Method and system for determining irradiance of photovoltaic module, storage medium and electronic equipment

By sampling the orientation and distribution position of the photovoltaic module, combining operating parameters, dynamically adjusting the irradiance measurement, and introducing a self-cleaning mode, it solves the problem that it is difficult to accurately monitor the irradiance of complex roof photovoltaic systems in traditional methods, and improves the accuracy of measurement and reliability reduce costs.

CN119030454AInactive Publication Date: 2024-11-26GUANGDONG HUANDIAN DESIGN CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411137994.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In existing photovoltaic power generation systems, traditional irradiance monitoring methods are difficult to accurately reflect the irradiation of complex roof photovoltaic systems, and are expensive, and ignore the impact of surface dirt on irradiance measurement of photovoltaic modules.

Method used

By sampling the orientation and distribution positions of each photovoltaic module, combining short-circuit current, open-circuit voltage and component temperature, the irradiance measurement is dynamically adjusted, and a self-cleaning mode is introduced. The irradiance is re-measured according to the clean parameters, taking into account the surface cleanliness of the component Changes.

Benefits of technology

Achieve accurate, dynamic and comprehensive monitoring of photovoltaic module irradiance without adding additional hardware costs, improve measurement accuracy and reliability, evaluate the impact of dirt on photovoltaic module performance, and reduce system costs .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119030454A_ABST
    Figure CN119030454A_ABST
Patent Text Reader

Abstract

The invention discloses a photovoltaic module irradiance determination method and system, a storage medium and electronic equipment, and relates to the field of photovoltaic power generation. The method comprises the following steps: sampling each photovoltaic module according to the orientation and distribution position of each photovoltaic module in a target area to obtain a current first operation parameter of a target photovoltaic module; determining first irradiance according to the orientation of the target photovoltaic module and the first operation parameter; if the first irradiance exceeds a preset irradiance range, starting a self-cleaning mode to clean the target photovoltaic module; and sampling a second operation parameter of the cleaned target photovoltaic module, and determining a second irradiance according to the orientation of the cleaned target photovoltaic module and the second operation parameter. By adopting the technical scheme of the invention, the accurate, dynamic and comprehensive irradiance monitoring of the complex photovoltaic system is realized on the premise of not increasing extra hardware cost by sampling the operation parameters of each component and considering the orientation and cleanliness.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of photovoltaic power generation, and specifically to a method, system, storage medium and electronic device for determining the irradiance of a photovoltaic module. Background Art

[0002] With the rapid development and widespread application of photovoltaic power generation technology, accurate monitoring of irradiance of photovoltaic modules is essential for optimizing system performance and improving power generation efficiency. Traditional irradiance monitoring methods mainly rely on installing specialized irradiance sensors or irradiance meters in photovoltaic arrays.

[0003] However, this approach faces significant challenges. First, high-quality irradiance sensors are expensive, especially for large-scale PV power plants or distributed PV systems. Installing multiple sensors will significantly increase system costs. Second, in complex rooftop PV systems, due to the diversity of component orientations and inclinations, a single or a few fixed-position irradiance sensors are difficult to accurately reflect the irradiation conditions of the entire system. In addition, the dirt accumulated on the surface of PV modules over time can affect their performance, which in turn affects the accurate measurement of irradiance, and existing monitoring methods often ignore this dynamic factor.

[0004] Therefore, how to accurately monitor the actual irradiance of photovoltaic modules in different orientations and positions without significantly increasing system costs, and take into account the dynamic changes in the surface cleanliness of the modules, has become a technical problem that urgently needs to be solved in the current photovoltaic industry. Summary of the invention

[0005] The present application provides a method, system, storage medium and electronic device for determining the irradiance of a photovoltaic module. By sampling the operating parameters of each component and taking into account the orientation and cleanliness, accurate, dynamic and comprehensive irradiance monitoring of a complex photovoltaic system is achieved without increasing additional hardware costs.

[0006] In a first aspect of the present application, the present application provides a method for determining the irradiance of a photovoltaic module, comprising: According to the orientation and distribution position of each photovoltaic module in the target area, sampling each photovoltaic module to obtain the current first operating parameter of the target photovoltaic module; Determining a first irradiance according to the orientation of the target photovoltaic assembly and the first operating parameter; If the first irradiance exceeds a preset irradiance range, a self-cleaning mode is activated to clean the target photovoltaic component; a second operating parameter of the cleaned target photovoltaic component is sampled, and a second irradiance is determined according to the orientation of the cleaned target photovoltaic component and the second operating parameter.

[0007] In a second aspect of the present application, a system for determining irradiance of a photovoltaic module is provided, comprising: A first operating parameter determination module is used to sample each photovoltaic component according to the orientation and distribution position of each photovoltaic component in the target area to obtain a current first operating parameter of the target photovoltaic component; A first irradiance determination module, configured to determine a first irradiance according to the orientation of the target photovoltaic assembly and the first operating parameter; A photovoltaic component cleaning module, configured to start a self-cleaning mode to clean the target photovoltaic component if the first irradiance exceeds a preset irradiance range; The second irradiance determination module is used to sample a second operating parameter of the cleaned target photovoltaic assembly and determine a second irradiance according to the orientation of the cleaned target photovoltaic assembly and the second operating parameter.

[0008] In a third aspect of the present application, a computer storage medium is provided, wherein the computer storage medium stores a plurality of instructions, wherein the instructions are suitable for being loaded by a processor and executing the above method steps.

[0009] In a fourth aspect of the present application, an electronic device is provided, comprising: a processor and a memory; wherein the memory stores a computer program, and the computer program is suitable for being loaded by the processor and executing the above-mentioned method steps.

