Online operation data management system and method based on big data

By using an online work data management system based on big data, the inefficiency of manually judging project implementation progress has been solved, and efficient, transparent and on-time project management has been achieved.

CN119027053APending Publication Date: 2024-11-26ANHUI DINGXIN PROJECT MANAGEMENT LTD BY SHARE LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411129423.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In existing technologies, project implementation progress needs to be judged manually, which leads to low efficiency and slow response, increases project management costs, and affects rapid response and timely adjustments.

Method used

An online operation data management system based on big data is adopted, including project bidding, implementation and acceptance modules. Contractors are selected through online bidding, material information is monitored in stages of the project, and drones are used to collect implementation progress images and compare them with drawings to evaluate progress and conduct quality inspection.

Benefits of technology

It enables full-process online monitoring of project management, improves efficiency and transparency, reduces the workload of manual review, ensures on-time project completion, and reduces the risk of delays.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119027053A_ABST
    Figure CN119027053A_ABST
Patent Text Reader

Abstract

The invention discloses an online operation data management system and method based on big data, relates to the technical field of project operation data management, and solves the technical problems that in the prior art, the project implementation progress needs to be judged manually, the efficiency is low, and the response is slow. According to the invention, a project is divided into a plurality of implementation stages, and material information of each implementation stage of the project is monitored; acquiring implementation progress images of each implementation stage of the project, comparing the implementation progress images with the plan real-time images of the corresponding implementation stages, evaluating the implementation progress of the project, and formulating the subsequent working efficiency according to the implementation progress; and finally, performing quality inspection evaluation after the project is completed. Through staged implementation, real-time monitoring and evaluation and strict quality inspection after completion, fine management and control of the whole process of the project are realized, the implementation efficiency and quality of the project are improved, the project cost is reduced, and the controllability of the project is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of project operation data management, and specifically relates to an online operation data management system and method based on big data. Background Art

[0002] With the increasing complexity of project management, traditional project management methods can no longer meet the needs of modern project management.

[0003] The patent application with publication number CN109949018A discloses a full-process tracking system for construction project management, including a cloud server, a screening module, a memory and a local server. The cloud server is connected to the local server, the local server has a built-in memory, and the cloud server has a built-in screening module. The cloud server can collect the location information of personnel, materials and mechanical equipment and update it in real time. The cloud server is used to obtain random client locations and transmit the client location information to the navigation module. The navigation module establishes a navigation path from the current client location to the target location information. The cloud server points out the direction to the target location to the staff holding the client according to the navigation path. The local server is used to store the relevant calculation result information of the cloud server, and the local server can also pre-process the relevant information of each client.

[0004] The above-mentioned prior art realizes the whole process management of construction projects from project approval to financing and construction; however, the implementation progress of the project needs to be manually determined. This inefficient determination method not only increases the project management cost, but also may affect the rapid response and timely adjustment of the project; therefore, the present invention provides an online operation data management system and method based on big data. Summary of the invention

[0005] The present invention aims to solve at least one of the technical problems existing in the prior art; to this end, the present invention proposes an online job data management system and method based on big data, which is used to solve the technical problems in the prior art that manual determination of project implementation progress is required, which has low efficiency and slow response.

[0006] To achieve the above-mentioned purpose, the first aspect of the present invention provides an online operation data management system and method based on big data, including a project implementation module, and a project bidding module and a project acceptance module connected thereto;

[0007] Project bidding module: used to conduct online bidding and determine the contracting companies;

[0008] Project implementation module: used to divide the project into several implementation stages, monitor the material information of each implementation stage of the project; collect the implementation progress images of each implementation stage of the project, and compare them with the planned implementation drawings of the corresponding implementation stage to evaluate the implementation progress of the project; and formulate subsequent work efficiency according to the implementation progress;

[0009] Project acceptance phase: used for quality inspection and evaluation after project completion.

