Developer work evaluation alarm method and device for informatization research and development project
By using blockchain technology in information research and development projects, dynamically determine statistical strategies and generate alarm information, the problem of low accuracy of manual fixed alarm strategies is solved, the accuracy of alarm prompts and work completion is improved, and the project's Perform normally.
Patent Information
- Application Number
- CN202411480542.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-23
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the prior art, the alarm prompts for development work through manual fixed alarm strategies have low accuracy, which affects the implementation accuracy of information technology research and development projects.
By subscribing to the target work information of distributed nodes of blockchain, dynamic statistical strategies are determined, and alarm information is generated and sent to improve the completion of work. The distributed nodes of blockchain and the work team are used to combine the work stage. Information and statistical information generate targeted alarm prompts.
It improves the accuracy and efficiency of alarm prompts, ensures the normal implementation of information technology research and development projects, and improves the accuracy and transparency of work completion.
Smart Images

Figure CN119026956A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data processing technology, and in particular to a method and device for providing work evaluation and warning to developers of information technology research and development projects. Background Art
[0002] In an information technology R&D project, developers in the development team are responsible for the development of specific tasks. Specifically, the development team accepts project requirements and assigns work tasks to each developer based on their responsibilities, workload, or ability. Developers perform work tasks to develop products.
[0003] In actual applications, problems may occur when each developer performs development work, resulting in extended development cycles or unqualified products, which affect the completion of information technology research and development projects. In related technologies, development work is manually warned according to fixed warning strategies to instruct developers to optimize development work according to warnings so that the development work meets expectations.
[0004] However, manually issuing alarm prompts based on fixed alarm strategies has the problem of low accuracy, which affects the execution accuracy of information technology R&D projects. Summary of the invention
[0005] The present application provides a method and device for warning developers of work evaluation in information technology research and development projects, so as to improve the accuracy of warning prompts.
[0006] In a first aspect, the present application provides a work evaluation alarm method for developers of an information-based R&D project, which is applied to a server and includes: extracting multiple target work information of multiple distributed nodes of a blockchain through a subscription function, wherein the multiple target work information includes at least work stage information, and the distributed nodes of the blockchain correspond one-to-one to work teams, and each work team includes multiple staff members; determining multiple target statistical strategies based on the multiple target work information, and performing statistical processing on the multiple target work information through the multiple target statistical strategies to obtain multiple target statistical information, wherein the target statistical information is used to indicate the degree of work completion; determining multiple corresponding target improvement measures based on the multiple target statistical information, wherein the target improvement measures are used to improve the degree of work completion; generating alarm information for target staff members of a target work team based on the work stage information, the multiple target statistical information, and the multiple target improvement measures; sending the alarm information to a project management platform so that the project management platform completes the alarm prompt for the target staff members.
[0007] In a possible implementation, multiple target work information of multiple distributed nodes of a blockchain is extracted through a subscription function, including: receiving an alarm indication, the alarm indication including multiple target team identifiers; determining a correspondence between distributed nodes and team identifiers; determining multiple target nodes based on the multiple target team identifiers and the correspondence; and obtaining the multiple target work information from the multiple target nodes.
[0008] In one possible implementation, obtaining the multiple target working information from the multiple target nodes includes: determining multiple node information corresponding to the multiple target nodes; determining multiple keys corresponding to the multiple target nodes; decrypting the multiple node information according to the multiple keys to obtain multiple working information corresponding to the multiple target nodes, wherein the working information is the full amount of information stored in the target nodes; and determining the multiple target working information based on the multiple working information.
[0009] In a possible implementation, the alarm indication also includes a preset time period and multiple preset personnel identifiers; based on the multiple work information, the multiple target work information are determined, including: determining the time and personnel identifier corresponding to each work information; based on the preset time period, the time corresponding to each work information, the multiple preset personnel identifiers, and the personnel identifier corresponding to each work information, the multiple target work information are determined from the multiple work information, the time corresponding to each target work information is within the preset time period, and the personnel identifier corresponding to each target work information belongs to the multiple preset personnel identifiers.
[0010] In a possible implementation, multiple target statistical strategies are determined based on the multiple target work information, including: determining multiple statistical types; determining multiple benchmark values corresponding to the multiple statistical types based on the multiple target work information; determining multiple statistical strategies corresponding to the multiple statistical types based on the multiple benchmark values; and determining that the target statistical strategy includes the multiple statistical strategies.
[0011] In a possible implementation, for any target staff member; determining a corresponding plurality of target improvement measures based on the plurality of target statistical information, including: determining a plurality of sub-statistical information corresponding to the target staff member; determining a correspondence between statistical information and improvement measures; determining a plurality of target improvement measures corresponding to the target staff member based on the plurality of sub-statistical information and the correspondence.
[0012] In a possible implementation, for any target staff member; the method also includes: determining multiple weights corresponding to the multiple sub-statistical information according to the work stage information; performing weighted summation processing on the multiple sub-statistical information through the multiple weights to obtain the target statistical information of the target work team; and issuing an alarm prompt to the target staff member based on the target statistical information and the multiple improvement measures.
[0013] In a second aspect, the present application provides a work evaluation alarm device for developers of an information-based R&D project, which is applied to a server and includes: an extraction module, which is used to extract multiple target work information of multiple distributed nodes of a blockchain through a subscription function, wherein the multiple target work information includes at least work stage information, and the distributed nodes of the blockchain correspond one-to-one to work teams, and each work team includes multiple staff members; a processing module, which is used to determine multiple target statistical strategies based on the multiple target work information, and perform statistical processing on the multiple target work information through the multiple target statistical strategies to obtain multiple target statistical information, wherein the target statistical information is used to indicate the degree of work completion; a determination module, which is used to determine the corresponding multiple target improvement measures based on the multiple target statistical information, wherein the target improvement measures are used to improve the degree of work completion; a generation module, which is used to generate alarm information for target staff members of a target work team based on the work stage information, the multiple target statistical information and the multiple target improvement measures; a sending module, which is used to send the alarm information to a project management platform so that the project management platform can complete the alarm prompt for the target staff members.
