Contact scheduling system for electric power facility construction
By designing a contact dispatching system for power facilities construction and combining with the acquisition of three-dimensional data and data analysis of lidar drones, the full process control from the early stage of the project to the commissioning of equipment is achieved, and the problem that the existing system cannot achieve full process control is solved. Improves the convenience and operation efficiency of the system.
Patent Information
- Application Number
- CN202411092440.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-26
AI Technical Summary
The existing power facility project scheduling system cannot achieve full process control from the early stage of the project to the equipment commissioning and acceptance, resulting in inconvenient system operation and difficulty in realizing construction scenarios and realizing scenario-based management.
A contact scheduling system for power facilities construction was designed, including infrastructure information acquisition module, communication transmission module, main processor module, contact scheduling module, communication contact module, three-dimensional visualization module and intelligent scheduling module, and used lidar drone to obtain it. High-precision three-dimensional data, combined with data analysis and visual display, realizes the full process control from the early stage of the project to the start of the equipment operation.
Through multi-source, multi-scale data integration and three-dimensional visual display, real scene simulation and parameter information display of infrastructure engineering lines are realized, which improves the convenience and operation efficiency of the system, reduces errors and losses in the scheduling process, and has traceable sources Sex management and electronic circulation functions.
Smart Images

Figure CN119026891A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of electric power technology, and in particular relates to a communication and dispatching system for electric power facility construction. Background Art
[0002] The construction of power facilities is the main content of power infrastructure construction and the main direction of investment in the construction of the national grid. Power facility projects are relatively complex projects in power transmission and transformation projects. Investment forecasting is the main task in the early decision-making stage of power facility projects. With the healthy, rapid and sustainable development of the economy and the increase in electricity demand in the whole society, major power companies have built large-scale power generation, transmission and distribution networks to increase power generation to meet the growing social electricity demand, thereby alleviating the current tense situation of power supply in my country. As an important source of national economic growth, the construction of power facility projects has received widespread attention. In the process of expanding the scale of the power industry, the rapid development of the national economy and the gradual realization of modernization require that the power supply must be highly reliable and the system operation must be highly safe. Therefore, when building power facilities, it is necessary to establish a suitable scheduling planning system.
[0003] The invention patent with publication number CN117541187A discloses a dispatching method, dispatching device and project dispatching system for power engineering projects, which cannot truly simulate the scenes in the infrastructure construction process, nor can it realize the full process control from the early stage of the project to the equipment commissioning acceptance, making the entire system inconvenient to operate.
[0004] Therefore, there is an urgent need to design a communication and dispatching system for power facility construction to improve the efficiency of infrastructure projects. Summary of the invention
[0005] In order to solve the above-mentioned problems, a communication and dispatching system for electric power facility construction is provided.
[0006] The present invention provides a contact and dispatch system for electric power facility construction, including an infrastructure information acquisition module, a communication transmission module, a main processor module, a contact and dispatch module, a communication contact module, a three-dimensional visualization module and an intelligent dispatch module; The infrastructure information acquisition module is used to collect information within the power supply station, and transmit the collected information to the main processor module through the communication transmission module. The main processor module is used to process the information and convert it into a digital signal, and then send instructions to the communication module, the three-dimensional visualization module and the intelligent scheduling module through the contact scheduling module.
[0007] Preferably, the three-dimensional visualization module includes a data processing module, a data analysis module and a visualization display module; The data processing module includes a drone equipped with a laser radar, the laser radar is used to perform spatial measurement of the engineering line, obtain high-precision three-dimensional data spatial information of the engineering line body and the infrastructure corridor, and realize panoramic replication of all objects in the channel. The drone is used to obtain orthophoto aerial survey photos; The data processing module performs tight coupling calculation on the acquired laser point cloud data, base station data, mobile station data and inertial navigation data, and generates Las format laser point cloud data after format conversion using JoLiDAR; The data analysis module is used to obtain the classified point cloud data of the infrastructure project line according to the data obtained by the data processing module; The visualization display module is used to generate a three-dimensional visualization view according to the classified point cloud data.