[0010] Preferably, the online bidding and determining the contracting enterprise include:

[0011] The tenderer publishes the tender information in the tender system; the tender information includes basic project information and bidding qualification requirements;

[0012] The bidding system selects enterprises that meet the bidding qualification requirements from the database and obtains a number of enterprises to be bid; extracts the information of a number of enterprises to be bid, evaluates the credibility of each enterprise to be bid, and the enterprise with the highest credibility is the contracting enterprise.

[0013] Preferably, the bidding companies register and log into the bidding system by themselves and input the company information. When the bidding information is released, the bidding system will automatically extract the company information that meets the qualifications of the bidding project from the database; the company information includes the company's basic information, financial information and qualification information.

[0014] The bidding system of the present invention stores information of each enterprise. When bidding information is released, the bidding system will automatically screen according to the bidding qualification requirements required by the bidding information, and quickly find enterprises that meet the bidding qualification requirements; this process reduces the workload of manual review, makes the bidding process more efficient, and helps to ensure that all participants are treated fairly.

[0015] Preferably, based on the information of the bid-to-be-bid enterprises, the evaluation of the credibility of each bid-to-be-bid enterprise includes:

[0016] Extract the number of successes and failures of the same type of bidding projects from the basic information of the bidding enterprise; calculate the ratio of successes to failures, marked as CGB;

[0017] Extract the skills of the technical personnel of the bidding enterprises from the qualification information of the bidding enterprises, count the number of skills that meet the requirements of the bidding project, calculate the proportion of the number of skills to the number of skills required by the bidding project, and mark it as JNB;

[0018] Extract the financial data of the bidding enterprise from its financial information, calculate the proportion of working capital to project cost, and mark it as ZJB;

[0019] The credibility XYD of the bidding enterprise is calculated by the formula XYD=α×CGB+β×JNB+γ×ZJB; among them, α, β, γ are weight coefficients, and α+β+γ=1.

[0020] The present invention comprehensively evaluates the enterprise's capabilities from three aspects: project success rate, skill matching and financial stability. This multi-dimensional evaluation method helps to fully understand the comprehensive strength of the enterprise and quickly screen out enterprises with excellent qualifications from a large number of bidding enterprises as contracting enterprises; ensure that the winning enterprise has sufficient contracting capacity to complete the project and reduce the possibility of project delay or failure. In addition, this method has clear evaluation standards and calculation formulas to increase the transparency of the evaluation process.

[0021] Preferably, the project is divided into several implementation stages, and the material information of each implementation stage of the project is monitored, including:

[0022] The project is divided into several implementation stages, and the material usage information of each implementation stage is allocated, and an online material usage record is made to record the planned material quantity, inventory quantity and pre-feed quantity; among which, pre-feed quantity = planned material quantity - inventory quantity + additional quantity, and when the inventory quantity is less than the planned material quantity, the warehouse is replenished with materials; and the online material usage record also includes the specifications and application locations of the materials; among which, the additional quantity is the additional quantity purchased on the basis of the material quantity required to meet the implementation stage.

[0023] The present invention divides the project into several implementation stages, and makes detailed planning and allocation of the materials required for each stage, which helps to more accurately control each stage with clear goals and milestones, making project management more orderly and efficient; and the online material usage record provides real-time data updates, which is convenient for managers to grasp the project progress and material status at any time, track the material requirements of the project in real time, reduce delays caused by material shortages, improve construction efficiency, and effectively control costs and ensure the smooth progress of the project.

[0024] Preferably, collecting the implementation progress images of each implementation stage of the project and comparing them with the implementation drawings of the corresponding implementation stage to evaluate the implementation progress of the project includes:

[0025] According to the building diagram shown in the implementation drawing, the implementation project image, i.e., the implementation progress image, is collected by using a drone; wherein the angle of the image collected by the drone is the same as that of the implementation drawing; the implementation drawing is a CAD drawing;

[0026] Adjust the size of the implementation progress image to match the size of the implementation drawing;

[0027] The building image is separated from the implementation progress image, the corner points of the building are marked in the implementation drawings, the corner points of the building image are overlapped with the corresponding corner points in the implementation drawings, and the overlapping part of the building image and the building in the implementation drawings is obtained. The area of ​​the overlapping part is ratioed with the total area of ​​the building to obtain the implementation progress of the project.

