Ventilation system of electrically-driven fracturing frequency conversion device

By optimizing the air duct structure in the electric fracturing frequency converter, the problem of poor heat dissipation caused by the compact design was solved, achieving efficient heat dissipation and ensuring the performance and lifespan of the equipment.

CN119031676APending Publication Date: 2024-11-26AOAISI PETROLEUM ENG SERVICES CHENGDU CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411332081.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-24
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

Existing compact electric fracturing frequency converters suffer from poor heat dissipation due to their compact design limiting the space for heat dissipation, which affects the performance and lifespan of the frequency converter.

Method used

A ventilation system for an electric fracturing frequency converter was designed, including a frequency converter room, a transformer room, and an electrical control room inside a container. Multiple air inlet and outlet channels were set up, and the air duct structure was optimized to improve heat dissipation efficiency. The operation and maintenance of the frequency converter were completed in the maintenance channel, increasing the air intake and heat dissipation effect.

Benefits of technology

By optimizing the air duct structure, the air intake area and air volume of the frequency converter room and transformer room have been increased, ensuring efficient heat dissipation of the equipment and guaranteeing its performance and lifespan.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119031676A_ABST
    Figure CN119031676A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of electrically-driven fracturing devices, in particular to a ventilation system of an electrically-driven fracturing frequency conversion device, which comprises a container and a ventilation assembly, the ventilation assembly comprises a frequency conversion chamber air inlet channel, a transformation chamber air inlet channel, a maintenance channel and an air outlet component, and the maintenance channel is arranged in the container. Operation and maintenance of the frequency converter are completed in the maintenance channel, meanwhile, the maintenance channel is a main channel for on-site air to enter the frequency conversion chamber, the distance of moisture brought in by the first-layer air inlet filtering system to the interior of the frequency converter is increased through the maintenance channel, and better protection operation is achieved for second-layer filtering of the frequency converter. By optimizing the air duct, the air inlet area and the air inlet amount of the frequency conversion chamber and the transformer chamber are greatly improved; meanwhile, heat generated by the equipment can be rapidly taken away through the design of the three-face air outlet components of the container, the purpose of efficient gas circulation is achieved, the heat dissipation effect is better, and the performance and the service life of all the equipment in the container are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric-driven fracturing devices, and in particular to a ventilation system of an electric-driven fracturing frequency conversion device. Background Art

[0002] Electric-driven fracturing equipment is a fracturing equipment that abandons traditional diesel-driven fracturing equipment and relies on electricity to provide power for related operations. During the operation, the discharge and output pressure of the entire system can be adjusted by controlling the voltage and current. It not only has higher operability, but also effectively changes the stability of traditional diesel-driven fracturing equipment. The current driving method adopted by electric-driven fracturing equipment is to use industrial power grids and gas-fired power stations to generate electricity, introduce electricity into the frequency conversion control system through the power distribution system, and output it to the frequency conversion motor after rectification and inversion, thereby driving the mechanical fracturing pump to work. Since the frequency conversion system in the existing electric-driven fracturing equipment is relatively complex, the cost of the frequency conversion system currently accounts for more than 45% of the total equipment cost, and the cost of electric-driven fracturing equipment needs to be further controlled.

[0003] The existing announcement number CN218293569U discloses a compact electric-driven fracturing frequency conversion device, a container with a centrally symmetrical distribution inside, a set of frequency converters are placed on the left and right sides of the inner space of the container, and the two sets of frequency converters operate independently of each other, and a transformer room, a frequency converter room and an electric control room are arranged on the inner side of the container, and the electric control room is equipped with a power distribution cabinet and an integrated control cabinet; the compact electric-driven fracturing frequency conversion device adopts a one-to-two technology, that is, one frequency converter skid tows two pump skids, and the compact layout of the frequency converter skid achieves the characteristics of high space utilization and small site footprint. At the same time, the setting of the frequency converter skid body material makes it have sufficient strength, which is convenient for overall lifting and dragging. In addition, in order to compress the volume of the container, no maintenance passage is set inside the container, and the operation and maintenance of the transformer and the frequency converter can be entered after opening the container door, saving the entire space of the room and saving costs.

[0004] However, the inverter will generate a lot of heat during operation, and the compact electric fracturing inverter device may limit the heat dissipation space due to its compact design. If the heat dissipation is poor, the inverter temperature may be too high, thus affecting its performance and life. Summary of the invention

[0005] The purpose of the present invention is to provide a ventilation system for an electric-driven fracturing frequency conversion device, which solves the problem of poor heat dissipation caused by limited heat dissipation space due to the compact design of the existing compact electric-driven fracturing frequency conversion device.