[0014] In a possible implementation, the extraction module is specifically used to receive an alarm indication, which includes multiple target team identifiers; the extraction module is also specifically used to determine the correspondence between distributed nodes and team identifiers; the extraction module is also specifically used to determine multiple target nodes based on the multiple target team identifiers and the correspondence; the extraction module is also specifically used to obtain the multiple target work information from the multiple target nodes.
[0015] In a possible implementation, the extraction module is specifically used to determine multiple node information corresponding to the multiple target nodes; the extraction module is also specifically used to determine multiple keys corresponding to the multiple target nodes; the extraction module is also specifically used to decrypt the multiple node information according to the multiple keys to obtain multiple work information corresponding to the multiple target nodes, and the work information is the full information stored in the target node; the extraction module is also specifically used to determine the multiple target work information based on the multiple work information.
[0016] In a possible implementation, the alarm indication also includes a preset time period and multiple preset personnel identifiers; the extraction module is specifically used to determine the time and personnel identifier corresponding to each work information; the extraction module is also specifically used to determine the multiple target work information from the multiple work information based on the preset time period, the time corresponding to each work information, the multiple preset personnel identifiers, and the personnel identifier corresponding to each work information, the time corresponding to each target work information is within the preset time period, and the personnel identifier corresponding to each target work information belongs to the multiple preset personnel identifiers.
[0017] In a possible implementation, the device also includes: an execution module, used to determine multiple statistical types; the execution module is also used to determine multiple benchmark values corresponding to the multiple statistical types based on the multiple target work information; the execution module is also used to determine multiple statistical strategies corresponding to the multiple statistical types based on the multiple benchmark values; the execution module is also used to determine that the target statistical strategy includes the multiple statistical strategies.
[0018] In one possible implementation, for any target staff member; the device also includes: an optimization module, used to determine multiple sub-statistical information corresponding to the target staff member; the optimization module is also used to determine the correspondence between statistical information and improvement measures; the optimization module is also used to determine multiple target improvement measures corresponding to the target staff member based on the multiple sub-statistical information and the correspondence.
[0019] In a possible implementation, for any target staff member; the device also includes: a calculation module, used to determine multiple weights corresponding to the multiple sub-statistical information according to the work stage information; the calculation module is also used to perform weighted sum processing on the multiple sub-statistical information through the multiple weights to obtain the target statistical information of the target work team; the calculation module is also used to issue an alarm prompt to the target staff member based on the target statistical information and the multiple improvement measures.
[0020] In a third aspect, the present application provides an electronic device comprising: a processor, and a memory communicatively connected to the processor; the memory stores computer-executable instructions; the processor executes the computer-executable instructions stored in the memory to implement any method described in any one of the first aspects.
[0021] In a fourth aspect, the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores computer-executable instructions, and the computer-executable instructions are executed by a processor as described in any one of the methods in the first aspect.
[0022] In a fifth aspect, the present application provides a computer program product, comprising a computer program, wherein the computer program is executed by a processor as in any one of the methods in the first aspect.
[0023] The work evaluation alarm method and device for developers of information-based R&D projects provided by this application are applied to a server, and the method includes: extracting multiple target work information of multiple distributed nodes of a blockchain through a subscription function, wherein the multiple target work information at least includes work stage information, wherein the distributed nodes of the blockchain correspond to work teams one by one, and each work team includes multiple staff members; determining multiple target statistical strategies, and statistically processing the multiple target work information through the multiple target statistical strategies to obtain multiple target statistical information, wherein the target statistical information is used to indicate the degree of work completion; determining the corresponding multiple target improvement measures according to the multiple target statistical information, and the target improvement measures are used to improve the degree of work completion; uploading the multiple target statistical information and the multiple target improvement measures to the blockchain, so that the blockchain generates alarm information for the target staff of the target work team according to the multiple target statistical information and the multiple target improvement measures; sending the alarm information to the project management platform, so that the project management platform completes the alarm prompt for the target staff member. The above scheme determines the target statistical strategy according to the target work information including the work stage information, which can effectively combine the importance of the work compared to the fixed alarm strategy, thereby improving the accuracy of the alarm prompt. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.
[0025] Figure 1 A schematic diagram of an application scenario of a method for providing an alarm for developer work evaluation of an information-based R&D project provided in an embodiment of the present application;
[0026] Figure 2 A flowchart of a method for evaluating and alerting developers of an information-based R&D project provided in an embodiment of the present application;
[0027] Figure 3 A flowchart of a method for evaluating and alerting developers of an information-based R&D project provided in an embodiment of the present application;
[0028] Figure 4 A schematic diagram of obtaining multiple target work information provided in an embodiment of the present application;
[0029] Figure 5 A schematic diagram of determining improvement measures provided in an embodiment of the present application;
[0030] Figure 6 A schematic diagram of an alarm prompt provided in an embodiment of the present application;
[0031] Figure 7 A schematic diagram of the structure of a work evaluation alarm device for developers of an information-based R&D project provided in an embodiment of the present application;
[0032] Figure 8 A schematic diagram of the structure of a work evaluation alarm device for developers of an information-based R&D project provided in an embodiment of the present application;
[0033] Fig. 9 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application.
[0034] The above drawings have shown clear embodiments of the present application, which will be described in more detail later. These drawings and text descriptions are not intended to limit the scope of the present application in any way, but to illustrate the concept of the present application to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION
[0035] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The implementations described in the following exemplary embodiments do not represent all implementations consistent with the present application. Instead, they are merely examples of devices and methods consistent with some aspects of the present application as detailed in the appended claims.