[0008] Preferably, the data analysis module processes the data acquired by the data processing module in the following steps: Step 1: Obtain Las format laser point cloud data; Step 2: Analyze the characteristics of the infrastructure project line corridor and the cross-over measurement content, and use a semi-automatic ground feature extraction and classification method to classify the remaining point cloud data into vegetation, buildings, roads, crossed towers and infrastructure project lines; Step 3: Identify the area where the tower is located based on the known tower coordinates, extract the infrastructure line and the laser points corresponding to the tower according to the line direction, geometric characteristics, and relative elevation, perform cluster analysis on the remaining infrastructure point cloud data, and determine the connected area to which the infrastructure point cloud data belongs; Step 4: Extract wires from the connected groups in the remaining connected areas, sort all connected groups according to the number of point clouds, among which the connected group with the largest number of points is composed of vegetation and other objects, perform plane expansion segmentation on the point cloud data in this group, and combine the manual auxiliary segmentation method to divide the reorganized point cloud into vegetation points, building points and roads; Step 5: Classify the remaining connected groups into wire categories.
[0009] Preferably, the steps of generating a three-dimensional visualization view by the visualization display module are as follows: Step 1: construct a spatial index for the point cloud data, generate a file sequence with index information based on the tiled LOD storage format of the octree; Step 2: Parse the point cloud and model data formats with established LOD spatial indexes, obtain spatial coordinates and attribute values, and organize them according to the 3DTiles standard; Step 3: Publish WMS, WCS and other map services through Map Server; Step 4: Based on Cesium JS dynamic scheduling technology, realize the 3D visualization rendering of massive spatial data on the Web side and generate a 3D visualization view; Step 5: Call the slice service to convert into 3DTiles format and publish it as a 3D map.
[0010] Preferably, the information collected by the infrastructure information collection module includes power supply equipment engineering operation information, power supply equipment engineering safety information and power supply equipment video information in the power supply station; The communication transmission module is used to transmit the information collected by the infrastructure information collection module to the main processor module, and the main processor module processes the information.
[0011] Preferably, the communication transmission module is based on the open source organizational structure open TCS, and uses the Java programming language to write a communication adapter for implementing the communication protocol of the power supply station; The steps include: S1: Create a subclass Vehicle Comm Adapter; Inherit Basic Vehicle Comm Adapter to implement command queue management; abstract methods of real vehicle in derived classes; call corresponding methods set Vehicle Position() and commandExecuted() on the comm adapter model, and feedback to the kernel when the controlled infrastructure project reports status and order operations; S2: Create the Vehicle Comm Adapter Factory class, which in turn instantiates the infrastructure engineering objects given by the Vehicle CommAdapter; S3: Create a Guice module Kernel Injection Module for the communication adapter; register and bind the VehicleCommAdapter Factory to the java.util.ServiceLoader service item of openTCS to automatically find the Guice module at startup; S4: In the CommProtocol class, define the basic content and trigger mechanism of the protocol; S5: Before starting the kernel of the upper computer scheduling system open TCS, place the JAR file and other resources of the communication adapter in a subdirectory of the kernel application installation directory; ensure that the kernel.bat startup script contains all the JAR files in the directory in the application's class path. When starting the kernel, it can automatically search and find the communication adapter that meets the requirements.
[0012] Preferably, the main processor module includes an ARM processor, which is used to establish the information acquisition module, AD function module, serial port and external interface functions on the ARM processor to achieve integrated processing of physical layer information; The AD function module, processor module, deformation monitoring and analysis module, and communication module all use STM32 chips as processors, and convert the collected information into digital signals through D / A converters, and input them into the information processing terminal for integrated processing and online mobilization of construction project budget information; The communication module includes a transmission system, a communication optical cable, a synchronous clock, an integrated network management system and an MSTP device, and the transmission system, the communication optical cable, the synchronous clock, the integrated network management system and the MSTP device form two tangent ring networks.