[0006] To achieve the above-mentioned purpose, the present invention provides a ventilation system for an electric-driven fracturing frequency conversion device, comprising a container, the center of the container is symmetrical, a set of frequency converters are placed on the left and right sides of the middle of the container, and they operate independently of each other, a transformer room, a frequency conversion room and an electric control room are arranged in the container, the frequency conversion room contains a frequency converter and a control unit, both of which are located in the same compartment, the transformer room is located at both ends of the container, the electric control room is located in the center of the container, there are two frequency conversion rooms and two transformer rooms, the two frequency conversion rooms are located between the two transformer rooms, and a ventilation component is also included;

[0007] The ventilation assembly includes a frequency conversion room air inlet channel, a transformer room air inlet channel, a maintenance channel and an air outlet component. There are multiple frequency conversion room air inlet channels, and the multiple frequency conversion room air inlet channels are respectively located on the surface of the container. The maintenance channel is located above the frequency conversion room. There are three transformer room air inlet channels, and the three transformer room air inlet channels are respectively located on the front of the transformer room, the lower half of the back of the transformer room and both sides of the maintenance channel. The air outlet component is arranged on the container.

[0008] Wherein, the air outlet component includes a frequency conversion chamber air outlet channel and a transformer chamber air outlet channel, the frequency conversion chamber air outlet channel is located above the container; the transformer chamber air outlet channel is located at the upper half of both sides of the container and above the container.

[0009] Among them, the ventilation system of the electric-driven fracturing frequency conversion device also includes an incoming line switch cabinet, and the incoming line switch cabinet is located below the frequency conversion room.

[0010] Wherein, the ventilation system of the electric-driven fracturing frequency conversion device also includes a PT cabinet, and the PT cabinet is located on a side of the incoming switch cabinet away from the transformer room.

[0011] The container is also provided with a high-voltage input and output wiring room, and the high-voltage input and output room is located on a side of the PT cabinet away from the incoming switch cabinet.

[0012] The container is further provided with a low voltage input and output wiring room, and the low voltage input and output wiring room is located on a side of the high voltage input and output wiring room away from the PT cabinet.

[0013] The ventilation system of an electric-driven fracturing frequency conversion device of the present invention is equipped with a power distribution cabinet, a frequency conversion cabinet and an integrated control cabinet in the electric control room, and the phase-shifting transformer is placed in the transformer room. By adopting the one-to-two technology, that is, one frequency conversion skid tows two pump skids, and the frequency conversion skid is compactly arranged, the space utilization rate is high and the site area is small. In addition, the maintenance channel is arranged inside the container, and the operation and maintenance of the frequency converter are completed in the maintenance channel. At the same time, the maintenance channel is also the main channel for the on-site air to enter the frequency conversion room, and the water vapor brought in by the first-layer air intake filtration system increases the distance to the inside of the frequency converter through the maintenance channel, which plays a better protective role for the second-layer filtration of the frequency converter. Through the optimization of the air duct, the air intake area and air intake volume of the frequency conversion room and the transformer room are greatly improved; at the same time, the design of the air outlet components on the three sides of the container also satisfies the requirement of quickly taking away the heat generated by the equipment, so as to achieve the purpose of efficient gas circulation, and the heat dissipation effect is better, so as to ensure the performance and life of each equipment in the container. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below.

[0015] Figure 1 It is a schematic diagram of the structure inside the container of the present invention.

[0016] Figure 2 It is a front view of the ventilation system of the electric-driven fracturing frequency conversion device of the present invention.

[0017] Figure 3 It is a rear view of the ventilation system of the electric-driven fracturing frequency conversion device of the present invention.

[0018] Figure 4 It is a side view of the ventilation system of the electric-driven fracturing frequency conversion device of the present invention.

[0019] In the figure: 101-container, 102-transformer room, 103-frequency conversion room, 104-electric control room, 105-frequency conversion room air inlet channel, 106-transformer room air inlet channel, 107-maintenance channel, 108-frequency conversion room air outlet channel, 109-transformer room air outlet channel, 110-incoming switch cabinet, 111-PT cabinet, 112-high voltage input and output wiring room, 113-low voltage input and output wiring room. DETAILED DESCRIPTION

[0020] Embodiments of the present invention are described in detail below. Examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, but should not be construed as limiting the present invention.

