New energy field station networking type unit optimal configuration method and device
By calculating the broadband oscillation stability margin index and node impedance model of the new energy station, the configuration of network-type units is optimized, and the problem of network-type units capacity and point configuration in the new energy station is solved, and the stable operation capability of the system is improved and consumption efficiency.
Patent Information
- Application Number
- CN202411507230.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-28
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-10-28
AI Technical Summary
In new energy stations, the capacity and point configuration of network-type units are difficult to maintain maximum power point tracking and control, which affects the efficiency of new energy consumption. There are gaps in existing methods in system stability analysis and cannot effectively support weak power grids. Stable operation.
By collecting relevant parameters of the new energy station grid connection system, calculating the broadband oscillation stability margin index, determining whether it is necessary to optimize the configuration, using the node impedance model to calculate the participation factor of the converter access node, and performing optimized configuration of the network-type unit. Until the optimal configuration is reached.
While ensuring the stable margin of wide-band oscillation of the system, the capacity and location of the network-type units are reasonably configured to improve the stable operation capability and consumption efficiency of new energy stations.
Smart Images

Figure CN119030044A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of renewable energy power generation, and in particular relates to a method and device for optimizing the configuration of a renewable energy station grid-forming unit. Background Art
[0002] Wind and solar resources are distributed inversely with load centers, and concentrated development and long-distance transmission are important forms of new energy development and utilization. The important characteristics of new energy bases are that they are far away from the AC main grid, lack conventional synchronous power support, and have relatively weak power grids, resulting in prominent system safety and stability issues. Research and analysis have shown that the characteristics of new energy power generation devices and their interaction with weak synchronous power grids are the main causes of the above problems. At present, mainstream wind and solar power generation all use phase-locked control to follow the synchronous voltage of the grid, and use multi-loop control to achieve power conversion and maximum power tracking output. Under normal operating conditions, the wide-band dynamics of the multi-loop control of the new energy power generation converter interact with the impedance characteristics of the weak grid, causing dynamic stability problems in the sub-synchronous to super-synchronous frequency range, and instability manifests itself as oscillation.
[0003] Starting from the control side of renewable energy power generation, improving the adaptability or support capabilities of renewable energy power generation to weak power grids has become a direct means to solve the above problems. Renewable energy power generation grid control technology synchronizes with the power grid through a self-synchronous control algorithm, generates its own internal potential, has the ability to independently establish and adjust frequency and voltage, and achieves grid-connected operation that does not rely on synchronous phase locking. It can effectively support the stable operation of the system under weak power grids. Therefore, it has received extensive attention and research in recent years.
[0004] However, under the large-scale, continuous and rapid development model of new energy, a large number of new energy stations that have been built and put into operation need to carry out the transformation and upgrading of grid-building technology to improve the stable operation and transmission capacity under weak power grids, and at the same time, provide space for the improvement of stability margin for the subsequent grid connection of new stations. However, due to the difference in control principles, it is difficult for new energy power generation units using grid-building control strategies to maintain maximum power point tracking control, which affects the efficiency of new energy consumption. Therefore, how to reasonably configure the capacity and layout of the grid-building units of new energy stations, while ensuring the wide-band oscillation stability margin of the system, and minimize the capacity of the grid-building units, has become a key issue in engineering applications.
[0005] Wang Yining et al. published an analysis of the optimal configuration of the proportion of direct-drive wind turbine generators in a grid-connected system, and proposed an optimal configuration analysis of the proportion of direct-drive wind turbine generators in a grid-connected system based on the equivalent short-circuit ratio. However, this method has the following disadvantages: the stability analysis of the grid-connected system cannot be simply evaluated by the size of the system short-circuit capacity; in addition, the equivalent model of the aggregated wind farm ignores the impact of the internal network topology of the wind farm on the stability of the system, which is different from the actual engineering application scenario.
[0006] Yu Guangzheng published a study on the coordinated optimization configuration method of hybrid multi-feed systems with grid-following / grid-building type, and proposed a coordinated optimization configuration method of grid-following / grid-building type based on modal decoupling. However, this method has the following disadvantages: the optimization configuration method proposed for heterogeneous hybrid multi-feed systems simplifies the equipment types in multiple frequency bands, and the stability analysis results are equivalent to those of homogeneous multi-feed systems, which is different from the actual engineering application scenarios. Summary of the invention
[0007] In order to overcome the problems existing in the above-mentioned related technologies, the present application provides a method and device for optimizing the configuration of networking units of new energy stations.
[0008] According to a first aspect of an embodiment of the present application, a method for optimizing configuration of a new energy station network unit is provided, comprising: Collect relevant parameters of the grid-connected system of new energy stations; Using the relevant parameters of the new energy station grid-connected system, a wide-band oscillation stability margin index of the new energy station grid-connected system is calculated; According to the broadband oscillation stability margin index of the new energy station grid connection, it is determined whether the new energy station grid connection system needs to be optimized; When the grid-connected system of the new energy station needs to be optimized, the node impedance model of the grid-connected system of the new energy station is used to calculate the participation factor of each converter access node in the grid-connected system of the new energy station; According to the participation factors of each converter access node in the new energy station grid-connected system, the grid-connected unit of the new energy station grid-connected system is optimally configured, and the wide-band oscillation stability margin index of the new energy station grid-connected system is recalculated until the new energy station grid-connected system reaches the optimal configuration.
[0009] Preferably, the relevant parameters of the new energy station grid-connected system include: operating point parameters of the new energy station grid-connected system, network topology parameters of the new energy station grid-connected system and control parameters of the new energy power generation unit; The operating point parameters of the new energy station grid-connected system include: voltage signals and current signals of each node in the new energy station grid-connected system; The network topology parameters of the new energy station grid-connected system include: a node admittance matrix of the new energy station grid-connected system; The control parameters of the new energy power generation unit include: main circuit parameters and control parameters of the new energy power generation unit; The main circuit parameters include: rated capacity and rated voltage of the converter, filter inductance and filter capacitance in the converter main circuit; The control parameters include: control parameters of a power link, a voltage link, a current link and a virtual impedance used in a converter controller.
[0010] Preferably, the use of the relevant parameters of the new energy station grid-connected system to calculate the new energy station grid-connected broadband oscillation stability margin index includes: Based on the relevant parameters of the new energy station grid-connected system, the impedance ratio of the new energy station grid-connected system is calculated using a pre-built new energy side aggregation impedance model; Using the impedance ratio of the new energy station grid-connected system, a stability margin function of the new energy station grid-connected system is calculated; The wide-band oscillation stability margin index of the new energy station grid-connected system is calculated using the new energy station grid-connected system stability margin function.
[0011] Preferably, the calculation formula of the new energy side aggregation impedance model includes:
[0012] The calculation formula of the impedance ratio of the new energy station grid-connected system includes:
[0013] In the above formula, is the aggregate admittance of the new energy station, is the aggregation impedance of the new energy station, is the positive sequence admittance of the new energy station, The coupling admittance of the new energy station is calculated from the positive sequence current disturbance component and the negative sequence voltage disturbance component at the grid connection point of the new energy station. The coupling admittance of the new energy station is calculated from the positive-sequence voltage disturbance component and the negative-sequence current disturbance component at the grid connection point of the new energy station. is the negative sequence admittance on the grid side, is the negative sequence admittance of the new energy station, s is the pull operator, s′ is the coupling frequency pull-down operator, Z ratio (s) is the impedance ratio of the grid-connected system of the new energy station, Z g (s) is the positive sequence impedance on the grid side.
[0014] Preferably, the calculation formula of the stability margin function of the new energy station grid-connected system includes: G(s)=1+Z ratio (s) In the above formula, Z ratio (s) is the impedance ratio of the grid-connected system of the new energy station, G(s) is the stability margin function of the grid-connected system of new energy stations, and s is the pull operator.
[0015] Preferably, the calculation formula of the broadband oscillation stability margin index of the new energy station grid connection includes:
[0016] In the above formula, γ It is the broadband oscillation stability margin index for new energy stations connected to the grid. s = jω , G(jω) is the stability margin function of the grid-connected system of new energy stations, j is the imaginary number symbol, ω is the angular frequency.
[0017] Preferably, judging whether the grid-connected system of the new energy station needs to be optimized according to the grid-connected broadband oscillation stability margin index of the new energy station includes: Determine whether the broadband oscillation stability margin index of the new energy station grid-connected is greater than or equal to the margin threshold; if the broadband oscillation stability margin index of the new energy station grid-connected is greater than or equal to the margin threshold, the new energy station grid-connected system does not need to be optimized, and the current configuration of the new energy station grid-connected system is the optimal configuration; if the broadband oscillation stability margin index of the new energy station grid-connected is less than the margin threshold, the new energy station grid-connected system needs to be optimized.
[0018] Preferably, when the new energy station grid-connected system needs to be optimized, the node impedance model of the new energy station grid-connected system is used to calculate the participation factor of each converter access node in the new energy station grid-connected system, including: According to the node impedance model of the new energy station grid-connected system, a characteristic equation of the node impedance model of the new energy station grid-connected system is obtained; The characteristic equation of the node impedance model of the new energy station grid-connected system is used to obtain the participation factor of each converter access node in the new energy station grid-connected system.
[0019] Preferably, the step of obtaining the characteristic equation of the node impedance model of the new energy station grid-connected system according to the node impedance model of the new energy station grid-connected system comprises: Determining the denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system according to the node impedance model of the new energy station grid-connected system; The denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system is set to zero, and the characteristic equation of the node impedance model of the new energy station grid-connected system is obtained by simplifying it.
[0020] Preferably, the method of using the characteristic equation of the node impedance model of the new energy station grid-connected system to obtain the participation factor of each converter access node in the new energy station grid-connected system includes: By using Schur complement transformation, the characteristic equation of the node impedance model of the grid-connected system of the new energy station is transformed into the solution of the determinant of the n+1-dimensional ordered impedance matrix to obtain the model eigenvalue; Determining stability information and oscillation property information of the new energy station grid-connected system according to the model characteristic value; When the new energy station grid-connected system is unstable, the participation factor of each converter access node in the new energy station grid-connected system under the oscillation mode is calculated according to the oscillation mode corresponding to the model eigenvalue.