[0010] In summary, one or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages: By sampling each photovoltaic module in the target area and considering its orientation and distribution position, the irradiation of the entire system can be fully reflected, overcoming the defect that a single or a few fixed position sensors in the traditional method are difficult to accurately reflect the irradiation of a complex roof photovoltaic system. By using the operating parameters of the photovoltaic module itself to determine the irradiance, the installation of expensive irradiance sensors is avoided, effectively reducing the system cost. Furthermore, a self-cleaning mode is introduced. When it is detected that the first irradiance exceeds the preset range, the cleaning process is triggered, and the second irradiance is resampled after cleaning. The above dynamic adjustment mechanism takes into account the impact of changes in the cleanliness of the component surface on the irradiance measurement, and improves the accuracy and reliability of irradiance determination. By comparing the irradiance before and after cleaning, the impact of dirt on the performance of the photovoltaic module can be evaluated, providing a basis for system maintenance. In general, the above technical solution reduces costs while ensuring accuracy, and can adapt to photovoltaic modules with different orientations and positions. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a flow chart of a method for determining irradiance of a photovoltaic module provided in an embodiment of the present application; Figure 2 It is a structural schematic diagram of a photovoltaic module irradiance determination system provided in an embodiment of the present application; Figure 3 It is a schematic diagram of the structure of an electronic device disclosed in an embodiment of the present application.

[0012] Description of reference numerals: 300, electronic device; 301, processor; 302, communication bus; 303, user interface; 304, network interface; 305, memory. DETAILED DESCRIPTION

[0013] In order to enable technicians in this field to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments.

[0014] In the description of the embodiments of the present application, words such as "for example" or "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "for example" or "for example" is intended to present related concepts in a specific way.

[0015] In the description of the embodiments of the present application, the meaning of the term "multiple" refers to two or more. For example, multiple systems refer to two or more systems, and multiple screen terminals refer to two or more screen terminals. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. The terms "include", "comprise", "have" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.

[0016] Please refer to Figure 1 , Figure 1 The present invention provides a flow chart of a method for determining the irradiance of a photovoltaic module provided in an embodiment of the present invention. The method can be implemented by a computer program, can be implemented by a single-chip microcomputer, or can be run on a system for determining the irradiance of a photovoltaic module. The computer program can be integrated into an application or run as an independent tool application. Specifically, the method for determining the irradiance of a photovoltaic module can include the following steps: S101: sampling each photovoltaic component according to the orientation and distribution position of each photovoltaic component in the target area to obtain a current first operating parameter of the target photovoltaic component.

[0017] Among them, the target area refers to a specific photovoltaic installation area that needs to be monitored and evaluated for irradiance. In the embodiment of the present application, it can be understood as the area covered by a complete distributed photovoltaic power generation system, which may be a single building roof, a group of multiple buildings, a ground photovoltaic power station or a hybrid installation area. For example, the target area can be the roof of a commercial building, a group of roofs of multiple buildings in a residential area, or a large-scale photovoltaic array installed in an open area.

[0018] Furthermore, the orientation and distribution of PV modules are key factors in evaluating the performance of PV systems. The orientation of PV modules refers to the horizontal angle of the module panel relative to the south direction, usually expressed as an azimuth. The distribution position refers to the specific installation location of the PV module in the target area, including its spatial coordinates on the roof or ground and its positional relationship relative to other modules.

[0019] In the embodiments of the present application, the orientation of the photovoltaic module can be understood as an angle value, which usually ranges from -180° to 180°, where 0° represents the south direction, -90° represents the east direction, 90° represents the west direction, and 180° or -180° represents the north direction. For example, a photovoltaic module with an orientation of 15° is slightly biased to the southwest. The distribution position can be understood as a set of coordinate values ​​or relative position descriptions, such as "southeast corner of the roof", "third row and fifth column in the central area", etc.

[0020] Since the solar radiation intensity received by photovoltaic modules in different orientations varies, reasonable sampling is required for different orientations to ensure that the collected data can accurately reflect the irradiation conditions of the entire target area. Specifically, the system first obtains detailed information on all photovoltaic modules in the target area, including the orientation angle, installation coordinates, and module model of each module. The above information provides comprehensive basic data for subsequent sampling strategies. Then, the system uses a preset sampling algorithm to determine the number of modules that need to be sampled in each orientation.

[0021] Furthermore, after determining the number of samples, the system selects specific components using random sampling or systematic sampling. For each selected component, the system records its current operating parameters, namely the first operating parameters, which mainly include short-circuit current, open-circuit voltage and component temperature. The above parameters directly reflect the working status of the photovoltaic component and are directly related to the irradiance.

[0022] On the basis of the above embodiment, as an optional embodiment, in S101: the step of sampling each photovoltaic component according to the orientation and distribution position of each photovoltaic component in the target area may further specifically include the following steps: determining the sampling number of photovoltaic components with different orientations according to the orientation, distribution position and number of each photovoltaic component in the target area, and sampling each photovoltaic component according to the sampling number.

[0023] In practical applications, the distribution location and quantity of photovoltaic modules not only reflect the scale of the system, but more importantly, the distribution density of the modules, which directly affects the formulation of the sampling strategy. At the same time, due to the diversity of the shapes of the target areas, the orientation of the photovoltaic panels may show a certain trend deviation, which requires considering a wider range of orientations when sampling. Based on the above considerations, the embodiments of the present application propose a more sophisticated and flexible sampling method.

[0024] Specifically, the system first conducts a comprehensive analysis of the PV modules in the target area, recording not only the orientation angle of each module, but also its specific coordinate position in the area in detail. For example, on the roof of an irregularly shaped commercial building, the system may find that although most modules are facing due south (0°), due to the influence of the roof structure, some modules have a deviation of -5° to 5° in orientation. At the same time, the system will also calculate the module density in different areas. For example, in the center area of ​​the roof, 4 modules may be installed per square meter, while in the edge area, due to equipment installation and other reasons, the density may be reduced to 2 modules per square meter.