[0036] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use, processing, transmission, provision, disclosure and application of the relevant data comply with the relevant laws, regulations and standards of the relevant countries and regions, take necessary confidentiality measures, do not violate public order and good customs, and provide corresponding operation entrances for users to choose to authorize or refuse.
[0037] In addition, this application involves conducting big data analysis of user information (including but not limited to personal biometrics, identity data, consumption data, asset data, electronic terminal operation data, etc.), and using artificial intelligence technology to make automated decisions, and making technical solutions that have a significant impact on personal rights and interests based on the results of automated decisions. The application provides users with corresponding operation entrances for them to choose to agree or reject the results of automated decisions; if the user chooses to reject, the expert decision-making process will be entered.
[0038] It should be noted that the work evaluation and alarm method and device for developers of the information technology R&D project of the present application can be used in the field of data processing technology, and can also be used in any field except data processing. The application field of the work evaluation and alarm method and device for developers of the information technology R&D project of the present application is not limited.
[0039] Figure 1 A schematic diagram of an application scenario of a method for evaluating and alerting developers of an information-based R&D project provided in an embodiment of the present application is provided, with examples being given in combination with the illustrated scenario: a development team receives project requirements, and assigns the project requirements to multiple developers within the development team, who then respectively perform the assigned tasks to achieve the project requirements.
[0040] In actual applications, problems may arise during the execution of project requirements, which may affect product quality and project execution progress.
[0041] In related technologies, development work is evaluated manually based on fixed alarm strategies to obtain problems in the process of executing project requirements, and alarm prompts are issued based on the problems, so that developers in the development team can optimize the development work in time according to the alarm prompts, thereby completing the product on time and with quality.
[0042] However, alarm prompts need to be carried out from multiple indicator dimensions, and comprehensive evaluation from multiple indicator dimensions can make accurate alarm prompts. Fixed alarm strategies cannot accurately integrate multiple indicator dimensions, and there is a problem of low accuracy.
[0043] The method for work evaluation and alarm of developers of information technology R&D projects provided in this application is intended to solve the above technical problems of the prior art.
[0044] The technical solution of the present application and how the technical solution of the present application solves the above-mentioned technical problems are described in detail below with specific embodiments. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments. The embodiments of the present application will be described below in conjunction with the accompanying drawings.
[0045] Figure 2 A flowchart of a method for providing an alarm for developer work evaluation of an information-based R&D project provided in an embodiment of the present application, the method comprising the following steps:
[0046] S201. Extract multiple target work information of multiple distributed nodes of the blockchain through the subscription function.
[0047] Among them, multiple target work information at least includes work stage information, the distributed nodes of the blockchain correspond one-to-one to the work teams, and each work team includes multiple staff members.
[0048] Exemplarily, the efficiency of evaluating alarms can be improved by automatically executing the evaluation alarms through a server instead of performing them manually.
[0049] For example, recording and managing work information through blockchain technology can improve the transparency and integrity of management.
[0050] Combined with the scenario example, in an information technology R&D project, when the development team is performing tasks, work information is regularly extracted for evaluation. If problems are found, alarms are issued in a timely manner to ensure the normal execution of the project.
[0051] Exemplarily, the work information of each staff member in each work team is uploaded to the blockchain through the corresponding distributed node, and each node can access the work information of other nodes.
[0052] Optionally, an alarm node is designed, and the alarm node is used to obtain working information of multiple distributed nodes and issue alarm prompts based on the working information.
[0053] The extracted multiple distributed nodes are nodes corresponding to the work teams to which the staff members who need to perform work evaluation belong.
[0054] For example, the work stage information reflects the stage corresponding to the work task. The tasks in each stage focus on different aspects.
[0055] S202. Determine multiple target statistical strategies according to multiple target work information, and perform statistical processing on the multiple target work information using the multiple target statistical strategies to obtain multiple target statistical information.
[0056] Among them, target statistics are used to indicate the degree of work completion.
[0057] Exemplarily, the target work information is obtained based on the work records of the staff. The target work information does not directly reflect the problems in the work, and the target work information needs to be processed to extract the problems in the work.
[0058] In the related art, existing problems are extracted from target work information manually according to fixed strategies.
[0059] The target statistical strategy in the present application is a dynamic strategy. Specifically, the target statistical strategy that matches the target work information is determined, and the target statistical information is obtained by performing statistical processing using the target statistical strategy.
[0060] It can be understood that determining a target statistical strategy that matches the target work information is more targeted than a fixed strategy and can improve the accuracy of alarm prompts.
[0061] S203: Determine corresponding multiple target improvement measures according to multiple target statistical information.
[0062] Among them, target improvement measures are used to improve the degree of work completion.
[0063] Exemplarily, multiple statistical information is obtained by performing statistics according to multiple indicator dimensions, each indicator dimension corresponds to a work problem type, and corresponding target improvement measures are determined according to the statistical information of each work problem type.
[0064] Combined with the scenario example, the indicators include but are not limited to at least one of the following: code weighted defect rate, task weighted defect rate, personnel defect reopening rate, backlog defect ratio, number of requirements analysis, average requirements analysis time, code volume, developer workload, development task weighted number, or development and testing combined working hours, etc. For example, if the code weighted defect rate is too high, it will affect the quality of the product, and the corresponding target improvement measures are intended to improve the coding level of the staff.
[0065] If the weighted defect rate of the task is too high, the corresponding target improvement measures are aimed at improving the code quality of the staff, specifically strengthening coding self-testing and code walkthrough.
[0066] If the staff defect reopening rate is high, the corresponding target improvement measures are aimed at improving the staff's ability to repair defects.