[0021] Preferably, the calculation formula of the node impedance model of the new energy station grid-connected system includes:
[0022] In the above formula, s is the pull operator, s′ is the coupling frequency pull-down operator, is the n+1-dimensional positive sequence small signal current component, is the n+1-dimensional negative sequence small signal current component, is the positive-sequence node admittance matrix of the network element, is the negative-sequence node admittance matrix of the network element, is the positive sequence admittance diagonal matrix of the converter, is a diagonal matrix composed of the coupled admittances calculated from the negative-sequence current disturbance component and the positive-sequence voltage disturbance component at each node in the new energy station. is the diagonal matrix composed of the converter coupling admittance calculated from the positive sequence current disturbance component and the negative sequence voltage disturbance component at each node in the new energy station. is the negative-sequence admittance diagonal matrix of the converter, is the n+1-dimensional positive sequence small signal voltage component, It is the n+1-dimensional negative-sequence small signal voltage component.
[0023] Preferably, the calculation formula of the denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system includes:
[0024] The calculation formula of the characteristic equation of the node impedance model of the new energy station grid-connected system includes:
[0025] In the above formula, s is the pull operator, det(・) is the determinant to be solved, Y net (s) is the 2(n+1)-dimensional admittance matrix of the network element, Y reg (s)is the 2(n+1)-dimensional admittance matrix of the converter.
[0026] Preferably, the calculation formula for solving the determinant of the n+1-dimensional ordered impedance matrix includes:
[0027] The calculation formula of the model characteristic value includes:
[0028] In the above formula, s is the pull operator, det(・) is the determinant to be solved, For Solve the determinant, is the corrected equivalent positive sequence admittance of the new energy station grid-connected system, L for The left eigenvector matrix of is the eigenvalue diagonal matrix, diag{·} is the diagonal matrix, λ n is the nth eigenvalue, λ n+1 is the n+1th eigenvalue, n+1 is The rank of the matrix, T for The right eigenvector matrix of .
[0029] Preferably, the calculation formula for the participation factor of the converter access node in the new energy station grid-connected system includes: p i =L ik •T ik In the above formula, i is the converter access node in the new energy station grid-connected system, p i Connecting nodes to converters in new energy station grid-connected systems i The participation factor, T ik To reflect the inverter access nodes in the grid-connected system of the new energy station i The injected current k The characteristic trajectory effect, L ik for T ik The corresponding weight of the new energy station grid-connected system mode.
[0030] Preferably, the step of optimizing the grid-connected unit configuration of the new energy station grid-connected system according to the participation factor of each converter access node in the new energy station grid-connected system includes: From the participation factors of the converter access nodes in the new energy station grid-connected system, the grid-following converter connected to the node with the largest participation factor is selected and replaced with a grid-building converter of the same capacity.
[0031] According to a second aspect of an embodiment of the present application, a new energy station network unit optimization configuration device is provided, comprising: The collection unit is used to collect relevant parameters of the grid-connected system of the new energy station; A first calculation unit is used to calculate the wide-band oscillation stability margin index of the new energy station grid connection by using relevant parameters of the new energy station grid connection system; A judgment unit, used to judge whether the grid-connected system of the new energy station needs to be optimized according to the broadband oscillation stability margin index of the grid-connected new energy station; The second calculation unit is used to calculate the participation factor of each converter access node in the new energy station grid-connected system by using the node impedance model of the new energy station grid-connected system when the new energy station grid-connected system needs to be optimized; The optimization configuration unit is used to optimize the configuration of the grid-connected units of the new energy station grid-connected system according to the participation factors of each converter access node in the new energy station grid-connected system, and recalculate the wide-band oscillation stability margin index of the new energy station grid-connected system until the new energy station grid-connected system reaches the optimal configuration.
[0032] Preferably, the relevant parameters of the new energy station grid-connected system include: operating point parameters of the new energy station grid-connected system, network topology parameters of the new energy station grid-connected system and control parameters of the new energy power generation unit; The operating point parameters of the new energy station grid-connected system include: voltage signals and current signals of each node in the new energy station grid-connected system; The network topology parameters of the new energy station grid-connected system include: a node admittance matrix of the new energy station grid-connected system; The control parameters of the new energy power generation unit include: main circuit parameters and control parameters of the new energy power generation unit; The main circuit parameters include: rated capacity and rated voltage of the converter, filter inductance and filter capacitance in the converter main circuit; The control parameters include: control parameters of a power link, a voltage link, a current link and a virtual impedance used in a converter controller.
[0033] Preferably, the first computing unit comprises: A first calculation module is used to calculate the impedance ratio of the new energy station grid-connected system based on relevant parameters of the new energy station grid-connected system and using a pre-built new energy side aggregation impedance model; A second calculation module is used to calculate the stability margin function of the new energy station grid-connected system by using the impedance ratio of the new energy station grid-connected system; The third calculation module is used to calculate the wide-band oscillation stability margin index of the new energy station grid-connected system by using the new energy station grid-connected system stability margin function.
[0034] Preferably, the calculation formula of the new energy side aggregation impedance model includes:
[0035] The calculation formula of the impedance ratio of the new energy station grid-connected system includes:
[0036] In the above formula, is the aggregate admittance of the new energy station, is the aggregation impedance of the new energy station, is the positive sequence admittance of the new energy station, The coupling admittance of the new energy station is calculated from the positive sequence current disturbance component and the negative sequence voltage disturbance component at the grid connection point of the new energy station. The coupling admittance of the new energy station is calculated from the positive-sequence voltage disturbance component and the negative-sequence current disturbance component at the grid connection point of the new energy station. is the negative sequence admittance on the grid side, is the negative sequence admittance of the new energy station, s is the pull operator, s′ is the coupling frequency pull-down operator, Z ratio (s) is the impedance ratio of the grid-connected system of the new energy station, Z g (s) is the positive sequence impedance on the grid side.
[0037] Preferably, the calculation formula of the stability margin function of the new energy station grid-connected system includes: G(s)=1+Z ratio (s) In the above formula, Z ratio (s) is the impedance ratio of the grid-connected system of the new energy station, G(s) is the stability margin function of the grid-connected system of new energy stations, and s is the pull operator.
[0038] Preferably, the calculation formula of the broadband oscillation stability margin index of the new energy station grid connection includes:
[0039] In the above formula, γIt is the broadband oscillation stability margin index for new energy stations connected to the grid. s = jω , G(jω) is the stability margin function of the grid-connected system of new energy stations, j is the imaginary number symbol, ω is the angular frequency.
[0040] Preferably, the judging unit is specifically used for: Determine whether the broadband oscillation stability margin index of the new energy station grid-connected is greater than or equal to the margin threshold; if the broadband oscillation stability margin index of the new energy station grid-connected is greater than or equal to the margin threshold, the new energy station grid-connected system does not need to be optimized, and the current configuration of the new energy station grid-connected system is the optimal configuration; if the broadband oscillation stability margin index of the new energy station grid-connected is less than the margin threshold, the new energy station grid-connected system needs to be optimized.
[0041] Preferably, the second computing unit comprises: A first acquisition module is used to acquire a characteristic equation of the node impedance model of the new energy station grid-connected system according to the node impedance model of the new energy station grid-connected system; The second acquisition module is used to obtain the participation factor of each converter access node in the new energy station grid-connected system by using the characteristic equation of the node impedance model of the new energy station grid-connected system.
[0042] Preferably, the first acquisition module includes: A first determination submodule is used to determine the denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system according to the node impedance model of the new energy station grid-connected system; The first acquisition submodule is used to make the denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system equal to zero, and simplify to obtain the characteristic equation of the node impedance model of the new energy station grid-connected system.
[0043] Preferably, the second acquisition module includes: The second acquisition submodule is used to convert the characteristic equation of the node impedance model of the new energy station grid-connected system into a solution for solving the determinant of the n+1-dimensional ordered impedance matrix by using Schur complement transformation to obtain the model eigenvalue; A second determination submodule is used to determine the stability information and oscillation property information of the new energy station grid-connected system according to the model characteristic value; The calculation submodule is used to calculate the participation factor of each converter access node in the new energy station grid-connected system under the oscillation mode according to the oscillation mode corresponding to the model eigenvalue when the new energy station grid-connected system is unstable.
[0044] Preferably, the calculation formula of the node impedance model of the new energy station grid-connected system includes:
[0045] In the above formula, s is the pull operator, s′ is the coupling frequency pull-down operator, is the n+1-dimensional positive sequence small signal current component, is the n+1-dimensional negative sequence small signal current component, is the positive-sequence node admittance matrix of the network element, is the negative-sequence node admittance matrix of the network element, is the positive sequence admittance diagonal matrix of the converter, is a diagonal matrix composed of the coupled admittances calculated from the negative-sequence current disturbance component and the positive-sequence voltage disturbance component at each node in the new energy station. is the diagonal matrix composed of the converter coupling admittance calculated from the positive sequence current disturbance component and the negative sequence voltage disturbance component at each node in the new energy station. is the negative-sequence admittance diagonal matrix of the converter, is the n+1-dimensional positive sequence small signal voltage component, It is the n+1-dimensional negative-sequence small signal voltage component.
[0046] Preferably, the calculation formula of the denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system includes:
[0047] The calculation formula of the characteristic equation of the node impedance model of the new energy station grid-connected system includes:
[0048] In the above formula, s is the pull operator, det(・) is the determinant to be solved, Y net (s) is the 2(n+1)-dimensional admittance matrix of the network element, Y reg (s) is the 2(n+1)-dimensional admittance matrix of the converter.
[0049] Preferably, the calculation formula for solving the determinant of the n+1-dimensional ordered impedance matrix includes:
[0050] The calculation formula of the model characteristic value includes:
[0051] In the above formula, s is the pull operator, det(・) is the determinant to be solved, For Solve the determinant, is the corrected equivalent positive sequence admittance of the new energy station grid-connected system, L for The left eigenvector matrix of is the eigenvalue diagonal matrix, diag{·} is the diagonal matrix, λ n is the nth eigenvalue, λ n+1 is the n+1th eigenvalue, n+1 is The rank of the matrix, T for The right eigenvector matrix of .