[0025] Based on the above information, the system uses a dynamic sampling algorithm to determine the number of samples in different directions and distribution density areas. The algorithm takes the following factors into account: Direction deviation range: The system no longer simply divides directions according to fixed angles, but sets deviation ranges based on actual conditions. For example, the range of -5° to 5° may be considered as "approximately due south" direction.

[0026] Distribution density: The sampling ratio of high-density areas may be slightly lower than that of low-density areas, because the differences between components in high-density areas may be smaller. For example, for an area with a density of 4 / m2, a sampling ratio of 8% may be adopted, while for an area with a density of 2 / m2, a sampling ratio of 12% may be increased.

[0027] Direction distribution trend: If it is found that the number of components in a certain direction range is significantly more than that in other directions, the system will appropriately increase the number of samples in this direction range to ensure that the radiation conditions in the main directions can be accurately captured.

[0028] Based on the above method, the system may come up with the following sampling strategy: for the 500 components facing "approximately due south" (-5° to 5°), considering their dominance, select 10% or 50 components for sampling; for the 200 components facing 5° to 15°, since they represent an obvious deviation trend, select 12% or 24 components; for the 100 components facing -15° to -5°, select 12% or 12 components. At the same time, within each orientation range, the system will further adjust the number of samples in a specific area according to the distribution density.

[0029] The main advantage of this sampling method based on distribution density and orientation deviation range is that it can more accurately reflect the actual situation of the target area. By considering the distribution density of components, the system can avoid oversampling in highly uniform areas while ensuring data representativeness. By considering the deviation range and distribution trend of orientation, the system can better capture the irradiation changes caused by the special shape of the target area.

[0030] In the actual sampling process, the system uses a stratified random sampling method to ensure that there are an appropriate number of samples in each orientation range and density area. For each selected PV module, the system records its first operating parameters such as short-circuit current, open-circuit voltage and module temperature.

[0031] Based on the above embodiment, as an optional embodiment, the orientation and distribution position of each photovoltaic module in the target area may be substituted into the first preset formula to obtain the sampling number of photovoltaic modules in different orientations.

[0032] Among them, the first preset formula is: In the formula, S i represents the number of samples of PV panels in the i-th direction, k represents the adjustment coefficient, N total Represents the total number of PV panels in the target area, A total Represents the total area of ​​the target area, N i represents the number of PV panels in the i-th orientation, P i The distribution position coefficient of the PV modules in the i-th orientation, θ i Represents the angle of the PV module facing the i-th direction; θ ideal Angle indicating the ideal orientation of a photovoltaic module.

[0033] Among them, the total number and total area of ​​PV modules in the target area are two key parameters, which together reflect the scale and density characteristics of the PV system. Specifically, the total number of PV modules in the target area refers to the sum of the number of all PV panels installed within a specific monitoring range, while the total area refers to the sum of the physical space covered or occupied by the above PV modules. They are used to calculate the overall density of the PV system. This density value reflects the compactness of the distribution of PV modules in the target area, which is crucial for formulating a reasonable sampling strategy.

[0034] For example, for a high-density installed system, relatively few sampling points may be required to obtain representative data; while for a low-density or dispersed installed system, the number of sampling points may need to be increased to ensure coverage.

[0035] Among them, the number of PV modules in different orientations is a key parameter, which reflects the distribution of the number of modules installed in a specific orientation in the PV system. Specifically, the number of PV modules in the i-th orientation refers to the sum of the number of all PV modules installed in the target area within the i-th orientation angle range. i Taking this into account, the system ensures that the number of samples is proportional to the number of components facing each direction, reflecting the importance of that direction in the entire system. For example, if the components facing south account for 60% of the total, then when sampling, the components facing south should also account for a large proportion to ensure that the collected data can accurately reflect the overall situation of the system.

[0036] Among them, the distribution position coefficient of the PV modules in the i-th orientation is an important parameter that reflects the spatial distribution characteristics of the PV modules in the target area. This coefficient refers to an adjustment factor obtained by quantitatively evaluating the distribution of the PV modules in a specific orientation at the installation location.

[0037] In a feasible implementation, it can be understood as a value between 0 and 2, where 1 represents a standard or average distribution. For example, for a rooftop distributed photovoltaic system, if the south-facing components are evenly distributed in the center of the roof, they may be assigned a standard value of 1. For southeast-facing components, if they are mainly concentrated at the edge of the building or in areas that may be partially shaded, they may be assigned a higher value of 1.2. On the contrary, if the southwest-facing components are distributed in a particularly open, unobstructed area, they may be assigned a lower value of 0.9.

[0038] P i The coefficient is used as the adjustment factor for the number of samples in the first preset formula. Through this coefficient, the system can flexibly adjust the sampling strategy according to the specific installation location of the component. For components distributed in areas where there may be occlusion or other unfavorable factors, by increasing P iThe system will increase the number of samples in this direction accordingly to ensure that possible local changes can be fully captured, thereby improving the representativeness and comprehensiveness of the sampling.

[0039] The angle of the PV module in the i-th orientation and the angle of the ideal orientation of the PV module are two key parameters describing the installation direction of the PV module. These two angle parameters together reflect the relationship between the actual installation orientation and the ideal installation orientation, and are used to evaluate the overall performance of the PV system and optimize the sampling strategy.

[0040] For example, the ideal orientation angle θ of the photovoltaic module is ideal It refers to the optimal installation direction that enables the photovoltaic module to receive the maximum amount of solar radiation throughout the year under specific geographical locations and climatic conditions. ideal It is usually a fixed value, and its specific value depends on the latitude of the installation site and the local climate characteristics. For example, in most areas of the northern hemisphere, θ ideal Usually close to or equal to 180° (due south), while in areas near the equator, θ ideal It may be closer to 90° or 270° (due east or west).