[0028] Preferably, there are several implementation drawings in each implementation stage, that is, the overlapping area is the sum of the overlapping areas between several implementation drawings and corresponding building images; the total building area is the sum of the areas of the buildings in several implementation drawings.

[0029] The present invention extracts the overlapping parts between the implementation progress image and the implementation drawings, sums up the areas of all the overlapping parts and performs ratio processing with the total area of ​​the buildings in all the implementation drawings to obtain the implementation progress of the project; through precise image processing technology, a progress evaluation that is very close to the actual situation can be obtained. The image comparison intuitively shows the difference between the actual progress of the project and the design drawings, and provides accurate data support for project managers to adjust resource allocation or construction plans according to the progress evaluation results.

[0030] Preferably, the formulating of subsequent work efficiency according to the implementation progress includes:

[0031] The subsequent daily work efficiency GZi of implementation stage i is calculated by the formula GZi=(1-SJD) / (Ti-T0); where SJD is the implementation progress; Ti is the planned duration of the implementation stage, i is the number of the implementation stage, which is a positive integer; T0 is the current implementation duration.

[0032] The present invention obtains the current implementation progress, the planned duration of the implementation phase, and the current implementation duration, analyzes the efficiency of subsequent project construction, ensures that the project is completed on schedule, and avoids losses caused by project delays; the work arrangement based on the actual progress is more scientific and reasonable, which helps to improve the overall efficiency of the project.

[0033] Preferably, a quality inspection and evaluation is conducted after the completion of the project, including:

[0034] The projects are checked one by one according to the project acceptance form, and an acceptance report is written. Unqualified projects will not be accepted and corresponding rectification will be carried out. Among them, the project acceptance form includes several inspection items.

[0035] Preferably, a management method of an online job data management system based on big data comprises the following steps:

[0036] Step 1: Conduct online bidding and determine the contracting company;

[0037] Step 2: During project implementation, divide the project into several implementation stages and monitor the material information of each implementation stage;

[0038] Step 3: Collect the implementation progress images of each implementation stage of the project and compare them with the planned real-time images of the corresponding implementation stage to evaluate the implementation progress of the project and formulate subsequent work efficiency according to the implementation progress;

[0039] Step 4: Conduct quality inspection and evaluation after project completion.

[0040] Compared with the prior art, the present invention has the following beneficial effects:

[0041] 1. The present invention separates the actual image of the building from the implementation progress image, manually or automatically marks the key corner points of the building on the implementation drawing, extracts the overlapping part according to the correspondence between the building image and the marked corner points on the implementation drawing, calculates the ratio of the overlapping part area to the total area of ​​the buildings in all the implementation drawings, and obtains a quantitative implementation progress index, which can be used as an important basis for project managers to make decisions, helping them to evaluate the progress of the project, predict future workload and adjust resource allocation, etc.;

[0042] 2. The present invention first conducts online bidding and determines the contracting enterprise; then, during the project implementation, the project is divided into several implementation stages, and the material information of each implementation stage of the project is monitored; and the implementation progress images of each implementation stage of the project are collected, and compared with the planned real-time images of the corresponding implementation stage, the implementation progress of the project is evaluated, and the subsequent work efficiency is formulated according to the implementation progress; finally, a quality inspection and evaluation is carried out after the completion of the project; the present invention realizes the online supervision of the whole process of the project from development to implementation completion through the three stages of project bidding period, implementation period and completion period, thereby improving the efficiency and transparency of project management. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0044] Figure 1 It is a schematic diagram of the system structure of the present invention;

[0045] Figure 2 This is a schematic diagram of the process flow of the implementation progress analysis method of the present invention;

[0046] Figure 3 It is a schematic diagram of the process of the present invention. DETAILED DESCRIPTION

[0047] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0048] See also Figure 1 , the first aspect of the present invention provides an online operation data management system and method based on big data, including a project implementation module, and a project bidding module and a project acceptance module connected thereto;

[0049] The project bidding module conducts online bidding and determines the contracting company;

[0050] The tenderer publishes the tender information in the tender system; the tender information includes basic project information and bidding qualification requirements; the basic project information includes project type and project duration;

[0051] The bidding system selects enterprises that meet the bidding qualification requirements from the database and obtains a number of enterprises to be bid; enterprises that meet the requirements are initially selected based on the bidding qualification requirements to reduce the complexity of data screening. Among them, the bidding enterprises register and log in to the bidding system by themselves, enter the enterprise information, and when the bidding information is released, the bidding system will automatically extract the enterprise information that meets the bidding project qualifications from the database.

