment when several production line equipment in the production line equipment set of the certain device production log is allocated to the new device production log; a risk assessment unit is used to calculate the comprehensive production qualification rate of the new device production log and perform risk assessment on the new device production log.
[0096] Obtain one of the historical equipment production logs on the production data management platform, which stores data generated by the production of equipment A, and extract the production line equipment information contained in three production records, namely equipment 1, equipment 2, and equipment 3; among them, the production qualification rate of equipment 1 is 90%, the production qualification rate of equipment 2 is 90%, and the production qualification rate of equipment 3 is 80%; the comprehensive production qualification rate is calculated to be 64.8%;
[0097] Obtain the previous device production log of the historical device production log, obtain the production record containing device 1, obtain the production qualification rate of device 1 to be 91%, and therefore obtain the production loss of device 1 being continuously used to be 1.11%;
[0098] In the historical equipment production log, device 1 corresponds to the first production record, and device 2 corresponds to the second production record. The time interval between the two production records is 1 minute, and the production quantity stored in the second production record is 1, so the production rate of device 2 is 1 / min.
[0099] When there is a new demand for device A, the production line equipment required for the production of device A is obtained as 1, 2, and 3. The most recent historical device production log is also for the production of device A. Therefore, the number of times the three production line equipment is used is 1. According to the formula:
[0100]
[0101] The actual comprehensive production qualification rate when the new demand uses equipment 1, 2, and 3 is calculated to be 64.8%-0.089%=64.711%;
[0102] The production rates of equipment 1, 2, and 3 are all 1 / min, and the comprehensive production rate is 1 / min. The target production quantity of the new demand is set to 100, and the expected production time is 100 minutes. According to the formula: The calculated selection priority value of using devices 1, 2, and 3 is 0.647%.
[0103] When there is a current demand to use equipment 1, 2, and 3 for production, a new demand is generated, and the new demand also requires equipment 3. Therefore, the remaining waiting time of the current demand after equipment 3 is removed from the production line of the current demand is calculated; at the same time, the production time when equipment 3 is assigned to the production line of the new demand is calculated, and the size of the two time values is compared to determine which demand the equipment 3 will be assigned to in the end.
[0104] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0105] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An adaptive optimization scheduling method based on artificial intelligence, characterized in that: The scheduling method comprises the following steps: Step S100: Obtain the historical equipment production log of any equipment in the production data management platform, extract the production records in the historical equipment production log, and determine the production line equipment set corresponding to the historical equipment production log; analyze the equipment production data stored in each production record to obtain the comprehensive production qualification rate of the historical equipment production log and the production rate of each production record; Step S200: obtaining the target device currently in demand, and generating a device production log of the target device on the production data management platform; determining a number of production line equipment sets presented by the target device in each historical device production log, and allocating production line equipment sets to the target device according to the production conditions of the number of production line equipment sets in the historical device production log; Step S300: if a new production record is added to a certain device production log, a new device production log is generated on the production data management platform, the production status of each production line equipment between the certain device production log and the new device production log is analyzed; the adjustment status of the production line equipment between the two device production logs is analyzed, and the production line equipment sets of the two device production logs are reallocated; Capture S400: When several production line equipment in the production line equipment set of the certain device production log are allocated to the new device production log, the production situation of the several production line equipment after reallocation and adjustment is analyzed; the comprehensive production qualification rate of the new device production log is calculated, and the risk assessment of the new device production log is performed.
2. The method for adaptive optimization scheduling based on artificial intelligence according to claim 1, characterized in that: The step S100 includes the following steps: Step S101: selecting a certain historical equipment production log of the i-th equipment on the production data management platform, extracting the production line equipment information contained in each production record in the certain historical equipment production log, and obtaining the production line equipment set of the certain historical equipment production log, wherein the production line equipment set corresponds to a production line of the i-th equipment; Step S102: Obtain the production qualification rate H of the kth production record in the historical equipment production log k , according to the formula: Wherein, a is the number of production records in the production log of a certain historical device; the comprehensive production qualification rate P of the production log of a certain historical device is calculated; Step S103: Set the equipment corresponding to the k-th production record as the k-th production line equipment, sort all the historical equipment production logs on the production data management platform according to the generation time, obtain the production line equipment set of the previous historical equipment production log of the said historical equipment production log, if the production line equipment set contains the k-th production line equipment, obtain the production qualification rate H of the corresponding production record of the k-th production line equipment in the previous historical equipment production log k ′, the production loss caused by the continuous use of the k-th production line equipment in two consecutively generated equipment production logs is calculated to be Step S104: Obtain the interval between any two adjacent records in the historical equipment production log, and set the interval between the k-1th production record and the kth production record to Δt k-1,k , get the number of devices produced stored in the k-th production record as n k , the production rate of the kth production record is v k =n k / Δt k-1,k .