[0067] If the backlog of defects accounts for a high proportion, the project cycle will be too long. The purpose of the corresponding target improvement measures is to ensure that the defects are resolved on time.
[0068] If the number of demand analyses is small, it means that the staff's efficiency in analyzing demand is low, and the corresponding target improvement measures are aimed at improving work efficiency.
[0069] If the average demand analysis time is long, it means that the staff is less efficient in analyzing demand, and the corresponding target improvement measures are intended to improve work efficiency.
[0070] The amount of code reflects the workload of staff, and the corresponding target improvement measures are aimed at optimizing the work arrangements of staff.
[0071] If the developer workload is too high or too low, it means that the work distribution is unreasonable. The corresponding target improvement measure is to improve the rationality of the allocated work.
[0072] If the weighted number of development tasks is low, it means that the staff's efficiency in completing tasks is low, and the corresponding target improvement measures are intended to improve the efficiency of completing tasks.
[0073] The comprehensive working hours of development and testing reflect the workload of staff through working hours, and the corresponding target improvement measures are aimed at improving the rationality of work allocation.
[0074] S204: Generate warning information for target staff members of the target work team according to the work stage information, multiple target statistical information, and multiple target improvement measures.
[0075] Combined with the scenario example, by uploading multiple target statistical information and multiple target improvement measures to the blockchain, the integrity and immutability of the information can be ensured.
[0076] Optionally, the distributed node corresponding to the work team to which the staff member belongs can subscribe to the alarm node, so as to obtain the information of the alarm node in a timely manner, thereby improving the efficiency of the alarm prompt.
[0077] Combined with the scenario example, the focus of the staff's work is determined according to the work stage information, the indicator dimension to be focused on is determined according to the focus, and the statistical information of the indicator dimension is used as the focus of the alarm prompt.
[0078] S205: Send the warning information to the project management platform so that the project management platform can complete the warning prompt to the target staff.
[0079] Exemplarily, the project management platform establishes a communication connection with each work team, issues an alarm to the work team based on the communication connection, and the work team then sends the alarm to multiple staff members.
[0080] Optionally, the project management platform establishes a correspondence between each work team and the communication connection, and issues an alarm prompt based on the correspondence.
[0081] Combined with the scenario example, when the project management platform receives alarm information, it automatically determines the corresponding communication connection according to the work team corresponding to the alarm information, and sends the alarm information to the corresponding work team through the communication connection, so that the work team can optimize the work in time according to the alarm information and improve the efficiency of the alarm prompt.
[0082] The work evaluation alarm method for developers of information-based R&D projects provided by the embodiment of the present application is applied to a server, including: extracting multiple target work information of multiple distributed nodes of a blockchain through a subscription function, and the multiple target work information at least includes work stage information, wherein the distributed nodes of the blockchain correspond to the work teams one by one, and each work team includes multiple staff members; determining multiple target statistical strategies, and statistically processing the multiple target work information through multiple target statistical strategies to obtain multiple target statistical information, wherein the target statistical information is used to indicate the degree of completion of the work; determining the corresponding multiple target improvement measures according to the multiple target statistical information, and the target improvement measures are used to improve the degree of completion of the work; uploading the multiple target statistical information and the multiple target improvement measures to the blockchain, so that the blockchain generates the warning information for the target staff of the target work team according to the multiple target statistical information and the multiple target improvement measures; sending the warning information to the project management platform, so that the project management platform completes the warning prompt for the target staff member. The above scheme determines the target statistical strategy according to the target work information including the work stage information, which can effectively combine the importance of the work compared to the fixed warning strategy, thereby improving the accuracy of the warning prompt.
[0083] Based on any of the above embodiments, Figure 3 , explains the detailed process of work evaluation alerts for developers in information technology R&D projects.
[0084] Figure 3 A flowchart of a method for evaluating and alerting developers of an information technology R&D project provided by an embodiment of the present application. Figure 3 As shown, the method includes:
[0085] S301. Receive an alarm indication, where the alarm indication includes multiple target team identifiers.
[0086] Exemplarily, an assessment alert for developer work is triggered by an alert indication.
[0087] Exemplarily, the target team identifier is a unique identifier of the target work team, and the corresponding target work team can be accurately determined through the target team identifier, thereby improving the accuracy of the alarm.
[0088] Optionally, a period of the alarm indication is set, and the alarm indication is automatically triggered every period.
[0089] S302: Determine the correspondence between the distributed nodes and the team identifiers.
[0090] Among them, there is a one-to-one correspondence between distributed nodes and team identifiers.
[0091] Optionally, the corresponding relationship is stored in the blockchain, thereby ensuring the integrity and immutability of the corresponding relationship.
[0092] S303: Determine multiple target nodes according to multiple target team identifiers and corresponding relationships.
[0093] Exemplarily, a node corresponding to each target team identifier in the corresponding relationship is determined as a target node, and the multiple target nodes are all nodes of the blockchain.
[0094] Combined with the scenario example, the work team corresponding to a part of all the nodes on the blockchain includes staff who need to be evaluated and alerted, and the multiple target nodes are determined based on multiple target team identifiers and corresponding relationships.
[0095] S304. Acquire multiple target work information from multiple target nodes.
[0096] Next, combine Figure 4 Acquisition of multiple target work information is described.
[0097] Figure 4 A schematic diagram of obtaining multiple target work information provided by an embodiment of the present application. Figure 4 As shown, the target node is determined from all nodes of the blockchain according to multiple target team identifiers and corresponding relationships, and multiple target work information is obtained from the target node.
[0098] A feasible implementation method can obtain multiple target working information through the following method: determine multiple node information corresponding to multiple target nodes; determine multiple keys corresponding to multiple target nodes; decrypt the multiple node information according to the multiple keys to obtain multiple working information corresponding to the multiple target nodes, where the working information is the full information stored in the target node; determine multiple target working information based on the multiple working information.