[0013] Preferably, the intelligent dispatching module includes a dispatching network module, a dispatching telephone module and a dispatching monitoring module; The dispatching network module includes a backbone layer and an access layer, which are used for the access and aggregation of services at the station and for switching service access circuits within the area; The backbone layer includes a power supply station master dispatcher and a power supply station management station node, and the power supply station master dispatcher and the power supply station management station node form a ring structure network; The access layer includes the power supply station management equipment, building monomers and the connection network between the backbone layer nodes under the backbone layer; The dispatch telephone module is used for unified voice dispatch and auxiliary administrative voice calls between the dispatch center of the whole line, the pump station for the infrastructure and technical transformation project power station, the management station for the infrastructure and technical transformation project, and the valve station for the infrastructure and technical transformation project power station; The power station valve station of the infrastructure and technical transformation project has a dedicated optical fiber network coverage, and uses VOIP technology to realize the function of the voice system of this project; The dispatch monitoring module includes a power supply station video monitoring module, which is used to realize power supply station video acquisition, storage, retrieval, playback, management, intelligent analysis and control functions of cameras and TV walls.
[0014] The present invention also includes a project connection scheduling method for executing infrastructure technical transformation, and the scheduling method executes any of the above-mentioned scheduling systems.
[0015] And a storage medium storing a computer program, which, when executed by a processor, implements the steps of the engineering connection scheduling method according to any one of claims 1-8.
[0016] The beneficial effects of the present invention are: Point cloud data, spatial data, facility model data and analysis data are uploaded to the platform for unified management, and are comprehensively organized through the project tree in the line corridor ledger. Laser point cloud, DEM and DOM data can better restore the infrastructure technical transformation corridor environment, which is the basis for the intersection analysis to display the infrastructure technical transformation parameter information. The facility model of infrastructure technical transformation truly simulates the scene of the line operation, and can visualize the state of the conductor under high temperature, icing and strong wind conditions, so that the entire system can more intuitively and clearly display the parameter information of the entire infrastructure technical transformation process during use, which improves the convenience of system use and also realizes multi-source, multi-scale and heterogeneous data integration.
[0017] Based on distributed computing and parallel computing, various spatial data of infrastructure engineering lines are processed and analyzed to realize services such as point cloud slicing, DOM slicing, DEM slicing, and model conversion. Multi-condition simulation and visual interaction of on-site operation scenes of infrastructure engineering lines and channels are realized in a three-dimensional visualization manner, realizing full-process control from the early stage of the project to the commissioning and acceptance of equipment. The full-process control from the early stage of the project to the commissioning and acceptance of equipment is realized. The use of automation and digitization has significantly improved the real-time nature of dispatching contact, which can reduce errors and losses in the dispatching process, realize traceability management of engineering orders, and have electronic online circulation functions. It can submit engineering materials to the dispatcher at any time, initiate work processes, and add work contact orders, thereby increasing the convenience of the entire dispatching use and improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a block diagram of the overall system in an embodiment of the present invention; Figure 2 A block diagram of a three-dimensional visualization module system in an embodiment of the present invention; Figure 3 This is a system block diagram of the intelligent scheduling module in an embodiment of the present invention.
[0019] Markings in the figure: 1 is the infrastructure information acquisition module, 2 is the communication transmission module, 3 is the main processor module, 4 is the contact and dispatch module, 5 is the communication contact module, 6 is the three-dimensional visualization module, 7 is the intelligent dispatch module, 8 is the dispatch network module, 9 is the dispatch telephone module, 10 is the dispatch monitoring module, 11 is the data processing module, 12 is the data analysis module, and 13 is the visualization display module. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0021] Reference Figure 1As shown, an embodiment of the present invention provides a contact and dispatch system for electric power facility construction, including an infrastructure information collection module 1, a communication transmission module 2, a main processor module 3, a contact and dispatch module 4, a communication contact module 5, a three-dimensional visualization module 6 and an intelligent dispatch module 7; The infrastructure information acquisition module 1 is used to collect information within the power supply station, and transmit the collected information to the main processor module 3 through the communication transmission module 2. The main processor module 3 is used to process the information and convert it into a digital signal, and then send instructions to the communication contact module 5, the three-dimensional visualization module 6 and the intelligent scheduling module 7 through the contact scheduling module 4.