[0052] Preferably, the calculation formula for the participation factor of the converter access node in the new energy station grid-connected system includes: p i =L ik •T ik In the above formula, i is the converter access node in the new energy station grid-connected system, p i Connecting nodes to converters in new energy station grid-connected systems i The participation factor, T ik To reflect the inverter access nodes in the grid-connected system of the new energy station i The injected current k The characteristic trajectory effect, L ik for T ik The corresponding weight of the new energy station grid-connected system mode.
[0053] Preferably, the optimization configuration unit includes: The selection module is used to select the grid-following converter connected to the node with the largest participation factor from the participation factors of the converter access nodes in the new energy station grid-connected system, and replace it with a grid-forming converter of the same capacity.
[0054] According to a third aspect of an embodiment of the present application, there is provided a computer device, including: one or more processors; The processor is used to store one or more programs; When the one or more programs are executed by the one or more processors, the new energy station networking unit optimization configuration method is implemented.
[0055] According to a fourth aspect of an embodiment of the present application, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed, the method for optimizing the configuration of the grid-type units of the new energy station is implemented.
[0056] The technical solution provided by the present invention has the following beneficial effects: The present invention provides a method and device for optimizing the configuration of a grid-connected unit of a new energy station. The method collects relevant parameters of a grid-connected system of a new energy station and uses the relevant parameters of the grid-connected system of the new energy station to calculate a wide-band oscillation stability margin index of the grid-connected system of the new energy station. According to the wide-band oscillation stability margin index of the grid-connected system of the new energy station, it is judged whether the grid-connected system of the new energy station needs to be optimized. When the grid-connected system of the new energy station needs to be optimized, the node impedance model of the grid-connected system of the new energy station is used to calculate the participation factor of each converter access node in the grid-connected system of the new energy station. According to the participation factor of each converter access node in the grid-connected system of the new energy station, the grid-connected unit of the grid-connected system of the new energy station is optimized, and the wide-band oscillation stability margin index of the grid-connected system of the new energy station is recalculated until the grid-connected system of the new energy station reaches the optimal configuration. The capacity and position of the grid-connected unit can be reasonably configured while ensuring the wide-band oscillation stability margin of the grid-connected system. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0058] Figure 1 It is a schematic diagram of a typical renewable energy power generation grid-connected converter structure and a grid-following type and grid-building type control structure provided by an embodiment of the present invention; Figure 2 It is a control block diagram of a grid-following type and a grid-building type converter provided in an embodiment of the present invention; Figure 3 It is a schematic diagram of a small signal impedance circuit model of a new energy station grid-connected system provided by an embodiment of the present invention; Figure 4 This is a network topology diagram of a typical new energy station grid-connected system provided by an embodiment of the present invention; Figure 5 It is a schematic diagram of a small signal circuit model of sequence impedance of a new energy station grid-connected system provided by an embodiment of the present invention; Figure 6 It is a flow chart of a method for optimizing configuration of a new energy station network unit provided by an embodiment of the present invention; Figure 7 It is a schematic diagram of the transmission relationship of small signal components of positive and negative sequence voltage and current at nodes of a new energy station grid-connected system provided by an embodiment of the present invention; Figure 8 It is a schematic diagram of the transmission feedback relationship of the node impedance model of the new energy station grid-connected system provided by an embodiment of the present invention; Fig. 9 It is a flow chart of a method for optimizing configuration of a new energy station network unit provided by an embodiment of the present invention; Fig.10 It is a network topology diagram of a new energy station provided by an embodiment of the present invention; Fig.11 It is a heat map of the participation factors of the new energy station nodes provided by an embodiment of the present invention; Fig.12 It is a Nyquist diagram of a new energy station grid-connected system provided by an embodiment of the present invention; Fig.13 It is a Bode diagram of a new energy station grid-connected system provided by an embodiment of the present invention; Fig.14 It is a schematic diagram of the variation trend of the participation factors of some nodes in a new energy station provided by an embodiment of the present invention; Fig.15 is a schematic diagram of a current waveform of a system grid connection point before configuration provided by an embodiment of the present invention; Fig.16 is a schematic diagram of a current waveform of a grid-connected point of a system after configuration provided by an embodiment of the present invention; Fig.17 It is a structural block diagram of a new energy station network unit optimization configuration device provided by an embodiment of the present invention; Fig.18 It is a structural block diagram of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0059] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the following embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0060] Embodiment 1 Typical renewable energy power generation grid-connected converter structure and grid-following and grid-forming control structures are as follows: Figure 1 As shown in the figure, i Labc is the abc three-phase filter inductor current, v abcis the three-phase voltage of abc, i abc is the three-phase current abc, v dc is the DC side voltage of the converter, θ is the phase-locking angle, dq represents the synchronous rotating coordinate system, abc Represents a three-phase stationary coordinate system. Grid-following control includes a phase-locked loop, a voltage loop, and a current loop. The phase-locked loop tracks the grid phase by inputting the collected grid connection point voltage. The voltage loop controls the DC bus capacitor to maintain a constant DC voltage and provides a reference current for the current inner loop. The current loop outputs a PWM modulation reference signal to keep the converter output current waveform constant.
[0061] The grid-forming control includes active power loop, reactive power loop and cascade voltage and current inner loop. A virtual impedance link is added before the cascade inner loop to improve the dynamic characteristics and stability of the converter. The power control link adopts a virtual synchronous control strategy to keep synchronization with the power grid by imitating the motion equation of the traditional synchronous generator. The detailed control block diagram of the typical grid-following and grid-forming converters can be found in Figure 2 , in the figure, P is the active power, Q is the reactive power, P ref is the active power reference value, Q ref is the reactive power reference value, J is the virtual moment of inertia, D p is the damping coefficient, D q is the voltage droop coefficient, K is the reactive power control integral coefficient, |V ref | is the absolute value of the reference voltage, |V| is the absolute value of the collected voltage, ψ is the virtual back EMF, H v (s) is the voltage loop transfer function, H i (s) is the current loop transfer function, L v is the virtual inductor, i d is the d-axis current, i q is the q-axis current, V d is the d-axis voltage, V q is the q-axis voltage, C f is the filter capacitor, i Ldis the d-axis inductor current, i Lq is the q-axis inductor current, L f is the filter inductor, E d is the d-axis modulation reference voltage, E q is the q-axis modulation reference voltage, ω 0 is the rated angular frequency.
[0062] The frequency domain small signal impedance method has been proposed in recent years and applied to the modeling and stability analysis of the grid-connected system of renewable energy stations. The impedance model of renewable energy power generation units is generally described as a 2×2 transfer function matrix in the form of admittance, as follows: (1) Where s is the Laplace operator (i.e., the Laplace operator), s′ is the Laplace operator at the coupling frequency, s′=s-j2ω1, j is the imaginary number sign, ω1 is the rated angular frequency, and Y p (s) and Y n (s′) represents the disturbance response characteristics of the new energy power generation unit when the voltage and current are at the same frequency, Y c (s) and Y r (s′) represents the coupling characteristics of the new energy generation unit between voltage and current at different frequencies. is the positive sequence small signal voltage component, is the negative sequence small signal voltage component, is the positive sequence small signal current component, It is the negative sequence small signal current component.
[0063] Based on this, the small signal model of the grid-connected system of the new energy station can be described as a small signal impedance circuit model at two coupling frequencies, such as Figure 3 shown. Figure 3 middle, is the small signal component of the positive sequence grid voltage, is the small signal component of the positive sequence grid current, is the small signal component of the negative sequence grid current. The negative sequence current response generated by the new energy generation unit at the coupling frequency is controlled by the controlled current source This means that the current passing through the grid and the inverter impedance will generate a negative sequence voltage at the inverter port. , which in turn will produce a positive sequence current response at the original disturbance frequency , and The expression is as follows: (2) (3) In the above formula, is a controlled current source, is the positive sequence current response, is the positive sequence small signal voltage component, It is the negative sequence small signal voltage component.
[0064] Based on the above impedance model, the stability analysis of the new energy station grid-connected system adopts the generalized Nyquist criterion. The system stability is determined by solving and analyzing the loci of the two characteristic roots of formula (4) around the point (-1, j0), where j is the imaginary number symbol. The characteristic root loci of formula 4 are on the complex plane, and generally the horizontal axis is the real axis and the vertical axis is the imaginary axis.
[0065] (4) In the above formula, L ′ is the return ratio matrix of the new energy station grid-connected system, Y g (s) and Y g (s′) is the admittance of the grid impedance at two frequencies.
[0066] It should be noted that formula (4) is a second-order matrix. Solving formula (4) will result in two characteristic roots. By changing s, a series of two different characteristic roots will be obtained.
[0067] Taking wind farms as an example, the network topology of a typical new energy station grid-connected system is as follows: Figure 4 As shown in the figure. Multiple renewable energy power generation units are connected in parallel to the medium voltage feeder through the converter and the box-type step-up transformer. Multiple feeders are uniformly connected to the station busbar and finally connected to the grid through the main transformer. The modeling needs to consider the internal network topology of the station and the frequency coupling characteristics of the power generation unit.
[0068] Based on the small signal impedance circuit model of the grid-connected system of the renewable energy power generation unit mentioned above, a small signal impedance network model of the grid-connected system of the renewable energy station is established as follows: Figure 5 As shown in the figure, is the positive sequence grid admittance, is the negative sequence grid admittance, is the positive sequence line admittance between node 0 and node 1, is the negative sequence line admittance between node 0 and node 1, is the positive sequence small signal voltage component of node n, is the negative sequence small signal voltage component of node n, is the positive sequence converter admittance at node n, Negative sequence converter admittance at node n, is the positive sequence small signal current coupling component of node n, is the negative sequence small signal current coupling component of node n. There are n+1 nodes in the grid-connected system of renewable energy power generation units, including n renewable energy station nodes and grid-connected points (i.e., node #0, where #0 is the node number of the grid-connected point). s is a pull operator, s′=s-j2ω1, and ω1 is the rated angular frequency. Since the sequence impedance small signal circuit model is symmetrical, taking the positive sequence circuit model as an example, is the grid positive sequence impedance, is the voltage small disturbance component of node i in the new energy station, is the positive sequence admittance of the line between node j and node k in the grid-connected system. The converter considering the frequency coupling effect can be expressed as the converter positive sequence admittance Y pp (s) Connect a controlled current source in parallel .