[0052] The information of several bidding companies is extracted, and the credibility of each bidding company is evaluated. The company with the highest credibility is the contracting company; the company information includes the company's basic information, financial information and qualification information.

[0053] The analysis process of the company's reputation is as follows:

[0054] Extract the number of successes and failures of the same type of bidding projects from the basic information of the bidding enterprise; calculate the ratio of successes to failures, marked as CGB;

[0055] Extract the skills of the technical personnel of the bidding enterprises from the qualification information of the bidding enterprises, count the number of skills that meet the requirements of the bidding project, calculate the proportion of the number of skills to the number of skills required by the bidding project, and mark it as JNB;

[0056] Extract the financial data of the bidding enterprise from its financial information, calculate the proportion of working capital to project cost, and mark it as ZJB;

[0057] The credibility XYD of the bidding enterprise is calculated by the formula XYD=α×CGB+β×JNB+γ×ZJB; among them, α, β, γ are weight coefficients, and α+β+γ=1.

[0058] The present invention evaluates the bidding qualification of an enterprise through its credibility; the bidding qualification is mainly closely related to the ratio of the number of successes to the number of failures, the ratio of the number of skill items to the number of skills required for the bidding project, and the ratio of working capital to the project cost. If the above three ratios are all relatively high, it indicates that the enterprise has better bidding qualification and can better undertake the construction of the project, that is, the credibility value of the enterprise is relatively large.

[0059] The project implementation module divides the project into several implementation stages and monitors the material information of each implementation stage of the project;

[0060] The project is divided into several implementation stages, and the material usage information of each implementation stage is allocated, and an online material usage record is made to record the planned material quantity, inventory quantity and pre-feed quantity; among which, pre-feed quantity = planned material quantity - inventory quantity + additional quantity, and when the inventory quantity is less than the planned material quantity, the warehouse is replenished with materials; and the online material usage record also includes the specifications and application locations of the materials; among which, the additional quantity is the additional quantity purchased on the basis of the material quantity required to meet the implementation stage.

[0061] By real-time monitoring of material storage conditions and timely supply of materials, project stagnation due to untimely supply of materials can be avoided; and the online material usage list is also used for later project quality inspection to trace the material usage of the project.

[0062] See also Figure 2 , collect implementation progress images of each implementation stage of the project, and compare them with the planned real-time images of the corresponding implementation stage to evaluate the implementation progress of the project;

[0063] Specifically, according to the building diagram shown in the implementation drawing, a drone is used to collect images of the implementation project, that is, implementation progress images; wherein the angle of the image collected by the drone is the same as that of the implementation drawing; the implementation drawing is a CAD drawing;

[0064] Adjust the implementation drawing in CAD according to the size of the implementation progress image and save it to obtain the implementation progress image and implementation drawing with the same size;

[0065] The building image is separated from the implementation progress image, the corner points of the building are marked in the implementation drawings, the corner points of the building image are overlapped with the corresponding corner points in the implementation drawings, and the overlapping part of the building image and the building in the implementation drawings is obtained. The area of ​​the overlapping part is ratioed with the total area of ​​the building to obtain the implementation progress of the project.

[0066] Among them, the corner point refers to the corner or other characteristic point of the building; the color of the part where the building image overlaps with the implementation drawing is darkened, and CAD analyzes the area of ​​the darkened part through its own "area" calculation instruction to obtain the area of ​​the overlapping part.