[0099] Exemplarily, the node information of each node in the blockchain is stored in encrypted form, which can ensure the integrity and non-tamperability of the node information.
[0100] In combination with the scenario example, the node information includes all encrypted work information of each worker in the work team corresponding to the target node. The multiple work information is obtained through decryption processing, and the work information related to the alarm indication can be determined from the multiple work information and used as the target work information.
[0101] Optionally, the work information required for this alarm indication is extracted from the node information, and the alarm prompt is issued based on the work information, which can reduce the amount of work information to be processed, thereby improving the efficiency of the alarm prompt.
[0102] In this feasible implementation, encrypted storage can improve the integrity and non-tamperability of node information, thereby improving the accuracy of alarm prompts.
[0103] A feasible implementation method can determine multiple target work information by the following method: determine the time and personnel identification corresponding to each work information; determine multiple target work information from multiple work information according to a preset time period, the time corresponding to each work information, multiple preset personnel identifications, and the personnel identification corresponding to each work information, the time corresponding to each target work information is within the preset time period, and the personnel identification corresponding to each target work information belongs to multiple preset personnel identifications.
[0104] The alarm indication also includes a preset time period and multiple preset personnel identifications.
[0105] Combined with the scenario example, according to the requirements of the information technology R&D project, alarm prompts can be issued regularly. For example, an alarm prompt can be issued once every quarter, and the preset period is the period corresponding to a quarter. The time corresponding to the work information is the time when the work information is generated. The corresponding time is uploaded at the same time as the work information is uploaded through the distributed node. For example, if the preset period is the fourth quarter, the time corresponding to each target work information is within the fourth quarter.
[0106] Combined with the scenario example, according to the requirements of the information technology research and development project, alarm prompts can be issued to a part of the staff in the work team, and these staff correspond to preset personnel identifications.
[0107] In this feasible implementation, the scope of the target work information can be accurately controlled by presetting the time period and presetting the personnel identification, thereby improving the accuracy of the alarm based on the target work information.
[0108] S305. Determine multiple target statistical strategies according to the multiple target work information, and perform statistical processing on the multiple target work information using the multiple target statistical strategies to obtain multiple target statistical information.
[0109] Among them, target statistics are used to indicate the degree of work completion.
[0110] A feasible implementation method can determine multiple target statistical strategies through the following method: determine multiple statistical types; determine multiple benchmark values corresponding to the multiple statistical types based on multiple target work information; determine multiple statistical strategies corresponding to the multiple statistical types based on the multiple benchmark values; determine that the target statistical strategy includes multiple statistical strategies.
[0111] Among them, each statistical type corresponds to an indicator dimension. Multiple statistical types can be used to perform statistics on multiple indicator dimensions separately, avoiding conflicts in information of different indicator dimensions during statistics.
[0112] Among them, the benchmark value is a reference value obtained by integrating information of multiple target tasks.
[0113] Optionally, a statistical value corresponding to any indicator dimension is determined, and the benchmark value may be the maximum value or average value of the statistical value of each target work team.
[0114] Combined with the scenario example, taking the code weighted defect rate indicator dimension as an example, the code weighted defect rate of each target worker is calculated, and the benchmark value corresponding to the code weighted defect rate is determined.
[0115] Among them, multiple statistical strategies are used to perform statistics on corresponding indicator dimensions.
[0116] Combined with the scenario example, different indicator dimensions correspond to different statistical value calculation methods. For example, the statistical value calculation method corresponding to the code weighted defect rate indicator can be the ratio of the product of the weighted total number of internal test defects and 1000 to the number of code change lines in the preset period. Optionally, remove more than 1000 lines of code submitted in a single submission. Through the analysis of the number of code lines submitted historically, in most cases, the number of code lines submitted by staff at a time does not exceed 1000 lines. Large batches of code submissions generally appear in scenarios of code merging, batch copying, or deletion. In order to improve the accuracy of the number of code lines, more than 1000 lines of code submitted in a single submission are removed.
[0117] The statistical value calculation method corresponding to the task weighted defect rate indicator can be the ratio of the total number of weighted defects to the total number of weighted tasks. Optionally, the weight can be determined according to the difficulty of the task.
[0118] The statistical value calculation method corresponding to the personnel defect reopening rate indicator can be the ratio of the number of internal test defects reopened by developers to the total number of internal test defects of developers.
[0119] The statistical value calculation method corresponding to the backlog defect ratio indicator can be the ratio of the total number of long internal testing defects to the total number of closed internal testing defects. Among them, long defects are defects whose duration between the resolution time and the creation time is greater than the preset duration.
[0120] The statistical value calculation method corresponding to the demand analysis number indicator can be the number of third-level demands for demand analysis within a preset time period.
[0121] The statistical value calculation method corresponding to the average demand analysis time indicator can be the ratio of the total demand analysis time of developers to the number of demand analyses by developers.
[0122] The statistical value calculation method corresponding to the code volume indicator can be the number of code lines changed in a preset period. Optionally, the code with more than 1,000 lines submitted in a single time is excluded.
[0123] The statistical value calculation method corresponding to the developer workload indicator may be a ratio of the developer's actual workload in a preset period to the standard workload in the preset period multiplied by 100, where 100 may be other coefficients.
[0124] The statistical value calculation method corresponding to the weighted number indicator of development tasks can be the weighted total number of design, coding, and self-test tasks within a preset time period.
[0125] The statistical numerical calculation method corresponding to the comprehensive working time indicator of development and testing can be the total time consumed by coding tasks, self-test tasks, non-code development tasks, and tasks of writing and running unit tests within a preset period of time.