3. The method for adaptive optimization scheduling based on artificial intelligence according to claim 2, characterized in that: The step S200 includes the following steps: Step S201: Set the target device of the current demand as the i-th device, generate a new device production log of the i-th device on the production data management platform; obtain the production line equipment information contained in each historical device production log of the i-th device, and obtain several production line equipment sets; use the several production line equipment sets as several production lines to be allocated for the new device production log; Step S202: arbitrarily select the k-th type of production line equipment in the j-th production line equipment set, extract x historical equipment production logs that are generated continuously and have the shortest time interval from the current moment from the production data management platform, and count the number of times the k-th type of equipment is used in the x historical equipment production logs. Step S203: Obtain the j-th production line equipment set in the corresponding historical equipment production log, and the production qualification rate of the k-th production record is H k ; According to the formula: in, is the comprehensive production qualification rate of the jth production line equipment set in the historical equipment production log of the i-th type of equipment, a is the number of production records in the historical equipment production log using the jth production line equipment set, θ k is the production loss caused by the continuous use of the k-th production line equipment in two consecutively generated equipment production logs; the actual comprehensive production qualification rate of the current new equipment production log is calculated Step S204: Obtain the j-th production line equipment set in the corresponding historical equipment production log, and the production rate of the k-th production record is v k ; According to the formula: Get the comprehensive production rate of the i-th type of equipment produced by the j-th production line equipment set Set the target production quantity of the current demand for the i-th type of device to be (S now ) i , the expected production time of the current j-th production line equipment set to produce the i-th type of device is calculated to be Step S205: Obtain the actual comprehensive production qualification rate and expected production time of each production line equipment set of the i-th type of equipment according to the formula: Calculate the selection priority value of the i-th category device for selecting the j-th production line equipment set; and assign the production line equipment set with the largest selection priority value to the current i-th category device.
4. The method for adaptive optimization scheduling based on artificial intelligence according to claim 3 is characterized in that: The step S300 includes the following steps: Step S301: If a new production record is added to the equipment production log of the current i-th category equipment, a new equipment production log is generated on the production data management platform; the target equipment of the new equipment production log is set to be the i′th category equipment, and several production line equipment sets recorded in the historical equipment production log of the i′th category equipment are obtained; the current i-th category equipment is set to select the j-th production line equipment set for production, and the production line equipment of the j-th production line equipment set is compared with the several production line equipment sets of the i′th category equipment; among the several production line equipment sets of the i′th category equipment, the j′th production line equipment set and the j-th production line equipment set contain the same production line equipment, and a common production line equipment set of the j′th production line equipment set and the j-th production line equipment set is generated; Step S302: Obtain the production line equipment information contained in each production record in the equipment production log of the current i-th type of equipment, compare the production line equipment with the j-th production line equipment set, and obtain a number of remaining production line equipment that are not in production; sort the corresponding identical production line equipment in the public production line equipment set according to the order of use of the remaining production line equipment in the j-th production line equipment set; Step S303: Obtain the generation time of the equipment production log of the current i-th type of equipment Assume that the expected production time of the i-th type of device produced by the j-th production line equipment set is Get the remaining production time of the current type i device The expected production time of the i′th type of device using the j′th production line equipment set is obtained as When the first public production line equipment in the public production line equipment set is removed from the j-th production line equipment set, according to the formula: Among them, (S now ) i is the target production quantity for class i devices currently in demand, is the comprehensive production rate of the i-th type of device produced by the j-th production line equipment set, u is an integer, and u∈(1,b), b is the number of equipment in the j-th production line equipment set, starting from the removed common production line equipment to the last production line equipment in the j-th production line equipment set, v u is the production rate of the uth device from the removed common production line device to the last production line device in the jth production line device set; the estimated waiting time of the i-th type of device is obtained like All production line equipment in the public production line equipment set are assigned to the j′th production line equipment set of the i′th category of equipment.