[0069] The present invention mainly aims at the broadband oscillation problem of renewable energy grid connection, and proposes a method for optimizing the configuration of renewable energy station grid-connected units. Figure 6 As shown, the following steps are included: Step 101: Collect relevant parameters of the new energy station grid-connected system; Step 102: using the relevant parameters of the grid-connected system of the new energy station, calculate and obtain the wide-band oscillation stability margin index of the grid-connected new energy station; Step 103: judging whether the grid-connected system of the new energy station needs to be optimized according to the wide-band oscillation stability margin index of the grid-connected new energy station; Step 104: When the new energy station grid-connected system needs to be optimized, the node impedance model of the new energy station grid-connected system is used to calculate the participation factor of each converter access node in the new energy station grid-connected system; Step 105: According to the participation factors of each converter access node in the new energy station grid-connected system, the grid-connected unit of the new energy station grid-connected system is optimized and the wide-band oscillation stability margin index of the new energy station grid-connected system is recalculated until the new energy station grid-connected system reaches the optimal configuration.
[0070] Furthermore, the relevant parameters of the new energy station grid-connected system include: The operating point parameters of the new energy station grid-connected system, the network topology parameters of the new energy station grid-connected system and the control parameters of the new energy power generation unit; The operating point parameters of the new energy station grid-connected system include: voltage signals and current signals of each node in the new energy station grid-connected system; The network topology parameters of the new energy station grid-connected system include: the node admittance matrix of the new energy station grid-connected system; The control parameters of the new energy power generation unit include: main circuit parameters and control parameters of the new energy power generation unit; The main circuit parameters include: rated capacity of the converter, rated voltage, filter inductance in the converter main circuit, and filter capacitance in the converter main circuit; The control parameters include: control parameters of a power link, a voltage link, a current link and a virtual impedance used in a converter controller.
[0071] Further, step 102 includes: Step 1021: Based on the relevant parameters of the new energy station grid-connected system, the impedance ratio of the new energy station grid-connected system is calculated using the pre-built new energy side aggregation impedance model; Specifically, the calculation formula of the new energy side aggregation impedance model includes:
[0072] The calculation formula for the impedance ratio of the grid-connected system of new energy stations includes:
[0073] In the above formula, is the aggregate admittance of the new energy station, is the aggregation impedance of the new energy station, is the positive sequence admittance of the new energy station, The coupling admittance of the new energy station is calculated from the positive sequence current disturbance component and the negative sequence voltage disturbance component at the grid connection point of the new energy station. The coupling admittance of the new energy station is calculated from the positive-sequence voltage disturbance component and the negative-sequence current disturbance component at the grid connection point of the new energy station. is the negative sequence admittance on the grid side, is the negative sequence admittance of the new energy station, s is the pull operator, s′ is the coupling frequency pull-down operator, Z ratio (s) is the impedance ratio of the grid-connected system of the new energy station, Z g (s) is the positive sequence impedance on the grid side; Step 1022: using the impedance ratio of the new energy station grid-connected system, calculate and obtain the stability margin function of the new energy station grid-connected system; Specifically, the calculation formula of the stability margin function of the new energy station grid-connected system includes: G(s)=1+Z ratio (s) In the above formula, Z ratio (s) is the impedance ratio of the grid-connected system of the new energy station, G(s) is the stability margin function of the grid-connected system of new energy stations, and s is the pull operator; Step 1023: using the new energy station grid-connected system stability margin function, calculate the new energy station grid-connected broadband oscillation stability margin index; Specifically, the calculation formula for the broadband oscillation stability margin index of the new energy station grid connection includes:
[0074] In the above formula, γ It is the broadband oscillation stability margin index for new energy stations connected to the grid. s = jω , G(jω) is the stability margin function of the grid-connected system of new energy stations, j is the imaginary number symbol, ω is the angular frequency.
[0075] Further, step 103 includes: Determine whether the broadband oscillation stability margin index of the new energy station grid-connected is greater than or equal to the margin threshold. If the broadband oscillation stability margin index of the new energy station grid-connected is greater than or equal to the margin threshold, the new energy station grid-connected system is stable, and the new energy station grid-connected system does not need to be optimized, and the current configuration of the new energy station grid-connected system is the optimal configuration; if the broadband oscillation stability margin index of the new energy station grid-connected is less than the margin threshold, the new energy station grid-connected system is unstable, and the new energy station grid-connected system needs to be optimized.
[0076] Further, step 104 includes: Step 1041: obtaining a characteristic equation of the node impedance model of the new energy station grid-connected system according to the node impedance model of the new energy station grid-connected system; Step 1042: using the characteristic equation of the node impedance model of the new energy station grid-connected system, obtain the participation factor of each converter access node in the new energy station grid-connected system.
[0077] Further, step 1041 includes: Step 1041a: determining the denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system according to the node impedance model of the new energy station grid-connected system; Step 1041b: Set the denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system to zero, and simplify to obtain the characteristic equation of the node impedance model of the new energy station grid-connected system.
[0078] Specifically, the calculation formula of the node impedance model of the new energy station grid-connected system includes:
[0079] In the above formula, s is the pull operator, s′ is the coupling frequency pull-down operator, is the n+1-dimensional positive sequence small signal current component, is the n+1-dimensional negative sequence small signal current component, is the positive-sequence node admittance matrix of the network element, is the negative-sequence node admittance matrix of the network element, is the positive sequence admittance diagonal matrix of the converter, is a diagonal matrix composed of the coupled admittances calculated from the negative-sequence current disturbance component and the positive-sequence voltage disturbance component at each node in the new energy station. is the diagonal matrix composed of the converter coupling admittance calculated from the positive sequence current disturbance component and the negative sequence voltage disturbance component at each node in the new energy station. is the negative-sequence admittance diagonal matrix of the converter, is the n+1-dimensional positive sequence small signal voltage component, It is the n+1-dimensional negative sequence small signal voltage component; The calculation formula of the denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system includes:
[0080] The calculation formula of the characteristic equation of the node impedance model of the new energy station grid-connected system includes:
[0081] In the above formula, s is the pull operator, det(・) is the determinant to be solved, Y net (s) is the 2(n+1)-dimensional admittance matrix of the network element, Y reg (s) is the 2(n+1)-dimensional admittance matrix of the converter.
[0082] Further, step 1042 includes: Step 1042a: using Schur complement transformation, transforming the characteristic equation of the node impedance model of the new energy station grid-connected system into a solution for solving the determinant of the n+1-dimensional ordered impedance matrix to obtain the model eigenvalue; Step 1042b: Determine the stability information and oscillation property information of the new energy station grid-connected system according to the model characteristic value; Step 1042c: When the renewable energy station grid-connected system is unstable, the participation factor of each converter access node in the renewable energy station grid-connected system under the oscillation mode is calculated according to the oscillation mode corresponding to the model eigenvalue.
[0083] Specifically, the calculation formula for solving the determinant of the n+1-dimensional ordered impedance matrix includes:
[0084] The calculation formula of the model eigenvalue includes:
[0085] In the above formula, s is the pull operator, det(・) is the determinant to be solved, For Solve the determinant, is the corrected equivalent positive sequence admittance of the new energy station grid-connected system, L for The left eigenvector matrix of is the eigenvalue diagonal matrix, diag{·} is the diagonal matrix, λ n is the nth eigenvalue, λ n+1 is the n+1th eigenvalue, n+1 is The rank of the matrix, T for The right eigenvector matrix of ; The calculation formula for the participation factor of the converter access node in the new energy station grid-connected system includes: p i =L ik •T ik In the above formula, i is the converter access node in the new energy station grid-connected system, p i Connecting nodes to converters in new energy station grid-connected systems i The participation factor, T ik To reflect the inverter access nodes in the grid-connected system of the new energy station i The injected current k The characteristic trajectory effect, L ik for T ik The corresponding weight of the new energy station grid-connected system mode.
[0086] Furthermore, in step 105, according to the participation factor of each converter access node in the new energy station grid-connected system, the grid-connected system of the new energy station is optimally configured for the grid-connected system, including: From the participation factors of each converter access node in the new energy station grid-connected system, the grid-following converter connected to the node with the largest participation factor is replaced with a grid-building converter of the same capacity.
[0087] In order to further illustrate the above-mentioned new energy station grid unit optimization configuration method, the present invention provides an example, including the following steps: (1) The capacity and layout configuration problem of the grid-connected units of new energy stations is established. The goal is to minimize the total capacity of the grid-connected units in the grid-connected system of new energy stations. The stability margin index γ of the grid-connected system of new energy stations is set to evaluate the stable operation capability of the grid-connected system of new energy stations. The stability margin γ of the grid-connected system of new energy stations after the optimized configuration needs to meet the minimum stability margin under the rated stable operation conditions of the grid-connected system of new energy stations.
[0088] (2) Wideband oscillation stability margin The stability margin function of the new energy station grid-connected system is used to measure the stability of the new energy station grid-connected system, which can be specifically expressed as: G(s)=1+Z ratio (s) (5) In the above formula, Z ratio (s) is the impedance ratio of the grid-connected system of the new energy station, G(s) It is a deformation and extension of the Nyquist curve of the new energy station grid-connected system, so it contains the broadband oscillation risk constraints of the complete new energy station grid-connected system. The broadband oscillation stability margin index γ of the new energy station grid-connected system is calculated according to G(s), which can be specifically expressed as
[0089] In the above formula, γ It is the broadband oscillation stability margin index for new energy stations connected to the grid. s = jω , G(jω) is the stability margin function of the grid-connected system of new energy stations, j is the imaginary number symbol, ω is the angular frequency; according to Figure 5 , the relationship between the voltage and current small signal sequence components of the new energy station at the grid connection point is: (7) In the above formula, s is the Laplace operator, s′ is the Laplace operator at the coupling frequency, and are the positive and negative sequence components of the small signal current at the grid connection point, and are the positive and negative sequence components of the small signal voltage at the grid connection point, is the positive sequence admittance of the new energy station, The coupling admittance of the new energy station is calculated from the positive sequence current disturbance component and the negative sequence voltage disturbance component at the station grid connection point. The coupling admittance of the new energy station is calculated from the positive-sequence voltage disturbance component and the negative-sequence current disturbance component at the station grid connection point. is the negative sequence admittance of the new energy station, Y stn It is the equivalent sequence impedance model of the new energy station.