[0126] Combined with the scenario example, taking the code weighted defect rate as an example, the calculation formula for calculating the statistical information of any staff member can be:
[0127]
[0128] Among them, T represents statistical information, A represents the standard score, which corresponds to the indicator type, B represents the benchmark value, C represents the statistical value of any staff member, D represents the minimum value of the statistical values of all staff members, γ1 is the first coefficient, γ2 is the second coefficient, the first coefficient and the second coefficient correspond to the indicator type respectively, and the sum of the first coefficient and the second coefficient is 1.
[0129] Combined with the scenario example, taking the developer workload indicator as an example, the calculation formula for calculating the statistical information of any worker can be:
[0130]
[0131] Among them, T represents statistical information, A represents the standard score, the standard score corresponds to the indicator type, ρ1 is the statistical value of the developer workload, and ρ2 is the benchmark workload.
[0132] In this feasible implementation, the statistical strategy corresponding to each statistical type is determined respectively, which can improve the pertinence of the statistical strategy and thus improve the accuracy of alarm enhancement.
[0133] S306: Determine multiple sub-statistical information corresponding to the target staff member.
[0134] Exemplarily, statistics are performed on multiple indicator dimensions respectively to obtain sub-statistical information corresponding to each indicator dimension.
[0135] S307: Determine the correspondence between statistical information and improvement measures.
[0136] Optionally, the corresponding relationship may include multiple statistical ranges and improvement measures corresponding to each statistical range.
[0137] In combination with the scenario example, for any statistical information, the statistical range in which the statistical information is located is determined, and the improvement measures corresponding to the statistical range are determined as the improvement measures corresponding to the statistical information.
[0138] S308. Determine multiple target improvement measures corresponding to the target staff members based on the multiple sub-statistical information and the corresponding relationships.
[0139] Next, combine Figure 5 Describe the identified improvement measures.
[0140] Figure 5 A schematic diagram of determining improvement measures provided in an embodiment of the present application. Figure 5 As shown, multiple sub-statistical information of the staff is determined, each sub-statistical information corresponds to an indicator dimension, and multiple corresponding improvement measures are determined according to the multiple sub-statistical information. For example, improvement measure 1 is used to optimize the work problem corresponding to sub-statistical information 1.
[0141] S309: Generate warning information for target staff members of the target work team according to the work stage information, multiple target statistical information, and multiple target improvement measures.
[0142] It should be noted that the execution process of S309 refers to S204 and will not be repeated here.
[0143] S310: Send the alarm information to the project management platform so that the project management platform can complete the alarm prompt to the target staff.
[0144] It should be noted that the execution process of S310 refers to S205 and will not be repeated here.
[0145] A feasible implementation method is for any target staff member; the method also includes: determining multiple weights corresponding to multiple sub-statistical information based on work stage information; performing weighted summation processing on multiple sub-statistical information through multiple weights to obtain target statistical information of the target work team; and issuing an alarm prompt to the target staff member based on the target statistical information and multiple improvement measures.
[0146] Next, combine Figure 6 Describe the warning prompt.
[0147] Figure 6 Schematic diagram of the alarm prompt provided in the embodiment of the present application. Figure 6As shown, multiple sub-statistical information corresponding to the staff member is determined, and the multiple sub-statistical information corresponds to multiple indicator dimensions one by one. Multiple weights are determined according to the work stage information, and the multiple weights correspond to the multiple sub-statistical information one by one. The target statistical information of the staff member is obtained by weighted summing the multiple sub-statistical information according to the multiple weights. An alarm prompt is issued according to the target statistical information and multiple improvement measures.
[0148] Combined with the scenario example, the focus of work is different in different work stages. For example, if the current work stage focuses on work efficiency, the sub-statistical information corresponding to the number of demand analyses and the average demand analysis duration will have a higher weight.
[0149] In this feasible implementation, the target statistical information obtained by weighted calculation based on the work stage information can accurately reflect the focus of the work, thereby improving the accuracy of the alarm prompt.
[0150] Figure 7 A schematic diagram of a work evaluation alarm device for developers of an information technology R&D project provided in an embodiment of the present application. Figure 7 As shown, the developer work evaluation alarm device 70 of the information technology R&D project may include: an extraction module 71, a processing module 72, a determination module 73, a generation module 74, and a sending module 75, wherein:
[0151] The extraction module 71 is used to extract multiple target work information of multiple distributed nodes of the blockchain through a subscription function, wherein the multiple target work information at least includes work stage information. The distributed nodes of the blockchain correspond one-to-one to the work teams, and each work team includes multiple staff members.
[0152] The processing module 72 is used to determine multiple target statistical strategies based on multiple target work information, and perform statistical processing on the multiple target work information through the multiple target statistical strategies to obtain multiple target statistical information, wherein the target statistical information is used to indicate the degree of work completion.
[0153] The determination module 73 is used to determine a plurality of corresponding target improvement measures according to a plurality of target statistical information, wherein the target improvement measures are used to improve the degree of work completion.
[0154] The generating module 74 is used to generate warning information for target staff members of the target work team according to the work stage information, multiple target statistical information and multiple target improvement measures.
[0155] The sending module 75 is used to send the alarm information to the project management platform so that the project management platform can complete the alarm prompt to the target staff.
[0156] Optionally, the extraction module 71 may execute Figure 2 S201 in the embodiment.
[0157] Optionally, the processing module 72 may execute Figure 2 S202 in the embodiment.
[0158] Optionally, the determination module 73 may execute Figure 2 S203 in the embodiment.
[0159] Optionally, the generation module 74 may execute Figure 2 S204 in the embodiment.
[0160] Optionally, the sending module 75 may execute Figure 2 S205 in the embodiment.