[0041] First, in the first preset formula, θ i and θ ideal By cos(θ i -θ ideal ) term is used to calculate the effect of orientation on the number of samples. This cosine function ensures that the component groups that are closer to the ideal orientation get more sampling opportunities. For example, if a certain orientation is exactly the same as the ideal orientation, cos(θ i -θ ideal )=1, the number of samples will not be reduced; however, if a certain orientation differs from the ideal orientation by 90°, cos(θ i -θ ideal )=0, the number of samples in this direction will be greatly reduced. The above mechanism ensures that more sampling resources are allocated to those directions that contribute more to the overall performance of the system.

[0042] By adopting the photovoltaic module sampling method of the first preset formula, the system can automatically generate the optimal sampling plan by comprehensively considering multiple key factors such as the overall scale, density, orientation distribution and local installation environment of the photovoltaic system, and can adapt to photovoltaic systems of different scales and complexities without manual intervention. This adaptive capability greatly improves the universality of the method, enabling it to be widely used in various types of photovoltaic projects, from small rooftop distributed systems to large ground power stations, and accurate irradiance data can be obtained.

[0043] In addition, the above method significantly improves the representativeness and comprehensiveness of the sampling. By accurately calculating the number of samples of components in different orientations, it is ensured that the collected data can truly reflect the irradiation conditions of the entire photovoltaic system. In particular, by introducing the distribution position coefficient, the method can take into account the influence of the local installation environment, such as potential shading or reflection, so as to capture possible micro-environmental differences. This comprehensiveness makes the subsequent irradiance calculation more accurate and provides a reliable data basis for system performance evaluation and optimization.

[0044] Based on the above embodiment, as an optional embodiment, after determining the sampling number of photovoltaic components in different orientations according to the orientation, distribution position and quantity of each photovoltaic component in the target area, and sampling each photovoltaic component according to the sampling number, the following steps may also be included: The current solar altitude and azimuth are obtained, and for any target photovoltaic component, the orientation correction factor of the target photovoltaic component is calculated according to the solar altitude, azimuth and orientation of the target photovoltaic component.

[0045] Specifically, the main purpose of introducing the orientation correction factor is to solve the problem of different solar radiation intensities received by photovoltaic modules in different orientations, so as to unify the measurement standards and improve the accuracy of irradiance estimation. In practical applications, the installation orientation of photovoltaic modules is often restricted by various factors, such as building structure, terrain features, etc., resulting in not all modules being able to maintain an ideal orientation. This difference in orientation will directly affect the amount of solar radiation received by the module, and thus affect the irradiance measurement results. By introducing the orientation correction factor, we can standardize the measurement results of modules in different orientations, making the irradiance estimation of the entire system more accurate and reliable.

[0046] The specific calculation process is as follows: First, the system needs to obtain the current solar altitude angle α and azimuth angle γ. The above data can be obtained by the solar position calculation algorithm based on the current time and geographical location, or directly measured by a dedicated solar tracking device. Next, for each target photovoltaic module, the system will use its known orientation azimuth angle δ and inclination angle β, combined with the position parameters of the sun, to calculate the actual incident angle θ i The calculation formula is: cos(θ i )=sin(α)×sin(β)×cos(γ-δ)+cos(α)×cos(β); At the same time, the system also needs to calculate the incident angle θideal under the ideal orientation. The ideal orientation is usually defined as the direction that enables the photovoltaic module to receive the maximum amount of solar radiation in a year. In the northern hemisphere, this usually corresponds to the south direction (azimuth angle δ ideal =180°), while in the southern hemisphere it is due north (azimuth δideal =0°). The formula for calculating the ideal incident angle is: cos(θ ideal )=sin(α)×sin(β)×cos(γ-δ ideal )+cos(α)×cos(β); After determining the actual incident angle and the ideal incident angle, the orientation correction factor K can be calculated. i The calculation formula is: K i =cos(θ i ) / cos(θ ideal ); The principle of the above formula is based on the characteristic that the radiation intensity received by the PV module is proportional to the cosine of the incident angle. By dividing the cosine of the actual incident angle by the cosine of the ideal incident angle, we get a factor that can be used to correct the irradiance measurement.

[0047] After the orientation correction factor is introduced, the system can multiply the measurement result of each sampling component by its corresponding K when calculating the irradiance. i The effect of this approach is significant: it not only improves the accuracy of the overall irradiance estimate, but also makes data from modules with different orientations comparable. For example, for a module that is oriented 45° from the ideal direction, its K i The value might be around 0.7. This means that the actual irradiance measurement for that component needs to be divided by 0.7 to get the irradiance value equivalent to the ideal orientation.

[0048] In addition, the introduction of the orientation correction factor provides more flexibility for the system. It enables the system to better adapt to complex installation environments, such as irregular roofs or partial shading. Even under the above conditions, the system can still obtain accurate overall irradiance estimation through the application of the correction factor.

[0049] S102: Determine a first irradiance according to the orientation of the target photovoltaic assembly and a first operating parameter.

[0050] Specifically, the first operating parameters may include short-circuit current, component temperature, and open-circuit voltage, which together form the basis for irradiance estimation and system performance evaluation.