[0090] From formula (7), we can see that Y stn It is a two-dimensional impedance model that aggregates the internal nodes of the station at the grid-connected point. It includes the unified influence of the network topology of the new energy station and the frequency coupling effect of the internal converter on the small signal voltage and current components of the system grid-connected point. It is essentially a full-order aggregated node frequency domain model.
[0091] When analyzing the stability of the grid-connected system of new energy stations, the system stability can be determined by solving the two sets of eigenvalues of equation (8) and using the generalized Nyquist criterion.
[0092] (8) In the above formula, H is the ratio matrix of the transfer function relationship between the voltage and current disturbance components at the grid connection point in the new energy station grid connection system, is the positive sequence admittance on the grid side, is the negative sequence admittance on the grid side, is the positive sequence admittance of the new energy station, The coupling admittance of the new energy station is calculated from the positive sequence current disturbance component and the negative sequence voltage disturbance component at the station grid connection point. The coupling admittance of the new energy station is calculated from the positive-sequence voltage disturbance component and the negative-sequence current disturbance component at the station grid connection point. is the negative sequence admittance of the new energy station; right H Perform Schur complement transformation and convert it into the new energy side aggregation impedance model, which can be specifically expressed as: (9) In the above formula, is the aggregate admittance of the new energy station, is the aggregation impedance of the new energy station, is the positive sequence admittance of the new energy station, The coupling admittance of the new energy station is calculated from the positive sequence current disturbance component and the negative sequence voltage disturbance component at the station grid connection point. The coupling admittance of the new energy station is calculated from the positive-sequence voltage disturbance component and the negative-sequence current disturbance component at the station grid connection point. is the negative sequence admittance on the grid side, is the negative sequence admittance of the new energy station; By solving the ratio of the corrected sequence impedance of the new energy station to the grid impedance The Nyquist curve of the grid-connected renewable energy station can be used to determine the stability of the grid-connected renewable energy station system based on the Nyquist stability criterion. Substituting into equation (5) can solve the system stability margin function G(s) and the broadband oscillation stability margin γ.
[0093] (3) Active output boundary under stability constraints Gradually increase the active power output of the grid-connected system of the new energy station. When the system is in a critical stable state, the active power output of the grid-connected system of the new energy station is recorded as the maximum active power output point P at which the system can operate stably. cr .
[0094] The maximum active output point is an operating indicator of a new energy station. By comparing the changes in the maximum active output point of the new energy station grid-connected system before and after the optimized configuration, it can be concluded that the optimized configuration method can improve the effectiveness of the stable output of the new energy station grid-connected system under this working condition.
[0095] (4) Participation factor of node oscillation mode within the station according to Figure 5 The KCL equations (current node method equations based on Kirchhoff's Current Law) of each node of the grid-connected system of the new energy station are obtained as follows: (10) In the above formula, and They are n+1-dimensional positive and negative sequence small signal current components, and They are n+1-dimensional positive and negative sequence small signal voltage components respectively. and are the positive and negative sequence admittance matrices of the impedance network, which include the positive and negative sequence admittances of the network elements and the positive and negative sequence admittances of the converter, and can be specifically expressed as: (11) In the above formula, and are the positive and negative sequence node admittance matrices of network elements, respectively. and is the positive and negative sequence admittance diagonal matrix of the converter.
[0096] and They are n+1-dimensional controlled current source components, which can be specifically expressed as: (12) In the above formula, and is the diagonal matrix of the converter coupling admittance. Combining the above equations, we can get: (13) According to formula (13), the transfer relationship between the small signal components of the voltage and current at the system nodes can be derived, as follows: Figure 7 shown.
[0097] The positive and negative sequence small signal voltage and current components, the network element node admittance matrix and the converter admittance matrix are recombined according to the node order to obtain the node impedance model that describes the node impedance characteristics of the new energy station grid-connected system. Its transmission feedback relationship is as follows: Figure 8 shown.
[0098] Figure 8 middle, is the inverse of the 2(n+1)-dimensional admittance matrix of the network element, Y reg (s) is the 2(n+1)-dimensional admittance matrix of the converter. and are the small signal voltage and current components of the system node sequence impedance, which can be expressed as: (14) (15) In the above formula, T is the transpose, m is the total number of nodes in the system, is the positive sequence small signal voltage component of the 0th node, is the negative sequence small signal voltage component at the 0th node, is the positive sequence small signal voltage component of the nth node, is the negative sequence small signal voltage component of the nth node, is the positive sequence small signal current component of the 0th node, is the negative sequence small signal current component at the 0th node, is the positive sequence small signal current component of the nth node, is the negative sequence small signal current component of the nth node.
[0099] Based on the node impedance model of the grid-connected system of new energy stations, the frequency domain modal participation factor is used to explore the impact of the impedance characteristics of each node in the system on the system stability. Figure 8 It can be seen that the characteristic equation of the model is: (16) Among them, det(・) represents the determinant solution. The Schur transformation is used to transform equation (16) into the determinant for solving the n+1-dimensional ordered impedance matrix: When the system is unstable, the corresponding There is at least one eigenvalue λ=0. Performing eigenvalue decomposition, we can get: (17) In the above formula, Lfor The left eigenvector matrix of is the eigenvalue diagonal matrix, T for The right eigenvector matrix of . The participation factor of the converter access node i in the system is defined as: p i =L ik •T ik (18) In the above formula, p i Connecting nodes to converters in new energy station grid-connected systems i The participation factor, T ik To reflect the node i The injected current k The characteristic trajectory effect, L ik for T ik The weight corresponding to the grid-connected system mode of the new energy station. p i The larger the value, the higher the node i The greater the impact on system instability, the weaker the node is in the system network. Therefore, according to the characteristic equation of the node impedance model of the new energy station grid-connected system, the focus is on calculating the inverter access node in the system. p , select the node with the maximum participation factor to replace the grid-connected converter with the same capacity.
[0100] In order to further illustrate the above-mentioned new energy station grid unit optimization configuration method, the present invention also provides an example, such as Fig. 9 As shown, the following steps are included: Step 1: Input system data. The system data mainly includes the operating point parameters of the new energy station grid-connected system, the network topology parameters of the new energy station grid-connected system and the control parameters of the new energy power generation unit; Step 2: Calculate the system broadband oscillation risk constraint. Construct the new energy side aggregation impedance model and calculate Z ratio (s) And judge the system stability, calculate the broadband oscillation stability margin index γ of the new energy station grid connection to evaluate the system's stable operation capability; Step 3: Determine whether the broadband oscillation stability margin index γ of the new energy station grid connection meets the broadband oscillation stability margin index threshold γ of the new energy station grid connection min Requirements. If γ satisfies γ min If the requirement is met, the optimization configuration solution is completed and the final optimization configuration result of the system is output; otherwise, the optimization configuration of the system network unit is performed; Step 4: Optimize the configuration of the system grid-connected units. Construct the node impedance model of the new energy station grid-connected system, calculate the model characteristic equation and the system node participation factor p i , select the node with the largest participation factor as the optimal node to optimize the configuration of the network-forming unit; Step 5: Optimization configuration result verification. After the optimization configuration of the grid-connected system of the new energy station is completed, repeat steps 2 to 4 to iteratively optimize the configuration of the grid-connected unit and verify the configuration results until γ satisfies γ min Requirement, the optimization configuration solution is completed.
[0101] The present invention proposes a method for optimizing the configuration of grid-forming units of new energy stations, proposes configuration optimization problems, grid-connected stability indicators, output boundary indicators, point distribution participation factors, etc., and proposes an iterative solution method based on the point distribution participation factor, which can achieve reasonable configuration of the capacity and position of the grid-forming units while ensuring the broadband oscillation stability margin of the grid-connected system.
[0102] In order to further illustrate the above-mentioned new energy station grid-connected unit optimization configuration method, the present invention provides an example in practical application. According to the actual engineering network topology structure, a new energy station grid-connected system simulation model is established. The topology diagram is as follows: Fig.10 The station contains three 35kV feeders, each of which is connected to 11 grid-following converters with a rated capacity of 3MW, with an access spacing of 1km.
[0103] Assume that the station is connected to a weak grid system with SCR=1.8, and gradually increase the system active output. When it is reduced to 0, the system has reached the critical stable operation point. The maximum active output of the system under the constraint of broadband oscillation risk is 0.76pu, and optimization configuration is required. The heat map of the participation factor of the new energy station node is as follows: Fig.11 As shown in the figure, the three feeders in the station all follow the rule that the node participation factor is inversely proportional to the distance to the grid connection point, that is, the node participation factor at the end of the feeder is the largest, and the node participation factor at the head of the feeder is the smallest. Fig.11 It can be seen that due to the inconsistent access spacing of the three feeders at the station, and due to the longer line distances of feeder 1 and feeder 2, their access nodes have a larger participation factor than the access nodes at the same position of feeder 3, and have a greater impact on system stability.
[0104] According to the participation factor results, the station is configured with a grid-type converter, and the iterative process is shown in Table 1. First, after configuring 15MW grid-type converters at the ends of feeder 1 and feeder 2, the system recovers stability but still does not meet the stability margin requirements. When 8 grid-type converters are configured in the system, λ=0.2409, and the system can operate stably under rated conditions. At this time, the configured grid-type converter capacity accounts for 24.2%.
[0105] Table 1 Iterative solution process of 33*3MW grid-connected converter configuration
[0106] The stability analysis results of the new energy station grid-connected system are as follows: Fig.12 and Fig.13 Before configuration, the system was in a critical instability state. Fig.12 The Nyquist curve of the system impedance ratio just surrounds the point (-1, j0), Fig.13 The impedance curve of the grid-connected system of the midfield station intersects with the grid impedance at 33Hz and 67Hz. The system phase margin is insufficient at the intersection frequency, and the system suffers from sub- / super-synchronous small signal instability. After configuration, the system impedance ratio Nyquist curve no longer surrounds the (-1, j0) point, and the phase margin at the intersection frequency of the system aggregate impedance curve and the grid impedance is increased to 16.2°, meeting the requirements for stable system operation.