[0021] The first embodiment of the present application is:

[0022] See also Figures 1 to 4 ,in, Figure 1 It is a schematic diagram of the structure inside the container 101 of the present invention. Figure 2 It is a front view of the ventilation system of the electric-driven fracturing frequency conversion device of the present invention. Figure 3 It is a rear view of the ventilation system of the electric-driven fracturing frequency conversion device of the present invention. Figure 4 It is a side view of the ventilation system of the electric-driven fracturing frequency conversion device of the present invention. The present invention provides a ventilation system of the electric-driven fracturing frequency conversion device: comprising a container 101, a ventilation assembly, an incoming line switch cabinet 110, a PT cabinet 111 and a phase-shifting transformer, wherein the container 101 is provided with a transformer room 102, a frequency conversion room 103, an electric control room 104, a high-voltage input and output wiring room 112 and a low-voltage input and output wiring room 113, wherein the ventilation assembly comprises a frequency conversion room air inlet channel 105, a transformer room air inlet channel 106, a maintenance channel 107 and an air outlet component, wherein the air outlet component comprises a frequency conversion room air outlet channel 108 and a transformer room air outlet channel 109.

[0023] According to this specific embodiment, the container 101 is centrally symmetrical. A set of frequency converters are placed on the left and right sides of the middle of the container 101, and they operate independently of each other. The frequency converter room 103 contains the frequency converter and the control unit, which are all located in the same compartment. The transformer room 102 is located at both ends of the container 101, and the electric control room 104 is located in the center of the container 101. There are two frequency converter rooms 103 and two transformer rooms 102, and the two frequency converter rooms 103 are located between the two transformer rooms 102. The container 101 is divided into three spaces, namely the transformer room 102, the control room 104 located in the container 101, and the control room 104 located in the center of the container 101. The two end sides of the box 101, the frequency conversion room 103 and the electric control room 104, the electric control room 104 is equipped with a power distribution cabinet, a frequency conversion cabinet and an integrated control cabinet, the transformer room 102 is placed with a phase-shifting transformer, and the frequency conversion room 103 is placed with a frequency converter. By adopting the one-to-two technology, that is, one frequency conversion skid tows two pump skids, the frequency conversion skid has a compact layout, which achieves the characteristics of high space utilization and small site footprint. At the same time, the frequency conversion skid body material is insulated with polystyrene insulation and environmentally friendly materials, and has sufficient strength. The steel plate is sealed on the bottom of the frequency conversion skid to make it have sufficient strength for overall lifting and dragging.

[0024] Among them, the number of the frequency conversion room air inlet channels 105 is multiple, and the multiple frequency conversion room air inlet channels 105 are respectively located on the surface of the container 101, the maintenance channel 107 is located above the frequency conversion room 103, and the transformer room air inlet channels 106 are provided at three locations, and the three transformer room air inlet channels 106 are respectively located on the front of the transformer room 102, the lower half of the back of the transformer room 102 and on both sides of the maintenance channel 107, and the air outlet component is provided on the container 101. The inverter room air inlet channel 105 is arranged at the front of the container 101. The transformer room 102 of the container 101 is designed with three transformer room air inlet channels 106, namely the transformer room 102 at the front of the container 101, the lower half of the transformer room 102 at the back of the container 101, and both sides of the maintenance channel 107. The inverter room 103 in the middle of the container 101 is provided with the maintenance channel 107. Two transformer room air inlet channels 106 of the transformer room 102 are provided at both ends of the maintenance channel 107. The inverter operation and maintenance are completed in the maintenance channel 107. At the same time, the maintenance channel 107 is also the main channel for on-site air to enter the inverter room. The water vapor brought in by the first-layer air inlet filtration system passes through the maintenance channel 107 to increase the distance to the inside of the inverter, thereby providing better protection for the second-layer filtration of the inverter.

[0025] Secondly, the frequency conversion room air outlet channel 108 is located above the container 101; the transformer room air outlet channel 109 is located at the upper half of both sides of the container 101 and above the container 101. A plurality of frequency conversion room air outlet channels 108 are arranged on the front of the container 101, and the transformer room 102 air outlet channels are arranged on the upper half of both sides of the container 101; self-hanging shutters are arranged at the air outlets of the frequency conversion room air outlet channel 108 and the transformer room air outlet channel 109, and when the device is not working, the air outlet is automatically closed to prevent foreign matter or rain from entering the device.