[0051] Among them, short-circuit current refers to the maximum current flowing through the module when the voltage across the photovoltaic module is zero, which can be understood as the maximum current value that the photovoltaic module can generate under specific irradiation conditions. It is proportional to the light intensity incident on the surface of the photovoltaic module, so it becomes the main basis for estimating irradiance. Module temperature refers to the actual temperature of the photovoltaic module in the working state, which can be understood as the average operating temperature of the photovoltaic cell. It is affected by factors such as ambient temperature, irradiation intensity, wind speed, etc., and will also affect the output characteristics of the module. Open circuit voltage refers to the maximum voltage generated across the photovoltaic module when no load is connected, reflecting the voltage output capacity of the module under specific conditions.

[0052] Based on the above embodiment, as an optional embodiment S102: the step of determining the first irradiance according to the orientation of the target photovoltaic assembly and the first operating parameter may further include the following steps: Substituting the orientation of the target photovoltaic module, and the short-circuit current, module temperature, and open-circuit voltage in the first operating parameter into a second preset formula to obtain a first irradiance; Among them, the second preset formula is: Where G represents the first irradiance, I sc,i represents the short-circuit current of the i-th target PV module, α represents the temperature coefficient of the short-circuit current, T mod,i represents the component temperature of the i-th target PV module, T ref Indicates the reference temperature, I sc,ref represents the short-circuit current under reference conditions, β represents the temperature coefficient of the open-circuit voltage, T a Indicates the ambient temperature, G ref represents the reference irradiance, η clean Indicates the cleanliness correction factor, K i The orientation correction factor of the i-th target PV module, S i Indicates the number of samples of PV panels facing the i-th direction, N i Indicates the number of PV panels in the i-th orientation.

[0053] First, the core part of the second preset formula is derived from the short-circuit current method, which is a widely used irradiance estimation method in the photovoltaic field. The basic principle of this method is based on the good linear relationship between the short-circuit current of the photovoltaic module and the incident light intensity. Under ideal conditions, the short-circuit current generated by the photovoltaic module is proportional to the intensity of the solar radiation it receives, providing a simple and effective way to estimate the irradiance.

[0054] In the second preset formula, (I sc,i +α×(T mod,i -T ref )) / Isc,ref The term reflects the above principle. In order to solve the impact of temperature change, the formula introduces the temperature correction term α×(T mod,i -T ref ). α is the temperature coefficient of short-circuit current, usually provided by the PV module manufacturer, and its unit is A / ℃ or % / ℃. mod,i represents the actual operating temperature of the ith PV module, and T ref It is the reference temperature under standard test conditions, usually 25°C. By calculating the difference between the actual temperature and the reference temperature and multiplying it by the temperature coefficient, we get the effect of temperature change on short-circuit current.

[0055] The denominator of the second preset formula is 1+β×(T a -T ref ) takes into account the effect of ambient temperature on the open circuit voltage. β is the temperature coefficient of the open circuit voltage. ref As a reference irradiance (usually 1000W / m 2 ), providing a standardized benchmark for the entire calculation.

[0056] η clean As a cleanliness correction factor, the influence of the cleanliness of the PV module surface on the irradiance measurement is taken into account, which is particularly important in practical applications because dust and dirt can significantly reduce the efficiency of PV modules.

[0057] Furthermore, the cleanliness correction factor is a key technical parameter in the embodiment of the present application, which reflects the impact of the cleanliness of the surface of the photovoltaic module on its performance. In the embodiment of the present application, it can be understood as a proportional factor between 0 and 1, which is used to quantify the degree of influence of dust, dirt or other deposits on the surface of the photovoltaic module on the module's ability to receive solar radiation. When the cleanliness correction factor is 1, it means that the surface of the module is completely clean without any obstruction or contamination; when its value is close to 0, it means that the surface of the module is seriously contaminated or obstructed, resulting in a significant decrease in the ability to receive radiation. The cleanliness correction factor is set to 1 during the initial calculation.

[0058] K i As an orientation correction factor, it allows the system to take into account the different orientations of PV panels, so that measurement data from different directions can be compared and combined on the same basis. This improves the accuracy of the overall irradiance estimate, especially for complex roof systems with multiple orientations.

[0059] Finally, S. i / N iThis scaling factor takes into account the representativeness of the sampling. By comparing the number of samples in each orientation to the total number of components in that orientation, the second preset formula ensures that the final result accurately reflects the status of the entire system without being biased by over- or under-sampling certain orientations.

[0060] S103: If the first irradiance exceeds a preset irradiance range, a self-cleaning mode is activated to clean the target photovoltaic component.

[0061] The preset irradiance range in the embodiment of the present application refers to an irradiance threshold interval used to determine whether the photovoltaic module needs to be cleaned. It can be understood as a dynamically adjusted standard, mainly used to identify abnormal irradiance decreases caused by factors such as component surface contamination or partial shading. This range is usually set as a percentage interval of the expected irradiance.

[0062] In actual applications, the determination of the preset irradiance range takes into account multiple factors, but mainly focuses on aspects related to component cleaning needs. First, it is based on historical data analysis, using irradiance data from the same period and location in the past to establish a benchmark, with special attention paid to the typical irradiance performance of components in a clean state. Secondly, it takes into account local environmental characteristics, such as air quality, rainfall frequency, dust conditions, etc. The above factors directly affect the contamination rate of the component surface. In addition, the system will adjust the preset range according to seasonal changes, because different seasons may face different degrees of pollution problems, such as there may be more pollen in spring, and there may be snow in winter.

[0063] The preset irradiance range is not fixed, but a dynamically adjusted system. It is updated in real time based on factors such as recent cleaning records, weather forecasts, and component aging. For example, the system may set a higher lower limit for a period of time after cleaning is completed to more sensitively detect new pollution; and before rain is expected, the system may temporarily relax the range to avoid unnecessary cleaning.