[0107] The change trend of the participation factor of the converter access node in the new energy station is as follows: Fig.14 As shown. It can be found from the figure that the participation factors of the configured nodes in the station are generally on a downward trend, indicating that after configuration, the influence of the converter nodes that originally had a greater impact on the small signal instability of the system gradually decreases. In addition, before the configuration begins, the participation factors of the #1, #3, #5, #7 and #9 nodes in feeder 1 are higher than those of the #23, #25 and #27 nodes in feeder 2. This is because the node access spacing of feeder 1 is larger than that of feeder 2, which has a greater impact on the wide-band oscillation stability of the system. In the first two iterative optimizations, the end nodes on feeder 1 are mainly targeted. Afterwards, as the participation factors of the converter nodes on feeder 1 decrease after configuration, the participation factors of the end nodes on feeder 2 increase relatively, approaching the participation factors of some nodes in feeder 1. Therefore, in the middle and late stages of the optimization, the nodes of feeder 1 and feeder 2 are alternately configured, and the participation factors of the two feeder nodes show an alternating downward trend until the system satisfies γ min The minimum active output point P at which the system can operate stably crmin Require.
[0108] The above working conditions are verified in the time domain simulation. The simulation waveform of the current at the grid connection point of the new energy station grid connection system is as follows: Fig.15 and Fig.16 Before the optimization configuration, the maximum active output of the system under the wide-band oscillation risk constraint is 0.76pu. At this time, the system is in a critical stable state, and the grid-connected current waveform oscillates, as shown in Fig.15 The grid-connected point current waveform was extracted and FFT analysis was performed. The results showed that there were 33Hz and 67Hz oscillation components in the current, and the system was at risk of sub- / super-synchronous oscillation. After the optimized configuration, the system resumed rated output operation. At this time, the grid-connected point current waveform of the system is as follows: Fig.16As shown in the figure, the current waveform at the grid-connected point is smooth and has no obvious oscillation component, which is consistent with the theoretical analysis results, verifying the effectiveness of the grid-connected unit optimization configuration method for the grid-connected system of new energy stations.
[0109] Embodiment 2 The present invention also provides a new energy station network unit optimization configuration device, such as Fig.17 As shown, including: The collection unit is used to collect relevant parameters of the grid-connected system of the new energy station; The first calculation unit is used to calculate the wide-band oscillation stability margin index of the new energy station grid connection by using relevant parameters of the new energy station grid connection system; A judgment unit, used to judge whether the grid-connected system of the new energy station needs to be optimized according to the broadband oscillation stability margin index of the grid-connected new energy station; The second calculation unit is used to calculate the participation factor of each converter access node in the new energy station grid-connected system by using the node impedance model of the new energy station grid-connected system when the new energy station grid-connected system needs to be optimized; The optimization configuration unit is used to optimize the configuration of the grid-connected units of the new energy station grid-connected system according to the participation factors of each converter access node in the new energy station grid-connected system, and recalculate the wide-band oscillation stability margin index of the new energy station grid-connected system until the new energy station grid-connected system reaches the optimal configuration.
[0110] Further, the relevant parameters of the new energy station grid-connected system include: operating point parameters of the new energy station grid-connected system, network topology parameters of the new energy station grid-connected system and control parameters of the new energy power generation unit; The operating point parameters of the new energy station grid-connected system include: voltage signals and current signals of each node in the new energy station grid-connected system; The network topology parameters of the new energy station grid-connected system include: the node admittance matrix of the new energy station grid-connected system; The control parameters of the new energy power generation unit include: main circuit parameters and control parameters of the new energy power generation unit; The main circuit parameters include: rated capacity of the converter, rated voltage, filter inductance in the converter main circuit, and filter capacitance in the converter main circuit; The control parameters include: control parameters of a power link, a voltage link, a current link and a virtual impedance used in a converter controller.
[0111] Furthermore, the first computing unit includes: The first calculation module is used to calculate the impedance ratio of the new energy station grid-connected system based on the relevant parameters of the new energy station grid-connected system and using the pre-built new energy side aggregation impedance model; The second calculation module is used to calculate the stability margin function of the new energy station grid-connected system by using the impedance ratio of the new energy station grid-connected system; The third calculation module is used to calculate the wide-band oscillation stability margin index of the new energy station grid-connected system by using the stability margin function of the new energy station grid-connected system.
[0112] Furthermore, the calculation formula of the new energy side aggregation impedance model includes:
[0113] The calculation formula for the impedance ratio of the grid-connected system of new energy stations includes:
[0114] In the above formula, is the aggregate admittance of the new energy station, is the aggregation impedance of the new energy station, is the positive sequence admittance of the new energy station, The coupling admittance of the new energy station is calculated from the positive sequence current disturbance component and the negative sequence voltage disturbance component at the grid connection point of the new energy station. The coupling admittance of the new energy station is calculated from the positive-sequence voltage disturbance component and the negative-sequence current disturbance component at the grid connection point of the new energy station. is the negative sequence admittance on the grid side, is the negative sequence admittance of the new energy station, s is the pull operator, s′ is the coupling frequency pull-down operator, Z ratio (s) is the impedance ratio of the grid-connected system of the new energy station, Z g (s) is the positive sequence impedance on the grid side.
[0115] Furthermore, the calculation formula of the stability margin function of the new energy station grid-connected system includes: G(s)=1+Z ratio (s) In the above formula, Z ratio (s) is the impedance ratio of the grid-connected system of the new energy station, G(s) is the stability margin function of the grid-connected system of new energy stations, and s is the pull operator.
[0116] Furthermore, the calculation formula for the broadband oscillation stability margin index of the new energy station grid connection includes:
[0117] In the above formula, γ It is the broadband oscillation stability margin index for new energy stations connected to the grid. s = jω , G(jω) is the stability margin function of the grid-connected system of new energy stations, j is the imaginary number symbol, ω is the angular frequency.
[0118] Furthermore, the judging unit is specifically used for: Determine whether the broadband oscillation stability margin index of the new energy station grid-connected is greater than or equal to the margin threshold. If the broadband oscillation stability margin index of the new energy station grid-connected is greater than or equal to the margin threshold, the new energy station grid-connected system does not need to be optimized, and the current configuration of the new energy station grid-connected system is the optimal configuration; if the broadband oscillation stability margin index of the new energy station grid-connected is less than the margin threshold, the new energy station grid-connected system needs to be optimized.
[0119] Furthermore, the second computing unit includes: The first acquisition module is used to acquire the characteristic equation of the node impedance model of the new energy station grid-connected system according to the node impedance model of the new energy station grid-connected system; The second acquisition module is used to obtain the participation factor of each converter access node in the new energy station grid-connected system by using the characteristic equation of the node impedance model of the new energy station grid-connected system.
[0120] Furthermore, the first acquisition module includes: The first determination submodule is used to determine the denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system according to the node impedance model of the new energy station grid-connected system; The first acquisition submodule is used to make the denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system equal to zero, and simplify to obtain the characteristic equation of the node impedance model of the new energy station grid-connected system.
[0121] Furthermore, the second acquisition module includes: The second acquisition submodule is used to convert the characteristic equation of the node impedance model of the new energy station grid-connected system into a solution for solving the determinant of the n+1-dimensional ordered impedance matrix by using Schur complement transformation to obtain the model eigenvalue; The second determination submodule is used to determine the stability information and oscillation property information of the new energy station grid-connected system according to the model characteristic value; The calculation submodule is used to calculate the participation factor of each converter access node in the new energy station grid-connected system under the oscillation mode according to the oscillation mode corresponding to the model eigenvalue when the new energy station grid-connected system is unstable.
[0122] Furthermore, the calculation formula of the node impedance model of the new energy station grid-connected system includes:
[0123] In the above formula, s is the pull operator, s′ is the coupling frequency pull-down operator, is the n+1-dimensional positive sequence small signal current component, is the n+1-dimensional negative sequence small signal current component, is the positive-sequence node admittance matrix of the network element, is the negative-sequence node admittance matrix of the network element, is the positive sequence admittance diagonal matrix of the converter, is a diagonal matrix composed of the coupled admittances calculated from the negative-sequence current disturbance component and the positive-sequence voltage disturbance component at each node in the new energy station. is the diagonal matrix composed of the converter coupling admittance calculated from the positive sequence current disturbance component and the negative sequence voltage disturbance component at each node in the new energy station. is the negative-sequence admittance diagonal matrix of the converter, is the n+1-dimensional positive sequence small signal voltage component, It is the n+1-dimensional negative-sequence small signal voltage component.
[0124] Furthermore, the calculation formula of the denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system includes:
[0125] The calculation formula of the characteristic equation of the node impedance model of the new energy station grid-connected system includes:
[0126] In the above formula, s is the pull operator, det(・) is the determinant to be solved, Y net (s) is the 2(n+1)-dimensional admittance matrix of the network element, Y reg (s) is the 2(n+1)-dimensional admittance matrix of the converter.
[0127] Furthermore, the calculation formula for solving the determinant of the n+1-dimensional ordered impedance matrix includes:
[0128] The calculation formula of the model eigenvalue includes:
[0129] In the above formula, s is the pull operator, det(・) is the determinant to be solved, For Solve the determinant, is the corrected equivalent positive sequence admittance of the new energy station grid-connected system, L for The left eigenvector matrix of is the eigenvalue diagonal matrix, diag{·} is the diagonal matrix, λ n is the nth eigenvalue, λ n+1 is the n+1th eigenvalue, n+1 is The rank of the matrix, T for The right eigenvector matrix of .
[0130] Furthermore, the calculation formula for the participation factor of the converter access node in the new energy station grid-connected system includes: p i =L ik •T ik In the above formula, i is the converter access node in the new energy station grid-connected system, p i Connecting nodes to converters in new energy station grid-connected systems i The participation factor, T ik To reflect the inverter access nodes in the grid-connected system of the new energy station i The injected current k The characteristic trajectory effect, L ik for T ik The corresponding weight of the new energy station grid-connected system mode.