[0161] It should be noted that the developer work evaluation alarm device for the information-based R&D project shown in the embodiment of the present application can execute the technical solution shown in the above method embodiment, and its implementation principle and beneficial effects are similar, which will not be repeated here.
[0162] In a possible implementation, the extraction module 71 is specifically used to: receive an alarm indication, the alarm indication including multiple target team identifiers; determine the correspondence between distributed nodes and team identifiers; determine multiple target nodes based on multiple target team identifiers and the correspondence; and obtain multiple target work information from the multiple target nodes.
[0163] In one possible implementation, the extraction module 71 is specifically used to: determine multiple node information corresponding to multiple target nodes; determine multiple keys corresponding to multiple target nodes; decrypt the multiple node information according to the multiple keys to obtain multiple work information corresponding to the multiple target nodes, where the work information is the full amount of information stored in the target node; determine multiple target work information based on the multiple work information.
[0164] In a possible implementation, the alarm indication also includes a preset time period and multiple preset personnel identifiers; the extraction module 71 is specifically used to: determine the time and personnel identifier corresponding to each work information; according to the preset time period, the time corresponding to each work information, multiple preset personnel identifiers, and the personnel identifier corresponding to each work information, determine multiple target work information from multiple work information, the time corresponding to each target work information is within the preset time period, and the personnel identifier corresponding to each target work information belongs to multiple preset personnel identifiers.
[0165] Figure 8 A schematic diagram of a work evaluation alarm device for developers of an information technology R&D project provided in an embodiment of the present application. Figure 7 Based on the embodiment shown, Figure 8As shown, the developer work evaluation alarm device 80 of the information technology R&D project also includes: an execution module 76, an optimization module 77, and a calculation module 78, wherein:
[0166] The execution module 76 is used to: determine multiple statistical types; determine multiple benchmark values corresponding to the multiple statistical types based on multiple target work information; determine multiple statistical strategies corresponding to the multiple statistical types based on the multiple benchmark values; and determine that the target statistical strategy includes multiple statistical strategies.
[0167] The optimization module 77 is used to: determine multiple sub-statistical information corresponding to the target staff member; determine the corresponding relationship between the statistical information and the improvement measures; and determine multiple target improvement measures corresponding to the target staff member based on the multiple sub-statistical information and the corresponding relationship.
[0168] The calculation module 78 is used to: determine multiple weights corresponding to multiple sub-statistical information according to the work stage information; perform weighted summation processing on the multiple sub-statistical information through the multiple weights to obtain the target statistical information of the target work team; and issue alarm prompts to the target staff according to the target statistical information and multiple improvement measures.
[0169] Fig. 9 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application is shown in FIG. Fig. 9 As shown, the electronic device includes:
[0170] The electronic device includes a processor 291 and a memory 292; it may also include a communication interface 293 and a bus 294. The processor 291, the memory 292, and the communication interface 293 may communicate with each other through the bus 294. The communication interface 293 may be used for information transmission. The processor 291 may call the logic instructions in the memory 292 to execute the method of the above embodiment.
[0171] In addition, the logic instructions in the above-mentioned memory 292 can be implemented in the form of software functional units and can be stored in a computer-readable storage medium when sold or used as an independent product.
[0172] The memory 292 is a computer-readable storage medium that can be used to store software programs and computer executable programs, such as program instructions / modules corresponding to the methods in the embodiments of the present application. The processor 291 executes functional applications and data processing by running the software programs, instructions, and modules stored in the memory 292, that is, implementing the methods in the above method embodiments.
[0173] The memory 292 may include a program storage area and a data storage area, wherein the program storage area may store an operating system and an application required for at least one function; the data storage area may store data created according to the use of the terminal device, etc. In addition, the memory 292 may include a high-speed random access memory and may also include a non-volatile memory.
[0174] An embodiment of the present application provides a non-temporary computer-readable storage medium, in which computer-executable instructions are stored. When the computer-executable instructions are executed by a processor, they are used to implement the method as described in the above embodiment.
[0175] An embodiment of the present application provides a computer program product, including a computer program, which implements the method of the above embodiment when the computer program is executed by a processor.
[0176] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all optional embodiments, and the actions and modules involved are not necessarily required by the present application.
[0177] It should be further noted that, although the various steps in the flowchart are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence in the order indicated by the arrows. Unless there is a clear description in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a portion of the steps in the flowchart may include multiple sub-steps or multiple stages, and these sub-steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these sub-steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a portion of the sub-steps or stages of other steps.
[0178] It should be understood that the above-mentioned device embodiments are only illustrative, and the device of the present application can also be implemented in other ways. For example, the division of units / modules in the above-mentioned embodiments is only a logical function division, and there may be other division methods in actual implementation. For example, multiple units, modules or components can be combined, or can be integrated into another system, or some features can be ignored or not executed.
[0179] In addition, unless otherwise specified, each functional unit / module in each embodiment of the present application may be integrated into one unit / module, each unit / module may exist physically separately, or two or more units / modules may be integrated together. The above-mentioned integrated unit / module may be implemented in the form of hardware or in the form of a software program module.
[0180] If the integrated unit / module is implemented in the form of hardware, the hardware may be a digital circuit, an analog circuit, etc. The physical implementation of the hardware structure includes but is not limited to transistors, memristors, etc. The processor may be any appropriate hardware processor, such as CPU, GPU, FPGA, DSP, and ASIC, etc. The storage unit may be any appropriate magnetic storage medium or magneto-optical storage medium, such as Resistive Random Access Memory (RRAM), Dynamic Random Access Memory (DRAM), Static Random Access Memory (SRAM), Enhanced Dynamic Random Access Memory (EDRAM), High-Bandwidth Memory (HBM), Hybrid Memory Cube (HMC), etc.