[0064] In the embodiment of the present application, the preset irradiance range is mainly used to trigger the self-cleaning mode and evaluate the cleaning effect. When the system detects that the first irradiance is lower than the lower limit of the preset range, it interprets this situation as a performance degradation that may be caused by component surface contamination or partial shading, thereby starting the self-cleaning procedure. After the cleaning is completed, the system will measure the irradiance again and compare it with the preset range to evaluate the cleaning effect. If the irradiance after cleaning is still lower than expected, the system may issue an alarm to indicate that there may be other problems, such as component damage or permanent shading.

[0065] When the system detects that the first irradiance is below the lower limit of the preset irradiance range, the self-cleaning mode will be activated. The activation process of this mode includes several key steps: First, the system will double-confirm the abnormal data to exclude the possibility of instantaneous fluctuations or sensor errors. After confirmation, the system will evaluate the current weather conditions and time to determine whether it is suitable for cleaning operations. If the conditions are suitable, the self-cleaning system will be activated.

[0066] The specific implementation of the self-cleaning system can vary depending on the size of the PV system and the installation environment. For rooftop systems, fixed water spray devices or small cleaning robots may be used. The above devices can rinse and wipe the target PV panels in an orderly manner according to the preset cleaning program. For large ground power stations, more complex automated cleaning equipment may be used, such as mobile cleaning vehicles with soft brushes. Regardless of the method used, the cleaning process will be carefully controlled to ensure adequate cleaning without causing damage to the components.

[0067] S104: sampling a second operating parameter of the cleaned target photovoltaic assembly, and determining a second irradiance according to the orientation of the cleaned target photovoltaic assembly and the second operating parameter.

[0068] When the system detects that the first irradiance exceeds the preset irradiance range, this usually indicates that the photovoltaic module may have problems such as contamination or shading that affect its performance. Therefore, the irradiance is measured again after the cleaning operation to eliminate the influence of the above temporary factors, so as to obtain a more accurate and reliable irradiance data. The calculation process of this process is the same as S103, and no further details are given here.

[0069] It is worth noting that when calculating the second irradiance after cleaning, the cleanliness correction factor also needs to be adjusted. Specifically, the cleanliness correction factor can be determined based on the first operating parameter and the second operating parameter.

[0070] Specifically, during the operation of a photovoltaic system, the cleanliness correction factor is an important parameter that changes dynamically. The main reason for adjusting it after the cleaning operation is that the cleaning process changes the state of the component surface, which directly affects the photovoltaic conversion efficiency of the component. By comparing the operating parameters before and after cleaning, we can accurately quantify the performance improvement brought about by the cleaning operation, thereby obtaining a more accurate cleanliness correction factor. This adjustment process not only improves the accuracy of subsequent irradiance estimates, but also provides valuable feedback to the system for optimizing cleaning strategies and evaluating long-term performance changes of components.

[0071] Specifically, the method for determining a new cleanliness correction factor by using the first operating parameter before cleaning and the second operating parameter after cleaning is as follows: First, pay attention to the change in short-circuit current. The short-circuit current is approximately proportional to the incident light intensity, so it is the most direct indicator of component cleanliness. Assume that the short-circuit current before cleaning is I sc1 , after cleaning I sc2 , then the preliminary cleanliness correction factor can be expressed as: η clean_initial =I sc1 / I sc2 ; However, the short-circuit current is also affected by temperature, so temperature correction is required. Using the short-circuit current temperature coefficient α, we can standardize the short-circuit current to a reference temperature (usually 25°C): I sc1_corrected =I sc1 / (1+α*(T mod1 -25));I sc2_corrected =I sc2 / (1+α*(T mod2 -25)); where T mod1 and T mod2 are the component temperatures before and after cleaning; using the temperature-corrected short-circuit current, a more accurate cleanliness correction factor can be obtained: η clean =I sc1_corrected / I sc2_corrected ; To further improve accuracy, the change in open circuit voltage can also be considered. Although open circuit voltage is not as sensitive to contamination as short circuit current, it can provide additional information, especially in the presence of partial shading. Assume that the open circuit voltage before and after cleaning is V oc1 and V oc2 , a weight factor w can be introduced to comprehensively consider: η clean_final =(1-w)*( Isc1_corrected / I sc2_corrected )+w*(V oc1 / V oc2 ).

[0072] Based on the above embodiment, as an optional embodiment, the following steps may be further included: if the second irradiance exceeds the preset irradiance range, a warning prompt is generated.

[0073] Specifically, the system will first compare the calculated second irradiance with the previously defined preset irradiance range. If the second irradiance falls outside this range, especially below the lower limit, the system will trigger the early warning mechanism. The generation of early warning prompts can take a variety of forms to meet different operation and maintenance needs. For example, the system may display a striking warning sign on the monitoring interface and send a detailed report to the mobile device of the operation and maintenance personnel. This report usually includes the location information of the abnormal component, the specific irradiance value, the degree of deviation from the expected value, and the change in irradiance before and after cleaning. In addition, the system may also grade warnings according to the severity of the abnormality, such as using yellow warnings to indicate minor abnormalities and red warnings to indicate serious problems that need to be dealt with immediately.

[0074] The above warning mechanism provides an effective mechanism to identify deep-seated problems that cannot be solved by conventional cleaning alone. If the second irradiance after cleaning is still abnormal, it may indicate that there may be stains that cannot be cleaned, or it may mean that there are more serious problems, such as component damage, internal failure, or continuous partial shading. By issuing early warnings in a timely manner, the system can help operation and maintenance personnel quickly locate and respond to the above potential major problems, thereby minimizing energy losses and avoiding possible safety hazards.