[0022] It should be noted that, in this embodiment, the three-dimensional visualization module 6 includes a data processing module 11, a data analysis module 12 and a visualization display module 13; The data processing module 11 includes a drone equipped with a laser radar, the laser radar is used to perform spatial measurement of the engineering line, obtain high-precision three-dimensional data spatial information of the engineering line body and the infrastructure corridor, and realize panoramic replication of all objects in the channel. The drone is used to obtain orthophotos; The objects in the channel are replicated by using drones to obtain orthophotos and laser radar, which is conducive to the later modeling of the visualization display module 13 to form a three-dimensional map.
[0023] Furthermore, the data processing module 11 performs a tightly coupled solution on the acquired laser point cloud data, base station data, mobile station data and inertial navigation data, and generates Las format laser point cloud data after format conversion using JoLiDAR; The data analysis module 12 is used to obtain the classified point cloud data of the infrastructure project line according to the data obtained by the data processing module 11; The visualization display module 13 is used to generate a three-dimensional visualization view according to the classified point cloud data.
[0024] The panorama and photos in the channel are acquired through the data processing module 11 , and the acquired panorama and photos are analyzed and processed by the data analysis module 12 to form point cloud data, and then a three-dimensional visualization view is generated through the visualization display module 13 .
[0025] Furthermore, the data analysis module 12 processes the data acquired by the data processing module 11 in the following steps: Step 1: Obtain Las format laser point cloud data; Step 2: Analyze the characteristics of the infrastructure project line corridor and the cross-over measurement content, and use a semi-automatic ground feature extraction and classification method to classify the remaining point cloud data into vegetation, buildings, roads, crossed towers and infrastructure project lines; Step 3: Identify the area where the tower is located based on the known tower coordinates, extract the infrastructure line and the laser points corresponding to the tower according to the line direction, geometric characteristics, and relative elevation, perform cluster analysis on the remaining infrastructure point cloud data, and determine the connected area to which the infrastructure point cloud data belongs; Step 4: Extract wires from the connected groups in the remaining connected areas, sort all connected groups according to the number of point clouds, among which the connected group with the largest number of points is composed of vegetation and other objects, perform plane expansion segmentation on the point cloud data in this group, and combine the manual auxiliary segmentation method to divide the reorganized point cloud into vegetation points, building points and roads; Step 5: Classify the remaining connected groups into wire categories.
[0026] After the above steps, the point cloud data is classified according to the ground objects. For the incorrectly classified point cloud data, manual interaction is used to set it up, and finally the classified point cloud data of the infrastructure project line is obtained.
[0027] Furthermore, the steps of generating a three-dimensional visualization view by the visualization display module 13 are as follows: Step 1: construct a spatial index for the point cloud data, generate a file sequence with index information based on the tiled LOD storage format of the octree; Step 2: Parse the point cloud and model data formats with established LOD spatial indexes, obtain spatial coordinates and attribute values, and organize them according to the 3DTiles standard; Step 3: Publish WMS, WCS and other map services through Map Server; Step 4: Based on Cesium JS dynamic scheduling technology, realize the 3D visualization rendering of massive spatial data on the Web side and generate a 3D visualization view; Step 5: Call the slice service to convert into 3DTiles format and publish it as a 3D map.
[0028] The information collected by the infrastructure information collection module 1 includes power supply equipment engineering operation information, power supply equipment engineering safety information and power supply equipment video information in the power supply station; It should be noted that in this embodiment, the infrastructure information collection module 1 adopts the Internet of Things technology and uses the integrated system of Internet of Things control and intelligent operation and maintenance to complete the collection, transmission, organization, analysis and management of information from various systems. The collection sources are divided into automatic, manual and data exchange with external systems. Automatic collection mainly includes information such as engineering operation, engineering safety and video. All terminals enter the integrated system of Internet of Things control and intelligent operation and maintenance, which effectively controls the effect of information collection and functional stability.
[0029] The communication transmission module 2 is used to transmit the information collected by the infrastructure information collection module 1 to the main processor module 3, and the main processor module 3 processes the information.
[0030] Preferably, the communication transmission module 2 is an open source organizational structure open TCS. Aiming at the problem of high communication pressure in the centralized control system of infrastructure projects, the upper computer software architecture is analyzed, and a communication adapter is written in Java programming language to complete the integrated development of the system communication module. The communication adapter supported by open TCS is mainly implemented in the communication protocols of specific automatic guided vehicles, non-continuous transporters, etc., as an intermediary between the kernel and the execution device.