[0181] If the integrated unit / module is implemented in the form of a software program module and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a memory, including a number of instructions to enable a computer device (which can be a personal computer, server or network device, etc.) to execute all or part of the steps of the various embodiments of the present application. The aforementioned memory includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, disk or optical disk and other media that can store program codes.
[0182] In the above embodiments, the description of each embodiment has its own emphasis. For the part not described in detail in a certain embodiment, please refer to the relevant description of other embodiments. The technical features of the above embodiments can be combined arbitrarily. In order to make the description concise, all possible combinations of the technical features in the above embodiments are not described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0183] Those skilled in the art will readily appreciate other embodiments of the present application after considering the specification and practicing the invention disclosed herein. The present application is intended to cover any modification, use or adaptation of the present application, which follows the general principles of the present application and includes common knowledge or customary techniques in the art that are not disclosed in the present application. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present application are indicated by the following claims.
[0184] It should be understood that the present application is not limited to the precise structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present application is limited only by the appended claims.
Claims
1. A work evaluation alarm method for developers of information technology R&D projects, characterized in that: Applicable to servers, including: Extracting multiple target work information of multiple distributed nodes of the blockchain through a subscription function, wherein the multiple target work information at least includes work stage information, the distributed nodes of the blockchain correspond to work teams one by one, and each work team includes multiple staff members; Determine a plurality of target statistical strategies according to the plurality of target work information, and perform statistical processing on the plurality of target work information by using the plurality of target statistical strategies to obtain a plurality of target statistical information, wherein the target statistical information is used to indicate the degree of work completion; Determine a plurality of corresponding target improvement measures according to the plurality of target statistical information, wherein the target improvement measures are used to improve the degree of work completion; generating warning information for target staff members of the target work team according to the work stage information, the multiple target statistical information and the multiple target improvement measures; The warning information is sent to the project management platform so that the project management platform can complete the warning prompt to the target staff member.
2. The method according to claim 1, characterized in that: Through the subscription function, multiple target work information of multiple distributed nodes of the blockchain is extracted, including: receiving an alarm indication, the alarm indication including a plurality of target team identifiers; Determine the correspondence between distributed nodes and team identities; Determining multiple target nodes according to the multiple target team identifiers and the corresponding relationships; The plurality of target work information is acquired from the plurality of target nodes.
3. The method according to claim 2, characterized in that Acquiring the plurality of target work information from the plurality of target nodes includes: Determine multiple node information corresponding to the multiple target nodes; Determine multiple keys corresponding to multiple target nodes; Decrypting the plurality of node information according to the plurality of keys to obtain a plurality of working information corresponding to the plurality of target nodes, wherein the working information is the full amount of information stored in the target node; The plurality of target work information are determined according to the plurality of work information.
4. The method according to claim 3, characterized in that The alarm indication also includes a preset time period and multiple preset personnel identifications; Determining the plurality of target work information according to the plurality of work information includes: Determine the time and personnel ID corresponding to each work information; According to the preset time period, the moment corresponding to each work information, the multiple preset personnel identifiers, and the personnel identifier corresponding to each work information, the multiple target work information are determined from the multiple work information, the moment corresponding to each target work information is within the preset time period, and the personnel identifier corresponding to each target work information belongs to the multiple preset personnel identifiers.
5. The method according to any one of claims 1 to 4, characterized in that Determining multiple target statistical strategies according to the multiple target work information includes: Identify multiple statistics types; Determining a plurality of benchmark values corresponding to the plurality of statistical types according to the plurality of target work information; Determining, according to the multiple benchmark values, multiple statistical strategies corresponding to the multiple statistical types; Determining the target statistical strategy includes the plurality of statistical strategies.
6. The method according to claim 5, characterized in that For any target staff member; Determining corresponding multiple target improvement measures according to the multiple target statistical information includes: Determine a plurality of sub-statistical information corresponding to the target staff member; Determine the correspondence between statistical information and improvement measures; According to the multiple sub-statistical information and the corresponding relationships, multiple target improvement measures corresponding to the target staff are determined.
7. The method according to claim 6, characterized in that For any target staff member; the method further comprises: Determine multiple weights corresponding to the multiple sub-statistical information according to the working stage information; Performing weighted sum processing on the plurality of sub-statistical information by using the plurality of weights to obtain target statistical information of the target work team; According to the target statistical information and the multiple improvement measures, an alarm is given to the target staff member.
8. A work evaluation alarm device for developers of information technology R&D projects, characterized in that: Applicable to servers, including: An extraction module, used to extract multiple target work information of multiple distributed nodes of the blockchain through a subscription function, wherein the multiple target work information at least includes work stage information, the distributed nodes of the blockchain correspond to work teams one by one, and each work team includes multiple staff members; A processing module, used for determining a plurality of target statistical strategies according to the plurality of target work information, and performing statistical processing on the plurality of target work information by using the plurality of target statistical strategies to obtain a plurality of target statistical information, wherein the target statistical information is used for indicating the degree of work completion; A determination module, configured to determine a plurality of corresponding target improvement measures according to the plurality of target statistical information, wherein the target improvement measures are used to improve the degree of work completion; A generating module, configured to generate warning information for a target worker of a target work team according to the work stage information, the plurality of target statistical information, and the plurality of target improvement measures; The sending module is used to send the alarm information to the project management platform so that the project management platform can complete the alarm prompt to the target staff member.
9. An electronic device, characterized in that: include: A processor, and a memory communicatively connected to the processor; The memory stores computer-executable instructions; The processor executes the computer-executable instructions stored in the memory to implement the method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-executable instructions, which are used to implement the method according to any one of claims 1 to 7 when executed by a processor.
Citation Information
Patent Citations
Business node management method, device, equipment and storage medium
CN110705893A
Whole process project management platform
CN112184175A
Method and system for business planning and improved business performance
US20040260588A1