[0131] Further, the configuration unit is optimized, including: The selection module is used to select the grid-following converter connected to the node with the largest participation factor from the participation factors of each converter access node in the new energy station grid-connected system, and replace it with a grid-forming converter with the same capacity.
[0132] It can be understood that the device embodiment provided above corresponds to the method embodiment described above, and the corresponding specific contents can be referenced to each other and will not be repeated here.
[0133] It can be understood that the same or similar parts of the above embodiments can be referenced to each other, and the contents not described in detail in some embodiments can refer to the same or similar contents in other embodiments.
[0134] Embodiment 3 like Fig.18As shown, the present invention also provides an electronic device, which may be a computer device, a single-chip device, an intelligent mobile device, etc. The electronic device in this embodiment may include a processor, a memory, a transceiver component, etc. The memory, the processor, and the transceiver component are connected via a bus; the memory may be used to store an execution program, and an exemplary execution program may include instructions; the processor is used to execute the instructions stored in the memory. The memory may also be used to store data, which may be called and / or modified when the instructions are executed.
[0135] The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. It is the computing core and control core of the terminal, which is suitable for implementing one or more instructions, specifically suitable for loading and executing one or more instructions in a storage medium to implement corresponding method flows or corresponding functions, so as to implement the steps of a new energy site networking unit optimization configuration method in the above-mentioned embodiment.
[0136] Embodiment 4 Based on the same inventive concept, the present invention also provides a readable storage medium, specifically an electronic device readable storage medium (Memory), which is a memory device in an electronic device for storing programs and data. It can be understood that the storage medium here can include both built-in storage media in electronic devices and extended storage media supported by electronic devices. The storage medium provides a storage space that stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by a processor are also stored in the storage space, and these instructions can be one or more execution programs (including program codes). It should be noted that the storage medium here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory. The processor loads and executes one or more instructions stored in the storage medium, which can implement the steps of a new energy site network unit optimization configuration method in the above embodiment.
[0137] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0138] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0139] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0140] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0141] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A method for optimizing the configuration of a new energy station network unit, characterized in that: include: Collect relevant parameters of the grid-connected system of new energy stations; Using the relevant parameters of the new energy station grid-connected system, a wide-band oscillation stability margin index of the new energy station grid-connected system is calculated; According to the broadband oscillation stability margin index of the new energy station grid connection, it is determined whether the new energy station grid connection system needs to be optimized; When the grid-connected system of the new energy station needs to be optimized, the node impedance model of the grid-connected system of the new energy station is used to calculate the participation factor of each converter access node in the grid-connected system of the new energy station; According to the participation factors of each converter access node in the new energy station grid-connected system, the grid-connected unit of the new energy station grid-connected system is optimally configured, and the wide-band oscillation stability margin index of the new energy station grid-connected system is recalculated until the new energy station grid-connected system reaches the optimal configuration.
2. The method according to claim 1, characterized in that The relevant parameters of the new energy station grid-connected system include: operating point parameters of the new energy station grid-connected system, network topology parameters of the new energy station grid-connected system and control parameters of the new energy power generation unit; The operating point parameters of the new energy station grid-connected system include: voltage signals and current signals of each node in the new energy station grid-connected system; The network topology parameters of the new energy station grid-connected system include: a node admittance matrix of the new energy station grid-connected system; The control parameters of the new energy power generation unit include: main circuit parameters and control parameters of the new energy power generation unit; The main circuit parameters include: rated capacity and rated voltage of the converter, filter inductance and filter capacitance in the converter main circuit; The control parameters include: control parameters of a power link, a voltage link, a current link and a virtual impedance used in a converter controller.
3. The method according to claim 1, characterized in that The method of calculating the wide-band oscillation stability margin index of the new energy station grid-connected system by using the relevant parameters of the new energy station grid-connected system includes: Based on the relevant parameters of the new energy station grid-connected system, the impedance ratio of the new energy station grid-connected system is calculated using a pre-built new energy side aggregation impedance model; Using the impedance ratio of the new energy station grid-connected system, a stability margin function of the new energy station grid-connected system is calculated; The wide-band oscillation stability margin index of the new energy station grid-connected system is calculated using the new energy station grid-connected system stability margin function.
4. The method according to claim 3, characterized in that The calculation formula of the new energy side aggregation impedance model includes: The calculation formula of the impedance ratio of the new energy station grid-connected system includes: In the above formula, is the aggregate admittance of the new energy station, is the aggregation impedance of the new energy station, is the positive sequence admittance of the new energy station, The coupling admittance of the new energy station is calculated from the positive sequence current disturbance component and the negative sequence voltage disturbance component at the grid connection point of the new energy station. The coupling admittance of the new energy station is calculated from the positive-sequence voltage disturbance component and the negative-sequence current disturbance component at the grid connection point of the new energy station. is the negative sequence admittance on the grid side, is the negative sequence admittance of the new energy station, s is the pull operator, s′ is the coupling frequency pull-down operator, Z ratio (s) is the impedance ratio of the grid-connected system of the new energy station, Z g (s) is the positive sequence impedance on the grid side.
5. The method according to claim 3, characterized in that: The calculation formula of the stability margin function of the new energy station grid-connected system includes: G(s)=1+Z ratio (s) In the above formula, Z ratio (s) is the impedance ratio of the grid-connected system of the new energy station, G(s) is the stability margin function of the grid-connected system of new energy stations, and s is the pull operator.
6. The method according to claim 3, characterized in that The calculation formula of the broadband oscillation stability margin index of the new energy station grid connection includes: In the above formula, γ It is the broadband oscillation stability margin index for new energy stations connected to the grid. s = jω , G(jω) is the stability margin function of the grid-connected system of new energy stations, j is the imaginary number symbol, ω is the angular frequency.
7. The method according to claim 1, characterized in that The step of judging whether the grid-connected system of the new energy station needs to be optimized according to the wide-band oscillation stability margin index of the new energy station grid-connected system includes: Determine whether the broadband oscillation stability margin index of the new energy station grid-connected is greater than or equal to the margin threshold; if the broadband oscillation stability margin index of the new energy station grid-connected is greater than or equal to the margin threshold, the new energy station grid-connected system does not need to be optimized, and the current configuration of the new energy station grid-connected system is the optimal configuration; if the broadband oscillation stability margin index of the new energy station grid-connected is less than the margin threshold, the new energy station grid-connected system needs to be optimized.
8. The method according to claim 1, characterized in that When the new energy station grid-connected system needs to be optimized, the node impedance model of the new energy station grid-connected system is used to calculate the participation factor of each converter access node in the new energy station grid-connected system, including: According to the node impedance model of the new energy station grid-connected system, a characteristic equation of the node impedance model of the new energy station grid-connected system is obtained; The characteristic equation of the node impedance model of the new energy station grid-connected system is used to obtain the participation factor of each converter access node in the new energy station grid-connected system.
9. The method according to claim 8, characterized in that The step of obtaining the characteristic equation of the node impedance model of the new energy station grid-connected system according to the node impedance model of the new energy station grid-connected system comprises: Determining the denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system according to the node impedance model of the new energy station grid-connected system; The denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system is set to zero, and the characteristic equation of the node impedance model of the new energy station grid-connected system is obtained by simplifying it.
10. The method according to claim 8, characterized in that The method of using the characteristic equation of the node impedance model of the new energy station grid-connected system to obtain the participation factor of each converter access node in the new energy station grid-connected system includes: By using Schur complement transformation, the characteristic equation of the node impedance model of the grid-connected system of the new energy station is transformed into the solution of the determinant of the n+1-dimensional ordered impedance matrix to obtain the model eigenvalue; Determining stability information and oscillation property information of the new energy station grid-connected system according to the model characteristic value; When the new energy station grid-connected system is unstable, the participation factor of each converter access node in the new energy station grid-connected system under the oscillation mode is calculated according to the oscillation mode corresponding to the model eigenvalue.
11. The method according to claim 1, characterized in that: The calculation formula of the node impedance model of the new energy station grid-connected system includes: In the above formula, s is the pull operator, s′ is the coupling frequency pull-down operator, is the n+1-dimensional positive sequence small signal current component, is the n+1-dimensional negative sequence small signal current component, is the positive-sequence node admittance matrix of the network element, is the negative-sequence node admittance matrix of the network element, is the positive sequence admittance diagonal matrix of the converter, is a diagonal matrix composed of the coupled admittances calculated from the negative-sequence current disturbance component and the positive-sequence voltage disturbance component at each node in the new energy station. is the diagonal matrix composed of the converter coupling admittance calculated from the positive sequence current disturbance component and the negative sequence voltage disturbance component at each node in the new energy station. is the negative-sequence admittance diagonal matrix of the converter, is the n+1-dimensional positive sequence small signal voltage component, It is the n+1-dimensional negative-sequence small signal voltage component.
12. The method according to claim 9, characterized in that The calculation formula of the denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system includes: The calculation formula of the characteristic equation of the node impedance model of the new energy station grid-connected system includes: In the above formula, s is the pull operator, det(・) is the determinant to be solved, Y net (s) is the 2(n+1)-dimensional admittance matrix of the network element, Y reg (s) is the 2(n+1)-dimensional admittance matrix of the converter.
13. The method according to claim 10, characterized in that The calculation formula for solving the determinant of the n+1-dimensional ordered impedance matrix includes: The calculation formula of the model characteristic value includes: In the above formula, s is the pull operator, det(・) is the determinant to be solved, For Solve the determinant, is the corrected equivalent positive sequence admittance of the new energy station grid-connected system, L for The left eigenvector matrix of is the eigenvalue diagonal matrix, diag{·} is the diagonal matrix, λ n is the nth eigenvalue, λ n+1 is the n+1th eigenvalue, n+1 is The rank of the matrix, T for The right eigenvector matrix of .