[0031] In this embodiment, the communication transmission module 2 is based on the open source organizational structure open TCS, and uses the Java programming language to write a communication adapter for implementing the communication protocol of the power supply station; The steps include: S1: Create a subclass Vehicle Comm Adapter; Inherit Basic Vehicle Comm Adapter to implement command queue management; abstract methods of real vehicle in derived classes; call corresponding methods set Vehicle Position() and commandExecuted() on the comm adapter model, and feedback to the kernel when the controlled infrastructure project reports status and order operations; S2: Create the Vehicle Comm Adapter Factory class, which in turn instantiates the infrastructure engineering objects given by the Vehicle CommAdapter; S3: Create a Guice module Kernel Injection Module for the communication adapter; register and bind the VehicleCommAdapter Factory to the java.util.ServiceLoader service item of openTCS to automatically find the Guice module at startup; S4: In the CommProtocol class, define the basic content and trigger mechanism of the protocol; S5: Before starting the kernel of the upper computer scheduling system open TCS, place the JAR file and other resources of the communication adapter in a subdirectory of the kernel application installation directory; ensure that the kernel.bat startup script contains all the JAR files in the directory in the application's class path. When starting the kernel, it can automatically search and find the communication adapter that meets the requirements.
[0032] In this embodiment, the main processor module 3 includes an ARM processor, which is used to establish the information acquisition module, AD function module, serial port and external interface functions on the ARM processor to realize the integrated processing of physical layer information; The AD function module, processor module, deformation monitoring and analysis module, and communication module 5 all use STM32 chips as processors, and convert the collected information into digital signals through D / A converters, and input them into the information processing terminal for integrated processing and online mobilization of construction project budget information; The communication module 5 includes a transmission system, a communication optical cable, a synchronous clock, an integrated network management system and an MSTP device, and the transmission system, the communication optical cable, the synchronous clock, the integrated network management system and the MSTP device form two tangent ring networks.
[0033] In this embodiment, a multi-channel, high-efficiency, large-capacity MSTP device based on SDH technology is used for networking to form two tangent ring networks, which greatly enhances the security and stability of the system.
[0034] like Figure 3 As shown, the intelligent dispatch module 7 includes a dispatch network module 8, a dispatch telephone module 9 and a dispatch monitoring module 10; The dispatching network module 8 includes a backbone layer and an access layer, which are used for the access and aggregation of services of the station and the service access circuits in the transfer area; The backbone layer includes a power supply station master dispatcher and a power supply station management station node, and the power supply station master dispatcher and the power supply station management station node form a ring structure network; It should be noted that the network structure also includes a pump station for a power supply station, a pump station for a power supply station, a power supply station general dispatching station and the power supply station management station nodes. Although the network nodes are few, the transmission capacity is large and the capacity and reliability requirements are high. Therefore, in this embodiment, a ring structure is adopted after comprehensive comparison to complete efficient and reliable large data stream transmission between nodes.
[0035] The access layer includes the power supply station management equipment, building units and the connection network between the backbone layer nodes under the backbone layer; it is responsible for the access and aggregation of the station's services and the business access circuits in the transfer area, which requires strong aggregation and relatively stable access capabilities. The secondary network is mainly composed of industrial application-level transmission platforms to form a ring network, which is responsible for completing the access and aggregation upload tasks of the densely distributed local stations along the project to the business aggregation nodes.
[0036] The dispatch telephone module 9 is used for unified voice dispatch and auxiliary administrative voice calls between the dispatch center of the whole line, the pump station for the infrastructure and technical transformation project power station, the management station for the infrastructure and technical transformation project, and the valve station for the infrastructure and technical transformation project power station; Furthermore, the project sites of the dispatch telephone module 9 are relatively scattered, so the power station valve station of the infrastructure and technical transformation project has a dedicated optical fiber network coverage, and adopts VOIP technology to realize the function of the voice system of this project; The dispatch monitoring module 10 includes a power supply station video monitoring module, which is used to realize power supply station video acquisition, storage, retrieval, playback, management, intelligent analysis and control functions of cameras and TV walls.