[0026] Meanwhile, the incoming switch cabinet 110 is located below the frequency conversion room 103. The PT cabinet 111 is located on the side of the incoming switch cabinet 110 away from the transformer room 102. The high-voltage input and output room is located on the side of the PT cabinet 111 away from the incoming switch cabinet 110. The low-voltage input and output wiring room 113 is located on the side of the high-voltage input and output wiring room 112 away from the PT cabinet 111. The phase-shifting transformer is located in the transformer room 102. The container 101 is also provided with the high-voltage input and output wiring room 112 and the low-voltage input and output wiring room 113 for external interfaces, the incoming switch cabinet 110 and the PT cabinet 111 for providing power to the transformer room 102; the phase-shifting transformer is placed in the transformer room 102, and the rectifier cabinet and inverter of the frequency conversion cabinet are placed in the frequency conversion room.

[0027] The ventilation system of the electric-driven fracturing frequency conversion device of the present embodiment adopts the one-to-two technology, that is, one frequency conversion skid tows two pump skids. Through the compact layout of the frequency conversion skid, the space utilization rate is high and the site area is small. In addition, the maintenance channel 107 is arranged inside the container 101, and the operation and maintenance of the frequency converter are completed in the maintenance channel 107. At the same time, the maintenance channel 107 is also the main channel for the on-site air to enter the frequency conversion room 103, and the water vapor brought in by the first-layer air intake filtration system increases the distance to the inside of the frequency converter through the maintenance channel 107, which plays a better protective role for the second-layer filtration of the frequency converter. Through the optimization of the air duct, the air intake area and air intake volume of the frequency conversion room 103 and the transformer room 102 are greatly improved; at the same time, the design of the air outlet components on the three sides of the container 101 also satisfies the requirement of quickly taking away the heat generated by the equipment, achieving the purpose of efficient gas circulation, better heat dissipation effect, and ensuring the performance and life of each device in the container 101.

[0028] What is disclosed above is only one or more preferred embodiments of the present application, and cannot be used to limit the scope of rights of the present application. Ordinary technicians in this field can understand that all or part of the processes of implementing the above embodiments and equivalent changes made according to the claims of the present application are still within the scope covered by the present application.

Claims

1. A ventilation system for an electric-driven fracturing frequency conversion device, comprising a container, wherein the container is symmetrical in center, and a set of frequency converters are placed on the left and right sides of the middle of the container, and the frequency converters operate independently of each other. A transformer room, a frequency conversion room, and an electric control room are arranged in the container, and the frequency conversion room contains a frequency converter and a control unit, which are all located in the same compartment. The transformer room is located at both ends of the container, and the electric control room is located in the center of the container. There are two frequency conversion rooms and two transformer rooms, and the two frequency conversion rooms are located between the two transformer rooms. The characteristics are as follows: Also included is a ventilation assembly; The ventilation assembly includes a frequency conversion room air inlet channel, a transformer room air inlet channel, a maintenance channel and an air outlet component. There are multiple frequency conversion room air inlet channels, and the multiple frequency conversion room air inlet channels are respectively located on the surface of the container. The maintenance channel is located above the frequency conversion room. There are three transformer room air inlet channels, and the three transformer room air inlet channels are respectively located on the front of the transformer room, the lower half of the back of the transformer room and both sides of the maintenance channel. The air outlet component is arranged on the container.

2. The ventilation system of the electric-driven fracturing frequency conversion device according to claim 1, characterized in that: The air outlet component includes a frequency conversion chamber air outlet channel and a transformer chamber air outlet channel. The frequency conversion chamber air outlet channel is located above the container; the transformer chamber air outlet channel is located at the upper parts of both sides of the container and above the container.

3. The ventilation system of the electric-driven fracturing frequency conversion device according to claim 1, characterized in that: The ventilation system of the electric-driven fracturing frequency conversion device further comprises an incoming line switch cabinet, and the incoming line switch cabinet is located below the frequency conversion room.

4. The ventilation system of the electric-driven fracturing frequency conversion device according to claim 3, characterized in that: The ventilation system of the electric-driven fracturing frequency conversion device also includes a PT cabinet, which is located on a side of the incoming switch cabinet away from the transformer room.

5. The ventilation system of the electric-driven fracturing frequency conversion device according to claim 4, characterized in that: The container is also provided with a high-voltage input and output wiring room, and the high-voltage input and output room is located on a side of the PT cabinet away from the incoming switch cabinet.

6. The ventilation system of the electric-driven fracturing frequency conversion device according to claim 5, characterized in that: The container is also provided with a low voltage input and output wiring room, and the low voltage input and output wiring room is located at a side of the high voltage input and output wiring room away from the PT cabinet.