5. The method for adaptive optimization scheduling based on artificial intelligence according to claim 4 is characterized in that: The step S400 includes the following steps: Step S401: If several production line devices in the jth production line device set of the current i-th category equipment are allocated to the j′th production line device set of the i′th category equipment, the number of production line devices in the j′th production line device set is obtained as u j′ ; Step S402: Obtain the production loss θ caused by the continuous use of the k-th production line equipment in two consecutively generated equipment production logs k , the actual production loss of the k-th type of production line equipment in the j′th production line equipment set is H′ k =H k ×(1-θ k ); According to the formula: Among them, IF() is a judgment function. When H k =H′ k When IF(H k =H′ k )=1, otherwise, IF(H k =H′ k )=0; when H k ≠H′ k When IF(H k ≠H′ k )=1, otherwise, IF(H k ≠H′ k )=0; the actual comprehensive production qualification rate of the current i′th type of equipment produced by the j′th production line equipment set is calculated as Set the production qualification rate threshold τ, if Then a risk warning will be issued for the device production log of the current Class i′ device.
6. An adaptive optimization scheduling system applied to an adaptive optimization scheduling method based on artificial intelligence as claimed in any one of claims 1 to 5, characterized in that: The scheduling system includes a production line data analysis module, a demand analysis module, a demand addition analysis module and a production evaluation module; The production line data analysis module is used to obtain the historical equipment production log of any equipment in the production data management platform, extract the production records in the historical equipment production log, and determine the production line equipment set corresponding to the historical equipment production log; analyze the equipment production data stored in each production record to obtain the comprehensive production qualification rate of the historical equipment production log and the production rate of each production record; The demand analysis module is used to obtain the target device of the current demand and generate the device production log of the target device on the production data management platform; determine the several production line equipment sets presented by the target device in each historical device production log, and allocate the production line equipment sets to the target device according to the production conditions of the several production line equipment sets in the historical device production log; The demand addition analysis module is used to generate a new equipment production log on the production data management platform if a new production record is added to a certain equipment production log, analyze the production status of each production line equipment between the certain equipment production log and the new equipment production log; analyze the adjustment status of the production line equipment between the two equipment production logs, and reallocate the production line equipment sets of the two equipment production logs; The production assessment module is used to analyze the production situation after the reallocation and adjustment of several production line equipment in the production line equipment set of the certain device production log when the several production line equipment in the production line equipment set of the certain device production log are allocated to the new device production log; calculate the comprehensive production qualification rate of the new device production log, and perform risk assessment on the new device production log.
7. The adaptive optimization scheduling system according to claim 6, characterized in that: The production line data analysis module includes a production line equipment extraction unit and a production data calculation unit; The production line equipment extraction unit is used to obtain the historical equipment production log of any equipment in the production data management platform, extract the production records in the historical equipment production log, and determine the production line equipment set corresponding to the historical equipment production log; The production data calculation unit is used to analyze the equipment production data stored in each production record to obtain the comprehensive production qualification rate of the historical equipment production log and the production rate of each production record.
8. The adaptive optimization scheduling system according to claim 6, characterized in that: The demand analysis module includes a production situation analysis unit and a production line equipment allocation unit; The production situation analysis unit is used to generate a new equipment production log on the production data management platform when a new production record is added to a certain equipment production log, and analyze the production situation of each production line equipment between the certain equipment production log and the new equipment production log; the production line equipment allocation unit is used to analyze the adjustment of the production line equipment between the two equipment production logs and reallocate the production line equipment sets of the two equipment production logs.
9. The adaptive optimization scheduling system according to claim 6, characterized in that: The demand addition analysis module includes a new demand analysis unit and a production line equipment adjustment unit; The new demand analysis unit is used to generate a new equipment production log on the production data management platform when a new production record is added to a certain equipment production log, and analyze the production status of each production line equipment between the certain equipment production log and the new equipment production log; the production line equipment adjustment unit is used to analyze the adjustment status of the production line equipment between the two equipment production logs and reallocate the production line equipment sets of the two equipment production logs.
10. The adaptive optimization scheduling system according to claim 6, characterized in that: The production assessment module includes an adjustment data analysis unit and a risk assessment unit; The adjustment data analysis unit is used to analyze the production status of several production line equipment after reallocation and adjustment when several production line equipment in the production line equipment set of the certain device production log are allocated to the new device production log; the risk assessment unit is used to calculate the comprehensive production qualification rate of the new device production log and perform risk assessment on the new device production log.
Citation Information
Cited By
Industrial automatic production scheduling system and method based on artificial intelligence
CN120355137A