[0075] Reference Figure 2 The present application also provides a photovoltaic module irradiance determination system, comprising: A first operating parameter determination module is used to sample each photovoltaic component according to the orientation and distribution position of each photovoltaic component in the target area to obtain a current first operating parameter of the target photovoltaic component; A first irradiance determination module, configured to determine a first irradiance according to the orientation of the target photovoltaic assembly and the first operating parameter; A photovoltaic component cleaning module, configured to start a self-cleaning mode to clean the target photovoltaic component if the first irradiance exceeds a preset irradiance range; The second irradiance determination module is used to sample a second operating parameter of the cleaned target photovoltaic assembly and determine a second irradiance according to the orientation of the cleaned target photovoltaic assembly and the second operating parameter.

[0076] On the basis of the above embodiment, as an optional embodiment, the first operating parameter determination module is also used to determine the sampling number of photovoltaic components in different orientations according to the orientation, distribution position and number of each photovoltaic component in the target area, and sample each photovoltaic component according to the sampling number.

[0077] Based on the above embodiment, as an optional embodiment, the first operating parameter determination module is further used to substitute the orientation and distribution position of each photovoltaic component in the target area into the first preset formula to obtain the sampling number of photovoltaic components in different orientations; Among them, the first preset formula is: In the formula, S i represents the number of samples of PV panels in the i-th direction, k represents the adjustment coefficient, N total Represents the total number of PV panels in the target area, A total Represents the total area of ​​the target area, N i represents the number of PV panels in the i-th orientation, P i The distribution position coefficient of the PV modules in the i-th orientation, θ i Represents the angle of the PV module facing the i-th direction; θ ideal Angle indicating the ideal orientation of a photovoltaic module.

[0078] Based on the above embodiments, as an optional embodiment, the first operating parameter determination module is also used to obtain the current solar altitude angle and azimuth angle; for any of the target photovoltaic components, the orientation correction factor of the target photovoltaic component is calculated according to the solar altitude angle, azimuth angle and the orientation of the target photovoltaic component.

[0079] Based on the above embodiment, as an optional embodiment, the first irradiance determination module is further used to substitute the orientation of the target photovoltaic component, and the short-circuit current, component temperature and open-circuit voltage in the first operating parameters into a second preset formula to obtain a first irradiance; Wherein, the second preset formula is: Where G represents the first irradiance, I sc,i represents the short-circuit current of the i-th target PV module, α represents the temperature coefficient of the short-circuit current, T mod,i represents the component temperature of the i-th target PV module, T ref Indicates the reference temperature, I sc,ref represents the short-circuit current under reference conditions, β represents the temperature coefficient of the open-circuit voltage, T a Indicates the ambient temperature, G ref represents the reference irradiance, η clean Indicates the cleanliness correction factor, K i The orientation correction factor of the i-th target PV module, S i Indicates the number of samples of PV panels facing the i-th direction, N i Indicates the number of PV panels in the i-th orientation.

[0080] Based on the above embodiment, as an optional embodiment, the photovoltaic component cleaning module is further used to determine a cleanliness correction coefficient according to the first operating parameter and the second operating parameter.

[0081] Based on the above embodiment, as an optional embodiment, the photovoltaic component cleaning module is further used to generate a warning prompt if the second irradiance exceeds a preset irradiance range.

[0082] It should be noted that: when the device provided in the above embodiment realizes its function, only the division of the above functional modules is used as an example. In actual application, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the device and method embodiments provided in the above embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.

[0083] The embodiment of the present application also provides a computer storage medium, which can store multiple instructions. The instructions are suitable for being loaded by a processor and executed by a method for determining the irradiance of a photovoltaic module such as the above embodiment. The specific execution process can refer to the specific description of the embodiment shown, which will not be repeated here.

[0084] The present application also discloses an electronic device. Figure 3 , Figure 3 The electronic device 300 may include: at least one processor 301 , at least one network interface 304 , a user interface 303 , a memory 305 , and at least one communication bus 302 .

[0085] The communication bus 302 is used to realize the connection and communication between the above components.

[0086] The user interface 303 may include a display interface and a camera interface. The optional user interface 303 may also include a standard wired interface and a wireless interface.

[0087] The network interface 304 may optionally include a standard wired interface or a wireless interface (such as a WI-FI interface).

[0088] Among them, the processor 301 may include one or more processing cores. The processor 301 uses various interfaces and lines to connect various parts in the entire server, and executes various functions of the server and processes data by running or executing instructions, programs, code sets or instruction sets stored in the memory 305, and calling data stored in the memory 305. Optionally, the processor 301 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field-Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The processor 301 can integrate one or a combination of a central processing unit (Central Processing Unit, CPU), a graphics processing unit (Graphics Processing Unit, GPU) and a modem. Among them, the CPU mainly processes the operating system, user interface diagrams and applications, etc.; the GPU is responsible for rendering and drawing the content to be displayed on the display screen; the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor 301, and it can be implemented separately through a chip.

[0089] Among them, the memory 305 may include a random access memory (Random Access Memory, RAM) and may also include a read-only memory (Read-Only Memory). Optionally, the memory 305 includes a non-transitory computer-readable storage medium. The memory 305 can be used to store instructions, programs, codes, code sets or instruction sets. The memory 305 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc.; the data storage area may store data involved in the above-mentioned various method embodiments, etc. The memory 305 may optionally also be at least one storage device located away from the aforementioned processor 301. Refer to Figure 3 The memory 305 as a computer storage medium may include an operating system, a network communication module, a user interface module, and an application program for a method for determining the irradiance of a photovoltaic module.

[0090] exist Figure 3In the electronic device 300 shown, the user interface 303 is mainly used to provide an input interface for the user and obtain the data input by the user; and the processor 301 can be used to call the application program storing a method for determining the irradiance of a photovoltaic module in the memory 305. When executed by one or more processors 301, the electronic device 300 executes one or more of the methods described in the above embodiments. It should be noted that for the aforementioned method embodiments, for the sake of simple description, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited to the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required for the present application.