[0037] It should be further explained that the module can index the video information collected by the front-end camera in real time according to time, image number, camera number, etc. and store it in the database for later rapid search and evidence analysis. The power supply station manager can not only manually control the opening and closing of the camera and the rotation of the pan / tilt head on the operating console, but also set parameters to achieve automatic control of the camera, including preset position control, automatic cruise, motion detection, and intrusion detection, ensuring the normal operation and maintenance of the power supply station.
[0038] Another embodiment of the present invention provides an engineering connection scheduling method for executing infrastructure technical transformation, and the scheduling method is used to execute the above-mentioned scheduling system.
[0039] Still another embodiment of the present invention is a computer-readable storage medium having a computer program stored thereon, and the computer program implements the above-mentioned engineering contact scheduling method when executed by a processor.
[0040] A person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment method can be implemented by instructing the relevant hardware through a computer program, and the program can be stored in a computer-readable storage medium. When the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, the storage medium can be a disk, an optical disk, a read-only memory (ROM) or a random access memory (RAM), etc. In the present application, the unit described as a separate component may or may not be physically separated, and the component displayed as a unit may or may not be a physical unit, that is, it may be located in one place, or it may be distributed on multiple network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the embodiment of the present invention. In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of a software functional unit.
[0041] The above description enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A communication and dispatching system for electric power facility construction, characterized in that: It includes infrastructure information collection module, communication transmission module, main processor module, contact scheduling module, communication contact module, three-dimensional visualization module and intelligent scheduling module; The infrastructure information acquisition module is used to collect information within the power supply station, and transmit the collected information to the main processor module through the communication transmission module. The main processor module is used to process the information and convert it into a digital signal, and then send instructions to the communication module, the three-dimensional visualization module and the intelligent scheduling module through the contact scheduling module.
2. A contact and dispatch system for electric power facility construction according to claim 1, characterized in that: The three-dimensional visualization module includes a data processing module, a data analysis module and a visualization display module; The data processing module includes a drone equipped with a laser radar, the laser radar is used to perform spatial measurement of the engineering line, obtain high-precision three-dimensional data spatial information of the engineering line body and the infrastructure corridor, and realize panoramic replication of all objects in the channel. The drone is used to obtain orthophoto aerial survey photos; The data processing module performs tight coupling calculation on the acquired laser point cloud data, base station data, mobile station data and inertial navigation data, and generates Las format laser point cloud data after format conversion using JoLiDAR; The data analysis module is used to obtain the classified point cloud data of the infrastructure project line according to the data obtained by the data processing module; The visualization display module is used to generate a three-dimensional visualization view according to the classified point cloud data.
3. A contact and dispatch system for electric power facility construction according to claim 2, characterized in that: The steps of processing the data obtained by the data processing module by the data analysis module are as follows: Step 1: Obtain laser point cloud data in Las format; Step 2: Analyze the characteristics of the infrastructure project line corridor and the cross-over measurement content, and use a semi-automatic ground feature extraction and classification method to classify the remaining point cloud data into vegetation, buildings, roads, crossed towers and infrastructure project lines; Step 3: Identify the area where the tower is located based on the known tower coordinates, extract the infrastructure line and the laser points corresponding to the tower according to the line direction, geometric characteristics, and relative elevation, perform cluster analysis on the remaining infrastructure point cloud data, and determine the connected area to which the infrastructure point cloud data belongs; Step 4: Extract wires from the connected groups in the remaining connected areas, sort all connected groups according to the number of point clouds, among which the connected group with the largest number of points is composed of vegetation and other objects, perform plane expansion segmentation on the point cloud data in this group, and combine the manual auxiliary segmentation method to divide the reorganized point cloud into vegetation points, building points and roads; Step 5: Classify the remaining connected groups into wire categories.