[0067] It should be noted that the building images were separated from the implementation progress images using the CNN neural network model;

[0068] Specifically, several images of project implementation are collected in advance; the implemented images are input into the CNN neural network model for image feature separation training; the trained CNN neural network model is marked as a CNN neural network separation model; wherein, building images are marked as 0, and non-building images are marked as 1;

[0069] The obtained implementation progress image is input into the CNN neural network separation model; the building features are separated by the CNN neural network separation model to obtain the building image.

[0070] It should be noted that there are several implementation drawings in each implementation stage. The on-site implementation images corresponding to each implementation drawing are collected, and the overlapping parts between the two are extracted. The area of ​​the overlapping part is the sum of the areas of the overlapping parts between the several implementation drawings and the corresponding building images; the total building area is the sum of the areas of the buildings in the several implementation drawings.

[0071] Develop follow-up work efficiency based on the implementation progress obtained;

[0072] Specifically, the subsequent daily work efficiency GZi of implementation stage i is calculated by the formula GZi=(1-SJD) / (Ti-T0); wherein SJD is the implementation progress; Ti is the planned duration of the implementation stage, i is the number of the implementation stage, which is a positive integer; and T0 is the current implementation duration.

[0073] The present invention evaluates the subsequent implementation work arrangement of the project through the implementation progress of the current project; the implementation work arrangement of the project is mainly closely related to the implementation progress, the planned duration of the implementation stage, and the current implementation node. If the implementation progress is faster, that is, most of the works of the entire project are completed, such as a certain percentage of the entire project is completed, the larger the value is, and the smaller the proportion of the current implementation time to the planned duration of the implementation stage is, it indicates that the current implementation stage is executed as planned or completed ahead of schedule, the subsequent work efficiency can be slowed down, and fewer construction tasks can be completed every day.

[0074] The project acceptance stage is a post-project quality inspection and evaluation. That is, the projects are inspected in turn according to the project acceptance form, and an acceptance report is written. Unqualified projects will not be accepted and corresponding rectification will be carried out. Among them, the project acceptance form includes several inspection items.

[0075] See also Figure 3 The second aspect of the present invention provides a management method for an online job data management system based on big data, comprising the following steps:

[0076] Step 1: The tenderer conducts online bidding and determines the contracting enterprise;

[0077] Step 2: During project implementation, divide the project into several implementation stages and monitor the material information of each implementation stage;

[0078] Step 3: Collect the implementation progress images of each implementation stage of the project and compare them with the planned real-time images of the corresponding implementation stage to evaluate the implementation progress of the project and formulate subsequent work efficiency according to the implementation progress;

[0079] Step 4: Conduct quality inspection and evaluation after project completion.

[0080] Part of the data in the above formula is calculated by removing the dimension and taking its numerical value. The formula is a formula closest to the actual situation obtained by software simulation of a large amount of collected data; the preset parameters and preset thresholds in the formula are set by technical personnel in this field according to actual conditions or obtained through simulation of a large amount of data.

[0081] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. An online job data management system and method based on big data, characterized in that: It includes the project implementation module, as well as the project bidding module and project acceptance module connected to it; Project bidding module: used to conduct online bidding and determine the contracting companies; Project implementation module: used to divide the project into several implementation stages, monitor the material information of each implementation stage of the project; collect the implementation progress images of each implementation stage of the project, and compare them with the planned implementation drawings of the corresponding implementation stage to evaluate the implementation progress of the project; and formulate subsequent work efficiency according to the implementation progress; Project acceptance phase: used for quality inspection and evaluation after project completion.

2. According to the big data-based online job data management system and method of claim 1, it is characterized in that: The online bidding and determination of the contracting enterprise include: The tenderer publishes the tender information in the tender system; the tender information includes basic project information and bidding qualification requirements; The bidding system selects enterprises that meet the bidding qualification requirements from the database and obtains a number of enterprises to be bid; extracts the information of a number of enterprises to be bid, evaluates the credibility of each enterprise to be bid, and the enterprise with the highest credibility is the contracting enterprise.