[0091] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0092] In the several embodiments provided in this application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.

[0093] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0094] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0095] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a memory and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the various embodiments of the present application. The aforementioned memory includes: various media that can store program codes, such as USB flash drives, mobile hard drives, magnetic disks or optical disks.

[0096] The above is only an exemplary embodiment of the present disclosure and cannot be used to limit the scope of the present disclosure. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the disclosure of the specification and the truth of practice, those skilled in the art will easily think of other embodiments of the present disclosure.

[0097] This application is intended to cover any variation, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the art that are not described in the present disclosure. The description and examples are to be regarded as exemplary only, and the scope and spirit of the present disclosure are defined by the claims.

Claims

1. A method for determining the irradiance of a photovoltaic module, characterized in that: include: According to the orientation and distribution position of each photovoltaic module in the target area, sampling each photovoltaic module to obtain the current first operating parameter of the target photovoltaic module; Determining a first irradiance according to the orientation of the target photovoltaic assembly and the first operating parameter; If the first irradiance exceeds a preset irradiance range, starting a self-cleaning mode to clean the target photovoltaic component; A second operating parameter of the cleaned target photovoltaic assembly is sampled, and a second irradiance is determined according to the orientation of the cleaned target photovoltaic assembly and the second operating parameter.

2. The method for determining the irradiance of a photovoltaic module according to claim 1, characterized in that: The step of sampling each photovoltaic module according to the orientation and distribution position of each photovoltaic module in the target area includes: The sampling quantity of photovoltaic components in different orientations is determined according to the orientation, distribution position and quantity of each photovoltaic component in the target area, and each photovoltaic component is sampled according to the sampling quantity.

3. The method for determining the irradiance of a photovoltaic module according to claim 2, characterized in that: The step of determining the number of samples of photovoltaic components in different orientations according to the orientation, distribution position and quantity of each photovoltaic component in the target area includes: Substituting the orientation and distribution position of each photovoltaic module in the target area into a first preset formula to obtain the sampling number of photovoltaic modules in different orientations; Among them, the first preset formula is: In the formula, S i represents the number of samples of PV panels in the i-th direction, k represents the adjustment coefficient, N total Represents the total number of PV panels in the target area, A total Represents the total area of ​​the target area, N i represents the number of PV panels in the i-th orientation, P i The distribution position coefficient of the PV modules in the i-th orientation, θ i Represents the angle of the PV module facing the i-th direction; θ ideal Angle indicating the ideal orientation of a PV panel.

4. The method for determining the irradiance of a photovoltaic module according to claim 2, characterized in that: The method further comprises: determining the sampling quantity of photovoltaic components in different directions according to the directions, distribution positions and quantities of each photovoltaic component in the target area, and sampling each photovoltaic component according to the sampling quantity; Get the current altitude and azimuth of the sun; For any of the target photovoltaic components, an orientation correction factor of the target photovoltaic component is calculated according to the altitude angle and azimuth angle of the sun and the orientation of the target photovoltaic component.

5. The method for determining the irradiance of a photovoltaic module according to claim 1, characterized in that: The determining the first irradiance according to the orientation of the target photovoltaic assembly and the first operating parameter includes: Substituting the orientation of the target photovoltaic component, and the short-circuit current, component temperature, and open-circuit voltage in the first operating parameters into a second preset formula to obtain a first irradiance; Wherein, the second preset formula is: Where G represents the first irradiance, I sc,i represents the short-circuit current of the i-th target PV module, α represents the temperature coefficient of the short-circuit current, T mod,i represents the component temperature of the i-th target PV module, T ref Indicates the reference temperature, I sc,ref represents the short-circuit current under reference conditions, β represents the temperature coefficient of the open-circuit voltage, T a Indicates the ambient temperature, G ref represents the reference irradiance, η clean Indicates the cleanliness correction factor, K i The orientation correction factor of the i-th target PV module, S i Indicates the number of samples of PV panels facing the i-th direction, N i Indicates the number of PV panels in the i-th orientation.

6. The method for determining the irradiance of a photovoltaic module according to claim 1, characterized in that: After sampling the second operating parameter of the cleaned target photovoltaic assembly, the method further includes: A cleanliness correction factor is determined according to the first operating parameter and the second operating parameter.

7. The method for determining the irradiance of a photovoltaic module according to claim 1, characterized in that: After determining the second irradiance according to the orientation of the cleaned target photovoltaic assembly and the second operating parameter, the method further includes: If the second irradiance exceeds a preset irradiance range, a warning prompt is generated.

8. A system for determining irradiance of a photovoltaic module, characterized in that: include: A first operating parameter determination module is used to sample each photovoltaic component according to the orientation and distribution position of each photovoltaic component in the target area to obtain a current first operating parameter of the target photovoltaic component; A first irradiance determination module, configured to determine a first irradiance according to the orientation of the target photovoltaic assembly and the first operating parameter; A photovoltaic component cleaning module, configured to start a self-cleaning mode to clean the target photovoltaic component if the first irradiance exceeds a preset irradiance range; The second irradiance determination module is used to sample a second operating parameter of the cleaned target photovoltaic assembly and determine a second irradiance according to the orientation of the cleaned target photovoltaic assembly and the second operating parameter.

9. An electronic device, characterized in that: It includes a processor, a memory, a user interface and a network interface, the memory is used to store instructions, the user interface and the network interface are used to communicate with other devices, and the processor is used to execute the instructions stored in the memory so that the electronic device executes the method as described in any one of claims 1-7.

10. A computer storage medium, characterized in that: The computer storage medium stores instructions, and when the instructions are executed, the method according to any one of claims 1 to 7 is executed.

Citation Information

Cited By

  • Irradiance detection method and device, PVT heat pump system and storage medium

    CN122429487A