4. A contact and dispatch system for electric power facility construction according to claim 3, characterized in that: The steps of generating a three-dimensional visualization view by the visualization display module are as follows: Step 1: construct a spatial index for the point cloud data, and generate a file sequence with index information based on the tiled LOD storage format of the octree; Step 2: Parse the point cloud and model data formats with established LOD spatial indexes, obtain spatial coordinates and attribute values, and organize them according to the 3DTiles standard; Step 3: Publish WMS, WCS and other map services through Map Server; Step 4: Based on Cesium JS dynamic scheduling technology, realize the 3D visualization rendering of massive spatial data on the Web side and generate a 3D visualization view; Step 5: Call the slice service to convert into 3DTiles format and publish it as a 3D map.
5. A contact and dispatch system for electric power facility construction according to claim 1, characterized in that: The information collected by the infrastructure information collection module includes power supply equipment engineering operation information, power supply equipment engineering safety information and power supply equipment video information in the power supply station; The communication transmission module is used to transmit the information collected by the infrastructure information collection module to the main processor module, and the main processor module processes the information.
6. A contact and dispatch system for electric power facility construction according to claim 5, wherein the communication transmission module is based on the open source organizational structure open TCS, and the communication adapter is written in Java programming language to implement the communication protocol of the power supply station; The steps include: S1: Create a subclass Vehicle Comm Adapter; Inherit Basic Vehicle Comm Adapter to implement command queue management; abstract methods of real vehicle in derived classes; call corresponding methods set Vehicle Position() and commandExecuted() on the comm adapter model, and feedback to the kernel when the controlled infrastructure project reports status and order operations; S2: Create the Vehicle Comm Adapter Factory class, which in turn instantiates the infrastructure engineering objects given by the Vehicle CommAdapter; S3: Create a Guice module Kernel Injection Module for the communication adapter; register and bind the VehicleComm Adapter Factory so that the java.util.ServiceLoader service item of openTCS can automatically find the Guice module at startup; S4: In the CommProtocol class, define the basic content and trigger mechanism of the protocol; S5: Before starting the kernel of the upper computer scheduling system open TCS, place the JAR file and other resources of the communication adapter in a subdirectory of the kernel application installation directory; ensure that the kernel.bat startup script contains all the JAR files in the directory in the application's class path. When starting the kernel, it can automatically search and find the communication adapter that meets the requirements.
7. A contact and dispatch system for electric power facility construction according to claim 5, characterized in that: The main processor module includes an ARM processor, which is used to establish the information acquisition module, AD function module, serial port and external interface functions on the ARM processor to realize the integrated processing of physical layer information; The AD function module, processor module, deformation monitoring and analysis module, and communication module all use STM32 chips as processors, and convert the collected information into digital signals through D / A converters, and input them into the information processing terminal for integrated processing and online mobilization of construction project budget information; The communication module includes a transmission system, a communication optical cable, a synchronous clock, an integrated network management system and an MSTP device, and the transmission system, the communication optical cable, the synchronous clock, the integrated network management system and the MSTP device form two tangent ring networks.
8. A contact and dispatch system for electric power facility construction according to claim 1, characterized in that: The intelligent dispatching module includes a dispatching network module, a dispatching telephone module and a dispatching monitoring module; The dispatching network module includes a backbone layer and an access layer, which are used for the access and aggregation of services at the station and for switching service access circuits within the area; The backbone layer includes a power supply station master dispatcher and a power supply station management station node, and the power supply station master dispatcher and the power supply station management station node form a ring structure network; The access layer includes the power supply station management equipment, building monomers and the connection network between the backbone layer nodes under the backbone layer; The dispatch telephone module is used for unified voice dispatch and auxiliary administrative voice calls between the dispatch center of the whole line, the pump station for the infrastructure and technical transformation project power station, the management station for the infrastructure and technical transformation project, and the valve station for the infrastructure and technical transformation project power station; The power station valve station of the infrastructure and technical transformation project has a dedicated optical fiber network coverage, and uses VOIP technology to realize the function of the voice system of this project; The dispatch monitoring module includes a power supply station video monitoring module, which is used to realize power supply station video acquisition, storage, retrieval, playback, management, intelligent analysis and control functions of cameras and TV walls.
9. A method for engineering connection scheduling for executing infrastructure technical transformation, characterized in that: The scheduling method executes the scheduling system of any one of claims 1-8.
10. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the engineering connection scheduling method according to any one of claims 1 to 8 are implemented.