3. The online operation data management system and method based on big data according to claim 2 is characterized in that: Bidding companies register and log into the bidding system by themselves and input their company information. When bidding information is released, the bidding system will automatically extract the company information that meets the qualifications of the bidding project from the database; the company information includes the company's basic information, financial information and qualification information.

4. The online operation data management system and method based on big data according to claim 2 is characterized in that: Based on the information of the bidders, the evaluation of the credibility of each bidder includes: Extract the number of successes and failures of the same type of bidding projects from the basic information of the bidding enterprise; calculate the ratio of successes to failures, marked as CGB; Extract the skills of the technical personnel of the bidding enterprises from the qualification information of the bidding enterprises, count the number of skills that meet the requirements of the bidding project, calculate the proportion of the number of skills to the number of skills required by the bidding project, and mark it as JNB; Extract the financial data of the bidding enterprise from its financial information, calculate the proportion of working capital to project cost, and mark it as ZJB; The credibility XYD of the bidding enterprise is calculated by the formula XYD=α×CGB+β×JNB+γ×ZJB; among them, α, β, γ are weight coefficients, and α+β+γ=1.

5. The online operation data management system and method based on big data according to claim 1 is characterized in that: The project is divided into several implementation stages, and the material information of each implementation stage of the project is monitored, including: The project is divided into several implementation stages, and the material usage information of each implementation stage is allocated, and an online material usage record is made to record the planned material quantity, inventory quantity and pre-feed quantity; among which, pre-feed quantity = planned material quantity - inventory quantity + additional quantity, and when the inventory quantity is less than the planned material quantity, the warehouse is replenished with materials; and the online material usage record also includes the specifications and application locations of the materials; among which, the additional quantity is the additional quantity purchased on the basis of the material quantity required to meet the implementation stage.

6. The online operation data management system and method based on big data according to claim 1 is characterized in that: The implementation progress images of each implementation stage of the project are collected and compared with the implementation drawings of the corresponding implementation stage to evaluate the implementation progress of the project, including: According to the building diagram shown in the implementation drawing, the implementation project image, i.e., the implementation progress image, is collected by using a drone; wherein the angle of the image collected by the drone is the same as that of the implementation drawing; the implementation drawing is a CAD drawing; Adjust the size of the implementation progress image to match the size of the implementation drawing; The building image is separated from the implementation progress image, the corner points of the building are marked in the implementation drawings, the corner points of the building image are overlapped with the corresponding corner points in the implementation drawings, and the overlapping part of the building image and the building in the implementation drawings is obtained. The area of ​​the overlapping part is ratioed with the total area of ​​the building to obtain the implementation progress of the project.

7. The online operation data management system and method based on big data according to claim 6 is characterized in that: There are several implementation drawings in each implementation stage, that is, the overlapping area is the sum of the overlapping areas between the several implementation drawings and the corresponding building images; the total building area is the sum of the areas of the buildings in the several implementation drawings.

8. The online operation data management system and method based on big data according to claim 6 is characterized in that: The subsequent work efficiency shall be formulated according to the implementation progress, including: The subsequent daily work efficiency GZi of implementation stage i is calculated by the formula GZi=(1-SJD) / (Ti-T0); where SJD is the implementation progress; Ti is the planned duration of the implementation stage, i is the number of the implementation stage, which is a positive integer; T0 is the current implementation duration.

9. The online operation data management system and method based on big data according to claim 1 is characterized in that: After the completion of the project, a quality inspection and evaluation will be conducted, including: The projects are checked one by one according to the project acceptance form, and an acceptance report is written. Unqualified projects will not be accepted and corresponding rectification will be carried out. Among them, the project acceptance form includes several inspection items.

10. A management method for an online job data management system based on big data, characterized in that: The following steps are involved: Step 1: Conduct online bidding and determine the contracting company; Step 2: During project implementation, divide the project into several implementation stages and monitor the material information of each implementation stage; Step 3: Collect the implementation progress images of each implementation stage of the project and compare them with the planned real-time images of the corresponding implementation stage to evaluate the implementation progress of the project and formulate subsequent work efficiency according to the implementation progress; Step 4: Conduct quality inspection and evaluation after project completion.