14. The method according to claim 10, characterized in that The calculation formula of the participation factor of the converter access node in the new energy station grid-connected system includes: p i =L ik •T ik In the above formula, i is the converter access node in the new energy station grid-connected system, p i Connecting nodes to converters in new energy station grid-connected systems i The participation factor, T ik To reflect the inverter access nodes in the grid-connected system of the new energy station i The injected current k The characteristic trajectory effect, L ik for T ik The corresponding weight of the new energy station grid-connected system mode.
15. The method according to claim 1, characterized in that The step of optimizing the grid-connected unit configuration of the new energy station grid-connected system according to the participation factor of each converter access node in the new energy station grid-connected system includes: From the participation factors of the converter access nodes in the new energy station grid-connected system, the grid-following converter connected to the node with the largest participation factor is selected and replaced with a grid-building converter of the same capacity.
16. A new energy station network unit optimization configuration device, characterized in that: include: The collection unit is used to collect relevant parameters of the grid-connected system of the new energy station; A first calculation unit is used to calculate the wide-band oscillation stability margin index of the new energy station grid connection by using relevant parameters of the new energy station grid connection system; A judgment unit, used to judge whether the grid-connected system of the new energy station needs to be optimized according to the broadband oscillation stability margin index of the grid-connected new energy station; The second calculation unit is used to calculate the participation factor of each converter access node in the new energy station grid-connected system by using the node impedance model of the new energy station grid-connected system when the new energy station grid-connected system needs to be optimized; The optimization configuration unit is used to optimize the configuration of the grid-connected units of the new energy station grid-connected system according to the participation factors of each converter access node in the new energy station grid-connected system, and recalculate the wide-band oscillation stability margin index of the new energy station grid-connected system until the new energy station grid-connected system reaches the optimal configuration.
17. The device according to claim 16, characterized in that The relevant parameters of the new energy station grid-connected system include: operating point parameters of the new energy station grid-connected system, network topology parameters of the new energy station grid-connected system and control parameters of the new energy power generation unit; The operating point parameters of the new energy station grid-connected system include: voltage signals and current signals of each node in the new energy station grid-connected system; The network topology parameters of the new energy station grid-connected system include: a node admittance matrix of the new energy station grid-connected system; The control parameters of the new energy power generation unit include: main circuit parameters and control parameters of the new energy power generation unit; The main circuit parameters include: rated capacity and rated voltage of the converter, filter inductance and filter capacitance in the converter main circuit; The control parameters include: control parameters of a power link, a voltage link, a current link and a virtual impedance used in a converter controller.
18. The device according to claim 16, characterized in that The first computing unit comprises: A first calculation module is used to calculate the impedance ratio of the new energy station grid-connected system based on relevant parameters of the new energy station grid-connected system and using a pre-built new energy side aggregation impedance model; A second calculation module is used to calculate the stability margin function of the new energy station grid-connected system by using the impedance ratio of the new energy station grid-connected system; The third calculation module is used to calculate the wide-band oscillation stability margin index of the new energy station grid-connected system by using the new energy station grid-connected system stability margin function.
19. The device according to claim 18, characterized in that The calculation formula of the new energy side aggregation impedance model includes: The calculation formula of the impedance ratio of the new energy station grid-connected system includes: In the above formula, is the aggregate admittance of the new energy station, is the aggregation impedance of the new energy station, is the positive sequence admittance of the new energy station, The coupling admittance of the new energy station is calculated from the positive sequence current disturbance component and the negative sequence voltage disturbance component at the grid connection point of the new energy station. The coupling admittance of the new energy station is calculated from the positive-sequence voltage disturbance component and the negative-sequence current disturbance component at the grid connection point of the new energy station. is the negative sequence admittance on the grid side, is the negative sequence admittance of the new energy station, s is the pull operator, s′ is the coupling frequency pull-down operator, Z ratio (s) is the impedance ratio of the grid-connected system of the new energy station, Z g (s) is the positive sequence impedance on the grid side.
20. The device according to claim 18, characterized in that The calculation formula of the stability margin function of the new energy station grid-connected system includes: G(s)=1+Z ratio (s) In the above formula, Z ratio (s) is the impedance ratio of the grid-connected system of the new energy station, G(s) is the stability margin function of the grid-connected system of new energy stations, and s is the pull operator.
21. The device according to claim 18, characterized in that The calculation formula of the broadband oscillation stability margin index of the new energy station grid connection includes: In the above formula, γ It is the broadband oscillation stability margin index for new energy stations connected to the grid. s = jω , G(jω) is the stability margin function of the grid-connected system of new energy stations, j is the imaginary number symbol, ω is the angular frequency.
22. The device according to claim 16, characterized in that The judging unit is specifically used for: Determine whether the broadband oscillation stability margin index of the new energy station grid-connected is greater than or equal to the margin threshold; if the broadband oscillation stability margin index of the new energy station grid-connected is greater than or equal to the margin threshold, the new energy station grid-connected system does not need to be optimized, and the current configuration of the new energy station grid-connected system is the optimal configuration; if the broadband oscillation stability margin index of the new energy station grid-connected is less than the margin threshold, the new energy station grid-connected system needs to be optimized.
23. The device according to claim 16, characterized in that The second computing unit comprises: A first acquisition module is used to acquire a characteristic equation of the node impedance model of the new energy station grid-connected system according to the node impedance model of the new energy station grid-connected system; The second acquisition module is used to obtain the participation factor of each converter access node in the new energy station grid-connected system by using the characteristic equation of the node impedance model of the new energy station grid-connected system.
24. The device according to claim 23, characterized in that The first acquisition module includes: A first determination submodule is used to determine the denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system according to the node impedance model of the new energy station grid-connected system; The first acquisition submodule is used to make the denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system equal to zero, and simplify to obtain the characteristic equation of the node impedance model of the new energy station grid-connected system.
25. The device according to claim 23, characterized in that The second acquisition module includes: The second acquisition submodule is used to convert the characteristic equation of the node impedance model of the new energy station grid-connected system into a solution for solving the determinant of the n+1-dimensional ordered impedance matrix by using Schur complement transformation to obtain the model eigenvalue; A second determination submodule is used to determine the stability information and oscillation property information of the new energy station grid-connected system according to the model characteristic value; The calculation submodule is used to calculate the participation factor of each converter access node in the new energy station grid-connected system under the oscillation mode according to the oscillation mode corresponding to the model eigenvalue when the new energy station grid-connected system is unstable.
26. The device according to claim 16, characterized in that The calculation formula of the node impedance model of the new energy station grid-connected system includes: In the above formula, s is the pull operator, s′ is the coupling frequency pull-down operator, is the n+1-dimensional positive sequence small signal current component, is the n+1-dimensional negative sequence small signal current component, is the positive-sequence node admittance matrix of the network element, is the negative-sequence node admittance matrix of the network element, is the positive sequence admittance diagonal matrix of the converter, is a diagonal matrix composed of the coupled admittances calculated from the negative-sequence current disturbance component and the positive-sequence voltage disturbance component at each node in the new energy station. is the diagonal matrix composed of the converter coupling admittance calculated from the positive sequence current disturbance component and the negative sequence voltage disturbance component at each node in the new energy station. is the negative-sequence admittance diagonal matrix of the converter, is the n+1-dimensional positive sequence small signal voltage component, It is the n+1-dimensional negative-sequence small signal voltage component.
27. The device according to claim 24, characterized in that The calculation formula of the denominator of the closed-loop transfer function of the node impedance model of the new energy station grid-connected system includes: The calculation formula of the characteristic equation of the node impedance model of the new energy station grid-connected system includes: In the above formula, s is the pull operator, det(・) is the determinant to be solved, Y net (s) is the 2(n+1)-dimensional admittance matrix of the network element, Y reg (s) is the 2(n+1)-dimensional admittance matrix of the converter.
28. The device according to claim 25, characterized in that The calculation formula for solving the determinant of the n+1-dimensional ordered impedance matrix includes: The calculation formula of the model characteristic value includes: In the above formula, s is the pull operator, det(・) is the determinant to be solved, For Solve the determinant, is the corrected equivalent positive sequence admittance of the new energy station grid-connected system, L for The left eigenvector matrix of is the eigenvalue diagonal matrix, diag{·} is the diagonal matrix, λ n is the nth eigenvalue, λ n+1 is the n+1th eigenvalue, n+1 is The rank of the matrix, T for The right eigenvector matrix of .
29. The device according to claim 25, characterized in that The calculation formula of the participation factor of the converter access node in the new energy station grid-connected system includes: p i =L ik •T ik In the above formula, i is the converter access node in the new energy station grid-connected system, p i Connecting nodes to converters in new energy station grid-connected systems i The participation factor, T ik To reflect the inverter access nodes in the grid-connected system of the new energy station i The injected current k The characteristic trajectory effect, L ik for T ik The corresponding weight of the new energy station grid-connected system mode.
30. The device according to claim 16, characterized in that The optimization configuration unit comprises: The selection module is used to select the grid-following converter connected to the node with the largest participation factor from the participation factors of the converter access nodes in the new energy station grid-connected system, and replace it with a grid-forming converter of the same capacity.
31. A computer device, characterized in that: include: at least one processor and memory; The memory is used to store one or more programs; When the one or more programs are executed by the at least one processor, the new energy station networking unit optimization configuration method as described in any one of claims 1 to 15 is implemented.
32. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and when the computer program is executed, the method for optimizing the configuration of the new energy station networking unit as described in any one of claims 1 to 15 is implemented.
Citation Information
Patent Citations
Method and system for determining maximum grid-connected capacity of new energy power generation
CN113852120A
Wind power plant stability evaluation method and system based on active equipment node impedance
CN114002954A
Method and device for determining reason of high-frequency oscillation of wind power plant
CN114256859A
Real-time monitoring method and system for short-circuit ratio of new energy multi-station
CN115864523A
Network construction unit access capacity optimization method meeting broadband oscillation stability constraint
CN116436081A
Cited By
New energy power grid modeling method and device, storage medium and computing equipment
CN119989712A
New energy grid modeling method, device, storage medium and computing equipment
CN119989712B
Wind turbine generator coupling modeling and clustering analysis method for multiple disturbance scenes
CN120728707A
SVG multi-working-condition control parameter optimization method and system
CN121417259A
SVG multi-working condition control parameter optimization method and system
CN121417259B